| issue date = 05/13/2009
| issue date = 05/13/2009
| title = Summary of Annual Assessment Mtg - Vermont Yankee - 4/16/09
| title = Summary of Annual Assessment Mtg - Vermont Yankee - 4/16/09
| author name = Jackson D A
| author name = Jackson D
| author affiliation = NRC/RGN-I/DRP/PB5
| author affiliation = NRC/RGN-I/DRP/PB5
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:May 13, 2009  
{{#Wiki_filter:May 13, 2009 MEETING  
 
MEETING  


==SUMMARY==
==SUMMARY==
 
LICENSEE:
LICENSEE: ENTERGY NUCLEAR OPERATIONS, INC.  
ENTERGY NUCLEAR OPERATIONS, INC.
 
FACILITY:
FACILITY: VERMONT YANKEE NUCLEAR POWER STATION  
VERMONT YANKEE NUCLEAR POWER STATION  


==SUBJECT:==
==SUBJECT:==
==SUMMARY==
==SUMMARY==
OF THE APRIL 16, 2009, ANNUAL ASSESSMENT MEETING AND TOWN HALL MEETING WITH ENTERGY NUCLEAR OPERATIONS, INC.  
OF THE APRIL 16, 2009, ANNUAL ASSESSMENT MEETING AND TOWN HALL MEETING WITH ENTERGY NUCLEAR OPERATIONS, INC.
 
On April 16, 2009 at 3:30 p.m., an Annual Assessment Meeting was conducted at the Ramada Hotel and Conference Center, Brattleboro, Vermont, between the Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc. (Entergy). The NRC presented and discussed its assessment of the safety performance of the Vermont Yankee Nuclear Power Plant for the period of January 1 through December 31, 2008. In addition, at 7:00 p.m., a Town Hall Meeting was held to answer questions on the role of the NRC in ensuring safe plant operations. A list of meeting attendees is attached.
On April 16, 2009 at 3:30 p.m., an Annual Assessment Meeting was conducted at the Ramada Hotel and Conference Center, Brattleboro, Vermont, between the Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc. (Entergy). The NRC presented and discussed its assessment of the safety performance of the Vermont Yankee Nuclear Power Plant for the period of January 1 through December 31, 2008. In addition, at 7:00 p.m., a Town Hall Meeting was held to answer questions on the role of the NRC in ensuring safe plant operations. A list of meeting attendees is attached.  
The NRC presentation for the Annual Assessment Meeting included information on the NRC Organization, Reactor Oversight Program (ROP), and the results of NRC's performance assessment for Vermont Yankee. As part of this meeting, Entergy presented its perspective regarding the plant's performance and operational goals for 2009. At the end of the meeting between the NRC and Entergy, public attendees were offered the opportunity to ask questions of NRC officials.
 
The NRC presentation for the Annual Assessment Meeting included information on the NRC Organization, Reactor Oversight Program (ROP), and the results of NRC's performance assessment for Vermont Yankee. As part of this meeting, Entergy presented its perspective regarding the plant's performance and operational goals for 2009. At the end of the meeting between the NRC and Entergy, public attendees were offered the opportunity to ask questions of NRC officials.  
 
Questions raised by members of the public and local media were also addressed by the NRC.
Questions raised by members of the public and local media were also addressed by the NRC.
The NRC's assessment letter can be found on the NRC's public web page in ADAMS (ADAMS Accession No. ML090630467). A notice of the meeting was issued on March 19, 2009, and was posted on the NRC's public web page (ADAMS Accession No. ML090780293). The meeting slides can also be located in the ADAMS package (ADAMS Accession No. ML090630466).
The NRCs assessment letter can be found on the NRCs public web page in ADAMS (ADAMS Accession No. ML090630467). A notice of the meeting was issued on March 19, 2009, and was posted on the NRCs public web page (ADAMS Accession No. ML090780293). The meeting slides can also be located in the ADAMS package (ADAMS Accession No. ML090630466).
ADAMS is accessible from the NRC Web site at www.nrc.gov/reading-rm/adams.html. Sincerely,
ADAMS is accessible from the NRC Web site at www.nrc.gov/reading-rm/adams.html.
      /RA BY PAUL G. KROHN ACTING FOR/  
Sincerely,  
 
/RA BY PAUL G. KROHN ACTING FOR/
Donald Jackson, Chief Projects Branch 5 Division of Reactor Projects  
Donald Jackson, Chief Projects Branch 5 Division of Reactor Projects  


Line 45: Line 39:


