{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 30, 2009 LICENSEE:       Entergy Operations, Inc. (ENO)
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 30, 2009 LICENSEE:
FACILITIES:     Palisades Nuclear Plant (PNP)
Entergy Operations, Inc. (ENO)
SUB~IECT:      
FACILITIES: Palisades Nuclear Plant (PNP)
SUB~IECT:  


==SUMMARY==
==SUMMARY==
OF TELEPHONE CONFERENCE CALL HELD ON OCTOBER 14, 2009, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY OPERATIONS, INC. REGARDING PROGRESS ON NATIONAL FIRE PROTECTION ASSOCIATION (I\lFPA) STANDARD 805 TRANSITION ACTIVITIES A teleconference was held between representatives of Entergy Nuclear Operations, Inc. (ENO) and the Nuclear Regulatory Commission (NRC) staff to discuss progress on the Palisades Nuclear Plant (PNP) National Fire Protection Association (NFPA) 805 transition activities. ENO submitted "Palisades NFPA 805 Project Milestones" table (see Enclosure 1) which provides the list of NFPA 805 transition activities and their status. The licensee reported that there has been significant increase in the work scope. As a result, the milestone date for completion of some of the tasks is shown to be later than the final license amendment request date of March 31, 2010. The licensee obtained additional resources for the project but has not completed development of a schedule. Enclosure 2 provides the list of all attendees.
OF TELEPHONE CONFERENCE CALL HELD ON OCTOBER 14, 2009, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY OPERATIONS, INC. REGARDING PROGRESS ON NATIONAL FIRE PROTECTION ASSOCIATION (I\\lFPA) STANDARD 805 TRANSITION ACTIVITIES A teleconference was held between representatives of Entergy Nuclear Operations, Inc. (ENO) and the Nuclear Regulatory Commission (NRC) staff to discuss progress on the Palisades Nuclear Plant (PNP) National Fire Protection Association (NFPA) 805 transition activities. ENO submitted "Palisades NFPA 805 Project Milestones" table (see Enclosure 1) which provides the list of NFPA 805 transition activities and their status. The licensee reported that there has been significant increase in the work scope. As a result, the milestone date for completion of some of the tasks is shown to be later than the final license amendment request date of March 31, 2010. The licensee obtained additional resources for the project but has not completed development of a schedule. Enclosure 2 provides the list of all attendees.  


===Background===
===Background===
On December 9, 2008 (Agencywide Documents Access and Management System (ADAMS)
On December 9, 2008 (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML083260577), NRC staff granted additional enforcement discretion to Palisades. ENO in its letter dated November 25, 2008 (ADAMS Accession No. ML083370155) made a commitment to conduct a monthly teleconference with the NRC staff to discuss progress on the PNP NFPA 805 transition activities.
Accession No. ML083260577), NRC staff granted additional enforcement discretion to Palisades. ENO in its {{letter dated|date=November 25, 2008|text=letter dated November 25, 2008}} (ADAMS Accession No. ML083370155) made a commitment to conduct a monthly teleconference with the NRC staff to discuss progress on the PNP NFPA 805 transition activities.  
                                                ~j         /)
~j  
/)
L1'~~ &t 1114--
L1'~~ &t 1114--
Mahesh Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255 Enclosures.
Mahesh Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255 Enclosures.
1: Table - Palisades NFPA 805 Project Milestones 2: Table - List of Attendees cc w/encls: Distribution via ListServ
1: Table - Palisades NFPA 805 Project Milestones 2: Table - List of Attendees cc w/encls: Distribution via ListServ  


