| title = IR 05000346-09-404, (Drs), on 09/14/2009 - 09/17/2009, Davis-Besse Nuclear Power Station, Routine Security Baseline Inspection - Cover Letter
| title = IR 05000346-09-404, (Drs), on 09/14/2009 - 09/17/2009, Davis-Besse Nuclear Power Station, Routine Security Baseline Inspection - Cover Letter
| author name = Duncan E R
| author name = Duncan E
| author affiliation = NRC/RGN-III/DRS/PSB
| author affiliation = NRC/RGN-III/DRS/PSB
| addressee name = Allen B
| addressee name = Allen B
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 October 20, 2009  
{{#Wiki_filter:October 20, 2009


Mr. Barry Allen
==SUBJECT:==
DAVIS-BESSE NUCLEAR POWER STATION


Site Vice President
NRC SECURITY BASELINE INSPECTION REPORT 05000346/2009404(DRS)
 
FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 North State Route 2, Mail Stop A-DB-3080
 
Oak Harbor, OH 43449-9760
 
SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION NRC SECURITY BASELINE INSPECTION REPORT 05000346/2009404(DRS)


==Dear Mr. Allen:==
==Dear Mr. Allen:==
On September 17, 2009, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Davis-Besse Nuclear Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on September 17, 2009, with Mr. V. Kaminskas and other members of your staff.
On September 17, 2009, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Davis-Besse Nuclear Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process.


The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license.
The enclosed inspection report documents the inspection results, which were discussed on September 17, 2009, with Mr. V. Kaminskas and other members of your staff.


The inspector reviewed selected procedures and records, observed activities, and interviewed
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.


personnel.
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.


No findings of significance were identified.
No findings of significance were identified.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.


Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.


Sincerely,/RA by D. Funk for/
Sincerely,
Eric Duncan, Chief  
/RA by D. Funk for/  
 
Eric Duncan, Chief Plant Support Branch Division of Reactor Safety


Plant Support Branch
Docket No. 50-346 License No. NPF-3


Division of Reactor Safety Docket No. 50-346 License No. NPF-3
Nonpublic Enclosure: Inspection Report 05000346/2009404(DRS)


Nonpublic
w/Attachment: Supplemental Information


===Enclosure:===
cc w/encl:
Inspection Report 05000346/2009404(DRS)
S. Coker, NSIR/DSO/DDSO/ST


===w/Attachment:===
C. OClaire, State Liaison Officer
Supplemental Information


cc w/encl: S. Coker, NSIR/DSO/DDSO/ST C. O'Claire, State Liaison Officer Ohio Emergency Management Agency  
Ohio Emergency Management Agency  


cc w/o encl: Distribution via ListServ
cc w/o encl:
Distribution via ListServ
}}
}}

Latest revision as of 08:42, 14 January 2025

IR 05000346-09-404, (Drs), on 09/14/2009 - 09/17/2009, Davis-Besse Nuclear Power Station, Routine Security Baseline Inspection - Cover Letter
ML092960434
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/20/2009
From: Eric Duncan
Plant Support Branch II
To: Allen B
FirstEnergy Nuclear Operating Co
References
IR-09-404
Download: ML092960434 (3)


Text

October 20, 2009

SUBJECT:

DAVIS-BESSE NUCLEAR POWER STATION

NRC SECURITY BASELINE INSPECTION REPORT 05000346/2009404(DRS)

Dear Mr. Allen:

On September 17, 2009, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Davis-Besse Nuclear Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process.

The enclosed inspection report documents the inspection results, which were discussed on September 17, 2009, with Mr. V. Kaminskas and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA by D. Funk for/

Eric Duncan, Chief Plant Support Branch Division of Reactor Safety

Docket No. 50-346 License No. NPF-3

Nonpublic Enclosure: Inspection Report 05000346/2009404(DRS)

w/Attachment: Supplemental Information

cc w/encl:

S. Coker, NSIR/DSO/DDSO/ST

C. OClaire, State Liaison Officer

Ohio Emergency Management Agency

cc w/o encl:

Distribution via ListServ