ML093500578: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML093500578
| number = ML093500578
| issue date = 12/16/2009
| issue date = 12/16/2009
| title = Ltr 12/16/09 Byron Notification of Inspection and Request for Information 05000454/2010002; 05000455/2010002
| title = Notification of Inspection and Request for Information 05000454/2010002; 05000455/2010002
| author name = Stone A
| author name = Stone A
| author affiliation = NRC/RGN-III/DRS/EB2
| author affiliation = NRC/RGN-III/DRS/EB2
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352  
{{#Wiki_filter:UNITED STATES  
  December 16, 2009
NUCLEAR REGULATORY COMMISSION  
REGION III  
2443 WARRENVILLE ROAD, SUITE 210  
LISLE, IL 60532-4352  
   
   
Mr. Charles G. Pardee Senior Vice President, Exelon Generation Company, LLC  
 
December 16, 2009
Mr. Charles G. Pardee  
Senior Vice President,  
Exelon Generation Company, LLC  
4300 Winfield Road  
4300 Winfield Road  
Warrenville IL  60555  
Warrenville IL  60555  
 
SUBJECT: BYRON STATION - NOTIFICATION OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION  
SUBJECT:  
BYRON STATION - NOTIFICATION OF AN NRC TRIENNIAL HEAT SINK  
PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION  
05000454/2010002; 05000455/2010002   
05000454/2010002; 05000455/2010002   
   
   
Dear Mr. Pardee: On February 1, 2010, the NRC will begin the on-site portion of the Triennial Heat Sink Performance Inspection at your Byron Station.  This inspection will be performed in accordance with NRC baseline inspection procedure (IP) 71111.07. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a request for documents needed for the inspection.  The  
Dear Mr. Pardee:  
documents have been divided into three groups. * The first group list information necessary for our initial inspection scoping activities.  This information should be available to the lead inspector no later than December 28, 2009.  By  
On February 1, 2010, the NRC will begin the on-site portion of the Triennial Heat Sink  
Performance Inspection at your Byron Station.  This inspection will be performed in accordance  
with NRC baseline inspection procedure (IP) 71111.07.  
In order to minimize the impact that the inspection has on the site and to ensure a productive  
inspection, we have enclosed a request for documents needed for the inspection.  The  
documents have been divided into three groups.  
* The first group list information necessary for our initial inspection scoping activities.  This  
information should be available to the lead inspector no later than December 28, 2009.  By  
January 4, 2010, the inspector will communicate the initial selected set of approximately 2-3  
January 4, 2010, the inspector will communicate the initial selected set of approximately 2-3  
risk-significant heat exchangers.  * The second group of documents requested are those items needed to support our in-office preparation activities.  This set of documents, including the calculations associated with the selected heat exchangers, should be available at the Regional Office no later than  
risk-significant heat exchangers.   
* The second group of documents requested are those items needed to support our in-office  
preparation activities.  This set of documents, including the calculations associated with the  
selected heat exchangers, should be available at the Regional Office no later than  
January 18, 2010.  This information should be separated for each selected component,  
January 18, 2010.  This information should be separated for each selected component,  
especially if provided electronically (e.g., folder with component name that includes  
especially if provided electronically (e.g., folder with component name that includes  
calculations, condition reports, maintenance history, etc).  During the in-office preparation  
calculations, condition reports, maintenance history, etc).  During the in-office preparation  
activities, the inspector may identify additional information needed to support the inspection. * The last group includes the additional information above, as well as plant specific reference material.  This information should be available to the inspector on February 1, 2010.  It is  
activities, the inspector may identify additional information needed to support the inspection.  
* The last group includes the additional information above, as well as plant specific reference  
material.  This information should be available to the inspector on February 1, 2010.  It is  
also requested that corrective action documents and/or questions developed during the  
also requested that corrective action documents and/or questions developed during the  
inspection be provided to the inspector as the documents are generated.  The lead inspector for this inspection is Michael Jones.  If there are questions about the material requested, or the inspection, please call Mr. Jones at (630) 829-9745.  Please send  
inspection be provided to the inspector as the documents are generated.   
the information to the following e-mail address michael.jones@nrc.gov.  A hard-copy with the required information is also an acceptable option.
The lead inspector for this inspection is Michael Jones.  If there are questions about the  
C. Pardee -2- It is important that these documents be as complete as possible, in order to minimize the
material requested, or the inspection, please call Mr. Jones at (630) 829-9745.  Please send  
number of documents requested during the preparation week or during the on-site inspection. All requested documents are to be for the time period from the on-site inspection period back to the last Heat Sink Performance Inspection.  If no activities were accomplished in that time
the information to the following e-mail address michael.jones@nrc.gov.  A hard-copy with the  
period, then the request applies to the last applicable document in the previous time period.  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
required information is also an acceptable option.
enclosure will be available electronically for public inspection in the NRC Public Document  Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  


C. Pardee
-2-
It is important that these documents be as complete as possible, in order to minimize the
number of documents requested during the preparation week or during the on-site inspection.
All requested documents are to be for the time period from the on-site inspection period back to
the last Heat Sink Performance Inspection.  If no activities were accomplished in that time
period, then the request applies to the last applicable document in the previous time period. 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document 
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
(the Public Electronic Reading Room).
   
   
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection requirements were approved by the Office  
This letter does not contain new or amended information collection requirements subject to the  
of Management and Budget, Control Number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a  
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection  
requirements were approved by the Office of Management and Budget, Control Number 3150-
0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a  
request for information or an information collection requirement unless the requesting  
request for information or an information collection requirement unless the requesting  
document displays a currently valid Offi
document displays a currently valid Office of Management and Budget control number.  
ce of Management and Budget control number.       Sincerely,  /RA/   
      Ann Marie Stone, Chief  
      Engineering Branch 2       Division of Reactor Safety  
Docket No. 50-454; 05-455 License No. NPF-37; NPF-66 Enclosure: TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST cc w/encl: Distribution via ListServ  
Sincerely,  
   
/RA/  
   
Ann Marie Stone, Chief  
Engineering Branch 2  
Division of Reactor Safety  
Docket No. 50-454; 05-455  
License No. NPF-37; NPF-66  
Enclosure:  
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT  
REQUEST  
cc w/encl:  
Distribution via ListServ
 
REQUEST FOR INFORMATION  
REQUEST FOR INFORMATION  
  TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST  
   
  Enclosure  
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST  
1 Inspection Report
:  05000454/2010002 (DRS); 05000455/2010002(DRS)  
Inspection Dates
Enclosure  
: February 1-5, 2010  
1
Inspection Procedure
: IP 71111.07, Triennial "Heat Sink Performance Inspection"
Inspection Report:   
Lead Inspector:  Michael A. Jones Jr.  
05000454/2010002 (DRS); 05000455/2010002(DRS)  
Inspection Dates:
   
February 1-5, 2010  
Inspection Procedure:
IP 71111.07, Triennial Heat Sink Performance Inspection  
Lead Inspector:  
   
Michael A. Jones Jr.  
(630) 829-9745  
(630) 829-9745  
michael.jones@nrc.gov
michael.jones@nrc.gov  
I. Information Requested By December 28, 2009 1. List of the Generic Letter (GL) 89-13, "Service Water System Problems Affecting Safety-Related Equipment," heat exchangers in order of risk-significance. 2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat  
I.  
exchanger. 3. List of corrective action program documents (with a short description) associated with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat exchanger testing, for the previous two years or since the last Triennial heat sink inspection. 4. Copy of any self-assessment done on any of GL 89-13 heat exchangers. 5. System health report(s) and maintenance rule system notebooks for all the GL 89-13  
Information Requested By December 28, 2009  
heat exchangers. II. Information Requested By January 18, 2010 1. For the specific heat exchangers selected: a. Copies of the two most recent completed tests confirming thermal performance for those heat exchangers which are performance tested; b. Copy of system description and design basis document for the heat exchangers (as applicable); c. Copy of any operability determinations or other documentation of degradation associated with the heat exchangers or the systems that support the operation for the selected heat exchangers; d. Copy of the Updated Final Safety Analysis Report (UFSAR) sections applicable for each heat exchanger; and
1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting  
Safety-Related Equipment, heat exchangers in order of risk-significance.  
2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat  
exchanger.  
3. List of corrective action program documents (with a short description) associated with  
GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat exchanger  
testing, for the previous two years or since the last Triennial heat sink inspection.  
4. Copy of any self-assessment done on any of GL 89-13 heat exchangers.  
5. System health report(s) and maintenance rule system notebooks for all the GL 89-13  
heat exchangers.  
II. Information Requested By January 18, 2010  
1. For the specific heat exchangers selected:  
a. Copies of the two most recent completed tests confirming thermal performance for  
those heat exchangers which are performance tested;  
b. Copy of system description and design basis document for the heat exchangers  
(as applicable);  
c. Copy of any operability determinations or other documentation of degradation  
associated with the heat exchangers or the systems that support the operation for  
the selected heat exchangers;  
d. Copy of the Updated Final Safety Analysis Report (UFSAR) sections applicable for  
each heat exchanger; and  
 
REQUEST FOR INFORMATION  
REQUEST FOR INFORMATION  
  TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST  
   
  Enclosure  
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST  
2e. Provide a list of calculations with a description which currently apply to each heat  
exchanger.  2. A schedule of all inspections, cleanings, maintenance, or testing of any plant heat exchanger to be done during the on-site portion of the inspection. 3. Copies of procedures developed to implement the recommendations of GL 89-13, e. g., the GL 89-13 Heat Exchanger Program description. 4. Updated Final Safety Analysis Report pages for the GL 89-13 Heat Exchanger Program. 5. Maximum Cooling Water system inlet temperature limit that still allows full licensed power operation of the nuclear reactor.  Please provide the document that states this  
Enclosure  
2
e. Provide a list of calculations with a description which currently apply to each heat  
exchanger.   
2. A schedule of all inspections, cleanings, maintenance, or testing of any plant heat  
exchanger to be done during the on-site portion of the inspection.  
3. Copies of procedures developed to implement the recommendations of GL 89-13, e. g.,  
the GL 89-13 Heat Exchanger Program description.  
4. Updated Final Safety Analysis Report pages for the GL 89-13 Heat Exchanger Program.  
5. Maximum Cooling Water system inlet temperature limit that still allows full licensed  
power operation of the nuclear reactor.  Please provide the document that states this  
limit (e.g., USAR or TRM) and the operating procedure that ensures this limit is not  
limit (e.g., USAR or TRM) and the operating procedure that ensures this limit is not  
exceeded.
III. Information Requested to be Available on First Day of Inspection, February 1, 2010.
1. For the specific heat exchangers selected:
a. Provide the Design Basis Documents and Updated Final Safety Analysis Report
pages for the selected heat exchangers;
b. Copy of the design specification and heat exchanger data sheets for each heat
exchanger;
c. Copy of the vendor manuals including component drawings for each heat exchanger; 
d. Copy of the calculation which establishes the limiting (maximum) design basis heat
load which is required to be removed by each of these heat exchangers; 
e. Copy of the calculation which correlates surveillance testing results from these heat
exchangers with design basis heat removal capability (e.g., basis for surveillance test
acceptance criteria); 
f.
Copy of the calculations or documents which evaluate the potential for water
hammer or excessive tube vibration in the heat exchanger or associated piping; 
g. List of engineering-related Operator Workarounds/Temporary Modifications for these
heat exchangers since the last Heat Sink Performance;
h. Copy of the evaluations of data for the two most recent completed tests confirming
the thermal performance of each heat exchanger;


exceeded. III. Information Requested to be Available on First Day of Inspection, February 1, 2010. 1. For the specific heat exchangers selected: a. Provide the Design Basis Documents and Updated Final Safety Analysis Report pages for the selected heat exchangers; b. Copy of the design specification and heat exchanger data sheets for each heat
exchanger; c. Copy of the vendor manuals including component drawings for each heat exchanger;  d. Copy of the calculation which establishes the limiting (maximum) design basis heat load which is required to be removed by each of these heat exchangers;  e. Copy of the calculation which correlates surveillance testing results from these heat exchangers with design basis heat removal capability (e.g., basis for surveillance test acceptance criteria);  f. Copy of the calculations or documents which evaluate the potential for water hammer or excessive tube vibration in the heat exchanger or associated piping;  g. List of engineering-related Operator Workarounds/Temporary Modifications for these heat exchangers since the last Heat Sink Performance; h. Copy of the evaluations of data for the two most recent completed tests confirming the thermal performance of each heat exchanger;
REQUEST FOR INFORMATION  
REQUEST FOR INFORMATION  
  TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST  
   
  Enclosure  
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST  
3i. Documentation and procedures that identify the types, accuracy, and location of any special instrumentation used for the two most recently completed thermal  
Enclosure  
3
i.  
Documentation and procedures that identify the types, accuracy, and location of any  
special instrumentation used for the two most recently completed thermal  
performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow  
performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow  
instruments or temperature instruments).  Include calibration records for the  
instruments or temperature instruments).  Include calibration records for the  
instruments used during these tests;  j. Copies of those documents that describe the methods taken to control water chemistry in the heat exchangers; k. Copies of the documents that verify the structural integrity of the heat exchanger, e.g., eddy current summary sheets, ultrasonic testing results, and visual inspection results;    l. The cleaning and inspection maintenance schedule for each heat exchanger for the next five years;  m. Copy of the document describing the inspection results for the last two clean and inspection activities completed on each heat exchanger;  n. Copy of the document which identifies the current number of tubes in service for each heat exchanger and the supporting calculation which establishes the maximum number of tubes which can be plugged in each heat exchanger;  o. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes which are identified in each heat exchanger; and    p. Information regarding any alarms which monitor on-line performance. 2. For the ultimate heat sink: a. Analysis which demonstrates that the adjacent non-seismic or non-safety related structures cannot degrade or block safety-related flow paths, during a severe  
instruments used during these tests;   
weather or seismic event; b. Procedures related to the monitoring of UHS Structural integrity and inspection results; c. Copies of procedures associated with operating during adverse weather conditions, e.g., icing or high temperatures or low levels; d. Copies of surveillance procedures and testing results conducted on the level instrumentation relied upon to determine UHS reservoir capability; and e. Copies of calculations and surveillances that determine the UHS reservoir capacity and heat transfer capability. 3. For the safety-related service water system and the UHS.  
j.  
Copies of those documents that describe the methods taken to control water  
chemistry in the heat exchangers;  
k. Copies of the documents that verify the structural integrity of the heat exchanger,  
e.g., eddy current summary sheets, ultrasonic testing results, and visual inspection  
results;     
l.  
The cleaning and inspection maintenance schedule for each heat exchanger for the  
next five years;   
m. Copy of the document describing the inspection results for the last two clean and  
inspection activities completed on each heat exchanger;   
n. Copy of the document which identifies the current number of tubes in service for  
each heat exchanger and the supporting calculation which establishes the maximum  
number of tubes which can be plugged in each heat exchanger;   
o. Copy of the document establishing the repair criteria (plugging limit) for degraded  
tubes which are identified in each heat exchanger; and     
p. Information regarding any alarms which monitor on-line performance.  
2. For the ultimate heat sink:  
a. Analysis which demonstrates that the adjacent non-seismic or non-safety related  
structures cannot degrade or block safety-related flow paths, during a severe  
weather or seismic event;  
b. Procedures related to the monitoring of UHS Structural integrity and inspection  
results;  
c. Copies of procedures associated with operating during adverse weather conditions,  
e.g., icing or high temperatures or low levels;  
d. Copies of surveillance procedures and testing results conducted on the level  
instrumentation relied upon to determine UHS reservoir capability; and  
e. Copies of calculations and surveillances that determine the UHS reservoir capacity  
and heat transfer capability.  
3. For the safety-related service water system and the UHS.
 
REQUEST FOR INFORMATION  
REQUEST FOR INFORMATION  
  TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST  
   
  Enclosure  
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST  
4a. Last two performance tests, such as the ASME in-service test, for all pumps, all valves and the cooling towers, if applicable, in the safety-related service water  
system.  If the components are not performance tested, please provide documentation verifying performance by the methods actually used; b. Copies of the documents that verify flow testing was done at maximum design flow during the last two years or since the last time it was done.  Copies of the documents that verify maximum design flow testing will continue to be periodically done in the  
future; c. Copies of any design changes performed on the system;  
Enclosure  
4
a. Last two performance tests, such as the ASME in-service test, for all pumps, all  
valves and the cooling towers, if applicable, in the safety-related service water  
system.  If the components are not performance tested, please provide  
documentation verifying performance by the methods actually used;  
b. Copies of the documents that verify flow testing was done at maximum design flow  
during the last two years or since the last time it was done.  Copies of the documents  
that verify maximum design flow testing will continue to be periodically done in the  
future;  
c. Copies of any design changes performed on the system;  
d. Copies of procedures for a loss of service water and loss of UHS;   
d. Copies of procedures for a loss of service water and loss of UHS;   
e. Copies of inspections and/or maintenance related to macrofouling (silt, dead mussel shells, debris, etc.) and aquatic life such as fish, algae, grass, or kelp; f. Copies of inspections and/or maintenance related to preventing biotic fouling; g. Copies of chemistry procedures and surveillances that monitor for pH, calcium hardness, etc.; h. Copies of procedures and/or test results to survey or monitor interface valves between the safety related section of the service water system and the non-safety-related section; i. Copies of the pipe testing and/or inspection program procedures and surveillances;  
e. Copies of inspections and/or maintenance related to macrofouling (silt, dead mussel  
j. Copies of the documents that verify the structural integrity of the heat exchanger, e.g., eddy current summary sheets, ultrasonic testing results, and visual inspection results; k. History of any thru wall pipe leak on the system; and l. Copies of the procedures to monitor assess and disposition active thru wall pipe leaks, including structural evaluations and/or planned corrective actions.
shells, debris, etc.) and aquatic life such as fish, algae, grass, or kelp;  
If the information requested above will not be available, please contact Mr. Jones as soon as
f.  
possible at (630) 829-9745, or email Michael.jones@nrc.gov. 
Copies of inspections and/or maintenance related to preventing biotic fouling;  
  C. Pardee -2- It is important that these documents be as complete as possible, in order to minimize the number of documents requested during the preparation week or during the on-site inspection. All requested documents are to be for the time period from the on-site inspection period back to the last Heat Sink Performance Inspection.  If no activities were accomplished in that time period, then the request applies to the last applicable document in the previous time period.  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document  Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
g. Copies of chemistry procedures and surveillances that monitor for pH, calcium  
hardness, etc.;  
h. Copies of procedures and/or test results to survey or monitor interface  
valves between the safety related section of the service water system and the  
non-safety-related section;  
i.  
Copies of the pipe testing and/or inspection program procedures and surveillances;  
j.  
Copies of the documents that verify the structural integrity of the heat exchanger,  
e.g., eddy current summary sheets, ultrasonic testing results, and visual inspection  
results;  
k. History of any thru wall pipe leak on the system; and  
l.  
Copies of the procedures to monitor assess and disposition active thru wall pipe  
leaks, including structural evaluations and/or planned corrective actions.  
   
   
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.       Sincerely,  /RA/       Ann Marie Stone, Chief  
If the information requested above will not be available, please contact Mr. Jones as soon as
      Engineering Branch 2       Division of Reactor Safety Docket No. 50-454; 05-455 License No. NPF-37; NPF-66 Enclosure: TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST cc w/encl: Distribution via ListServ  
possible at (630) 829-9745, or email Michael.jones@nrc.gov.
  DISTRIBUTION
 
See next page DOCUMENT NAME:  G:\DRS\Work in Progress\Ltr 12__09 Byron RFI MAJ.doc
  Publicly Available Non-Publicly Available       Sensitive         Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl; "E" = Copy with attach/encl "N" = No copy OFFICE RIII  RIII     NAME MJones:ls AMStone   DATE 12/16/09 12/16/09  
OFFICIAL RECORD COPY  
  Letter to Mr. Charles Pardee from Ms. Ann Marie Stone dated December 15, 2009.  
C. Pardee
  SUBJECT: BYRON STATION - NOTIFICATION OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION  
-2-
It is important that these documents be as complete as possible, in order to minimize the number of
documents requested during the preparation week or during the on-site inspection.
All requested documents are to be for the time period from the on-site inspection period back to the last
Heat Sink Performance Inspection.  If no activities were accomplished in that time period, then the
request applies to the last applicable document in the previous time period. 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure
will be available electronically for public inspection in the NRC Public Document 
Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic
Reading Room).
This letter does not contain new or amended information collection requirements subject to  
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information  
collection requirements were approved by the Office of Management and Budget, Control Number 3150-
0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for  
information or an information collection requirement unless the requesting document displays a currently  
valid Office of Management and Budget control number.  
Sincerely,  
   
/RA/  
Ann Marie Stone, Chief  
Engineering Branch 2  
Division of Reactor Safety  
Docket No. 50-454; 05-455  
License No. NPF-37; NPF-66  
Enclosure:  
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST  
cc w/encl:  
Distribution via ListServ  
   
DISTRIBUTION  
See next page  
DOCUMENT NAME:  G:\\DRS\\Work in Progress\\Ltr 12__09 Byron RFI MAJ.doc  
9 Publicly Available  
9 Non-Publicly Available       9 Sensitive       9  Non-Sensitive  
To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy  
OFFICE  
RIII  
   
RIII  
NAME  
MJones:ls  
AMStone  
DATE  
12/16/09  
12/16/09  
OFFICIAL RECORD COPY
 
Letter to Mr. Charles Pardee from Ms. Ann Marie Stone dated December 15, 2009.  
SUBJECT:  
BYRON STATION - NOTIFICATION OF AN NRC TRIENNIAL HEAT SINK  
PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION  
05000454/2010002; 05000455/2010002   
05000454/2010002; 05000455/2010002   
   
   
  DISTRIBUTION
   
: Susan Bagley  
DISTRIBUTION:
 
Susan Bagley  
RidsNrrDorlLpl3-2 Resource  
RidsNrrDorlLpl3-2 Resource  
RidsNrrPMByron Resource  
RidsNrrPMByron Resource  
 
RidsNrrDirsIrib Resource  
RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth  
Cynthia Pederson  
Steven Orth  
Jared Heck  
Jared Heck  
Allan Barker  
Allan Barker  
 
Carole Ariano  
Carole Ariano Linda Linn DRPIII  
Linda Linn  
DRPIII  
DRSIII  
DRSIII  
Patricia Buckley  
Patricia Buckley  

Latest revision as of 07:47, 14 January 2025

Notification of Inspection and Request for Information 05000454/2010002; 05000455/2010002
ML093500578
Person / Time
Site: Byron  Constellation icon.png
Issue date: 12/16/2009
From: Ann Marie Stone
NRC/RGN-III/DRS/EB2
To: Pardee C
Exelon Generation Co
References
IR-10-002
Download: ML093500578 (8)


See also: IR 05000454/2010002

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE ROAD, SUITE 210

LISLE, IL 60532-4352

December 16, 2009

Mr. Charles G. Pardee

Senior Vice President,

Exelon Generation Company, LLC

4300 Winfield Road

Warrenville IL 60555

SUBJECT:

BYRON STATION - NOTIFICATION OF AN NRC TRIENNIAL HEAT SINK

PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION

05000454/2010002; 05000455/2010002

Dear Mr. Pardee:

On February 1, 2010, the NRC will begin the on-site portion of the Triennial Heat Sink

Performance Inspection at your Byron Station. This inspection will be performed in accordance

with NRC baseline inspection procedure (IP) 71111.07.

In order to minimize the impact that the inspection has on the site and to ensure a productive

inspection, we have enclosed a request for documents needed for the inspection. The

documents have been divided into three groups.

  • The first group list information necessary for our initial inspection scoping activities. This

information should be available to the lead inspector no later than December 28, 2009. By

January 4, 2010, the inspector will communicate the initial selected set of approximately 2-3

risk-significant heat exchangers.

  • The second group of documents requested are those items needed to support our in-office

preparation activities. This set of documents, including the calculations associated with the

selected heat exchangers, should be available at the Regional Office no later than

January 18, 2010. This information should be separated for each selected component,

especially if provided electronically (e.g., folder with component name that includes

calculations, condition reports, maintenance history, etc). During the in-office preparation

activities, the inspector may identify additional information needed to support the inspection.

  • The last group includes the additional information above, as well as plant specific reference

material. This information should be available to the inspector on February 1, 2010. It is

also requested that corrective action documents and/or questions developed during the

inspection be provided to the inspector as the documents are generated.

The lead inspector for this inspection is Michael Jones. If there are questions about the

material requested, or the inspection, please call Mr. Jones at (630) 829-9745. Please send

the information to the following e-mail address michael.jones@nrc.gov. A hard-copy with the

required information is also an acceptable option.

C. Pardee

-2-

It is important that these documents be as complete as possible, in order to minimize the

number of documents requested during the preparation week or during the on-site inspection.

All requested documents are to be for the time period from the on-site inspection period back to

the last Heat Sink Performance Inspection. If no activities were accomplished in that time

period, then the request applies to the last applicable document in the previous time period.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html

(the Public Electronic Reading Room).

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting

document displays a currently valid Office of Management and Budget control number.

Sincerely,

/RA/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-454;05-455

License No. NPF-37; NPF-66

Enclosure:

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT

REQUEST

cc w/encl:

Distribution via ListServ

REQUEST FOR INFORMATION

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

Enclosure

1

Inspection Report: 05000454/2010002 (DRS); 05000455/2010002(DRS)

Inspection Dates:

February 1-5, 2010

Inspection Procedure:

IP 71111.07, Triennial Heat Sink Performance Inspection

Lead Inspector:

Michael A. Jones Jr.

(630) 829-9745

michael.jones@nrc.gov

I.

Information Requested By December 28, 2009

1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting

Safety-Related Equipment, heat exchangers in order of risk-significance.

2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat

exchanger.

3. List of corrective action program documents (with a short description) associated with

GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat exchanger

testing, for the previous two years or since the last Triennial heat sink inspection.

4. Copy of any self-assessment done on any of GL 89-13 heat exchangers.

5. System health report(s) and maintenance rule system notebooks for all the GL 89-13

heat exchangers.

II. Information Requested By January 18, 2010

1. For the specific heat exchangers selected:

a. Copies of the two most recent completed tests confirming thermal performance for

those heat exchangers which are performance tested;

b. Copy of system description and design basis document for the heat exchangers

(as applicable);

c. Copy of any operability determinations or other documentation of degradation

associated with the heat exchangers or the systems that support the operation for

the selected heat exchangers;

d. Copy of the Updated Final Safety Analysis Report (UFSAR) sections applicable for

each heat exchanger; and

REQUEST FOR INFORMATION

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

Enclosure

2

e. Provide a list of calculations with a description which currently apply to each heat

exchanger.

2. A schedule of all inspections, cleanings, maintenance, or testing of any plant heat

exchanger to be done during the on-site portion of the inspection.

3. Copies of procedures developed to implement the recommendations of GL 89-13, e. g.,

the GL 89-13 Heat Exchanger Program description.

4. Updated Final Safety Analysis Report pages for the GL 89-13 Heat Exchanger Program.

5. Maximum Cooling Water system inlet temperature limit that still allows full licensed

power operation of the nuclear reactor. Please provide the document that states this

limit (e.g., USAR or TRM) and the operating procedure that ensures this limit is not

exceeded.

III. Information Requested to be Available on First Day of Inspection, February 1, 2010.

1. For the specific heat exchangers selected:

a. Provide the Design Basis Documents and Updated Final Safety Analysis Report

pages for the selected heat exchangers;

b. Copy of the design specification and heat exchanger data sheets for each heat

exchanger;

c. Copy of the vendor manuals including component drawings for each heat exchanger;

d. Copy of the calculation which establishes the limiting (maximum) design basis heat

load which is required to be removed by each of these heat exchangers;

e. Copy of the calculation which correlates surveillance testing results from these heat

exchangers with design basis heat removal capability (e.g., basis for surveillance test

acceptance criteria);

f.

Copy of the calculations or documents which evaluate the potential for water

hammer or excessive tube vibration in the heat exchanger or associated piping;

g. List of engineering-related Operator Workarounds/Temporary Modifications for these

heat exchangers since the last Heat Sink Performance;

h. Copy of the evaluations of data for the two most recent completed tests confirming

the thermal performance of each heat exchanger;

REQUEST FOR INFORMATION

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

Enclosure

3

i.

Documentation and procedures that identify the types, accuracy, and location of any

special instrumentation used for the two most recently completed thermal

performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow

instruments or temperature instruments). Include calibration records for the

instruments used during these tests;

j.

Copies of those documents that describe the methods taken to control water

chemistry in the heat exchangers;

k. Copies of the documents that verify the structural integrity of the heat exchanger,

e.g., eddy current summary sheets, ultrasonic testing results, and visual inspection

results;

l.

