ML091530199: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 06/02/2009 | | issue date = 06/02/2009 | ||
| title = Summary of Annual Assessment Public Meeting, 5/28/09, with Sign-in Sheets | | title = Summary of Annual Assessment Public Meeting, 5/28/09, with Sign-in Sheets | ||
| author name = Bellamy | | author name = Bellamy R | ||
| author affiliation = NRC/RGN-I/DRP/PB6 | | author affiliation = NRC/RGN-I/DRP/PB6 | ||
| addressee name = | | addressee name = | ||
| Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:June 2, 2009 | {{#Wiki_filter:June 2, 2009 LICENSEE: | ||
EXELON GENERATION COMPANY, LLC FACILITY: | |||
LICENSEE: EXELON GENERATION COMPANY, LLC | OYSTER CREEK GENERATING STATION | ||
FACILITY: OYSTER CREEK GENERATING STATION | |||
==SUBJECT:== | ==SUBJECT:== | ||
==SUMMARY== | ==SUMMARY== | ||
OF THE MAY 28, 2009 ANNUAL ASSESSMENT PUBLIC MEETING | OF THE MAY 28, 2009 ANNUAL ASSESSMENT PUBLIC MEETING On May 28, 2009, at 7:00 p.m., the Annual Assessment Meeting was conducted at the Holiday Inn, Toms River, NJ, between the Nuclear Regulatory Commission and Exelon Generation Company, LLC. The NRC requested this meeting with Exelon management to discuss 2008 performance at the Oyster Creek Generating Station. | ||
The NRC presented and discussed its assessment of the safety performance of Oyster Creek for the period from January 1 through December 31, 2008. The NRC presentations included a discussion of the Reactor Oversight Process (ROP), a summary of national performance assessment results, and the results of NRCs performance assessment of Oyster Creek. As part of this regulatory performance meeting, Exelon presented its perspective regarding the plants performance in 2008 and operational goals for 2009. | |||
On May 28, 2009, at 7:00 p.m., the Annual Assessment Meeting was conducted at the Holiday | The public was invited to observe and at the end of the meeting was offered the opportunity to communicate with the NRC regarding Exelons performance at Oyster Creek and the role of the agency in ensuring safe plant operations. The public also interfaced with NRC at an Open House held from 6:00 p.m. to 7:00 p.m. | ||
The NRC's assessment letter can be found in ADAMS with Accession Number ML090620775. | |||
Inn, Toms River, NJ, between the Nuclear Regulatory Commission and Exelon Generation | The annual assessment meeting notice, with the attached meeting agenda and slides, can be found in ADAMS with Accession Numbers ML091330051 and ML091320652. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. | ||
Sincerely, | |||
Company, LLC. The NRC requested this | /RA/ | ||
Ronald R. Bellamy, Ph.D., Chief Projects Branch 6 Division of Reactor Projects | |||
The NRC presented and discussed its assessment of the safety performance of Oyster Creek | |||
for the period from January 1 through December 31, 2008. The NRC presentations included a | |||
discussion of the Reactor Oversight Process (ROP), a summary of national performance | |||
assessment results, and the results of | |||
part of this regulatory performance meeting, Exelon presented its perspective regarding the | |||
The public was invited to observe and at the end of the meeting was offered the opportunity to | |||
communicate with the NRC regarding | |||
agency in ensuring safe plant operations. The public also interfaced with NRC at an Open | |||
House held from 6:00 p.m. to 7:00 p.m. | |||
The NRC's assessment letter can be found in ADAMS with Accession Number ML090620775. | |||
The annual assessment meeting notice, with the attached meeting agenda and slides, can be found in ADAMS with Accession Numbers ML091330051 and ML091320652. ADAMS is | |||
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. Sincerely, | |||
Ronald R. Bellamy, Ph.D., Chief | |||
Projects Branch 6 | |||
Division of Reactor Projects | |||
==Attachment:== | ==Attachment:== | ||
List of Attendees | |||
LICENSEE: | |||
EXELON GENERATION COMPANY, LLC FACILITY: | |||
LICENSEE: EXELON GENERATION COMPANY, LLC | OYSTER CREEK GENERATING STATION | ||
FACILITY: OYSTER CREEK GENERATING STATION | |||
==SUBJECT:== | ==SUBJECT:== | ||
==SUMMARY== | ==SUMMARY== | ||
OF THE MAY 28, 2009 ANNUAL ASSESSMENT PUBLIC MEETING | OF THE MAY 28, 2009 ANNUAL ASSESSMENT PUBLIC MEETING On May 28, 2009, at 7:00 p.m., the Annual Assessment Meeting was conducted at the Holiday Inn, Toms River, NJ, between the Nuclear Regulatory Commission and Exelon Generation Company, LLC. The NRC requested this meeting with Exelon management to discuss 2008 performance at the Oyster Creek Generating Station. | ||
