ML091520264: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML091520264
| number = ML091520264
| issue date = 07/07/2008
| issue date = 07/07/2008
| title = Palisades - NRC Region Iii, Initial License Exam, Job Performance Measure, JPM: Ro/Sro Admin 1A, Title: Determine Quadrant Power Tilt Per PO-3
| title = NRC Region III, Initial License Exam, Job Performance Measure, JPM: Ro/Sro Admin 1A, Title: Determine Quadrant Power Tilt Per PO-3
| author name =  
| author name =  
| author affiliation = NRC/RGN-III
| author affiliation = NRC/RGN-III
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE  
{{#Wiki_filter:NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM:
RO/SRO ADMIN 1a TITLE:
DETERMINE QUADRANT POWER TILT PER PO-3 CANDIDATE:
EXAMINER:


JPM: RO/SRO ADMIN 1a TITLE: DETERMINE QUADRANT POWER TILT PER PO-3 
JPM RO SRO ADMIN 1a PALISADES NUCLEAR PLANT Page 2 of 9 July 2008 JOB PERFORMANCE MEASURE DATA PAGE Task: Determine Quadrant Power Tilt PER PO-3 Alternate Path: N/A Facility JPM #: PL-OPS-ENG-014J K/A: G2.1.7 Importance: RO: 4.4 SRO: 4.7 K/A Statement: Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation.
 
Task Standard: Correctly calculate a Quadrant Power Tilt Per PO-3 Preferred Evaluation Location: Simulator
CANDIDATE: _____________________________________________
__X__
 
In Plant Preferred Evaluation Method:
EXAMINER: _____________________________________________
Perform
 
__X__
JPM RO SRO ADMIN 1a PALISADES NUCLEAR PLANT Page 2 of 9 July 2008 JOB PERFORMANCE MEASURE DATA PAGE Task: Determine Quadrant Power Tilt PER PO-3  
Simulate  
 
Alternate Path: N/A  
 
Facility JPM #: PL-OPS-ENG-014J  
 
K/A: G2.1.7           Importance: RO: 4.4   SRO: 4.7  
 
K/A Statement: Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation.  
 
Task Standard: Correctly calculate a Quadrant Power Tilt Per PO-3  
 
Preferred Evaluation Location: Simulator __X__ In Plant _____
 
Preferred Evaluation Method: Perform __X__ Simulate _____


==References:==
==References:==
PO-3, Alternate Incore and Excore Applications  
PO-3, Alternate Incore and Excore Applications Validation Time: 12 minutes Time Critical:
 
NO Candidate: ________________________________________________
Validation Time: 12 minutes Time Critical: NO  
Time Start: ________
 
Time Finish:
Candidate: ________________________________________________  
Performance Time:
 
________ minutes Performance Rating:
Time Start: ________ Time Finish: ________
SAT______
 
UNSAT ______
Performance Time: ________ minutes  
Comments:
 
Examiner: _______________________________
Performance Rating: SAT______ UNSAT ______  
Date:
 
Signature  
Comments:  
 
Examiner: _______________________________ Date: ______________ Signature JPM RO SRO ADMIN 1a PALISADES NUCLEAR PLANT Page 3 of 9 July 2008 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
PO-3, Attachment 2, Rev. 2
 
Also see Simulator Operator Instructions (last page of this document).
 
READ TO CANDIDATE
 
DIRECTION TO CANDIDATE:
 
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.


JPM RO SRO ADMIN 1a PALISADES NUCLEAR PLANT Page 3 of 9 July 2008 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
PO-3, Attachment 2, Rev. 2 Also see Simulator Operator Instructions (last page of this document).
READ TO CANDIDATE DIRECTION TO CANDIDATE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
* Plant was at full power.
* Plant was at full power.
* Incores #9 and #35 are inoperable.
* Incores #9 and #35 are inoperable.
* CRD #11 has dropped into the core.  
* CRD #11 has dropped into the core.
 
INITIATING CUES:
INITIATING CUES:
* During performance of PO-3, Alternate Incore and Excore Applications, the Control Room Supervisor directs you to calculate Excore Quadrant Power Tilt utilizing Power Range NI Channels on Panel C-06.  
* During performance of PO-3, Alternate Incore and Excore Applications, the Control Room Supervisor directs you to calculate Excore Quadrant Power Tilt utilizing Power Range NI Channels on Panel C-06.  