10/14/2009 Palisades NFPA 805 Project Milestones NEI Task                                                                                 Milestone                            Start Title                                                  Status'                      ,
10/14/2009 Palisades NFPA 805 Project Milestones NEI Task No.
No.                                                                                     Date'                           Date Transition of Nuclear Safety Performance                                                   See Task 1:
Title Milestone Date' Status' Start Date 10/26/09 Task 1:
Criteria (NEI 04-02 Table B-2) 11/25/09                             -
Transition of Nuclear Safety Performance Criteria (NEI 04-02 Table B-2) 11/25/09 See Comments Task 2:
Comments Fundamental Fire Protection Program & Desig                                               See Task 2:                                                                                      12/22/09                              -
Fundamental Fire Protection Program & Desig Elements (NEI 04-02 Table B-1) 12/22/09 See Comments Task 3:
Elements (NEI 04-02 Table B-1)                                                       Comments Radioactive Release Transition (NEI 04-02                                                 See Task 3:                                                                                      12/22/09                             -
Radioactive Release Transition (NEI 04-02 Table G-1) 12/22/09 See Comments Task 4:
Table G-1)                                                                            Comments Nuclear Safety Analysis Transition (NEI 04-02                                             See Task 4:
Nuclear Safety Analysis Transition (NEI 04-02 Table B-3) 03/29/10 See Comments ST4.1.1 Off-Site Power Cable Selection and Analysis 11/05/09 See Comments ST 4.1.2 Other Power Cable Selection and Analysis Complete ST4.1.3 Subsequent Cablellnstrument Identification &
Table B-3) 03/29/10 Comments
Analysis 11/13/09 See Comments Task 5:
                                                                                                                                    -
Non-Power Operational Modes Transition NEI 04-02 Table F-1) 11/19/09 See Comments Task 6:
See ST4.1.1           Off-Site Power Cable Selection and Analysis                             11/05/09                             -
Internal Events PRA 06/03/10 See Comments ST 6.2.1 Prepare LERF Model Complete ST 6.2.2 Update Flooding Analysis 11/03/09 See Comments ST 6.3 Thermal Hydraulic Analysis for MSOIHRA 12108/09 See Comments ST 6.4 Internal Events PRA Peer Review 10/30109 Not Started Task 7:
Comments ST 4.1.2         Other Power Cable Selection and Analysis                                     -        Complete               -
Fire PRA 02/01/10 See Comments 02/24/10 ST 7.6.4 R3 Internal Events Model Complete ST 7.7 Quantification Risk Screening 01/21/10 See Comments ST 7.8 Scoping for Fire Modeling Complete ST 7.9/10 Circuit Failure Mode Likelihood Analysis 11120109 See Comments ST 7.12 Post Fire HRA 12/07/09 See Comments ST 7.13 Seismic Fire Interaction Assessment Complete ST 7.14 Fire Risk Quantification 02/24/10 See Comments ST 7.15 Uncertainty and Sensitivity Analysis 02/25/10 See Comments 01/18/10 ST 7.17 Fire PRA Peer Review 01/22/10 Not Started Task 8:
Subsequent Cablellnstrument Identification &                                              See ST4.1.3                                                                                   11/13/09                             -
NFPA 805 Change Evaluations 04/22/10 See Comments 02/10/10 ST 8.1 Change Evaluations 03/30/10 See Comments ST 8.2 Non-Compliance Risk Evaluations 04/22/10 See Comments Task 9:
Analysis                                                                              Comments Non-Power Operational Modes Transition                                                     See Task 5:                                                                                      11/19/09                              -
Palisades Mapping of Post Transition Procedures & Document Revisions 01/26/10 See Comments 11/16/09 Task 10:
NEI 04-02 Table F-1)                                                                 Comments See Task 6:             Internal Events PRA                                                     06/03/10                             -
Transition Report 05/12/10 See Comments 09/07/09 Task 11:
Comments ST 6.2.1         Prepare LERF Model                                                           -        Complete               -
License Amendment Request (LAR) 03/31/10 Notes:
See ST 6.2.2         Update Flooding Analysis                                                 11/03/09                             -
1 The original milestone dates per schedule PLP B05 S1~3 WIFe Schedule 12NOVOB and are subject to change. The current schedule (B05 S8 OJ 050CT09) dates were...alidated to be on or before these dates unless otherwise noted.
Comments See ST 6.3           Thermal Hydraulic Analysis for MSOIHRA                                   12108/09 Comments
                                                                                                                                    -
ST 6.4           Internal Events PRA Peer Review                                         10/30109     Not Started         10/26/09 See Task 7:             Fire PRA                                                                 02/01/10                             -
Comments ST 7.6.4         R3 Internal Events Model                                                     -        Complete               -
See ST 7.7           Quantification Risk Screening                                           01/21/10                             -
Comments ST 7.8           Scoping for Fire Modeling                                                     -        Complete               -
See ST 7.9/10 Circuit Failure Mode Likelihood Analysis                                         11120109                             -
Comments See ST 7.12           Post Fire HRA                                                           12/07/09                             -
Comments ST 7.13           Seismic Fire Interaction Assessment                                           -        Complete               -
See ST 7.14           Fire Risk Quantification                                                 02/24/10                        02/24/10 Comments See ST 7.15           Uncertainty and Sensitivity Analysis                                     02/25/10                             -
Comments ST 7.17           Fire PRA Peer Review                                                     01/22/10     Not Started         01/18/10 See Task 8:             NFPA 805 Change Evaluations                                             04/22/10                             -
Comments See ST 8.1           Change Evaluations                                                       03/30/10 Comments
                                                                                                                                    -
See ST 8.2           Non-Compliance Risk Evaluations                                         04/22/10                         02/10/10 Comments Palisades Mapping of Post Transition                                                       See Task 9:                                                                                      01/26/10                         11/16/09 Procedures & Document Revisions                                                      Comments See Task 10:           Transition Report                                                         05/12/10                         09/07/09 Comments Task 11:           License Amendment Request (LAR)                                           03/31/10           -                  -
Notes:
1 The original milestone dates per schedule PLP B05 S1~3 WIFe Schedule 12NOVOB and are subject to change. The current schedule (B05 S8 OJ 050CT09) dates were ...alidated to be on or before these dates unless otherwise noted.
2 "On Track" means that the task current percentage completed i2: the expected completion percent and the expected completion date for the task is projected to be mel.
2 "On Track" means that the task current percentage completed i2: the expected completion percent and the expected completion date for the task is projected to be mel.
3 Start dates provided are estimates and may \lary contingent upon predecessor completion and available resources at that time. Even if this start date is adjusted, the completion date is still expected to be met unless indicated otherwise Comments:
3 Start dates provided are estimates and may \\lary contingent upon predecessor completion and available resources at that time. Even if this start date is adjusted, the completion date is still expected to be met unless indicated otherwise Comments:
All uncompleted task dates have slipped except the IE PRA Peer Review 1ST 6.4J. Fire PRA Peer Review [ST 7.17]. and the LERF model 1ST 6.2.1] which was completed.
All uncompleted task dates have slipped except the IE PRA Peer Review 1ST 6.4J. Fire PRA Peer Review [ST 7.17]. and the LERF model 1ST 6.2.1] which was completed.
The Task 11. LAR submittal date is prior to the IE PRA completion [T 6J, Change Evaluations [T 8). and the Transition report completion [T 10] due to the self-imposed contraint for the LAR submittal of the end of the 1st quarter 2010.
The Task 11. LAR submittal date is prior to the IE PRA completion [T 6J, Change Evaluations [T 8). and the Transition report completion [T 10] due to the self-imposed contraint for the LAR submittal of the end of the 1st quarter 2010.
E:\Palisades\PLP\Enforcement Extension\Milestone Itrs\NRC Milestones 10-14-09.xls Enclosure 1
E:\\Palisades\\PLP\\Enforcement Extension\\Milestone Itrs\\NRC Milestones 10-14-09.xls  


