{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 | {{#Wiki_filter:UNITED STATES | ||
NUCLEAR REGULATORY COMMISSION | |||
Mr. Dennis R. Madison Vice President | REGION II | ||
Southern Nuclear Operating | SAM NUNN ATLANTA FEDERAL CENTER | ||
SUBJECT: EDWIN I. HATCH - NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION 05000321/2009302 AND 05000366/2009302 | 61 FORSYTH STREET, SW, SUITE 23T85 | ||
Dear Mr. Madison: | ATLANTA, GEORGIA 30303-8931 | ||
June 4, 2009 | |||
Mr. Dennis R. Madison | |||
Vice President | |||
Southern Nuclear Operating | |||
Company, Inc. | |||
Edwin I. Hatch Nuclear Plant | |||
11028 Hatch Parkway North | |||
Baxley, GA 31513 | |||
SUBJECT: EDWIN I. HATCH - NOTIFICATION OF LICENSED OPERATOR INITIAL | |||
EXAMINATION 05000321/2009302 AND 05000366/2009302 | |||
Dear Mr. Madison: | |||
In a telephone conversation on June 2, 2009, between Mr. Steve Grantham - Operations | |||
Training Supervisor, Mr. Charlie Edmund - Lead Instructor Nuclear Operations, Mr. Anthony | |||
Ball - Plant Instructor Nuclear Operations, and Mr. Bruno Caballero - Operations Engineer, | |||
arrangements were made for the administration of licensing examinations at the Edwin I. Hatch | |||
Nuclear Plant. The operating test is scheduled to be administered during the two weeks of | |||
October 26 and November 2, 2009. The written examination is scheduled to be administered | |||
the week of November 9, 2009. The on-site preparatory week is scheduled for the week of | |||
October 5, 2009. | |||
As agreed during the telephone conversation, your staff will prepare both the operating test and | |||
written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, | |||
"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory | |||
Commission (NRC) regional office will discuss with your staff any changes that might be | |||
necessary before the examinations are administered. Your staff has also agreed to make | |||
copies of all examination materials that are necessary for administering the examination. | |||
To meet the above schedule, it will be necessary for your staff to furnish the operating test | |||
outline by August 14, 2009. Mr. Bruno Caballero provided the written examination outline to | |||
your staff on May 7, 2009. The operating test, written examination, and the supporting | |||
reference materials identified in Attachment 3 to ES-201 will be due by September 4, 2009. | |||
Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations | |||
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the | |||
outline, examination, and test before they are submitted to the NRC for review and approval. All | |||
materials shall be complete and ready-to-use. | |||
We request that any personal, proprietary, sensitive unclassified, or safeguards information in | |||
your response be contained in a separate enclosure and appropriately marked. Any delay in | |||
receiving the required examination and reference materials, or the submittal of inadequate or | |||
incomplete materials, may cause the examinations to be rescheduled. | |||
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. | SNC | ||
To permit timely NRC review and evaluation, your staff should submit preliminary reactor | 2 | ||
operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has | |||
In order to conduct the requested written examinations and operating tests, it will be necessary | |||
for your staff to provide adequate space and accommodations in accordance with ES-402, and | |||
to make the simulation facility available on the dates noted above. In accordance with ES-302, | |||
your staff should retain the original simulator performance data (e.g., system pressures, | |||
temperatures, and levels) generated during the dynamic operating tests until the examination | |||
results are final. | |||
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in | |||
effect while the written examinations and operating tests are being administered. | |||
To permit timely NRC review and evaluation, your staff should submit preliminary reactor | |||
operator and senior reactor operator license applications (Office of Management and Budget | |||
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), | |||
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first | |||
examination date. If the applications are not received at least 30 days before the examination | |||
date, a postponement may be necessary. Signed applications certifying that all training has | |||
been completed should be submitted at least 14 days before the first examination date. | been completed should be submitted at least 14 days before the first examination date. | ||
This letter contains information collections that are subject to the Paperwork Reduction Act of | |||
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on June 30, 2009. The public reporting burden for | This letter contains information collections that are subject to the Paperwork Reduction Act of | ||
this collection of information is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150- | 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under | ||
approval number 3150-0018, which expires on June 30, 2009. The public reporting burden for | |||
this collection of information is estimated to average 500 hours per response, including the time | |||
for reviewing instructions, gathering and maintaining the data needed, writing the examinations, | |||
and completing and reviewing the collection of information. Send comments on any aspect of | |||
this collection of information, including suggestions for reducing the burden, to the Information | |||
and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, | |||
Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; | |||
and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150- | |||
0018), Office of Management and Budget, Washington, DC 20503. | 0018), Office of Management and Budget, Washington, DC 20503. | ||
In accordance with 10 CFR 2.390 of the | The NRC may not conduct or sponsor, and a person is not required to respond to, a collection | ||
of information unless it displays a currently valid OMB control number. | |||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be | |||
available electronically for public inspection in the NRC Public Document Room or from the | |||
Publicly Available Records (PARS) component of the NRCs document system (ADAMS). | |||
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the | |||
Public Electronic Reading Room). | |||
SNC | |||
3 | |||
(Internet E-mail: Bruno.Caballero@nrc.gov), or me at (404) 562-4550, (Internet E-mail: Malcolm.Widmann@nrc.gov). | |||
Sincerely, | |||
Thank you for your cooperation in this matter. Mr. Steve Grantham has been advised of the | |||
policies and guidelines referenced in this letter. If you have any questions regarding the NRC's | |||
Docket Nos.: 50-321, 50-366 | examination procedures and guidelines, please contact Mr. Bruno Caballero at (404) 562-4608, | ||
(Internet E-mail: Bruno.Caballero@nrc.gov), or me at (404) 562-4550, (Internet E-mail: | |||
Malcolm.Widmann@nrc.gov). | |||
Sincerely, | |||
/RA/ | |||
Malcolm T. Widmann, Chief | |||
Operations Branch | |||
Division of Reactor Safety | |||
Docket Nos.: 50-321, 50-366 | |||
License Nos.: DPR-57, NPF-5 | License Nos.: DPR-57, NPF-5 | ||
(cc: w/encl - See Page 3) | |||
(cc: w/encl - See Page 3) | |||
Jeffrey T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc. Electronic Mail Distribution | SNC | ||
4 | |||
L. Mike Stinson, Vice President | |||
Fleet Operations Support Southern Nuclear Operating Company, Inc. Electronic Mail Distribution | cc: w/encl | ||
David H. Jones | Angela Thornhill | ||
Vice President Engineering Southern Nuclear Operating Company, Inc. Electronic Mail Distribution | Managing Attorney and Compliance Officer | ||
Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution | |||
Jeffrey T. Gasser | |||
Executive Vice President | |||
Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution | |||
Raymond D. Baker | |||
Licensing Manager | |||
Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution | |||
L. Mike Stinson, Vice President | |||
Fleet Operations Support | |||
Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution | |||
David H. Jones | |||
Vice President | |||
Engineering | |||
Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution | |||
Moanica Caston | |||
Vice President and General Counsel | |||
Southern Nuclear Operating Company, Inc. | |||
Electronic Mail Distribution | |||
Steven B. Tipps | |||
Hatch Principal Engineer - Licensing | |||
Edwin I. Hatch Nuclear Plant | |||
Electronic Mail Distribution | |||
Mr. Ken Rosanski | |||
Resident Manager | |||
Edwin I. Hatch | |||
Oglethorpe Power Corporation | |||
Electronic Mail Distribution | |||
Lee Foley | |||
Manager of Contracts Generation | |||
Oglethorpe Power Corporation | |||
Electronic Mail Distribution | |||
Bob Masse | |||
Resident Manager | |||
Vogtle Electric Generating Plant | |||
Oglethorpe Power Corporation | |||
Electronic Mail Distribution | |||
Senior Resident Inspector | |||
Southern Nuclear Operating Company, Inc. | |||
Edwin I. Hatch Nuclear Plant | |||
U.S. NRC | |||
11030 Hatch Parkway N | |||
Baxley, GA 30334 | |||
Arthur H. Domby, Esq. | |||
Troutman Sanders | |||
Electronic Mail Distribution | |||
Dr. Carol Couch, Director | |||
Environmental Protection | |||
Department of Natural Resources | |||
Electronic Mail Distribution | Electronic Mail Distribution | ||
Cynthia Sanders Program Manager Radioactive Materials Program | Cynthia Sanders | ||
Program Manager | |||
Radioactive Materials Program | |||
Department of Natural Resources | |||
Electronic Mail Distribution | Electronic Mail Distribution | ||
Jim Sommerville | |||
(Acting) Chief | |||
Environmental Protection Division | |||
Department of Natural Resources | |||
Electronic Mail Distribution | Electronic Mail Distribution | ||
Mr. | |||
Mr. Steven M. Jackson | |||
Senior Engineer - Power Supply | |||
Municipal Electric Authority of Georgia | |||
Electronic Mail Distribution | Electronic Mail Distribution | ||
Chairman Appling County Commissioners County Courthouse 69 Tippins Street, Suite 201 Baxley, GA 31513 | |||
Mr. Reece McAlister | |||
Executive Secretary | |||
11028 Hatch Parkway North Baxley, GA 31513 | Georgia Public Service Commission | ||
Electronic Mail Distribution | |||
Chairman | |||
Appling County Commissioners | |||
County Courthouse | |||
69 Tippins Street, Suite 201 | |||
Baxley, GA 31513 | |||
Southern Nuclear Operating Company, Inc. | |||
ATTN: Mr. John Hammonds | |||
Training Manager | |||
Hatch Nuclear Plant | |||
11028 Hatch Parkway North | |||
Baxley, GA 31513 | |||
}} | }} | ||
Latest revision as of 11:31, 14 January 2025
| ML091550455 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 06/04/2009 |
| From: | Widmann M NRC/RGN-II/DRS/OLB |
| To: | Madison D Southern Nuclear Operating Co |
| References | |
| 05000321/09-302, 05000366/09-302 | |
| Download: ML091550455 (4) | |
See also: IR 05000321/2009302
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
SAM NUNN ATLANTA FEDERAL CENTER
61 FORSYTH STREET, SW, SUITE 23T85
ATLANTA, GEORGIA 30303-8931
June 4, 2009
Mr. Dennis R. Madison
Vice President
Southern Nuclear Operating
Company, Inc.
Edwin I. Hatch Nuclear Plant
11028 Hatch Parkway North
Baxley, GA 31513
SUBJECT: EDWIN I. HATCH - NOTIFICATION OF LICENSED OPERATOR INITIAL
EXAMINATION 05000321/2009302 AND 05000366/2009302
Dear Mr. Madison:
In a telephone conversation on June 2, 2009, between Mr. Steve Grantham - Operations
Training Supervisor, Mr. Charlie Edmund - Lead Instructor Nuclear Operations, Mr. Anthony
Ball - Plant Instructor Nuclear Operations, and Mr. Bruno Caballero - Operations Engineer,
arrangements were made for the administration of licensing examinations at the Edwin I. Hatch
Nuclear Plant. The operating test is scheduled to be administered during the two weeks of
October 26 and November 2, 2009. The written examination is scheduled to be administered
the week of November 9, 2009. The on-site preparatory week is scheduled for the week of
October 5, 2009.
As agreed during the telephone conversation, your staff will prepare both the operating test and
written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,
"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory
Commission (NRC) regional office will discuss with your staff any changes that might be
necessary before the examinations are administered. Your staff has also agreed to make
copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline by August 14, 2009. Mr. Bruno Caballero provided the written examination outline to
your staff on May 7, 2009. The operating test, written examination, and the supporting
reference materials identified in Attachment 3 to ES-201 will be due by September 4, 2009.
Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the
outline, examination, and test before they are submitted to the NRC for review and approval. All
materials shall be complete and ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked. Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled.
2
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which expires on June 30, 2009. The public reporting burden for
this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time
for reviewing instructions, gathering and maintaining the data needed, writing the examinations,
and completing and reviewing the collection of information. Send comments on any aspect of
this collection of information, including suggestions for reducing the burden, to the Information
and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov;
and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-
0018), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of the NRCs document system (ADAMS).
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the
Public Electronic Reading Room).
3
Thank you for your cooperation in this matter. Mr. Steve Grantham has been advised of the
policies and guidelines referenced in this letter. If you have any questions regarding the NRC's
examination procedures and guidelines, please contact Mr. Bruno Caballero at (404) 562-4608,
(Internet E-mail: Bruno.Caballero@nrc.gov), or me at (404) 562-4550, (Internet E-mail:
Malcolm.Widmann@nrc.gov).
Sincerely,
/RA/
Malcolm T. Widmann, Chief
Operations Branch
Division of Reactor Safety
Docket Nos.: 50-321, 50-366
(cc: w/encl - See Page 3)
4
cc: w/encl
Angela Thornhill
Managing Attorney and Compliance Officer
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
Jeffrey T. Gasser
Executive Vice President
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
Raymond D. Baker
Licensing Manager
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
L. Mike Stinson, Vice President
Fleet Operations Support
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
David H. Jones
Vice President
Engineering
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
Moanica Caston
Vice President and General Counsel
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
Steven B. Tipps
Hatch Principal Engineer - Licensing
Edwin I. Hatch Nuclear Plant
Electronic Mail Distribution
Mr. Ken Rosanski
Resident Manager
Edwin I. Hatch
Oglethorpe Power Corporation
Electronic Mail Distribution
Lee Foley
Manager of Contracts Generation
Oglethorpe Power Corporation
Electronic Mail Distribution
Bob Masse
Resident Manager
Vogtle Electric Generating Plant
Oglethorpe Power Corporation
Electronic Mail Distribution
Senior Resident Inspector
Southern Nuclear Operating Company, Inc.
Edwin I. Hatch Nuclear Plant
U.S. NRC
11030 Hatch Parkway N
Baxley, GA 30334
Arthur H. Domby, Esq.
Troutman Sanders
Electronic Mail Distribution
Dr. Carol Couch, Director
Environmental Protection
Department of Natural Resources
Electronic Mail Distribution
Cynthia Sanders
Program Manager
Radioactive Materials Program
Department of Natural Resources
Electronic Mail Distribution
Jim Sommerville
(Acting) Chief
Environmental Protection Division
Department of Natural Resources
Electronic Mail Distribution
Mr. Steven M. Jackson
Senior Engineer - Power Supply
Municipal Electric Authority of Georgia
Electronic Mail Distribution
Mr. Reece McAlister
Executive Secretary
Georgia Public Service Commission
Electronic Mail Distribution
Chairman
Appling County Commissioners
County Courthouse
69 Tippins Street, Suite 201
Baxley, GA 31513
Southern Nuclear Operating Company, Inc.
ATTN: Mr. John Hammonds
Training Manager
Hatch Nuclear Plant
11028 Hatch Parkway North
Baxley, GA 31513