IR 05000285/2009403: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:September 10, 2009 | ||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 24: | Line 24: | ||
==Dear Mr. Bannister:== | ==Dear Mr. Bannister:== | ||
On August 21, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Fort Calhoun Station. The inspection covered one or more of the key attributes of the security cornerstone of the | On August 21, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Fort Calhoun Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on August 21, 2009, with Mr. J. Reinhart, Site Vice President, and other members of your staff. | ||
The inspection examined activities conducted under your license as they relate to security and compliance with the | The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license. | ||
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | |||
Based on the results of this inspection, no findings of significance were identified. | Based on the results of this inspection, no findings of significance were identified. | ||
In accordance with 10 CFR 2.390 of the | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, ADAMS. | ||
ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. | |||
UNITED | UNITED STATES NUCLEAR REGULATORY COMMISSION R EGIO N I V 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125 Omaha Public Power District 2 In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390. and follow the instructions for withholding in 10 CFR 2.390(b)(1). | ||
Sincerely, | Sincerely, | ||
/RA/ | /RA/ | ||
Michael P. Shannon, Chief Plant Support Branch-1 Division of Reactor Safety Docket No.: 50-285 License No.: DPR-40 Nonpublic Enclosure: | |||
NRC Inspection Report 05000285/2009403 w/Attachment: Supplemental Information cc w/enclosure: Jeffrey A. Reinhart Site Vice President Omaha Public Power District Fort Calhoun Station FC-2-4 Adm P.O. Box 550 Fort Calhoun, NE 68023-0550 | Michael P. Shannon, Chief | ||
Plant Support Branch-1 | |||
Division of Reactor Safety | |||
Docket No.: 50-285 License No.: DPR-40 | |||
Nonpublic Enclosure: | |||
NRC Inspection Report 05000285/2009403 w/Attachment: Supplemental Information | |||
cc w/enclosure: | |||
Jeffrey A. Reinhart Site Vice President Omaha Public Power District Fort Calhoun Station FC-2-4 Adm P.O. Box 550 Fort Calhoun, NE 68023-0550 | |||
Mr. Thomas C. Matthews Manager - Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm. | Mr. Thomas C. Matthews Manager - Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm. | ||
Latest revision as of 09:23, 14 January 2025
| ML092550090 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 09/10/2009 |
| From: | Shannon M Plant Support Branch-1 |
| To: | Bannister D Omaha Public Power District |
| K Brewton | |
| References | |
| IR-09-403 | |
| Download: ML092550090 (2) | |
Text
September 10, 2009
SUBJECT:
FORT CALHOUN NUCLEAR STATION - NRC SECURITY INSPECTION REPORT 05000285/2009403
Dear Mr. Bannister:
On August 21, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Fort Calhoun Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on August 21, 2009, with Mr. J. Reinhart, Site Vice President, and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, no findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, ADAMS.
ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
UNITED STATES NUCLEAR REGULATORY COMMISSION R EGIO N I V 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011-4125 Omaha Public Power District 2 In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390. and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
/RA/
Michael P. Shannon, Chief
Plant Support Branch-1
Division of Reactor Safety
Docket No.: 50-285 License No.: DPR-40
Nonpublic Enclosure:
NRC Inspection Report 05000285/2009403 w/Attachment: Supplemental Information
cc w/enclosure:
Jeffrey A. Reinhart Site Vice President Omaha Public Power District Fort Calhoun Station FC-2-4 Adm P.O. Box 550 Fort Calhoun, NE 68023-0550
Mr. Thomas C. Matthews Manager - Nuclear Licensing Omaha Public Power District Fort Calhoun Station FC-2-4 Adm.
P.O. Box 550 Fort Calhoun, NE 68023-0550