TELEPHONE CONFERENCE CALL ON NFPA 805 TRANSITION PROGRESS BETWEEN U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY OPERATIONS, INC.
TELEPHONE CONFERENCE CALL ON NFPA 805 TRANSITION PROGRESS BETWEEN U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY OPERATIONS, INC.
LIST OF PARTICIPANTS OCTOBER 14, 2009 PARTICIPANTS   TITLE/POSITION                           AFFILIATIONS U.S. NUCLEAR REGULATORY COMMISSION (NRC)
LIST OF PARTICIPANTS OCTOBER 14, 2009 PARTICIPANTS TITLE/POSITION AFFILIATIONS U.S. NUCLEAR REGULATORY COMMISSION (NRC)
Mahesh Chawla   Proiect Manaaer                         HEADQUARTERS Alex Klein     Branch Chief Harrv Barrett   Senior Fire Protection Enaineer John Ellegood   Senior Resident Inspector               REGION ENTERGY Bob VanWagner   Program Engineering Manager             PALISADES NUCLEAR PLANT Ron Penna       Program Engineering Supervisor Tom Swiecicki   Fire Protection Lead Brian Brogan   Probabilistic Safety Assessment (PSA)
Mahesh Chawla Proiect Manaaer HEADQUARTERS Alex Klein Branch Chief Harrv Barrett Senior Fire Protection Enaineer John Ellegood Senior Resident Inspector REGION ENTERGY Bob VanWagner Program Engineering Manager PALISADES NUCLEAR PLANT Ron Penna Program Engineering Supervisor Tom Swiecicki Fire Protection Lead Brian Brogan Probabilistic Safety Assessment (PSA)
Engineer Frank Yanik     Probabilistic Safety Assessment Engineer Roger Stobert   Contract Project Manager NFPA 805 Jim Kuemin     Licensing Engineer Enclosure 2
Engineer Frank Yanik Probabilistic Safety Assessment Engineer Roger Stobert Contract Project Manager NFPA 805 Jim Kuemin Licensing Engineer  


