{{#Wiki_filter:Quad Cities                               NRC EXAM                               Scenario 1 Appendix D                                 Scenario Outline                               Form ES-D-1 Facility: Quad Cities   Scenario No.: NRC Scenario   1   Op-Test No.: ILT 08-1 __
{{#Wiki_filter:Quad Cities NRC EXAM Scenario 1 Appendix D Scenario Outline Form ES-D-1 Facility: Quad Cities Scenario No.: NRC Scenario 1 Op-Test No.: ILT 08-1 __
Examiners: ____________________________ Operators:                 _____________________________
Examiners: ____________________________ Operators:
Initial Conditions:
Initial Conditions:
100% power Turnover: Perform QCOS 1400-01, Quarterly Core Spray System Flow Rate Test, for the 1A Core Spray Pump.
100% power Turnover: Perform QCOS 1400-01, Quarterly Core Spray System Flow Rate Test, for the 1A Core Spray Pump.
Event         Malf. No.           Event                                Event No.                                Type*                             Description 1     None                       BOP       QCOS 1400-01, Quarterly Core Spray System Flow N      Rate Test (A Pump only )
Event No.
2     RD04R                 ATC/SRO       Control rod drift out (TS)
Malf. No.
I/C 3     None                       ATC       B RFP steam leak resulting in Emergency Power R      Reduction to < 9.8 Mlb/hr Feedwater flow.
Event Type*
4     None                   BOP/SRO       T-12 Oil leak /transfer Aux power to T-11 (TS)
Event Description 1
I/C 5      DIFC1064018I1              ATC      FRV master controller failure (High)
None BOP N
RAISE                      I/C 6     RR11A                     Crew       LOOP/LOCA (A Recirc Pump Discharge Line Break)
QCOS 1400-01, Quarterly Core Spray System Flow Rate Test (A Pump only )
M 7     DG04A                     BOP       EDG-1 auto start failure IC 8     HP01                     Crew       Malfunction after EOP entry: HPCI Trip M
2 RD04R ATC/SRO I/C Control rod drift out (TS) 3 None ATC R
9      None                     Crew       Contingencies: Blowdown at TAF and Restore M      RPV water level (N)ormal, (R)eactivity, (I)nstrument, (C)omponent,   (M)ajor ES-301-4 Quantitative attributes:                 ES-301-5 Quantitative attributes:
B RFP steam leak resulting in Emergency Power Reduction to < 9.8 Mlb/hr Feedwater flow.
Total Malfunctions (5-8): 5                       BOP Normal: E1 Malfunction(s) after EOP (1-2): E7, E8           ATC Reactivity (1 per set): E3 Abnormal Events (2-4): E2, E5                     BOP I/C (4 / set): E4 & E7 Major Transient(s) /E-Plan entry (1-2): E6       ATC I/C (4 / set): E2 & E5 EOPs (1-2): 100/200                               SRO-I I/C (4 / set inc 2 as ATC): E2,E4,E5,E7 EOP Contingencies (0-2): 500-1                   SRO Tech Spec (2 per set): E2 & E4 Critical Tasks (2-3): 4                           ALL Major Transients (2 per set): 1 Quad Cities                             NRC EXAM                             Scenario 1
4 None BOP/SRO I/C T-12 Oil leak /transfer Aux power to T-11 (TS) 5 DIFC1064018I1 RAISE ATC I/C FRV master controller failure (High) 6 RR11A Crew M
LOOP/LOCA (A Recirc Pump Discharge Line Break) 7 DG04A BOP IC EDG-1 auto start failure 8
HP01 Crew M
Malfunction after EOP entry: HPCI Trip 9
None Crew M
Contingencies: Blowdown at TAF and Restore RPV water level (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor ES-301-5 Quantitative attributes:
BOP Normal: E1 ATC Reactivity (1 per set): E3 BOP I/C (4 / set): E4 & E7 ATC I/C (4 / set): E2 & E5 SRO-I I/C (4 / set inc 2 as ATC): E2,E4,E5,E7 SRO Tech Spec (2 per set): E2 & E4 ALL Major Transients (2 per set): 1 ES-301-4 Quantitative attributes:
Total Malfunctions (5-8): 5 Malfunction(s) after EOP (1-2): E7, E8 Abnormal Events (2-4): E2, E5 Major Transient(s) /E-Plan entry (1-2): E6 EOPs (1-2): 100/200 EOP Contingencies (0-2): 500-1 Critical Tasks (2-3): 4  
 
Quad Cities NRC EXAM Scenario 1  


==SUMMARY==
==SUMMARY==
* The scenario starts at 100% steady state power operation. The B RHR Pump is out of service.
The scenario starts at 100% steady state power operation. The B RHR Pump is out of service.
* The first event is QCOS 1400-01, Quarterly Core Spray System Flow Rate Test (A Pump only ).
The first event is QCOS 1400-01, Quarterly Core Spray System Flow Rate Test (A Pump only ).
* A Control Rod begins to drift out. The rod should be inserted and scrammed. The SRO should address Tech Specs for an inoperable control rod.
A Control Rod begins to drift out. The rod should be inserted and scrammed. The SRO should address Tech Specs for an inoperable control rod.
* The B Feed Pump must be secured due to a steam leak. Emergency Power Reduction is necessary prior to securing and isolating the pump.
The B Feed Pump must be secured due to a steam leak. Emergency Power Reduction is necessary prior to securing and isolating the pump.
* An oil leak is reported on the System Aux Transformer, T-12. The BOP will transfer all auxiliary power to the Unit Aux transformer, T-11. The SRO should address Tech Specs for loss of an offsite source.
An oil leak is reported on the System Aux Transformer, T-12. The BOP will transfer all auxiliary power to the Unit Aux transformer, T-11. The SRO should address Tech Specs for loss of an offsite source.
* The Master Feed Reg Valve controller output fails high. RPV water level can be stabilized by taking manual control of the individual Reg Valve controllers.
The Master Feed Reg Valve controller output fails high. RPV water level can be stabilized by taking manual control of the individual Reg Valve controllers.
* A LOCA begins inside the Drywell. With T-12 out of service, the plant trip results in a Loss of Offsite Power (LOOP).
A LOCA begins inside the Drywell. With T-12 out of service, the plant trip results in a Loss of Offsite Power (LOOP).
* EDG-1 fails to automatically start, but appropriate operator action can start and load it.
EDG-1 fails to automatically start, but appropriate operator action can start and load it.
* During the attempt to restore RPV Water level, HPCI trips.
During the attempt to restore RPV Water level, HPCI trips.
* The leak rate is more than the capacity of the remaining high pressure systems. The crew must perform RPV Blowdown in order to restore level with low pressure systems.
The leak rate is more than the capacity of the remaining high pressure systems. The crew must perform RPV Blowdown in order to restore level with low pressure systems.
CRITICAL TASKS:
CRITICAL TASKS:
Critical Task #1: When Torus pressure exceeds 5 psig, INITIATE Drywell sprays while in the safe region of the Drywell Initiation Spray Limit (DSIL), (BWROG PC-5 INIT DW SPRAY).
Critical Task #1: When Torus pressure exceeds 5 psig, INITIATE Drywell sprays while in the safe region of the Drywell Initiation Spray Limit (DSIL), (BWROG PC-5 INIT DW SPRAY).
Critical task #2: When RPV water level approaches -59, INHIBIT ADS to prevent an uncontrolled RPV depressurization.(BWROG RPV-4.2/5.2/6.2 Important PSA task has Risk Achievement Worth RAW of 6.06. Accomplishing this task terminates 2 of the 20 most probable Core Damage Sequences).
Critical task #2: When RPV water level approaches -59, INHIBIT ADS to prevent an uncontrolled RPV depressurization.(BWROG RPV-4.2/5.2/6.2 Important PSA task has Risk Achievement Worth RAW of 6.06. Accomplishing this task terminates 2 of the 20 most probable Core Damage Sequences).
Critical task #3: With the inability to maintain RPV water level above -142, with an injection source lined up and running INITIATE an Emergency Depressurization before RPV water level drops to -166. (Minimum Steam Cooling RPV Water Level, BWROG RPV 1.1 Loss HP INJ E/D TAF).
Critical task #3: With the inability to maintain RPV water level above -142, with an injection source lined up and running INITIATE an Emergency Depressurization before RPV water level drops to -166. (Minimum Steam Cooling RPV Water Level, BWROG RPV 1.1 Loss HP INJ E/D TAF).
Critical task #4 Given a shutdown reactor with an emergency depressurization in progress due to the inability to maintain RPV water level above -142, restore RPV water level above -142 using available injection systems in accordance with QGA 100 and QGA 500-1.
Critical task #4 Given a shutdown reactor with an emergency depressurization in progress due to the inability to maintain RPV water level above -142, restore RPV water level above -142 using available injection systems in accordance with QGA 100 and QGA 500-1.  
Quad Cities                           NRC EXAM                             Scenario 1 Simulator setup:
 
Quad Cities NRC EXAM Scenario 1 Simulator setup:
: 1. Reset to IC-21 (Commands to be utilized DURING the scenario are contained in the CAEP file NRC exam scenario #1.cae)
: 1. Reset to IC-21 (Commands to be utilized DURING the scenario are contained in the CAEP file NRC exam scenario #1.cae)
: 2. Insert Commands for setup:
: 2. Insert Commands for setup:
* imf dg04a
imf dg04a irf ed54r XFRM82 imf hp01
* irf ed54r XFRM82
* imf hp01
: 3. Verify the flowing commands for scenario performance:
: 3. Verify the flowing commands for scenario performance:
* imf rd04r4631
imf rd04r4631 irf rd06r4631r inop ior difc1064018I1 raise imf rr11a.5 20:
* irf rd06r4631r inop
mrf rp02r mg_set mrf rp29r reset mrf rp03r mg_set mrf rp28r reset
* ior difc1064018I1 raise
* imf rr11a .5 20:
* mrf rp02r mg_set
* mrf rp29r reset
* mrf rp03r mg_set
* mrf rp28r reset
: 4. Take the following equipment OOS (hang OOS Card):
: 4. Take the following equipment OOS (hang OOS Card):
* 1/2 Service Water pump control switches (Bus 14 and Bus 24) in PTL
1/2 Service Water pump control switches (Bus 14 and Bus 24) in PTL Zinc injection on 1A RFP
* Zinc injection on 1A RFP
: 5. Provide the crew with a Holding Load REMA.
: 5. Provide the crew with a Holding Load REMA.
: 6. Provide a current revision of the following procedures, signed off as specified:
: 6. Provide a current revision of the following procedures, signed off as specified:
* QCOS 1400-01, Quarterly Core Spray System Flow Rate Test marked up as partial for the 1A Core Spray pump (Group B test)
QCOS 1400-01, Quarterly Core Spray System Flow Rate Test marked up as partial for the 1A Core Spray pump (Group B test)
* Copy of the Short Duration Time Clock for the 1A Core Spray Pump
Copy of the Short Duration Time Clock for the 1A Core Spray Pump
: 7. Provide the key for the 901-16 panel scram toggle switches to the Lead Evaluator
: 7. Provide the key for the 901-16 panel scram toggle switches to the Lead Evaluator
: 8. Ensure procedures are erased and put away including QGAs.
: 8. Ensure procedures are erased and put away including QGAs.
: 9. Advance recorders.
: 9. Advance recorders.
: 10. Clean marked up meter/recorder faces and hard cards.
: 10. Clean marked up meter/recorder faces and hard cards.
: 11. Remove any flags placed by the previous crew.
: 11. Remove any flags placed by the previous crew.  
Quad Cities                     NRC EXAM Scenario 1 LIST OF POTENTIAL PROCEDURES Annunciator Procedures o 901-5 A-3, Rev. 6 o 901-5 E-8, Rev. 9 o 901-3 A-16, Rev. 10 QCGP 3-1, Rev. 58 QCGP 2-3, Rev. 67 QGA 100, Rev. 9 QGA 200, Rev. 9 QGA 500-1, Rev. 13 QCOA 6100-03, Rev. 25 QCOA 0300-04, Rev. 15 QCOA 0300-11, Rev. 20 QCOA 0201-08, Rev. 21 QCOA 0201-01, Rev. 22 QOA 6100-01, Rev. 23 QCOP 3200-05, Rev. 28 QOP 6100-01, Rev. 20 QCOP 1300-02, Rev. 27 QCOP 2900-02, Rev. 20 QOP 7000-01, Rev. 43 QCOP 5750-19, Rev. 6 QCOP 1000-30, Rev. 24 QCOS 1400-01, Rev.37 QCOP 2300-06, Rev. 28 Quad Cities                           NRC EXAM                           Scenario 1 SHIFT TURNOVER INFORMATION
 
Quad Cities NRC EXAM Scenario 1 LIST OF POTENTIAL PROCEDURES Annunciator Procedures o
901-5 A-3, Rev. 6 o
901-5 E-8, Rev. 9 o
901-3 A-16, Rev. 10 QCGP 3-1, Rev. 58 QCGP 2-3, Rev. 67 QGA 100, Rev. 9 QGA 200, Rev. 9 QGA 500-1, Rev. 13 QCOA 6100-03, Rev. 25 QCOA 0300-04, Rev. 15 QCOA 0300-11, Rev. 20 QCOA 0201-08, Rev. 21 QCOA 0201-01, Rev. 22 QOA 6100-01, Rev. 23 QCOP 3200-05, Rev. 28 QOP 6100-01, Rev. 20 QCOP 1300-02, Rev. 27 QCOP 2900-02, Rev. 20 QOP 7000-01, Rev. 43 QCOP 5750-19, Rev. 6 QCOP 1000-30, Rev. 24 QCOS 1400-01, Rev.37 QCOP 2300-06, Rev. 28  
 
Quad Cities NRC EXAM Scenario 1 SHIFT TURNOVER INFORMATION
: 1. Plant Conditions:
: 1. Plant Conditions:
a.) Unit 1 is operating at 100% power.
a.) Unit 1 is operating at 100% power.
Line 82: Line 89:
3.) Evolutions/maintenance for the oncoming shift:
3.) Evolutions/maintenance for the oncoming shift:
a.) Perform QCOS 1400-01, Quarterly Core Spray Flow Rate Test for the 1A Core Spray Pump.
a.) Perform QCOS 1400-01, Quarterly Core Spray Flow Rate Test for the 1A Core Spray Pump.
b.) Continue to operate at rated power per QCGP 3-1, Reactor Power Operations Quad Cities                           NRC EXAM                             Scenario 1 Appendix D                           Required Operator Actions                       Form ES-D-2 Quad Cities           Scenario No.: 1 Event No.: 1                   Page 1 of 2 Event
b.) Continue to operate at rated power per QCGP 3-1, Reactor Power Operations  
 
Quad Cities NRC EXAM Scenario 1 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 1 Event No.: 1 Page 1 of 2 Event


== Description:==
== Description:==
QCOS 1400-01, Quarterly Core Spray System Flow Rate Test (A Pump flow rate only )
QCOS 1400-01, Quarterly Core Spray System Flow Rate Test (A Pump flow rate only )
Time       Position     Applicants Actions or Behavior SRO       Authorizes performance of QCOS 1400-01 for the 1A Core Spray Pump. Flow rate portion of test only.
Time Position Applicants Actions or Behavior SRO Authorizes performance of QCOS 1400-01 for the 1A Core Spray Pump. Flow rate portion of test only.
EVALUATOR NOTE: The US may log entry into TS 3.5.1 prior to the start of the surveillance in lieu of the required entry at step H.1.h of the procedure.
EVALUATOR NOTE: The US may log entry into TS 3.5.1 prior to the start of the surveillance in lieu of the required entry at step H.1.h of the procedure.
BOP       Contacts the EO to determine ESS Keep Fill pressure from PI 1-1468 located in the 1B Core Spray Room.
BOP Contacts the EO to determine ESS Keep Fill pressure from PI 1-1468 located in the 1B Core Spray Room.
SIM OP ROLE PLAY: As the EO dispatched to the 1B Core Spray Room, call back and report the ESS Keep Fill pressure is 70 psig as indicated on PI 1-1468.
SIM OP ROLE PLAY: As the EO dispatched to the 1B Core Spray Room, call back and report the ESS Keep Fill pressure is 70 psig as indicated on PI 1-1468.
BOP       Announces start of 1A Core Spray Pump over the plant paging system.
BOP Announces start of 1A Core Spray Pump over the plant paging system.
BOP       Starts the 1A Core Spray pump.
BOP Starts the 1A Core Spray pump.
BOP       Verifies the MO 1-1402-38A, CS PMP MIN FLOW VLV, opens.
BOP Verifies the MO 1-1402-38A, CS PMP MIN FLOW VLV, opens.
BOP       Contacts EO to inspect the 1A Core Spray pump and valves for leaks.
BOP Contacts EO to inspect the 1A Core Spray pump and valves for leaks.
SIM OP ROLE PLAY: As EO, call back after 1 minute and report no leaks found on the 1A Core Spray pump and valves thus far. Will monitor the system during the test run.
SIM OP ROLE PLAY: As EO, call back after 1 minute and report no leaks found on the 1A Core Spray pump and valves thus far. Will monitor the system during the test run.
BOP       Notifies US to log entry time of 1A Core Spray pump inoperability when the MO 1-1402-4A, CS BYP AND TEST VLV is opened.
BOP Notifies US to log entry time of 1A Core Spray pump inoperability when the MO 1-1402-4A, CS BYP AND TEST VLV is opened.
BOP       Throttles open the MO 1-1402-4A valve to establish approx. 260 psig on PI 1-1450-1A, CS HEADER PRESS.
BOP Throttles open the MO 1-1402-4A valve to establish approx. 260 psig on PI 1-1450-1A, CS HEADER PRESS.
BOP       Verifies the MO 1-1402- 38A closes.
BOP Verifies the MO 1-1402-38A closes.  
Quad Cities                           NRC EXAM                               Scenario 1 Appendix D                         Required Operator Actions                         Form ES-D-2 Quad Cities           Scenario No.: 1 Event No.: 1                     Page 2 of 2 Event
 
Quad Cities NRC EXAM Scenario 1 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 1 Event No.: 1 Page 2 of 2 Event


== Description:==
== Description:==
QCOS 1400-01, Quarterly Core Spray System Flow Rate Test (Group B Test for 1A Core Spray pump) )
QCOS 1400-01, Quarterly Core Spray System Flow Rate Test (Group B Test for 1A Core Spray pump) )
Time     Position     Applicants Actions or Behavior Contacts EO to determine pump suction pressure as indicated on PI 1-BOP 1402-40A (located at the 1A CS pump)
Time Position Applicants Actions or Behavior BOP Contacts EO to determine pump suction pressure as indicated on PI 1-1402-40A (located at the 1A CS pump)
SIM OP ROLE PLAY: As the EO, call back and report a suction pressure of 3 psig as indicated on PI 1-1402-40A.
SIM OP ROLE PLAY: As the EO, call back and report a suction pressure of 3 psig as indicated on PI 1-1402-40A.
Throttles MO 1-1402-4A valve to establish a flow rate of approximately BOP      4550 gpm and records data, ( Flow, Discharge pressure, Differential pressure).
BOP Throttles MO 1-1402-4A valve to establish a flow rate of approximately 4550 gpm and records data, ( Flow, Discharge pressure, Differential pressure).
Verifies IST criteria for the 1A Core Spray pump flow and discharge BOP pressure are met.
BOP Verifies IST criteria for the 1A Core Spray pump flow and discharge pressure are met.
SIM OP ROLE PLAY: If requested again, as EO contacted to report 1A Core Spray Pump Inlet Pressure as indicated on PI 1-1402-40A, report 1A Core Spray Pump inlet pressure is 3 psig.
SIM OP ROLE PLAY: If requested again, as EO contacted to report 1A Core Spray Pump Inlet Pressure as indicated on PI 1-1402-40A, report 1A Core Spray Pump inlet pressure is 3 psig.
BOP       Calculates pump differential pressure (discharge-inlet pressure)
BOP Calculates pump differential pressure (discharge-inlet pressure)
Verifies pump differential pressure (discharge-inlet pressure)
SRO Verifies pump differential pressure (discharge-inlet pressure) calculation.
SRO calculation.
BOP Verifies IST criteria for 1-1402-8A is met by attaining > 4550 gpm flow rate and BOP Contacts EO and requests reading from PI 1-1468, ESS Keep Fill pressure in the 1B Core Spray room SIM OP ROLE PLAY: As EO contacted to read PI 1-1468, report wait 1 minute and report the pressure reading as 70 psig.  
Verifies IST criteria for 1-1402-8A is met by attaining > 4550 gpm flow BOP rate and Contacts EO and requests reading from PI 1-1468, ESS Keep Fill BOP pressure in the 1B Core Spray room SIM OP ROLE PLAY: As EO contacted to read PI 1-1468, report wait 1 minute and report the pressure reading as 70 psig.
 
Quad Cities                           NRC EXAM                             Scenario 1 Quad Cities           Scenario No.: 1 Event No.: 1                     Page 2 of 2 Event
Quad Cities NRC EXAM Scenario 1 Quad Cities Scenario No.: 1 Event No.: 1 Page 2 of 2 Event


== Description:==
== Description:==
QCOS 1400-01, Quarterly Core Spray System Flow Rate Test (Group B Test for 1A Core Spray pump) )
QCOS 1400-01, Quarterly Core Spray System Flow Rate Test (Group B Test for 1A Core Spray pump) )
Records ESS Keep Fill pressure and compares it with the previous BOP      reading. Verifies IST criteria is met for the 1-1402-64 A and 1-1402-65A Check Valves since the pressure differential is < 10 psig.
BOP Records ESS Keep Fill pressure and compares it with the previous reading. Verifies IST criteria is met for the 1-1402-64 A and 1-1402-65A Check Valves since the pressure differential is < 10 psig.
BOP     Closes MO 1-1402-4A valve.
BOP Closes MO 1-1402-4A valve.
BOP     Verifies the MO 1-1402-38A valve opens as system flow decreases.
BOP Verifies the MO 1-1402-38A valve opens as system flow decreases.
BOP     Notifies the US to exit the LCO for the 1A Core Spray pump.
BOP Notifies the US to exit the LCO for the 1A Core Spray pump.
Exits TS 3.5.1 for the 1A Core Spray pump when the MO 1-1402-4A SRO valve is fully closed.
SRO Exits TS 3.5.1 for the 1A Core Spray pump when the MO 1-1402-4A valve is fully closed.
BOP     Contacts EO to verify the leak inspection is complete.
BOP Contacts EO to verify the leak inspection is complete.
SIM OP ROLE PLAY: As EO, report that the leak inspection is complete and no leaks were found.
SIM OP ROLE PLAY: As EO, report that the leak inspection is complete and no leaks were found.
BOP     Stops the 1A Core Spray pump and closes the MO 1-1402-38A valve.
BOP Stops the 1A Core Spray pump and closes the MO 1-1402-38A valve.
BOP     Verifies system fill pressure is being maintained.
BOP Verifies system fill pressure is being maintained.
Returns surveillance paperwork to the US for verification of Core Spray BOP Subsystem A standby lineup.
BOP Returns surveillance paperwork to the US for verification of Core Spray Subsystem A standby lineup.
EVALUATOR NOTE: The BOP may elect to lower discharge pressure by opening the MO 1-1402-4A valve due to the time it would take to depressurize normally.
EVALUATOR NOTE: The BOP may elect to lower discharge pressure by opening the MO 1-1402-4A valve due to the time it would take to depressurize normally.
SIM OP ROLE PLAY: As EO contacted to determine fill pressure per step F.1.y, report, 70 psig as indicated on PI 1-1468.
SIM OP ROLE PLAY: As EO contacted to determine fill pressure per step F.1.y, report, 70 psig as indicated on PI 1-1468.
Proceed to Event 2 Quad Cities                           NRC EXAM                               Scenario 1 Appendix D                         Required Operator Actions                         Form ES-D-2 Quad Cities           Scenario No.: 1 Event No.: 2                     Page 1 of 1 Event
Proceed to Event 2  
 
Quad Cities NRC EXAM Scenario 1 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 1 Event No.: 2 Page 1 of 1 Event


== Description:==
== Description:==
Control Rod Drift Out Time       Position   Applicants Actions or Behavior SIM OP: Drift out control rod M-8 (HCU 46-31) using the command imf rd04r4631 ATC       Acknowledges annunciator 901-5 A-3, Rod Drift, and reports control rod M-8 is drifting out.
Control Rod Drift Out Time Position Applicants Actions or Behavior SIM OP: Drift out control rod M-8 (HCU 46-31) using the command imf rd04r4631 ATC Acknowledges annunciator 901-5 A-3, Rod Drift, and reports control rod M-8 is drifting out.
SRO       Directs actions of QCOA 0300-11, Control Rod Drift, and QCOA 0300-04, Mispositioned Control Rod.
SRO Directs actions of QCOA 0300-11, Control Rod Drift, and QCOA 0300-04, Mispositioned Control Rod.
ATC       Inserts control rod M-8 using the RMCS to position 00.
ATC Inserts control rod M-8 using the RMCS to position 00.
(Immediate operator action)
(Immediate operator action)
ATC       Releases RMCS and observes control rod M-8 begins to drift out from position 00, then reinserts control rod M-8 to position 00, and applies continuous insert signal.
ATC Releases RMCS and observes control rod M-8 begins to drift out from position 00, then reinserts control rod M-8 to position 00, and applies continuous insert signal.
ATC       Reports control M-8 will NOT latch at position 00.
ATC Reports control M-8 will NOT latch at position 00.
SRO       Directs control rod M-8 scrammed using the Rod Scram Test Switch.
SRO Directs control rod M-8 scrammed using the Rod Scram Test Switch.
LEAD EVALUATOR: Provide the Scram Key to the BOP.
LEAD EVALUATOR: Provide the Scram Key to the BOP.
BOP       Places the individual Control Rod Scram Test Switch for M-8 into the scram position at the 901-16 panel.
BOP Places the individual Control Rod Scram Test Switch for M-8 into the scram position at the 901-16 panel.
ATC       Confirms blue scram light for HCU 46-31 is lit and release RMCS.
ATC Confirms blue scram light for HCU 46-31 is lit and release RMCS.
BOP       Dispatches EO to close the 1-305-105, CRD EXH VLV, for HCU 46-31.
BOP Dispatches EO to close the 1-305-105, CRD EXH VLV, for HCU 46-31.
SIM OP ROLE PLAY: As EO dispatched to the North CRD Bank, wait approximately 2 minutes, then insert the following Remote Function to close the 1-305-105 valve:
SIM OP ROLE PLAY: As EO dispatched to the North CRD Bank, wait approximately 2 minutes, then insert the following Remote Function to close the 1-305-105 valve:
irf rd06r4631r inop Call the NSO to report that the 1-305-105 valve for HCU 46-31 is closed.
irf rd06r4631r inop Call the NSO to report that the 1-305-105 valve for HCU 46-31 is closed.
SRO       Declares control rod M-8 inoperable and enters TS 3.1.3, Condition C, which is 2 hours to fully insert and 4 hours to disarm.
SRO Declares control rod M-8 inoperable and enters TS 3.1.3, Condition C, which is 2 hours to fully insert and 4 hours to disarm.
SIM OP ROLE PLAY: As QNE: State that you understand that M-8 has drifted out and that you will look at thermal limits.
SIM OP ROLE PLAY: As QNE: State that you understand that M-8 has drifted out and that you will look at thermal limits.
SRO       Enters QCOS 0300-14 to track inoperable rod and electrically disarm.
SRO Enters QCOS 0300-14 to track inoperable rod and electrically disarm.  
Quad Cities                           NRC EXAM                             Scenario 1 Appendix D                         Required Operator Actions                         Form ES-D-2 Quad Cities           Scenario No.: 1 Event No.: 3                     Page 1 of 1 Event
 
Quad Cities NRC EXAM Scenario 1 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 1 Event No.: 3 Page 1 of 1 Event


== Description:==
== Description:==
1B Reactor Feed Pump Seal Leak Time     Position     Applicants Actions or Behavior SIM OP ROLE PLAY: As the Unit 1 Field Supervisor, call in and report a large leak on the B Reactor Feed pump seal. Report steam and water flowing from seal area. If asked about the status of the pump, reply that the pump should be taken offline immediately.
1B Reactor Feed Pump Seal Leak Time Position Applicants Actions or Behavior SIM OP ROLE PLAY: As the Unit 1 Field Supervisor, call in and report a large leak on the B Reactor Feed pump seal. Report steam and water flowing from seal area. If asked about the status of the pump, reply that the pump should be taken offline immediately.
ATC/BOP     Informs Unit Supervisor of 1B Reactor Feed pump seal leak.
ATC/BOP Informs Unit Supervisor of 1B Reactor Feed pump seal leak.
SIM OP ROLE PLAY: If contacted as RP Tech, acknowledge the direction to control access to the Feed Pump room.
SIM OP ROLE PLAY: If contacted as RP Tech, acknowledge the direction to control access to the Feed Pump room.
Directs Emergency Power Reduction per QCGP 3-1 to < 9.8 Mlb/hr SRO feedwater flow.
SRO Directs Emergency Power Reduction per QCGP 3-1 to < 9.8 Mlb/hr feedwater flow.
Reduces Reactor Recirculation pump speeds as necessary until ATC Feedwater flow is <9.8 Mlb/hr.
ATC Reduces Reactor Recirculation pump speeds as necessary until Feedwater flow is <9.8 Mlb/hr.
Inserts in-sequence control rods as necessary to stay below MELLA ATC region.
ATC Inserts in-sequence control rods as necessary to stay below MELLA region.
EVALUATOR NOTE: During rapid power reductions, annunciator 901-3 A-2, Main Stm Line Hi Radiation may alarm due to a momentary spike. The operator should verify that MSL radiation monitor readings return to normal after reactor power stabilizes or the annunciator clears.
EVALUATOR NOTE: During rapid power reductions, annunciator 901-3 A-2, Main Stm Line Hi Radiation may alarm due to a momentary spike. The operator should verify that MSL radiation monitor readings return to normal after reactor power stabilizes or the annunciator clears.
Directs 1B RFP and a Condensate/Condensate Booster Pump secured SRO per QCOP 3200-05.
SRO Directs 1B RFP and a Condensate/Condensate Booster Pump secured per QCOP 3200-05.
BOP       Secures the 1B RFP per QCOP 3200-05.
BOP Secures the 1B RFP per QCOP 3200-05.
SIM OP ROLE PLAY: As the Field Supervisor, 1 minute after the 1B RFP is stopped, report that the leak has subsided but there is still a small amount of steam and water coming from the seal.
SIM OP ROLE PLAY: As the Field Supervisor, 1 minute after the 1B RFP is stopped, report that the leak has subsided but there is still a small amount of steam and water coming from the seal.
SRO       Directs BOP to isolate the 1B RFP.
SRO Directs BOP to isolate the 1B RFP.
Closes the MO 1-3201B, RFP DISCH VLV and directs an EO to close BOP the 1-3499-16, 1B RFP SUCT VLV.
BOP Closes the MO 1-3201B, RFP DISCH VLV and directs an EO to close the 1-3499-16, 1B RFP SUCT VLV.
SIM OP ROLE PLAY: If contacted after isolating the 1B RFP, as the Field Supervisor, report the leak has stopped.
SIM OP ROLE PLAY: If contacted after isolating the 1B RFP, as the Field Supervisor, report the leak has stopped.
SRO       Informs QNE and Nuclear Duty Officer of rapid power reduction.
SRO Informs QNE and Nuclear Duty Officer of rapid power reduction.
ATC/SRO     Directs Chemistry to take RETS samples if power reduction is > 20%
ATC/SRO Directs Chemistry to take RETS samples if power reduction is > 20%
Proceed to Event 4 Quad Cities                           NRC EXAM                             Scenario 1 Appendix D                         Required Operator Actions                         Form ES-D-2 Quad Cities           Scenario No.: 1 Event No.: 4                     Page 1 of 1 Event
Proceed to Event 4  
 
Quad Cities NRC EXAM Scenario 1 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 1 Event No.: 4 Page 1 of 1 Event