A-1 LIST OF ATTENDEES VERMONT YANKEE NUCLEAR POWER PLANT APRIL 2009 ANNUAL ASSESSMENT MEETING THURSDAY, APRIL 16, 2009 3:30 p.m.
A-1 LIST OF ATTENDEES VERMONT YANKEE NUCLEAR POWER PLANT APRIL 2009 ANNUAL ASSESSMENT MEETING THURSDAY, APRIL 16, 2009 3:30 p.m.
NAME     ORGANIZATION Norm Rademacher   Entergy Ruth Clark     Guilford VT Citizen David Mannai     Entergy Charles Baker Heather Jones     NRC Justin Heinley     NRC John Dreyfuss Uldis Vanags     Vermont DPS Randy Sullivan   NRC Jim Kim     NRC Jonathan Rowley   NRC Howard Shaffer   Nuclear Public Outreach Larry Smith     Entergy M.J. Colomb     Entergy Tim Johnson     WTSA - Media Bob Wanczyk     Entergy Tom Buchanan   NRC Phil Couture     Entergy Susan Smallheer   Rutland Herald Roland Lilee     DPHS (NH)
NAME ORGANIZATION Norm Rademacher Entergy Ruth Clark Guilford VT Citizen David Mannai Entergy Charles Baker Heather Jones NRC Justin Heinley NRC John Dreyfuss Uldis Vanags Vermont DPS Randy Sullivan NRC Jim Kim NRC Jonathan Rowley NRC Howard Shaffer Nuclear Public Outreach Larry Smith Entergy M.J. Colomb Entergy Tim Johnson WTSA - Media Bob Wanczyk Entergy Tom Buchanan NRC Phil Couture Entergy Susan Smallheer Rutland Herald Roland Lilee DPHS (NH)
Chris Wamser     Entergy George Patterson   Contractor M Nawoj     NH John Giarrusio, Jr. MEMA Dennis O'Dowd    NH Radiation Control Program Gorty Baldwin     WKVT Radio Sarah Kotkan Michael Dusaniwskyj   NRC Anneliese Simmons   NRC Michael Granoor   Public Clay Turbull     New England Coalition Harry Sprugt President Sachs Mike McKenney   VY Patti Buck     Public M. Philippon     VY G. Gibbs     VY P Van der Does   Public Ellen Cote     VY Mary Alice Hechert   VCAN and NEC Ken Wit     VCAN and NEC A-2  NAME      ORGANIZATION Sally Shaw    NEC John Ward    CAN Brad Ferland    Vermont Energy Partnership Mark Gilvesoe    Entergy Matthew Campbell    CBS 3 A-3 LIST OF ATTENDEES VERMONT YANKEE NUCLEAR POWER PLANT APRIL 2009 TOWN HALL MEETING THURSDAY, APRIL 16, 2009 7:00 p.m.
Chris Wamser Entergy George Patterson Contractor M Nawoj NH John Giarrusio, Jr.
MEMA Dennis ODowd NH Radiation Control Program Gorty Baldwin WKVT Radio Sarah Kotkan Michael Dusaniwskyj NRC Anneliese Simmons NRC Michael Granoor Public Clay Turbull New England Coalition Harry Sprugt President Sachs Mike McKenney VY Patti Buck Public M. Philippon VY G. Gibbs VY P Van der Does Public Ellen Cote VY Mary Alice Hechert VCAN and NEC Ken Wit VCAN and NEC  


NAME     ORGANIZATION Ruth van Houten    Chesterfield EMD Mike Granger    Newfane, VT Jim Kim    NRC Randy Sullivan    NRC Daniel Sicken    CAN Hattie Nestel    CAN Ken West    CAN Mike Nawoj    NH Janet Schwarz    CAN Anthony L. Stevens    Entergy Bernard Buteau    VY Clay Turnbull    NEC Bill Murray Anneliese Simmons    NRC Ami Rao    NRC Justin Heinley    NRC Heather Jones    NRC John Ward Howard Shaffer    ANS - PI Committee Jim Rogers    Entergy Riaz Ghare    Entergy Vermont Yankee Phillip DeVan    Entergy Jonathan Rowley    NRC Russ Pearson Alison MaCrae Jim Matteau    Windham Regional Commission Charles Baker Walter Schwarz    S&G Amit Kumar    Entergy Claire Chang Peter van der Does    Public Ned Childs     
A-2 NAME ORGANIZATION Sally Shaw NEC John Ward CAN Brad Ferland Vermont Energy Partnership Mark Gilvesoe Entergy Matthew Campbell CBS 3


