IR 05000133/2009001: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 02/12/2009
| issue date = 02/12/2009
| title = IR 05000133-09-001, on 01/12/09 Through 01/15/09, Humboldt Bay Power Plant, Unit 3
| title = IR 05000133-09-001, on 01/12/09 Through 01/15/09, Humboldt Bay Power Plant, Unit 3
| author name = Whitten J E
| author name = Whitten J
| author affiliation = NRC/RGN-IV/DNMS/NMSB-B
| author affiliation = NRC/RGN-IV/DNMS/NMSB-B
| addressee name = Conway J T
| addressee name = Conway J
| addressee affiliation = Pacific Gas & Electric Co
| addressee affiliation = Pacific Gas & Electric Co
| docket = 05000133
| docket = 05000133
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:February 12, 2009
[[Issue date::February 12, 2009]]


Mr. John Senior Vice President-Generation
==SUBJECT:==
& Chief Nuclear Officer Pacific Gas and Electric Company P.O. Box 3 Mail Code 104/6/601 Avila Beach, California 93424
NRC INSPECTION REPORT 050-00133/09-001
 
SUBJECT: NRC INSPECTION REPORT 050-00133/09-001


==Dear Mr. Conway:==
==Dear Mr. Conway:==
This refers to the inspection conducted on January 12-15, 2009, at the Humboldt Bay Power Plant, Unit 3 facility. This inspection was an examination of activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. Within these areas, the inspection consisted of selected examination of procedures and representative records, observations of activities, and interviews with personnel.
This refers to the inspection conducted on January 12-15, 2009, at the Humboldt Bay Power Plant, Unit 3 facility. This inspection was an examination of activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license. Within these areas, the inspection consisted of selected examination of procedures and representative records, observations of activities, and interviews with personnel.


This inspection consisted of a routine inspection of decommissioning activities and included a confirmatory survey of the area where the new generation plant will be constructed. The enclosed report presents the results of this inspection. In summary, the inspector determined that you were conducting decommissioning activities in compliance with regulatory and license requirements.
This inspection consisted of a routine inspection of decommissioning activities and included a confirmatory survey of the area where the new generation plant will be constructed. The enclosed report presents the results of this inspection. In summary, the inspector determined that you were conducting decommissioning activities in compliance with regulatory and license requirements.
Line 33: Line 30:
During the inspection, representatives from Oak Ridge Institute for Science and Education (ORISE) conducted confirmatory surveys in the new generation plant area. The confirmatory surveys included ambient gamma radiation scan surveys and soil sampling. The results of the survey were not available at the end of the inspection period. The results will be presented to you at a later date under separate correspondence.
During the inspection, representatives from Oak Ridge Institute for Science and Education (ORISE) conducted confirmatory surveys in the new generation plant area. The confirmatory surveys included ambient gamma radiation scan surveys and soil sampling. The results of the survey were not available at the end of the inspection period. The results will be presented to you at a later date under separate correspondence.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if you choose to provide one, will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system (ADAMS), accessible from the NRC's Web site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction. Mr. John Should you have any questions concerning this inspection, please contact Mr. Robert Evans, Senior Health Physicist, at (817) 860-8234, or the undersigned at (817) 860-8197.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if you choose to provide one, will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS), accessible from the NRCs Web site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction.
 
UNITED STATES NUCLEAR REGULATORY COMM ISSION R E GI ON I V 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125
 
Mr. John Should you have any questions concerning this inspection, please contact Mr. Robert Evans, Senior Health Physicist, at (817) 860-8234, or the undersigned at (817) 860-8197.
 
Sincerely,
/RA/
 
Jack E. Whitten, Chief
 
Nuclear Materials Safety Branch B


Sincerely,/RA/
Docket No.: 050-00133 License No.: DPR-7


Jack E. Whitten, Chief Nuclear Materials Safety Branch B Docket No.: 050-00133 License No.: DPR-7
Enclosure:
NRC Inspection Report 050-00133/09-001


===Enclosure:===
cc w/enclosure:
NRC Inspection Report 050-00133/09-001 cc w/enclosure: Donna Jacobs, Vice President Nuclear Services Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424  
Donna Jacobs, Vice President Nuclear Services Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424  


Antonio Fernandez, Esq. PG&E P.O. Box 7442 San Francisco, CA 94120  
Antonio Fernandez, Esq.
 