The NRC presented and discussed its assessment of the safety performance of Oyster Creek for the period from January 1 through December 31, 2008. The NRC presentations included a discussion of the Reactor Oversight Process (ROP), a summary of national performance assessment results, and the results of NRCs performance assessment of Oyster Creek. As part of this regulatory performance meeting, Exelon presented its perspective regarding the plants performance in 2008 and operational goals for 2009. | |||
On May 28, 2009, at 7:00 p.m., the Annual Assessment Meeting was conducted at the Holiday | The public was invited to observe and at the end of the meeting was offered the opportunity to communicate with the NRC regarding Exelons performance at Oyster Creek and the role of the agency in ensuring safe plant operations. The public also interfaced with NRC at an Open House held from 6:00 p.m. to 7:00 p.m. | ||
The NRC's assessment letter can be found in ADAMS with Accession Number ML090620775. | |||
Inn, Toms River, NJ, between the Nuclear Regulatory Commission and Exelon Generation | The annual assessment meeting notice, with the attached meeting agenda and slides, can be found in ADAMS with Accession Numbers ML091330051 and ML091320652. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. | ||
Sincerely, /RA/ | |||
Company, LLC. The NRC requested this | Ronald R. Bellamy, Ph.D., Chief Projects Branch 6 Division of Reactor Projects Distribution: | ||
S. Collins, RA M. Dapas, ORA D. Lew, DRP J. Clifford, DRP R. Bellamy, DRP G. Barber, DRP C. Newport, DRP M. Ferdas, DRP, SRI J. Kulp, DRP, RI J. DeVries, DRP, OA S. Campbell, RI OEDO H. Chernoff, NRR R. Nelson, NRR E. Miller, NRR SUNSI review complete:_ RRB__ (Reviewers Initials) | |||
The NRC presented and discussed its assessment of the safety performance of Oyster Creek | |||
for the period from January 1 through December 31, 2008. The NRC presentations included a | |||
discussion of the Reactor Oversight Process (ROP), a summary of national performance | |||
assessment results, and the results of | |||
part of this regulatory performance meeting, Exelon presented its perspective regarding the | |||
The public was invited to observe and at the end of the meeting was offered the opportunity to | |||
communicate with the NRC regarding | |||
agency in ensuring safe plant operations. The public also interfaced with NRC at an Open | |||
House held from 6:00 p.m. to 7:00 p.m. | |||
The NRC's assessment letter can be found in ADAMS with Accession Number ML090620775. | |||
The annual assessment meeting notice, with the attached meeting agenda and slides, can be found in ADAMS with Accession Numbers ML091330051 and ML091320652. ADAMS is | |||
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. Sincerely, | |||
/RA/ | |||
Projects Branch 6 | |||
Division of Reactor Projects Distribution | |||
J. Clifford, DRP R. Bellamy, DRP | |||
G. Barber, DRP C. Newport, DRP | |||
M. Ferdas, DRP, SRI | |||
J. Kulp, DRP, RI | |||
J. DeVries, DRP, OA | |||
S. Campbell, RI OEDO | |||
H. Chernoff, NRR | |||
R. Nelson, NRR | |||
E. Miller, NRR | |||
SUNSI review complete:_ RRB__ | |||
After declaring this document An Official Agency Record it will be released to the Public. | After declaring this document An Official Agency Record it will be released to the Public. | ||
DOCUMENT NAME: G:\DRP\BRANCH6\ROP ASSESSMENT FOLDERS\ROP 9\OYSTER CREEK\END-OF-CYCLE\OC 2009 AA MEETING | DOCUMENT NAME: G:\\DRP\\BRANCH6\\ROP ASSESSMENT FOLDERS\\ROP 9\\OYSTER CREEK\\END-OF-CYCLE\\OC 2009 AA MEETING | ||
==SUMMARY== | ==SUMMARY== | ||
.DOC To receive a copy of this document, indicate in the box: | .DOC To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME CNewport/CN RBellamy/RRB DATE 06/ 01 /09 06/02 /09 OFFICIAL RECORD COPY}} | ||
" C" = Copy without attachment/enclosure | |||
RBellamy/RRB | |||
DATE 06/ 01 /09 | |||
06/02 /09 OFFICIAL RECORD COPY}} | |||
Latest revision as of 11:33, 14 January 2025
| ML091530199 | |
| Person / Time | |
|---|---|
| Site: | Oyster Creek |
| Issue date: | 06/02/2009 |
| From: | Ronald Bellamy NRC/RGN-I/DRP/PB6 |
| To: | NRC Region 1 |
| BELLAMY RR | |
| References | |
| Download: ML091530199 (7) | |
Text
June 2, 2009 LICENSEE:
EXELON GENERATION COMPANY, LLC FACILITY:
OYSTER CREEK GENERATING STATION
SUBJECT:
SUMMARY
OF THE MAY 28, 2009 ANNUAL ASSESSMENT PUBLIC MEETING On May 28, 2009, at 7:00 p.m., the Annual Assessment Meeting was conducted at the Holiday Inn, Toms River, NJ, between the Nuclear Regulatory Commission and Exelon Generation Company, LLC. The NRC requested this meeting with Exelon management to discuss 2008 performance at the Oyster Creek Generating Station.