JPM RO SRO ADMIN 1a PALISADES NUCLEAR PLANT Page 4 of 9 July 2008 Proc. Step TASK ELEMENT 1 STANDARD Grade n/a Correct Procedure located PO-3, Attachment 2, Excore Quadrant Power Tilt, located.
JPM RO SRO ADMIN 1a PALISADES NUCLEAR PLANT Page 4 of 9 July 2008 Proc. Step TASK ELEMENT 1 STANDARD Grade n/a Correct Procedure located PO-3, Attachment 2, Excore Quadrant Power Tilt, located.
S U Comment: Notes: Evaluator provides candidate with a Working Copy.  
S U Comment:
Notes:
Evaluator provides candidate with a Working Copy.
Proc. Step TASK ELEMENT 2 STANDARD Grade 5.2.1 Obtain lower and upper excore readings as required. (SAL, SBL, SCL, SDL and SAU, SBU, SCU, SDU).
Lower and upper excore readings from the PPC using NI5L, NI5U, NI6L, NI6U, NI7L, NI7U, NI8L and NI8U or from the Upper and Lower NI Detector meters on EC-06 are entered on PO-3,, within +/-1% (0.01) of the answer key.
S U Comment:
CRITICAL STEP Proc. Step TASK ELEMENT 3 STANDARD Grade 5.2.1 Calculate the sum from the Lower + Upper excore readings (SA, SB, SC, SD Lower + Upper excore readings (SA, SB, SC, SD) summed and entered on PO-3, Attachment #2, within +/-1% (0.01) of the answer key.
S U Comment:
CRITICAL STEP


Proc. Step TASK ELEMENT 2 STANDARD Grade5.2.1 Obtain lower and upper excore readings as required. (S AL , S BL , S CL , S DL and S AU , S BU , S CU , S DU). Lower and upper excore readings from the PPC using NI5L, NI5U, NI6L, NI6U, NI7L, NI7U, NI8L and NI8U or from the Upper and Lower NI Detector meters on EC-06 are entered on PO-3, Attachment 2, within
JPM RO SRO ADMIN 1a PALISADES NUCLEAR PLANT Page 5 of 9 July 2008 Proc. Step TASK ELEMENT 4 STANDARD Grade 5.2.1
+/-1% (0.01) of the answer key. S  U Comment:
: 1. Calculate the sum of all excore readings divided by 4:
CRITICAL STEP
(S = all detectors/4).
 
Proc. Step TASK ELEMENT 3 STANDARD Grade5.2.1 Calculate the sum from the Lower + Upper excore readings (S A , S B , S C , S D  Lower + Upper excore readings (S A , S B , S C , S D) summed and entered on PO-3, Attachment #2, within +/-1% (0.01) of the answer key.
S  U Comment:
CRITICAL STEP
 
JPM RO SRO ADMIN 1a PALISADES NUCLEAR PLANT Page 5 of 9 July 2008 Proc. Step TASK ELEMENT 4 STANDARD Grade5.2.1 1. Calculate the sum of all excore readings divided by 4: (S = all detectors/4).
Sum of all excores reading divided by 4 calculated and entered on PO-3, Attachment 2, within +/- 1% (0.01) of the answer key.
Sum of all excores reading divided by 4 calculated and entered on PO-3, Attachment 2, within +/- 1% (0.01) of the answer key.
S U Comment:
S U Comment:
CRITICAL STEP
CRITICAL STEP Proc. Step TASK ELEMENT 5 STANDARD Grade 5.2.1 Calculate the Quadrant Tilt.
 
Using the formula TEX
Proc. Step TASK ELEMENT 5 STANDARD Grade5.2.1 Calculate the Quadrant Tilt.
= [(SX - S)/S], calculate the tilt for each Quadrant, within +/-1% (0.01) of the answer key.
Using the formula T EX = [(S X - S)/S], calculate the tilt for each Quadrant, within  
S U Comment:
+/-1% (0.01) of the answer key.
Evaluator: Acceptance criteria is all four Quadrant Tilts should add up to zero (0) +/- 0.01 CRITICAL STEP Proc. Step TASK ELEMENT 6 STANDARD Grade 5.2.1 Have calculations verified.
S U Comment: Evaluator: Acceptance criteria is all four Quadrant Tilts should add up to zero (0) +/- 0.01 CRITICAL STEP
 
Proc. Step TASK ELEMENT 6 STANDARD Grade5.2.1 Have calculations verified.
Have another qualified individual verify the calculations.
Have another qualified individual verify the calculations.
S U Comment: Notes: Evaluator CUE: State to operator that someone else will verify the calculation.  
S U Comment:
Notes: Evaluator CUE: State to operator that someone else will verify the calculation.  