The cleaning and inspection maintenance schedule for each heat exchanger for the

next five years;

m. Copy of the document describing the inspection results for the last two clean and

inspection activities completed on each heat exchanger;

n. Copy of the document which identifies the current number of tubes in service for

each heat exchanger and the supporting calculation which establishes the maximum

number of tubes which can be plugged in each heat exchanger;

o. Copy of the document establishing the repair criteria (plugging limit) for degraded

tubes which are identified in each heat exchanger; and

p. Information regarding any alarms which monitor on-line performance.

2. For the ultimate heat sink:

a. Analysis which demonstrates that the adjacent non-seismic or non-safety related

structures cannot degrade or block safety-related flow paths, during a severe

weather or seismic event;

b. Procedures related to the monitoring of UHS Structural integrity and inspection

results;

c. Copies of procedures associated with operating during adverse weather conditions,

e.g., icing or high temperatures or low levels;

d. Copies of surveillance procedures and testing results conducted on the level

instrumentation relied upon to determine UHS reservoir capability; and

e. Copies of calculations and surveillances that determine the UHS reservoir capacity

and heat transfer capability.

3. For the safety-related service water system and the UHS.

REQUEST FOR INFORMATION

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

Enclosure

4

a. Last two performance tests, such as the ASME in-service test, for all pumps, all

valves and the cooling towers, if applicable, in the safety-related service water

system. If the components are not performance tested, please provide

documentation verifying performance by the methods actually used;

b. Copies of the documents that verify flow testing was done at maximum design flow

during the last two years or since the last time it was done. Copies of the documents

that verify maximum design flow testing will continue to be periodically done in the

future;

c. Copies of any design changes performed on the system;

d. Copies of procedures for a loss of service water and loss of UHS;

e. Copies of inspections and/or maintenance related to macrofouling (silt, dead mussel

shells, debris, etc.) and aquatic life such as fish, algae, grass, or kelp;

f.

Copies of inspections and/or maintenance related to preventing biotic fouling;

g. Copies of chemistry procedures and surveillances that monitor for pH, calcium

hardness, etc.;

h. Copies of procedures and/or test results to survey or monitor interface

valves between the safety related section of the service water system and the

non-safety-related section;

i.

Copies of the pipe testing and/or inspection program procedures and surveillances;

j.

Copies of the documents that verify the structural integrity of the heat exchanger,

e.g., eddy current summary sheets, ultrasonic testing results, and visual inspection

results;

k. History of any thru wall pipe leak on the system; and

l.

Copies of the procedures to monitor assess and disposition active thru wall pipe

leaks, including structural evaluations and/or planned corrective actions.

If the information requested above will not be available, please contact Mr. Jones as soon as

possible at (630) 829-9745, or email Michael.jones@nrc.gov.

C. Pardee

-2-

It is important that these documents be as complete as possible, in order to minimize the number of

documents requested during the preparation week or during the on-site inspection.

All requested documents are to be for the time period from the on-site inspection period back to the last

Heat Sink Performance Inspection. If no activities were accomplished in that time period, then the

request applies to the last applicable document in the previous time period.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure

will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic

Reading Room).

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control Number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for

information or an information collection requirement unless the requesting document displays a currently

valid Office of Management and Budget control number.

Sincerely,

/RA/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-454;05-455

License No. NPF-37; NPF-66

Enclosure:

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

cc w/encl:

Distribution via ListServ

DISTRIBUTION

See next page

DOCUMENT NAME: G:\\DRS\\Work in Progress\\Ltr 12__09 Byron RFI MAJ.doc

9 Publicly Available

9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive

To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy

OFFICE

RIII

RIII

NAME

MJones:ls

AMStone

DATE

12/16/09

12/16/09

OFFICIAL RECORD COPY

Letter to Mr. Charles Pardee from Ms. Ann Marie Stone dated December 15, 2009.

SUBJECT:

BYRON STATION - NOTIFICATION OF AN NRC TRIENNIAL HEAT SINK

PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION

05000454/2010002; 05000455/2010002

DISTRIBUTION:

Susan Bagley

RidsNrrDorlLpl3-2 Resource

RidsNrrPMByron Resource

RidsNrrDirsIrib Resource

Cynthia Pederson

Steven Orth

Jared Heck

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

Patricia Buckley

Tammy Tomczak

ROPreports Resource