ML100620833: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (5 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
{{Adams | |||
| number = ML100620833 | |||
| issue date = 03/03/2010 | |||
| title = Annual Assessment Letter (Report 05000244-10-001) | |||
| author name = Collins S | |||
| author affiliation = NRC/RGN-I/DRP/PB1 | |||
| addressee name = Carlin J | |||
| addressee affiliation = R. E. Ginna Nuclear Power Plant, LLC | |||
| docket = 05000244 | |||
| license number = DPR-018 | |||
| contact person = | |||
| case reference number = IR-10-001 | |||
| package number = ML100541651 | |||
| document type = Inspection Plan, Letter | |||
| page count = 5 | |||
}} | |||
See also: [[see also::IR 05000244/2010001]] | |||
=Text= | |||
{{#Wiki_filter:UNITED STATES | |||
NUCLEAR REGULATORY COMMISSION | |||
REGION I | |||
475 ALLENDALE ROAD | |||
KING OF PRUSSIA, PENNSYLVANIA 19406-1415 | |||
March 3, 2010 | |||
Mr. John T. Carlin | |||
Vice President R. E. Ginna Nuclear Power Plant | |||
R. E. Ginna Nuclear Power Plant, LLC | |||
1503 Lake Road | |||
Ontario, NY 14519 | |||
SUBJECT: | |||
ANNUAL ASSESSMENT LEDER ~ R. E. GINNA NUCLEAR POWER PLANT | |||
(REPORT 05000244/2010001) | |||
Dear Mr. Carlin: | |||
On February 12, 2010, the NRC staff completed its performance review of R. E. Ginna Nuclear | |||
Power Plant (Ginna). Our technical staff reviewed performance indicators (Pis) for the most | |||
recent quarter and inspection results for the period from January 1 through December 31, 2009. | |||
The purpose of this letter is to inform you of our assessment of your safety performance during | |||
this period and our plans for future inspections at your facility. | |||
This performance review and enclosed inspection plan do not include security information. A | |||
separate letter designated and marked as "Official Use Only-Security Information" will include | |||
the security cornerstone performance review and resultant inspection plan. | |||
Overall, Ginna operated in a manner that preserved public health and safety and met all | |||
cornerstone objectives with moderate degradation in safety performance. Plant performance for | |||
the most recent quarter was within the Degraded Cornerstone column of the NRC's Action | |||
Matrix. based on two findings having low to moderatei safety Significance (White) and one White | |||
PI in the Mitigating Systems Cornerstone. The first White finding, originating in the first quarter | |||
2009, was related to Ginna's inadequate implementation of a preventive maintenance (PM) | |||
program for, and the subsequent failure of, the turbine-driven auxiliary feedwater (TDAFW) | |||
pump governor. The second White finding. originating in the fourth quarter 2009, was related to | |||
inadequate corrective actions which led to binding of the governor control valve and failure of | |||
the same TDAFW pump. Additionally, the assigned White PI resulted from exceeding the White | |||
significance threshold for the Mitigating Systems Performance Index (MSPI), Heat Removal | |||
Systems PI, in the third quarter 2009, due to the reliability and unavailability issues associated | |||
with the TDAFW pump. | |||
In addition to reactor oversight process (ROP) baseline inspection at your facility, based on our | |||
current assessment of performance for Ginna, we plan to conduct a supplemental inspection | |||
using Inspection Procedure 95002, "Inspection for One Degraded Cornerstone or Any Three | |||
White Inputs in a Strategic Performance Area." The NRC has previously conducted inspections | |||