JPM RO SRO ADMIN 1a PALISADES NUCLEAR PLANT Page 6 of 9 July 2008 Proc. Step TASK ELEMENT 7 STANDARD Grade n/a Notify the CRS that Excore Quadrant Power Tilt has been completed per PO-3, .
JPM RO SRO ADMIN 1a PALISADES NUCLEAR PLANT Page 6 of 9 July 2008 Proc. Step TASK ELEMENT 7 STANDARD Grade n/a Notify the CRS that Excore Quadrant Power Tilt has been completed per PO-3,.
Operator notifies CRS of completion of PO-3, Attachment 2, Excore Quadrant Power Tilt S U Comment:
Operator notifies CRS of completion of PO-3,, Excore Quadrant Power Tilt S U Comment:
END OF TASK  
END OF TASK  


JPM RO SRO ADMIN 1a PALISADES NUCLEAR PLANT Page 7 of 9 July 2008 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)  
JPM RO SRO ADMIN 1a PALISADES NUCLEAR PLANT Page 7 of 9 July 2008 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
 
INITIAL CONDITIONS:
INITIAL CONDITIONS:
* Plant was at full power.
* Plant was at full power.
* Incores #9 and #35 are inoperable.
* Incores #9 and #35 are inoperable.
* CRD #11 has dropped into the core.  
* CRD #11 has dropped into the core.
 
INITIATING CUES:
INITIATING CUES:
* During performance of PO-3, Alternate Incore and Excore Applications, the Control Room Supervisor directs you to calculate Excore Quadrant Power Tilt utilizing Power Range NI Channels on Panel C-06.  
* During performance of PO-3, Alternate Incore and Excore Applications, the Control Room Supervisor directs you to calculate Excore Quadrant Power Tilt utilizing Power Range NI Channels on Panel C-06.  


JPM RO SRO ADMIN 1a PALISADES NUCLEAR PLANT Page 8 of 9 July 2008 SIMULATOR OPERATOR INSTRUCTIONS SIMULATOR SET UP:
JPM RO SRO ADMIN 1a PALISADES NUCLEAR PLANT Page 8 of 9 July 2008 SIMULATOR OPERATOR INSTRUCTIONS SIMULATOR SET UP:
Simulator Setup Instructions:
Simulator Setup Instructions:
* Full power IC
* Full power IC
* Drop CRD #11 fully into the core with RD-11 (Final Value = 2) on PIDRD02
* Drop CRD #11 fully into the core with RD-11 (Final Value = 2) on PIDRD02
* When plant has stabilized, freeze the Simulator and SNAP. ***See NOTE #1 below.
* When plant has stabilized, freeze the Simulator and SNAP. ***See NOTE #1 below.
* Use PO-3, Attachment 2 and record/calculate from the Upper and Lower NI Detector meters on EC-06) and use as answer key.
* Use PO-3, Attachment 2 and record/calculate from the Upper and Lower NI Detector meters on EC-06) and use as answer key.
* Leave the Simulator in freeze during performance of this JPM to ensure that the conditions will not change  
* Leave the Simulator in freeze during performance of this JPM to ensure that the conditions will not change  


JPM RO SRO ADMIN 1a PALISADES NUCLEAR PLANT Page 9 of 9 July 2008 Excore Lower Reading(%)
JPM RO SRO ADMIN 1a PALISADES NUCLEAR PLANT Page 9 of 9 July 2008 Excore Lower Reading(%)
S AL , S BL , S CL , S DL  Upper Reading(%)  
SAL, SBL, SCL, SDL Upper Reading(%)
 
SAU, SBU, SCU, SDU Lower + Upper SA, SB, SC, SD S = ( All Detectors)/4  
S AU , S BU , S CU , S DU Lower + Upper S A , S B , S C , S D S = ( All Detectors)/4   = (S A + S B + S C + S D)/4 Excore Quadrant Tilt T EA , T EB , T EC , T ED  5 (CH A) S AL = 50.5   S AU = 50 S A = S AL + SAU   100.5  
= (SA + SB + SC + SD)/4 Excore Quadrant Tilt TEA, TEB, TEC, TED 5 (CH A)
 
SAL =
95.125 T EA = [(S A-S)/S]   .0565 QUAD 1   6 (CH B) S BL = 40   S BU = 39 S B = S BL + SBU   79 T EB = [(S B-S)/S]   -.1695 QUAD 3   7 (CH C) S CL = 50   S CU = 50 S C = S CL + S CU  100 T EC = [(S C-S)/S]   .0512 QUAD 4   8 (CH D) S DL = 52   S DU = 49 S D = S DL + S DU  101 T ED = [(S D-S)/S]   .0618 QUAD 2 NOTE: The four QPTs should sum to approximately zero.
50.5 SAU =
Comments:  
50 SA = SAL + SAU 100.5 95.125 TEA = [(SA-S)/S]  
 
