ML090770162: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML090770162 | | number = ML090770162 | ||
| issue date = 06/03/2009 | | issue date = 06/03/2009 | ||
| title = | | title = TVA, Presentation Slides for Browns Ferry, Unit 1 | ||
| author name = Brown E | | author name = Brown E | ||
| author affiliation = NRC/NRR/DORL/LPLII-2 | | author affiliation = NRC/NRR/DORL/LPLII-2 | ||
| Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:-- | ||
Z JJ | |||
() | |||
() | S:S: | ||
~ | |||
CD | |||
('") | ~ | ||
:: | CD | ||
('") | |||
~ | |||
::r ::J | |||
-L to 0)1 I\\)~ | |||
8~ | |||
COeD 11- | |||
::J OJ | |||
...., o | |||
:E | |||
::::J en | |||
::;i~ | |||
tu...., | |||
::::J en'< | |||
r-+ | r-+ | ||
o >> | |||
::::J CD < | |||
tu 11 c:: | |||
CD | |||
tu | |||
CD | |||
(J) c 0 | |||
3 Q.)- | |||
""C Q.) | |||
("") | |||
Q.) " | |||
(Q CD 0 < | |||
CD ;: | |||
Q.) | CD | ||
~ | |||
(J) | |||
C 0 | |||
3 Q.)- | |||
en | |||
("") | |||
::::r CD | |||
: a. | |||
c - | |||
CD C | |||
""C | |||
: a. | |||
Q.) | |||
CD CO> | |||
CD | CD | ||
:::J | |||
: a. | |||
Q) | |||
: | |||
c | en c | ||
cr 3 | |||
Ol en o | Ol en o | ||
::r. | ::r. | ||
eo | eo | ||
: a. | |||
c CD C | |||
-c | |||
: a. | |||
Ol eo | |||
Revised Schedule | Revised Schedule | ||
* January 28 meeting - NRC requested that the submittal schedule be reviewed to determine best possible dates | * January 28 meeting - NRC requested that the submittal schedule be reviewed to determine best possible dates | ||
* Areva and TVA have agreed on approach to improve schedule | * Areva and TVA have agreed on approach to improve schedule | ||
- Preliminary core design work will be eliminated | |||
- Final core design has commenced using best available energy plan estimate for current cycle | |||
- TVA review time for selected reload inputs and analyses will be accelerated | |||
Revised Schedule (cant) | Revised Schedule (cant) | ||
* Areva will deliver all reload documentation needed to support submittal by 10/23/09 | * Areva will deliver all reload documentation needed to support submittal by 10/23/09 | ||
* TVA will require time to prepare final submittal package and complete internal reviews and approvals | * TVA will require time to prepare final submittal package and complete internal reviews and approvals | ||
- TVA will commit to a submittal date of 12/11/09 | |||
en c | en c | ||
c 3 | c 3 | ||
Dl | |||
-c Dl o | |||
=" | |||
Dl | |||
Dl co CD o | Dl co CD o | ||
CD | |||
CD | ~ | ||
CD | |||
~ | |||
CD | |||
LAR Contents | LAR Contents LAR will be a complete package No supplemental information planned to be submitted | ||
* Will include the following reports: | * Will include the following reports: | ||
Thermal Hydraulic Design Report Mechanical Design Report ANP-2637 (BWR Licensing Methodology Compendium) | |||
Fuel Cycle Design Report Reload Safety Report | |||
* Will not submit the LOCA break spectrum report Will provide justification as to unit 1 applicability | |||
* Will not submit the LOCA break spectrum report | |||
* Will include the following Tech Spec related changes: | * Will include the following Tech Spec related changes: | ||
SLMCPR Tech Spec (if required) | |||
Tech Spec 5.6.5 update to add Areva analytical methods Tech Spec Bases page changes | |||
LAR Contents (cant) | LAR Contents (cant) | ||
* LAR will also address the eleven items requested by NRC in the draft Summary of Information Request | * LAR will also address the eleven items requested by NRC in the draft Summary of Information Request | ||
- Request NRC formally issue final as soon as possible | |||
* RAI Reviews | * RAI Reviews | ||
- LAR will address the prior BFN 2/3 fuel related EPU RAls | |||
- Will also address the RAls from the Brunswick transition}} | |||
Latest revision as of 12:47, 14 January 2025
| ML090770162 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 06/03/2009 |
| From: | Ellen Brown Plant Licensing Branch II |
| To: | |
| Brown E, NRR/DORL, 415-2315 | |
| Shared Package | |
| ML090770387 | List: |
| References | |
| TAC ME0438 | |
| Download: ML090770162 (8) | |
Text
--
Z JJ
()
S:S:
~
CD
~
CD
('")
~
- r ::J
-L to 0)1 I\\)~
8~
COeD 11-
- J OJ
...., o
- E
- J en
- i~
tu....,
- J en'<
r-+
o >>
- J CD <
tu 11 c::
CD
(J) c 0
3 Q.)-
""C Q.)
("")
Q.) "
(Q CD 0 <
CD ;:
CD
~
(J)
C 0
3 Q.)-
en
("")
- r CD
- a.
c -
CD C
""C
- a.
Q.)
CD CO>
CD
- J
- a.
Q)
en c
cr 3
Ol en o
- r.
eo
- a.
c CD C
-c
- a.
Ol eo
Revised Schedule
- January 28 meeting - NRC requested that the submittal schedule be reviewed to determine best possible dates
- Areva and TVA have agreed on approach to improve schedule
- Preliminary core design work will be eliminated
- Final core design has commenced using best available energy plan estimate for current cycle
- TVA review time for selected reload inputs and analyses will be accelerated
Revised Schedule (cant)
- Areva will deliver all reload documentation needed to support submittal by 10/23/09
- TVA will require time to prepare final submittal package and complete internal reviews and approvals
- TVA will commit to a submittal date of 12/11/09
en c
c 3
Dl
-c Dl o
="
Dl co CD o
CD
~
CD
~
LAR Contents LAR will be a complete package No supplemental information planned to be submitted
- Will include the following reports:
Thermal Hydraulic Design Report Mechanical Design Report ANP-2637 (BWR Licensing Methodology Compendium)
Fuel Cycle Design Report Reload Safety Report
- Will not submit the LOCA break spectrum report Will provide justification as to unit 1 applicability
- Will include the following Tech Spec related changes:
SLMCPR Tech Spec (if required)
Tech Spec 5.6.5 update to add Areva analytical methods Tech Spec Bases page changes
LAR Contents (cant)
- LAR will also address the eleven items requested by NRC in the draft Summary of Information Request
- Request NRC formally issue final as soon as possible
- RAI Reviews
- LAR will address the prior BFN 2/3 fuel related EPU RAls
- Will also address the RAls from the Brunswick transition