== Description:==
== Description:==
Transformer 12 Oil Leak/Transfer Aux Power to Transformer 11 Time     Position     Applicants Actions or Behavior SIM OP ROLE PLAY: As the outside EO, report a large oil leak on Transformer 12. All oil is contained in the burm.
Transformer 12 Oil Leak/Transfer Aux Power to Transformer 11 Time Position Applicants Actions or Behavior SIM OP ROLE PLAY: As the outside EO, report a large oil leak on Transformer 12. All oil is contained in the burm.
SRO       Directs removal of Transformer 12 from service.
SRO Directs removal of Transformer 12 from service.
BOP       Transfers aux power to Transformer 11 per QOP 6100-01 or deenergizes Transformer 12 by opening GCB 4-6 and GCB 3-4 and verifying Aux power transfers.
BOP Transfers aux power to Transformer 11 per QOP 6100-01 or deenergizes Transformer 12 by opening GCB 4-6 and GCB 3-4 and verifying Aux power transfers.
BOP       Verifies Transformer 11 voltage and load are normal (in green band) and bus voltages are > 4000 KV after the XFMR 11 to Bus 12 ACB is closed.
BOP Verifies Transformer 11 voltage and load are normal (in green band) and bus voltages are > 4000 KV after the XFMR 11 to Bus 12 ACB is closed.
BOP       Verifies Transformer 11 voltage and load are normal (in green band) and bus voltages are > 4000 KV after XFMR 11 to Bus 13 ACB is closed.
BOP Verifies Transformer 11 voltage and load are normal (in green band) and bus voltages are > 4000 KV after XFMR 11 to Bus 13 ACB is closed.
BOP       Verifies all 345 KV Bus section breakers are closed.
BOP Verifies all 345 KV Bus section breakers are closed.
BOP       Notifies BPO prior to opening 345 KV Bus CKT BKR 3-4 and CKT BKR 4-6.
BOP Notifies BPO prior to opening 345 KV Bus CKT BKR 3-4 and CKT BKR 4-6.
SIM OP ROLE PLAY: As BPO, concur with opening of 345KV Bus CKT BKR 3-4 and 345 KV Bus CKT BKR 4-6.
SIM OP ROLE PLAY: As BPO, concur with opening of 345KV Bus CKT BKR 3-4 and 345 KV Bus CKT BKR 4-6.
BOP       Opens 345 KV Bus CKT BKR 3-4 and 345 KV Bus CKT 4-6 at the 912-2 panel.
BOP Opens 345 KV Bus CKT BKR 3-4 and 345 KV Bus CKT 4-6 at the 912-2 panel.
SRO       Directs BOP to enter QCOA 6100-01, Loss of Reserve Auxiliary Transformer 12 (22) During Power Operation.
SRO Directs BOP to enter QCOA 6100-01, Loss of Reserve Auxiliary Transformer 12 (22) During Power Operation.
SRO       Enters TS 3.8.1 Condition A, one required offsite circuit inoperable for Unit 1 and directs completion of QCOS 0005-08 within one hour and once per eight hours after.
SRO Enters TS 3.8.1 Condition A, one required offsite circuit inoperable for Unit 1 and directs completion of QCOS 0005-08 within one hour and once per eight hours after.
Proceed to Event 5 Quad Cities                             NRC EXAM                           Scenario 1 Appendix D                           Required Operator Actions                       Form ES-D-2 Quad Cities             Scenario No.: 1 Event No.: 5                   Page 1 of 1 Event
Proceed to Event 5  
 
Quad Cities NRC EXAM Scenario 1 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 1 Event No.: 5 Page 1 of 1 Event


== Description:==
== Description:==
Fail the DFWLC Master Controller Upscale Time     Position       Applicants Actions or Behavior SIM OP: Fail the DFWLC Master Controller upscale: ior difc1064018i1 raise ATC         Acknowledges annunciator 901-5 E-8, Rx Vessel High Level and reports RPV water level and power rising.
Fail the DFWLC Master Controller Upscale Time Position Applicants Actions or Behavior SIM OP: Fail the DFWLC Master Controller upscale: ior difc1064018i1 raise ATC Acknowledges annunciator 901-5 E-8, Rx Vessel High Level and reports RPV water level and power rising.
SRO         Sets scram criteria of RPV water level > 44 or < 11.
SRO Sets scram criteria of RPV water level > 44 or < 11.
ATC         Reports the Feedwater Master Controller setpoint is drifting upscale and places the A and B Feedwater regulators in MANUAL per QCOA 0201-08.
ATC Reports the Feedwater Master Controller setpoint is drifting upscale and places the A and B Feedwater regulators in MANUAL per QCOA 0201-08.
ATC/BOP         Maintains RPV water level between +11 and +44 inches by adjusting the A and/or B Feedwater Regulator valve positions.
ATC/BOP Maintains RPV water level between +11 and +44 inches by adjusting the A and/or B Feedwater Regulator valve positions.
SRO         Assigns one operator to monitor and control RPV water level.
SRO Assigns one operator to monitor and control RPV water level.
CREW         Contacts Instrument Maintenance to investigate DFWLC Master Controller failure.
CREW Contacts Instrument Maintenance to investigate DFWLC Master Controller failure.
SIM OP ROLE PLAY: As IM Supervisor, inform the caller that you will prepare a work package and dispatch a technician to the control room Proceed to Event 6 Quad Cities                           NRC EXAM                             Scenario 1 Appendix D                         Required Operator Actions                       Form ES-D-2 Quad Cities           Scenario No.: 1 Event No.: 6                     Page 1 of 1 Event
SIM OP ROLE PLAY: As IM Supervisor, inform the caller that you will prepare a work package and dispatch a technician to the control room Proceed to Event 6  
 
Quad Cities NRC EXAM Scenario 1 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 1 Event No.: 6 Page 1 of 1 Event


== Description:==
== Description:==
LOOP/LOCA (A Loop Reactor Recirc Pump Discharge Line Break)
LOOP/LOCA (A Loop Reactor Recirc Pump Discharge Line Break)
Time     Position     Applicants Actions or Behavior SIM OP NOTE: At the Lead Examiners direction, insert a .5% break ramped over 20 minutes on the A Loop Recirc pump discharge line: imf rr011a .5 20:
Time Position Applicants Actions or Behavior SIM OP NOTE: At the Lead Examiners direction, insert a.5% break ramped over 20 minutes on the A Loop Recirc pump discharge line: imf rr011a.5 20:
BOP       Acknowledges annunciator 901-3 A-16, PRI CNMT HIGH PRESSURE.
BOP Acknowledges annunciator 901-3 A-16, PRI CNMT HIGH PRESSURE.
SRO       Sets scram criteria at 2.0 psig Drywell pressure and directs actions of QCOA 0201-01.
SRO Sets scram criteria at 2.0 psig Drywell pressure and directs actions of QCOA 0201-01.
ATC/BOP     Investigate cause of Drywell pressure rise by checking the following:
ATC/BOP Investigate cause of Drywell pressure rise by checking the following:
* Reactor Recirculation pump seals
Reactor Recirculation pump seals RBCCW system operation Safety/Relief valve leakage Drywell to Torus D/P controller operation.
* RBCCW system operation
ATC/BOP Notifies Radiation Protection of elevated Containment pressure and evacuates the Reactor Building.
* Safety/Relief valve leakage
BOP Starts all available Drywell Coolers and monitors leak rate.
* Drywell to Torus D/P controller operation.
SRO Briefs crew on methods of RPV water level, pressure control, and priorities with a loss of offsite power and a LOCA.
ATC/BOP     Notifies Radiation Protection of elevated Containment pressure and evacuates the Reactor Building.
ATC Inserts a manual reactor scram when Drywell pressure reaches 2.0 psig.
BOP       Starts all available Drywell Coolers and monitors leak rate.
SRO Enters QGA 100 on RPV low water level and QGA 200 when Drywell pressure reaches 2.5 psig (also re-enters QGA 100).
SRO       Briefs crew on methods of RPV water level, pressure control, and priorities with a loss of offsite power and a LOCA.
SRO Directs actions of QGA 100.
ATC     Inserts a manual reactor scram when Drywell pressure reaches 2.0 psig.
ATC Enters and executes actions of QCGP 2-3.
SRO       Enters QGA 100 on RPV low water level and QGA 200 when Drywell pressure reaches 2.5 psig (also re-enters QGA 100).
ATC/BOP Verifies isolations and auto actions for 0 inches RPV water level and 2.5 psig Drywell pressure.
SRO       Directs actions of QGA 100.
Proceed to Event 7 & 8.  
ATC     Enters and executes actions of QCGP 2-3.
 
ATC/BOP     Verifies isolations and auto actions for 0 inches RPV water level and 2.5 psig Drywell pressure.
Quad Cities NRC EXAM Scenario 1 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 1 Event No.: 7 & 8 Page 1 of 1 Event
Proceed to Event 7 & 8.
Quad Cities                           NRC EXAM                           Scenario 1 Appendix D                         Required Operator Actions                     Form ES-D-2 Quad Cities           Scenario No.: 1 Event No.: 7 & 8                     Page 1 of 1 Event


== Description:==
== Description:==
U-1 Emergency Diesel Generator Autostart Failure HPCI Turbine trip Time     Position     Applicants Actions or Behavior BOP       Reports the following failures:
U-1 Emergency Diesel Generator Autostart Failure HPCI Turbine trip Time Position Applicants Actions or Behavior BOP Reports the following failures:
* HPCI Turbine trip
HPCI Turbine trip U-1 EDG failed to autostart BOP Manually starts the U-1 EDG and verifies the B Loop Core Spray and RHR pumps autostart.
* U-1 EDG failed to autostart BOP       Manually starts the U-1 EDG and verifies the B Loop Core Spray and RHR pumps autostart.
BOP Attempts to start HPCI per QCOP 2300-06 (Hard Card), and reports unable to start HPCI.
BOP       Attempts to start HPCI per QCOP 2300-06 (Hard Card), and reports unable to start HPCI.
ATC/BOP Dispatches EOs to investigate HPCI Turbine failure.
ATC/BOP     Dispatches EOs to investigate HPCI Turbine failure.
SIM OP ROLE PLAY: As EO dispatched to the HPCI Room, wait 2 minutes and report you see no apparent cause for the HPCI turbine trip and will contact maintenance for assistance.
SIM OP ROLE PLAY: As EO dispatched to the HPCI Room, wait 2 minutes and report you see no apparent cause for the HPCI turbine trip and will contact maintenance for assistance.
SRO       Directs RPV water level maintained between 0 and 48 inches using RCIC and Safe Shutdown Makeup Pump (SSMP).
SRO Directs RPV water level maintained between 0 and 48 inches using RCIC and Safe Shutdown Makeup Pump (SSMP).
ATC/BOP Starts RCIC for injection per QCOP 1300-02. (Hard Card)
ATC/BOP Starts RCIC for injection per QCOP 1300-02. (Hard Card)
ATC/BOP     Starts the SSMP for injection per QCOP 2900-02. (Hard Card)
ATC/BOP Starts the SSMP for injection per QCOP 2900-02. (Hard Card)
SRO       Verifies RPV pressure < 1060 psig and directs RPV cooldown using ADS valves.
SRO Verifies RPV pressure < 1060 psig and directs RPV cooldown using ADS valves.
BOP       Starts cooldown at < 100&deg;F/hr using the ADS valves, (action dependent on rate of depressurization).
BOP Starts cooldown at < 100&deg;F/hr using the ADS valves, (action dependent on rate of depressurization).
SRO       Directs restoration of Electric Plant as follows:
SRO Directs restoration of Electric Plant as follows:
* Re-energize RPS A and RPS B
Re-energize RPS A and RPS B Backfeed Bus 13 and Bus 14 Restore 480V Bus 15, 16, and/or 17 as needed ATC/BOP Dispatches EO to re-energize RPS A and RPS B per QOP 7000-01.
* Backfeed Bus 13 and Bus 14
ATC/BOP Backfeeds Bus 13 and Bus 14 per QCOA 6100-03.
* Restore 480V Bus 15, 16, and/or 17 as needed ATC/BOP     Dispatches EO to re-energize RPS A and RPS B per QOP 7000-01.
ATC/BOP Re-energizes Bus 15, 16, and/or Bus 17 per QCOA 6100-03.
ATC/BOP     Backfeeds Bus 13 and Bus 14 per QCOA 6100-03.
SIM OP If requested wait 4 minutes and re-energize RPS A and RPS B from their normal power supplies:
ATC/BOP     Re-energizes Bus 15, 16, and/or Bus 17 per QCOA 6100-03.
RPS A:
SIM OP     If requested wait 4 minutes and re-energize RPS A and RPS B from their normal power supplies:
mrf rp02r mg_set mrf rp29r reset RPS B:
RPS A: mrf rp02r mg_set mrf rp29r reset RPS B: mrf rp03r mg_set mrf rp28r reset Quad Cities                           NRC EXAM                                 Scenario 1 Quad Cities           Scenario No.: 1 Event No.: 6                         Page 2 of 3 (continued after power restoration)
mrf rp03r mg_set mrf rp28r reset  
 
Quad Cities NRC EXAM Scenario 1 Quad Cities Scenario No.: 1 Event No.: 6 Page 2 of 3 (continued after power restoration)
Event
Event


== Description:==
== Description:==
LOOP/LOCA (A Loop Reactor Recirc Pump Discharge Line Break)
LOOP/LOCA (A Loop Reactor Recirc Pump Discharge Line Break)
Time     Position     Applicants Actions or Behavior SRO       Directs actions of QGA 200.
Time Position Applicants Actions or Behavior SRO Directs actions of QGA 200.
ATC/BOP     Restarts RBCCW and Drywell Coolers per QCOP 5750-19.
ATC/BOP Restarts RBCCW and Drywell Coolers per QCOP 5750-19.
BOP       Reports Torus pressure > 2.5 psig and Torus level < 27 ft.
BOP Reports Torus pressure > 2.5 psig and Torus level < 27 ft.
BOP       Initiates Torus Sprays per QCOP 1000-30.
BOP Initiates Torus Sprays per QCOP 1000-30.
BOP       Reports Torus pressure > 5 psig and Torus level < 17 ft.
BOP Reports Torus pressure > 5 psig and Torus level < 17 ft.
SRO       Verifies Drywell temperature/pressure are within DSIL curve.
CT1 SRO Verifies Drywell temperature/pressure are within DSIL curve.
CT1 BOP       Verifies Recirc pumps are tripped and trips all Drywell Coolers.
BOP Verifies Recirc pumps are tripped and trips all Drywell Coolers.
SRO       Directs initiation of Drywell Sprays CT1 BOP       Initiates Drywell Sprays per QCOP 1000-30.
CT1 SRO Directs initiation of Drywell Sprays CT1 BOP Initiates Drywell Sprays per QCOP 1000-30.
CT1 ATC/BOP     Monitors the following:
ATC/BOP Monitors the following:
* Drywell temperature and pressure
Drywell temperature and pressure Torus temperature and level Drywell/Torus Hydrogen concentration  
* Torus temperature and level
 
* Drywell/Torus Hydrogen concentration Quad Cities                           NRC EXAM                                 Scenario 1 Appendix D                         Required Operator Actions                         Form ES-D-2 Quad Cities           Scenario No.: 1 Event No.: 6                       Page 3 of 3 (continued after power restoration)
Quad Cities NRC EXAM Scenario 1 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 1 Event No.: 6 Page 3 of 3 (continued after power restoration)
Event
Event


== Description:==
== Description:==
LOOP/LOCA (A Loop Reactor Recirc Pump Discharge Line Break)
LOOP/LOCA (A Loop Reactor Recirc Pump Discharge Line Break)
SRO       Directs further actions of QGA 100 when RPV water level cannot be held above -59 inches.
SRO Directs further actions of QGA 100 when RPV water level cannot be held above -59 inches.
CT2       SRO       Directs BOP to inhibit ADS.
CT2 SRO Directs BOP to inhibit ADS.
CT2       BOP       Inhibits ADS.
CT2 BOP Inhibits ADS.
SRO       Directs use of Alternate Injection Systems.
SRO Directs use of Alternate Injection Systems.
ATC       Injects SBLC per QCOP 1100-02.
ATC Injects SBLC per QCOP 1100-02.
ATC       Starts a CRD pump if power is available or dispatches an EO to cross-tie the CRD system per QCOP 0300-19.
ATC Starts a CRD pump if power is available or dispatches an EO to cross-tie the CRD system per QCOP 0300-19.
SIM OP ROLE PLAY: If Condensate crosstie is requested, state the Unit 2 Condensate system is Out-of-Service.
SIM OP ROLE PLAY: If Condensate crosstie is requested, state the Unit 2 Condensate system is Out-of-Service.
SRO       Verifies 2 or more Detail F subsystems are available.
SRO Verifies 2 or more Detail F subsystems are available.
* SSMP
SSMP B Core Spray B Loop RHR ATC Reports RPV water level at -142 inches (TAF).
* B Core Spray
SRO Verifies injection sources are lined up with pumps running.  
* B Loop RHR ATC       Reports RPV water level at -142 inches (TAF).
 
SRO       Verifies injection sources are lined up with pumps running.
Quad Cities NRC EXAM Scenario 1 Quad Cities Scenario No.: 1 Event No.: 9 Page 1 of 1 Event
Quad Cities                           NRC EXAM                             Scenario 1 Quad Cities           Scenario No.: 1 Event No.: 9                     Page 1 of 1 Event


== Description:==
== Description:==
RPV Blowdown and Level Restoration Time     Position     Applicants Actions or Behavior Enters QGA 500-1 before RPV water level drops to -166 inches and SRO directs actions.
RPV Blowdown and Level Restoration Time Position Applicants Actions or Behavior SRO Enters QGA 500-1 before RPV water level drops to -166 inches and directs actions.
SRO       Verifies all rods in and Drywell pressure at or above 2.5 psig.
SRO Verifies all rods in and Drywell pressure at or above 2.5 psig.
BOP       Reports Torus level > 5 ft.
BOP Reports Torus level > 5 ft.
CT3         SRO       Directs BOP to open all 5 ADS valves and leave switches in Manual.
CT3 SRO Directs BOP to open all 5 ADS valves and leave switches in Manual.
CT3         BOP       Opens all 5 ADS valves and leaves switches in Manual.
CT3 BOP Opens all 5 ADS valves and leaves switches in Manual.
ATC/BOP     Monitor RPV depressurization and RPV water level.
ATC/BOP Monitor RPV depressurization and RPV water level.
Verifies low pressure ECCS pumps inject when RPV pressure is < 325 BOP psig.
BOP Verifies low pressure ECCS pumps inject when RPV pressure is < 325 psig.
CT4         SRO       Directs RPV water level raised to above -142 inches.
CT4 SRO Directs RPV water level raised to above -142 inches.
Restore RPV water level above -142 (TAF) by injecting with low CT4      ATC/BOP pressure ECCS pumps.
CT4 ATC/BOP Restore RPV water level above -142 (TAF) by injecting with low pressure ECCS pumps.
End Of Scenario Quad Cities                               NRC EXAM                                 Scenario 2 Appendix D                                 Scenario Outline                               Form ES-D-1 Facility: Quad Cities   Scenario No.: NRC Scenario   2     Op-Test No.: ILT 08-1 _
End Of Scenario  
Examiners: ____________________________ Operators:                 _____________________________
 
Quad Cities NRC EXAM Scenario 2 Appendix D Scenario Outline Form ES-D-1 Facility: Quad Cities Scenario No.: NRC Scenario 2 Op-Test No.: ILT 08-1 _
Examiners: ____________________________ Operators:
Initial Conditions:
Initial Conditions:
85 % power Turnover: Reverse Main Condenser Flow per QCOP 4400-09, then return to rated power by increasing core flow in accordance with QCGP 3-1 and the REMA.
85 % power Turnover: Reverse Main Condenser Flow per QCOP 4400-09, then return to rated power by increasing core flow in accordance with QCGP 3-1 and the REMA.
Event         Malf. No.           Event                               Event No.                                Type*                             Description 1     None                       BOP       Reverse Main Condenser flow N
Event No.
2      ED01C                     BOP       GCB 4-6 trip / reclose IC 3     RM05A                     SRO       DW Rad Mon fails upscale (TS)
Malf. No.
TS 4     FW08A                     ATC       FRV Lockup IC 5     HP13                   BOP/SRO       HPCI Steam leak / failure to isolate (TS)
Event Type*
IC 6     MC08                       ATC       Main Condenser Vacuum leak / Emergency Power R      Reduction, ( attempt to maintain Main Condenser backpressure < 6.5 in Hg.)
Event Description 1
7     RD13A                     Crew       Manual Scram / ATWS (Hydraulic)
None BOP N
M 8     DIHS11130301               ATC       Malfunction after Major: Start failure of 1st SBLC IC      Pump 9     MC08                     Crew       Complete Loss of Main Condenser Vacuum M
Reverse Main Condenser flow 2
10       None                     Crew       Contingencies: Power Level Control QGA 101 M
ED01C BOP IC GCB 4-6 trip / reclose 3
*        (N)ormal, (R)eactivity, (I)nstrument, (C)omponent,   (M)ajor ES-301-4 Quantitative attributes:                   ES-301-5 Quantitative attributes:
RM05A SRO TS DW Rad Mon fails upscale (TS) 4 FW08A ATC IC FRV Lockup 5
Total Malfunctions (5-8): 7                         BOP Normal: E1 Malfunction(s) after EOP (1-2): E8                   ATC Reactivity (1 per set): E6 Abnormal Events (2-4): E2, E4, E5, E6               BOP I/C (4 per set): E2 & E5 Major Transient(s) /E-Plan entry (1-2): E7           ATC I/C (4 per set): E4 & E8 EOPs (1-2): 100                                     SRO-I I/C (4/set & 2 as ATC):E2, E4, E5, E8 EOP Contingencies (0-2): 101 ATWS                   SRO Tech Spec (2 per set): E3 & E5 Critical Tasks (2-3): 5                             ALL Major Transients (2 per set) E7 Quad Cities                             NRC EXAM                               Scenario 2
HP13 BOP/SRO IC HPCI Steam leak / failure to isolate (TS) 6 MC08 ATC R
Main Condenser Vacuum leak / Emergency Power Reduction, ( attempt to maintain Main Condenser backpressure < 6.5 in Hg.)
7 RD13A Crew M
Manual Scram / ATWS (Hydraulic) 8 DIHS11130301 ATC IC Malfunction after Major: Start failure of 1st SBLC Pump 9
MC08 Crew M
Complete Loss of Main Condenser Vacuum 10 None Crew M
Contingencies: Power Level Control QGA 101 (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor ES-301-5 Quantitative attributes:
BOP Normal: E1 ATC Reactivity (1 per set): E6 BOP I/C (4 per set): E2 & E5 ATC I/C (4 per set): E4 & E8 SRO-I I/C (4/set & 2 as ATC):E2, E4, E5, E8 SRO Tech Spec (2 per set): E3 & E5 ALL Major Transients (2 per set) E7 ES-301-4 Quantitative attributes:
Total Malfunctions (5-8): 7 Malfunction(s) after EOP (1-2): E8 Abnormal Events (2-4): E2, E4, E5, E6 Major Transient(s) /E-Plan entry (1-2): E7 EOPs (1-2): 100 EOP Contingencies (0-2): 101 ATWS Critical Tasks (2-3): 5  
 
Quad Cities NRC EXAM Scenario 2  


==SUMMARY==
==SUMMARY==
* The scenario starts with the crew holding power at approximately 85% with no LCOs in effect.
The scenario starts with the crew holding power at approximately 85% with no LCOs in effect.
* The BOP operator reverses Main Condenser Circ Water flow.
The BOP operator reverses Main Condenser Circ Water flow.
* GCB 4-6 is inadvertently tripped open during a Switchyard breaker inspection. The problem is resolved and the US directs the BOP to reclose GCB 4-6 per QCOP 6400-08.
GCB 4-6 is inadvertently tripped open during a Switchyard breaker inspection. The problem is resolved and the US directs the BOP to reclose GCB 4-6 per QCOP 6400-08.
* The Drywell Radiation Monitor fails upscale. The US must declare the monitor inoperable and reference Technical Specifications.
The Drywell Radiation Monitor fails upscale. The US must declare the monitor inoperable and reference Technical Specifications.
* The 1A Feedwater Reg Valve locks up. The ATC operator controls RPV water level and, when the problem is resolved, resets the lock-up.
The 1A Feedwater Reg Valve locks up. The ATC operator controls RPV water level and, when the problem is resolved, resets the lock-up.
* A steam leak begins in the HPCI room. The crew performs actions from QGA 300 and manually isolates HPCI when the automatic isolation fails.
A steam leak begins in the HPCI room. The crew performs actions from QGA 300 and manually isolates HPCI when the automatic isolation fails.
* Main Condenser begins to degrade due to an air leak. The crew performs QOA 3300-02 and Emergency Power Reduction.
Main Condenser begins to degrade due to an air leak. The crew performs QOA 3300-02 and Emergency Power Reduction.
* The loss of vacuum results in a reactor scram, but control rods fail to fully insert due to a hydraulic ATWS. The crew performs QGA 100 and QGA 101 in response.
The loss of vacuum results in a reactor scram, but control rods fail to fully insert due to a hydraulic ATWS. The crew performs QGA 100 and QGA 101 in response.
* When SBLC is initiated, the first pump selected will not start. The alternate pump will start if a start is attempted.
When SBLC is initiated, the first pump selected will not start. The alternate pump will start if a start is attempted.
* A complete loss of Vacuum eliminates the Main Condenser as a heat sink. Operators must manually control RPV Pressure with relief valves. Torus Cooling must be placed in service per QGA 200.
A complete loss of Vacuum eliminates the Main Condenser as a heat sink. Operators must manually control RPV Pressure with relief valves. Torus Cooling must be placed in service per QGA 200.
* The scenario is terminated when RPV water level and pressure are controlled in the established bands per QGA 101 and actions are being taken to shutdown the reactor.
The scenario is terminated when RPV water level and pressure are controlled in the established bands per QGA 101 and actions are being taken to shutdown the reactor.
CRITICAL TASKS:
CRITICAL TASKS:
Critical Task #1: With a HPCI steam line break and a failure of the automatic isolation, take action to manually isolate the HPCI steam line to terminate a primary system discharge into the Reactor Building.
Critical Task #1: With a HPCI steam line break and a failure of the automatic isolation, take action to manually isolate the HPCI steam line to terminate a primary system discharge into the Reactor Building.
Line 309: Line 335:
Critical Task #3: With a reactor scram required and the reactor not shutdown, TAKE ACTION TO REDUCE POWER by injecting Boron (prior to exceeding 110&deg;F Torus temperature) and/or inserting control rods to prevent exceeding primary containment design limits. (BWROG RPV-6.1 ATWS/PWR/LVL S/D REACTOR)
Critical Task #3: With a reactor scram required and the reactor not shutdown, TAKE ACTION TO REDUCE POWER by injecting Boron (prior to exceeding 110&deg;F Torus temperature) and/or inserting control rods to prevent exceeding primary containment design limits. (BWROG RPV-6.1 ATWS/PWR/LVL S/D REACTOR)
Critical Task #4: During an ATWS with conditions met to perform power/level control, TERMINATE AND PREVENT INJECTION with the exception of Boron, CRD, and RCIC into the RPV until conditions are met to re-establish injection. ((BWROG RPV-6.3 PWR/LVL TERM/PREVENT)
Critical Task #4: During an ATWS with conditions met to perform power/level control, TERMINATE AND PREVENT INJECTION with the exception of Boron, CRD, and RCIC into the RPV until conditions are met to re-establish injection. ((BWROG RPV-6.3 PWR/LVL TERM/PREVENT)
Critical Task #5: When conditions are met to re-establish injection, use available injection systems to MAINTAIN RPV water level above the Minimum Steam Cooling RPV Water Level ( -166). (BWROG RPV-6.4 ATWS PWR/LVL RESTORE RPV LVL)
Critical Task #5: When conditions are met to re-establish injection, use available injection systems to MAINTAIN RPV water level above the Minimum Steam Cooling RPV Water Level ( -166). (BWROG RPV-6.4 ATWS PWR/LVL RESTORE RPV LVL)  
Quad Cities                         NRC EXAM                           Scenario 2 Simulator setup:
 
Quad Cities NRC EXAM Scenario 2 Simulator setup:
: 1. Reset to IC-23.
: 1. Reset to IC-23.
Verify Main Condenser flow is in the South direction.
Verify Main Condenser flow is in the South direction.
: 2. Insert Commands for setup:
: 2. Insert Commands for setup:
* imf hp15
imf hp15 imf rd13a 100 ior dihs11130301 off irf mc20br open irf mc20ar open
* imf rd13a 100
* ior dihs11130301 off
* irf mc20br open
* irf mc20ar open
: 3. Verify the flowing commands for scenario performance:
: 3. Verify the flowing commands for scenario performance:
* imf ed01c
imf ed01c dmf ed01c imf rm05a 100 :10 imf fw08a dmf fw08a imf hp13 7 2:
* dmf ed01c
irf sw10r run imf mc08 100 25:
* imf rm05a 100 :10
irf rd04r close irf qg08r 1 irf qg14r 1 irf qg09r 1 dor dihs11130301
* imf fw08a
* dmf fw08a
* imf hp13 7 2:
* irf sw10r run
* imf mc08 100 25:
* irf rd04r close
* irf qg08r 1
* irf qg14r 1
* irf qg09r 1
* dor dihs11130301
: 4. Take the following equipment OOS (hang OOS Card):
: 4. Take the following equipment OOS (hang OOS Card):
* None.
None.
: 5. Provide the crew with a Standard Load Drop REMA.
: 5. Provide the crew with a Standard Load Drop REMA.
: 6. Provide the Lead Evaluator with Switching Orders to reclose GCB 4-6.
: 6. Provide the Lead Evaluator with Switching Orders to reclose GCB 4-6.
Line 342: Line 355:
: 9. Advance recorders.
: 9. Advance recorders.
: 10. Clean marked up meter/recorder faces and hard cards.
: 10. Clean marked up meter/recorder faces and hard cards.
: 11. Remove any flags placed by the previous crew.
: 11. Remove any flags placed by the previous crew.  
Quad Cities                     NRC EXAM Scenario 2 LIST OF POTENTIAL PROCEDURES Annunciator Procedures o 901-5 A-8, Rev. 14 o 901-55 A-1, Rev. 10 o 901-5 G-7, Rev. 6 o 901-4 G-17, Rev. 10 QGA 100, Rev. 9 QGA 101, Rev. 13 QGA 200, Rev. 9 QCOA 0600-01, Rev. 11 QOA 3300-02, Rev. 34 QCOP 6400-08, Rev. 14 QCOP 4400-09, Rev. 20 QCOP 0300-28, Rev. 27 QCOP 0250-02, Rev. 11 QCOP 0201-16, Rev. 5 QCOP 0600-18, Rev. 20 QCOP 2400-01, Rev. 18 QCOP 1000-30, Rev. 23 Quad Cities                       NRC EXAM                       Scenario 2 CREW TURNOVER SHIFT TURNOVER INFORMATION
 
Quad Cities NRC EXAM Scenario 2 LIST OF POTENTIAL PROCEDURES Annunciator Procedures o
901-5 A-8, Rev. 14 o
901-55 A-1, Rev. 10 o
901-5 G-7, Rev. 6 o
901-4 G-17, Rev. 10 QGA 100, Rev. 9 QGA 101, Rev. 13 QGA 200, Rev. 9 QCOA 0600-01, Rev. 11 QOA 3300-02, Rev. 34 QCOP 6400-08, Rev. 14 QCOP 4400-09, Rev. 20 QCOP 0300-28, Rev. 27 QCOP 0250-02, Rev. 11 QCOP 0201-16, Rev. 5 QCOP 0600-18, Rev. 20 QCOP 2400-01, Rev. 18 QCOP 1000-30, Rev. 23  
 
Quad Cities NRC EXAM Scenario 2 CREW TURNOVER SHIFT TURNOVER INFORMATION
: 1. Plant Conditions:
: 1. Plant Conditions:
a.) Unit 1 is operating at 85% power.
a.) Unit 1 is operating at 85% power.
Line 349: Line 369:
(1) Unit 1: None (2) Unit 2: None d.) On Line Risk is Green 2.) Evolutions/maintenance for the oncoming shift:
(1) Unit 1: None (2) Unit 2: None d.) On Line Risk is Green 2.) Evolutions/maintenance for the oncoming shift:
a.) Reverse Main Condenser Flow per QCOP 4400-09.
a.) Reverse Main Condenser Flow per QCOP 4400-09.
b.) Increase to rated power with Recirc flow per QCGP 3-1, Reactor Power Operation.
b.) Increase to rated power with Recirc flow per QCGP 3-1, Reactor Power Operation.  
Quad Cities                           NRC EXAM                               Scenario 2 Appendix D                         Required Operator Actions                           Form ES-D-2 Quad Cities           Scenario No.: 2 Event No.: 1                       Page 1 of 1 NOTE:
 
Quad Cities NRC EXAM Scenario 2 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 2 Event No.: 1 Page 1 of 1 NOTE:
Event
Event


== Description:==
== Description:==
Reverse Main Condenser Flow from South to North Time     Position     Applicants Actions or Behavior SRO       Directs Main Condenser flow reversal per QCOP 4400-09.
Reverse Main Condenser Flow from South to North Time Position Applicants Actions or Behavior SRO Directs Main Condenser flow reversal per QCOP 4400-09.
BOP       Verifies annunciator 901-7 C-1, COND FLOW REV VLVS ON LOCAL CONT, is NOT in alarm.
BOP Verifies annunciator 901-7 C-1, COND FLOW REV VLVS ON LOCAL CONT, is NOT in alarm.
BOP       Opens South SJAE Suction valves using the Test switch on the 901-7 panel by placing the switch to the SOU position.
BOP Opens South SJAE Suction valves using the Test switch on the 901-7 panel by placing the switch to the SOU position.
BOP       Places the Circulating Water Flow Selector switch to the NORTH position when the South SJAE valves are fully open.
BOP Places the Circulating Water Flow Selector switch to the NORTH position when the South SJAE valves are fully open.
BOP       Verifies the following:
BOP Verifies the following:
* SJAE Suction valves change over
SJAE Suction valves change over Condenser seal trough fill and drain valves changeover Condenser differential pressure has reversed and vacuum is stable BOP Verifies after a time delay that one set of seal troughs have drained and the other has filled.
* Condenser seal trough fill and drain valves changeover
Proceed to Event 2  
* Condenser differential pressure has reversed and vacuum is stable BOP       Verifies after a time delay that one set of seal troughs have drained and the other has filled.
 
Proceed to Event 2 Quad Cities                           NRC EXAM                             Scenario 2 Appendix D                         Required Operator Actions                         Form ES-D-2 Quad Cities         Scenario No.: 2 Event No.: 2                     Page 1 of 1 Event
Quad Cities NRC EXAM Scenario 2 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 2 Event No.: 2 Page 1 of 1 Event


== Description:==
== Description:==
GCB 4-6 Trip and Reclosure Time     Position   Applicants Actions or Behavior SIMOP: Trip GCB 4-6 using the command imf ed01c, then delete the GCB 4-6 trip to allow re-close using dmf ed01c Acknowledges annunciator 912-2 C-3, 345KV CKT BKR TRIP, and BOP reports GCB 4-6 has tripped.
GCB 4-6 Trip and Reclosure Time Position Applicants Actions or Behavior SIMOP: Trip GCB 4-6 using the command imf ed01c, then delete the GCB 4-6 trip to allow re-close using dmf ed01c BOP Acknowledges annunciator 912-2 C-3, 345KV CKT BKR TRIP, and reports GCB 4-6 has tripped.
Refers to annunciator procedure and dispatches an EO to the Relay BOP House.
BOP Refers to annunciator procedure and dispatches an EO to the Relay House.
SIM OP ROLE PLAY: As OAD, call into the Control Room and report you inadvertently bumped the control cabinet for GCB 4-6 while staging equipment for an upcoming modification. You have inspected the cabinet and found no damage. You suggest contacting Bulk Power and reclosing GCB 4-6.
SIM OP ROLE PLAY: As OAD, call into the Control Room and report you inadvertently bumped the control cabinet for GCB 4-6 while staging equipment for an upcoming modification. You have inspected the cabinet and found no damage. You suggest contacting Bulk Power and reclosing GCB 4-6.
LEAD EVALUATOR NOTE: Provide a copy of the Switching Orders after the SRO requests them from Bulk Power.
LEAD EVALUATOR NOTE: Provide a copy of the Switching Orders after the SRO requests them from Bulk Power.
Contacts Bulk Power Operations for permission and Switching Orders SRO to reclose GCB 4-6.
SRO Contacts Bulk Power Operations for permission and Switching Orders to reclose GCB 4-6.
SRO     Directs reclosure of GCB 4-6 per QCOP 6400-08.
SRO Directs reclosure of GCB 4-6 per QCOP 6400-08.
Directs EO in the Relay House to inspect GCB 4-6 and surrounding BOP area prior to closure of the circuit breaker.
BOP Directs EO in the Relay House to inspect GCB 4-6 and surrounding area prior to closure of the circuit breaker.
SIM OP ROLE PLAY: As EO, call back after approximately 2 minutes, and report area is cleared of all personnel and no safety hazards exist. If directed or asked to complete QCOP 6400-08 steps F.2a.-c., wait 1 minute and report those steps as complete.
SIM OP ROLE PLAY: As EO, call back after approximately 2 minutes, and report area is cleared of all personnel and no safety hazards exist. If directed or asked to complete QCOP 6400-08 steps F.2a.-c., wait 1 minute and report those steps as complete.
Turns on the 345KV Synchronization Switch with the key and verifies BOP      synchroscope is at 12 oclock and incoming and running voltages are equal.
BOP Turns on the 345KV Synchronization Switch with the key and verifies synchroscope is at 12 oclock and incoming and running voltages are equal.
Closes GCB 4-6 with the control switch at the 912-2 panel and verifies BOP both RED lights are energized.
BOP Closes GCB 4-6 with the control switch at the 912-2 panel and verifies both RED lights are energized.
BOP     Turns off 345KV breaker synchronization switch and removes key.
BOP Turns off 345KV breaker synchronization switch and removes key.
BOP     Verifies re-closure cutout toggle switch is in the UP (ON) position.
BOP Verifies re-closure cutout toggle switch is in the UP (ON) position.
Proceed to Event 3 Quad Cities                           NRC EXAM                             Scenario 2 Appendix D                         Required Operator Actions                       Form ES-D-2 Quad Cities           Scenario No.: 2 Event No.: 3                   Page 1 of 1 Event
Proceed to Event 3  
 
Quad Cities NRC EXAM Scenario 2 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 2 Event No.: 3 Page 1 of 1 Event


== Description:==
== Description:==
1A Drywell Radiation Monitor Upscale Failure Time     Position     Applicants Actions or Behavior SIMOP: Fail the 1A Drywell Radiation Monitor Upscale: imf rm05a 100 :10 BOP       Acknowledges annunciator 901-55 A-1, Drywell A High Rad Conc, and reports the 1-2419A Drywell radiation monitor is indicating full upscale.
1A Drywell Radiation Monitor Upscale Failure Time Position Applicants Actions or Behavior SIMOP: Fail the 1A Drywell Radiation Monitor Upscale: imf rm05a 100 :10 BOP Acknowledges annunciator 901-55 A-1, Drywell A High Rad Conc, and reports the 1-2419A Drywell radiation monitor is indicating full upscale.
ATC       Acknowledges annunciator 901-5 A-8, Group 2 Isol Ch Trip, and refers to annunciator procedure.
ATC Acknowledges annunciator 901-5 A-8, Group 2 Isol Ch Trip, and refers to annunciator procedure.
SRO       Confirms the 1-2419B Drywell radiation monitor is indicating normally (approximately 3-4 R/hr), and no other indications of increasing radiation levels exist on the following:
SRO Confirms the 1-2419B Drywell radiation monitor is indicating normally (approximately 3-4 R/hr), and no other indications of increasing radiation levels exist on the following:
* Main Steam Line Radiation monitors
Main Steam Line Radiation monitors Offgas Radiation monitors Area Radiation monitors SRO Enters the following Technical Specifications for an inoperable Drywell Radiation monitor:
* Offgas Radiation monitors
PCI 3.3.6.1, Condition A, Place the Channel in Trip Within 24 Hours PAM 3.3.3.1, Condition A, Restore Required Channel to Operable Status Within 30 Days Proceed to Event 4  
* Area Radiation monitors SRO       Enters the following Technical Specifications for an inoperable Drywell Radiation monitor:
 
* PCI 3.3.6.1, Condition A, Place the Channel in Trip Within 24 Hours
Quad Cities NRC EXAM Scenario 2 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 2 Event No.: 4 Page 1 of 1 Event
* PAM 3.3.3.1, Condition A, Restore Required Channel to Operable Status Within 30 Days Proceed to Event 4 Quad Cities                           NRC EXAM                             Scenario 2 Appendix D                         Required Operator Actions                         Form ES-D-2 Quad Cities           Scenario No.: 2 Event No.: 4                     Page 1 of 1 Event


== Description:==
== Description:==
1A Feedwater Regulator Valve Lock-Up Time     Position     Applicants Actions or Behavior SIM OP: Lock-up the 1A FRV using the command: imf fw08a Acknowledges annunciator 901-5 G-7, 1A FW ACTUATOR ATC TROUBLE, and reports the 1A FRV has locked up.
1A Feedwater Regulator Valve Lock-Up Time Position Applicants Actions or Behavior SIM OP: Lock-up the 1A FRV using the command: imf fw08a ATC Acknowledges annunciator 901-5 G-7, 1A FW ACTUATOR TROUBLE, and reports the 1A FRV has locked up.
Verifies and reports that the 1B FRV is in AUTO and controlling RPV ATC water level.
ATC Verifies and reports that the 1B FRV is in AUTO and controlling RPV water level.
Contacts Instrument Maintenance to investigate the 1A FRV lock-up SRO/ATC and dispatches EO to the Feedwater Regulator Station to investigate.
SRO/ATC Contacts Instrument Maintenance to investigate the 1A FRV lock-up and dispatches EO to the Feedwater Regulator Station to investigate.
BOP       Checks Fuse F13 at Panel 901-5 TB-HH and reports the fuse is intact.
BOP Checks Fuse F13 at Panel 901-5 TB-HH and reports the fuse is intact.
EVALUATOR NOTE: The above mentioned fuse is not modeled. When the candidate is at the 901-5 inside panel, inform him/her that the fuse is intact.
EVALUATOR NOTE: The above mentioned fuse is not modeled. When the candidate is at the 901-5 inside panel, inform him/her that the fuse is intact.
SIM OP ROLE PLAY: As EO dispatched to the 1A Feed Reg Valve, report that the Nematron is displaying an Input Signal vs Valve Position Error.
SIM OP ROLE PLAY: As EO dispatched to the 1A Feed Reg Valve, report that the Nematron is displaying an Input Signal vs Valve Position Error.
SIM OP ROLE PLAY: As Instrument Maintenance, wait 3 minutes, delete the lock-up malfunction by inserting the command: dmf fw08a. Call back and report you have corrected the control signal problem by cleaning and securing several leads. You recommend resetting the lock-up.
SIM OP ROLE PLAY: As Instrument Maintenance, wait 3 minutes, delete the lock-up malfunction by inserting the command: dmf fw08a. Call back and report you have corrected the control signal problem by cleaning and securing several leads. You recommend resetting the lock-up.
Directs resetting the 1A FW Regulator valve per QCOA 0600-01 and SRO QCOP 0600-18, step F.4.
SRO Directs resetting the 1A FW Regulator valve per QCOA 0600-01 and QCOP 0600-18, step F.4.
ATC       Verifies the 1B FRV is controlling RPV water level.
ATC Verifies the 1B FRV is controlling RPV water level.
ATC       Depresses the 1A VLV RESET pushbutton and holds for five seconds.
ATC Depresses the 1A VLV RESET pushbutton and holds for five seconds.
ATC       Verifies the 1A FRV lock-up reset light extinguishes and the valve is controlling RPV water level.
ATC Verifies the 1A FRV lock-up reset light extinguishes and the valve is controlling RPV water level.
ATC       Places 1A FRV in AUTO per QCOP 0600-18 step F.5 Proceed to Event 5 Quad Cities                           NRC EXAM                           Scenario 2 Appendix D                       Required Operator Actions                       Form ES-D-2 Quad Cities         Scenario No.: 2 Event No.: 5                   Page 1 of 1 Event
ATC Places 1A FRV in AUTO per QCOP 0600-18 step F.5 Proceed to Event 5  
 
Quad Cities NRC EXAM Scenario 2 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 2 Event No.: 5 Page 1 of 1 Event


== Description:==
== Description:==
HPCI Steam Leak/Failure to Isolate Time     Position   Applicants Actions or Behavior SIM OP: Insert a 7% steam leak in the HPCI Room: imf hp13 7 2:
HPCI Steam Leak/Failure to Isolate Time Position Applicants Actions or Behavior SIM OP: Insert a 7% steam leak in the HPCI Room: imf hp13 7 2:
BOP     Acknowledges annunciator 901-3 H-2, Area Hi Temp Steam Leak Detection, and refers to annunciator procedure.
BOP Acknowledges annunciator 901-3 H-2, Area Hi Temp Steam Leak Detection, and refers to annunciator procedure.
BOP     Reports HPCI Room temperature is 140&deg;F and rising after checking temperature recorder on the 901-21 panel.
BOP Reports HPCI Room temperature is 140&deg;F and rising after checking temperature recorder on the 901-21 panel.
SRO     Enters QGA 300 on HPCI Area High Temperature and directs actions.
SRO Enters QGA 300 on HPCI Area High Temperature and directs actions.
BOP     Dispatches EO to the Reactor Building basement to monitor area water levels.
BOP Dispatches EO to the Reactor Building basement to monitor area water levels.
BOP     Dispatches EO to start the U-1 EDG Cooling Water pump.
BOP Dispatches EO to start the U-1 EDG Cooling Water pump.
SIM OP: If dispatched as EO, wait 1 minute and start the U-1 EDG Cooling Water pump:
SIM OP: If dispatched as EO, wait 1 minute and start the U-1 EDG Cooling Water pump:
imf sw10r run SIM OP ROLE PLAY: As the EO dispatched to the Reactor Building basement, wait approximately 2 minutes and report, there is no water in the basement and corner rooms, but you can see steam in the HPCI Room and did not enter.
imf sw10r run SIM OP ROLE PLAY: As the EO dispatched to the Reactor Building basement, wait approximately 2 minutes and report, there is no water in the basement and corner rooms, but you can see steam in the HPCI Room and did not enter.
CT1         SRO     Directs isolation of HPCI steam lines.
CT1 SRO Directs isolation of HPCI steam lines.
CT1         BOP     Closes the HPCI Steam Inlet isolation valves (MO 1-2301-4 and MO 1-2301-5).
CT1 BOP Closes the HPCI Steam Inlet isolation valves (MO 1-2301-4 and MO 1-2301-5).
BOP     Monitors HPCI Room temperature and reports lowering temperatures.
BOP Monitors HPCI Room temperature and reports lowering temperatures.
Proceed to Event 6 Quad Cities                           NRC EXAM                               Scenario 2 Appendix D                         Required Operator Actions                         Form ES-D-2 Quad Cities           Scenario No.: 2 Event No.: 6                     Page 1 of 1 Event
Proceed to Event 6  
 
Quad Cities NRC EXAM Scenario 2 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 2 Event No.: 6 Page 1 of 1 Event


== Description:==
== Description:==
Main Condenser Vacuum Leak/Emergency Power Reduction/Scram Time     Position     Applicants Actions or Behavior SIM OP: Insert a 100% Main Condenser leak ramped over 25 minutes: imf mc08 100 25:
Main Condenser Vacuum Leak/Emergency Power Reduction/Scram Time Position Applicants Actions or Behavior SIM OP: Insert a 100% Main Condenser leak ramped over 25 minutes: imf mc08 100 25:
BOP       Acknowledges annunciator 901-3 D-2, Off Gas High Radiation, and confirms elevated Off-Gas radiation levels at the 901-10 panel.
BOP Acknowledges annunciator 901-3 D-2, Off Gas High Radiation, and confirms elevated Off-Gas radiation levels at the 901-10 panel.
Evaluator Note: The Off-Gas radiation monitor readings will increase with an elevated flow rate resulting from air in-leakage. It is not indicative of fuel damage in this case.
Evaluator Note: The Off-Gas radiation monitor readings will increase with an elevated flow rate resulting from air in-leakage. It is not indicative of fuel damage in this case.
BOP       Acknowledges annunciator 901-54 C-7, Normal Process Flow Hi/Lo, and reports off-gas flow > 100 scfm and Main Condenser backpressure rising.
BOP Acknowledges annunciator 901-54 C-7, Normal Process Flow Hi/Lo, and reports off-gas flow > 100 scfm and Main Condenser backpressure rising.
SRO       Enters QOA 3300-02, Loss of Vacuum, and orders Emergency Power Reduction to maintain < 5 inches/Hg backpressure in Main Condenser.
SRO Enters QOA 3300-02, Loss of Vacuum, and orders Emergency Power Reduction to maintain < 5 inches/Hg backpressure in Main Condenser.
ATC/BOP       Reduces Reactor Recirculation flow and inserts control rods as necessary to attempt to maintain Main Condenser backpressure < 5 in Hg.
ATC/BOP Reduces Reactor Recirculation flow and inserts control rods as necessary to attempt to maintain Main Condenser backpressure < 5 in Hg.
SRO       Sets scram criteria on high Main Condenser backpressure.
SRO Sets scram criteria on high Main Condenser backpressure.
ATC/BOP       Checks SJAE valve position, steam seal pressure, and dispatches EOs and Radiation Protection to look for leaks in the LP Heater Bay.
ATC/BOP Checks SJAE valve position, steam seal pressure, and dispatches EOs and Radiation Protection to look for leaks in the LP Heater Bay.
ATC/BOP       Dispatches EOs to fill loop seals per QCOP 3300-09 and verify the Main Condenser vacuum breaker is closed and has a water seal.
ATC/BOP Dispatches EOs to fill loop seals per QCOP 3300-09 and verify the Main Condenser vacuum breaker is closed and has a water seal.
ATC       Scrams the reactor on high Main Condenser backpressure by depressing both manual scram pushbuttons and places the mode switch to the SHUTDOWN position.
ATC Scrams the reactor on high Main Condenser backpressure by depressing both manual scram pushbuttons and places the mode switch to the SHUTDOWN position.
Proceed to Event 7 Quad Cities                           NRC EXAM                               Scenario 2 Appendix D                         Required Operator Actions                       Form ES-D-2 Quad Cities           Scenario No.: 2 Event No.: 7                   Page 1 of 2 Event
Proceed to Event 7  
 
Quad Cities NRC EXAM Scenario 2 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 2 Event No.: 7 Page 1 of 2 Event


== Description:==
== Description:==
Hydraulic ATWS Time     Position     Applicants Actions or Behavior ATC       Reports control rods did NOT insert.
Hydraulic ATWS Time Position Applicants Actions or Behavior ATC Reports control rods did NOT insert.
SRO       Enters QGA 100, transitions to QGA 101.
SRO Enters QGA 100, transitions to QGA 101.
SRO       Directs actions for Power Leg of QGA 101.
SRO Directs actions for Power Leg of QGA 101.
ATC       Arms and depresses ARI, and reduces both Reactor Recirc pumps to minimum speed.
ATC Arms and depresses ARI, and reduces both Reactor Recirc pumps to minimum speed.
CT2         SRO       Directs ATC/BOP to inhibit ADS CT2         BOP       Inhibits ADS and places both Core Spray pumps in PTL.
CT2 SRO Directs ATC/BOP to inhibit ADS CT2 BOP Inhibits ADS and places both Core Spray pumps in PTL.
SRO       Directs both Reactor Recirc pumps tripped.
SRO Directs both Reactor Recirc pumps tripped.
ATC       Trips both Reactor Recirc pumps.
ATC Trips both Reactor Recirc pumps.
CT3         SRO       Directs control rod insertion per QCOP 0300-28.
CT3 SRO Directs control rod insertion per QCOP 0300-28.
ATC       Dispatches EO to close the 1-301-25 valve.
ATC Dispatches EO to close the 1-301-25 valve.
CT3         ATC       Inserts all CRAM rods to position 00.
CT3 ATC Inserts all CRAM rods to position 00.
CT3         ATC       Continues to insert control rods spiraling outward from center of core.
CT3 ATC Continues to insert control rods spiraling outward from center of core.
ATC       Directs operator to bypass all reactor scrams per QCOP 0300-28.
ATC Directs operator to bypass all reactor scrams per QCOP 0300-28.
ATC       Resets reactor scram.
ATC Resets reactor scram.
ATC       Dispatches EO to de-energize ARI by removing fuses in 2201-70A and 2201-70B panels per QCOP 0300-28.
ATC Dispatches EO to de-energize ARI by removing fuses in 2201-70A and 2201-70B panels per QCOP 0300-28.
ATC       Verifies scram is reset and inserts another manual scram.
ATC Verifies scram is reset and inserts another manual scram.
ATC       Verifies NO control rod movement and resets reactor scram.
ATC Verifies NO control rod movement and resets reactor scram.  
Quad Cities                           NRC EXAM                             Scenario 2 Appendix D                       Required Operator Actions                         Form ES-D-2 Quad Cities           Scenario No.: 2 Event No.: 7                     Page 2 of 2 Event
 
Quad Cities NRC EXAM Scenario 2 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 2 Event No.: 7 Page 2 of 2 Event


== Description:==
== Description:==
Hydraulic ATWS Time     Position     Applicants Actions or Behavior ATC       Directs personnel to individually scram control rods from the 901-16 panel.
Hydraulic ATWS Time Position Applicants Actions or Behavior ATC Directs personnel to individually scram control rods from the 901-16 panel.
SIM OP ROLE PLAY: Attempt to individually scram 3 control rods, then contact the ATC operator and report, Control rods will not insert from the 901-16 panel.
SIM OP ROLE PLAY: Attempt to individually scram 3 control rods, then contact the ATC operator and report, Control rods will not insert from the 901-16 panel.
SIM OP ROLE PLAY: If requested as EO, closes the 1-301-25 valve using: irf rd04r close SIM OP ROLE PLAY: If requested, wait approx. 2 minutes and bypass all reactor scrams using: irf qg08r 1 SIM OP ROLE PLAY: If requested as EO, pull the ARI fuses in the 2201-70A and 2201-70B panels in Aux Electric Room using: irf qg14r 1 SIM OP ROLE PLAY: If requested, bypass the Low RPV water level MSIV isolation and High Radiation Offgas isolation per QCOP 0250-02 using: irf qg09r 1 Proceed to Event 8 Quad Cities                             NRC EXAM                           Scenario 2 Appendix D                             Required Operator Actions                   Form ES-D-2 Quad Cities             Scenario No.: 2 Event No.: 8                   Page 1 of 1 Event
SIM OP ROLE PLAY: If requested as EO, closes the 1-301-25 valve using: irf rd04r close SIM OP ROLE PLAY: If requested, wait approx. 2 minutes and bypass all reactor scrams using: irf qg08r 1 SIM OP ROLE PLAY: If requested as EO, pull the ARI fuses in the 2201-70A and 2201-70B panels in Aux Electric Room using: irf qg14r 1 SIM OP ROLE PLAY: If requested, bypass the Low RPV water level MSIV isolation and High Radiation Offgas isolation per QCOP 0250-02 using: irf qg09r 1 Proceed to Event 8  
 
Quad Cities NRC EXAM Scenario 2 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 2 Event No.: 8 Page 1 of 1 Event


== Description:==
== Description:==
Failure of Initial SBLC Pump to Inject Time     Position       Applicants Actions or Behavior SIM OP NOTE: Delete the override for the SBLC switch when the ATC operator selects the 2nd SBLC pump for injection. dor dihs11130301 ATC       Reports SBLC tank level and selects a SBLC pump for injection by placing the control switch to SYS 1 or SYS 2.
Failure of Initial SBLC Pump to Inject Time Position Applicants Actions or Behavior SIM OP NOTE: Delete the override for the SBLC switch when the ATC operator selects the 2nd SBLC pump for injection. dor dihs11130301 ATC Reports SBLC tank level and selects a SBLC pump for injection by placing the control switch to SYS 1 or SYS 2.
CT3         ATC       Reports the SBLC pump has failed to inject, and selects the other SBLC pump.
CT3 ATC Reports the SBLC pump has failed to inject, and selects the other SBLC pump.
ATC       Verifies and reports the 2nd SBLC pump is injecting.
ATC Verifies and reports the 2nd SBLC pump is injecting.
ATC       Monitors SBLC Tank level for 16% decrease.
ATC Monitors SBLC Tank level for 16% decrease.
Proceed to Event 9 Quad Cities                             NRC EXAM                             Scenario 2 Quad Cities             Scenario No.: 2 Event No.: 9                     Page 1 of 1 Event
Proceed to Event 9  
 
Quad Cities NRC EXAM Scenario 2 Quad Cities Scenario No.: 2 Event No.: 9 Page 1 of 1 Event


== Description:==
== Description:==
Complete Loss of Main Condenser Vacuum, (with transition to Relief Valves to control reactor pressure).
Complete Loss of Main Condenser Vacuum, (with transition to Relief Valves to control reactor pressure).
Time       Position     Applicants Actions or Behavior SRO       Directs actions of QGA 101 Pressure Control leg.
Time Position Applicants Actions or Behavior SRO Directs actions of QGA 101 Pressure Control leg.
SRO       Sets RPV pressure band of 800-1000 psig.
SRO Sets RPV pressure band of 800-1000 psig.
BOP       Monitors DEHC and Main Condenser backpressure.
BOP Monitors DEHC and Main Condenser backpressure.
BOP       Transitions to relief valves prior to Main Condenser backpressure reaching 23 Hg.
BOP Transitions to relief valves prior to Main Condenser backpressure reaching 23 Hg.
BOP       Controls RPV pressure using B and/or C relief valves.
BOP Controls RPV pressure using B and/or C relief valves.
Proceed to Event 10 Quad Cities                           NRC EXAM                             Scenario 2 Appendix D                       Required Operator Actions                       Form ES-D-2 Quad Cities           Scenario No.: 2 Event No.: 10                           Page 1 of 2 Event
Proceed to Event 10  
 
Quad Cities NRC EXAM Scenario 2 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 2 Event No.: 10 Page 1 of 2 Event


== Description:==
== Description:==
RPV Power, Level Control Time     Position   Applicants Actions or Behavior SRO       Directs actions of QGA 101 Level Control Leg.
RPV Power, Level Control Time Position Applicants Actions or Behavior SRO Directs actions of QGA 101 Level Control Leg.
BOP       Verifies auto actions and isolations for 0 inches RPV water level.
BOP Verifies auto actions and isolations for 0 inches RPV water level.
SRO       Directs isolations bypassed per QCOP 0250-02.
SRO Directs isolations bypassed per QCOP 0250-02.
BOP       Contacts EO/SS to bypass RPV low water level MSIV and high offgas radiation isolations per QCOP 0250-02.
BOP Contacts EO/SS to bypass RPV low water level MSIV and high offgas radiation isolations per QCOP 0250-02.
SIM OP: If requested, bypass isolations per QCOP 0250-02: irf qg09r 1 SRO       Verifies reactor power >5% and RPV water level > -35.
SIM OP: If requested, bypass isolations per QCOP 0250-02: irf qg09r 1 SRO Verifies reactor power >5% and RPV water level > -35.
CT4         SRO       Directs termination and prevention of all RPV injection except for Boron and CRD.
CT4 SRO Directs termination and prevention of all RPV injection except for Boron and CRD.
CT4         ATC     Isolates Condensate/Feed system per QCOP 0201-16 (Hard Card).
CT4 ATC Isolates Condensate/Feed system per QCOP 0201-16 (Hard Card).
CT4       ATC/BOP     Trip latches HPCI, and verifies no injection sources except for Boron and CRD are operating.
CT4 ATC/BOP Trip latches HPCI, and verifies no injection sources except for Boron and CRD are operating.
ATC/BOP     Monitors RPV water level and reactor power.
ATC/BOP Monitors RPV water level and reactor power.
ATC/BOP     Reports RPV water level at -35 inches and lowering.
ATC/BOP Reports RPV water level at -35 inches and lowering.
SRO       Sets RPV water level band between -166 inches and the level lowered to when reactor power indicates < 5% or RPV water level is -142, or all ADS valves stay closed and drywell pressure stays below 2.5 psig.
SRO Sets RPV water level band between -166 inches and the level lowered to when reactor power indicates < 5% or RPV water level is -142, or all ADS valves stay closed and drywell pressure stays below 2.5 psig.
SRO       Directs injection with Condensate/Feed system to maintain RPV water CT5 level in established band.
CT5 SRO Directs injection with Condensate/Feed system to maintain RPV water level in established band.
ATC/BOP     Re-establishes injection to control RPV water level in band using the CT5 Condensate/Feed system.
CT5 ATC/BOP Re-establishes injection to control RPV water level in band using the Condensate/Feed system.  
Quad Cities                         NRC EXAM                         Scenario 2 Appendix D                       Required Operator Actions                   Form ES-D-2 Quad Cities           Scenario No.: 2 Event No.: 10                     Page 2 of 2 Event
 
Quad Cities NRC EXAM Scenario 2 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 2 Event No.: 10 Page 2 of 2 Event


== Description:==
== Description:==
QGA 200 Actions Time     Position     Applicants Actions or Behavior Acknowledges annunciator 901-4 G-17, Torus Wtr High Temp and BOP reports Torus temperature is 90&deg;F and rising.
QGA 200 Actions Time Position Applicants Actions or Behavior BOP Acknowledges annunciator 901-4 G-17, Torus Wtr High Temp and reports Torus temperature is 90&deg;F and rising.
SRO       Directs actions of QGA 200.
SRO Directs actions of QGA 200.
BOP       Monitors and reports containment parameters.
BOP Monitors and reports containment parameters.
BOP       Starts the CAM system per QCOP 2400-01.
BOP Starts the CAM system per QCOP 2400-01.
SRO       Directs Torus Cooling initiated.
SRO Directs Torus Cooling initiated.
BOP       Starts Torus Cooling per QCOP 1000-30 (Hard Card).
BOP Starts Torus Cooling per QCOP 1000-30 (Hard Card).
End of Scenario Quad Cities                               NRC EXAM                             Scenario 3 Appendix D                                 Scenario Outline                               Form ES-D-1 Facility: Quad Cities   Scenario No.: NRC Scenario   3   Op-Test No.: ILT 08-1 __
End of Scenario  
Examiners: ____________________________ Operators:               _____________________________
 
Quad Cities NRC EXAM Scenario 3 Appendix D Scenario Outline Form ES-D-1 Facility: Quad Cities Scenario No.: NRC Scenario 3 Op-Test No.: ILT 08-1 __
Examiners: ____________________________ Operators:
Initial Conditions:
Initial Conditions:
34% Power, MO 1-1001-26B, INBD DW SPRAY ISOL VLV out of service for limitorque replacement.
34% Power, MO 1-1001-26B, INBD DW SPRAY ISOL VLV out of service for limitorque replacement.
Turnover:
Turnover:
Perform QCOS 1000-09 RHR Power Operated Valve Test (Partial) then continue the startup per step 2 of the REMA and QCGP 1-1.
Perform QCOS 1000-09 RHR Power Operated Valve Test (Partial) then continue the startup per step 2 of the REMA and QCGP 1-1.
Event         Malf. No.           Event                              Event No.                                Type*                           Description 1     None                       BOP       Perform QCOS 1000-09 RHR Power Operated N      Valve Test (Partial) 2     None                       ATC       Normal power up Recirc R
Event No.
3      DIFC10262222               ATC       Recirc Pump run up/Master Controller fails high RAISE                        IC 4     NM08F/RP02B/           ATC/SRO       APRM upscale w no 1/2 scram (TS)
Malf. No.
RP02D                        IC 5     AD01D                 BOP/SRO       Spurious ERV actuation (TS)
Event Type*
IC 6     SW12A                     BOP       Degraded TBCCW pump, Start STBY IC 7     MS05A                     Crew       Steam Line break inside Containment M
Event Description 1
8      None                     Crew       Contingencies: Blowdown M
None BOP N
9      MS16A, MS16B             Crew       Malfunction after EOP: Tailpipe rupture MS16C                        M 10       None                     Crew       Venting to stay under PCPL M
Perform QCOS 1000-09 RHR Power Operated Valve Test (Partial) 2 None ATC R
*        (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor ES-301-4 Quantitative attributes:                   ES-301-5 Quantitative attributes:
Normal power up Recirc 3
Total Malfunctions (5-8): 6                         BOP Normal: E1 Malfunction(s) after EOP (1-2): E9                   ATC Reactivity (1 per set): E2 Abnormal Events (2-4): E3, E4, E5                   BOP I/C (4 per set): E5, E6 Major Transient(s) /E-Plan entry (1-2): E7           ATC I/C (4 per set): E3, E4 EOPs (1-2): QGA 100 & 200                           SRO-I I/C (4 /set inc 2 as ATC): E3,E4,E5,E6 EOP Contingencies (0-2): QGA 500-1                   SRO Tech Spec (2 per set): E4, E5 Critical Tasks (2-3): 3                             ALL Major Transients (2 per set) E7 Quad Cities                             NRC EXAM                             Scenario 3
DIFC10262222 RAISE ATC IC Recirc Pump run up/Master Controller fails high 4
NM08F/RP02B/
RP02D ATC/SRO IC APRM upscale w no 1/2 scram (TS) 5 AD01D BOP/SRO IC Spurious ERV actuation (TS) 6 SW12A BOP IC Degraded TBCCW pump, Start STBY 7
MS05A Crew M
Steam Line break inside Containment 8
None Crew M
Contingencies: Blowdown 9
MS16A, MS16B MS16C Crew M
Malfunction after EOP: Tailpipe rupture 10 None Crew M
Venting to stay under PCPL (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor ES-301-5 Quantitative attributes:
BOP Normal: E1 ATC Reactivity (1 per set): E2 BOP I/C (4 per set): E5, E6 ATC I/C (4 per set): E3, E4 SRO-I I/C (4 /set inc 2 as ATC): E3,E4,E5,E6 SRO Tech Spec (2 per set): E4, E5 ALL Major Transients (2 per set) E7 ES-301-4 Quantitative attributes:
Total Malfunctions (5-8): 6 Malfunction(s) after EOP (1-2): E9 Abnormal Events (2-4): E3, E4, E5 Major Transient(s) /E-Plan entry (1-2): E7 EOPs (1-2): QGA 100 & 200 EOP Contingencies (0-2): QGA 500-1 Critical Tasks (2-3): 3  
 
Quad Cities NRC EXAM Scenario 3  


==SUMMARY==
==SUMMARY==
* The scenario starts with the plant at approximately 34% power during a startup. The B Loop of Drywell Sprays is inoperable.
The scenario starts with the plant at approximately 34% power during a startup. The B Loop of Drywell Sprays is inoperable.
* Before power ascension, perform the RHR Power Operated Valve Test, QCOS 1000-09 step H.14 only.
Before power ascension, perform the RHR Power Operated Valve Test, QCOS 1000-09 step H.14 only.
* The crew then raises reactor power by increasing Recirc Flow.
The crew then raises reactor power by increasing Recirc Flow.
* When the reactivity manipulation has been sufficiently evaluated, the Master Recirc Controller will fail high. APRM power, Total Core Flow, and Recirc Pump speeds will all show increasing trends. There are several ways for the ATC operator to take manual control and terminate the transient.
When the reactivity manipulation has been sufficiently evaluated, the Master Recirc Controller will fail high. APRM power, Total Core Flow, and Recirc Pump speeds will all show increasing trends. There are several ways for the ATC operator to take manual control and terminate the transient.
* APRM 6 will fail upscale but a 1/2 scram will fail to occur. The crew should diagnose this problem and insert a manual 1/2 Scram. APRM 6 will be inoperable per Tech Specs.
APRM 6 will fail upscale but a 1/2 scram will fail to occur. The crew should diagnose this problem and insert a manual 1/2 Scram. APRM 6 will be inoperable per Tech Specs.
* The D Relief Valve will actuate. The crew responds per QCOA 0203-01 to close the valve and stabilize the plant. One ADS valve will be inoperable per Tech Specs.
The D Relief Valve will actuate. The crew responds per QCOA 0203-01 to close the valve and stabilize the plant. One ADS valve will be inoperable per Tech Specs.
* The 1A TBCCW Pump will degrade. The B TBCCW Pump can be manually started and the system stabilized .
The 1A TBCCW Pump will degrade. The B TBCCW Pump can be manually started and the system stabilized.
* A steam line break inside the Drywell results in a reactor scram and entry into QGA 100 and 200.
A steam line break inside the Drywell results in a reactor scram and entry into QGA 100 and 200.
* When the only available loop of Drywell Sprays cannot be placed in service, the crew will perform a RPV Blowdown per QGA 500-1.
When the only available loop of Drywell Sprays cannot be placed in service, the crew will perform a RPV Blowdown per QGA 500-1.
* When relief valves are opened, tailpipe ruptures pressurize the containment even further.
When relief valves are opened, tailpipe ruptures pressurize the containment even further.
* The crew must perform Containment Venting to stay under the Primary Containment Pressure Limit (PCPL).
The crew must perform Containment Venting to stay under the Primary Containment Pressure Limit (PCPL).
CRITICAL TASKS:
CRITICAL TASKS:
Critical Task #1: Given an operating plant with a stuck open relief valve, take actions to close the valve in accordance with QCOA 0203-01.
Critical Task #1: Given an operating plant with a stuck open relief valve, take actions to close the valve in accordance with QCOA 0203-01.
Critical Task #2: When Drywell temperature CANNOT be maintained < 280&deg;F OR Torus pressure CANNOT be maintained < Pressure Suppression Pressure Limit (PSP), INITIATE an Emergency Depressurization.
Critical Task #2: When Drywell temperature CANNOT be maintained < 280&deg;F OR Torus pressure CANNOT be maintained < Pressure Suppression Pressure Limit (PSP), INITIATE an Emergency Depressurization.
Critical Task #3: Before Torus pressure reaches the Primary Containment Pressure Limit (PCPL), INITIATE venting of the containment irrespective of offsite radioactivity release rates. (BWROG PC-7.2 LOCA VENT PC VENT)
Critical Task #3: Before Torus pressure reaches the Primary Containment Pressure Limit (PCPL), INITIATE venting of the containment irrespective of offsite radioactivity release rates. (BWROG PC-7.2 LOCA VENT PC VENT)  
Quad Cities                         NRC EXAM                             Scenario 3 Simulator setup:
 
Quad Cities NRC EXAM Scenario 3 Simulator setup:
: 1. Reset to IC-17.
: 1. Reset to IC-17.
* Verify RWM loads to proper sequence (if not, repeat IC-17 reset).
Verify RWM loads to proper sequence (if not, repeat IC-17 reset).
* Withdraw Step 19 to the target out position.
Withdraw Step 19 to the target out position.
* Place DFWLC system in 3-element control.
Place DFWLC system in 3-element control.
* Increase Reactor Recirc flow until Feedwater flow is 3.0 Mlb/hr.
Increase Reactor Recirc flow until Feedwater flow is 3.0 Mlb/hr.
* Verify Recirc Controllers are in MASTER
Verify Recirc Controllers are in MASTER Place DFWLC system in 3-element control.
* Place DFWLC system in 3-element control.
Close Feedwater Heater Extraction and Vent Valves (QCGP 1-1 step F.9.k and F.9.l )
* Close Feedwater Heater Extraction and Vent Valves (QCGP 1-1 step F.9.k and F.9.l )
Place the ADSORB INLT/BYP VLVS switch to the TREAT position (901-54)
* Place the ADSORB INLT/BYP VLVS switch to the TREAT position (901-54)
(Commands to be utilized DURING the scenario are contained in the CAEP file NRC Scenario #3
(Commands to be utilized DURING the scenario are contained in the CAEP file NRC Scenario #3
: 2. Run CAEP file and verify the following setup commands are inserted:
: 2. Run CAEP file and verify the following setup commands are inserted:
* trgset 1 zdifc1026222(1)
trgset 1 zdifc1026222(1) trg 1 dor difc10262222 ior dihs1100123a close imf rp02b imf rp02d irf rh20br open irf rh19br open trgset 3 rdv10305117.LT.0.99 imf rp05a(3) imf rp05b(3 1) imf rp05c(3 2) trgset 4 zdihs10287303A(1) imf ms16a(4) imf ms16b(4) imf ms16c(4) irf ms01r latch irf ms02r latch irf ms03r latch irf ms04r latch irf ms05r latch irf ms06r latch
* trg 1 dor difc10262222
* ior dihs1100123a close
* imf rp02b
* imf rp02d
* irf rh20br open
* irf rh19br open
* trgset 3 rdv10305117.LT.0.99
* imf rp05a(3)
* imf rp05b(3 1)
* imf rp05c(3 2)
* trgset 4 zdihs10287303A(1)
* imf ms16a(4)
* imf ms16b(4)
* imf ms16c(4)
* irf ms01r latch
* irf ms02r latch
* irf ms03r latch
* irf ms04r latch
* irf ms05r latch
* irf ms06r latch
: 3. Verify the flowing commands for scenario performance are available in the CAEP file:
: 3. Verify the flowing commands for scenario performance are available in the CAEP file:
* ior difc10262222 raise
ior difc10262222 raise imf nm08f 100 imf ad01d 0 imf sw12a 100 10:
* imf nm08f 100
imf ms05a.3 3:
* imf ad01d 0
irf rh19ar open
* imf sw12a 100 10:
* imf ms05a .3 3:
* irf rh19ar open
: 4. Take the following equipment OOS (hang OOS Card/EST):
: 4. Take the following equipment OOS (hang OOS Card/EST):
* APRM 5 in Bypass/EST
APRM 5 in Bypass/EST MO 1-1001-26B Control Switch OOS MO 1-1001-23B Control Switch OOS  
* MO 1-1001-26B Control Switch OOS
 
* MO 1-1001-23B Control Switch OOS Quad Cities                           NRC EXAM                             Scenario 3
Quad Cities NRC EXAM Scenario 3
: 5. Provide the crew with a startup REMA.
: 5. Provide the crew with a startup REMA.
: 6. Provide a current revision of the following procedures, signed off as specified:
: 6. Provide a current revision of the following procedures, signed off as specified:
* QCOS 1000-09, partial for Step #14, RHR B Containment Cooling Valves and IST data attached.
QCOS 1000-09, partial for Step #14, RHR B Containment Cooling Valves and IST data attached.
* QCGP 1-1, signed off up to F.9.v
QCGP 1-1, signed off up to F.9.v Stopwatch 7 Ensure procedures are erased and put away including QGAs.
* Stopwatch 7 Ensure procedures are erased and put away including QGAs.
: 8. Advance recorders.
: 8. Advance recorders.
: 9. Clean marked up meter/recorder faces and hard cards.
: 9. Clean marked up meter/recorder faces and hard cards.
: 10. Remove any flags placed by the previous crew.
: 10. Remove any flags placed by the previous crew.  
Quad Cities                     NRC EXAM Scenario 3 LIST OF POTENTIAL PROCEDURES Annunciator Procedures o 901-3 A-16, Rev. 11 o 901-5 D-13, Rev. 9 o 901-5 A-6, Rev. 8 o 901-5 C-3, Rev. 11 o 901-5 H-1, Rev. 3 o 901-5 B-11, Rev. 10 o 901-3 E-13, Rev. 5 o 901-3 E-14, Rev. 7 QCGP 1-1, Rev. 78 QCGP 2-3, Rev. 66 QGA 100, Rev. 9 QGA 200, Rev. 9 QGA 500-1, Rev. 13 QCOA 0201-01, Rev. 22 QCOA 0700-03, Rev. 8 QCOA 0202-02, Rev. 13 QCOA 0203-01, Rev. 12 QCOA 0400-01, Rev. 20 QCOP 0202-03, Rev. 18 QCOP 1600-13, Rev. 22 QCOS 1000-09, Rev. 19 Quad Cities                       NRC EXAM                           Scenario 3 SHIFT TURNOVER INFORMATION
 
Quad Cities NRC EXAM Scenario 3 LIST OF POTENTIAL PROCEDURES Annunciator Procedures o
901-3 A-16, Rev. 11 o
901-5 D-13, Rev. 9 o
901-5 A-6, Rev. 8 o
901-5 C-3, Rev. 11 o
901-5 H-1, Rev. 3 o
901-5 B-11, Rev. 10 o
901-3 E-13, Rev. 5 o
901-3 E-14, Rev. 7 QCGP 1-1, Rev. 78 QCGP 2-3, Rev. 66 QGA 100, Rev. 9 QGA 200, Rev. 9 QGA 500-1, Rev. 13 QCOA 0201-01, Rev. 22 QCOA 0700-03, Rev. 8 QCOA 0202-02, Rev. 13 QCOA 0203-01, Rev. 12 QCOA 0400-01, Rev. 20 QCOP 0202-03, Rev. 18 QCOP 1600-13, Rev. 22 QCOS 1000-09, Rev. 19  
 
Quad Cities NRC EXAM Scenario 3 SHIFT TURNOVER INFORMATION
: 1. Plant Conditions:
: 1. Plant Conditions:
a.) Unit 1 is at approximately 34% power starting up from a weekend outage.
a.) Unit 1 is at approximately 34% power starting up from a weekend outage.
b.) Unit 2 is at rated power.
b.) Unit 2 is at rated power.
c.) Technical Specification limitations:
c.) Technical Specification limitations:
(1)   Unit 1:
(1) Unit 1:
TS 3.6.1.3, Condition A, for the MO 1-1001-26B PCI Valve inoperable.
TS 3.6.1.3, Condition A, for the MO 1-1001-26B PCI Valve inoperable.
Day 1/7, TLCO 3.6.a, Condition A, One Drywell Spray Subsystem Inoperable (2)   Unit 2: None d.) On Line Risk is Green 2.) Significant problems/abnormalities:
Day 1/7, TLCO 3.6.a, Condition A, One Drywell Spray Subsystem Inoperable (2) Unit 2: None d.) On Line Risk is Green 2.) Significant problems/abnormalities:
a.) The MO 1-1001-26B, INBD DW SPRAY ISOL VLV, is Out-Of-Service for a limitorque replacement after the valve failed to stroke during performance of QCOS 1000-09.
a.) The MO 1-1001-26B, INBD DW SPRAY ISOL VLV, is Out-Of-Service for a limitorque replacement after the valve failed to stroke during performance of QCOS 1000-09.
b.) APRM 5 is bypassed due to erratic indications. Instrument Maintenance is preparing a troubleshooting package.
b.) APRM 5 is bypassed due to erratic indications. Instrument Maintenance is preparing a troubleshooting package.
3.) Evolutions/maintenance for the oncoming shift:
3.) Evolutions/maintenance for the oncoming shift:
a.) Complete QCOS 1000-09, RHR Power Operated Valve Test, step 14 only.
a.) Complete QCOS 1000-09, RHR Power Operated Valve Test, step 14 only.
(Partial for RHR B Containment Cooling Valves) b.) Continue the start-up per the REMA and QCGP 1-1, step F.9.v.
(Partial for RHR B Containment Cooling Valves) b.) Continue the start-up per the REMA and QCGP 1-1, step F.9.v.  
Quad Cities                         NRC EXAM                             Scenario 3 Appendix D                       Required Operator Actions                     Form ES-D-2 Quad Cities         Scenario No.: 3         Event No.: 1                       Page 1 of 1 NOTE:
 
Quad Cities NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 1 Page 1 of 1 NOTE:
Event
Event


== Description:==
== Description:==
QCOS 1000-09, RHR Power Operated Valve Test for the B Loop Containment Cooling Valves ONLY.
QCOS 1000-09, RHR Power Operated Valve Test for the B Loop Containment Cooling Valves ONLY.
Time   Position     Applicants Actions or Behavior SRO       Authorizes performance of QCOS 1000-09, RHR Power Operated Valve Test, Step 14 for the RHR B Loop Containment Cooling Valves.
Time Position Applicants Actions or Behavior SRO Authorizes performance of QCOS 1000-09, RHR Power Operated Valve Test, Step 14 for the RHR B Loop Containment Cooling Valves.
BOP       Opens and times the MO 1-1001-36B, Torus Test or Spray Valve.
BOP Opens and times the MO 1-1001-36B, Torus Test or Spray Valve.
BOP       Records time and verifies opening time meets IST criteria.
BOP Records time and verifies opening time meets IST criteria.
BOP       Closes and times the MO 1-1001-36B valve.
BOP Closes and times the MO 1-1001-36B valve.
BOP       Records time and verifies closing time meets IST criteria.
BOP Records time and verifies closing time meets IST criteria.
BOP       Opens and times the MO 1-1001-37B, Torus Spray Shutoff Valve.
BOP Opens and times the MO 1-1001-37B, Torus Spray Shutoff Valve.
BOP       Records time and verifies opening time meets IST criteria.
BOP Records time and verifies opening time meets IST criteria.
BOP       Closes and times the MO 1-1001-37B valve.
BOP Closes and times the MO 1-1001-37B valve.
BOP       Records time and verifies closing time meets IST criteria.
BOP Records time and verifies closing time meets IST criteria.
BOP       Opens and times the MO 1-1001-34B, Torus Test or Spray Valve.
BOP Opens and times the MO 1-1001-34B, Torus Test or Spray Valve.
BOP       Records time and verifies opening time meets IST criteria BOP       Closes and times the MO 1-1001-34B valve BOP       Records time and verifies closing time meets IST criteria.
BOP Records time and verifies opening time meets IST criteria BOP Closes and times the MO 1-1001-34B valve BOP Records time and verifies closing time meets IST criteria.
BOP       Returns the surveillance to the Unit Supervisor for independent verification of the B Loop Containment Cooling Valves.
BOP Returns the surveillance to the Unit Supervisor for independent verification of the B Loop Containment Cooling Valves.
Proceed to Event 2 Quad Cities                           NRC EXAM                             Scenario 3 Appendix D                         Required Operator Actions                         Form ES-D-2 Quad Cities           Scenario No.: 3 Event No.: 2                     Page 1 of 1 Event
Proceed to Event 2  
 
Quad Cities NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 2 Page 1 of 1 Event


== Description:==
== Description:==
Normal Power Increase with Reactor Recirculation Pumps Time     Position     Applicants Actions or Behavior SRO       Directs Reactor power increase per REMA and QCGP 1-1.
Normal Power Increase with Reactor Recirculation Pumps Time Position Applicants Actions or Behavior SRO Directs Reactor power increase per REMA and QCGP 1-1.
Raises Recirculation flow by depressing the RAISE pushbutton on the ATC 1-0262-22, MASTER SPEED DEMAND CONTROLLER.
ATC Raises Recirculation flow by depressing the RAISE pushbutton on the 1-0262-22, MASTER SPEED DEMAND CONTROLLER.
Monitors Recirculation pump speeds, Total Core Flow, APRM power, ATC RPV water level, and RPV pressure.
ATC Monitors Recirculation pump speeds, Total Core Flow, APRM power, RPV water level, and RPV pressure.
BOP       Peer checks operation of the 1-0262-22, Master Controller.
BOP Peer checks operation of the 1-0262-22, Master Controller.
ATC       Refers to QCGP 3-1 when reactor power is greater than 35%.
ATC Refers to QCGP 3-1 when reactor power is greater than 35%.
Adjusts Load Set to approximately 10% above Main Generator Load ATC/BOP per QCGP 3-1 Attachment D.
ATC/BOP Adjusts Load Set to approximately 10% above Main Generator Load per QCGP 3-1 Attachment D.
ATC       Verifies annunciator 901-5 H-4 resets when reactor power is > 38.5%.
ATC Verifies annunciator 901-5 H-4 resets when reactor power is > 38.5%.
Monitors Condensate Demin differential pressure (<30 psid) and ATC      Condensate Demin flows (<3000 gpm). Places additional Demineralizers in service as necessary.
ATC Monitors Condensate Demin differential pressure (<30 psid) and Condensate Demin flows (<3000 gpm). Places additional Demineralizers in service as necessary.
SIM OP ROLE PLAY: If requested as EO place additional Demineralizers in service using the commands irf fw02r through fw08r.
SIM OP ROLE PLAY: If requested as EO place additional Demineralizers in service using the commands irf fw02r through fw08r.
NOTE: After the required power change has been completed, proceed to Event 3.
NOTE: After the required power change has been completed, proceed to Event 3.  
Quad Cities                           NRC EXAM                               Scenario 3 Appendix D                         Required Operator Actions                         Form ES-D-2 Quad Cities           Scenario No.: 3 Event No.: 3                       Page 1 of 1 Event
 
Quad Cities NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 3 Page 1 of 1 Event


== Description:==
== Description:==
Reactor Recirculation Pump Master Controller Fails High Time     Position     Applicants Actions or Behavior SIMOP: At the evaluators instruction, fail the Reactor Recirculation Master Controller RAISE pushbutton with the following command: ior difc10262222 raise ATC       Reports APRM power, total core flow, and Reactor Recirculation pump speeds increasing.
Reactor Recirculation Pump Master Controller Fails High Time Position Applicants Actions or Behavior SIMOP: At the evaluators instruction, fail the Reactor Recirculation Master Controller RAISE pushbutton with the following command: ior difc10262222 raise ATC Reports APRM power, total core flow, and Reactor Recirculation pump speeds increasing.
SRO       Directs actions of QCOA 0202-02 and QCOP 0202-03.
SRO Directs actions of QCOA 0202-02 and QCOP 0202-03.
ATC       Performs one of the following to terminate the power increase:
ATC Performs one of the following to terminate the power increase:
* Place the 1-0262-25A and 1-262-25B Loop A/B SPEED CONTROLLERS in individual Manual mode.
Place the 1-0262-25A and 1-262-25B Loop A/B SPEED CONTROLLERS in individual Manual mode.
* Depress the LOWER pushbutton on the 1-0262-22 Master Speed Demand Controller.
Depress the LOWER pushbutton on the 1-0262-22 Master Speed Demand Controller.
* Lock-up both Recirc MG sets by placing the Scoop Tube Power Reset switches to the LOCKUP position.
Lock-up both Recirc MG sets by placing the Scoop Tube Power Reset switches to the LOCKUP position.
ATC       Contacts Instrument Maintenance to investigate cause of the Master Controller failure.
ATC Contacts Instrument Maintenance to investigate cause of the Master Controller failure.
ATC/BOP     Adjusts Load Set if necessary SRO       Directs actions of QCOA 0400-01, Reactivity Addition.
ATC/BOP Adjusts Load Set if necessary SRO Directs actions of QCOA 0400-01, Reactivity Addition.
ATC       Monitors LRPM/APRM levels and SRM period indications for signs off core instabilities.
ATC Monitors LRPM/APRM levels and SRM period indications for signs off core instabilities.
ATC/BOP     Verify Flow Control Line is < 100%.
ATC/BOP Verify Flow Control Line is < 100%.
SIM OP ROLE PLAY: If contacted as QNE acknowledge the report of the Master Controller failure and state you will verify compliance with thermal limits.
SIM OP ROLE PLAY: If contacted as QNE acknowledge the report of the Master Controller failure and state you will verify compliance with thermal limits.
Proceed to Event 4 Quad Cities                         NRC EXAM                             Scenario 3 Appendix D                       Required Operator Actions                         Form ES-D-2 Quad Cities           Scenario No.: 3 Event No.: 4                     Page 1 of 1 Event
Proceed to Event 4  
 
Quad Cities NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 4 Page 1 of 1 Event


== Description:==
== Description:==
APRM 6 Upscale With No 1/2 Scram Time     Position     Applicants Actions or Behavior SIM OP: Fail APRM 6 upscale HI-HI: imf nm08f 100 Acknowledges annunciator 901-5 D-13, APRM HI-HI OR INOP and ATC reports APRM 6 indicates HI-HI and RPS B failed to scram.
APRM 6 Upscale With No 1/2 Scram Time Position Applicants Actions or Behavior SIM OP: Fail APRM 6 upscale HI-HI: imf nm08f 100 ATC Acknowledges annunciator 901-5 D-13, APRM HI-HI OR INOP and reports APRM 6 indicates HI-HI and RPS B failed to scram.
ATC     Manually inserts a 1/2 scram in RPS B.
ATC Manually inserts a 1/2 scram in RPS B.
Refers to QCOA 0700-03 and directs crew to hold Reactor power SRO constant.
SRO Refers to QCOA 0700-03 and directs crew to hold Reactor power constant.
BOP       Verifies APRM 6 indicates HI-HI in the 901-37 panel.
BOP Verifies APRM 6 indicates HI-HI in the 901-37 panel.
ATC     Refers to the following annunciator procedures and reports to the Unit Supervisor that all are expected for the condition:
ATC Refers to the following annunciator procedures and reports to the Unit Supervisor that all are expected for the condition:
* 901-5 A-6, APRM Upscale High
901-5 A-6, APRM Upscale High 901-5 C-3, Rod Out Block 901-5 H-1, OPRM Trouble/Inop 901-5 B-11, Channel A/B Neutron Monitor ATC/BOP Contacts Instrument Maintenance to troubleshoot APRM 4.
* 901-5 C-3, Rod Out Block
SRO Enters TS 3.3.1.1 Condition A, APRM inoperable. Verifies minimum number of APRMs (4) per TRM 3.3.a are operable.
* 901-5 H-1, OPRM Trouble/Inop
Proceed to Event 5  
* 901-5 B-11, Channel A/B Neutron Monitor ATC/BOP     Contacts Instrument Maintenance to troubleshoot APRM 4.
 
SRO       Enters TS 3.3.1.1 Condition A, APRM inoperable. Verifies minimum number of APRMs (4) per TRM 3.3.a are operable.
Quad Cities NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 5 Page 1 of 1 Event
Proceed to Event 5 Quad Cities                           NRC EXAM                             Scenario 3 Appendix D                         Required Operator Actions                         Form ES-D-2 Quad Cities           Scenario No.: 3 Event No.: 5                     Page 1 of 1 Event


== Description:==
== Description:==
Spurious ERV Actuation Time     Position     Applicants Actions or Behavior SIM OP: Fail the 1-203-3D Relief Valve open: imf ad01d 0 BOP       Acknowledges annunciator 901-3 E-13, Elect Relief Valves 3C/3D/3E Open and reports the D Relief Valve indicates open.
Spurious ERV Actuation Time Position Applicants Actions or Behavior SIM OP: Fail the 1-203-3D Relief Valve open: imf ad01d 0 BOP Acknowledges annunciator 901-3 E-13, Elect Relief Valves 3C/3D/3E Open and reports the D Relief Valve indicates open.
ATC       Reports RPV water level and pressure are stable and a 2 MW(e) decrease.
ATC Reports RPV water level and pressure are stable and a 2 MW(e) decrease.
SRO       Directs actions of QCOA 0203-01.
CT1 SRO Directs actions of QCOA 0203-01.
CT1 BOP       Places the D Relief Valve key switch to the OFF position.
CT1 BOP Places the D Relief Valve key switch to the OFF position.
CT1 BOP       Verifies D Relief Valve closure by the following:
BOP Verifies D Relief Valve closure by the following:
* At the 901-21 panel, places the TEST/RESET toggle switch to RESET and verifies the green close light is lit on the Acoustic Monitor.
At the 901-21 panel, places the TEST/RESET toggle switch to RESET and verifies the green close light is lit on the Acoustic Monitor.
* Decreasing tailpipe temperature on the 1-260-20, VLV LEAK AND CTMT AIR TEMP, Recorder.
Decreasing tailpipe temperature on the 1-260-20, VLV LEAK AND CTMT AIR TEMP, Recorder.
* Increase in Main Generator MW(e) output.
Increase in Main Generator MW(e) output.
* Annunciator 901-3 E-13 and 901-3 E-14 clear.
Annunciator 901-3 E-13 and 901-3 E-14 clear.
SRO       Enters TS 3.5.1 Condition G, One ADS Valve Inoperable, and TS 3.3.6.3 Condition A, Inoperable Relief Valve.
SRO Enters TS 3.5.1 Condition G, One ADS Valve Inoperable, and TS 3.3.6.3 Condition A, Inoperable Relief Valve.
Proceed to Event 6 Quad Cities                           NRC EXAM                             Scenario 3 Appendix D                         Required Operator Actions                     Form ES-D-2 Quad Cities           Scenario No.: 3 Event No.: 6                 Page 1 of 1 Event
Proceed to Event 6  
 
Quad Cities NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 6 Page 1 of 1 Event


== Description:==
== Description:==
1A TBCCW Pump Degrades/Failure of Standby to Autostart Time     Position     Applicants Actions or Behavior SIM OP: Degrade the 1A TBCCW pump 100% over 10 minutes: imf sw12a 100 10:
1A TBCCW Pump Degrades/Failure of Standby to Autostart Time Position Applicants Actions or Behavior SIM OP: Degrade the 1A TBCCW pump 100% over 10 minutes: imf sw12a 100 10:
BOP       Acknowledges annunciator 912-1 D-2, Turb Bldg Cooling Water Low Pressure and reports the U-1 TBCCW Discharge Header pressure is 35 psig and lowering.
BOP Acknowledges annunciator 912-1 D-2, Turb Bldg Cooling Water Low Pressure and reports the U-1 TBCCW Discharge Header pressure is 35 psig and lowering.
BOP       Starts the 1B TBCCW pump and reports TBCCW Discharge Header pressure is stable at 40 psig.
BOP Starts the 1B TBCCW pump and reports TBCCW Discharge Header pressure is stable at 40 psig.
BOP       Dispatches EO to the 1A TBCCW pump to investigate.
BOP Dispatches EO to the 1A TBCCW pump to investigate.
SIM OP ROLE PLAY: As the EO dispatched to the 1A TBCCW pump, wait 2 minutes and report the 1A TBCCW pump is running hot and sounding noisy. You recommend securing the pump. No leaks were found. If asked, report the 1B TBCCW pump is operating properly.
SIM OP ROLE PLAY: As the EO dispatched to the 1A TBCCW pump, wait 2 minutes and report the 1A TBCCW pump is running hot and sounding noisy. You recommend securing the pump. No leaks were found. If asked, report the 1B TBCCW pump is operating properly.
BOP       Secures the 1A TBCCW pump and verifies TBCCW discharge header pressure is stable at approximately 40 psig.
BOP Secures the 1A TBCCW pump and verifies TBCCW discharge header pressure is stable at approximately 40 psig.
Proceed to Event 7 Quad Cities                           NRC EXAM                             Scenario 3 Appendix D                         Required Operator Actions                       Form ES-D-2 Quad Cities           Scenario No.: 3 Event No.: 7                   Page 1 of 2 Event
Proceed to Event 7  
 
Quad Cities NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 7 Page 1 of 2 Event


== Description:==
== Description:==
Main Steam Line Break Inside Containment Time     Position     Applicants Actions or Behavior SIM OP: Insert an A MSL break inside containment of .3% over 3 minutes:
Main Steam Line Break Inside Containment Time Position Applicants Actions or Behavior SIM OP: Insert an A MSL break inside containment of.3% over 3 minutes:
imf ms05a .3 3:
imf ms05a.3 3:
BOP       Acknowledges annunciator 901-3 A-16, Pri Cnmt High Pressure and reports Drywell pressure at 1.55 psig and rising.
BOP Acknowledges annunciator 901-3 A-16, Pri Cnmt High Pressure and reports Drywell pressure at 1.55 psig and rising.
SRO       Sets scram criteria on high Drywell pressure and directs actions of QCOA 0201-01.
SRO Sets scram criteria on high Drywell pressure and directs actions of QCOA 0201-01.
ATC/BOP     Investigates cause of high Drywell pressure.
ATC/BOP Investigates cause of high Drywell pressure.
ATC/BOP     Notifies Radiation Protection and evacuate the Reactor Building.
ATC/BOP Notifies Radiation Protection and evacuate the Reactor Building.
BOP       Starts all available Drywell Coolers.
BOP Starts all available Drywell Coolers.
ATC       Inserts a manual reactor scram prior to exceeding 2.5 psig Drywell pressure.
ATC Inserts a manual reactor scram prior to exceeding 2.5 psig Drywell pressure.
SRO       Enters QGA 100 on low RPV water level and high Drywell pressure and directs actions.
SRO Enters QGA 100 on low RPV water level and high Drywell pressure and directs actions.
ATC       Performs QCGP 2-3 Attachment A.
ATC Performs QCGP 2-3 Attachment A.
ATC/BOP     Verifies auto actions and isolations for 0 RPV water level and 2.5 psig Drywell pressure.
ATC/BOP Verifies auto actions and isolations for 0 RPV water level and 2.5 psig Drywell pressure.
ATC/BOP     Reports MSIVs have spuriously isolated.
ATC/BOP Reports MSIVs have spuriously isolated.
ATC       Controls RPV water level between 0 and 48 inches using the Condensate and Feedwater system.
ATC Controls RPV water level between 0 and 48 inches using the Condensate and Feedwater system.
BOP       Reports RPV pressure less than 1060 psig.
BOP Reports RPV pressure less than 1060 psig.
SRO       Directs RPV cooldown at < 100&deg;F/hr using ADS valves.
SRO Directs RPV cooldown at < 100&deg;F/hr using ADS valves.
BOP       Initiates RPV cooldown using B and C ADS valves.
BOP Initiates RPV cooldown using B and C ADS valves.  
Quad Cities                           NRC EXAM                           Scenario 3 Appendix D                         Required Operator Actions                     Form ES-D-2 Quad Cities           Scenario No.: 3 Event No.: 7                 Page 2 of 2 Event
 
Quad Cities NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 7 Page 2 of 2 Event


== Description:==
== Description:==
Main Steam Line Break Inside Containment Time     Position     Applicants Actions or Behavior SRO       Enters QGA 200 on 2.5 psig Drywell pressure and directs actions.
Main Steam Line Break Inside Containment Time Position Applicants Actions or Behavior SRO Enters QGA 200 on 2.5 psig Drywell pressure and directs actions.
BOP       Reports Torus pressure < 5 psig and Torus level < 27 ft.
BOP Reports Torus pressure < 5 psig and Torus level < 27 ft.
BOP       Initiates Torus Sprays per QCOP 1000-30 (Hard Card).
BOP Initiates Torus Sprays per QCOP 1000-30 (Hard Card).
BOP       Initiates Torus Cooling and monitors Torus temperature and level.
BOP Initiates Torus Cooling and monitors Torus temperature and level.
BOP       Starts both Containment Atmospheric Monitors (CAMs) and monitors Drywell/Torus Hydrogen and Oxygen concentrations.
BOP Starts both Containment Atmospheric Monitors (CAMs) and monitors Drywell/Torus Hydrogen and Oxygen concentrations.
BOP       Reports Torus pressure > 5 psig and Torus level < 17 ft.
BOP Reports Torus pressure > 5 psig and Torus level < 17 ft.
SRO       Verifies Drywell temperature and pressure are within the Drywell Spray Initiation Limit (DSIL) Curve.
SRO Verifies Drywell temperature and pressure are within the Drywell Spray Initiation Limit (DSIL) Curve.
SRO       Directs BOP to verify the following:
SRO Directs BOP to verify the following:
* Both Reactor Recirc pumps tripped.
Both Reactor Recirc pumps tripped.
* All Drywell Cooling Fans tripped.
All Drywell Cooling Fans tripped.
SRO       Directs BOP to initiate Drywell Sprays on A RHR Loop.
SRO Directs BOP to initiate Drywell Sprays on A RHR Loop.
BOP       Reports the MO 1-1001-23A valve will not open.
BOP Reports the MO 1-1001-23A valve will not open.
BOP       Dispatches EO to MCC 18-1B to check the breaker and/or manually open the MO 1-1001-23A valve.
BOP Dispatches EO to MCC 18-1B to check the breaker and/or manually open the MO 1-1001-23A valve.
SIM OP ROLE PLAY: As EO if dispatched to inspect the breaker, call back and report there is an acrid smell but no fire.
SIM OP ROLE PLAY: As EO if dispatched to inspect the breaker, call back and report there is an acrid smell but no fire.
SIM OP ROLE PLAY: If directed to manually open the MO 1-1001-23A valve, open the breaker using the command: irf rh19ar open. Then wait 5 minutes and report, the valve is bound shut and you are unable to open it.
SIM OP ROLE PLAY: If directed to manually open the MO 1-1001-23A valve, open the breaker using the command: irf rh19ar open. Then wait 5 minutes and report, the valve is bound shut and you are unable to open it.
SRO       Directs BOP to re-establish RBCCW and Drywell Coolers.
SRO Directs BOP to re-establish RBCCW and Drywell Coolers.
BOP       Restarts RBCCW and Drywell Coolers per QCOP 5750-19 (Hard Card).
BOP Restarts RBCCW and Drywell Coolers per QCOP 5750-19 (Hard Card).
ATC/BOP     Monitors Containment parameters.
ATC/BOP Monitors Containment parameters.
Proceed to Event 8 Quad Cities                           NRC EXAM                           Scenario 3 Quad Cities           Scenario No.: 3 Event No.: 8                   Page 1 of 1 Event
Proceed to Event 8  
 
Quad Cities NRC EXAM Scenario 3 Quad Cities Scenario No.: 3 Event No.: 8 Page 1 of 1 Event


== Description:==
== Description:==
Blowdown Time     Position     Applicants Actions or Behavior BOP       Reports Torus pressure 13 psig and rising.
Blowdown Time Position Applicants Actions or Behavior BOP Reports Torus pressure 13 psig and rising.
SRO       Anticipates Blowdown and directs actions of QCOP 0250-01 to re-open the MSIVs.
SRO Anticipates Blowdown and directs actions of QCOP 0250-01 to re-open the MSIVs.
BOP       Attempts to reset the Group I isolation per QCOP 0250-01 and reports it will NOT reset.
BOP Attempts to reset the Group I isolation per QCOP 0250-01 and reports it will NOT reset.
SRO       Monitors Pressure Suppression Pressure (PSP) Curve and determines containment parameters cannot be maintained below limits.
SRO Monitors Pressure Suppression Pressure (PSP) Curve and determines containment parameters cannot be maintained below limits.
SRO       Enters QGA 500-1, RPV Blowdown, and directs actions.
SRO Enters QGA 500-1, RPV Blowdown, and directs actions.
ATC/BOP       Verifies all rods in.
ATC/BOP Verifies all rods in.
BOP       Reports Drywell pressure above 2.5 psig.
BOP Reports Drywell pressure above 2.5 psig.
SRO       Directs BOP to prevent Core Spray and LPCI injection NOT needed for core cooling.
SRO Directs BOP to prevent Core Spray and LPCI injection NOT needed for core cooling.
BOP       Reports Torus level > 5 ft.
BOP Reports Torus level > 5 ft.
SRO       Directs BOP to open all 5 ADS valves and leave switches in MANUAL.
SRO Directs BOP to open all 5 ADS valves and leave switches in MANUAL.
BOP       Opens all 5 ADS valves, leaves switches in MANUAL.
BOP Opens all 5 ADS valves, leaves switches in MANUAL.
BOP       Verifies all 5 ADS valves are open by acoustic monitor indication on the 901-21 panel and reports to the Unit Supervisor.
BOP Verifies all 5 ADS valves are open by acoustic monitor indication on the 901-21 panel and reports to the Unit Supervisor.
ATC/BOP       Monitors RPV depressurization.
ATC/BOP Monitors RPV depressurization.
Proceed to Event 9 and 10 Quad Cities                             NRC EXAM                             Scenario 3 Appendix D                           Required Operator Actions                       Form ES-D-2 Quad Cities             Scenario No.: 3 Event No.: 9 & 10                       Page 1 of 2 Event
Proceed to Event 9 and 10  
 
Quad Cities NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 9 & 10 Page 1 of 2 Event


== Description:==
== Description:==
ADS Tailpipe Rupture and Venting of Containment to Stay Below PCPL.
ADS Tailpipe Rupture and Venting of Containment to Stay Below PCPL.
SIM OP: When the A ADS valve is opened, verify trigger 4 goes true rupturing the tailpipe.
SIM OP: When the A ADS valve is opened, verify trigger 4 goes true rupturing the tailpipe.
BOP         Reports Drywell and Torus pressure rising rapidly.
BOP Reports Drywell and Torus pressure rising rapidly.
BOP         Reports Torus AND Drywell pressure are > 25 psig.
BOP Reports Torus AND Drywell pressure are > 25 psig.
SRO         Directs BOP to vent the Torus per QCOP 1000-13, and also states it is OK to exceed release rates.
SRO Directs BOP to vent the Torus per QCOP 1000-13, and also states it is OK to exceed release rates.
BOP         Starts all available Turbine Building and Radwaste Exhaust Fans.
BOP Starts all available Turbine Building and Radwaste Exhaust Fans.
BOP         Verifies the following valves are closed:
BOP Verifies the following valves are closed:
* AO 1-1601-23
AO 1-1601-23 AO 1-1601-24 AO 1-1601-60 AO 1-1601-61 AO 1-1601-62 AO 1-1601-63 BOP Evacuates the Reactor AND Turbine Building.
* AO 1-1601-24
BOP Places MASTER VENT MODE switch in the APCV position.
* AO 1-1601-60
BOP Verifies the AO 1-1699-7 valve closed.
* AO 1-1601-61
BOP Places the AO 1-1601-24, CIS OVERRIDE, switch in OVERRIDE position for 1 second.
* AO 1-1601-62
BOP Simultaneously places the AO 1-1601-23 AND AO 1-1601-60 CIS OVERRIDE switches to the OVERRIDE position and holds them for 1 second.
* AO 1-1601-63 BOP         Evacuates the Reactor AND Turbine Building.
BOP Opens the AO 1-1601-24.
BOP       Places MASTER VENT MODE switch in the APCV position.
SRO Directs BOP to vent to maintain Torus pressure < 53 psig.  
BOP         Verifies the AO 1-1699-7 valve closed.
 
BOP         Places the AO 1-1601-24, CIS OVERRIDE, switch in OVERRIDE position for 1 second.
Quad Cities NRC EXAM Scenario 3 Quad Cities Scenario No.: 3 Event No.: 9 & 10 Page 2 of 2 Event
BOP         Simultaneously places the AO 1-1601-23 AND AO 1-1601-60 CIS OVERRIDE switches to the OVERRIDE position and holds them for 1 second.
BOP         Opens the AO 1-1601-24.
Directs BOP to vent to maintain Torus pressure < 53 psig.
SRO Quad Cities                           NRC EXAM                               Scenario 3 Quad Cities           Scenario No.: 3 Event No.: 9 & 10                         Page 2 of 2 Event


== Description:==
== Description:==
ADS Tailpipe Rupture and Venting of Containment to Stay Below PCPL.
ADS Tailpipe Rupture and Venting of Containment to Stay Below PCPL.
Time     Position     Applicants Actions or Behavior BOP       Verifies Torus level is < 27 ft and opens AO 1-1601-60.
Time Position Applicants Actions or Behavior BOP Verifies Torus level is < 27 ft and opens AO 1-1601-60.
Initiates venting by cycling the AO 1-1699-6 and monitoring Drywell BOP and Torus pressure.
BOP Initiates venting by cycling the AO 1-1699-6 and monitoring Drywell and Torus pressure.
Monitors the 1/2-1740-19, CHIMNEY GAS ACTIVITY, on the 912-4 BOP panel.
BOP Monitors the 1/2-1740-19, CHIMNEY GAS ACTIVITY, on the 912-4 panel.
End of Scenario Quad Cities                               NRC EXAM                                 Scenario 4 Appendix D                                 Scenario Outline                               Form ES-D-1 Facility: Quad Cities   Scenario No.: NRC Scenario     4   Op-Test No.: ILT 08-1 _
End of Scenario  
Examiners: ____________________________ Operators:                 _____________________________
 
Quad Cities NRC EXAM Scenario 4 Appendix D Scenario Outline Form ES-D-1 Facility: Quad Cities Scenario No.: NRC Scenario 4 Op-Test No.: ILT 08-1 _
Examiners: ____________________________ Operators:
Initial Conditions:
Initial Conditions:
100% Power Turnover: Continue to maintain full load per QCGP 3-1 and the REMA.
100% Power Turnover: Continue to maintain full load per QCGP 3-1 and the REMA.
Event         Malf. No.           Event                                 Event No.                              Type*                             Description 1     RD07A                     ATC       CRD Pump trip IC 2     RD03R                     ATC       Rod drift in one notch after CRD Pump Restart IC 3     DIHS13401A               ATC       Emergency Power Reduction for loss of FW Heater String DIHS13403                  R      due to 1A1 Heater Level Switch failure, (maintain Reactor Power < 105% and Flow Control Line < 100%)
Event No.
4     RP04A/RD05R             Crew       A RPS Trip w 5 rod scram /Manual Scram / Fuel damage CR01                        M 5     RD14A                   Crew       Malfunction After EOP: SDV Rupture M
Malf. No.
6      DIHS10590303             Crew       Scram Reset Switch failure M
Event Type*
7      None                     Crew       Contingency: Blowdown due to 2 areas > Max Safe M      Rads
Event Description 1
*        (N)ormal, (R)eactivity, (I)nstrument, (C)omponent,   (M)ajor ES-301-4 Quantitative attributes:                         ES-301-5 Quantitative attributes:
RD07A ATC IC CRD Pump trip 2
Total Malfunctions (5-8): 7                               BOP Normal: None Malfunction(s) after EOP (1-2): E5, E6                   ATC Reactivity (1 per set): E3 Abnormal Events (2-4): E1, E2, E3                         BOP I/C (4 per set): None Major Transient(s) /E-Plan entry (1-2): E4               ATC I/C (4 per set): E1, E2 EOPs (1-2): QGA 300 & 100                                 SRO-I I/C (4 /set inc 2 as ATC): E1, E2 EOP Contingencies (0-2): QGA 500-1                       SRO Tech Spec (2 per set): None Critical Tasks (2-3): 2                                   ALL Major Transients (2 per set): E4 Quad Cities                             NRC EXAM                           Scenario 4
RD03R ATC IC Rod drift in one notch after CRD Pump Restart 3
DIHS13401A DIHS13403 ATC R
Emergency Power Reduction for loss of FW Heater String due to 1A1 Heater Level Switch failure, (maintain Reactor Power < 105% and Flow Control Line < 100%)
4 RP04A/RD05R CR01 Crew M
A RPS Trip w 5 rod scram /Manual Scram / Fuel damage 5
RD14A Crew M
Malfunction After EOP: SDV Rupture 6
DIHS10590303 Crew M
Scram Reset Switch failure 7
None Crew M
Contingency: Blowdown due to 2 areas > Max Safe Rads (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor ES-301-5 Quantitative attributes:
BOP Normal: None ATC Reactivity (1 per set): E3 BOP I/C (4 per set): None ATC I/C (4 per set): E1, E2 SRO-I I/C (4 /set inc 2 as ATC): E1, E2 SRO Tech Spec (2 per set): None ALL Major Transients (2 per set): E4 ES-301-4 Quantitative attributes:
Total Malfunctions (5-8): 7 Malfunction(s) after EOP (1-2): E5, E6 Abnormal Events (2-4): E1, E2, E3 Major Transient(s) /E-Plan entry (1-2): E4 EOPs (1-2): QGA 300 & 100 EOP Contingencies (0-2): QGA 500-1 Critical Tasks (2-3): 2  
 
Quad Cities NRC EXAM Scenario 4  


==SUMMARY==
==SUMMARY==
* The scenario starts at 100% power, steady sate operation.
The scenario starts at 100% power, steady sate operation.
* The A CRD Pump trips and the crew is able to restart the B CRD Pump.
The A CRD Pump trips and the crew is able to restart the B CRD Pump.
* When the B CRD Pump is started, control rod L-5 drifts in and settles at position 46. The SRO and ATC take actions to notify the QNE and return control rod L-5 to position 48 per QCOA 0300-04, Mispositioned Control Rod.
When the B CRD Pump is started, control rod L-5 drifts in and settles at position 46. The SRO and ATC take actions to notify the QNE and return control rod L-5 to position 48 per QCOA 0300-04, Mispositioned Control Rod.
* The 1A Feedwater Heater level switch fails. The Crew responds per QCOA 3500-01, Feedwater Temperature Reduction with the Main Turbine Online, and QCOA 0400-01, Reactivity Addition, by performing an Emergency Power Reduction.
The 1A Feedwater Heater level switch fails. The Crew responds per QCOA 3500-01, Feedwater Temperature Reduction with the Main Turbine Online, and QCOA 0400-01, Reactivity Addition, by performing an Emergency Power Reduction.
* When the plant is stable, the A RPS MG Set will trip, which results in 5 rods scramming.
When the plant is stable, the A RPS MG Set will trip, which results in 5 rods scramming.
The ATC Operator should manually scram the reactor in accordance with immediate actions of QCOA 0300-11, Control Rod Drift.
The ATC Operator should manually scram the reactor in accordance with immediate actions of QCOA 0300-11, Control Rod Drift.
* All control rods fully insert during the scram, but fuel damage occurs and the North Scram Discharge Volume ruptures.
All control rods fully insert during the scram, but fuel damage occurs and the North Scram Discharge Volume ruptures.
* A RPS Bus can be restored from the Alternate source but the Scram Reset Switch fails to function, which prevents isolation of the reactor from the Scram Discharge Volume. The crew performs QGA 300, Secondary Containment Control, in response.
A RPS Bus can be restored from the Alternate source but the Scram Reset Switch fails to function, which prevents isolation of the reactor from the Scram Discharge Volume. The crew performs QGA 300, Secondary Containment Control, in response.
* When two areas exceed their Max Safe Radiation Levels, the crew will perform RPV Blowdown per QGP 500-1.
When two areas exceed their Max Safe Radiation Levels, the crew will perform RPV Blowdown per QGP 500-1.
CRITICAL TASKS:
CRITICAL TASKS:
Critical Task #1: Given an operating reactor plant and a loss of Feedwater heating, perform actions to control reactor power and reclose the MO 1-3403, LP HTR STRING BYP VLV, to terminate the reactivity addition.
Critical Task #1: Given an operating reactor plant and a loss of Feedwater heating, perform actions to control reactor power and reclose the MO 1-3403, LP HTR STRING BYP VLV, to terminate the reactivity addition.
Critical Task #2: Given an operating reactor plant with a primary system discharging into the reactor building and the discharge cannot be isolated, INITIATE an emergency depressurization when two or more areas exceed the maximum safe operating levels of the same parameter (radiation, temperature, or water level). (BWROG SC-1.2)
Critical Task #2: Given an operating reactor plant with a primary system discharging into the reactor building and the discharge cannot be isolated, INITIATE an emergency depressurization when two or more areas exceed the maximum safe operating levels of the same parameter (radiation, temperature, or water level). (BWROG SC-1.2)  
Quad Cities                         NRC EXAM                       Scenario 4 Simulator setup:
 
Quad Cities NRC EXAM Scenario 4 Simulator setup:
: 1. Reset to IC 21.
: 1. Reset to IC 21.
(Commands to be utilized DURING the scenario are contained in the CAEP file NRC Scenario #4.cae)
(Commands to be utilized DURING the scenario are contained in the CAEP file NRC Scenario #4.cae)
: 2. Insert Commands for setup:
: 2. Insert Commands for setup:
* ior dihs10590303 norm
ior dihs10590303 norm trgset 1 rdv10305117.LT.0.99 imf rd05r3423(1) imf rd05r3819(1) imf rd05r4223(1) imf rd05r3419(1) imf rd05r4219(1) trgset 2 zdihs10590300(1) imf cr01(2) 100 10:
* trgset 1 rdv10305117.LT.0.99
imf rd14a(2) 50 10:
* imf rd05r3423(1)
trgset 3 zdihs103023b(4) imf rd03r4219 (3 :30) trgset 4 rdsdrpos(136).le.720 trg 4 dmf rd03r4219
* imf rd05r3819(1)
* imf rd05r4223(1)
* imf rd05r3419(1)
* imf rd05r4219(1)
* trgset 2 zdihs10590300(1)
* imf cr01(2) 100 10:
* imf rd14a(2) 50 10:
* trgset 3 zdihs103023b(4)
* imf rd03r4219 (3 :30)
* trgset 4 rdsdrpos(136).le.720
* trg 4 dmf rd03r4219
: 3. Verify the flowing commands for scenario performance:
: 3. Verify the flowing commands for scenario performance:
* imf rd07a
imf rd07a imf ser1405 on ior dihs13401a close ior dihs13403 open dmf ser1405 on dor dihs13401a close dor dihs13403 open imf rp04a mrf rp02r alt imf rm0113 40 10:
* imf ser1405 on
imf rm0112 40 10:
* ior dihs13401a close
imf rm0111 40 10:
* ior dihs13403 open
imf rm0108 40 12:
* dmf ser1405 on
imf rm0109 40 12:
* dor dihs13401a close
imf rm0106 40 15:
* dor dihs13403 open
* imf rp04a
* mrf rp02r alt
* imf rm0113 40 10:
* imf rm0112 40 10:
* imf rm0111 40 10:
* imf rm0108 40 12:
* imf rm0109 40 12:
* imf rm0106 40 15:
: 4. Provide the crew with a Holding Load REMA.
: 4. Provide the crew with a Holding Load REMA.
: 5. Ensure procedures are erased and put away including QGAs.
: 5. Ensure procedures are erased and put away including QGAs.
: 6. Advance recorders.
: 6. Advance recorders.
: 7. Clean marked up meter/recorder faces and hard cards.
: 7. Clean marked up meter/recorder faces and hard cards.
: 8. Remove any flags placed by the previous crew.
: 8. Remove any flags placed by the previous crew.  
Quad Cities                   NRC EXAM Scenario 4 LIST OF POTENTIAL PROCEDURES Annunciator Procedures o 901-5 B-2, Rev. 5 o 901-5 F-2, Rev. 5 o 901-6 F-3, Rev. 1 o 901-6 G-3, Rev. 3 QCGP 2-3, Rev. 66 QGA 100, Rev. 9 QGA 300, Rev. 11 QGA 500-1, Rev. 13 QCOA 0300-01, Rev. 16 QCOA 0300-04 Rev. 15 QCOA 0300-11, Rev.20 QCOA 3500-01, Rev. 27 QCOA 0400-01, Rev. 20 QOA 7000-01, Rev. 31 QCOP 3200-05, Rev. 28 Quad Cities                       NRC EXAM                     Scenario 4 CREW TURNOVER
 
Quad Cities NRC EXAM Scenario 4 LIST OF POTENTIAL PROCEDURES Annunciator Procedures o
901-5 B-2, Rev. 5 o
901-5 F-2, Rev. 5 o
901-6 F-3, Rev. 1 o
901-6 G-3, Rev. 3 QCGP 2-3, Rev. 66 QGA 100, Rev. 9 QGA 300, Rev. 11 QGA 500-1, Rev. 13 QCOA 0300-01, Rev. 16 QCOA 0300-04 Rev. 15 QCOA 0300-11, Rev.20 QCOA 3500-01, Rev. 27 QCOA 0400-01, Rev. 20 QOA 7000-01, Rev. 31 QCOP 3200-05, Rev. 28  
 
Quad Cities NRC EXAM Scenario 4 CREW TURNOVER
: 1. Plant Conditions:
: 1. Plant Conditions:
a.) Unit 1 is operating at 100% power.
a.) Unit 1 is operating at 100% power.
Line 822: Line 874:
c.) Technical Specification limitations:
c.) Technical Specification limitations:
(1) Unit 1: None (2) Unit 2: None d.) On Line Risk is Green 2.) Evolutions/maintenance for the oncoming shift:
(1) Unit 1: None (2) Unit 2: None d.) On Line Risk is Green 2.) Evolutions/maintenance for the oncoming shift:
a.) Continue to hold load per QCGP 3-1, Reactor Power Operations. And the REMA.
a.) Continue to hold load per QCGP 3-1, Reactor Power Operations. And the REMA.  
Quad Cities                             NRC EXAM                             Scenario 4 Appendix D                           Required Operator Actions                         Form ES-D-2 Quad Cities           Scenario No.: 4 Event No.: 1 & 2                         Page 1 of 2 NOTE:
 
Quad Cities NRC EXAM Scenario 4 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 4 Event No.: 1 & 2 Page 1 of 2 NOTE:
Event
Event


== Description:==
== Description:==
1A CRD Pump Trip.
1A CRD Pump Trip.
Control Rod drift on 1B CRD pump start Time     Position     Applicants Actions or Behavior SIM OP: Trip the 1A CRD pump: imf rd07a ATC       Acknowledges annunciator 901-5 B-2, CRD PP TRIP, and reports the 1A CRD pump has tripped.
Control Rod drift on 1B CRD pump start Time Position Applicants Actions or Behavior SIM OP: Trip the 1A CRD pump: imf rd07a ATC Acknowledges annunciator 901-5 B-2, CRD PP TRIP, and reports the 1A CRD pump has tripped.
SRO       Sets scram criteria of 2 or more accumulator trouble alarms AND charging water header pressure < 940 psig for 20 minutes.
SRO Sets scram criteria of 2 or more accumulator trouble alarms AND charging water header pressure < 940 psig for 20 minutes.
ATC       Verifies the MO 1-301-2B, 1B PMP DISCH VLV, is closed for the standby pump.
ATC Verifies the MO 1-301-2B, 1B PMP DISCH VLV, is closed for the standby pump.
ATC       Starts the 1B CRD pump and verifies current is < 34 amps on the 1-302-1B.
ATC Starts the 1B CRD pump and verifies current is < 34 amps on the 1-302-1B.
SIM OP NOTE: Verify trigger 3 goes true after the 1B CRD pump is started. This will start control rod L-5 drifting in from position 48. Verify trigger 4 goes true at rod position 45 which deletes the rod drift malfunction causing control rod L-5 to settle at rod position 46.
SIM OP NOTE: Verify trigger 3 goes true after the 1B CRD pump is started. This will start control rod L-5 drifting in from position 48. Verify trigger 4 goes true at rod position 45 which deletes the rod drift malfunction causing control rod L-5 to settle at rod position 46.
ATC       Throttles MO 1-301-2B to maintain 1400-1500 psig discharge pressure.
ATC Throttles MO 1-301-2B to maintain 1400-1500 psig discharge pressure.
ATC       Closes the MO 1-301-2A in the tripped pump.
ATC Closes the MO 1-301-2A in the tripped pump.
ATC       Dispatches EO to verify proper operation of running pump.
ATC Dispatches EO to verify proper operation of running pump.
SIM OP ROLE PLAY: As EO dispatched to the CRD pump, wait 2 minutes and report the 1B CRD pump sounds normal, no leaks, and oil levels are in band. If also requested to check the 1A CRD pump breaker at Bus 13, report the breaker tripped on overcurrent.
SIM OP ROLE PLAY: As EO dispatched to the CRD pump, wait 2 minutes and report the 1B CRD pump sounds normal, no leaks, and oil levels are in band. If also requested to check the 1A CRD pump breaker at Bus 13, report the breaker tripped on overcurrent.
ATC/BOP       Reviews actions of QCOA 0300-01.
ATC/BOP Reviews actions of QCOA 0300-01.
ATC       Acknowledges 901-5 A-3, Rod Drift, and reports control rod L-5 is drifting in.
ATC Acknowledges 901-5 A-3, Rod Drift, and reports control rod L-5 is drifting in.
ATC       Refers to QCAN 901-5 A-3, and QCOA 0300-11, Control Rod Drift.
ATC Refers to QCAN 901-5 A-3, and QCOA 0300-11, Control Rod Drift.  
Quad Cities                           NRC EXAM                           Scenario 4 Quad Cities           Scenario No.: 4 Event No.: 1 & 2                       Page 2 of 2 NOTE:
 
Quad Cities NRC EXAM Scenario 4 Quad Cities Scenario No.: 4 Event No.: 1 & 2 Page 2 of 2 NOTE:
Event
Event


== Description:==
== Description:==
1A CRD Pump Trip.
1A CRD Pump Trip.
Control Rod drift on 1B CRD pump start Time     Position   Applicants Actions or Behavior SRO     Notifies Shift Manager and Qualified Nuclear Engineer of control rod L5 drifting in.
Control Rod drift on 1B CRD pump start Time Position Applicants Actions or Behavior SRO Notifies Shift Manager and Qualified Nuclear Engineer of control rod L5 drifting in.
ATC     Reports control rod L-5 has settled at position 46. Exits QCOA 0300-11 and enters QCOA 0300-04, Mispositioned Control Rod.
ATC Reports control rod L-5 has settled at position 46. Exits QCOA 0300-11 and enters QCOA 0300-04, Mispositioned Control Rod.
SRO     Directs actions of QCOA 0300-04 and directs ATC to withdraw control rod L-5 to position 48.
SRO Directs actions of QCOA 0300-04 and directs ATC to withdraw control rod L-5 to position 48.
SIM OP ROLE PLAY: As the QNE, concur with the action to return control rod L-5 to position 48.
SIM OP ROLE PLAY: As the QNE, concur with the action to return control rod L-5 to position 48.
ATC     Withdraws control rod L-5 to position 48 and performs a coupling check.
ATC Withdraws control rod L-5 to position 48 and performs a coupling check.
SRO     Notifies SOS and Operations Manager.
SRO Notifies SOS and Operations Manager.
Proceed to Event 3 Quad Cities                             NRC EXAM                             Scenario 4 Appendix D                           Required Operator Actions                       Form ES-D-2 Quad Cities           Scenario No.: 4 Event No.: 3                   Page 1 of 2 Event
Proceed to Event 3  
 
Quad Cities NRC EXAM Scenario 4 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 4 Event No.: 3 Page 1 of 2 Event


== Description:==
== Description:==
Emergency Power Reduction for loss of FW Heater String due to 1A1 Heater Level Switch failure.
Emergency Power Reduction for loss of FW Heater String due to 1A1 Heater Level Switch failure.
Time       Position     Applicants Actions or Behavior SIMOP: Insert the following commands to simulate a failure of the 1A1 Heater level switch (1-3541-32A): imf ser1405 on ior dihs13401a close ior dihs13403 open ATC/BOP     Acknowledges annunciator 901-6 G-1, Heater 1A1 Heater High Level, and verifies the following:
Time Position Applicants Actions or Behavior SIMOP: Insert the following commands to simulate a failure of the 1A1 Heater level switch (1-3541-32A): imf ser1405 on ior dihs13401a close ior dihs13403 open ATC/BOP Acknowledges annunciator 901-6 G-1, Heater 1A1 Heater High Level, and verifies the following:
* FCV 1-3101A, 1A1 Emergency Drain Vlv, opens.
FCV 1-3101A, 1A1 Emergency Drain Vlv, opens.
* MO 1-3401A, Line 1 Htr Inlet Isol Vlv, closed.
MO 1-3401A, Line 1 Htr Inlet Isol Vlv, closed.
* MO 1-3402A, Line 1 Htr Outlt Isol Vlv, closed.
MO 1-3402A, Line 1 Htr Outlt Isol Vlv, closed.
* MO 1-3403, LP Htr String Byp Vlv, open Monitors 1A1 Flash Tank level and reports level is low.and dispatches ATC/BOP an EO to investigate.
MO 1-3403, LP Htr String Byp Vlv, open ATC/BOP Monitors 1A1 Flash Tank level and reports level is low.and dispatches an EO to investigate.
SIM OP ROLE PLAY: As EO dispatched to the 1A1 Flash Tank Level Controller, (LIC 1-3541-9A) wait 3 minutes and report that level is downscale and you have contacted Electrical Maintenance to assist in troubleshooting.
SIM OP ROLE PLAY: As EO dispatched to the 1A1 Flash Tank Level Controller, (LIC 1-3541-9A) wait 3 minutes and report that level is downscale and you have contacted Electrical Maintenance to assist in troubleshooting.
Reports increasing Condensate Demin D/P as indicated on the DPR ATC/BOP 1-3340-1, Cond Demin DP, at the 901-6 panel.
ATC/BOP Reports increasing Condensate Demin D/P as indicated on the DPR 1-3340-1, Cond Demin DP, at the 901-6 panel.
Enters and directs actions of QCOA 3500-01 and QCOA 0400-01 and SRO      sets scram criteria of reactor power > 105%, or any indication of Core Instabilities.
SRO Enters and directs actions of QCOA 3500-01 and QCOA 0400-01 and sets scram criteria of reactor power > 105%, or any indication of Core Instabilities.
SRO       Directs Emergency Power Reduction to < 7.6 Mlb/hr Feedwater flow.
CT1 SRO Directs Emergency Power Reduction to < 7.6 Mlb/hr Feedwater flow.
CT1 Initiates Emergency Power Reduction by inserting CRAM rods and ATC CT1                    lowering Recirc pump speeds.
CT1 ATC Initiates Emergency Power Reduction by inserting CRAM rods and lowering Recirc pump speeds.
EVALUATOR NOTE: During rapid power reductions, annunciator 901-3 A-2, Main Stm Line Hi Radiation may alarm due to a momentary spike. The operator should verify that MSL radiation monitor readings return to normal after reactor power stabilizes or the annunciator clears.
EVALUATOR NOTE: During rapid power reductions, annunciator 901-3 A-2, Main Stm Line Hi Radiation may alarm due to a momentary spike. The operator should verify that MSL radiation monitor readings return to normal after reactor power stabilizes or the annunciator clears.
CREW       Monitors and maintains Flow Control Line (FCL) < 100%.
CREW Monitors and maintains Flow Control Line (FCL) < 100%.
ATC       Monitors for indications of core instabilities.
ATC Monitors for indications of core instabilities.
Directs power reduction continued until total Feedwater flow is SRO
SRO Directs power reduction continued until total Feedwater flow is  
                        < 7.6 Mlb/hr.
< 7.6 Mlb/hr.  
Quad Cities                           NRC EXAM                               Scenario 4 Appendix D                         Required Operator Actions                         Form ES-D-2 Quad Cities           Scenario No.: 4 Event No.: 3                     Page 2 of 2 Event
 
Quad Cities NRC EXAM Scenario 4 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 4 Event No.: 3 Page 2 of 2 Event


== Description:==
== Description:==
Emergency Power Reduction for loss of FW Heater String due to 1A1 Heater Level Switch failure.
Emergency Power Reduction for loss of FW Heater String due to 1A1 Heater Level Switch failure.
Time       Position   Applicants Actions or Behavior ATC/BOP     Monitors D Heater Outlet temperature and Reactor power per QCOA 3500-01, Attachment A, and scrams the reactor if operating below the curve.
Time Position Applicants Actions or Behavior ATC/BOP Monitors D Heater Outlet temperature and Reactor power per QCOA 3500-01, Attachment A, and scrams the reactor if operating below the curve.
ATC/BOP     Reports total Feedwater flow is < 7.6 Mlb/hr and annunciator 901-6 G-1 has cleared.
ATC/BOP Reports total Feedwater flow is < 7.6 Mlb/hr and annunciator 901-6 G-1 has cleared.
SIM OP ROLE PLAY: When Feedwater flow is < 7.6 Mlb/hr, insert the following commands:
SIM OP ROLE PLAY: When Feedwater flow is < 7.6 Mlb/hr, insert the following commands:
dor dihs13401a dor dihs13403 imf ser1405 off Call in as the EM Supervisor and report while removing the cover to inspect the 1A1 Heater Level Switch, the switch repositioned. It appears the switch had stuck. A work package will be prepared to clean or replace the switch.
dor dihs13401a dor dihs13403 imf ser1405 off Call in as the EM Supervisor and report while removing the cover to inspect the 1A1 Heater Level Switch, the switch repositioned. It appears the switch had stuck. A work package will be prepared to clean or replace the switch.
SRO     Directs closure of MO 1-3403, LP Htr String Byp Vlv, to terminate the reactivity addition.
CT1 SRO Directs closure of MO 1-3403, LP Htr String Byp Vlv, to terminate the reactivity addition.
CT1 ATC/BOP     Closes the MO 1-3403, LP Htr String Byp Vlv.
CT1 ATC/BOP Closes the MO 1-3403, LP Htr String Byp Vlv.
CT1 BOP     Secures one Reactor Feed pump and one Condensate/Condensate Booster pump per QCOP 3200-05.
BOP Secures one Reactor Feed pump and one Condensate/Condensate Booster pump per QCOP 3200-05.
Proceed to Event 4 Quad Cities                           NRC EXAM                             Scenario 4 Appendix D                         Required Operator Actions                       Form ES-D-2 Quad Cities           Scenario No.: 4 Event No.: 4                     Page 1 of 1 Event
Proceed to Event 4  
 
Quad Cities NRC EXAM Scenario 4 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 4 Event No.: 4 Page 1 of 1 Event


== Description:==
== Description:==
RPS A Trip With 5 Control Rod Scram/Manual Scram / Fuel Damage Time     Position     Applicants Actions or Behavior SIM OP: Trip RPS A MG Set and verify trigger 1 goes true, scramming 5 control rods:
RPS A Trip With 5 Control Rod Scram/Manual Scram / Fuel Damage Time Position Applicants Actions or Behavior SIM OP: Trip RPS A MG Set and verify trigger 1 goes true, scramming 5 control rods:
imf rp04a ATC     Reports RPS A has tripped and 5 control rods have scrammed.
imf rp04a ATC Reports RPS A has tripped and 5 control rods have scrammed.
ATC     Inserts a manual reactor scram IAW QCOA 0300-11 ATC     Reports the following:
ATC Inserts a manual reactor scram IAW QCOA 0300-11 ATC Reports the following:
* All rods in.
All rods in.
* RPV water level dropped below 0 inches and is recovering with Condensate and Feedwater system.
RPV water level dropped below 0 inches and is recovering with Condensate and Feedwater system.
* RPV pressure is < 1060 psig and controlled by DEHC.
RPV pressure is < 1060 psig and controlled by DEHC.
Proceed to Event 5 Quad Cities                           NRC EXAM                               Scenario 4 Appendix D                         Required Operator Actions                         Form ES-D-2 Quad Cities             Scenario No.: 4 Event No.: 5                     Page 1 of 2 Event
Proceed to Event 5  
 
Quad Cities NRC EXAM Scenario 4 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 4 Event No.: 5 Page 1 of 2 Event


== Description:==
== Description:==
Fuel Damage / North SDV Rupture Time     Position     Applicants Actions or Behavior SIM OP: Verify trigger 2 (fuel damage) and trigger 3 (SDV rupture) go true when the Mode Switch is taken to Shutdown. If not, make both triggers true when a full scram is inserted.
Fuel Damage / North SDV Rupture Time Position Applicants Actions or Behavior SIM OP: Verify trigger 2 (fuel damage) and trigger 3 (SDV rupture) go true when the Mode Switch is taken to Shutdown. If not, make both triggers true when a full scram is inserted.
SRO       Enters QGA 100 on low RPV water level and directs actions.
SRO Enters QGA 100 on low RPV water level and directs actions.
SRO       Directs BOP to verify auto actions for 0 inches RPV water level.
SRO Directs BOP to verify auto actions for 0 inches RPV water level.
BOP       Verifies Group II and Group III isolations complete after RPS A is restored from the alternate power supply.
BOP Verifies Group II and Group III isolations complete after RPS A is restored from the alternate power supply.
ATC       Performs actions of QCGP 2-3 Attachment A.
ATC Performs actions of QCGP 2-3 Attachment A.
ATC       Maintains RPV water level band if 0 to 48 inches with Condensate and Feedwater.
ATC Maintains RPV water level band if 0 to 48 inches with Condensate and Feedwater.
SRO       Directs RPV cooldown at < 100&deg;F/hr (initially with Main Turbine Bypass valves, then transitions to ADS valves when MSIVs are closed due to high off-gas radiation levels).
SRO Directs RPV cooldown at < 100&deg;F/hr (initially with Main Turbine Bypass valves, then transitions to ADS valves when MSIVs are closed due to high off-gas radiation levels).
ATC       Starts RPV cooldown at < 100&deg;F/hr.
ATC Starts RPV cooldown at < 100&deg;F/hr.
SRO       Directs BOP to perform actions of QOA 7000-01.
SRO Directs BOP to perform actions of QOA 7000-01.
BOP       Performs QOA 7000-01 and restores RPS A on the Alternate supply.
BOP Performs QOA 7000-01 and restores RPS A on the Alternate supply.
SIM OP ROLE PLAY: If dispatched to restore RPS A from its alternate supply, wait 3 minutes and restore it using: mrf rp02r alt Report the EPA 1A-2 has tripped on underfrequency.
SIM OP ROLE PLAY: If dispatched to restore RPS A from its alternate supply, wait 3 minutes and restore it using: mrf rp02r alt Report the EPA 1A-2 has tripped on underfrequency.
BOP       Acknowledges annunciators 901-55/56 A-1, Drywell High Rad Conc, and reports Drywell radiation is 30 R/hr and rising.
BOP Acknowledges annunciators 901-55/56 A-1, Drywell High Rad Conc, and reports Drywell radiation is 30 R/hr and rising.
BOP       Acknowledges the following alarms:
BOP Acknowledges the following alarms:
* 901-3 D-2, Off-Gas Hi Radiation
901-3 D-2, Off-Gas Hi Radiation 901-3 C-2, Off-Gas Hi Hi Radiation 901-3 A-2, Main Stm Line Hi Radiation 901-3 D-1, Turb Bldg Hi Radiation SRO Directs actions of QCOA 1700-04, 1700-05, and 1800-01.
* 901-3 C-2, Off-Gas Hi Hi Radiation
BOP Monitors area radiation levels at the 901-11 panel and evacuates areas as necessary.  
* 901-3 A-2, Main Stm Line Hi Radiation
 
* 901-3 D-1, Turb Bldg Hi Radiation SRO       Directs actions of QCOA 1700-04, 1700-05, and 1800-01.
Quad Cities NRC EXAM Scenario 4 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 4 Event No.: 5 Page 2 of 2 Event
BOP       Monitors area radiation levels at the 901-11 panel and evacuates areas as necessary.
Quad Cities                           NRC EXAM                               Scenario 4 Appendix D                         Required Operator Actions                         Form ES-D-2 Quad Cities             Scenario No.: 4 Event No.: 5                     Page 2 of 2 Event


== Description:==
== Description:==
Fuel Damage / North SDV Rupture Time     Position       Applicants Actions or Behavior ATC/BOP       Notifies Radiation Protection of area high radiation and request access control established.
Fuel Damage / North SDV Rupture Time Position Applicants Actions or Behavior ATC/BOP Notifies Radiation Protection of area high radiation and request access control established.
ATC/BOP       Notifies QNE and Chemistry personnel of high radiation.
ATC/BOP Notifies QNE and Chemistry personnel of high radiation.
BOP         Monitors MSL and Off-Gas radiation levels at the 901-2 and 901-10 panels.
BOP Monitors MSL and Off-Gas radiation levels at the 901-2 and 901-10 panels.
SRO         Directs closure of all MSIVs, MSIV drain valves, AO 1-5406 and AO 1-5408A/B.
SRO Directs closure of all MSIVs, MSIV drain valves, AO 1-5406 and AO 1-5408A/B.
ATC/BOP       Closes all MSIVs and MSIV drain valves at the 901-3 panel.
ATC/BOP Closes all MSIVs and MSIV drain valves at the 901-3 panel.
ATC/BOP       Close the AO 1-5406 and verify the AO 1-5408A and AO 1-5408B close at the 901-54 panel.
ATC/BOP Close the AO 1-5406 and verify the AO 1-5408A and AO 1-5408B close at the 901-54 panel.
Proceed to Event 6 Quad Cities                           NRC EXAM                           Scenario 4 Appendix D                         Required Operator Actions                       Form ES-D-2 Quad Cities           Scenario No.: 4 Event No.: 6                   Page 1 of 1 Event
Proceed to Event 6  
 
Quad Cities NRC EXAM Scenario 4 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 4 Event No.: 6 Page 1 of 1 Event


== Description:==
== Description:==
Scram Reset Switch Failure Time       Position     Applicants Actions or Behavior SIM OP: Fail the 1st and 2nd Floor RB Rad Monitor upscale:
Scram Reset Switch Failure Time Position Applicants Actions or Behavior SIM OP: Fail the 1st and 2nd Floor RB Rad Monitor upscale:
imf rm0113 40 10:, imf rm0112 40 10:, imf rm0111 40 10:, imf 0108 40 12:,
imf rm0113 40 10:, imf rm0112 40 10:, imf rm0111 40 10:, imf 0108 40 12:,
imf rm0109 40 12:, imf rm0106 40 15:
imf rm0109 40 12:, imf rm0106 40 15:
BOP       Acknowledges annunciator 901-3 A-1, Rx Bldg Hi Radiation, and refers to annunciator procedure.
BOP Acknowledges annunciator 901-3 A-1, Rx Bldg Hi Radiation, and refers to annunciator procedure.
SRO       Enters and directs actions of QGA 300.
SRO Enters and directs actions of QGA 300.
ATC/BOP     Dispatches EO to start the U-1 EDG Cooling Water Pump.
ATC/BOP Dispatches EO to start the U-1 EDG Cooling Water Pump.
SIM OP ROLE PLAY: If requested wait approx. 2 minutes and start the U-1 EDGCWP:
SIM OP ROLE PLAY: If requested wait approx. 2 minutes and start the U-1 EDGCWP:
mrf sw10r run ATC/BOP     Dispatches EO to monitor area water levels in the Reactor Building Basement.
mrf sw10r run ATC/BOP Dispatches EO to monitor area water levels in the Reactor Building Basement.
SIM OP ROLE PLAY: As EO dispatched to the RB basement, wait approx. 5 minutes and report, there is no steam or water leaking around the Torus or any of the corner rooms.
SIM OP ROLE PLAY: As EO dispatched to the RB basement, wait approx. 5 minutes and report, there is no steam or water leaking around the Torus or any of the corner rooms.
SIM OP ROLE PLAY: As an RP Technician, call in and report, Steam and water are leaking from the North Scram Discharge Volume. You have verified no other personnel are in the area.
SIM OP ROLE PLAY: As an RP Technician, call in and report, Steam and water are leaking from the North Scram Discharge Volume. You have verified no other personnel are in the area.
SRO       Directs ATC to reset the reactor scram.
SRO Directs ATC to reset the reactor scram.
ATC       Bypasses the SDV high level, attempts to reset the reactor scram, and reports the scram will NOT reset.
ATC Bypasses the SDV high level, attempts to reset the reactor scram, and reports the scram will NOT reset.
ATC/BOP     Continues monitoring Area Radiation and temperatures.
ATC/BOP Continues monitoring Area Radiation and temperatures.
Proceed to Event 7 Quad Cities                           NRC EXAM                               Scenario 4 Appendix D                         Required Operator Actions                         Form ES-D-2 Quad Cities           Scenario No.: 4 Event No.: 7                     Page 1 of 1 Event
Proceed to Event 7  
 
Quad Cities NRC EXAM Scenario 4 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 4 Event No.: 7 Page 1 of 1 Event


== Description:==
== Description:==
RPV Blowdown on 2 Areas at Max Safe Radiation Levels Time     Position     Applicants Actions or Behavior ATC/BOP     Reports that area radiation levels for the 1st and 2nd Floor Reactor Building are above max safe levels.
RPV Blowdown on 2 Areas at Max Safe Radiation Levels Time Position Applicants Actions or Behavior ATC/BOP Reports that area radiation levels for the 1st and 2nd Floor Reactor Building are above max safe levels.
SRO       Enters QGA 500-1, RPV Blowdown, and directs actions.
SRO Enters QGA 500-1, RPV Blowdown, and directs actions.
SRO       Verifies all rods in.
SRO Verifies all rods in.
ATC/BOP     Reports Drywell pressure < 2.5 psig.
ATC/BOP Reports Drywell pressure < 2.5 psig.
ATC/BOP     Reports Torus level > 5 ft.
ATC/BOP Reports Torus level > 5 ft.
SRO       Directs ATC/BOP to open all 5 ADS valves and leave switches in MANUAL.
CT2 SRO Directs ATC/BOP to open all 5 ADS valves and leave switches in MANUAL.
CT2 ATC/BOP     Opens all 5 ADS valves and leaves switches in MANUAL.
CT2 ATC/BOP Opens all 5 ADS valves and leaves switches in MANUAL.
CT2 ATC/BOP     Verifies all 5 ADS valves are open by Acoustic Monitor indications on the 901-21 panel.
ATC/BOP Verifies all 5 ADS valves are open by Acoustic Monitor indications on the 901-21 panel.
ATC/BOP     Monitor RPV depressurization.
ATC/BOP Monitor RPV depressurization.
ATC/BOP     Report RPV pressure < 100 psig and lowering.
ATC/BOP Report RPV pressure < 100 psig and lowering.
End of Scenario
End of Scenario}}
                                            }}

Latest revision as of 06:15, 14 January 2025

Initial License Exam, As-Submitted Scenarios
ML100640151
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 11/30/2009
From:
NRC/RGN-III
To:
Exelon Generation Co
References
Download: ML100640151 (65)


Text

Quad Cities NRC EXAM Scenario 1 Appendix D Scenario Outline Form ES-D-1 Facility: Quad Cities Scenario No.: NRC Scenario 1 Op-Test No.: ILT 08-1 __

Examiners: ____________________________ Operators:

Initial Conditions:

100% power Turnover: Perform QCOS 1400-01, Quarterly Core Spray System Flow Rate Test, for the 1A Core Spray Pump.

Event No.

Malf. No.

Event Type*

Event Description 1

None BOP N

QCOS 1400-01, Quarterly Core Spray System Flow Rate Test (A Pump only )

2 RD04R ATC/SRO I/C Control rod drift out (TS) 3 None ATC R

B RFP steam leak resulting in Emergency Power Reduction to < 9.8 Mlb/hr Feedwater flow.

4 None BOP/SRO I/C T-12 Oil leak /transfer Aux power to T-11 (TS) 5 DIFC1064018I1 RAISE ATC I/C FRV master controller failure (High) 6 RR11A Crew M

LOOP/LOCA (A Recirc Pump Discharge Line Break) 7 DG04A BOP IC EDG-1 auto start failure 8

HP01 Crew M

Malfunction after EOP entry: HPCI Trip 9

None Crew M

Contingencies: Blowdown at TAF and Restore RPV water level (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor ES-301-5 Quantitative attributes:

BOP Normal: E1 ATC Reactivity (1 per set): E3 BOP I/C (4 / set): E4 & E7 ATC I/C (4 / set): E2 & E5 SRO-I I/C (4 / set inc 2 as ATC): E2,E4,E5,E7 SRO Tech Spec (2 per set): E2 & E4 ALL Major Transients (2 per set): 1 ES-301-4 Quantitative attributes:

Total Malfunctions (5-8): 5 Malfunction(s) after EOP (1-2): E7, E8 Abnormal Events (2-4): E2, E5 Major Transient(s) /E-Plan entry (1-2): E6 EOPs (1-2): 100/200 EOP Contingencies (0-2): 500-1 Critical Tasks (2-3): 4

Quad Cities NRC EXAM Scenario 1

SUMMARY

The scenario starts at 100% steady state power operation. The B RHR Pump is out of service.

The first event is QCOS 1400-01, Quarterly Core Spray System Flow Rate Test (A Pump only ).

A Control Rod begins to drift out. The rod should be inserted and scrammed. The SRO should address Tech Specs for an inoperable control rod.

The B Feed Pump must be secured due to a steam leak. Emergency Power Reduction is necessary prior to securing and isolating the pump.

An oil leak is reported on the System Aux Transformer, T-12. The BOP will transfer all auxiliary power to the Unit Aux transformer, T-11. The SRO should address Tech Specs for loss of an offsite source.

The Master Feed Reg Valve controller output fails high. RPV water level can be stabilized by taking manual control of the individual Reg Valve controllers.

A LOCA begins inside the Drywell. With T-12 out of service, the plant trip results in a Loss of Offsite Power (LOOP).

EDG-1 fails to automatically start, but appropriate operator action can start and load it.

During the attempt to restore RPV Water level, HPCI trips.

The leak rate is more than the capacity of the remaining high pressure systems. The crew must perform RPV Blowdown in order to restore level with low pressure systems.

CRITICAL TASKS:

Critical Task #1: When Torus pressure exceeds 5 psig, INITIATE Drywell sprays while in the safe region of the Drywell Initiation Spray Limit (DSIL), (BWROG PC-5 INIT DW SPRAY).

Critical task #2: When RPV water level approaches -59, INHIBIT ADS to prevent an uncontrolled RPV depressurization.(BWROG RPV-4.2/5.2/6.2 Important PSA task has Risk Achievement Worth RAW of 6.06. Accomplishing this task terminates 2 of the 20 most probable Core Damage Sequences).

Critical task #3: With the inability to maintain RPV water level above -142, with an injection source lined up and running INITIATE an Emergency Depressurization before RPV water level drops to -166. (Minimum Steam Cooling RPV Water Level, BWROG RPV 1.1 Loss HP INJ E/D TAF).

Critical task #4 Given a shutdown reactor with an emergency depressurization in progress due to the inability to maintain RPV water level above -142, restore RPV water level above -142 using available injection systems in accordance with QGA 100 and QGA 500-1.

Quad Cities NRC EXAM Scenario 1 Simulator setup:

1. Reset to IC-21 (Commands to be utilized DURING the scenario are contained in the CAEP file NRC exam scenario #1.cae)
2. Insert Commands for setup:

imf dg04a irf ed54r XFRM82 imf hp01

3. Verify the flowing commands for scenario performance:

imf rd04r4631 irf rd06r4631r inop ior difc1064018I1 raise imf rr11a.5 20:

mrf rp02r mg_set mrf rp29r reset mrf rp03r mg_set mrf rp28r reset

4. Take the following equipment OOS (hang OOS Card):

1/2 Service Water pump control switches (Bus 14 and Bus 24) in PTL Zinc injection on 1A RFP

5. Provide the crew with a Holding Load REMA.
6. Provide a current revision of the following procedures, signed off as specified:

QCOS 1400-01, Quarterly Core Spray System Flow Rate Test marked up as partial for the 1A Core Spray pump (Group B test)

Copy of the Short Duration Time Clock for the 1A Core Spray Pump

7. Provide the key for the 901-16 panel scram toggle switches to the Lead Evaluator
8. Ensure procedures are erased and put away including QGAs.
9. Advance recorders.
10. Clean marked up meter/recorder faces and hard cards.
11. Remove any flags placed by the previous crew.

Quad Cities NRC EXAM Scenario 1 LIST OF POTENTIAL PROCEDURES Annunciator Procedures o

901-5 A-3, Rev. 6 o

901-5 E-8, Rev. 9 o

901-3 A-16, Rev. 10 QCGP 3-1, Rev. 58 QCGP 2-3, Rev. 67 QGA 100, Rev. 9 QGA 200, Rev. 9 QGA 500-1, Rev. 13 QCOA 6100-03, Rev. 25 QCOA 0300-04, Rev. 15 QCOA 0300-11, Rev. 20 QCOA 0201-08, Rev. 21 QCOA 0201-01, Rev. 22 QOA 6100-01, Rev. 23 QCOP 3200-05, Rev. 28 QOP 6100-01, Rev. 20 QCOP 1300-02, Rev. 27 QCOP 2900-02, Rev. 20 QOP 7000-01, Rev. 43 QCOP 5750-19, Rev. 6 QCOP 1000-30, Rev. 24 QCOS 1400-01, Rev.37 QCOP 2300-06, Rev. 28

Quad Cities NRC EXAM Scenario 1 SHIFT TURNOVER INFORMATION

1. Plant Conditions:

a.) Unit 1 is operating at 100% power.

b.) Unit 2 is in a Refueling Outage. Many systems are Out-of-Service.

c.) Technical Specification limitations:

(1) Unit 1: None (2) Unit 2: None d.) On Line Risk is Green 2.) Significant problems/abnormalities:

a.) The 1/2 Service Water pump is out of service for a cubicle inspection. Work is expected to be completed next shift.

b.) Transformer 81 is out-of service for a repair to the MOD. Transformer 82 is carrying the 13.8 KV loads.

3.) Evolutions/maintenance for the oncoming shift:

a.) Perform QCOS 1400-01, Quarterly Core Spray Flow Rate Test for the 1A Core Spray Pump.

b.) Continue to operate at rated power per QCGP 3-1, Reactor Power Operations

Quad Cities NRC EXAM Scenario 1 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 1 Event No.: 1 Page 1 of 2 Event

Description:

QCOS 1400-01, Quarterly Core Spray System Flow Rate Test (A Pump flow rate only )

Time Position Applicants Actions or Behavior SRO Authorizes performance of QCOS 1400-01 for the 1A Core Spray Pump. Flow rate portion of test only.

EVALUATOR NOTE: The US may log entry into TS 3.5.1 prior to the start of the surveillance in lieu of the required entry at step H.1.h of the procedure.

BOP Contacts the EO to determine ESS Keep Fill pressure from PI 1-1468 located in the 1B Core Spray Room.

SIM OP ROLE PLAY: As the EO dispatched to the 1B Core Spray Room, call back and report the ESS Keep Fill pressure is 70 psig as indicated on PI 1-1468.

BOP Announces start of 1A Core Spray Pump over the plant paging system.

BOP Starts the 1A Core Spray pump.

BOP Verifies the MO 1-1402-38A, CS PMP MIN FLOW VLV, opens.

BOP Contacts EO to inspect the 1A Core Spray pump and valves for leaks.

SIM OP ROLE PLAY: As EO, call back after 1 minute and report no leaks found on the 1A Core Spray pump and valves thus far. Will monitor the system during the test run.

BOP Notifies US to log entry time of 1A Core Spray pump inoperability when the MO 1-1402-4A, CS BYP AND TEST VLV is opened.

BOP Throttles open the MO 1-1402-4A valve to establish approx. 260 psig on PI 1-1450-1A, CS HEADER PRESS.

BOP Verifies the MO 1-1402-38A closes.

Quad Cities NRC EXAM Scenario 1 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 1 Event No.: 1 Page 2 of 2 Event

Description:

QCOS 1400-01, Quarterly Core Spray System Flow Rate Test (Group B Test for 1A Core Spray pump) )

Time Position Applicants Actions or Behavior BOP Contacts EO to determine pump suction pressure as indicated on PI 1-1402-40A (located at the 1A CS pump)

SIM OP ROLE PLAY: As the EO, call back and report a suction pressure of 3 psig as indicated on PI 1-1402-40A.

BOP Throttles MO 1-1402-4A valve to establish a flow rate of approximately 4550 gpm and records data, ( Flow, Discharge pressure, Differential pressure).

BOP Verifies IST criteria for the 1A Core Spray pump flow and discharge pressure are met.

SIM OP ROLE PLAY: If requested again, as EO contacted to report 1A Core Spray Pump Inlet Pressure as indicated on PI 1-1402-40A, report 1A Core Spray Pump inlet pressure is 3 psig.

BOP Calculates pump differential pressure (discharge-inlet pressure)

SRO Verifies pump differential pressure (discharge-inlet pressure) calculation.

BOP Verifies IST criteria for 1-1402-8A is met by attaining > 4550 gpm flow rate and BOP Contacts EO and requests reading from PI 1-1468, ESS Keep Fill pressure in the 1B Core Spray room SIM OP ROLE PLAY: As EO contacted to read PI 1-1468, report wait 1 minute and report the pressure reading as 70 psig.

Quad Cities NRC EXAM Scenario 1 Quad Cities Scenario No.: 1 Event No.: 1 Page 2 of 2 Event

Description:

QCOS 1400-01, Quarterly Core Spray System Flow Rate Test (Group B Test for 1A Core Spray pump) )

BOP Records ESS Keep Fill pressure and compares it with the previous reading. Verifies IST criteria is met for the 1-1402-64 A and 1-1402-65A Check Valves since the pressure differential is < 10 psig.

BOP Closes MO 1-1402-4A valve.

BOP Verifies the MO 1-1402-38A valve opens as system flow decreases.

BOP Notifies the US to exit the LCO for the 1A Core Spray pump.

SRO Exits TS 3.5.1 for the 1A Core Spray pump when the MO 1-1402-4A valve is fully closed.

BOP Contacts EO to verify the leak inspection is complete.

SIM OP ROLE PLAY: As EO, report that the leak inspection is complete and no leaks were found.

BOP Stops the 1A Core Spray pump and closes the MO 1-1402-38A valve.

BOP Verifies system fill pressure is being maintained.

BOP Returns surveillance paperwork to the US for verification of Core Spray Subsystem A standby lineup.

EVALUATOR NOTE: The BOP may elect to lower discharge pressure by opening the MO 1-1402-4A valve due to the time it would take to depressurize normally.

SIM OP ROLE PLAY: As EO contacted to determine fill pressure per step F.1.y, report, 70 psig as indicated on PI 1-1468.

Proceed to Event 2

Quad Cities NRC EXAM Scenario 1 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 1 Event No.: 2 Page 1 of 1 Event

Description:

Control Rod Drift Out Time Position Applicants Actions or Behavior SIM OP: Drift out control rod M-8 (HCU 46-31) using the command imf rd04r4631 ATC Acknowledges annunciator 901-5 A-3, Rod Drift, and reports control rod M-8 is drifting out.

SRO Directs actions of QCOA 0300-11, Control Rod Drift, and QCOA 0300-04, Mispositioned Control Rod.

ATC Inserts control rod M-8 using the RMCS to position 00.

(Immediate operator action)

ATC Releases RMCS and observes control rod M-8 begins to drift out from position 00, then reinserts control rod M-8 to position 00, and applies continuous insert signal.

ATC Reports control M-8 will NOT latch at position 00.

SRO Directs control rod M-8 scrammed using the Rod Scram Test Switch.

LEAD EVALUATOR: Provide the Scram Key to the BOP.

BOP Places the individual Control Rod Scram Test Switch for M-8 into the scram position at the 901-16 panel.

ATC Confirms blue scram light for HCU 46-31 is lit and release RMCS.

BOP Dispatches EO to close the 1-305-105, CRD EXH VLV, for HCU 46-31.

SIM OP ROLE PLAY: As EO dispatched to the North CRD Bank, wait approximately 2 minutes, then insert the following Remote Function to close the 1-305-105 valve:

irf rd06r4631r inop Call the NSO to report that the 1-305-105 valve for HCU 46-31 is closed.

SRO Declares control rod M-8 inoperable and enters TS 3.1.3, Condition C, which is 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to fully insert and 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> to disarm.

SIM OP ROLE PLAY: As QNE: State that you understand that M-8 has drifted out and that you will look at thermal limits.

SRO Enters QCOS 0300-14 to track inoperable rod and electrically disarm.

Quad Cities NRC EXAM Scenario 1 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 1 Event No.: 3 Page 1 of 1 Event

Description:

1B Reactor Feed Pump Seal Leak Time Position Applicants Actions or Behavior SIM OP ROLE PLAY: As the Unit 1 Field Supervisor, call in and report a large leak on the B Reactor Feed pump seal. Report steam and water flowing from seal area. If asked about the status of the pump, reply that the pump should be taken offline immediately.

ATC/BOP Informs Unit Supervisor of 1B Reactor Feed pump seal leak.

SIM OP ROLE PLAY: If contacted as RP Tech, acknowledge the direction to control access to the Feed Pump room.

SRO Directs Emergency Power Reduction per QCGP 3-1 to < 9.8 Mlb/hr feedwater flow.

ATC Reduces Reactor Recirculation pump speeds as necessary until Feedwater flow is <9.8 Mlb/hr.

ATC Inserts in-sequence control rods as necessary to stay below MELLA region.

EVALUATOR NOTE: During rapid power reductions, annunciator 901-3 A-2, Main Stm Line Hi Radiation may alarm due to a momentary spike. The operator should verify that MSL radiation monitor readings return to normal after reactor power stabilizes or the annunciator clears.

SRO Directs 1B RFP and a Condensate/Condensate Booster Pump secured per QCOP 3200-05.

BOP Secures the 1B RFP per QCOP 3200-05.

SIM OP ROLE PLAY: As the Field Supervisor, 1 minute after the 1B RFP is stopped, report that the leak has subsided but there is still a small amount of steam and water coming from the seal.

SRO Directs BOP to isolate the 1B RFP.

BOP Closes the MO 1-3201B, RFP DISCH VLV and directs an EO to close the 1-3499-16, 1B RFP SUCT VLV.

SIM OP ROLE PLAY: If contacted after isolating the 1B RFP, as the Field Supervisor, report the leak has stopped.

SRO Informs QNE and Nuclear Duty Officer of rapid power reduction.

ATC/SRO Directs Chemistry to take RETS samples if power reduction is > 20%

Proceed to Event 4

Quad Cities NRC EXAM Scenario 1 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 1 Event No.: 4 Page 1 of 1 Event

Description:

Transformer 12 Oil Leak/Transfer Aux Power to Transformer 11 Time Position Applicants Actions or Behavior SIM OP ROLE PLAY: As the outside EO, report a large oil leak on Transformer 12. All oil is contained in the burm.

SRO Directs removal of Transformer 12 from service.

BOP Transfers aux power to Transformer 11 per QOP 6100-01 or deenergizes Transformer 12 by opening GCB 4-6 and GCB 3-4 and verifying Aux power transfers.

BOP Verifies Transformer 11 voltage and load are normal (in green band) and bus voltages are > 4000 KV after the XFMR 11 to Bus 12 ACB is closed.

BOP Verifies Transformer 11 voltage and load are normal (in green band) and bus voltages are > 4000 KV after XFMR 11 to Bus 13 ACB is closed.

BOP Verifies all 345 KV Bus section breakers are closed.

BOP Notifies BPO prior to opening 345 KV Bus CKT BKR 3-4 and CKT BKR 4-6.

SIM OP ROLE PLAY: As BPO, concur with opening of 345KV Bus CKT BKR 3-4 and 345 KV Bus CKT BKR 4-6.

BOP Opens 345 KV Bus CKT BKR 3-4 and 345 KV Bus CKT 4-6 at the 912-2 panel.

SRO Directs BOP to enter QCOA 6100-01, Loss of Reserve Auxiliary Transformer 12 (22) During Power Operation.

SRO Enters TS 3.8.1 Condition A, one required offsite circuit inoperable for Unit 1 and directs completion of QCOS 0005-08 within one hour and once per eight hours after.

Proceed to Event 5

Quad Cities NRC EXAM Scenario 1 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 1 Event No.: 5 Page 1 of 1 Event

Description:

Fail the DFWLC Master Controller Upscale Time Position Applicants Actions or Behavior SIM OP: Fail the DFWLC Master Controller upscale: ior difc1064018i1 raise ATC Acknowledges annunciator 901-5 E-8, Rx Vessel High Level and reports RPV water level and power rising.

SRO Sets scram criteria of RPV water level > 44 or < 11.

ATC Reports the Feedwater Master Controller setpoint is drifting upscale and places the A and B Feedwater regulators in MANUAL per QCOA 0201-08.

ATC/BOP Maintains RPV water level between +11 and +44 inches by adjusting the A and/or B Feedwater Regulator valve positions.

SRO Assigns one operator to monitor and control RPV water level.

CREW Contacts Instrument Maintenance to investigate DFWLC Master Controller failure.

SIM OP ROLE PLAY: As IM Supervisor, inform the caller that you will prepare a work package and dispatch a technician to the control room Proceed to Event 6

Quad Cities NRC EXAM Scenario 1 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 1 Event No.: 6 Page 1 of 1 Event

Description:

LOOP/LOCA (A Loop Reactor Recirc Pump Discharge Line Break)

Time Position Applicants Actions or Behavior SIM OP NOTE: At the Lead Examiners direction, insert a.5% break ramped over 20 minutes on the A Loop Recirc pump discharge line: imf rr011a.5 20:

BOP Acknowledges annunciator 901-3 A-16, PRI CNMT HIGH PRESSURE.

SRO Sets scram criteria at 2.0 psig Drywell pressure and directs actions of QCOA 0201-01.

ATC/BOP Investigate cause of Drywell pressure rise by checking the following:

Reactor Recirculation pump seals RBCCW system operation Safety/Relief valve leakage Drywell to Torus D/P controller operation.

ATC/BOP Notifies Radiation Protection of elevated Containment pressure and evacuates the Reactor Building.

BOP Starts all available Drywell Coolers and monitors leak rate.

SRO Briefs crew on methods of RPV water level, pressure control, and priorities with a loss of offsite power and a LOCA.

ATC Inserts a manual reactor scram when Drywell pressure reaches 2.0 psig.

SRO Enters QGA 100 on RPV low water level and QGA 200 when Drywell pressure reaches 2.5 psig (also re-enters QGA 100).

SRO Directs actions of QGA 100.

ATC Enters and executes actions of QCGP 2-3.

ATC/BOP Verifies isolations and auto actions for 0 inches RPV water level and 2.5 psig Drywell pressure.

Proceed to Event 7 & 8.

Quad Cities NRC EXAM Scenario 1 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 1 Event No.: 7 & 8 Page 1 of 1 Event

Description:

U-1 Emergency Diesel Generator Autostart Failure HPCI Turbine trip Time Position Applicants Actions or Behavior BOP Reports the following failures:

HPCI Turbine trip U-1 EDG failed to autostart BOP Manually starts the U-1 EDG and verifies the B Loop Core Spray and RHR pumps autostart.

BOP Attempts to start HPCI per QCOP 2300-06 (Hard Card), and reports unable to start HPCI.

ATC/BOP Dispatches EOs to investigate HPCI Turbine failure.

SIM OP ROLE PLAY: As EO dispatched to the HPCI Room, wait 2 minutes and report you see no apparent cause for the HPCI turbine trip and will contact maintenance for assistance.

SRO Directs RPV water level maintained between 0 and 48 inches using RCIC and Safe Shutdown Makeup Pump (SSMP).

ATC/BOP Starts RCIC for injection per QCOP 1300-02. (Hard Card)

ATC/BOP Starts the SSMP for injection per QCOP 2900-02. (Hard Card)

SRO Verifies RPV pressure < 1060 psig and directs RPV cooldown using ADS valves.

BOP Starts cooldown at < 100°F/hr using the ADS valves, (action dependent on rate of depressurization).

SRO Directs restoration of Electric Plant as follows:

Re-energize RPS A and RPS B Backfeed Bus 13 and Bus 14 Restore 480V Bus 15, 16, and/or 17 as needed ATC/BOP Dispatches EO to re-energize RPS A and RPS B per QOP 7000-01.

ATC/BOP Backfeeds Bus 13 and Bus 14 per QCOA 6100-03.

ATC/BOP Re-energizes Bus 15, 16, and/or Bus 17 per QCOA 6100-03.

SIM OP If requested wait 4 minutes and re-energize RPS A and RPS B from their normal power supplies:

RPS A:

mrf rp02r mg_set mrf rp29r reset RPS B:

mrf rp03r mg_set mrf rp28r reset

Quad Cities NRC EXAM Scenario 1 Quad Cities Scenario No.: 1 Event No.: 6 Page 2 of 3 (continued after power restoration)

Event

Description:

LOOP/LOCA (A Loop Reactor Recirc Pump Discharge Line Break)

Time Position Applicants Actions or Behavior SRO Directs actions of QGA 200.

ATC/BOP Restarts RBCCW and Drywell Coolers per QCOP 5750-19.

BOP Reports Torus pressure > 2.5 psig and Torus level < 27 ft.

BOP Initiates Torus Sprays per QCOP 1000-30.

BOP Reports Torus pressure > 5 psig and Torus level < 17 ft.

CT1 SRO Verifies Drywell temperature/pressure are within DSIL curve.

BOP Verifies Recirc pumps are tripped and trips all Drywell Coolers.

CT1 SRO Directs initiation of Drywell Sprays CT1 BOP Initiates Drywell Sprays per QCOP 1000-30.

ATC/BOP Monitors the following:

Drywell temperature and pressure Torus temperature and level Drywell/Torus Hydrogen concentration

Quad Cities NRC EXAM Scenario 1 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 1 Event No.: 6 Page 3 of 3 (continued after power restoration)

Event

Description:

LOOP/LOCA (A Loop Reactor Recirc Pump Discharge Line Break)

SRO Directs further actions of QGA 100 when RPV water level cannot be held above -59 inches.

CT2 SRO Directs BOP to inhibit ADS.

CT2 BOP Inhibits ADS.

SRO Directs use of Alternate Injection Systems.

ATC Injects SBLC per QCOP 1100-02.

ATC Starts a CRD pump if power is available or dispatches an EO to cross-tie the CRD system per QCOP 0300-19.

SIM OP ROLE PLAY: If Condensate crosstie is requested, state the Unit 2 Condensate system is Out-of-Service.

SRO Verifies 2 or more Detail F subsystems are available.

SSMP B Core Spray B Loop RHR ATC Reports RPV water level at -142 inches (TAF).

SRO Verifies injection sources are lined up with pumps running.

Quad Cities NRC EXAM Scenario 1 Quad Cities Scenario No.: 1 Event No.: 9 Page 1 of 1 Event

Description:

RPV Blowdown and Level Restoration Time Position Applicants Actions or Behavior SRO Enters QGA 500-1 before RPV water level drops to -166 inches and directs actions.

SRO Verifies all rods in and Drywell pressure at or above 2.5 psig.

BOP Reports Torus level > 5 ft.

CT3 SRO Directs BOP to open all 5 ADS valves and leave switches in Manual.

CT3 BOP Opens all 5 ADS valves and leaves switches in Manual.

ATC/BOP Monitor RPV depressurization and RPV water level.

BOP Verifies low pressure ECCS pumps inject when RPV pressure is < 325 psig.

CT4 SRO Directs RPV water level raised to above -142 inches.

CT4 ATC/BOP Restore RPV water level above -142 (TAF) by injecting with low pressure ECCS pumps.

End Of Scenario

Quad Cities NRC EXAM Scenario 2 Appendix D Scenario Outline Form ES-D-1 Facility: Quad Cities Scenario No.: NRC Scenario 2 Op-Test No.: ILT 08-1 _

Examiners: ____________________________ Operators:

Initial Conditions:

85 % power Turnover: Reverse Main Condenser Flow per QCOP 4400-09, then return to rated power by increasing core flow in accordance with QCGP 3-1 and the REMA.

Event No.

Malf. No.

Event Type*

Event Description 1

None BOP N

Reverse Main Condenser flow 2

ED01C BOP IC GCB 4-6 trip / reclose 3

RM05A SRO TS DW Rad Mon fails upscale (TS) 4 FW08A ATC IC FRV Lockup 5

HP13 BOP/SRO IC HPCI Steam leak / failure to isolate (TS) 6 MC08 ATC R

Main Condenser Vacuum leak / Emergency Power Reduction, ( attempt to maintain Main Condenser backpressure < 6.5 in Hg.)

7 RD13A Crew M

Manual Scram / ATWS (Hydraulic) 8 DIHS11130301 ATC IC Malfunction after Major: Start failure of 1st SBLC Pump 9

MC08 Crew M

Complete Loss of Main Condenser Vacuum 10 None Crew M

Contingencies: Power Level Control QGA 101 (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor ES-301-5 Quantitative attributes:

BOP Normal: E1 ATC Reactivity (1 per set): E6 BOP I/C (4 per set): E2 & E5 ATC I/C (4 per set): E4 & E8 SRO-I I/C (4/set & 2 as ATC):E2, E4, E5, E8 SRO Tech Spec (2 per set): E3 & E5 ALL Major Transients (2 per set) E7 ES-301-4 Quantitative attributes:

Total Malfunctions (5-8): 7 Malfunction(s) after EOP (1-2): E8 Abnormal Events (2-4): E2, E4, E5, E6 Major Transient(s) /E-Plan entry (1-2): E7 EOPs (1-2): 100 EOP Contingencies (0-2): 101 ATWS Critical Tasks (2-3): 5

Quad Cities NRC EXAM Scenario 2

SUMMARY

The scenario starts with the crew holding power at approximately 85% with no LCOs in effect.

The BOP operator reverses Main Condenser Circ Water flow.

GCB 4-6 is inadvertently tripped open during a Switchyard breaker inspection. The problem is resolved and the US directs the BOP to reclose GCB 4-6 per QCOP 6400-08.

The Drywell Radiation Monitor fails upscale. The US must declare the monitor inoperable and reference Technical Specifications.

The 1A Feedwater Reg Valve locks up. The ATC operator controls RPV water level and, when the problem is resolved, resets the lock-up.

A steam leak begins in the HPCI room. The crew performs actions from QGA 300 and manually isolates HPCI when the automatic isolation fails.

Main Condenser begins to degrade due to an air leak. The crew performs QOA 3300-02 and Emergency Power Reduction.

The loss of vacuum results in a reactor scram, but control rods fail to fully insert due to a hydraulic ATWS. The crew performs QGA 100 and QGA 101 in response.

When SBLC is initiated, the first pump selected will not start. The alternate pump will start if a start is attempted.

A complete loss of Vacuum eliminates the Main Condenser as a heat sink. Operators must manually control RPV Pressure with relief valves. Torus Cooling must be placed in service per QGA 200.

The scenario is terminated when RPV water level and pressure are controlled in the established bands per QGA 101 and actions are being taken to shutdown the reactor.

CRITICAL TASKS:

Critical Task #1: With a HPCI steam line break and a failure of the automatic isolation, take action to manually isolate the HPCI steam line to terminate a primary system discharge into the Reactor Building.

Critical Task #2: With a reactor scram required and the reactor not shutdown, INHIBIT ADS to prevent an uncontrolled RPV blowdown and significant power excursion.

(BWR RPV-6.2 ATWS PWR/LVL INHIBIT ADS)

Critical Task #3: With a reactor scram required and the reactor not shutdown, TAKE ACTION TO REDUCE POWER by injecting Boron (prior to exceeding 110°F Torus temperature) and/or inserting control rods to prevent exceeding primary containment design limits. (BWROG RPV-6.1 ATWS/PWR/LVL S/D REACTOR)

Critical Task #4: During an ATWS with conditions met to perform power/level control, TERMINATE AND PREVENT INJECTION with the exception of Boron, CRD, and RCIC into the RPV until conditions are met to re-establish injection. ((BWROG RPV-6.3 PWR/LVL TERM/PREVENT)

Critical Task #5: When conditions are met to re-establish injection, use available injection systems to MAINTAIN RPV water level above the Minimum Steam Cooling RPV Water Level ( -166). (BWROG RPV-6.4 ATWS PWR/LVL RESTORE RPV LVL)

Quad Cities NRC EXAM Scenario 2 Simulator setup:

1. Reset to IC-23.

Verify Main Condenser flow is in the South direction.

2. Insert Commands for setup:

imf hp15 imf rd13a 100 ior dihs11130301 off irf mc20br open irf mc20ar open

3. Verify the flowing commands for scenario performance:

imf ed01c dmf ed01c imf rm05a 100 :10 imf fw08a dmf fw08a imf hp13 7 2:

irf sw10r run imf mc08 100 25:

irf rd04r close irf qg08r 1 irf qg14r 1 irf qg09r 1 dor dihs11130301

4. Take the following equipment OOS (hang OOS Card):

None.

5. Provide the crew with a Standard Load Drop REMA.
6. Provide the Lead Evaluator with Switching Orders to reclose GCB 4-6.
7. Need to have blank EST available for use during the scenario.

None

8. Ensure procedures are erased and put away including QGAs.
9. Advance recorders.
10. Clean marked up meter/recorder faces and hard cards.
11. Remove any flags placed by the previous crew.

Quad Cities NRC EXAM Scenario 2 LIST OF POTENTIAL PROCEDURES Annunciator Procedures o

901-5 A-8, Rev. 14 o

901-55 A-1, Rev. 10 o

901-5 G-7, Rev. 6 o

901-4 G-17, Rev. 10 QGA 100, Rev. 9 QGA 101, Rev. 13 QGA 200, Rev. 9 QCOA 0600-01, Rev. 11 QOA 3300-02, Rev. 34 QCOP 6400-08, Rev. 14 QCOP 4400-09, Rev. 20 QCOP 0300-28, Rev. 27 QCOP 0250-02, Rev. 11 QCOP 0201-16, Rev. 5 QCOP 0600-18, Rev. 20 QCOP 2400-01, Rev. 18 QCOP 1000-30, Rev. 23

Quad Cities NRC EXAM Scenario 2 CREW TURNOVER SHIFT TURNOVER INFORMATION

1. Plant Conditions:

a.) Unit 1 is operating at 85% power.

b.) Unit 2 is at rated power c.) Technical Specification limitations:

(1) Unit 1: None (2) Unit 2: None d.) On Line Risk is Green 2.) Evolutions/maintenance for the oncoming shift:

a.) Reverse Main Condenser Flow per QCOP 4400-09.

b.) Increase to rated power with Recirc flow per QCGP 3-1, Reactor Power Operation.

Quad Cities NRC EXAM Scenario 2 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 2 Event No.: 1 Page 1 of 1 NOTE:

Event

Description:

Reverse Main Condenser Flow from South to North Time Position Applicants Actions or Behavior SRO Directs Main Condenser flow reversal per QCOP 4400-09.

BOP Verifies annunciator 901-7 C-1, COND FLOW REV VLVS ON LOCAL CONT, is NOT in alarm.

BOP Opens South SJAE Suction valves using the Test switch on the 901-7 panel by placing the switch to the SOU position.

BOP Places the Circulating Water Flow Selector switch to the NORTH position when the South SJAE valves are fully open.

BOP Verifies the following:

SJAE Suction valves change over Condenser seal trough fill and drain valves changeover Condenser differential pressure has reversed and vacuum is stable BOP Verifies after a time delay that one set of seal troughs have drained and the other has filled.

Proceed to Event 2

Quad Cities NRC EXAM Scenario 2 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 2 Event No.: 2 Page 1 of 1 Event

Description:

GCB 4-6 Trip and Reclosure Time Position Applicants Actions or Behavior SIMOP: Trip GCB 4-6 using the command imf ed01c, then delete the GCB 4-6 trip to allow re-close using dmf ed01c BOP Acknowledges annunciator 912-2 C-3, 345KV CKT BKR TRIP, and reports GCB 4-6 has tripped.

BOP Refers to annunciator procedure and dispatches an EO to the Relay House.

SIM OP ROLE PLAY: As OAD, call into the Control Room and report you inadvertently bumped the control cabinet for GCB 4-6 while staging equipment for an upcoming modification. You have inspected the cabinet and found no damage. You suggest contacting Bulk Power and reclosing GCB 4-6.

LEAD EVALUATOR NOTE: Provide a copy of the Switching Orders after the SRO requests them from Bulk Power.

SRO Contacts Bulk Power Operations for permission and Switching Orders to reclose GCB 4-6.

SRO Directs reclosure of GCB 4-6 per QCOP 6400-08.

BOP Directs EO in the Relay House to inspect GCB 4-6 and surrounding area prior to closure of the circuit breaker.

SIM OP ROLE PLAY: As EO, call back after approximately 2 minutes, and report area is cleared of all personnel and no safety hazards exist. If directed or asked to complete QCOP 6400-08 steps F.2a.-c., wait 1 minute and report those steps as complete.

BOP Turns on the 345KV Synchronization Switch with the key and verifies synchroscope is at 12 oclock and incoming and running voltages are equal.

BOP Closes GCB 4-6 with the control switch at the 912-2 panel and verifies both RED lights are energized.

BOP Turns off 345KV breaker synchronization switch and removes key.

BOP Verifies re-closure cutout toggle switch is in the UP (ON) position.

Proceed to Event 3

Quad Cities NRC EXAM Scenario 2 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 2 Event No.: 3 Page 1 of 1 Event

Description:

1A Drywell Radiation Monitor Upscale Failure Time Position Applicants Actions or Behavior SIMOP: Fail the 1A Drywell Radiation Monitor Upscale: imf rm05a 100 :10 BOP Acknowledges annunciator 901-55 A-1, Drywell A High Rad Conc, and reports the 1-2419A Drywell radiation monitor is indicating full upscale.

ATC Acknowledges annunciator 901-5 A-8, Group 2 Isol Ch Trip, and refers to annunciator procedure.

SRO Confirms the 1-2419B Drywell radiation monitor is indicating normally (approximately 3-4 R/hr), and no other indications of increasing radiation levels exist on the following:

Main Steam Line Radiation monitors Offgas Radiation monitors Area Radiation monitors SRO Enters the following Technical Specifications for an inoperable Drywell Radiation monitor:

PCI 3.3.6.1, Condition A, Place the Channel in Trip Within 24 Hours PAM 3.3.3.1, Condition A, Restore Required Channel to Operable Status Within 30 Days Proceed to Event 4

Quad Cities NRC EXAM Scenario 2 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 2 Event No.: 4 Page 1 of 1 Event

Description:

1A Feedwater Regulator Valve Lock-Up Time Position Applicants Actions or Behavior SIM OP: Lock-up the 1A FRV using the command: imf fw08a ATC Acknowledges annunciator 901-5 G-7, 1A FW ACTUATOR TROUBLE, and reports the 1A FRV has locked up.

ATC Verifies and reports that the 1B FRV is in AUTO and controlling RPV water level.

SRO/ATC Contacts Instrument Maintenance to investigate the 1A FRV lock-up and dispatches EO to the Feedwater Regulator Station to investigate.

BOP Checks Fuse F13 at Panel 901-5 TB-HH and reports the fuse is intact.

EVALUATOR NOTE: The above mentioned fuse is not modeled. When the candidate is at the 901-5 inside panel, inform him/her that the fuse is intact.

SIM OP ROLE PLAY: As EO dispatched to the 1A Feed Reg Valve, report that the Nematron is displaying an Input Signal vs Valve Position Error.

SIM OP ROLE PLAY: As Instrument Maintenance, wait 3 minutes, delete the lock-up malfunction by inserting the command: dmf fw08a. Call back and report you have corrected the control signal problem by cleaning and securing several leads. You recommend resetting the lock-up.

SRO Directs resetting the 1A FW Regulator valve per QCOA 0600-01 and QCOP 0600-18, step F.4.

ATC Verifies the 1B FRV is controlling RPV water level.

ATC Depresses the 1A VLV RESET pushbutton and holds for five seconds.

ATC Verifies the 1A FRV lock-up reset light extinguishes and the valve is controlling RPV water level.

ATC Places 1A FRV in AUTO per QCOP 0600-18 step F.5 Proceed to Event 5

Quad Cities NRC EXAM Scenario 2 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 2 Event No.: 5 Page 1 of 1 Event

Description:

HPCI Steam Leak/Failure to Isolate Time Position Applicants Actions or Behavior SIM OP: Insert a 7% steam leak in the HPCI Room: imf hp13 7 2:

BOP Acknowledges annunciator 901-3 H-2, Area Hi Temp Steam Leak Detection, and refers to annunciator procedure.

BOP Reports HPCI Room temperature is 140°F and rising after checking temperature recorder on the 901-21 panel.

SRO Enters QGA 300 on HPCI Area High Temperature and directs actions.

BOP Dispatches EO to the Reactor Building basement to monitor area water levels.

BOP Dispatches EO to start the U-1 EDG Cooling Water pump.

SIM OP: If dispatched as EO, wait 1 minute and start the U-1 EDG Cooling Water pump:

imf sw10r run SIM OP ROLE PLAY: As the EO dispatched to the Reactor Building basement, wait approximately 2 minutes and report, there is no water in the basement and corner rooms, but you can see steam in the HPCI Room and did not enter.

CT1 SRO Directs isolation of HPCI steam lines.

CT1 BOP Closes the HPCI Steam Inlet isolation valves (MO 1-2301-4 and MO 1-2301-5).

BOP Monitors HPCI Room temperature and reports lowering temperatures.

Proceed to Event 6

Quad Cities NRC EXAM Scenario 2 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 2 Event No.: 6 Page 1 of 1 Event

Description:

Main Condenser Vacuum Leak/Emergency Power Reduction/Scram Time Position Applicants Actions or Behavior SIM OP: Insert a 100% Main Condenser leak ramped over 25 minutes: imf mc08 100 25:

BOP Acknowledges annunciator 901-3 D-2, Off Gas High Radiation, and confirms elevated Off-Gas radiation levels at the 901-10 panel.

Evaluator Note: The Off-Gas radiation monitor readings will increase with an elevated flow rate resulting from air in-leakage. It is not indicative of fuel damage in this case.

BOP Acknowledges annunciator 901-54 C-7, Normal Process Flow Hi/Lo, and reports off-gas flow > 100 scfm and Main Condenser backpressure rising.

SRO Enters QOA 3300-02, Loss of Vacuum, and orders Emergency Power Reduction to maintain < 5 inches/Hg backpressure in Main Condenser.

ATC/BOP Reduces Reactor Recirculation flow and inserts control rods as necessary to attempt to maintain Main Condenser backpressure < 5 in Hg.

SRO Sets scram criteria on high Main Condenser backpressure.

ATC/BOP Checks SJAE valve position, steam seal pressure, and dispatches EOs and Radiation Protection to look for leaks in the LP Heater Bay.

ATC/BOP Dispatches EOs to fill loop seals per QCOP 3300-09 and verify the Main Condenser vacuum breaker is closed and has a water seal.

ATC Scrams the reactor on high Main Condenser backpressure by depressing both manual scram pushbuttons and places the mode switch to the SHUTDOWN position.

Proceed to Event 7

Quad Cities NRC EXAM Scenario 2 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 2 Event No.: 7 Page 1 of 2 Event

Description:

Hydraulic ATWS Time Position Applicants Actions or Behavior ATC Reports control rods did NOT insert.

SRO Enters QGA 100, transitions to QGA 101.

SRO Directs actions for Power Leg of QGA 101.

ATC Arms and depresses ARI, and reduces both Reactor Recirc pumps to minimum speed.

CT2 SRO Directs ATC/BOP to inhibit ADS CT2 BOP Inhibits ADS and places both Core Spray pumps in PTL.

SRO Directs both Reactor Recirc pumps tripped.

ATC Trips both Reactor Recirc pumps.

CT3 SRO Directs control rod insertion per QCOP 0300-28.

ATC Dispatches EO to close the 1-301-25 valve.

CT3 ATC Inserts all CRAM rods to position 00.

CT3 ATC Continues to insert control rods spiraling outward from center of core.

ATC Directs operator to bypass all reactor scrams per QCOP 0300-28.

ATC Resets reactor scram.

ATC Dispatches EO to de-energize ARI by removing fuses in 2201-70A and 2201-70B panels per QCOP 0300-28.

ATC Verifies scram is reset and inserts another manual scram.

ATC Verifies NO control rod movement and resets reactor scram.

Quad Cities NRC EXAM Scenario 2 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 2 Event No.: 7 Page 2 of 2 Event

Description:

Hydraulic ATWS Time Position Applicants Actions or Behavior ATC Directs personnel to individually scram control rods from the 901-16 panel.

SIM OP ROLE PLAY: Attempt to individually scram 3 control rods, then contact the ATC operator and report, Control rods will not insert from the 901-16 panel.

SIM OP ROLE PLAY: If requested as EO, closes the 1-301-25 valve using: irf rd04r close SIM OP ROLE PLAY: If requested, wait approx. 2 minutes and bypass all reactor scrams using: irf qg08r 1 SIM OP ROLE PLAY: If requested as EO, pull the ARI fuses in the 2201-70A and 2201-70B panels in Aux Electric Room using: irf qg14r 1 SIM OP ROLE PLAY: If requested, bypass the Low RPV water level MSIV isolation and High Radiation Offgas isolation per QCOP 0250-02 using: irf qg09r 1 Proceed to Event 8

Quad Cities NRC EXAM Scenario 2 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 2 Event No.: 8 Page 1 of 1 Event

Description:

Failure of Initial SBLC Pump to Inject Time Position Applicants Actions or Behavior SIM OP NOTE: Delete the override for the SBLC switch when the ATC operator selects the 2nd SBLC pump for injection. dor dihs11130301 ATC Reports SBLC tank level and selects a SBLC pump for injection by placing the control switch to SYS 1 or SYS 2.

CT3 ATC Reports the SBLC pump has failed to inject, and selects the other SBLC pump.

ATC Verifies and reports the 2nd SBLC pump is injecting.

ATC Monitors SBLC Tank level for 16% decrease.

Proceed to Event 9

Quad Cities NRC EXAM Scenario 2 Quad Cities Scenario No.: 2 Event No.: 9 Page 1 of 1 Event

Description:

Complete Loss of Main Condenser Vacuum, (with transition to Relief Valves to control reactor pressure).

Time Position Applicants Actions or Behavior SRO Directs actions of QGA 101 Pressure Control leg.

SRO Sets RPV pressure band of 800-1000 psig.

BOP Monitors DEHC and Main Condenser backpressure.

BOP Transitions to relief valves prior to Main Condenser backpressure reaching 23 Hg.

BOP Controls RPV pressure using B and/or C relief valves.

Proceed to Event 10

Quad Cities NRC EXAM Scenario 2 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 2 Event No.: 10 Page 1 of 2 Event

Description:

RPV Power, Level Control Time Position Applicants Actions or Behavior SRO Directs actions of QGA 101 Level Control Leg.

BOP Verifies auto actions and isolations for 0 inches RPV water level.

SRO Directs isolations bypassed per QCOP 0250-02.

BOP Contacts EO/SS to bypass RPV low water level MSIV and high offgas radiation isolations per QCOP 0250-02.

SIM OP: If requested, bypass isolations per QCOP 0250-02: irf qg09r 1 SRO Verifies reactor power >5% and RPV water level > -35.

CT4 SRO Directs termination and prevention of all RPV injection except for Boron and CRD.

CT4 ATC Isolates Condensate/Feed system per QCOP 0201-16 (Hard Card).

CT4 ATC/BOP Trip latches HPCI, and verifies no injection sources except for Boron and CRD are operating.

ATC/BOP Monitors RPV water level and reactor power.

ATC/BOP Reports RPV water level at -35 inches and lowering.

SRO Sets RPV water level band between -166 inches and the level lowered to when reactor power indicates < 5% or RPV water level is -142, or all ADS valves stay closed and drywell pressure stays below 2.5 psig.

CT5 SRO Directs injection with Condensate/Feed system to maintain RPV water level in established band.

CT5 ATC/BOP Re-establishes injection to control RPV water level in band using the Condensate/Feed system.

Quad Cities NRC EXAM Scenario 2 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 2 Event No.: 10 Page 2 of 2 Event

Description:

QGA 200 Actions Time Position Applicants Actions or Behavior BOP Acknowledges annunciator 901-4 G-17, Torus Wtr High Temp and reports Torus temperature is 90°F and rising.

SRO Directs actions of QGA 200.

BOP Monitors and reports containment parameters.

BOP Starts the CAM system per QCOP 2400-01.

SRO Directs Torus Cooling initiated.

BOP Starts Torus Cooling per QCOP 1000-30 (Hard Card).

End of Scenario

Quad Cities NRC EXAM Scenario 3 Appendix D Scenario Outline Form ES-D-1 Facility: Quad Cities Scenario No.: NRC Scenario 3 Op-Test No.: ILT 08-1 __

Examiners: ____________________________ Operators:

Initial Conditions:

34% Power, MO 1-1001-26B, INBD DW SPRAY ISOL VLV out of service for limitorque replacement.

Turnover:

Perform QCOS 1000-09 RHR Power Operated Valve Test (Partial) then continue the startup per step 2 of the REMA and QCGP 1-1.

Event No.

Malf. No.

Event Type*

Event Description 1

None BOP N

Perform QCOS 1000-09 RHR Power Operated Valve Test (Partial) 2 None ATC R

Normal power up Recirc 3

DIFC10262222 RAISE ATC IC Recirc Pump run up/Master Controller fails high 4

NM08F/RP02B/

RP02D ATC/SRO IC APRM upscale w no 1/2 scram (TS) 5 AD01D BOP/SRO IC Spurious ERV actuation (TS) 6 SW12A BOP IC Degraded TBCCW pump, Start STBY 7

MS05A Crew M

Steam Line break inside Containment 8

None Crew M

Contingencies: Blowdown 9

MS16A, MS16B MS16C Crew M

Malfunction after EOP: Tailpipe rupture 10 None Crew M

Venting to stay under PCPL (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor ES-301-5 Quantitative attributes:

BOP Normal: E1 ATC Reactivity (1 per set): E2 BOP I/C (4 per set): E5, E6 ATC I/C (4 per set): E3, E4 SRO-I I/C (4 /set inc 2 as ATC): E3,E4,E5,E6 SRO Tech Spec (2 per set): E4, E5 ALL Major Transients (2 per set) E7 ES-301-4 Quantitative attributes:

Total Malfunctions (5-8): 6 Malfunction(s) after EOP (1-2): E9 Abnormal Events (2-4): E3, E4, E5 Major Transient(s) /E-Plan entry (1-2): E7 EOPs (1-2): QGA 100 & 200 EOP Contingencies (0-2): QGA 500-1 Critical Tasks (2-3): 3

Quad Cities NRC EXAM Scenario 3

SUMMARY

The scenario starts with the plant at approximately 34% power during a startup. The B Loop of Drywell Sprays is inoperable.

Before power ascension, perform the RHR Power Operated Valve Test, QCOS 1000-09 step H.14 only.

The crew then raises reactor power by increasing Recirc Flow.

When the reactivity manipulation has been sufficiently evaluated, the Master Recirc Controller will fail high. APRM power, Total Core Flow, and Recirc Pump speeds will all show increasing trends. There are several ways for the ATC operator to take manual control and terminate the transient.

APRM 6 will fail upscale but a 1/2 scram will fail to occur. The crew should diagnose this problem and insert a manual 1/2 Scram. APRM 6 will be inoperable per Tech Specs.

The D Relief Valve will actuate. The crew responds per QCOA 0203-01 to close the valve and stabilize the plant. One ADS valve will be inoperable per Tech Specs.

The 1A TBCCW Pump will degrade. The B TBCCW Pump can be manually started and the system stabilized.

A steam line break inside the Drywell results in a reactor scram and entry into QGA 100 and 200.

When the only available loop of Drywell Sprays cannot be placed in service, the crew will perform a RPV Blowdown per QGA 500-1.

When relief valves are opened, tailpipe ruptures pressurize the containment even further.

The crew must perform Containment Venting to stay under the Primary Containment Pressure Limit (PCPL).

CRITICAL TASKS:

Critical Task #1: Given an operating plant with a stuck open relief valve, take actions to close the valve in accordance with QCOA 0203-01.

Critical Task #2: When Drywell temperature CANNOT be maintained < 280°F OR Torus pressure CANNOT be maintained < Pressure Suppression Pressure Limit (PSP), INITIATE an Emergency Depressurization.

Critical Task #3: Before Torus pressure reaches the Primary Containment Pressure Limit (PCPL), INITIATE venting of the containment irrespective of offsite radioactivity release rates. (BWROG PC-7.2 LOCA VENT PC VENT)

Quad Cities NRC EXAM Scenario 3 Simulator setup:

1. Reset to IC-17.

Verify RWM loads to proper sequence (if not, repeat IC-17 reset).

Withdraw Step 19 to the target out position.

Place DFWLC system in 3-element control.

Increase Reactor Recirc flow until Feedwater flow is 3.0 Mlb/hr.

Verify Recirc Controllers are in MASTER Place DFWLC system in 3-element control.

Close Feedwater Heater Extraction and Vent Valves (QCGP 1-1 step F.9.k and F.9.l )

Place the ADSORB INLT/BYP VLVS switch to the TREAT position (901-54)

(Commands to be utilized DURING the scenario are contained in the CAEP file NRC Scenario #3

2. Run CAEP file and verify the following setup commands are inserted:

trgset 1 zdifc1026222(1) trg 1 dor difc10262222 ior dihs1100123a close imf rp02b imf rp02d irf rh20br open irf rh19br open trgset 3 rdv10305117.LT.0.99 imf rp05a(3) imf rp05b(3 1) imf rp05c(3 2) trgset 4 zdihs10287303A(1) imf ms16a(4) imf ms16b(4) imf ms16c(4) irf ms01r latch irf ms02r latch irf ms03r latch irf ms04r latch irf ms05r latch irf ms06r latch

3. Verify the flowing commands for scenario performance are available in the CAEP file:

ior difc10262222 raise imf nm08f 100 imf ad01d 0 imf sw12a 100 10:

imf ms05a.3 3:

irf rh19ar open

4. Take the following equipment OOS (hang OOS Card/EST):

APRM 5 in Bypass/EST MO 1-1001-26B Control Switch OOS MO 1-1001-23B Control Switch OOS

Quad Cities NRC EXAM Scenario 3

5. Provide the crew with a startup REMA.
6. Provide a current revision of the following procedures, signed off as specified:

QCOS 1000-09, partial for Step #14, RHR B Containment Cooling Valves and IST data attached.

QCGP 1-1, signed off up to F.9.v Stopwatch 7 Ensure procedures are erased and put away including QGAs.

8. Advance recorders.
9. Clean marked up meter/recorder faces and hard cards.
10. Remove any flags placed by the previous crew.

Quad Cities NRC EXAM Scenario 3 LIST OF POTENTIAL PROCEDURES Annunciator Procedures o

901-3 A-16, Rev. 11 o

901-5 D-13, Rev. 9 o

901-5 A-6, Rev. 8 o

901-5 C-3, Rev. 11 o

901-5 H-1, Rev. 3 o

901-5 B-11, Rev. 10 o

901-3 E-13, Rev. 5 o

901-3 E-14, Rev. 7 QCGP 1-1, Rev. 78 QCGP 2-3, Rev. 66 QGA 100, Rev. 9 QGA 200, Rev. 9 QGA 500-1, Rev. 13 QCOA 0201-01, Rev. 22 QCOA 0700-03, Rev. 8 QCOA 0202-02, Rev. 13 QCOA 0203-01, Rev. 12 QCOA 0400-01, Rev. 20 QCOP 0202-03, Rev. 18 QCOP 1600-13, Rev. 22 QCOS 1000-09, Rev. 19

Quad Cities NRC EXAM Scenario 3 SHIFT TURNOVER INFORMATION

1. Plant Conditions:

a.) Unit 1 is at approximately 34% power starting up from a weekend outage.

b.) Unit 2 is at rated power.

c.) Technical Specification limitations:

(1) Unit 1:

TS 3.6.1.3, Condition A, for the MO 1-1001-26B PCI Valve inoperable.

Day 1/7, TLCO 3.6.a, Condition A, One Drywell Spray Subsystem Inoperable (2) Unit 2: None d.) On Line Risk is Green 2.) Significant problems/abnormalities:

a.) The MO 1-1001-26B, INBD DW SPRAY ISOL VLV, is Out-Of-Service for a limitorque replacement after the valve failed to stroke during performance of QCOS 1000-09.

b.) APRM 5 is bypassed due to erratic indications. Instrument Maintenance is preparing a troubleshooting package.

3.) Evolutions/maintenance for the oncoming shift:

a.) Complete QCOS 1000-09, RHR Power Operated Valve Test, step 14 only.

(Partial for RHR B Containment Cooling Valves) b.) Continue the start-up per the REMA and QCGP 1-1, step F.9.v.

Quad Cities NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 1 Page 1 of 1 NOTE:

Event

Description:

QCOS 1000-09, RHR Power Operated Valve Test for the B Loop Containment Cooling Valves ONLY.

Time Position Applicants Actions or Behavior SRO Authorizes performance of QCOS 1000-09, RHR Power Operated Valve Test, Step 14 for the RHR B Loop Containment Cooling Valves.

BOP Opens and times the MO 1-1001-36B, Torus Test or Spray Valve.

BOP Records time and verifies opening time meets IST criteria.

BOP Closes and times the MO 1-1001-36B valve.

BOP Records time and verifies closing time meets IST criteria.

BOP Opens and times the MO 1-1001-37B, Torus Spray Shutoff Valve.

BOP Records time and verifies opening time meets IST criteria.

BOP Closes and times the MO 1-1001-37B valve.

BOP Records time and verifies closing time meets IST criteria.

BOP Opens and times the MO 1-1001-34B, Torus Test or Spray Valve.

BOP Records time and verifies opening time meets IST criteria BOP Closes and times the MO 1-1001-34B valve BOP Records time and verifies closing time meets IST criteria.

BOP Returns the surveillance to the Unit Supervisor for independent verification of the B Loop Containment Cooling Valves.

Proceed to Event 2

Quad Cities NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 2 Page 1 of 1 Event

Description:

Normal Power Increase with Reactor Recirculation Pumps Time Position Applicants Actions or Behavior SRO Directs Reactor power increase per REMA and QCGP 1-1.

ATC Raises Recirculation flow by depressing the RAISE pushbutton on the 1-0262-22, MASTER SPEED DEMAND CONTROLLER.

ATC Monitors Recirculation pump speeds, Total Core Flow, APRM power, RPV water level, and RPV pressure.

BOP Peer checks operation of the 1-0262-22, Master Controller.

ATC Refers to QCGP 3-1 when reactor power is greater than 35%.

ATC/BOP Adjusts Load Set to approximately 10% above Main Generator Load per QCGP 3-1 Attachment D.

ATC Verifies annunciator 901-5 H-4 resets when reactor power is > 38.5%.

ATC Monitors Condensate Demin differential pressure (<30 psid) and Condensate Demin flows (<3000 gpm). Places additional Demineralizers in service as necessary.

SIM OP ROLE PLAY: If requested as EO place additional Demineralizers in service using the commands irf fw02r through fw08r.

NOTE: After the required power change has been completed, proceed to Event 3.

Quad Cities NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 3 Page 1 of 1 Event

Description:

Reactor Recirculation Pump Master Controller Fails High Time Position Applicants Actions or Behavior SIMOP: At the evaluators instruction, fail the Reactor Recirculation Master Controller RAISE pushbutton with the following command: ior difc10262222 raise ATC Reports APRM power, total core flow, and Reactor Recirculation pump speeds increasing.

SRO Directs actions of QCOA 0202-02 and QCOP 0202-03.

ATC Performs one of the following to terminate the power increase:

Place the 1-0262-25A and 1-262-25B Loop A/B SPEED CONTROLLERS in individual Manual mode.

Depress the LOWER pushbutton on the 1-0262-22 Master Speed Demand Controller.

Lock-up both Recirc MG sets by placing the Scoop Tube Power Reset switches to the LOCKUP position.

ATC Contacts Instrument Maintenance to investigate cause of the Master Controller failure.

ATC/BOP Adjusts Load Set if necessary SRO Directs actions of QCOA 0400-01, Reactivity Addition.

ATC Monitors LRPM/APRM levels and SRM period indications for signs off core instabilities.

ATC/BOP Verify Flow Control Line is < 100%.

SIM OP ROLE PLAY: If contacted as QNE acknowledge the report of the Master Controller failure and state you will verify compliance with thermal limits.

Proceed to Event 4

Quad Cities NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 4 Page 1 of 1 Event

Description:

APRM 6 Upscale With No 1/2 Scram Time Position Applicants Actions or Behavior SIM OP: Fail APRM 6 upscale HI-HI: imf nm08f 100 ATC Acknowledges annunciator 901-5 D-13, APRM HI-HI OR INOP and reports APRM 6 indicates HI-HI and RPS B failed to scram.

ATC Manually inserts a 1/2 scram in RPS B.

SRO Refers to QCOA 0700-03 and directs crew to hold Reactor power constant.

BOP Verifies APRM 6 indicates HI-HI in the 901-37 panel.

ATC Refers to the following annunciator procedures and reports to the Unit Supervisor that all are expected for the condition:

901-5 A-6, APRM Upscale High 901-5 C-3, Rod Out Block 901-5 H-1, OPRM Trouble/Inop 901-5 B-11, Channel A/B Neutron Monitor ATC/BOP Contacts Instrument Maintenance to troubleshoot APRM 4.

SRO Enters TS 3.3.1.1 Condition A, APRM inoperable. Verifies minimum number of APRMs (4) per TRM 3.3.a are operable.

Proceed to Event 5

Quad Cities NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 5 Page 1 of 1 Event

Description:

Spurious ERV Actuation Time Position Applicants Actions or Behavior SIM OP: Fail the 1-203-3D Relief Valve open: imf ad01d 0 BOP Acknowledges annunciator 901-3 E-13, Elect Relief Valves 3C/3D/3E Open and reports the D Relief Valve indicates open.

ATC Reports RPV water level and pressure are stable and a 2 MW(e) decrease.

CT1 SRO Directs actions of QCOA 0203-01.

CT1 BOP Places the D Relief Valve key switch to the OFF position.

BOP Verifies D Relief Valve closure by the following:

At the 901-21 panel, places the TEST/RESET toggle switch to RESET and verifies the green close light is lit on the Acoustic Monitor.

Decreasing tailpipe temperature on the 1-260-20, VLV LEAK AND CTMT AIR TEMP, Recorder.

Increase in Main Generator MW(e) output.

Annunciator 901-3 E-13 and 901-3 E-14 clear.

SRO Enters TS 3.5.1 Condition G, One ADS Valve Inoperable, and TS 3.3.6.3 Condition A, Inoperable Relief Valve.

Proceed to Event 6

Quad Cities NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 6 Page 1 of 1 Event

Description:

1A TBCCW Pump Degrades/Failure of Standby to Autostart Time Position Applicants Actions or Behavior SIM OP: Degrade the 1A TBCCW pump 100% over 10 minutes: imf sw12a 100 10:

BOP Acknowledges annunciator 912-1 D-2, Turb Bldg Cooling Water Low Pressure and reports the U-1 TBCCW Discharge Header pressure is 35 psig and lowering.

BOP Starts the 1B TBCCW pump and reports TBCCW Discharge Header pressure is stable at 40 psig.

BOP Dispatches EO to the 1A TBCCW pump to investigate.

SIM OP ROLE PLAY: As the EO dispatched to the 1A TBCCW pump, wait 2 minutes and report the 1A TBCCW pump is running hot and sounding noisy. You recommend securing the pump. No leaks were found. If asked, report the 1B TBCCW pump is operating properly.

BOP Secures the 1A TBCCW pump and verifies TBCCW discharge header pressure is stable at approximately 40 psig.

Proceed to Event 7

Quad Cities NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 7 Page 1 of 2 Event

Description:

Main Steam Line Break Inside Containment Time Position Applicants Actions or Behavior SIM OP: Insert an A MSL break inside containment of.3% over 3 minutes:

imf ms05a.3 3:

BOP Acknowledges annunciator 901-3 A-16, Pri Cnmt High Pressure and reports Drywell pressure at 1.55 psig and rising.

SRO Sets scram criteria on high Drywell pressure and directs actions of QCOA 0201-01.

ATC/BOP Investigates cause of high Drywell pressure.

ATC/BOP Notifies Radiation Protection and evacuate the Reactor Building.

BOP Starts all available Drywell Coolers.

ATC Inserts a manual reactor scram prior to exceeding 2.5 psig Drywell pressure.

SRO Enters QGA 100 on low RPV water level and high Drywell pressure and directs actions.

ATC Performs QCGP 2-3 Attachment A.

ATC/BOP Verifies auto actions and isolations for 0 RPV water level and 2.5 psig Drywell pressure.

ATC/BOP Reports MSIVs have spuriously isolated.

ATC Controls RPV water level between 0 and 48 inches using the Condensate and Feedwater system.

BOP Reports RPV pressure less than 1060 psig.

SRO Directs RPV cooldown at < 100°F/hr using ADS valves.

BOP Initiates RPV cooldown using B and C ADS valves.

Quad Cities NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 7 Page 2 of 2 Event

Description:

Main Steam Line Break Inside Containment Time Position Applicants Actions or Behavior SRO Enters QGA 200 on 2.5 psig Drywell pressure and directs actions.

BOP Reports Torus pressure < 5 psig and Torus level < 27 ft.

BOP Initiates Torus Sprays per QCOP 1000-30 (Hard Card).

BOP Initiates Torus Cooling and monitors Torus temperature and level.

BOP Starts both Containment Atmospheric Monitors (CAMs) and monitors Drywell/Torus Hydrogen and Oxygen concentrations.

BOP Reports Torus pressure > 5 psig and Torus level < 17 ft.

SRO Verifies Drywell temperature and pressure are within the Drywell Spray Initiation Limit (DSIL) Curve.

SRO Directs BOP to verify the following:

Both Reactor Recirc pumps tripped.

All Drywell Cooling Fans tripped.

SRO Directs BOP to initiate Drywell Sprays on A RHR Loop.

BOP Reports the MO 1-1001-23A valve will not open.

BOP Dispatches EO to MCC 18-1B to check the breaker and/or manually open the MO 1-1001-23A valve.

SIM OP ROLE PLAY: As EO if dispatched to inspect the breaker, call back and report there is an acrid smell but no fire.

SIM OP ROLE PLAY: If directed to manually open the MO 1-1001-23A valve, open the breaker using the command: irf rh19ar open. Then wait 5 minutes and report, the valve is bound shut and you are unable to open it.

SRO Directs BOP to re-establish RBCCW and Drywell Coolers.

BOP Restarts RBCCW and Drywell Coolers per QCOP 5750-19 (Hard Card).

ATC/BOP Monitors Containment parameters.

Proceed to Event 8

Quad Cities NRC EXAM Scenario 3 Quad Cities Scenario No.: 3 Event No.: 8 Page 1 of 1 Event

Description:

Blowdown Time Position Applicants Actions or Behavior BOP Reports Torus pressure 13 psig and rising.

SRO Anticipates Blowdown and directs actions of QCOP 0250-01 to re-open the MSIVs.

BOP Attempts to reset the Group I isolation per QCOP 0250-01 and reports it will NOT reset.

SRO Monitors Pressure Suppression Pressure (PSP) Curve and determines containment parameters cannot be maintained below limits.

SRO Enters QGA 500-1, RPV Blowdown, and directs actions.

ATC/BOP Verifies all rods in.

BOP Reports Drywell pressure above 2.5 psig.

SRO Directs BOP to prevent Core Spray and LPCI injection NOT needed for core cooling.

BOP Reports Torus level > 5 ft.

SRO Directs BOP to open all 5 ADS valves and leave switches in MANUAL.

BOP Opens all 5 ADS valves, leaves switches in MANUAL.

BOP Verifies all 5 ADS valves are open by acoustic monitor indication on the 901-21 panel and reports to the Unit Supervisor.

ATC/BOP Monitors RPV depressurization.

Proceed to Event 9 and 10

Quad Cities NRC EXAM Scenario 3 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 3 Event No.: 9 & 10 Page 1 of 2 Event

Description:

ADS Tailpipe Rupture and Venting of Containment to Stay Below PCPL.

SIM OP: When the A ADS valve is opened, verify trigger 4 goes true rupturing the tailpipe.

BOP Reports Drywell and Torus pressure rising rapidly.

BOP Reports Torus AND Drywell pressure are > 25 psig.

SRO Directs BOP to vent the Torus per QCOP 1000-13, and also states it is OK to exceed release rates.

BOP Starts all available Turbine Building and Radwaste Exhaust Fans.

BOP Verifies the following valves are closed:

AO 1-1601-23 AO 1-1601-24 AO 1-1601-60 AO 1-1601-61 AO 1-1601-62 AO 1-1601-63 BOP Evacuates the Reactor AND Turbine Building.

BOP Places MASTER VENT MODE switch in the APCV position.

BOP Verifies the AO 1-1699-7 valve closed.

BOP Places the AO 1-1601-24, CIS OVERRIDE, switch in OVERRIDE position for 1 second.

BOP Simultaneously places the AO 1-1601-23 AND AO 1-1601-60 CIS OVERRIDE switches to the OVERRIDE position and holds them for 1 second.

BOP Opens the AO 1-1601-24.

SRO Directs BOP to vent to maintain Torus pressure < 53 psig.

Quad Cities NRC EXAM Scenario 3 Quad Cities Scenario No.: 3 Event No.: 9 & 10 Page 2 of 2 Event

Description:

ADS Tailpipe Rupture and Venting of Containment to Stay Below PCPL.

Time Position Applicants Actions or Behavior BOP Verifies Torus level is < 27 ft and opens AO 1-1601-60.

BOP Initiates venting by cycling the AO 1-1699-6 and monitoring Drywell and Torus pressure.

BOP Monitors the 1/2-1740-19, CHIMNEY GAS ACTIVITY, on the 912-4 panel.

End of Scenario

Quad Cities NRC EXAM Scenario 4 Appendix D Scenario Outline Form ES-D-1 Facility: Quad Cities Scenario No.: NRC Scenario 4 Op-Test No.: ILT 08-1 _

Examiners: ____________________________ Operators:

Initial Conditions:

100% Power Turnover: Continue to maintain full load per QCGP 3-1 and the REMA.

Event No.

Malf. No.

Event Type*

Event Description 1

RD07A ATC IC CRD Pump trip 2

RD03R ATC IC Rod drift in one notch after CRD Pump Restart 3

DIHS13401A DIHS13403 ATC R

Emergency Power Reduction for loss of FW Heater String due to 1A1 Heater Level Switch failure, (maintain Reactor Power < 105% and Flow Control Line < 100%)

4 RP04A/RD05R CR01 Crew M

A RPS Trip w 5 rod scram /Manual Scram / Fuel damage 5

RD14A Crew M

Malfunction After EOP: SDV Rupture 6

DIHS10590303 Crew M

Scram Reset Switch failure 7

None Crew M

Contingency: Blowdown due to 2 areas > Max Safe Rads (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor ES-301-5 Quantitative attributes:

BOP Normal: None ATC Reactivity (1 per set): E3 BOP I/C (4 per set): None ATC I/C (4 per set): E1, E2 SRO-I I/C (4 /set inc 2 as ATC): E1, E2 SRO Tech Spec (2 per set): None ALL Major Transients (2 per set): E4 ES-301-4 Quantitative attributes:

Total Malfunctions (5-8): 7 Malfunction(s) after EOP (1-2): E5, E6 Abnormal Events (2-4): E1, E2, E3 Major Transient(s) /E-Plan entry (1-2): E4 EOPs (1-2): QGA 300 & 100 EOP Contingencies (0-2): QGA 500-1 Critical Tasks (2-3): 2

Quad Cities NRC EXAM Scenario 4

SUMMARY

The scenario starts at 100% power, steady sate operation.

The A CRD Pump trips and the crew is able to restart the B CRD Pump.

When the B CRD Pump is started, control rod L-5 drifts in and settles at position 46. The SRO and ATC take actions to notify the QNE and return control rod L-5 to position 48 per QCOA 0300-04, Mispositioned Control Rod.

The 1A Feedwater Heater level switch fails. The Crew responds per QCOA 3500-01, Feedwater Temperature Reduction with the Main Turbine Online, and QCOA 0400-01, Reactivity Addition, by performing an Emergency Power Reduction.

When the plant is stable, the A RPS MG Set will trip, which results in 5 rods scramming.

The ATC Operator should manually scram the reactor in accordance with immediate actions of QCOA 0300-11, Control Rod Drift.

All control rods fully insert during the scram, but fuel damage occurs and the North Scram Discharge Volume ruptures.

A RPS Bus can be restored from the Alternate source but the Scram Reset Switch fails to function, which prevents isolation of the reactor from the Scram Discharge Volume. The crew performs QGA 300, Secondary Containment Control, in response.

When two areas exceed their Max Safe Radiation Levels, the crew will perform RPV Blowdown per QGP 500-1.

CRITICAL TASKS:

Critical Task #1: Given an operating reactor plant and a loss of Feedwater heating, perform actions to control reactor power and reclose the MO 1-3403, LP HTR STRING BYP VLV, to terminate the reactivity addition.

Critical Task #2: Given an operating reactor plant with a primary system discharging into the reactor building and the discharge cannot be isolated, INITIATE an emergency depressurization when two or more areas exceed the maximum safe operating levels of the same parameter (radiation, temperature, or water level). (BWROG SC-1.2)

Quad Cities NRC EXAM Scenario 4 Simulator setup:

1. Reset to IC 21.

(Commands to be utilized DURING the scenario are contained in the CAEP file NRC Scenario #4.cae)

2. Insert Commands for setup:

ior dihs10590303 norm trgset 1 rdv10305117.LT.0.99 imf rd05r3423(1) imf rd05r3819(1) imf rd05r4223(1) imf rd05r3419(1) imf rd05r4219(1) trgset 2 zdihs10590300(1) imf cr01(2) 100 10:

imf rd14a(2) 50 10:

trgset 3 zdihs103023b(4) imf rd03r4219 (3 :30) trgset 4 rdsdrpos(136).le.720 trg 4 dmf rd03r4219

3. Verify the flowing commands for scenario performance:

imf rd07a imf ser1405 on ior dihs13401a close ior dihs13403 open dmf ser1405 on dor dihs13401a close dor dihs13403 open imf rp04a mrf rp02r alt imf rm0113 40 10:

imf rm0112 40 10:

imf rm0111 40 10:

imf rm0108 40 12:

imf rm0109 40 12:

imf rm0106 40 15:

4. Provide the crew with a Holding Load REMA.
5. Ensure procedures are erased and put away including QGAs.
6. Advance recorders.
7. Clean marked up meter/recorder faces and hard cards.
8. Remove any flags placed by the previous crew.

Quad Cities NRC EXAM Scenario 4 LIST OF POTENTIAL PROCEDURES Annunciator Procedures o

901-5 B-2, Rev. 5 o

901-5 F-2, Rev. 5 o

901-6 F-3, Rev. 1 o

901-6 G-3, Rev. 3 QCGP 2-3, Rev. 66 QGA 100, Rev. 9 QGA 300, Rev. 11 QGA 500-1, Rev. 13 QCOA 0300-01, Rev. 16 QCOA 0300-04 Rev. 15 QCOA 0300-11, Rev.20 QCOA 3500-01, Rev. 27 QCOA 0400-01, Rev. 20 QOA 7000-01, Rev. 31 QCOP 3200-05, Rev. 28

Quad Cities NRC EXAM Scenario 4 CREW TURNOVER

1. Plant Conditions:

a.) Unit 1 is operating at 100% power.

b.) Unit 2 is operating at 100% power.

c.) Technical Specification limitations:

(1) Unit 1: None (2) Unit 2: None d.) On Line Risk is Green 2.) Evolutions/maintenance for the oncoming shift:

a.) Continue to hold load per QCGP 3-1, Reactor Power Operations. And the REMA.

Quad Cities NRC EXAM Scenario 4 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 4 Event No.: 1 & 2 Page 1 of 2 NOTE:

Event

Description:

1A CRD Pump Trip.

Control Rod drift on 1B CRD pump start Time Position Applicants Actions or Behavior SIM OP: Trip the 1A CRD pump: imf rd07a ATC Acknowledges annunciator 901-5 B-2, CRD PP TRIP, and reports the 1A CRD pump has tripped.

SRO Sets scram criteria of 2 or more accumulator trouble alarms AND charging water header pressure < 940 psig for 20 minutes.

ATC Verifies the MO 1-301-2B, 1B PMP DISCH VLV, is closed for the standby pump.

ATC Starts the 1B CRD pump and verifies current is < 34 amps on the 1-302-1B.

SIM OP NOTE: Verify trigger 3 goes true after the 1B CRD pump is started. This will start control rod L-5 drifting in from position 48. Verify trigger 4 goes true at rod position 45 which deletes the rod drift malfunction causing control rod L-5 to settle at rod position 46.

ATC Throttles MO 1-301-2B to maintain 1400-1500 psig discharge pressure.

ATC Closes the MO 1-301-2A in the tripped pump.

ATC Dispatches EO to verify proper operation of running pump.

SIM OP ROLE PLAY: As EO dispatched to the CRD pump, wait 2 minutes and report the 1B CRD pump sounds normal, no leaks, and oil levels are in band. If also requested to check the 1A CRD pump breaker at Bus 13, report the breaker tripped on overcurrent.

ATC/BOP Reviews actions of QCOA 0300-01.

ATC Acknowledges 901-5 A-3, Rod Drift, and reports control rod L-5 is drifting in.

ATC Refers to QCAN 901-5 A-3, and QCOA 0300-11, Control Rod Drift.

Quad Cities NRC EXAM Scenario 4 Quad Cities Scenario No.: 4 Event No.: 1 & 2 Page 2 of 2 NOTE:

Event

Description:

1A CRD Pump Trip.

Control Rod drift on 1B CRD pump start Time Position Applicants Actions or Behavior SRO Notifies Shift Manager and Qualified Nuclear Engineer of control rod L5 drifting in.

ATC Reports control rod L-5 has settled at position 46. Exits QCOA 0300-11 and enters QCOA 0300-04, Mispositioned Control Rod.

SRO Directs actions of QCOA 0300-04 and directs ATC to withdraw control rod L-5 to position 48.

SIM OP ROLE PLAY: As the QNE, concur with the action to return control rod L-5 to position 48.

ATC Withdraws control rod L-5 to position 48 and performs a coupling check.

SRO Notifies SOS and Operations Manager.

Proceed to Event 3

Quad Cities NRC EXAM Scenario 4 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 4 Event No.: 3 Page 1 of 2 Event

Description:

Emergency Power Reduction for loss of FW Heater String due to 1A1 Heater Level Switch failure.

Time Position Applicants Actions or Behavior SIMOP: Insert the following commands to simulate a failure of the 1A1 Heater level switch (1-3541-32A): imf ser1405 on ior dihs13401a close ior dihs13403 open ATC/BOP Acknowledges annunciator 901-6 G-1, Heater 1A1 Heater High Level, and verifies the following:

FCV 1-3101A, 1A1 Emergency Drain Vlv, opens.

MO 1-3401A, Line 1 Htr Inlet Isol Vlv, closed.

MO 1-3402A, Line 1 Htr Outlt Isol Vlv, closed.

MO 1-3403, LP Htr String Byp Vlv, open ATC/BOP Monitors 1A1 Flash Tank level and reports level is low.and dispatches an EO to investigate.

SIM OP ROLE PLAY: As EO dispatched to the 1A1 Flash Tank Level Controller, (LIC 1-3541-9A) wait 3 minutes and report that level is downscale and you have contacted Electrical Maintenance to assist in troubleshooting.

ATC/BOP Reports increasing Condensate Demin D/P as indicated on the DPR 1-3340-1, Cond Demin DP, at the 901-6 panel.

SRO Enters and directs actions of QCOA 3500-01 and QCOA 0400-01 and sets scram criteria of reactor power > 105%, or any indication of Core Instabilities.

CT1 SRO Directs Emergency Power Reduction to < 7.6 Mlb/hr Feedwater flow.

CT1 ATC Initiates Emergency Power Reduction by inserting CRAM rods and lowering Recirc pump speeds.

EVALUATOR NOTE: During rapid power reductions, annunciator 901-3 A-2, Main Stm Line Hi Radiation may alarm due to a momentary spike. The operator should verify that MSL radiation monitor readings return to normal after reactor power stabilizes or the annunciator clears.

CREW Monitors and maintains Flow Control Line (FCL) < 100%.

ATC Monitors for indications of core instabilities.

SRO Directs power reduction continued until total Feedwater flow is

< 7.6 Mlb/hr.

Quad Cities NRC EXAM Scenario 4 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 4 Event No.: 3 Page 2 of 2 Event

Description:

Emergency Power Reduction for loss of FW Heater String due to 1A1 Heater Level Switch failure.

Time Position Applicants Actions or Behavior ATC/BOP Monitors D Heater Outlet temperature and Reactor power per QCOA 3500-01, Attachment A, and scrams the reactor if operating below the curve.

ATC/BOP Reports total Feedwater flow is < 7.6 Mlb/hr and annunciator 901-6 G-1 has cleared.

SIM OP ROLE PLAY: When Feedwater flow is < 7.6 Mlb/hr, insert the following commands:

dor dihs13401a dor dihs13403 imf ser1405 off Call in as the EM Supervisor and report while removing the cover to inspect the 1A1 Heater Level Switch, the switch repositioned. It appears the switch had stuck. A work package will be prepared to clean or replace the switch.

CT1 SRO Directs closure of MO 1-3403, LP Htr String Byp Vlv, to terminate the reactivity addition.

CT1 ATC/BOP Closes the MO 1-3403, LP Htr String Byp Vlv.

BOP Secures one Reactor Feed pump and one Condensate/Condensate Booster pump per QCOP 3200-05.

Proceed to Event 4

Quad Cities NRC EXAM Scenario 4 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 4 Event No.: 4 Page 1 of 1 Event

Description:

RPS A Trip With 5 Control Rod Scram/Manual Scram / Fuel Damage Time Position Applicants Actions or Behavior SIM OP: Trip RPS A MG Set and verify trigger 1 goes true, scramming 5 control rods:

imf rp04a ATC Reports RPS A has tripped and 5 control rods have scrammed.

ATC Inserts a manual reactor scram IAW QCOA 0300-11 ATC Reports the following:

All rods in.

RPV water level dropped below 0 inches and is recovering with Condensate and Feedwater system.

RPV pressure is < 1060 psig and controlled by DEHC.

Proceed to Event 5

Quad Cities NRC EXAM Scenario 4 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 4 Event No.: 5 Page 1 of 2 Event

Description:

Fuel Damage / North SDV Rupture Time Position Applicants Actions or Behavior SIM OP: Verify trigger 2 (fuel damage) and trigger 3 (SDV rupture) go true when the Mode Switch is taken to Shutdown. If not, make both triggers true when a full scram is inserted.

SRO Enters QGA 100 on low RPV water level and directs actions.

SRO Directs BOP to verify auto actions for 0 inches RPV water level.

BOP Verifies Group II and Group III isolations complete after RPS A is restored from the alternate power supply.

ATC Performs actions of QCGP 2-3 Attachment A.

ATC Maintains RPV water level band if 0 to 48 inches with Condensate and Feedwater.

SRO Directs RPV cooldown at < 100°F/hr (initially with Main Turbine Bypass valves, then transitions to ADS valves when MSIVs are closed due to high off-gas radiation levels).

ATC Starts RPV cooldown at < 100°F/hr.

SRO Directs BOP to perform actions of QOA 7000-01.

BOP Performs QOA 7000-01 and restores RPS A on the Alternate supply.

SIM OP ROLE PLAY: If dispatched to restore RPS A from its alternate supply, wait 3 minutes and restore it using: mrf rp02r alt Report the EPA 1A-2 has tripped on underfrequency.

BOP Acknowledges annunciators 901-55/56 A-1, Drywell High Rad Conc, and reports Drywell radiation is 30 R/hr and rising.

BOP Acknowledges the following alarms:

901-3 D-2, Off-Gas Hi Radiation 901-3 C-2, Off-Gas Hi Hi Radiation 901-3 A-2, Main Stm Line Hi Radiation 901-3 D-1, Turb Bldg Hi Radiation SRO Directs actions of QCOA 1700-04, 1700-05, and 1800-01.

BOP Monitors area radiation levels at the 901-11 panel and evacuates areas as necessary.

Quad Cities NRC EXAM Scenario 4 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 4 Event No.: 5 Page 2 of 2 Event

Description:

Fuel Damage / North SDV Rupture Time Position Applicants Actions or Behavior ATC/BOP Notifies Radiation Protection of area high radiation and request access control established.

ATC/BOP Notifies QNE and Chemistry personnel of high radiation.

BOP Monitors MSL and Off-Gas radiation levels at the 901-2 and 901-10 panels.

SRO Directs closure of all MSIVs, MSIV drain valves, AO 1-5406 and AO 1-5408A/B.

ATC/BOP Closes all MSIVs and MSIV drain valves at the 901-3 panel.

ATC/BOP Close the AO 1-5406 and verify the AO 1-5408A and AO 1-5408B close at the 901-54 panel.

Proceed to Event 6

Quad Cities NRC EXAM Scenario 4 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 4 Event No.: 6 Page 1 of 1 Event

Description:

Scram Reset Switch Failure Time Position Applicants Actions or Behavior SIM OP: Fail the 1st and 2nd Floor RB Rad Monitor upscale:

imf rm0113 40 10:, imf rm0112 40 10:, imf rm0111 40 10:, imf 0108 40 12:,

imf rm0109 40 12:, imf rm0106 40 15:

BOP Acknowledges annunciator 901-3 A-1, Rx Bldg Hi Radiation, and refers to annunciator procedure.

SRO Enters and directs actions of QGA 300.

ATC/BOP Dispatches EO to start the U-1 EDG Cooling Water Pump.

SIM OP ROLE PLAY: If requested wait approx. 2 minutes and start the U-1 EDGCWP:

mrf sw10r run ATC/BOP Dispatches EO to monitor area water levels in the Reactor Building Basement.

SIM OP ROLE PLAY: As EO dispatched to the RB basement, wait approx. 5 minutes and report, there is no steam or water leaking around the Torus or any of the corner rooms.

SIM OP ROLE PLAY: As an RP Technician, call in and report, Steam and water are leaking from the North Scram Discharge Volume. You have verified no other personnel are in the area.

SRO Directs ATC to reset the reactor scram.

ATC Bypasses the SDV high level, attempts to reset the reactor scram, and reports the scram will NOT reset.

ATC/BOP Continues monitoring Area Radiation and temperatures.

Proceed to Event 7

Quad Cities NRC EXAM Scenario 4 Appendix D Required Operator Actions Form ES-D-2 Quad Cities Scenario No.: 4 Event No.: 7 Page 1 of 1 Event

Description:

RPV Blowdown on 2 Areas at Max Safe Radiation Levels Time Position Applicants Actions or Behavior ATC/BOP Reports that area radiation levels for the 1st and 2nd Floor Reactor Building are above max safe levels.

SRO Enters QGA 500-1, RPV Blowdown, and directs actions.

SRO Verifies all rods in.

ATC/BOP Reports Drywell pressure < 2.5 psig.

ATC/BOP Reports Torus level > 5 ft.

CT2 SRO Directs ATC/BOP to open all 5 ADS valves and leave switches in MANUAL.

CT2 ATC/BOP Opens all 5 ADS valves and leaves switches in MANUAL.

ATC/BOP Verifies all 5 ADS valves are open by Acoustic Monitor indications on the 901-21 panel.

ATC/BOP Monitor RPV depressurization.

ATC/BOP Report RPV pressure < 100 psig and lowering.

End of Scenario