IR 05000016/2008010: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:January 6, 2009 Mr. Joseph Plona Site Vice President Nuclear Generation The Detroit Edison Company 6400 North Dixie Highway Newport, MI 48166
{{#Wiki_filter:January 6, 2009


SUBJECT: NRC INSPECTION REPORT 050-00016/08-010(DNMS) - ENRICO FERMI UNIT 1
==SUBJECT:==
NRC INSPECTION REPORT 050-00016/08-010(DNMS) - ENRICO  
 
FERMI UNIT 1


==Dear Mr. Plona:==
==Dear Mr. Plona:==
On December 19, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at the Enrico Fermi Unit 1 facility. The purpose of the inspection was to observe the conduct of characterization surveys of two excavated sites (Survey Unit OOL-01-02) within the footprint of the original survey area OOL-01, and to determine whether decommissioning activities were conducted safely and in accordance with the survey plan, "CHAR-OOL01," and NRC requirements. The inspector performed direct radiation surveys and collected soil samples from two excavated sites during an on-site inspection. At the conclusion of the on-site inspection on September 30, 2008, the NRC inspector discussed the findings with members of your staff. On December 19, 2008, the inspector completed an in-office review of the sample analysis results and discussed the findings with Mr. Martin C. Erickson of your staff. The inspection consisted of an examination of activities at the facility as they relate to safety and compliance with the Commission's rules and regulations. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of a selective examination of procedures and representative records, field observations of activities in progress, and interviews with personnel. Based on the results of this inspection, the NRC did not identify any violations.
On December 19, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at the Enrico Fermi Unit 1 facility. The purpose of the inspection was to observe the conduct of characterization surveys of two excavated sites (Survey Unit OOL-01-02) within the footprint of the original survey area OOL-01, and to determine whether decommissioning activities were conducted safely and in accordance with the survey plan, CHAR-OOL01, and NRC requirements. The inspector performed direct radiation surveys and collected soil samples from two excavated sites during an on-site inspection. At the conclusion of the on-site inspection on September 30, 2008, the NRC inspector discussed the findings with members of your staff. On December 19, 2008, the inspector completed an in-office review of the sample analysis results and discussed the findings with Mr. Martin C. Erickson of your staff.
 
The inspection consisted of an examination of activities at the facility as they relate to safety and compliance with the Commissions rules and regulations. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of a selective examination of procedures and representative records, field observations of activities in progress, and interviews with personnel.
 
Based on the results of this inspection, the NRC did not identify any violations.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). The NRC's document system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. We will gladly discuss any questions you have concerning this inspection.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). The NRCs document system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. We will gladly discuss any questions you have concerning this inspection.


Sincerely,
Sincerely,
/RA/ Christine Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Docket No. 050000016 License No. DPR-9 Enclosure: Inspection Report 050-00016/08-010(DNMS)  
/RA/  
 
Christine Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch  
 
Docket No. 050000016 License No. DPR-9  
 
Enclosure:
Inspection Report 050-00016/08-010(DNMS)  


cc w/encl:
cc w/encl:
}}
}}

Latest revision as of 13:48, 14 January 2025

IR 050-00016-08-010 (DNMS) on 09/30/08 and 12/19/08 for Fermi, Unit 1
ML090060876
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/06/2009
From: Christine Lipa
NRC/RGN-III/DNMS/DB
To: Plona J
Detroit Edison
References
IR-08-010
Download: ML090060876 (1)


Text

January 6, 2009

SUBJECT:

NRC INSPECTION REPORT 050-00016/08-010(DNMS) - ENRICO

FERMI UNIT 1

Dear Mr. Plona:

On December 19, 2008, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at the Enrico Fermi Unit 1 facility. The purpose of the inspection was to observe the conduct of characterization surveys of two excavated sites (Survey Unit OOL-01-02) within the footprint of the original survey area OOL-01, and to determine whether decommissioning activities were conducted safely and in accordance with the survey plan, CHAR-OOL01, and NRC requirements. The inspector performed direct radiation surveys and collected soil samples from two excavated sites during an on-site inspection. At the conclusion of the on-site inspection on September 30, 2008, the NRC inspector discussed the findings with members of your staff. On December 19, 2008, the inspector completed an in-office review of the sample analysis results and discussed the findings with Mr. Martin C. Erickson of your staff.

The inspection consisted of an examination of activities at the facility as they relate to safety and compliance with the Commissions rules and regulations. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of a selective examination of procedures and representative records, field observations of activities in progress, and interviews with personnel.

Based on the results of this inspection, the NRC did not identify any violations.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). The NRCs document system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. We will gladly discuss any questions you have concerning this inspection.

Sincerely,

/RA/

Christine Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch

Docket No. 050000016 License No. DPR-9

Enclosure:

Inspection Report 050-00016/08-010(DNMS)

cc w/encl: