| number = ML091910434
| number = ML091910434
| issue date = 07/10/2009
| issue date = 07/10/2009
| title = Notification of Inspection (NRC Inspection Report 05000482-09-005 and Request for Information
| title = Notification of Inspection (NRC Inspection Report 05000482-09-005 and Request for Information
| author name = Farnholtz T
| author name = Farnholtz T
| author affiliation = NRC/RGN-IV/DRS/EB-1
| author affiliation = NRC/RGN-IV/DRS/EB-1
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES
                                NUC LE AR RE G UL AT O RY C O M M I S S I O N
NUCLEAR REGULATORY COMMISSION
                                                    R E GI ON I V
R E GI ON I V
                                        612 EAST LAMAR BLVD , SU I TE 400
612 EAST LAMAR BLVD, SUITE 400
                                        AR LI N GTON , TEXAS 76011-4125
ARLINGTON, TEXAS 76011-4125
                                              July 10, 2009
July 10, 2009  
Rick A. Muench, President and
   Chief Executive Officer
Wolf Creek Nuclear Operating Corporation
Rick A. Muench, President and
P.O. Box 411
   Chief Executive Officer  
Burlington, KS 66839
Wolf Creek Nuclear Operating Corporation  
SUBJECT:       WOLF CREEK GENERATING STATION - NOTIFICATION OF INSPECTION
P.O. Box 411  
                (NRC INSPECTION REPORT 05000482/2009005 ) AND REQUEST FOR
Burlington, KS 66839  
                INFORMATION
Dear Mr. Muench,
SUBJECT:  
From October 15 through October 30, 2009, reactor inspectors from the Nuclear Regulatory
WOLF CREEK GENERATING STATION - NOTIFICATION OF INSPECTION  
Commissions (NRC) Region IV office will perform the baseline inservice inspection at the Wolf
(NRC INSPECTION REPORT 05000482/2009005 ) AND REQUEST FOR  
Creek Generating Station, using NRC Inspection Procedure 71111.08, "Inservice Inspection
INFORMATION  
Activities," and TI 2515/172, "Reactor Coolant System Dissimilar Metal Butt Welds." Experience
has shown that this inspection is a resource intensive inspection both for the NRC inspectors
Dear Mr. Muench,  
and your staff. In order to minimize the impact to your onsite resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
From October 15 through October 30, 2009, reactor inspectors from the Nuclear Regulatory  
These documents have been divided into two groups. The first group (Section A of the
Commissions (NRC) Region IV office will perform the baseline inservice inspection at the Wolf  
enclosure) identified information to be provided prior to the inspection to ensure that the
Creek Generating Station, using NRC Inspection Procedure 71111.08, "Inservice Inspection  
inspectors are adequately prepared. The second group (Section B of the enclosure) identifies
Activities," and TI 2515/172, "Reactor Coolant System Dissimilar Metal Butt Welds." Experience  
the information the inspectors will need upon arrival at the site. It is important that all of these
has shown that this inspection is a resource intensive inspection both for the NRC inspectors  
documents are up to date and complete in order to minimize the number of additional
and your staff. In order to minimize the impact to your onsite resources and to ensure a  
documents requested during the preparation and/or the onsite portions of the inspection.
productive inspection, we have enclosed a request for documents needed for this inspection.
We have discussed the schedule for these inspection activities with your staff and understand
These documents have been divided into two groups. The first group (Section A of the  
that our regulatory contact for this inspection will be Mr. William Muilenberg, of your licensing
enclosure) identified information to be provided prior to the inspection to ensure that the  
organization. Our inspection dates are subject to change based on your updated schedule of
inspectors are adequately prepared. The second group (Section B of the enclosure) identifies  
outage activities. If there are any questions about this inspection or the material requested,
the information the inspectors will need upon arrival at the site. It is important that all of these  
please contact the lead inspector Ronald A. Kopriva, at (817) 860-8104, or
documents are up to date and complete in order to minimize the number of additional  
ron.kopriva@nrc.gov.
documents requested during the preparation and/or the onsite portions of the inspection.  
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
We have discussed the schedule for these inspection activities with your staff and understand  
Room or from the Publicly Available Records (PARS) component of NRCs document
that our regulatory contact for this inspection will be Mr. William Muilenberg, of your licensing  
system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-
organization. Our inspection dates are subject to change based on your updated schedule of  
rm/adams.html (the Public Electronic Reading Room).
outage activities. If there are any questions about this inspection or the material requested,  
please contact the lead inspector Ronald A. Kopriva, at (817) 860-8104, or  
ron.kopriva@nrc.gov.  
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its  
enclosure will be available electronically for public inspection in the NRC Public Document  
Room or from the Publicly Available Records (PARS) component of NRCs document  
system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).  


Wolf Creek Nuclear Operating Corporation -2-
Wolf Creek Nuclear Operating Corporation  
                                        Sincerely,
- 2 -  
                                            /RA/
                                        Thomas Farnholtz, Chief
                                        Engineering Branch 1
                                        Division of Reactor Safety
Sincerely,  
Docket: 50-482
License: NPF-42
Enclosure:
/RA/  
Inservice Inspection Document Request
Vice President Operations/Plant Manager
Wolf Creek Nuclear Operating Corporation
Thomas Farnholtz, Chief  
P.O. Box 411
Burlington, KS 66839
Engineering Branch 1  
Jay Silberg, Esq.
Pillsbury Winthrop Shaw Pittman LLP
Division of Reactor Safety  
2300 N Street, NW
Washington, DC 20037
Docket:   50-482  
Supervisor Licensing
License: NPF-42  
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Enclosure:  
Burlington, KS 66839
Inservice Inspection Document Request  
Chief Engineer
Utilities Division
Vice President Operations/Plant Manager  
Kansas Corporation Commission
Wolf Creek Nuclear Operating Corporation  
1500 SW Arrowhead Road
P.O. Box 411  
Topeka, KS 66604-4027
Burlington, KS 66839  
Office of the Governor
State of Kansas
Jay Silberg, Esq.  
Topeka, KS 66612-1590
Pillsbury Winthrop Shaw Pittman LLP  
Attorney General
2300 N Street, NW  
120 S.W. 10th Avenue, 2nd Floor
Washington, DC 20037  
Topeka, KS 66612-1597
County Clerk
Supervisor Licensing  
Coffey County Courthouse
Wolf Creek Nuclear Operating Corporation  
110 South 6th Street
P.O. Box 411  
Burlington, KS 66839
Burlington, KS 66839  
Chief Engineer  
Utilities Division  
Kansas Corporation Commission  
1500 SW Arrowhead Road  
Topeka, KS 66604-4027  
Office of the Governor  
State of Kansas  
Topeka, KS 66612-1590  
Attorney General  
120 S.W. 10th Avenue, 2nd Floor  
Topeka, KS 66612-1597  
County Clerk  
Coffey County Courthouse  
110 South 6th Street  
Burlington, KS 66839  


Wolf Creek Nuclear Operating Corporation -3-
Wolf Creek Nuclear Operating Corporation  
Chief, Radiation and Asbestos
- 3 -  
Control Section
Bureau of Air and Radiation
Chief, Radiation and Asbestos  
Kansas Department of Health and
  Control Section  
Environment
Bureau of Air and Radiation  
1000 SW Jackson, Suite 310
Kansas Department of Health and  
Topeka, KS 66612-1366
  Environment  
Chief, Technological Hazards
1000 SW Jackson, Suite 310  
  Branch
Topeka, KS 66612-1366  
FEMA, Region VII
9221 Ward Parkway
Chief, Technological Hazards  
Suite 300
  Branch  
Kansas City, MO 64114-3372
FEMA, Region VII  
9221 Ward Parkway  
Suite 300  
Kansas City, MO 64114-3372  


Wolf Creek Nuclear Operating Corporation           -4-
Wolf Creek Nuclear Operating Corporation  
Electronic distribution by RIV:
- 4 -  
Regional Administrator (Elmo.Collins@nrc.gov )
Deputy Regional Administrator (Chuck.Casto@nrc.gov )
Electronic distribution by RIV:  
DRP Director (Dwight.Chamberlain@nrc.gov )
Regional Administrator (Elmo.Collins@nrc.gov )  
DRP Deputy Director (Anton.Vegel@nrc.gov )
Deputy Regional Administrator (Chuck.Casto@nrc.gov )  
DRS Director (Roy.Caniano@nrc.gov )
DRP Director (Dwight.Chamberlain@nrc.gov )  
DRS Deputy Director (Troy.Pruett@nrc.gov )
DRP Deputy Director (Anton.Vegel@nrc.gov )  
Senior Resident Inspector (Chris.Long@nrc.gov )
DRS Director (Roy.Caniano@nrc.gov )  
Resident Inspector (Charles.Peabody@nrc.gov )
DRS Deputy Director (Troy.Pruett@nrc.gov )  
Site Secretary (Shirley.Allen@nrc.gov )
Senior Resident Inspector (Chris.Long@nrc.gov )  
Branch Chief, DRP/B (Vincent.Gaddy@nrc.gov )
Resident Inspector (Charles.Peabody@nrc.gov )  
Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov )
Site Secretary (Shirley.Allen@nrc.gov )  
Public Affairs Officer (Victor.Dricks@nrc.gov )
Branch Chief, DRP/B (Vincent.Gaddy@nrc.gov )  
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov )
Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov )  
RITS Coordinator (Marisa.Herrera@nrc.gov )
Public Affairs Officer (Victor.Dricks@nrc.gov )  
Regional Counsel (Karla.Fuller@nrc.gov )
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov )  
Congressional Affairs Officer (Jenny.Weil@nrc.gov )
RITS Coordinator (Marisa.Herrera@nrc.gov )  
OEMail Resource
Regional Counsel (Karla.Fuller@nrc.gov )  
SUNSI Review Completed: ___Y___             ADAMS: 7 Yes         No   Initials: ___TRF_
Congressional Affairs Officer (Jenny.Weil@nrc.gov )  
7 Publicly Available       Non-Publicly Available     Sensitive     7 Non-Sensitive
OEMail Resource  
S:\DRS\REPORTS\WC 2009005 RFI -RAK                                     ML091910434
SRI:EB1               C:EB1
RAKopriva             TFarnholtz
/RA/                 /RA/
7/8/09               7/10/09
OFFICIAL RECORD COPY T=Telephone                 E=E-mail     F=Fax
SUNSI Review Completed: ___Y___  
ADAMS: 7 Yes  
  No       Initials: ___TRF_
7   Publicly Available         Non-Publicly Available         Sensitive  
7   Non-Sensitive  
S:\\DRS\\REPORTS\\WC 2009005 RFI -RAK
ML091910434  
SRI:EB1  
C:EB1  
RAKopriva  
TFarnholtz  
/RA/  
/RA/  
7/8/09  
7/10/09  
OFFICIAL RECORD COPY T=Telephone           E=E-mail       F=Fax  


                      INSERVICE INSPECTION DOCUMENT REQUEST
Inspection Dates:         October 15 through October 30, 2009
Inspection Procedures:     IP 71111.08 "Inservice Inspection (ISI) Activities"
                          TI 2515/172 "Reactor Coolant System Dissimilar Metal Butt Welds"
- 1 -
Inspectors:               Ronald A. Kopriva, Senior Reactor Inspector (Lead Inspector - ISI)
Enclosure
                          James Drake, Senior Reactor Inspector
INSERVICE INSPECTION DOCUMENT REQUEST  
A.     Information Requested for the In-Office Preparation Week
      The following information should be sent to the Region IV office in hard copy or
      electronic format (ims.certrec.com preferred), in care of Ronald A. Kopriva, by
Inspection Dates:  
      September 28, 2009, to facilitate the selection of specific items that will be reviewed
October 15 through October 30, 2009  
      during the onsite inspection week. The inspector will select specific items from the
      information requested below and then request from your staff additional documents
Inspection Procedures:  
      needed during the onsite inspection week (Section B of this enclosure). We ask that the
IP 71111.08 "Inservice Inspection (ISI) Activities"  
      specific items selected from the lists be available and ready for review on the first day of
TI 2515/172 "Reactor Coolant System Dissimilar Metal Butt Welds"  
      inspection. *Please provide requested documentation electronically if possible. If
      requested documents are large and only hard copy formats are available, please inform
Inspectors:  
      the inspector(s), and provide subject documentation during the first day of the onsite
Ronald A. Kopriva, Senior Reactor Inspector (Lead Inspector - ISI)  
      inspection. If you have any questions regarding this information request, please call the
James Drake, Senior Reactor Inspector  
      inspector as soon as possible.
A.1   ISI/Welding Programs and Schedule Information
A.  
      a)     A detailed schedule (including preliminary dates) of:
Information Requested for the In-Office Preparation Week  
              i)     Nondestructive examinations (NDEs) planned for Class 1 & 2 systems
                      and containment, performed as part of your ASME Section XI, Risk
The following information should be sent to the Region IV office in hard copy or  
                      Informed (if applicable), and augmented ISI programs during the
electronic format (ims.certrec.com preferred), in care of Ronald A. Kopriva, by  
                      upcoming outage.
September 28, 2009, to facilitate the selection of specific items that will be reviewed  
                      Provide a status summary of the NDE inspection activities vs. the
during the onsite inspection week. The inspector will select specific items from the  
                      required inspection period percentages for this Interval by category per
information requested below and then request from your staff additional documents  
                      ASME Section XI, IWX-2400 (Do not provide separately if other
needed during the onsite inspection week (Section B of this enclosure). We ask that the  
                      documentation requested contains this information)
specific items selected from the lists be available and ready for review on the first day of  
              ii)     Reactor pressure vessel head (RPVH) examinations planned for the
inspection. *Please provide requested documentation electronically if possible. If  
                      upcoming outage.
requested documents are large and only hard copy formats are available, please inform  
              iii)   Examinations planned for Alloy 82/182/600 components that are not
the inspector(s), and provide subject documentation during the first day of the onsite  
                      included in the Section XI scope. (If applicable)
inspection. If you have any questions regarding this information request, please call the  
              iv)     Examinations planned as part of your Boric Acid Corrosion Control
inspector as soon as possible.  
                      Program (Mode 3 walkdowns, bolted connection walkdowns, etc.)
                                            -1-                                        Enclosure
A.1  
ISI/Welding Programs and Schedule Information  
a)  
A detailed schedule (including preliminary dates) of:  
i)
Nondestructive examinations (NDEs) planned for Class 1 & 2 systems  
and containment, performed as part of your ASME Section XI, Risk  
Informed (if applicable), and augmented ISI programs during the  
upcoming outage.  
Provide a status summary of the NDE inspection activities vs. the  
required inspection period percentages for this Interval by category per  
ASME Section XI, IWX-2400 (Do not provide separately if other  
documentation requested contains this information)  
ii)
Reactor pressure vessel head (RPVH) examinations planned for the  
upcoming outage.  
iii)  
Examinations planned for Alloy 82/182/600 components that are not  
included in the Section XI scope. (If applicable)  
iv)  
Examinations planned as part of your Boric Acid Corrosion Control  
Program (Mode 3 walkdowns, bolted connection walkdowns, etc.)  


          v)       Welding activities that are scheduled to be completed during the
                  upcoming outage (ASME Class 1, 2, or 3 structures, systems, or
                  components (SSCs))
    b)   A copy of ASME Section XI Code Relief Requests and associated NRC Safety
- 2 -
          Evaluations applicable to the examinations identified above.
Enclosure
    c)   A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrate,
v)  
          Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code
Welding activities that are scheduled to be completed during the  
          Class 1 & 2 systems since the beginning of the last refueling outage. This should
upcoming outage (ASME Class 1, 2, or 3 structures, systems, or  
          include the previous Section XI pressure test(s) conducted during start up and
components (SSCs))  
          any evaluations associated with the results of the pressure tests. Also, include in
          the list the NDE reports with relevant conditions in the RPVH penetration nozzles
b)  
          which have been accepted for continued service. The list of NDE reports should
A copy of ASME Section XI Code Relief Requests and associated NRC Safety  
          include a brief description of the SSC where the relevant condition was identified.
Evaluations applicable to the examinations identified above.
    d)   A list with a brief description (e.g., system, material, pipe size, weld number, and
          NDE performed) of the welds in Code Class 1 and 2 systems which have been
          fabricated due to component repair/replacement activities since the beginning of
c)  
          the last refueling outage, or are planned to be fabricated this refueling outage.
A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrate,  
    e)   If reactor vessel weld examinations required by the ASME Code are scheduled to
Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code  
          occur during the upcoming outage, provide a detailed description of the welds to
Class 1 & 2 systems since the beginning of the last refueling outage. This should  
          be examined and the extent of the planned examination. Please also provide
include the previous Section XI pressure test(s) conducted during start up and  
          reference numbers for applicable procedures that will be used to conduct these
any evaluations associated with the results of the pressure tests. Also, include in  
          examinations.
the list the NDE reports with relevant conditions in the RPVH penetration nozzles  
    f)   Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of
which have been accepted for continued service. The list of NDE reports should  
          Section XI of the ASME Code that have been identified since the beginning of the
include a brief description of the SSC where the relevant condition was identified.  
          last refueling outage.
    g)   A list of any temporary non-code repairs in service (e.g., pinhole leaks).
d)  
    h)   Please provide copies of the most recent self assessments for the ISI, Welding,
A list with a brief description (e.g., system, material, pipe size, weld number, and  
          and Alloy 600 Programs.
NDE performed) of the welds in Code Class 1 and 2 systems which have been  
A.2 Reactor Pressure Vessel Head (RPVH)
fabricated due to component repair/replacement activities since the beginning of  
    a)   Provide the detailed scope of the planned NDE of the reactor vessel head which
the last refueling outage, or are planned to be fabricated this refueling outage.  
          identifies the types of NDE methods to be used on each specific part of the
          vessel head to fulfill commitments made in response to NRC Bulletin 2002-02
e)  
          and NRC Order EA-03-009. Also, include examination scope expansion criteria
If reactor vessel weld examinations required by the ASME Code are scheduled to  
          and planned expansion sample sizes if relevant conditions are identified. (If
occur during the upcoming outage, provide a detailed description of the welds to  
          applicable)
be examined and the extent of the planned examination. Please also provide  
    b)   A list of the standards and/or requirements that will be used to evaluate
reference numbers for applicable procedures that will be used to conduct these  
          indications identified during NDE of the reactor vessel head (e.g., the specific
examinations.  
          industry or procedural standards which will be used to evaluate potential leakage
          and/or flaw indications).
f)  
                                        -2-                                        Enclosure
Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of  
Section XI of the ASME Code that have been identified since the beginning of the  
last refueling outage.  
g)
A list of any temporary non-code repairs in service (e.g., pinhole leaks).  
h)  
Please provide copies of the most recent self assessments for the ISI, Welding,  
and Alloy 600 Programs.
A.2  
Reactor Pressure Vessel Head (RPVH)  
a)
Provide the detailed scope of the planned NDE of the reactor vessel head which  
identifies the types of NDE methods to be used on each specific part of the  
vessel head to fulfill commitments made in response to NRC Bulletin 2002-02  
and NRC Order EA-03-009. Also, include examination scope expansion criteria  
and planned expansion sample sizes if relevant conditions are identified. (If  
applicable)  
b)
A list of the standards and/or requirements that will be used to evaluate  
indications identified during NDE of the reactor vessel head (e.g., the specific  
industry or procedural standards which will be used to evaluate potential leakage  
and/or flaw indications).  


A.3 Boric Acid Corrosion Control Program (BACCP)
    a)     Copy of the procedures that govern the scope, equipment and implementation of
          the inspections required to identify boric acid leakage and the procedures for
          boric acid leakage/corrosion evaluation.
- 3 -
    b)     Please provide a list of leaks (including Code class of the components) that have
Enclosure
          been identified since the last refueling outage and associated corrective action
A.3  
          documentation. If during the last cycle, the Unit was shutdown, please provide
Boric Acid Corrosion Control Program (BACCP)  
          documentation of containment walkdown inspections performed as part of the
          BACCP.
a)
    c)     Please provide a copy of the most recent self-assessment performed for the
Copy of the procedures that govern the scope, equipment and implementation of  
          BACCP.
the inspections required to identify boric acid leakage and the procedures for  
A.4 Steam Generator Tube (SGT) Inspections
boric acid leakage/corrosion evaluation.  
    a)     A detailed schedule of:
          i)     SGT inspection, data analyses, and repair activities for the upcoming
b)  
                  outage. (If occurring)
Please provide a list of leaks (including Code class of the components) that have  
          ii)     SG secondary side inspection activities for the upcoming outage. (If
been identified since the last refueling outage and associated corrective action  
                  occurring)
documentation. If during the last cycle, the Unit was shutdown, please provide  
    b)     Please provide a copy of your SG ISI Inspection Program and Plan. Please
documentation of containment walkdown inspections performed as part of the  
          include a copy of the Operational Assessment from last outage and a copy of the
BACCP.  
          following documents as they become available:
          i)     Degradation Assessment
c)  
          ii)     Condition Monitoring Assessment
Please provide a copy of the most recent self-assessment performed for the  
    c)     If you are planning on modifying your Technical Specifications such that they are
BACCP.  
          consistent with TSTF-449, please provide copies of your correspondence with
          the NRC regarding deviations from the STS.
A.4  
    d)     Copy of SG history documentation given to vendors performing eddy current (ET)
Steam Generator Tube (SGT) Inspections  
          testing of the SGs during the upcoming outage.
    e)     Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy
a)  
          Current Technique Specification Sheets (ETSS). Additionally, please provide a
A detailed schedule of:  
          copy of EPRI Appendix H ETSS Qualification Records.
    f)     Identify and quantify any SGT leakage experienced during the previous operating
i)
          cycle. Also provide documentation identifying which SG was leaking and
SGT inspection, data analyses, and repair activities for the upcoming  
          corrective actions completed or planned for this condition. (If applicable)
outage. (If occurring)  
    g)     Provide past history of the condition and issues pertaining to the secondary side
          of the steam generators (including items such as loose parts, fouling, top of tube
ii)
          sheet condition, crud removal amounts, etc.).
SG secondary side inspection activities for the upcoming outage. (If  
                                        -3-                                        Enclosure
occurring)  
b)  
Please provide a copy of your SG ISI Inspection Program and Plan. Please  
include a copy of the Operational Assessment from last outage and a copy of the  
following documents as they become available:
i)  
Degradation Assessment  
ii)  
Condition Monitoring Assessment  
c)  
If you are planning on modifying your Technical Specifications such that they are  
consistent with TSTF-449, please provide copies of your correspondence with  
the NRC regarding deviations from the STS.  
d)  
Copy of SG history documentation given to vendors performing eddy current (ET)  
testing of the SGs during the upcoming outage.  
e)  
Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy  
Current Technique Specification Sheets (ETSS). Additionally, please provide a  
copy of EPRI Appendix H ETSS Qualification Records.  
f)  
Identify and quantify any SGT leakage experienced during the previous operating  
cycle. Also provide documentation identifying which SG was leaking and  
corrective actions completed or planned for this condition. (If applicable)  
g)
Provide past history of the condition and issues pertaining to the secondary side  
of the steam generators (including items such as loose parts, fouling, top of tube  
sheet condition, crud removal amounts, etc.).  


    h)     Please provide copies of your most recent self assessments of the SG
          monitoring, loose parts monitoring, and secondary side water chemistry control
          programs.
    i)     Please also indicate where the primary, secondary, and resolution analyses are
- 4 -
          scheduled to take place.
Enclosure
    j)     Please provide a summary of the scope of the SGT examinations, including
          examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the
h)  
          percentage of tubes to be examined. *Do not provide these documents
Please provide copies of your most recent self assessments of the SG  
          separately if already included in other information requested.
monitoring, loose parts monitoring, and secondary side water chemistry control  
A.5 Materials Reliability (MRP-139) Program Activities
programs.  
    a)     A list of, with verification, that the baseline inspections of all applicable Dissimilar
          Metal Butt Welds (DMBWs) have been completed by September 28, 2009.
i)  
    b)     Verification that baseline inspection of hot leg and cold leg temperature DMBWs
Please also indicate where the primary, secondary, and resolution analyses are  
          have been included in the inspection program and that the schedules for the
scheduled to take place.  
          baseline inspections are consistent with the baseline schedules in MRP-139.
    c)     A list and schedule (examination dates) of all DMBW examinations planned for
j)  
          the upcoming refueling outage. If none are scheduled, then data from previous
Please provide a summary of the scope of the SGT examinations, including  
          examinations should be available for review.
examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the  
    d)     A list and schedule for any welding to be performed on DMBWs in the upcoming
percentage of tubes to be examined. *Do not provide these documents  
          outage. If no welding will be performed then records of previous welding on
separately if already included in other information requested.
          DMBWs and postweld NDE documentation.
    e)     A list and schedule of any stress improvement (SI) activities planned for the
A.5  
          upcoming refueling outage. If none are scheduled then have qualification reports
Materials Reliability (MRP-139) Program Activities  
          for any SIs previously performed.
    f)     Documentation and description of how the baseline and inservice inspection
a)  
          specifications in MRP-139 are satisfied at your facility.
A list of, with verification, that the baseline inspections of all applicable Dissimilar  
    g)     A list of weld locations controlled by MRP-139 which includes the MRP-139 weld
Metal Butt Welds (DMBWs) have been completed by September 28, 2009.  
          category, pre-mitigation volumetric examination date, type of mitigation or stress
          improvement, post mitigation volumetric examination date, and plans for future
b)  
          MRP-139 required examinations.
Verification that baseline inspection of hot leg and cold leg temperature DMBWs  
A.6 Additional information related to all ISI activities
have been included in the inspection program and that the schedules for the  
    a)     A list with a brief description of ISI, BACCP, and SGT inspection related issues
baseline inspections are consistent with the baseline schedules in MRP-139.  
          (e.g., condition reports) entered into your corrective action program since the
          beginning of the last refueling outage. For example, a list based upon data base
c)  
          searches using key words related to piping or SG tube degradation such as: ISI,
A list and schedule (examination dates) of all DMBW examinations planned for  
          ASME Code, Section XI, NDE, cracks, wear, thinning, leakage, rust, corrosion,
the upcoming refueling outage. If none are scheduled, then data from previous  
          boric acid, or errors in piping/SGT examinations.
examinations should be available for review.  
                                          -4-                                        Enclosure
d)  
A list and schedule for any welding to be performed on DMBWs in the upcoming  
outage. If no welding will be performed then records of previous welding on  
DMBWs and postweld NDE documentation.  
e)  
A list and schedule of any stress improvement (SI) activities planned for the  
upcoming refueling outage. If none are scheduled then have qualification reports  
for any SIs previously performed.  
f)  
Documentation and description of how the baseline and inservice inspection  
specifications in MRP-139 are satisfied at your facility.  
g)  
A list of weld locations controlled by MRP-139 which includes the MRP-139 weld  
category, pre-mitigation volumetric examination date, type of mitigation or stress  
improvement, post mitigation volumetric examination date, and plans for future  
MRP-139 required examinations.  
A.6  
Additional information related to all ISI activities  
a)
A list with a brief description of ISI, BACCP, and SGT inspection related issues  
(e.g., condition reports) entered into your corrective action program since the  
beginning of the last refueling outage. For example, a list based upon data base  
searches using key words related to piping or SG tube degradation such as: ISI,  
ASME Code, Section XI, NDE, cracks, wear, thinning, leakage, rust, corrosion,  
boric acid, or errors in piping/SGT examinations.  


    b)     Please provide names and phone numbers for the following program leads:
          ISI contacts (Examination, planning)
          Containment Exams
          RPVH Exams
- 5 -
          Snubbers and Supports
Enclosure
          Repair and Replacement Program Manager
          Licensing Contact
b)
          Site Welding Engineer
Please provide names and phone numbers for the following program leads:  
          Boric Acid Corrosion Control Program
          SG Inspection Activities (site lead and vendor contact)
ISI contacts (Examination, planning)  
B. Information to be provided onsite to the inspector(s) at the entrance meeting (October
Containment Exams  
    16, 2009):
RPVH Exams  
B.1 ISI / Welding Programs and Schedule Information
Snubbers and Supports  
    a)     Updated schedules for ISI/NDE activities, including SGT inspections, planned
Repair and Replacement Program Manager  
          welding activities, and schedule showing contingency repair plans, if available.
Licensing Contact  
    b)     For ASME Code Class 1 and 2 welds selected by the inspector from the lists
Site Welding Engineer  
          provided from section A of this enclosure, please provide copies of the following
Boric Acid Corrosion Control Program  
          documentation for each subject weld:
SG Inspection Activities (site lead and vendor contact)  
          i)     Weld data sheet (traveler)
          ii)     Weld configuration and system location
B.  
          iii)   Applicable Code Edition and Addenda for weldment
Information to be provided onsite to the inspector(s) at the entrance meeting (October  
          iv)     Applicable Code Edition and Addenda for welding procedures
16, 2009):  
          v)     Applicable weld procedures (WPS) used to fabricate the welds
          vi)     Copies of procedure qualification records (PQRs) supporting the WPS
B.1  
                  from B.1.b.v
ISI / Welding Programs and Schedule Information  
          vii)   Copies of mechanical test reports identified in the PQRs above
          viii)   Copies of the nonconformance reports for the selected welds (If
a)  
                  applicable)
Updated schedules for ISI/NDE activities, including SGT inspections, planned  
          ix)     Radiographs of the selected welds and access to equipment to allow
welding activities, and schedule showing contingency repair plans, if available.  
                  viewing radiographs (If RT was performed)
          x)     Copies of the preservice examination records for the selected welds
b)  
          xi)     Copies of welder performance qualifications records applicable to the
For ASME Code Class 1 and 2 welds selected by the inspector from the lists  
                  selected welds, including documentation that welder maintained
provided from section A of this enclosure, please provide copies of the following  
                  proficiency in the applicable welding processes specified in the WPS (at
documentation for each subject weld:  
                  least six months prior to the date of subject work)
          xii)   Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable
i)  
    c)     For the ISI related corrective action issues selected by the inspector(s) from
Weld data sheet (traveler)  
          section A of this enclosure, provide a copy of the corrective actions and
ii)  
          supporting documentation.
Weld configuration and system location  
    d)     For the NDE reports with relevant conditions on Code Class 1 & 2 systems
iii)  
          selected by the inspector from section A above, provide a copy of the
Applicable Code Edition and Addenda for weldment  
                                        -5-                                        Enclosure
iv)  
Applicable Code Edition and Addenda for welding procedures  
v)  
Applicable weld procedures (WPS) used to fabricate the welds  
vi)  
Copies of procedure qualification records (PQRs) supporting the WPS  
from B.1.b.v  
vii)  
Copies of mechanical test reports identified in the PQRs above  
viii)  
Copies of the nonconformance reports for the selected welds (If  
applicable)  
ix)  
Radiographs of the selected welds and access to equipment to allow  
viewing radiographs (If RT was performed)  
x)  
Copies of the preservice examination records for the selected welds  
xi)  
Copies of welder performance qualifications records applicable to the  
selected welds, including documentation that welder maintained  
proficiency in the applicable welding processes specified in the WPS (at  
least six months prior to the date of subject work)  
xii)  
Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable  
c)  
For the ISI related corrective action issues selected by the inspector(s) from  
section A of this enclosure, provide a copy of the corrective actions and  
supporting documentation.  
d)  
For the NDE reports with relevant conditions on Code Class 1 & 2 systems  
selected by the inspector from section A above, provide a copy of the  


          examination records, examiner qualification records, and associated corrective
          action documents.
    e)     A copy of (or ready access to) most current revision of the ISI Program Manual
          and Plan for the current Interval.
- 6 -
    f)     For the NDEs selected by the inspector from section A of this enclosure, provide
Enclosure
          copy of the NDE procedures used to perform the examinations (including
examination records, examiner qualification records, and associated corrective  
          calibration and flaw characterization/sizing procedures). For ultrasonic
action documents.  
          examination procedures qualified in accordance with ASME Code, Section XI,
          Appendix VIII, provide documentation supporting the procedure qualification
e)  
          (e.g., the EPRI performance demonstration qualification summary sheets). Also,
A copy of (or ready access to) most current revision of the ISI Program Manual  
          include qualification documentation of the specific equipment to be used (e.g.,
and Plan for the current Interval.
          ultrasonic unit, cables, and transducers including serial numbers) and NDE
          personnel qualification records.
f)  
B.2 Reactor Pressure Vessel Head (RPVH)
For the NDEs selected by the inspector from section A of this enclosure, provide  
    a)     Provide the NDE personnel qualification records for the examiners who will
copy of the NDE procedures used to perform the examinations (including  
          perform examinations of the RPVH.
calibration and flaw characterization/sizing procedures). For ultrasonic  
    b)     Provide drawings showing the following: (If a visual examination is planned for
examination procedures qualified in accordance with ASME Code, Section XI,  
          the upcoming refueling outage).
Appendix VIII, provide documentation supporting the procedure qualification  
          i)       RPVH and CRDM nozzle configurations
(e.g., the EPRI performance demonstration qualification summary sheets). Also,  
          ii)     RPVH insulation configuration
include qualification documentation of the specific equipment to be used (e.g.,  
    The drawings listed above should include fabrication drawings for the nozzle attachment
ultrasonic unit, cables, and transducers including serial numbers) and NDE  
    welds as applicable.
personnel qualification records.  
    c)     Copy of NDE reports from the last RPVH examination.
    d)     Copy of evaluation or calculation demonstrating that the scope of the visual
B.2  
          examination of the upper head will meet the 95 percent minimum coverage
Reactor Pressure Vessel Head (RPVH)  
          required by NRC Order EA-03-009 (If a visual examination is planned for the
          upcoming refueling outage).
a)  
    e)     Provide a copy of the procedures that will be used to identify the source of any
Provide the NDE personnel qualification records for the examiners who will  
          boric acid deposits identified on the RPVH. If no explicit procedures exist which
perform examinations of the RPVH.
          govern this activity, provide a description of the process to be followed including
          personnel responsibilities and expectations.
b)  
    f)     Provide a copy of the updated calculation of effective degradation years (EDY)
Provide drawings showing the following: (If a visual examination is planned for  
          for the RPVH susceptibility ranking.
the upcoming refueling outage).  
    g)     Provide copy of the vendor qualification report(s) that demonstrates the detection
          capability of the NDE equipment used for the RPVH examinations. Also, identify
i)  
          any changes in equipment configurations used for the RPVH examinations which
RPVH and CRDM nozzle configurations
          differ from that used in the vendor qualification report(s).
ii)  
                                        -6-                                        Enclosure
RPVH insulation configuration
The drawings listed above should include fabrication drawings for the nozzle attachment  
welds as applicable.
c)  
Copy of NDE reports from the last RPVH examination.  
d)  
Copy of evaluation or calculation demonstrating that the scope of the visual  
examination of the upper head will meet the 95 percent minimum coverage  
required by NRC Order EA-03-009 (If a visual examination is planned for the  
upcoming refueling outage).  
e)  
Provide a copy of the procedures that will be used to identify the source of any  
boric acid deposits identified on the RPVH. If no explicit procedures exist which  
govern this activity, provide a description of the process to be followed including  
personnel responsibilities and expectations.
f)
Provide a copy of the updated calculation of effective degradation years (EDY)  
for the RPVH susceptibility ranking.  
g)
Provide copy of the vendor qualification report(s) that demonstrates the detection  
capability of the NDE equipment used for the RPVH examinations. Also, identify  
any changes in equipment configurations used for the RPVH examinations which  
differ from that used in the vendor qualification report(s).  


B.3 Boric Acid Corrosion Control Program (BACCP)
    a)     Please provide boric acid walkdown inspection results, an updated list of boric
          acid leaks identified so far this outage, associated corrective action
          documentation, and overall status of planned boric acid inspections.
- 7 -
    b)     Please provide any engineering evaluations completed for boric acid leaks
Enclosure
          identified since the end of the last refueling outage. Please include a status of
B.3  
          corrective actions to repair and/or clean these boric acid leaks. Please identify
Boric Acid Corrosion Control Program (BACCP)  
          specifically which known leaks, if any, have remained in service or will remain in
          service as active leaks.
a)  
B.4 Steam Generator Tube (SGT) Inspections
Please provide boric acid walkdown inspection results, an updated list of boric  
    a)     Copies of the Examination Technique Specification Sheets (ETSS) and
acid leaks identified so far this outage, associated corrective action  
          associated justification for any revisions.
documentation, and overall status of planned boric acid inspections.  
    b)     Copy of the guidance to be followed if a loose part or foreign material is identified
          in the SGs.
b)  
    c)     Please provide a copy of the ET procedures used to perform the SGT
Please provide any engineering evaluations completed for boric acid leaks  
          inspections (specifically calibration and flaw characterization/sizing procedures,
identified since the end of the last refueling outage. Please include a status of  
          etc.). Also include documentation for the specific equipment to be used.
corrective actions to repair and/or clean these boric acid leaks. Please identify  
    d)     Please provide copies of your responses to NRC and industry operating
specifically which known leaks, if any, have remained in service or will remain in  
          experience communications such as Generic Letters, Information Notices, etc.
service as active leaks.
          (as applicable to SGT inspections) *Do not provide these documents separately if
          already included in other information requested such as the degradation
B.4  
          assessment.
Steam Generator Tube (SGT) Inspections  
    e)     List of corrective action documents generated by the vendor and/or site with
          respect to SG inspection activities.
a)  
B.5 Codes and Standards
Copies of the Examination Technique Specification Sheets (ETSS) and  
    a)     Ready access to (i.e., copies provided to the inspector(s) for use during the
associated justification for any revisions.  
          inspection at the onsite inspection location, or room number and location where
          available):
b)  
          i)       Applicable Editions of the ASME Code (Sections V, IX and XI) for the
Copy of the guidance to be followed if a loose part or foreign material is identified  
                    inservice inspection program and the repair/replacement program.
in the SGs.  
          ii)     EPRI and industry standards referenced in the procedures used to
                    perform the SGT eddy current examination.
c)  
                                        -7-                                        Enclosure
Please provide a copy of the ET procedures used to perform the SGT  
inspections (specifically calibration and flaw characterization/sizing procedures,  
etc.). Also include documentation for the specific equipment to be used.  
d)  
Please provide copies of your responses to NRC and industry operating  
experience communications such as Generic Letters, Information Notices, etc.  
(as applicable to SGT inspections) *Do not provide these documents separately if  
already included in other information requested such as the degradation  
assessment.  
e)  
List of corrective action documents generated by the vendor and/or site with  
respect to SG inspection activities.  
B.5  
Codes and Standards  
a)  
Ready access to (i.e., copies provided to the inspector(s) for use during the  
inspection at the onsite inspection location, or room number and location where  
available):  
i)
Applicable Editions of the ASME Code (Sections V, IX and XI) for the  
inservice inspection program and the repair/replacement program.
ii)
EPRI and industry standards referenced in the procedures used to  
perform the SGT eddy current examination.  


Inspector Contact Information:
Ronald A. Kopriva             James Drake
Senior Reactor Inspector       Senior Reactor Inspector
817-860-8104                   817-276-6558
- 8 -
Ron.kopriva@nrc.gov           James.Drake@nrc.gov
Enclosure
Mailing Address:
US NRC Region IV
Inspector Contact Information:  
Attn: Ron Kopriva
612 E. Lamar Blvd, Suite 400
Ronald A. Kopriva  
James Drake
Senior Reactor Inspector  
Senior Reactor Inspector  
817-860-8104
817-276-6558
Ron.kopriva@nrc.gov
James.Drake@nrc.gov  
Mailing Address:  
US NRC Region IV  
Attn: Ron Kopriva  
612 E. Lamar Blvd, Suite 400  
Arlington, TX 76011
Arlington, TX 76011
                                    -8-                Enclosure
}}
}}

Latest revision as of 11:02, 14 January 2025

Notification of Inspection (NRC Inspection Report 05000482-09-005 and Request for Information
ML091910434
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 07/10/2009
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Muench R
Wolf Creek
References
IR-09-005
Download: ML091910434 (12)


See also: IR 05000482/2009005

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

R E GI ON I V

612 EAST LAMAR BLVD, SUITE 400

ARLINGTON, TEXAS 76011-4125

July 10, 2009

Rick A. Muench, President and

Chief Executive Officer

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, KS 66839

SUBJECT:

WOLF CREEK GENERATING STATION - NOTIFICATION OF INSPECTION

(NRC INSPECTION REPORT 05000482/2009005 ) AND REQUEST FOR

INFORMATION

Dear Mr. Muench,

From October 15 through October 30, 2009, reactor inspectors from the Nuclear Regulatory

Commissions (NRC) Region IV office will perform the baseline inservice inspection at the Wolf

Creek Generating Station, using NRC Inspection Procedure 71111.08, "Inservice Inspection

Activities," and TI 2515/172, "Reactor Coolant System Dissimilar Metal Butt Welds." Experience

has shown that this inspection is a resource intensive inspection both for the NRC inspectors

and your staff. In order to minimize the impact to your onsite resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

These documents have been divided into two groups. The first group (Section A of the

enclosure) identified information to be provided prior to the inspection to ensure that the

inspectors are adequately prepared. The second group (Section B of the enclosure) identifies

the information the inspectors will need upon arrival at the site. It is important that all of these

documents are up to date and complete in order to minimize the number of additional

documents requested during the preparation and/or the onsite portions of the inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Mr. William Muilenberg, of your licensing

organization. Our inspection dates are subject to change based on your updated schedule of

outage activities. If there are any questions about this inspection or the material requested,

please contact the lead inspector Ronald A. Kopriva, at (817) 860-8104, or

ron.kopriva@nrc.gov.

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document

system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Wolf Creek Nuclear Operating Corporation

- 2 -

Sincerely,

/RA/

Thomas Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket: 50-482

License: NPF-42

Enclosure:

Inservice Inspection Document Request

Vice President Operations/Plant Manager

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, KS 66839

Jay Silberg, Esq.

Pillsbury Winthrop Shaw Pittman LLP

2300 N Street, NW

Washington, DC 20037

Supervisor Licensing

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, KS 66839

Chief Engineer

Utilities Division

Kansas Corporation Commission

1500 SW Arrowhead Road

Topeka, KS 66604-4027

Office of the Governor

State of Kansas

Topeka, KS 66612-1590

Attorney General

120 S.W. 10th Avenue, 2nd Floor

Topeka, KS 66612-1597

County Clerk

Coffey County Courthouse

110 South 6th Street

Burlington, KS 66839

Wolf Creek Nuclear Operating Corporation

- 3 -

Chief, Radiation and Asbestos

Control Section

Bureau of Air and Radiation

Kansas Department of Health and

Environment

1000 SW Jackson, Suite 310

Topeka, KS 66612-1366

Chief, Technological Hazards

Branch

FEMA, Region VII

9221 Ward Parkway

Suite 300

Kansas City, MO 64114-3372

Wolf Creek Nuclear Operating Corporation

- 4 -

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov )

Deputy Regional Administrator (Chuck.Casto@nrc.gov )

DRP Director (Dwight.Chamberlain@nrc.gov )

DRP Deputy Director (Anton.Vegel@nrc.gov )

DRS Director (Roy.Caniano@nrc.gov )

DRS Deputy Director (Troy.Pruett@nrc.gov )

Senior Resident Inspector (Chris.Long@nrc.gov )

Resident Inspector (Charles.Peabody@nrc.gov )

Site Secretary (Shirley.Allen@nrc.gov )

Branch Chief, DRP/B (Vincent.Gaddy@nrc.gov )

Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov )

Public Affairs Officer (Victor.Dricks@nrc.gov )

Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov )

RITS Coordinator (Marisa.Herrera@nrc.gov )

Regional Counsel (Karla.Fuller@nrc.gov )

Congressional Affairs Officer (Jenny.Weil@nrc.gov )

OEMail Resource

SUNSI Review Completed: ___Y___

ADAMS: 7 Yes

No Initials: ___TRF_

7 Publicly Available Non-Publicly Available Sensitive

7 Non-Sensitive

S:\\DRS\\REPORTS\\WC 2009005 RFI -RAK

ML091910434

SRI:EB1

C:EB1

RAKopriva

TFarnholtz

/RA/

/RA/

7/8/09

7/10/09

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

- 1 -

Enclosure

INSERVICE INSPECTION DOCUMENT REQUEST

Inspection Dates:

October 15 through October 30, 2009

Inspection Procedures:

IP 71111.08 "Inservice Inspection (ISI) Activities"

TI 2515/172 "Reactor Coolant System Dissimilar Metal Butt Welds"

Inspectors:

Ronald A. Kopriva, Senior Reactor Inspector (Lead Inspector - ISI)

James Drake, Senior Reactor Inspector

A.

Information Requested for the In-Office Preparation Week

The following information should be sent to the Region IV office in hard copy or

electronic format (ims.certrec.com preferred), in care of Ronald A. Kopriva, by

September 28, 2009, to facilitate the selection of specific items that will be reviewed

during the onsite inspection week. The inspector will select specific items from the

information requested below and then request from your staff additional documents

needed during the onsite inspection week (Section B of this enclosure). We ask that the

specific items selected from the lists be available and ready for review on the first day of

inspection. *Please provide requested documentation electronically if possible. If

requested documents are large and only hard copy formats are available, please inform

the inspector(s), and provide subject documentation during the first day of the onsite

inspection. If you have any questions regarding this information request, please call the

inspector as soon as possible.

A.1

ISI/Welding Programs and Schedule Information

a)

A detailed schedule (including preliminary dates) of:

i)

Nondestructive examinations (NDEs) planned for Class 1 & 2 systems

and containment, performed as part of your ASME Section XI, Risk

Informed (if applicable), and augmented ISI programs during the

upcoming outage.

Provide a status summary of the NDE inspection activities vs. the

required inspection period percentages for this Interval by category per

ASME Section XI, IWX-2400 (Do not provide separately if other

documentation requested contains this information)

ii)

Reactor pressure vessel head (RPVH) examinations planned for the

upcoming outage.

iii)

Examinations planned for Alloy 82/182/600 components that are not

included in the Section XI scope. (If applicable)

iv)

Examinations planned as part of your Boric Acid Corrosion Control

Program (Mode 3 walkdowns, bolted connection walkdowns, etc.)

- 2 -

Enclosure

v)

Welding activities that are scheduled to be completed during the

upcoming outage (ASME Class 1, 2, or 3 structures, systems, or

components (SSCs))

b)

A copy of ASME Section XI Code Relief Requests and associated NRC Safety

Evaluations applicable to the examinations identified above.

c)

A list of NDE reports (ultrasonic, radiography, magnetic particle, dye penetrate,

Visual VT-1, VT-2, and VT-3), which have identified relevant conditions on Code

Class 1 & 2 systems since the beginning of the last refueling outage. This should

include the previousSection XI pressure test(s) conducted during start up and

any evaluations associated with the results of the pressure tests. Also, include in

the list the NDE reports with relevant conditions in the RPVH penetration nozzles

which have been accepted for continued service. The list of NDE reports should

include a brief description of the SSC where the relevant condition was identified.

d)

A list with a brief description (e.g., system, material, pipe size, weld number, and

NDE performed) of the welds in Code Class 1 and 2 systems which have been

fabricated due to component repair/replacement activities since the beginning of

the last refueling outage, or are planned to be fabricated this refueling outage.

e)

If reactor vessel weld examinations required by the ASME Code are scheduled to

occur during the upcoming outage, provide a detailed description of the welds to

be examined and the extent of the planned examination. Please also provide

reference numbers for applicable procedures that will be used to conduct these

examinations.

f)

Copy of any 10 CFR Part 21 reports applicable to your SSCs within the scope of

Section XI of the ASME Code that have been identified since the beginning of the

last refueling outage.

g)

A list of any temporary non-code repairs in service (e.g., pinhole leaks).

h)

Please provide copies of the most recent self assessments for the ISI, Welding,

and Alloy 600 Programs.

A.2

Reactor Pressure Vessel Head (RPVH)

a)

Provide the detailed scope of the planned NDE of the reactor vessel head which

identifies the types of NDE methods to be used on each specific part of the

vessel head to fulfill commitments made in response to NRC Bulletin 2002-02

and NRC Order EA-03-009. Also, include examination scope expansion criteria

and planned expansion sample sizes if relevant conditions are identified. (If

applicable)

b)

A list of the standards and/or requirements that will be used to evaluate

indications identified during NDE of the reactor vessel head (e.g., the specific

industry or procedural standards which will be used to evaluate potential leakage

and/or flaw indications).

- 3 -

Enclosure

A.3

Boric Acid Corrosion Control Program (BACCP)

a)

Copy of the procedures that govern the scope, equipment and implementation of

the inspections required to identify boric acid leakage and the procedures for

boric acid leakage/corrosion evaluation.

b)

Please provide a list of leaks (including Code class of the components) that have

been identified since the last refueling outage and associated corrective action

documentation. If during the last cycle, the Unit was shutdown, please provide

documentation of containment walkdown inspections performed as part of the

BACCP.

c)

Please provide a copy of the most recent self-assessment performed for the

BACCP.

A.4

Steam Generator Tube (SGT) Inspections

a)

A detailed schedule of:

i)

SGT inspection, data analyses, and repair activities for the upcoming

outage. (If occurring)

ii)

SG secondary side inspection activities for the upcoming outage. (If

occurring)

b)

Please provide a copy of your SG ISI Inspection Program and Plan. Please

include a copy of the Operational Assessment from last outage and a copy of the

following documents as they become available:

i)

Degradation Assessment

ii)

Condition Monitoring Assessment

c)

If you are planning on modifying your Technical Specifications such that they are

consistent with TSTF-449, please provide copies of your correspondence with

the NRC regarding deviations from the STS.

d)

Copy of SG history documentation given to vendors performing eddy current (ET)

testing of the SGs during the upcoming outage.

e)

Copy of SG Eddy Current Data Analyst Guidelines and Site Validated Eddy

Current Technique Specification Sheets (ETSS). Additionally, please provide a

copy of EPRI Appendix H ETSS Qualification Records.

f)

Identify and quantify any SGT leakage experienced during the previous operating

cycle. Also provide documentation identifying which SG was leaking and

corrective actions completed or planned for this condition. (If applicable)

g)

Provide past history of the condition and issues pertaining to the secondary side

of the steam generators (including items such as loose parts, fouling, top of tube

sheet condition, crud removal amounts, etc.).

- 4 -

Enclosure

h)

Please provide copies of your most recent self assessments of the SG

monitoring, loose parts monitoring, and secondary side water chemistry control

programs.

i)

Please also indicate where the primary, secondary, and resolution analyses are

scheduled to take place.

j)

Please provide a summary of the scope of the SGT examinations, including

examination methods such as Bobbin, Rotating Pancake, or Plus Point, and the

percentage of tubes to be examined. *Do not provide these documents

separately if already included in other information requested.

A.5

Materials Reliability (MRP-139) Program Activities

a)

A list of, with verification, that the baseline inspections of all applicable Dissimilar

Metal Butt Welds (DMBWs) have been completed by September 28, 2009.

b)

Verification that baseline inspection of hot leg and cold leg temperature DMBWs

have been included in the inspection program and that the schedules for the

baseline inspections are consistent with the baseline schedules in MRP-139.

c)

A list and schedule (examination dates) of all DMBW examinations planned for

the upcoming refueling outage. If none are scheduled, then data from previous

examinations should be available for review.

d)

A list and schedule for any welding to be performed on DMBWs in the upcoming

outage. If no welding will be performed then records of previous welding on

DMBWs and postweld NDE documentation.

e)

A list and schedule of any stress improvement (SI) activities planned for the

upcoming refueling outage. If none are scheduled then have qualification reports

for any SIs previously performed.

f)

Documentation and description of how the baseline and inservice inspection

specifications in MRP-139 are satisfied at your facility.

g)

A list of weld locations controlled by MRP-139 which includes the MRP-139 weld

category, pre-mitigation volumetric examination date, type of mitigation or stress

improvement, post mitigation volumetric examination date, and plans for future

MRP-139 required examinations.

A.6

Additional information related to all ISI activities

a)

A list with a brief description of ISI, BACCP, and SGT inspection related issues

(e.g., condition reports) entered into your corrective action program since the

beginning of the last refueling outage. For example, a list based upon data base

searches using key words related to piping or SG tube degradation such as: ISI,

ASME Code,Section XI, NDE, cracks, wear, thinning, leakage, rust, corrosion,

boric acid, or errors in piping/SGT examinations.

- 5 -

Enclosure

b)

Please provide names and phone numbers for the following program leads:

ISI contacts (Examination, planning)

Containment Exams

RPVH Exams

Snubbers and Supports

Repair and Replacement Program Manager

Licensing Contact

Site Welding Engineer

Boric Acid Corrosion Control Program

SG Inspection Activities (site lead and vendor contact)

B.

Information to be provided onsite to the inspector(s) at the entrance meeting (October

16, 2009):

B.1

ISI / Welding Programs and Schedule Information

a)

Updated schedules for ISI/NDE activities, including SGT inspections, planned

welding activities, and schedule showing contingency repair plans, if available.

b)

For ASME Code Class 1 and 2 welds selected by the inspector from the lists

provided from section A of this enclosure, please provide copies of the following

documentation for each subject weld:

i)

Weld data sheet (traveler)

ii)

Weld configuration and system location

iii)

Applicable Code Edition and Addenda for weldment

iv)

Applicable Code Edition and Addenda for welding procedures

v)

Applicable weld procedures (WPS) used to fabricate the welds

vi)

Copies of procedure qualification records (PQRs) supporting the WPS

from B.1.b.v

vii)

Copies of mechanical test reports identified in the PQRs above

viii)

Copies of the nonconformance reports for the selected welds (If

applicable)

ix)

Radiographs of the selected welds and access to equipment to allow

viewing radiographs (If RT was performed)

x)

Copies of the preservice examination records for the selected welds

xi)

Copies of welder performance qualifications records applicable to the

selected welds, including documentation that welder maintained

proficiency in the applicable welding processes specified in the WPS (at

least six months prior to the date of subject work)

xii)

Copies of NDE personnel qualifications (VT, PT, UT, RT), as applicable

c)

For the ISI related corrective action issues selected by the inspector(s) from

section A of this enclosure, provide a copy of the corrective actions and

supporting documentation.

d)

For the NDE reports with relevant conditions on Code Class 1 & 2 systems

selected by the inspector from section A above, provide a copy of the

- 6 -

Enclosure

examination records, examiner qualification records, and associated corrective

action documents.

e)

A copy of (or ready access to) most current revision of the ISI Program Manual

and Plan for the current Interval.

f)

For the NDEs selected by the inspector from section A of this enclosure, provide

copy of the NDE procedures used to perform the examinations (including

calibration and flaw characterization/sizing procedures). For ultrasonic

examination procedures qualified in accordance with ASME Code,Section XI,

Appendix VIII, provide documentation supporting the procedure qualification

(e.g., the EPRI performance demonstration qualification summary sheets). Also,

include qualification documentation of the specific equipment to be used (e.g.,

ultrasonic unit, cables, and transducers including serial numbers) and NDE

personnel qualification records.

B.2

Reactor Pressure Vessel Head (RPVH)

a)

Provide the NDE personnel qualification records for the examiners who will

perform examinations of the RPVH.

b)

Provide drawings showing the following: (If a visual examination is planned for

the upcoming refueling outage).

i)

RPVH and CRDM nozzle configurations

ii)

RPVH insulation configuration

The drawings listed above should include fabrication drawings for the nozzle attachment

welds as applicable.

c)

Copy of NDE reports from the last RPVH examination.

d)

Copy of evaluation or calculation demonstrating that the scope of the visual

examination of the upper head will meet the 95 percent minimum coverage

required by NRC Order EA-03-009 (If a visual examination is planned for the

upcoming refueling outage).

e)

Provide a copy of the procedures that will be used to identify the source of any

boric acid deposits identified on the RPVH. If no explicit procedures exist which

govern this activity, provide a description of the process to be followed including

personnel responsibilities and expectations.

f)

Provide a copy of the updated calculation of effective degradation years (EDY)

for the RPVH susceptibility ranking.

g)

Provide copy of the vendor qualification report(s) that demonstrates the detection

capability of the NDE equipment used for the RPVH examinations. Also, identify

any changes in equipment configurations used for the RPVH examinations which

differ from that used in the vendor qualification report(s).

- 7 -

Enclosure

B.3

Boric Acid Corrosion Control Program (BACCP)

a)

Please provide boric acid walkdown inspection results, an updated list of boric

acid leaks identified so far this outage, associated corrective action

documentation, and overall status of planned boric acid inspections.

b)

Please provide any engineering evaluations completed for boric acid leaks

identified since the end of the last refueling outage. Please include a status of

corrective actions to repair and/or clean these boric acid leaks. Please identify

specifically which known leaks, if any, have remained in service or will remain in

service as active leaks.

B.4

Steam Generator Tube (SGT) Inspections

a)

Copies of the Examination Technique Specification Sheets (ETSS) and

associated justification for any revisions.

b)

Copy of the guidance to be followed if a loose part or foreign material is identified

in the SGs.

c)

Please provide a copy of the ET procedures used to perform the SGT

inspections (specifically calibration and flaw characterization/sizing procedures,

etc.). Also include documentation for the specific equipment to be used.

d)

Please provide copies of your responses to NRC and industry operating

experience communications such as Generic Letters, Information Notices, etc.

(as applicable to SGT inspections) *Do not provide these documents separately if

already included in other information requested such as the degradation

assessment.

e)

List of corrective action documents generated by the vendor and/or site with

respect to SG inspection activities.

B.5

Codes and Standards

a)

Ready access to (i.e., copies provided to the inspector(s) for use during the

inspection at the onsite inspection location, or room number and location where

available):

i)

Applicable Editions of the ASME Code (Sections V, IX and XI) for the

inservice inspection program and the repair/replacement program.

ii)

EPRI and industry standards referenced in the procedures used to

perform the SGT eddy current examination.

- 8 -

Enclosure

Inspector Contact Information:

Ronald A. Kopriva

James Drake

Senior Reactor Inspector

Senior Reactor Inspector

817-860-8104

817-276-6558

Ron.kopriva@nrc.gov

James.Drake@nrc.gov

Mailing Address:

US NRC Region IV

Attn: Ron Kopriva

612 E. Lamar Blvd, Suite 400

Arlington, TX 76011