ML090630467). A notice of the meeting was issued on March 19, 2009, and was posted on the NRC's public web page (ADAMS Accession No. ML090780293). The meeting slides can also be located in the ADAMS package (ADAMS Accession No. ML090630466). ADAMS is accessible from the NRC Web site at www.nrc.gov/reading-rm/adams.html. Sincerely,           /RA BY PAUL G. KROHN ACTING FOR/ Donald Jackson, Chief Projects Branch 5 Division of Reactor Projects  
A-3 LIST OF ATTENDEES VERMONT YANKEE NUCLEAR POWER PLANT APRIL 2009 TOWN HALL MEETING THURSDAY, APRIL 16, 2009 7:00 p.m.
NAME ORGANIZATION Ruth van Houten Chesterfield EMD Mike Granger Newfane, VT Jim Kim NRC Randy Sullivan NRC Daniel Sicken CAN Hattie Nestel CAN Ken West CAN Mike Nawoj NH Janet Schwarz CAN Anthony L. Stevens Entergy Bernard Buteau VY Clay Turnbull NEC Bill Murray Anneliese Simmons NRC Ami Rao NRC Justin Heinley NRC Heather Jones NRC John Ward Howard Shaffer ANS - PI Committee Jim Rogers Entergy Riaz Ghare Entergy Vermont Yankee Phillip DeVan Entergy Jonathan Rowley NRC Russ Pearson Alison MaCrae Jim Matteau Windham Regional Commission Charles Baker Walter Schwarz S&G Amit Kumar Entergy Claire Chang Peter van der Does Public Ned Childs
 
ML090630467). A notice of the meeting was issued on March 19, 2009, and was posted on the NRCs public web page (ADAMS Accession No. ML090780293). The meeting slides can also be located in the ADAMS package (ADAMS Accession No. ML090630466). ADAMS is accessible from the NRC Web site at www.nrc.gov/reading-rm/adams.html.
Sincerely,  
/RA BY PAUL G. KROHN ACTING FOR/
Donald Jackson, Chief Projects Branch 5 Division of Reactor Projects  


==Attachment:==
==Attachment:==
List of Attendees Distribution
List of Attendees Distribution:
S. Collins, RA M. Dapas, ORA D. Lew, DRP J. Clifford, DRP D. Jackson, DRP T. Setzer, DRP A. Rao, DRP M. Marshfield, SRI H. Jones, RI A. Rancourt, OA J. Kim, NRR SUNSI REVIEW COMPLETE _PGK______ (Reviewer's Initials)                                             ML091330823 After declaring this document An Official Agency Record it will be released to the Public Document Name: G:\DRP\BRANCH5\Annual Assessment Meetings\2008 EOC\Meeting Summaries\VY 2009 AA Meeting Summary.doc T o receive a copy of this document, indicate in the box:
S. Collins, RA M. Dapas, ORA D. Lew, DRP J. Clifford, DRP D. Jackson, DRP T. Setzer, DRP A. Rao, DRP M. Marshfield, SRI H. Jones, RI A. Rancourt, OA J. Kim, NRR SUNSI REVIEW COMPLETE _PGK______ (Reviewers Initials) ML091330823 After declaring this document An Official Agency Record it will be released to the Public Document Name: G:\\DRP\\BRANCH5\\Annual Assessment Meetings\\2008 EOC\\Meeting Summaries\\VY 2009 AA Meeting Summary.doc To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP N
" C" = Copy without attachment/enclosure   " E" = Copy with attachment/enclosure   " N" = No copy OFFICE RI/DRP N RI/DRP N   NAME TSetzer/ TS DJackson/PGK for DATE 05/ 13 /09 05/ 13 /09}}
RI/DRP N
NAME TSetzer/ TS DJackson/PGK for DATE 05/ 13 /09 05/ 13 /09}}

Latest revision as of 11:51, 14 January 2025

Summary of Annual Assessment Mtg - Vermont Yankee - 4/16/09
ML091330823
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 05/13/2009
From: Diane Jackson
NRC/RGN-I/DRP/PB5
To:
Jackson, D E RI/DRP/PB5/610-337-5306
References
Download: ML091330823 (4)


Text

May 13, 2009 MEETING

SUMMARY

LICENSEE:

ENTERGY NUCLEAR OPERATIONS, INC.

FACILITY:

VERMONT YANKEE NUCLEAR POWER STATION

SUBJECT:

SUMMARY

OF THE APRIL 16, 2009, ANNUAL ASSESSMENT MEETING AND TOWN HALL MEETING WITH ENTERGY NUCLEAR OPERATIONS, INC.

On April 16, 2009 at 3:30 p.m., an Annual Assessment Meeting was conducted at the Ramada Hotel and Conference Center, Brattleboro, Vermont, between the Nuclear Regulatory Commission (NRC) and Entergy Nuclear Operations, Inc. (Entergy). The NRC presented and discussed its assessment of the safety performance of the Vermont Yankee Nuclear Power Plant for the period of January 1 through December 31, 2008. In addition, at 7:00 p.m., a Town Hall Meeting was held to answer questions on the role of the NRC in ensuring safe plant operations. A list of meeting attendees is attached.