.0565 QUAD 1 6 (CH B)
Performed By: ____Pat Person_________________________________ Date: _____Today__________     Time: _______Now______
SBL =
Calculations Verified By: _____________________________________________________ Date: _______________
40 SBU =
After calculations are verified, forward to Reactor Engineering Supervisor or designee for final review.  
39 SB = SBL + SBU 79 TEB = [(SB-S)/S]  
 
-.1695 QUAD 3 7 (CH C)
Reactor Engineering Supervisor or designee: _______________________________________ Date: _______________  
SCL =
 
50 SCU =
ANSWER KEY ANSWER KEY ANSWER KEY ANSWER KEY ANSWER KEY ANSWER KEY}}
50 SC = SCL + SCU 100 TEC = [(SC-S)/S]  
.0512 QUAD 4 8 (CH D)
SDL =
52 SDU =
49 SD = SDL + SDU 101 TED = [(SD-S)/S]  
.0618 QUAD 2 NOTE:
The four QPTs should sum to approximately zero.
Comments:
Performed By: ____Pat Person_________________________________
Date: _____Today__________ Time: _______Now______
Calculations Verified By: _____________________________________________________
Date: _______________
After calculations are verified, forward to Reactor Engineering Supervisor or designee for final review.
Reactor Engineering Supervisor or designee: _______________________________________
Date: _______________
ANSWER KEY ANSWER KEY ANSWER KEY ANSWER KEY ANSWER KEY ANSWER KEY}}

Latest revision as of 11:35, 14 January 2025

NRC Region III, Initial License Exam, Job Performance Measure, JPM: Ro/Sro Admin 1A, Title: Determine Quadrant Power Tilt Per PO-3
ML091520264
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/07/2008
From:
NRC/RGN-III
To:
Entergy Nuclear Palisades
Shared Package
ML082200311 List:
References
Download: ML091520264 (9)


Text

NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM:

RO/SRO ADMIN 1a TITLE:

DETERMINE QUADRANT POWER TILT PER PO-3 CANDIDATE:

EXAMINER:

JPM RO SRO ADMIN 1a PALISADES NUCLEAR PLANT Page 2 of 9 July 2008 JOB PERFORMANCE MEASURE DATA PAGE Task: Determine Quadrant Power Tilt PER PO-3 Alternate Path: N/A Facility JPM #: PL-OPS-ENG-014J K/A: G2.1.7 Importance: RO: 4.4 SRO: 4.7 K/A Statement: Ability to evaluate plant performance and make operational judgments based on operating characteristics, reactor behavior, and instrument interpretation.

Task Standard: Correctly calculate a Quadrant Power Tilt Per PO-3 Preferred Evaluation Location: Simulator

__X__

In Plant Preferred Evaluation Method:

Perform

__X__

Simulate

References:

PO-3, Alternate Incore and Excore Applications Validation Time: 12 minutes Time Critical:

NO Candidate: ________________________________________________

Time Start: ________

Time Finish:

Performance Time:

________ minutes Performance Rating:

SAT______

UNSAT ______

Comments:

Examiner: _______________________________

Date:

Signature

JPM RO SRO ADMIN 1a PALISADES NUCLEAR PLANT Page 3 of 9 July 2008 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

PO-3, Attachment 2, Rev. 2 Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • Plant was at full power.
  • CRD #11 has dropped into the core.

INITIATING CUES:

  • During performance of PO-3, Alternate Incore and Excore Applications, the Control Room Supervisor directs you to calculate Excore Quadrant Power Tilt utilizing Power Range NI Channels on Panel C-06.

JPM RO SRO ADMIN 1a PALISADES NUCLEAR PLANT Page 4 of 9 July 2008 Proc. Step TASK ELEMENT 1 STANDARD Grade n/a Correct Procedure located PO-3, Attachment 2, Excore Quadrant Power Tilt, located.

S U Comment:

Notes:

Evaluator provides candidate with a Working Copy.

Proc. Step TASK ELEMENT 2 STANDARD Grade 5.2.1 Obtain lower and upper excore readings as required. (SAL, SBL, SCL, SDL and SAU, SBU, SCU, SDU).

Lower and upper excore readings from the PPC using NI5L, NI5U, NI6L, NI6U, NI7L, NI7U, NI8L and NI8U or from the Upper and Lower NI Detector meters on EC-06 are entered on PO-3,, within +/-1% (0.01) of the answer key.

