| issue date = 10/08/2009 | | issue date = 10/08/2009 | ||
| title = Er 05000327-09-302, 05000328-09-302, on 09/09/2009; Sequoyah Nuclear Plant; Operator License Examination | | title = Er 05000327-09-302, 05000328-09-302, on 09/09/2009; Sequoyah Nuclear Plant; Operator License Examination | ||
| author name = Widmann M | | author name = Widmann M | ||
| author affiliation = NRC/RGN-II/DRS | | author affiliation = NRC/RGN-II/DRS | ||
| addressee name = Swafford P | | addressee name = Swafford P | ||
| addressee affiliation = Tennessee Valley Authority | | addressee affiliation = Tennessee Valley Authority | ||
| docket = 05000327, 05000328 | | docket = 05000327, 05000328 | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:October 8, 2009 | ||
==SUBJECT:== | |||
SEQUOYAH NUCLEAR PLANT - NRC INITIAL RETAKE EXAMINATION REPORT 05000327/2009302 AND 05000328/2009302 | |||
==Dear Mr. Swafford:== | |||
On September 9, 2009, members of your staff administered an initial license written retake examination to employees of your company who had applied for licenses to operate the Sequoyah Nuclear Plant. The examiner discussed preliminary findings related to the written examination submittal with Brad Picchiottino, Training Manager, on September 30, 2009. | |||
Two Reactor Operator (RO) applicants and one Senior Reactor Operator (SRO) applicant took the initial written retake examination. Two RO applicants and one SRO applicant passed the written examination. There were no post examination comments. | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
If you have any questions concerning this letter, please contact me at (404) 562-4550. | |||
Sincerely, | |||
/RA/ | |||
Malcolm T. Widmann, Chief | |||
Operations Branch | |||
Division of Reactor Safety | |||
Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79 | |||
===Enclosure:=== | |||
Report Details | |||
( | |||
REGION II== | |||
Docket No.: | |||
50-327, 50-328 | |||
License No.: | |||
DPR-77, DPR-79 | |||
Report Nos.: | |||
05000327/2009302, 05000328/2009302 | |||
Licensee: | |||
Tennessee Valley Authority (TVA) | |||
Facility: | |||
Sequoyah Nuclear Plant, Units 1 & 2 | |||
Location: | |||
Sequoyah Access Road Soddy-Daisy, TN 37379 | |||
Dates: | |||
Written Examination - September 9, 2009 | |||
Examiners: | |||
Phillip G. Capehart, Chief Examiner, Operations Engineer | |||
Approved by: | |||
Malcolm T. Widmann, Chief | |||
Operations Branch | |||
Division of Reactor Safety | |||
Enclosure SUMMARY OF FINDINGS | |||
ER 05000327/2009302, 05000328/2009302, 09/09/2009; Sequoyah Nuclear Plant; Operator License Examination. | |||
The NRC examiner conducted an operator licensing initial retake examination in accordance with the guidance in NUREG-1021, Revision 9, Supplement 1, Operator Licensing Examination Standards for Power Reactors. This examination implemented the operator licensing requirements of 10 CFR §55.41, §55.43, and §55.45. | |||
Members of the Sequoyah Nuclear Plant training staff administered the initial written retake examination on September 9, 2009. The licensing initial written retake examination was developed by the Sequoyah Nuclear Plant training staff. | |||
Two Reactor Operator (RO) applicants and one Senior Reactor Operator (SRO) applicant took the initial written retake examination. Two Reactor Operator (RO) applicants and one Senior Reactor Operator applicant passed the written examination. Each applicant who passed the initial written retake examination was issued an operator license commensurate with the level of examination administered. | |||
There were no post examination comments. | |||
No findings of significance were identified. | |||
Enclosure | |||
REPORT DETAILS | |||
4. | |||
OTHER ACTIVITIES | |||
4OA5 Operator Licensing Initial Retake Examination | |||
a. | |||
Inspection Scope | |||
The licensee developed the initial written retake examination. NRC examiner reviewed the proposed examination material to determine whether it was developed in accordance with NUREG-1021, AOperator Licensing Examination Standards for Power Reactors,@ | |||
Revision 9, Supplement 1. Examination changes agreed upon between the NRC and the licensee were made according to NUREG-1021 and incorporated into the final version of the examination materials. | |||
The examiner reviewed the licensees examination security measures while preparing and administering the examination to ensure examination security and integrity complied with 10 CFR 55.49, Integrity of Examinations and Tests. | |||
The examiner evaluated two RO applicants and one SRO applicant who were being assessed under the guidelines specified in NUREG-1021. Members of the Sequoyah Nuclear Plant training staff administered the initial written retake examination on September 9, 2009. The evaluations of the applicants and review of documentation were performed to determine if the applicants, who applied for licenses to operate the Sequoyah Nuclear Plant, met requirements specified in 10 CFR Part 55, Operators Licenses. | |||
b. | |||
Findings | |||
No findings of significance were identified. | |||
The NRC determined that the licensee=s examination submittal for the initial written retake examination was within the range of acceptability expected for a proposed examination. | |||
Two Reactor Operator (RO) applicants and one Senior Reactor Operator (SRO) | |||
applicant took the initial written retake examination. Two Reactor Operator (RO) | |||
applicants and one Senior Reactor Operator (SRO) applicant passed the initial written retake examination. Each applicant was issued an operator license commensurate with the level of examination administered. The licensee did not submit any post-examination comments. | |||
A copy of the final initial written retake examination and answer key, with all changes incorporated, may be accessed in the ADAMS system (ADAMS Accession Number ML092810103 and ML092810111). | |||
Enclosure 4OA6 Meetings | |||
Exit Meeting Summary | |||
On September 30, 2009, the Chief Examiner discussed generic issues associated with Brad Picchiottino, Training Manager. The Chief examiner asked the licensee whether any materials examined during the inspection should be considered proprietary. No proprietary information was identified. | |||
KEY POINTS OF CONTACT | |||
Licensee personnel | |||
D. Bodine, Chemical Environmental Manager D. Boone, RP Manager J. Carden, III, Site Procurement Manager C. Church, Plant Manager T. Cleary, Site Vice President J. Dvorak, O& SS Manager N. Eggemeyer, Site Security Manager V. Ford, Operations Superintendent K. Jones, Site Engineering Manager R. Kerwin, NA Manager T. Niessen, Corporate NA Manager B. Picchiottino, Training Manager R. Proffitt, Licensing Engineer R. Thompson, EP Manager | |||
NRC personnel | |||
M. Speck, RI | |||
}} | }} | ||
Latest revision as of 08:59, 14 January 2025
| ML092810510 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 10/08/2009 |
| From: | Widmann M Division of Reactor Safety II |
| To: | Swafford P Tennessee Valley Authority |
| References | |
| ER-09-302 | |
| Download: ML092810510 (9) | |
Text
October 8, 2009
SUBJECT:
SEQUOYAH NUCLEAR PLANT - NRC INITIAL RETAKE EXAMINATION REPORT 05000327/2009302 AND 05000328/2009302
Dear Mr. Swafford:
On September 9, 2009, members of your staff administered an initial license written retake examination to employees of your company who had applied for licenses to operate the Sequoyah Nuclear Plant. The examiner discussed preliminary findings related to the written examination submittal with Brad Picchiottino, Training Manager, on September 30, 2009.
Two Reactor Operator (RO) applicants and one Senior Reactor Operator (SRO) applicant took the initial written retake examination. Two RO applicants and one SRO applicant passed the written examination. There were no post examination comments.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If you have any questions concerning this letter, please contact me at (404) 562-4550.
Sincerely,
/RA/
Malcolm T. Widmann, Chief
Operations Branch
Division of Reactor Safety
Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79
Enclosure:
Report Details
(
REGION II==
Docket No.:
50-327, 50-328
License No.:
Report Nos.:
05000327/2009302, 05000328/2009302
Licensee:
Tennessee Valley Authority (TVA)
Facility:
Sequoyah Nuclear Plant, Units 1 & 2
Location:
Sequoyah Access Road Soddy-Daisy, TN 37379
Dates:
Written Examination - September 9, 2009
Examiners:
Phillip G. Capehart, Chief Examiner, Operations Engineer
Approved by:
Malcolm T. Widmann, Chief
Operations Branch
Division of Reactor Safety
Enclosure SUMMARY OF FINDINGS
ER 05000327/2009302, 05000328/2009302, 09/09/2009; Sequoyah Nuclear Plant; Operator License Examination.
The NRC examiner conducted an operator licensing initial retake examination in accordance with the guidance in NUREG-1021, Revision 9, Supplement 1, Operator Licensing Examination Standards for Power Reactors. This examination implemented the operator licensing requirements of 10 CFR §55.41, §55.43, and §55.45.
Members of the Sequoyah Nuclear Plant training staff administered the initial written retake examination on September 9, 2009. The licensing initial written retake examination was developed by the Sequoyah Nuclear Plant training staff.
Two Reactor Operator (RO) applicants and one Senior Reactor Operator (SRO) applicant took the initial written retake examination. Two Reactor Operator (RO) applicants and one Senior Reactor Operator applicant passed the written examination. Each applicant who passed the initial written retake examination was issued an operator license commensurate with the level of examination administered.
There were no post examination comments.
No findings of significance were identified.
Enclosure
REPORT DETAILS
4.
OTHER ACTIVITIES
4OA5 Operator Licensing Initial Retake Examination
a.
Inspection Scope
The licensee developed the initial written retake examination. NRC examiner reviewed the proposed examination material to determine whether it was developed in accordance with NUREG-1021, AOperator Licensing Examination Standards for Power Reactors,@
Revision 9, Supplement 1. Examination changes agreed upon between the NRC and the licensee were made according to NUREG-1021 and incorporated into the final version of the examination materials.
The examiner reviewed the licensees examination security measures while preparing and administering the examination to ensure examination security and integrity complied with 10 CFR 55.49, Integrity of Examinations and Tests.
The examiner evaluated two RO applicants and one SRO applicant who were being assessed under the guidelines specified in NUREG-1021. Members of the Sequoyah Nuclear Plant training staff administered the initial written retake examination on September 9, 2009. The evaluations of the applicants and review of documentation were performed to determine if the applicants, who applied for licenses to operate the Sequoyah Nuclear Plant, met requirements specified in 10 CFR Part 55, Operators Licenses.
b.
Findings
No findings of significance were identified.
The NRC determined that the licensee=s examination submittal for the initial written retake examination was within the range of acceptability expected for a proposed examination.
Two Reactor Operator (RO) applicants and one Senior Reactor Operator (SRO)
applicant took the initial written retake examination. Two Reactor Operator (RO)
applicants and one Senior Reactor Operator (SRO) applicant passed the initial written retake examination. Each applicant was issued an operator license commensurate with the level of examination administered. The licensee did not submit any post-examination comments.
A copy of the final initial written retake examination and answer key, with all changes incorporated, may be accessed in the ADAMS system (ADAMS Accession Number ML092810103 and ML092810111).
Enclosure 4OA6 Meetings
Exit Meeting Summary
On September 30, 2009, the Chief Examiner discussed generic issues associated with Brad Picchiottino, Training Manager. The Chief examiner asked the licensee whether any materials examined during the inspection should be considered proprietary. No proprietary information was identified.
KEY POINTS OF CONTACT
Licensee personnel
D. Bodine, Chemical Environmental Manager D. Boone, RP Manager J. Carden, III, Site Procurement Manager C. Church, Plant Manager T. Cleary, Site Vice President J. Dvorak, O& SS Manager N. Eggemeyer, Site Security Manager V. Ford, Operations Superintendent K. Jones, Site Engineering Manager R. Kerwin, NA Manager T. Niessen, Corporate NA Manager B. Picchiottino, Training Manager R. Proffitt, Licensing Engineer R. Thompson, EP Manager
NRC personnel
M. Speck, RI