| issue date = 05/10/2010
| issue date = 05/10/2010
| title = IR 05000413-10-403, & IR 05000414-10-403, on 04/30/2010, for Catawba, NRC Special Security Inspection
| title = IR 05000413-10-403, & IR 05000414-10-403, on 04/30/2010, for Catawba, NRC Special Security Inspection
| author name = Shehee J C
| author name = Shehee J
| author affiliation = NRC/RGN-II/DRS/PSB2
| author affiliation = NRC/RGN-II/DRS/PSB2
| addressee name = Morris J R
| addressee name = Morris J
| addressee affiliation = Duke Energy Carolinas, LLC
| addressee affiliation = Duke Energy Carolinas, LLC
| docket = 05000413, 05000414
| docket = 05000413, 05000414
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter: Enclosure(s) transmitted herewith contain(s) SUNI. When separated from enclosure(s), this transmittal document is decontrolled May 10, 2010
{{#Wiki_filter:May 10, 2010


Mr. J. Site Vice President Duke Energy Carolinas, LLC Catawba Nuclear Station 4800 Concord Road York, SC 29745-9635
==SUBJECT:==
 
CATAWBA NUCLEAR STATION - NRC SPECIAL SECURITY INSPECTION REPORT 05000413/2010403 AND 05000414/2010403
SUBJECT: CATAWBA NUCLEAR STATION - NRC SPECIAL SECURITY INSPECTION REPORT 05000413/2010403 AND 05000414/2010403


==Dear Mr. Morris:==
==Dear Mr. Morris:==
On April 30, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed a Special security inspection at your Catawba Nuclear Station, Units 1 and 2. The enclosed inspection report documents the inspection results, which were discussed on May 4, 2010, with you and other members of your staff.
On April 30, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed a Special security inspection at your Catawba Nuclear Station, Units 1 and 2. The enclosed inspection report documents the inspection results, which were discussed on May 4, 2010, with you and other members of your staff.


This inspection examined activities conducted under your license as they relate to security and compliance with the Commission
This inspection examined activities conducted under your license as they relate to security and compliance with the Commission=s rules and regulations and with the conditions of your license.
=s rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
 
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.


This report documents one finding of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process). The finding is NRC identified. The deficiency was corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector left the site. The finding had a cross-cutting aspect in the area of Problem Identification  
This report documents one finding of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process). The finding is NRC identified. The deficiency was corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector left the site. The finding had a cross-cutting aspect in the area of Problem Identification  
& Resolution P.2 (b). If you disagree with the characterization of any finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555-0001; with copies to the Regional Admi nistrator Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, D.C. 20555-
& Resolution P.2 (b). If you disagree with the characterization of any finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555-0001; with copies to the Regional Administrator Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, D.C. 20555-0001; and the NRC Resident Inspector at the Catawba Nuclear Station. The information you provide will be considered in accordance with Inspection Manual Chapter 0305. DEC, LLC 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection.
0001; and the NRC Resident Inspector at the Catawba Nuclear Station. The information you provide will be considered in accordance with Inspection Manual Chapter 0305. DEC, LLC 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter
=s enclosure will not be available for public inspection.


In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
=s document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Should you have any questions concerning this letter, please contact us.
Should you have any questions concerning this letter, please contact us.


Sincerely,/RA/ James C. Shehee, Acting Chief Plant Support Branch 2 Division of Reactor Safety  
Sincerely,
/RA/  
 
James C. Shehee, Acting Chief  
 
Plant Support Branch 2 Division of Reactor Safety  


Docket Nos.: 50-413, 50-414 License Nos.: NPF-35, NPF-52  
Docket Nos.: 50-413, 50-414 License Nos.: NPF-35, NPF-52  


===Enclosure:===
Enclosure: Inspection Report 05000413/2010403 and 05000414/2010403  
Inspection Report 05000413/2010403 and 05000414/2010403  


===w/Attachment:===
w/Attachment: Supplemental Information  
Supplemental Information  


cc: See Page 3 DEC,LLC 3 Regulatory Compliance Manager Duke Power Company, LLC d/b/a Duke Energy Carolinas, LLC  
cc: See Page 3 DEC,LLC 3 Regulatory Compliance Manager Duke Power Company, LLC d/b/a Duke Energy Carolinas, LLC CN01RC 4800 Concord Road York, SC 29745-9635


CN01RC 4800 Concord Road York, SC 29745-9635
Lisa F. Vaughn Associate General Counsel Duke Energy Corporation 526 South Church Street-EC07H Charlotte, NC 28202


Lisa F. Vaughn Associate General Counsel Duke Energy Corporation 526 South Church Street-EC07H Charlotte, NC 28202  
Kathryn B. Nolan Senior Counsel Duke Energy Corporation 526 South Church Street-EC07H Charlotte, NC 28202  


Kathryn B. Nolan Senior Counsel Duke Energy Corporation 526 South Church Street-EC07H Charlotte, NC 28202 R. L. Gill, Jr.
R. L. Gill, Jr.