(Ml093160122, ML093160200 and ML091250233)1 to ensure that deficiencies associated with | |||
the TDAFW pump have been corrected. However, this inspection will be conducted, when your | |||
staff notifies us of your readiness, to provide assurance that the root and contributing causes for | |||
the risk significant performance issues are understood, to independentty assess the extent of | |||
I DeSignation in parenthesis refers to an ADAMS accession number. Documents referenced in this letter | |||
are publicly available using the accession number in ADAMS | |||
J. Carlin | |||
2 | |||
condition and extent of cause, to Independently detennine if safety culture components | |||
contributed to the performance issues, and to provide assurance that the corrective actions are | |||
sufficient to prevent recurrence. | |||
The enclosed inspection plan details the inspections, less those related to security, scheduled | |||
through June 30, 2011. In addition to the previously noted 95002 supplemental inspection and | |||
the baseline inspections, we plan on conducting independent spent fuel storage installation | |||
(ISFSI) inspections. The inspection plan is provided to allow for the resolution of any scheduling | |||
conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine | |||
resident inspections are not listed due to their ongoing and continuous nature. The inspections | |||
in the last nine months of the inspection plan are tentlative and may be revised at the mid-cycle | |||
review. | |||
In accordance with 10 CFR 2.390 of the NRC's ~Rules of Practice," a copy of this letter and its | |||
enclosure will be made available electronically for public inspection in the NRC Public | |||
Document Room or from the Publicly Available Records (PARS) component of NRC's document | |||
system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading | |||
rm/adams.html (the Public Electronic Reading Room). | |||
If circumstances arise which cause us to change this inspection plan, we will contact you to | |||
discuss the change as soon as possible. Please contact Glenn Dentel of my staff at | |||
610-337-5233 with any questions you may have regarding this letter or the inspection plan. | |||
Sincerely, | |||
~~ | |||
Regional Administrator, Region I | |||
Docket No. 50-244 | |||
License No. DPR-18 | |||
Enclosure: Ginna Inspection I Activity Plan | |||
cc w/encl: | |||
Distribution via ListServ | |||
OFFICE | |||
NAME | |||
DATE | |||
J. Carlin | |||
2 | |||
condition and extent of cause, to independently determine if safety culture components | |||
contributed to the performance issues, and to provide assurance that the corrective actions are | |||
sufficient to prevent recurrence. | |||
The enclosed inspection plan details the inspections, less those related to security, scheduled | |||
through June 30, 2011. In addition to the previously noted 95002 supplemental inspection and | |||
the baseline inspections, we plan on conducting independent spent fuel storage installation | |||
(ISFSI) inspections. The inspection plan is provided to allow for the resolution of any scheduling | |||
conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine | |||
resident inspections are not listed due to their ongoing and continuous nature. The inspections | |||
in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle | |||
review. | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its | |||
enclosure will be made available electronically for public inspection in the NRC Public | |||
Document Room or from the Publicly Available Records (PARS) component of NRC's document | |||
