Line 2: Line 2:
| number = ML090770162
| number = ML090770162
| issue date = 06/03/2009
| issue date = 06/03/2009
| title = 03/16/09 TVA, Presentation Slides for Browns Ferry, Unit 1
| title = TVA, Presentation Slides for Browns Ferry, Unit 1
| author name = Brown E
| author name = Brown E
| author affiliation = NRC/NRR/DORL/LPLII-2
| author affiliation = NRC/NRR/DORL/LPLII-2
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:OJ
{{#Wiki_filter:--
                      ....,
Z JJ
o Z             :E JJ             ::::J
()
()             en S:S:
S:S:  
  ~     CD
~
  ~     CD       ::;i~
CD  
('")   ~     tu ....,
~
::::J     ::::J  ....,
CD
  -L  to      en'<
('")  
....0)1        --
~
::r ::J
-L to 0)1 I\\)~
8~
COeD 11-
::J OJ
...., o
:E
::::J en
::;i~
tu....,
::::J en'<
r-+
r-+
                        .........
o >>
I\)~          --
::::J CD <
8~
tu 11 c::
o::::J >>....,
CD  
COeD                CD 11            <
tu
        --
        -::J
        ......        11 c::
CD


  * *
(J) c 0
(J)    (J) c     C 0    0 3
3 Q.)-  
,..... 3
""C Q.)
        ,.....
("")
--
Q.) "
,..... --
(Q CD 0 <
        ,.....
CD ;:
Q.)   Q.)
CD
-      -
~
""C    en Q.)   ("")
(J)
("")  ::::r CD Q.)    a.
C 0
(Q
3 Q.)-
"      c CD     -
en
("")
::::r CD
: a.
c -
CD C
""C
: a.
Q.)
CD CO>
CD
CD
                >
:::J
CO 0      C      CD
: a.
<
Q)  
CD ""C        :::J
: a.      a.
;: Q.)        Q)
-- ,.....
CD    CD
~


c en cr 3--
en c
  ,.....
cr 3
  ,.....
Ol en o
Ol en o
::r.
::r.
eo a.
c CD C
-c a.
Ol
  ,.....
eo
eo
: a.
c CD C
-c
: a.
Ol eo


Revised Schedule
Revised Schedule
* January 28 meeting - NRC requested that the submittal schedule be reviewed to determine best possible dates
* January 28 meeting - NRC requested that the submittal schedule be reviewed to determine best possible dates
* Areva and TVA have agreed on approach to improve schedule
* Areva and TVA have agreed on approach to improve schedule  
  - Preliminary core design work will be eliminated
- Preliminary core design work will be eliminated  
  - Final core design has commenced using best available energy plan estimate for current cycle
- Final core design has commenced using best available energy plan estimate for current cycle  
  - TVA review time for selected reload inputs and analyses will be accelerated
- TVA review time for selected reload inputs and analyses will be accelerated  


Revised Schedule (cant)
Revised Schedule (cant)
* Areva will deliver all reload documentation needed to support submittal by 10/23/09
* Areva will deliver all reload documentation needed to support submittal by 10/23/09
* TVA will require time to prepare final submittal package and complete internal reviews and approvals
* TVA will require time to prepare final submittal package and complete internal reviews and approvals  
  - TVA will commit to a submittal date of 12/11/09
- TVA will commit to a submittal date of 12/11/09  


en c
en c
c 3
c 3
--
Dl  
,......
-c Dl o  
,......
="
Dl
-c Dl o
="
Dl co CD o
Dl co CD o
<
CD  
CD
~
~
CD  
<
~  
--
CD
~