ML083370155) made a commitment to conduct a monthly teleconference with the NRC staff to discuss progress on the PNP NFPA 805 transition activities.
ML083370155) made a commitment to conduct a monthly teleconference with the NRC staff to discuss progress on the PNP NFPA 805 transition activities.
IRA!
IRA!
Mahesh Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255
Mahesh Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255  


==Enclosures:==
==Enclosures:==
1: Table - Palisades NFPA 805 Project Milestones 2: Table - List of Attendees cc w/encls: Listserv Distribution:
1: Table - Palisades NFPA 805 Project Milestones 2: Table - List of Attendees cc w/encls: Listserv Distribution:
PUBLIC           LPL3-1 r/f           RidsRgn3MailCenter Resource     AKlein, NRR     JGeissner, Rill RidsNrrDorLpl3-1 Resource             RidsNrrPMANO Resource           MVaaler, NRR   TTaylor, Rill RidsNrrPMPalisades Resource           RidsNrrLABTully                 Paul Lain, NRR HBarrett RidsAcrsAcnw_MailCtr Resource         RidsOgcRp Resource             JEliegood, Rill SBagley, EDO R-III CTucci, NRR ADAMS Accession No' ML093030151
PUBLIC LPL3-1 r/f RidsRgn3MailCenter Resource AKlein, NRR JGeissner, Rill RidsNrrDorLpl3-1 Resource RidsNrrPMANO Resource MVaaler, NRR TTaylor, Rill RidsNrrPMPalisades Resource RidsNrrLABTully Paul Lain, NRR HBarrett RidsAcrsAcnw_MailCtr Resource RidsOgcRp Resource JEliegood, Rill SBagley, EDO R-III CTucci, NRR ADAMS Accession No' ML093030151 OFFICE LPL3-1/PM LPL3-1/LA DRNAFPB/BC LPL3-1/BC NAME MChawla THarris AKlein RPascarelli DATE 10/30/09 10/30/09 10/30/09 10/30/09}}
                    "
OFFICE       LPL3-1/PM     LPL3-1/LA         DRNAFPB/BC           LPL3-1/BC NAME         MChawla       THarris           AKlein               RPascarelli DATE         10/30/09       10/30/09           10/30/09             10/30/09}}

Latest revision as of 08:35, 14 January 2025

Summary of Telephone Conference Call Held on October 14, 2009 Between the U.S. NRC Commission and Entergy Operations, Inc. Regarding Progress on National Fire Protection Association Standard 805 Transition Activities
ML093030151
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/30/2009
From: Mahesh Chawla
Plant Licensing Branch III
To:
Entergy Operations
Chawla M, NRR/DORL, 415-8371
References
Download: ML093030151 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 30, 2009 LICENSEE:

Entergy Operations, Inc. (ENO)

FACILITIES: Palisades Nuclear Plant (PNP)

SUB~IECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON OCTOBER 14, 2009, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY OPERATIONS, INC. REGARDING PROGRESS ON NATIONAL FIRE PROTECTION ASSOCIATION (I\\lFPA) STANDARD 805 TRANSITION ACTIVITIES A teleconference was held between representatives of Entergy Nuclear Operations, Inc. (ENO) and the Nuclear Regulatory Commission (NRC) staff to discuss progress on the Palisades Nuclear Plant (PNP) National Fire Protection Association (NFPA) 805 transition activities. ENO submitted "Palisades NFPA 805 Project Milestones" table (see Enclosure 1) which provides the list of NFPA 805 transition activities and their status. The licensee reported that there has been significant increase in the work scope. As a result, the milestone date for completion of some of the tasks is shown to be later than the final license amendment request date of March 31, 2010. The licensee obtained additional resources for the project but has not completed development of a schedule. Enclosure 2 provides the list of all attendees.

Background

On December 9, 2008 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML083260577), NRC staff granted additional enforcement discretion to Palisades. ENO in its letter dated November 25, 2008 (ADAMS Accession No. ML083370155) made a commitment to conduct a monthly teleconference with the NRC staff to discuss progress on the PNP NFPA 805 transition activities.

~j

/)

L1'~~ &t 1114--

Mahesh Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255 Enclosures.

1: Table - Palisades NFPA 805 Project Milestones 2: Table - List of Attendees cc w/encls: Distribution via ListServ

10/14/2009 Palisades NFPA 805 Project Milestones NEI Task No.

Title Milestone Date' Status' Start Date 10/26/09 Task 1:

Transition of Nuclear Safety Performance Criteria (NEI 04-02 Table B-2) 11/25/09 See Comments Task 2:

Fundamental Fire Protection Program & Desig Elements (NEI 04-02 Table B-1) 12/22/09 See Comments Task 3:

Radioactive Release Transition (NEI 04-02 Table G-1) 12/22/09 See Comments Task 4:

Nuclear Safety Analysis Transition (NEI 04-02 Table B-3) 03/29/10 See Comments ST4.1.1 Off-Site Power Cable Selection and Analysis 11/05/09 See Comments ST 4.1.2 Other Power Cable Selection and Analysis Complete ST4.1.3 Subsequent Cablellnstrument Identification &

Analysis 11/13/09 See Comments Task 5:

Non-Power Operational Modes Transition NEI 04-02 Table F-1) 11/19/09 See Comments Task 6:

Internal Events PRA 06/03/10 See Comments ST 6.2.1 Prepare LERF Model Complete ST 6.2.2 Update Flooding Analysis 11/03/09 See Comments ST 6.3 Thermal Hydraulic Analysis for MSOIHRA 12108/09 See Comments ST 6.4 Internal Events PRA Peer Review 10/30109 Not Started Task 7:

Fire PRA 02/01/10 See Comments 02/24/10 ST 7.6.4 R3 Internal Events Model Complete ST 7.7 Quantification Risk Screening 01/21/10 See Comments ST 7.8 Scoping for Fire Modeling Complete ST 7.9/10 Circuit Failure Mode Likelihood Analysis 11120109 See Comments ST 7.12 Post Fire HRA 12/07/09 See Comments ST 7.13 Seismic Fire Interaction Assessment Complete ST 7.14 Fire Risk Quantification 02/24/10 See Comments ST 7.15 Uncertainty and Sensitivity Analysis 02/25/10 See Comments 01/18/10 ST 7.17 Fire PRA Peer Review 01/22/10 Not Started Task 8:

NFPA 805 Change Evaluations 04/22/10 See Comments 02/10/10 ST 8.1 Change Evaluations 03/30/10 See Comments ST 8.2 Non-Compliance Risk Evaluations 04/22/10 See Comments Task 9:

Palisades Mapping of Post Transition Procedures & Document Revisions 01/26/10 See Comments 11/16/09 Task 10:

Transition Report 05/12/10 See Comments 09/07/09 Task 11:

License Amendment Request (LAR) 03/31/10 Notes:

1 The original milestone dates per schedule PLP B05 S1~3 WIFe Schedule 12NOVOB and are subject to change. The current schedule (B05 S8 OJ 050CT09) dates were...alidated to be on or before these dates unless otherwise noted.

2 "On Track" means that the task current percentage completed i2: the expected completion percent and the expected completion date for the task is projected to be mel.

3 Start dates provided are estimates and may \\lary contingent upon predecessor completion and available resources at that time. Even if this start date is adjusted, the completion date is still expected to be met unless indicated otherwise Comments:

All uncompleted task dates have slipped except the IE PRA Peer Review 1ST 6.4J. Fire PRA Peer Review [ST 7.17]. and the LERF model 1ST 6.2.1] which was completed.

The Task 11. LAR submittal date is prior to the IE PRA completion [T 6J, Change Evaluations [T 8). and the Transition report completion [T 10] due to the self-imposed contraint for the LAR submittal of the end of the 1st quarter 2010.

E:\\Palisades\\PLP\\Enforcement Extension\\Milestone Itrs\\NRC Milestones 10-14-09.xls

TELEPHONE CONFERENCE CALL ON NFPA 805 TRANSITION PROGRESS BETWEEN U.S. NUCLEAR REGULATORY COMMISSION AND ENTERGY OPERATIONS, INC.

LIST OF PARTICIPANTS OCTOBER 14, 2009 PARTICIPANTS TITLE/POSITION AFFILIATIONS U.S. NUCLEAR REGULATORY COMMISSION (NRC)

Mahesh Chawla Proiect Manaaer HEADQUARTERS Alex Klein Branch Chief Harrv Barrett Senior Fire Protection Enaineer John Ellegood Senior Resident Inspector REGION ENTERGY Bob VanWagner Program Engineering Manager PALISADES NUCLEAR PLANT Ron Penna Program Engineering Supervisor Tom Swiecicki Fire Protection Lead Brian Brogan Probabilistic Safety Assessment (PSA)

Engineer Frank Yanik Probabilistic Safety Assessment Engineer Roger Stobert Contract Project Manager NFPA 805 Jim Kuemin Licensing Engineer

ML083370155) made a commitment to conduct a monthly teleconference with the NRC staff to discuss progress on the PNP NFPA 805 transition activities.

IRA!

Mahesh Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-255

Enclosures:

1: Table - Palisades NFPA 805 Project Milestones 2: Table - List of Attendees cc w/encls: Listserv Distribution:

PUBLIC LPL3-1 r/f RidsRgn3MailCenter Resource AKlein, NRR JGeissner, Rill RidsNrrDorLpl3-1 Resource RidsNrrPMANO Resource MVaaler, NRR TTaylor, Rill RidsNrrPMPalisades Resource RidsNrrLABTully Paul Lain, NRR HBarrett RidsAcrsAcnw_MailCtr Resource RidsOgcRp Resource JEliegood, Rill SBagley, EDO R-III CTucci, NRR ADAMS Accession No' ML093030151 OFFICE LPL3-1/PM LPL3-1/LA DRNAFPB/BC LPL3-1/BC NAME MChawla THarris AKlein RPascarelli DATE 10/30/09 10/30/09 10/30/09 10/30/09