system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading | |||
rmfadams.html (the Public Electronic Reading Room). | |||
If circumstances arise which cause us to change this inspection plan, we will contact you to | |||
discuss the change as soon as possible. Please contact Glenn Dentel of my staff at | |||
610-337-5233 with any questions you may have regarding this letter or the inspection plan. | |||
Sincerely, | |||
IRA! | |||
Samuel J. Collins | |||
Regional Administrator, Region I | |||
Docket No. 50-244 | |||
License No. DPR-18 | |||
Distribution w/encl: (via E-mail) | |||
S. Collins, RA (R1AMAIL RESOllRCE) | |||
M. Dapas. IlRA(R1MA1LRt!SOURCEI | |||
D. Lew, ORP (R1IlR_RESOURCE) | |||
J. Clifford, DRP (R1DRPMAIL RESOllRCIE) | |||
D. Roberts, DRS (R1DR~oII R"o_1 | |||
P. Wilson, DRS (R1PRS ..... 1R**.,'''''.) | |||
L. Trocine, RI OEDO | |||
G. Dantel. DRP | |||
N.Peny,DRP | |||
J. Hawkins, DRP | |||
S. Sloan, ORP | |||
K. Kolaczyk, DRP. SRI | |||
L. Casey, DRP, RI | |||
M. Rose, DRP. OA | |||
RidsNrrPMREGinna Res()urce | |||
RldsNrrOorlLpl1-1 Resource | |||
SUNSI Review Complete: _N:.:,:P"'--___ (Reviewer's Initials) | |||
DOCUMENT NAME: S:\\ROP*10 EOC Revlew\\Branch 1\\Ginna AA Letter 2.doc | |||
RQPreportsResource@nrc.gov | |||
ORS Branch Chiefs (6) | |||
L. Scholl, DRS | |||
D.Silk, DRS | |||
J. Trapp, DRS | |||
D. Serenci, PAO | |||
N. Sheehan, PAO | |||
R. Barkley, ORA | |||
ML100620833 | |||
After declaring this document "An Official Agency Record" it will be released to the Public. | |||
To receive a copy of this document, indicate In the box: "C*;:: Copy without attachment/enclosure "En", Copy with | |||
attachment/enclosure uN" ... No copy | |||
RI/DRP | |||
I | |||
RIIDRP | |||
I | |||
RIIDRP | |||
I | |||
RI/ORA | |||
I | |||
NPerry/NP | |||
GDentellGTD | |||
DLew/DCL | |||
SCollins/SJC | |||
03/0112010 | |||
03/01/10 | |||
03/01/10 | |||
03/01/10 | |||
OFFICIAL RECORD COPY | |||
I | |||
0211912010 | |||
Page 1 012 | |||
Report2Z | |||
1 | |||
1 | |||
1 | |||
1 | |||
1 | |||
10:14:25 | |||
Planned Dates | |||
Start | |||
End | |||
01/1112010 | |||
01/1512010 | |||
01/1112010 | |||
01f15/2010 | |||
0210812010 | |||
0211212010 | |||
0210812010 | |||
0211212010 | |||
0210812010 | |||
02/1212010 | |||
02/08/2010 | |||
0211212010 | |||
02108/2010 | |||
02112/2010 | |||
02108/2010 | |||
0211212010 | |||
0210812010 | |||
0211212010 | |||
05/2412010 | |||
0512812010 | |||
06121/2010 | |||
0710212010 | |||
0312212010 | |||
03/26/2010 | |||
05ii7i20iQ | |||
OS/2812010 | |||
05/1712010 | |||
0512812010 | |||
05124/2010 | |||
05/2812010 | |||
0610712010 | |||
06111/2010 | |||
0612112010 | |||
06125/2010 | |||
06121/2010 | |||
06125/2010 | |||
1110812010 | |||
11/12/2010 | |||
0912712010 | |||
1010112010 | |||
0912712010 | |||
10/0112010 | |||
09/27/2010 | |||
10/0112010 | |||
10/1812010 | |||
10/22/2010 | |||
11/0112010 | |||
11/1212010 | |||
Ginna | |||
Inspection / Activity Plan | |||
01/01/2010 - 0613012011 | |||
Titi" | |||
71124 | |||
- RADIATION SAFETY | |||
1 | |||
lP 71124.01 | |||
Radiological Hazard Assessment and Exposure Controls | |||
IP 71124.02 | |||
Occupational ALARA Planning and Controls | |||
EP PROG | |||
- EP PROGRAM INSPECTION | |||
IP 7111402 | |||
Radiological Environmental Monitoring Program | |||
IP 7111403 | |||
Emergency Response Organization Augmentation Testing | |||
IP 7111404 | |||
Emergency Action Level and Emergency Plan Changes | |||
lP 7111405 | |||
Correction of Emergency Preparedness Weaknesses and Deficiencies | |||
IP 71151-EP01 | |||
DrilllExercise Performance | |||
IP 71151-EP02 | |||