PG&E P.O. Box 7442 San Francisco, CA 94120  


Paul Roller, Director and Plant Manager Humboldt Bay Power Plant, PG&E 1000 King Salmon Avenue Eureka, CA 95505  
Paul Roller, Director and Plant Manager Humboldt Bay Power Plant, PG&E 1000 King Salmon Avenue Eureka, CA 95505  


Chairman Humboldt County Board of Supervisors County Courthouse 825 Fifth Street Eureka, CA 95501 Law Office of Linda J. Brown, Esq. 300 Drake's Landing Road, Suite 172 Greenbrae, CA 94904 Regional Radiation Representative U. S. Environmental Protection Agency Region IX Office 75 Hawthorne Street San Francisco, CA 94105  
Chairman Humboldt County Board of Supervisors County Courthouse 825 Fifth Street Eureka, CA 95501  
 
Law Office of Linda J. Brown, Esq.
 
300 Drakes Landing Road, Suite 172 Greenbrae, CA 94904  
 
Regional Radiation Representative U. S. Environmental Protection Agency Region IX Office 75 Hawthorne Street San Francisco, CA 94105  


Mr. John
Mr. John
}}
}}

Latest revision as of 13:11, 14 January 2025

IR 05000133-09-001, on 01/12/09 Through 01/15/09, Humboldt Bay Power Plant, Unit 3
ML090440322
Person / Time
Site: Humboldt Bay
Issue date: 02/12/2009
From: Whitten J
NRC/RGN-IV/DNMS/NMSB-B
To: Conway J
Pacific Gas & Electric Co
References
IR-09-001
Download: ML090440322 (14)


Text

February 12, 2009

SUBJECT:

NRC INSPECTION REPORT 050-00133/09-001

Dear Mr. Conway:

This refers to the inspection conducted on January 12-15, 2009, at the Humboldt Bay Power Plant, Unit 3 facility. This inspection was an examination of activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license. Within these areas, the inspection consisted of selected examination of procedures and representative records, observations of activities, and interviews with personnel.

This inspection consisted of a routine inspection of decommissioning activities and included a confirmatory survey of the area where the new generation plant will be constructed. The enclosed report presents the results of this inspection. In summary, the inspector determined that you were conducting decommissioning activities in compliance with regulatory and license requirements.

During the inspection, representatives from Oak Ridge Institute for Science and Education (ORISE) conducted confirmatory surveys in the new generation plant area. The confirmatory surveys included ambient gamma radiation scan surveys and soil sampling. The results of the survey were not available at the end of the inspection period. The results will be presented to you at a later date under separate correspondence.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if you choose to provide one, will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (ADAMS), accessible from the NRCs Web site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the Public without redaction.

UNITED STATES NUCLEAR REGULATORY COMM ISSION R E GI ON I V 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125

Mr. John Should you have any questions concerning this inspection, please contact Mr. Robert Evans, Senior Health Physicist, at (817) 860-8234, or the undersigned at (817) 860-8197.

Sincerely,

/RA/

Jack E. Whitten, Chief

Nuclear Materials Safety Branch B

Docket No.: 050-00133 License No.: DPR-7

Enclosure:

NRC Inspection Report 050-00133/09-001

cc w/enclosure:

Donna Jacobs, Vice President Nuclear Services Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424

Antonio Fernandez, Esq.

PG&E P.O. Box 7442 San Francisco, CA 94120

Paul Roller, Director and Plant Manager Humboldt Bay Power Plant, PG&E 1000 King Salmon Avenue Eureka, CA 95505

Chairman Humboldt County Board of Supervisors County Courthouse 825 Fifth Street Eureka, CA 95501

Law Office of Linda J. Brown, Esq.

300 Drakes Landing Road, Suite 172 Greenbrae, CA 94904

Regional Radiation Representative U. S. Environmental Protection Agency Region IX Office 75 Hawthorne Street San Francisco, CA 94105

Mr. John