S U Comment:

CRITICAL STEP Proc. Step TASK ELEMENT 3 STANDARD Grade 5.2.1 Calculate the sum from the Lower + Upper excore readings (SA, SB, SC, SD Lower + Upper excore readings (SA, SB, SC, SD) summed and entered on PO-3, Attachment #2, within +/-1% (0.01) of the answer key.

S U Comment:

CRITICAL STEP

JPM RO SRO ADMIN 1a PALISADES NUCLEAR PLANT Page 5 of 9 July 2008 Proc. Step TASK ELEMENT 4 STANDARD Grade 5.2.1

1. Calculate the sum of all excore readings divided by 4:

(S = all detectors/4).

Sum of all excores reading divided by 4 calculated and entered on PO-3, Attachment 2, within +/- 1% (0.01) of the answer key.

S U Comment:

CRITICAL STEP Proc. Step TASK ELEMENT 5 STANDARD Grade 5.2.1 Calculate the Quadrant Tilt.

Using the formula TEX

= [(SX - S)/S], calculate the tilt for each Quadrant, within +/-1% (0.01) of the answer key.

S U Comment:

Evaluator: Acceptance criteria is all four Quadrant Tilts should add up to zero (0) +/- 0.01 CRITICAL STEP Proc. Step TASK ELEMENT 6 STANDARD Grade 5.2.1 Have calculations verified.

Have another qualified individual verify the calculations.

S U Comment:

Notes: Evaluator CUE: State to operator that someone else will verify the calculation.

JPM RO SRO ADMIN 1a PALISADES NUCLEAR PLANT Page 6 of 9 July 2008 Proc. Step TASK ELEMENT 7 STANDARD Grade n/a Notify the CRS that Excore Quadrant Power Tilt has been completed per PO-3,.

Operator notifies CRS of completion of PO-3,, Excore Quadrant Power Tilt S U Comment:

END OF TASK

JPM RO SRO ADMIN 1a PALISADES NUCLEAR PLANT Page 7 of 9 July 2008 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • Plant was at full power.
  • CRD #11 has dropped into the core.

INITIATING CUES:

  • During performance of PO-3, Alternate Incore and Excore Applications, the Control Room Supervisor directs you to calculate Excore Quadrant Power Tilt utilizing Power Range NI Channels on Panel C-06.

JPM RO SRO ADMIN 1a PALISADES NUCLEAR PLANT Page 8 of 9 July 2008 SIMULATOR OPERATOR INSTRUCTIONS SIMULATOR SET UP:

Simulator Setup Instructions:

  • Full power IC
  • Drop CRD #11 fully into the core with RD-11 (Final Value = 2) on PIDRD02
  • When plant has stabilized, freeze the Simulator and SNAP. ***See NOTE #1 below.
  • Use PO-3, Attachment 2 and record/calculate from the Upper and Lower NI Detector meters on EC-06) and use as answer key.
  • Leave the Simulator in freeze during performance of this JPM to ensure that the conditions will not change

JPM RO SRO ADMIN 1a PALISADES NUCLEAR PLANT Page 9 of 9 July 2008 Excore Lower Reading(%)

SAL, SBL, SCL, SDL Upper Reading(%)

SAU, SBU, SCU, SDU Lower + Upper SA, SB, SC, SD S = ( All Detectors)/4

= (SA + SB + SC + SD)/4 Excore Quadrant Tilt TEA, TEB, TEC, TED 5 (CH A)

SAL =

50.5 SAU =

50 SA = SAL + SAU 100.5 95.125 TEA = [(SA-S)/S]

.0565 QUAD 1 6 (CH B)

SBL =

40 SBU =

39 SB = SBL + SBU 79 TEB = [(SB-S)/S]

-.1695 QUAD 3 7 (CH C)

SCL =

50 SCU =

50 SC = SCL + SCU 100 TEC = [(SC-S)/S]

.0512 QUAD 4 8 (CH D)

SDL =

52 SDU =

49 SD = SDL + SDU 101 TED = [(SD-S)/S]

.0618 QUAD 2 NOTE:

The four QPTs should sum to approximately zero.

Comments:

Performed By: ____Pat Person_________________________________

Date: _____Today__________ Time: _______Now______

Calculations Verified By: _____________________________________________________

Date: _______________

After calculations are verified, forward to Reactor Engineering Supervisor or designee for final review.

Reactor Engineering Supervisor or designee: _______________________________________

Date: _______________

ANSWER KEY ANSWER KEY ANSWER KEY ANSWER KEY ANSWER KEY ANSWER KEY