ERO Drill Participation | |||
IP 71151-EP03 | |||
Alert & Notification System | |||
6f21EXAM | |||
- OPERATOR LICENSING INITIAL EXAMS | |||
5 | |||
U01766 | |||
FY10 - GINNA INITIAL OPERATOR LICENSING EXAM | |||
U01766 | |||
FY10 - GINNA INITIAL OPERATOR LICENSING EXAM | |||
71124.08 | |||
* RAD SOLID WASTE PROCESS AND RAD MATL HAN | |||
1 | |||
lP 71124.08 | |||
Radioactive Solid Waste Processing and Radioactive Material Handling, Storage. and Transportation | |||
ISFSI | |||
- ISFSI DRY RUN AND INITIAL LOADING | |||
IP 80854 | |||
Preoperational Testing Of An ISFSI | |||
IP 80855 | |||
Operation Of An ISFSI | |||
71152B | |||
*PI&R | |||
4 | |||
IP 711528 | |||
Identffication and Resolution of Problems | |||
IP 711528 | |||
Identification and Resolution of Problems | |||
2515/173 | |||
-INDUSTRY GROUND WATER INITIATIVE | |||
IP 2515/173 | |||
Review of the Implementation of the Industry Ground Water Protection Voluntary Inttlative | |||
71124.07 | |||
.REMP | |||
1 | |||
IP 71124.07 | |||
Public Radiation Safety | |||
711111 B | |||
- REQUAL INSP WI P/F RESULTS | |||
3 | |||
IP 71111118 | |||
Licensed Operator Requallficatlon Program | |||
71124 | |||
- RAD SAFElY - RAe HAZZARD ASSESSIALARA | |||
IP 71124.01 | |||
Radiological Hazard Assessment and Exposure Controls | |||
lP 71124.02 | |||
Occupational ALARA Planning and Controls | |||
IP 71151 | |||
Performance Indicator Verification | |||
CDBI | |||
* COMPONENT DESIGN BASES INSPECTION | |||
6 | |||
IP 7111121 | |||
Component Design Bases Inspection | |||
IP 7111121 | |||
Component Design Bases Inspection | |||
his report does not inClude INPO andOlJTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
Page 2 012 | |||
02/1912010 | |||
10:14:25 | |||
Report 22 | |||
Planned Dates | |||
Start | |||
End | |||
0110312011 | |||
01/0712011 | |||
03128/2011 | |||
0410112011 | |||
1 | |||
03/2812011 | |||
04/01/2011 | |||
1 | |||
03/2812011 | |||
04f01/2011 | |||
0312812011 | |||
0410112011 | |||
0312812011 | |||
0410112011 | |||
04/04/2011 | |||
0410812011 | |||
05/0912011 | |||
05/2012011 | |||
05/09/2011 | |||
05/2712011 | |||
05/0912011 | |||
05127/2011 | |||
05/0912011 | |||
05/2712011 | |||
05/0912011 | |||
05127/2011 | |||
05/09/2011 | |||
05i27i20ii | |||
71124.05 | |||
IP 71124.05 | |||
71124.01 | |||
IP 71124.01 | |||
IP 71124.02 | |||
lP 71124.03 | |||
IP 71124.04 | |||
lP 71124.05 | |||
TI-177 | |||
IP 2515/177 | |||
7111108P | |||
IP 7111108P | |||
71124.01 | |||
IP 71124.01 | |||
IP 71124.02 | |||
IP 71124.03 | |||
IP 71124.04 | |||
iP 71124.05 | |||
Ginna | |||
Inspection / Activity Plan | |||
01/0112010 - 0613012011 | |||
Title | |||
- RAD INSTRUMENTATION | |||
Radiation Monitoring Instrumentation | |||
- RAe HAZZARD ASSESS, ALARA, AIR, DOSE | |||
1 | |||
Radiological Hazard Assessment and Exposure Controls | |||
Occupational ALARA Planning and Controls | |||
In*Plant Airborne Radioactivity Control and Mitigatlon | |||
Occupational Oose Assessment | |||
Radiation Monitoring InstrumentatiQn | |||
* MANAGING GAS ACCUMULATION IN ECCS | |||
2 | |||
Managing Gas Accumulatlon In Emergency Core Cooling, Decay Heat Removal 8. Containment Spray System | |||
*INSERVICE INSPECTION | |||
1 | |||
Inservice Inspection Activities - PWR | |||
- RAD HAZARD ASSESS, ALARA, AIR, DOSE | |||
1 | |||
Radiological Hazard Assessment and Exposure Controls | |||
Occupational ALARA Planning and Controls | |||
In-Plant Alrborne Radioactivity Control and MitigatJon | |||
OccupatJonal Dose Assessment | |||
Radiation ivionitoring Instrumentation | |||
is report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
}} | |||
Latest revision as of 06:19, 14 January 2025
| ML100620833 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 03/03/2010 |
| From: | Collins S Reactor Projects Branch 1 |
| To: | John Carlin Ginna |
| Shared Package | |
| ML100541651 | List: |
| References | |
| IR-10-001 | |
| Download: ML100620833 (5) | |
See also: IR 05000244/2010001
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
475 ALLENDALE ROAD
KING OF PRUSSIA, PENNSYLVANIA 19406-1415
March 3, 2010
Mr. John T. Carlin
Vice President R. E. Ginna Nuclear Power Plant
R. E. Ginna Nuclear Power Plant, LLC
1503 Lake Road
Ontario, NY 14519
SUBJECT:
ANNUAL ASSESSMENT LEDER ~ R. E. GINNA NUCLEAR POWER PLANT
(REPORT 05000244/2010001)
Dear Mr. Carlin:
On February 12, 2010, the NRC staff completed its performance review of R. E. Ginna Nuclear
Power Plant (Ginna). Our technical staff reviewed performance indicators (Pis) for the most
recent quarter and inspection results for the period from January 1 through December 31, 2009.
The purpose of this letter is to inform you of our assessment of your safety performance during
this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A
separate letter designated and marked as "Official Use Only-Security Information" will include
the security cornerstone performance review and resultant inspection plan.
Overall, Ginna operated in a manner that preserved public health and safety and met all
cornerstone objectives with moderate degradation in safety performance. Plant performance for
the most recent quarter was within the Degraded Cornerstone column of the NRC's Action
Matrix. based on two findings having low to moderatei safety Significance (White) and one White
PI in the Mitigating Systems Cornerstone. The first White finding, originating in the first quarter
2009, was related to Ginna's inadequate implementation of a preventive maintenance (PM)
program for, and the subsequent failure of, the turbine-driven auxiliary feedwater (TDAFW)
pump governor. The second White finding. originating in the fourth quarter 2009, was related to
inadequate corrective actions which led to binding of the governor control valve and failure of
the same TDAFW pump. Additionally, the assigned White PI resulted from exceeding the White
significance threshold for the Mitigating Systems Performance Index (MSPI), Heat Removal
Systems PI, in the third quarter 2009, due to the reliability and unavailability issues associated
with the TDAFW pump.
In addition to reactor oversight process (ROP) baseline inspection at your facility, based on our
current assessment of performance for Ginna, we plan to conduct a supplemental inspection
using Inspection Procedure 95002, "Inspection for One Degraded Cornerstone or Any Three
White Inputs in a Strategic Performance Area." The NRC has previously conducted inspections
(Ml093160122, ML093160200 and ML091250233)1 to ensure that deficiencies associated with
the TDAFW pump have been corrected. However, this inspection will be conducted, when your
staff notifies us of your readiness, to provide assurance that the root and contributing causes for
the risk significant performance issues are understood, to independentty assess the extent of
I DeSignation in parenthesis refers to an ADAMS accession number. Documents referenced in this letter
are publicly available using the accession number in ADAMS
J. Carlin
2
condition and extent of cause, to Independently detennine if safety culture components
contributed to the performance issues, and to provide assurance that the corrective actions are
sufficient to prevent recurrence.