LAR Contents
LAR Contents LAR will be a complete package No supplemental information planned to be submitted
* LAR will be a complete package
  -  No supplemental information planned to be submitted
* Will include the following reports:
* Will include the following reports:
  -  Thermal Hydraulic Design Report
Thermal Hydraulic Design Report Mechanical Design Report ANP-2637 (BWR Licensing Methodology Compendium)
  -  Mechanical Design Report
Fuel Cycle Design Report Reload Safety Report
  -  ANP-2637 (BWR Licensing Methodology Compendium)
* Will not submit the LOCA break spectrum report Will provide justification as to unit 1 applicability
  -  Fuel Cycle Design Report
  -  Reload Safety Report
* Will not submit the LOCA break spectrum report
  -  Will provide justification as to unit 1 applicability
* Will include the following Tech Spec related changes:
* Will include the following Tech Spec related changes:
  - SLMCPR Tech Spec (if required)
SLMCPR Tech Spec (if required)
  - Tech Spec 5.6.5 update to add Areva analytical methods
Tech Spec 5.6.5 update to add Areva analytical methods Tech Spec Bases page changes  
  - Tech Spec Bases page changes


LAR Contents (cant)
LAR Contents (cant)
* LAR will also address the eleven items requested by NRC in the draft Summary of Information Request
* LAR will also address the eleven items requested by NRC in the draft Summary of Information Request  
  - Request NRC formally issue final as soon as possible
- Request NRC formally issue final as soon as possible
* RAI Reviews
* RAI Reviews  
  - LAR will address the prior BFN 2/3 fuel related EPU RAls
- LAR will address the prior BFN 2/3 fuel related EPU RAls  
  - Will also address the RAls from the Brunswick transition}}
- Will also address the RAls from the Brunswick transition}}

Latest revision as of 12:47, 14 January 2025

TVA, Presentation Slides for Browns Ferry, Unit 1
ML090770162
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 06/03/2009
From: Ellen Brown
Plant Licensing Branch II
To:
Brown E, NRR/DORL, 415-2315
Shared Package
ML090770387 List:
References
TAC ME0438
Download: ML090770162 (8)


Text

--

Z JJ

()

S:S:

~

CD

~

CD

('")

~

r ::J

-L to 0)1 I\\)~

8~

COeD 11-

J OJ

...., o

E
J en
i~

tu....,

J en'<

r-+

o >>

J CD <

tu 11 c::

CD

(J) c 0

3 Q.)-

""C Q.)

("")

Q.) "

(Q CD 0 <

CD ;:

CD

~

(J)

C 0

3 Q.)-

en

("")

r CD
a.

c -

CD C

""C

a.

Q.)

CD CO>

CD

J
a.

Q)

en c

cr 3

Ol en o

r.

eo

a.

c CD C

-c

a.

Ol eo

Revised Schedule

  • January 28 meeting - NRC requested that the submittal schedule be reviewed to determine best possible dates
  • Areva and TVA have agreed on approach to improve schedule

- Preliminary core design work will be eliminated

- Final core design has commenced using best available energy plan estimate for current cycle

- TVA review time for selected reload inputs and analyses will be accelerated

Revised Schedule (cant)

  • Areva will deliver all reload documentation needed to support submittal by 10/23/09
  • TVA will require time to prepare final submittal package and complete internal reviews and approvals

- TVA will commit to a submittal date of 12/11/09

en c

c 3

Dl

-c Dl o

="

Dl co CD o

CD

~

CD

~

LAR Contents LAR will be a complete package No supplemental information planned to be submitted

  • Will include the following reports:

Thermal Hydraulic Design Report Mechanical Design Report ANP-2637 (BWR Licensing Methodology Compendium)

Fuel Cycle Design Report Reload Safety Report

  • Will not submit the LOCA break spectrum report Will provide justification as to unit 1 applicability
  • Will include the following Tech Spec related changes:

SLMCPR Tech Spec (if required)

Tech Spec 5.6.5 update to add Areva analytical methods Tech Spec Bases page changes

LAR Contents (cant)

  • LAR will also address the eleven items requested by NRC in the draft Summary of Information Request

- Request NRC formally issue final as soon as possible

- LAR will address the prior BFN 2/3 fuel related EPU RAls

- Will also address the RAls from the Brunswick transition