The NRC presentation for the Annual Assessment Meeting included information on the NRC Organization, Reactor Oversight Program (ROP), and the results of NRC's performance assessment for Vermont Yankee. As part of this meeting, Entergy presented its perspective regarding the plant's performance and operational goals for 2009. At the end of the meeting between the NRC and Entergy, public attendees were offered the opportunity to ask questions of NRC officials.

Questions raised by members of the public and local media were also addressed by the NRC.

The NRCs assessment letter can be found on the NRCs public web page in ADAMS (ADAMS Accession No. ML090630467). A notice of the meeting was issued on March 19, 2009, and was posted on the NRCs public web page (ADAMS Accession No. ML090780293). The meeting slides can also be located in the ADAMS package (ADAMS Accession No. ML090630466).

ADAMS is accessible from the NRC Web site at www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA BY PAUL G. KROHN ACTING FOR/

Donald Jackson, Chief Projects Branch 5 Division of Reactor Projects

Attachment:

List of Attendees

A-1 LIST OF ATTENDEES VERMONT YANKEE NUCLEAR POWER PLANT APRIL 2009 ANNUAL ASSESSMENT MEETING THURSDAY, APRIL 16, 2009 3:30 p.m.

NAME ORGANIZATION Norm Rademacher Entergy Ruth Clark Guilford VT Citizen David Mannai Entergy Charles Baker Heather Jones NRC Justin Heinley NRC John Dreyfuss Uldis Vanags Vermont DPS Randy Sullivan NRC Jim Kim NRC Jonathan Rowley NRC Howard Shaffer Nuclear Public Outreach Larry Smith Entergy M.J. Colomb Entergy Tim Johnson WTSA - Media Bob Wanczyk Entergy Tom Buchanan NRC Phil Couture Entergy Susan Smallheer Rutland Herald Roland Lilee DPHS (NH)

Chris Wamser Entergy George Patterson Contractor M Nawoj NH John Giarrusio, Jr.

MEMA Dennis ODowd NH Radiation Control Program Gorty Baldwin WKVT Radio Sarah Kotkan Michael Dusaniwskyj NRC Anneliese Simmons NRC Michael Granoor Public Clay Turbull New England Coalition Harry Sprugt President Sachs Mike McKenney VY Patti Buck Public M. Philippon VY G. Gibbs VY P Van der Does Public Ellen Cote VY Mary Alice Hechert VCAN and NEC Ken Wit VCAN and NEC

A-2 NAME ORGANIZATION Sally Shaw NEC John Ward CAN Brad Ferland Vermont Energy Partnership Mark Gilvesoe Entergy Matthew Campbell CBS 3

A-3 LIST OF ATTENDEES VERMONT YANKEE NUCLEAR POWER PLANT APRIL 2009 TOWN HALL MEETING THURSDAY, APRIL 16, 2009 7:00 p.m.

NAME ORGANIZATION Ruth van Houten Chesterfield EMD Mike Granger Newfane, VT Jim Kim NRC Randy Sullivan NRC Daniel Sicken CAN Hattie Nestel CAN Ken West CAN Mike Nawoj NH Janet Schwarz CAN Anthony L. Stevens Entergy Bernard Buteau VY Clay Turnbull NEC Bill Murray Anneliese Simmons NRC Ami Rao NRC Justin Heinley NRC Heather Jones NRC John Ward Howard Shaffer ANS - PI Committee Jim Rogers Entergy Riaz Ghare Entergy Vermont Yankee Phillip DeVan Entergy Jonathan Rowley NRC Russ Pearson Alison MaCrae Jim Matteau Windham Regional Commission Charles Baker Walter Schwarz S&G Amit Kumar Entergy Claire Chang Peter van der Does Public Ned Childs

ML090630467). A notice of the meeting was issued on March 19, 2009, and was posted on the NRCs public web page (ADAMS Accession No. ML090780293). The meeting slides can also be located in the ADAMS package (ADAMS Accession No. ML090630466). ADAMS is accessible from the NRC Web site at www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA BY PAUL G. KROHN ACTING FOR/

Donald Jackson, Chief Projects Branch 5 Division of Reactor Projects

Attachment:

List of Attendees Distribution:

S. Collins, RA M. Dapas, ORA D. Lew, DRP J. Clifford, DRP D. Jackson, DRP T. Setzer, DRP A. Rao, DRP M. Marshfield, SRI H. Jones, RI A. Rancourt, OA J. Kim, NRR SUNSI REVIEW COMPLETE _PGK______ (Reviewers Initials) ML091330823 After declaring this document An Official Agency Record it will be released to the Public Document Name: G:\\DRP\\BRANCH5\\Annual Assessment Meetings\\2008 EOC\\Meeting Summaries\\VY 2009 AA Meeting Summary.doc To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP N

RI/DRP N

NAME TSetzer/ TS DJackson/PGK for DATE 05/ 13 /09 05/ 13 /09