The enclosed inspection plan details the inspections, less those related to security, scheduled
through June 30, 2011. In addition to the previously noted 95002 supplemental inspection and
the baseline inspections, we plan on conducting independent spent fuel storage installation
(ISFSI) inspections. The inspection plan is provided to allow for the resolution of any scheduling
conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine
resident inspections are not listed due to their ongoing and continuous nature. The inspections
in the last nine months of the inspection plan are tentlative and may be revised at the mid-cycle
review.
In accordance with 10 CFR 2.390 of the NRC's ~Rules of Practice," a copy of this letter and its
enclosure will be made available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's document
system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to
discuss the change as soon as possible. Please contact Glenn Dentel of my staff at
610-337-5233 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
~~
Regional Administrator, Region I
Docket No. 50-244
License No. DPR-18
Enclosure: Ginna Inspection I Activity Plan
cc w/encl:
Distribution via ListServ
OFFICE
NAME
DATE
J. Carlin
2
condition and extent of cause, to independently determine if safety culture components
contributed to the performance issues, and to provide assurance that the corrective actions are
sufficient to prevent recurrence.
The enclosed inspection plan details the inspections, less those related to security, scheduled
through June 30, 2011. In addition to the previously noted 95002 supplemental inspection and
the baseline inspections, we plan on conducting independent spent fuel storage installation
(ISFSI) inspections. The inspection plan is provided to allow for the resolution of any scheduling
conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine
resident inspections are not listed due to their ongoing and continuous nature. The inspections
in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle
review.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be made available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's document
system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
rmfadams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to
discuss the change as soon as possible. Please contact Glenn Dentel of my staff at
610-337-5233 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
IRA!
Samuel J. Collins
Regional Administrator, Region I
Docket No. 50-244
License No. DPR-18
Distribution w/encl: (via E-mail)
S. Collins, RA (R1AMAIL RESOllRCE)
M. Dapas. IlRA(R1MA1LRt!SOURCEI
D. Lew, ORP (R1IlR_RESOURCE)
J. Clifford, DRP (R1DRPMAIL RESOllRCIE)
D. Roberts, DRS (R1DR~oII R"o_1
P. Wilson, DRS (R1PRS ..... 1R**.,.)
L. Trocine, RI OEDO
G. Dantel. DRP
N.Peny,DRP
J. Hawkins, DRP
S. Sloan, ORP
L. Casey, DRP, RI
M. Rose, DRP. OA
RidsNrrPMREGinna Res()urce
RldsNrrOorlLpl1-1 Resource
SUNSI Review Complete: _N:.:,:P"'--___ (Reviewer's Initials)
DOCUMENT NAME: S:\\ROP*10 EOC Revlew\\Branch 1\\Ginna AA Letter 2.doc
RQPreportsResource@nrc.gov
ORS Branch Chiefs (6)
L. Scholl, DRS
D.Silk, DRS
J. Trapp, DRS
D. Serenci, PAO
N. Sheehan, PAO
R. Barkley, ORA
After declaring this document "An Official Agency Record" it will be released to the Public.