The NRC presented and discussed its assessment of the safety performance of Oyster Creek for the period from January 1 through December 31, 2008. The NRC presentations included a discussion of the Reactor Oversight Process (ROP), a summary of national performance assessment results, and the results of NRCs performance assessment of Oyster Creek. As part of this regulatory performance meeting, Exelon presented its perspective regarding the plants performance in 2008 and operational goals for 2009.
The public was invited to observe and at the end of the meeting was offered the opportunity to communicate with the NRC regarding Exelons performance at Oyster Creek and the role of the agency in ensuring safe plant operations. The public also interfaced with NRC at an Open House held from 6:00 p.m. to 7:00 p.m.
The NRC's assessment letter can be found in ADAMS with Accession Number ML090620775.
The annual assessment meeting notice, with the attached meeting agenda and slides, can be found in ADAMS with Accession Numbers ML091330051 and ML091320652. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
/RA/
Ronald R. Bellamy, Ph.D., Chief Projects Branch 6 Division of Reactor Projects
Attachment:
List of Attendees
LICENSEE:
EXELON GENERATION COMPANY, LLC FACILITY:
OYSTER CREEK GENERATING STATION
SUBJECT:
SUMMARY
OF THE MAY 28, 2009 ANNUAL ASSESSMENT PUBLIC MEETING On May 28, 2009, at 7:00 p.m., the Annual Assessment Meeting was conducted at the Holiday Inn, Toms River, NJ, between the Nuclear Regulatory Commission and Exelon Generation Company, LLC. The NRC requested this meeting with Exelon management to discuss 2008 performance at the Oyster Creek Generating Station.
The NRC presented and discussed its assessment of the safety performance of Oyster Creek for the period from January 1 through December 31, 2008. The NRC presentations included a discussion of the Reactor Oversight Process (ROP), a summary of national performance assessment results, and the results of NRCs performance assessment of Oyster Creek. As part of this regulatory performance meeting, Exelon presented its perspective regarding the plants performance in 2008 and operational goals for 2009.
The public was invited to observe and at the end of the meeting was offered the opportunity to communicate with the NRC regarding Exelons performance at Oyster Creek and the role of the agency in ensuring safe plant operations. The public also interfaced with NRC at an Open House held from 6:00 p.m. to 7:00 p.m.
The NRC's assessment letter can be found in ADAMS with Accession Number ML090620775.
The annual assessment meeting notice, with the attached meeting agenda and slides, can be found in ADAMS with Accession Numbers ML091330051 and ML091320652. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely, /RA/
Ronald R. Bellamy, Ph.D., Chief Projects Branch 6 Division of Reactor Projects Distribution:
S. Collins, RA M. Dapas, ORA D. Lew, DRP J. Clifford, DRP R. Bellamy, DRP G. Barber, DRP C. Newport, DRP M. Ferdas, DRP, SRI J. Kulp, DRP, RI J. DeVries, DRP, OA S. Campbell, RI OEDO H. Chernoff, NRR R. Nelson, NRR E. Miller, NRR SUNSI review complete:_ RRB__ (Reviewers Initials)
After declaring this document An Official Agency Record it will be released to the Public.
DOCUMENT NAME: G:\\DRP\\BRANCH6\\ROP ASSESSMENT FOLDERS\\ROP 9\\OYSTER CREEK\\END-OF-CYCLE\\OC 2009 AA MEETING
SUMMARY
.DOC To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME CNewport/CN RBellamy/RRB DATE 06/ 01 /09 06/02 /09 OFFICIAL RECORD COPY