To receive a copy of this document, indicate In the box: "C*;:: Copy without attachment/enclosure "En", Copy with
attachment/enclosure uN" ... No copy
RI/DRP
I
RIIDRP
I
RIIDRP
I
RI/ORA
I
NPerry/NP
GDentellGTD
DLew/DCL
SCollins/SJC
03/0112010
03/01/10
03/01/10
03/01/10
OFFICIAL RECORD COPY
I
0211912010
Page 1 012
Report2Z
1
1
1
1
1
10:14:25
Planned Dates
Start
End
01/1112010
01/1512010
01/1112010
01f15/2010
0210812010
0211212010
0210812010
0211212010
0210812010
02/1212010
02/08/2010
0211212010
02108/2010
02112/2010
02108/2010
0211212010
0210812010
0211212010
05/2412010
0512812010
06121/2010
0710212010
0312212010
03/26/2010
05ii7i20iQ
OS/2812010
05/1712010
0512812010
05124/2010
05/2812010
0610712010
06111/2010
0612112010
06125/2010
06121/2010
06125/2010
1110812010
11/12/2010
0912712010
1010112010
0912712010
10/0112010
09/27/2010
10/0112010
10/1812010
10/22/2010
11/0112010
11/1212010
Ginna
Inspection / Activity Plan
01/01/2010 - 0613012011
Titi"
71124
- RADIATION SAFETY
1
lP 71124.01
Radiological Hazard Assessment and Exposure Controls
Occupational ALARA Planning and Controls
EP PROG
- EP PROGRAM INSPECTION
Radiological Environmental Monitoring Program
Emergency Response Organization Augmentation Testing
Emergency Action Level and Emergency Plan Changes
lP 7111405
Correction of Emergency Preparedness Weaknesses and Deficiencies
IP 71151-EP01
DrilllExercise Performance
IP 71151-EP02
ERO Drill Participation
IP 71151-EP03
Alert & Notification System
6f21EXAM
- OPERATOR LICENSING INITIAL EXAMS
5
U01766
FY10 - GINNA INITIAL OPERATOR LICENSING EXAM
U01766
FY10 - GINNA INITIAL OPERATOR LICENSING EXAM
- RAD SOLID WASTE PROCESS AND RAD MATL HAN
1
lP 71124.08
Radioactive Solid Waste Processing and Radioactive Material Handling, Storage. and Transportation
- ISFSI DRY RUN AND INITIAL LOADING
Preoperational Testing Of An ISFSI
Operation Of An ISFSI
- PI&R
4
Identffication and Resolution of Problems
Identification and Resolution of Problems
2515/173
-INDUSTRY GROUND WATER INITIATIVE
Review of the Implementation of the Industry Ground Water Protection Voluntary Inttlative
.REMP
1
711111 B
- REQUAL INSP WI P/F RESULTS
3
Licensed Operator Requallficatlon Program
71124
- RAD SAFElY - RAe HAZZARD ASSESSIALARA
Radiological Hazard Assessment and Exposure Controls
lP 71124.02
Occupational ALARA Planning and Controls
Performance Indicator Verification
- COMPONENT DESIGN BASES INSPECTION
6
Component Design Bases Inspection
Component Design Bases Inspection
his report does not inClude INPO andOlJTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 012
02/1912010
10:14:25
Report 22
Planned Dates
Start
End
0110312011
01/0712011
03128/2011
0410112011
1
03/2812011
04/01/2011
1
03/2812011
04f01/2011
0312812011
0410112011
0312812011
0410112011
04/04/2011
0410812011
05/0912011
05/2012011
05/09/2011
05/2712011
05/0912011
05127/2011
05/0912011
05/2712011
05/0912011
05127/2011
05/09/2011
05i27i20ii
lP 71124.03
lP 71124.05
TI-177
7111108P
IP 7111108P
iP 71124.05
Ginna
Inspection / Activity Plan
01/0112010 - 0613012011
Title
- RAD INSTRUMENTATION
Radiation Monitoring Instrumentation
- RAe HAZZARD ASSESS, ALARA, AIR, DOSE
1
Radiological Hazard Assessment and Exposure Controls
Occupational ALARA Planning and Controls
In*Plant Airborne Radioactivity Control and Mitigatlon
Occupational Oose Assessment
Radiation Monitoring InstrumentatiQn
- MANAGING GAS ACCUMULATION IN ECCS
2
Managing Gas Accumulatlon In Emergency Core Cooling, Decay Heat Removal 8. Containment Spray System
- INSERVICE INSPECTION
1
Inservice Inspection Activities - PWR
- RAD HAZARD ASSESS, ALARA, AIR, DOSE
1
Radiological Hazard Assessment and Exposure Controls
Occupational ALARA Planning and Controls
In-Plant Alrborne Radioactivity Control and MitigatJon
OccupatJonal Dose Assessment
Radiation ivionitoring Instrumentation
is report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.