Manager Nuclear Regulatory Issues and Industry Affairs Duke Power Company, LLC d/b/a Duke Energy Carolinas, LLC 526 South Church Street Charlotte, NC 28201-0006  
Manager Nuclear Regulatory Issues and Industry Affairs Duke Power Company, LLC d/b/a Duke Energy Carolinas, LLC 526 South Church Street Charlotte, NC 28201-0006  


cc w/o encl: David A. Repka Winston Strawn LLP 1400 L Street NW Washington, DC 20005  
cc w/o encl:
David A. Repka Winston Strawn LLP 1400 L Street NW Washington, DC 20005  


Susan E. Jenkins Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control Elizabeth McMahon Assistant Attorney General S.C. Attorney General's Office P.O. Box 11549 Columbia, SC 29211  
Susan E. Jenkins Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control  
 
Elizabeth McMahon Assistant Attorney General S.C. Attorney General's Office P.O. Box 11549 Columbia, SC 29211  


Vanessa Quinn Federal Emergency Management Agency 500 C Street, SW Room 840 Washington, DC 20472  
Vanessa Quinn Federal Emergency Management Agency 500 C Street, SW Room 840 Washington, DC 20472  
Line 78: Line 81:
Piedmont Municipal Power Agency 121 Village Drive Greer, SC 29651  
Piedmont Municipal Power Agency 121 Village Drive Greer, SC 29651  


2600 Bull Street Columbia, SC 29201  
2600 Bull Street Columbia, SC 29201 Letter to J. from James C. Shehee dated May 10, 2010.
 
SUBJECT:
CATAWBA NUCLEAR STATION - NRC SECURITY SPECIAL INSPECTION REPORT 05000413/2010403 AND 05000414/2010403
 
Distribution w/encl:
B. Westreich, NSIR D. Riffle, NSIR RIDSNRRDIRS
 
Distribution w/o encl:
PUBLIC
 
(*) - SEE PREVIOUS PAGE FOR CONCURRENCES
 
G PUBLICLY AVAILABLE x NON-PUBLICLY AVAILABLE x SENSITIVE G NON-SENSITIVE ADAMS: G Yes ACCESSION NUMBER:_________________________
 
G SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS RII:DRS HQ:NSIR RII:DRP RII:DRS
 
SIGNATURE RA *
 
RA *
 
RA *
 
NAME JWALLO MERNSTES JTORNOW SOPARA JBARTLEY JLUBINSKI
 
DATE 4/5/2010
 
4/5/2010
 
5/6/2010


_________________________
E-MAIL COPY?
G SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS RII:DRS HQ:NSIR RII:DRP RII:DRS SIGNATURE RA * RA * RA * NAME JWALLO MERNSTES JTORNOW SOPARA JBARTLEY JLUBINSKI DATE 4/5/2010 4/5/2010 5/6/2010 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES N
YES NO YES NO YES NO YES NO YES NO YES N
OFFICIAL RECORD COPY DOCUMENT NAME:
G:\\DRSII\\PSBII\\REACTORS\\CATAWBA\\REPORTS\\2010\\CATAWBA SI IR 2010403 REVISION 1 OUO.DOC
}}
}}

Latest revision as of 04:58, 14 January 2025

IR 05000413-10-403, & IR 05000414-10-403, on 04/30/2010, for Catawba, NRC Special Security Inspection
ML101330452
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 05/10/2010
From: James Shehee
NRC/RGN-II/DRS/PSB2
To: Morris J
Duke Energy Carolinas
References
IR-10-403
Download: ML101330452 (4)


Text

May 10, 2010

SUBJECT:

CATAWBA NUCLEAR STATION - NRC SPECIAL SECURITY INSPECTION REPORT 05000413/2010403 AND 05000414/2010403

Dear Mr. Morris:

On April 30, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed a Special security inspection at your Catawba Nuclear Station, Units 1 and 2. The enclosed inspection report documents the inspection results, which were discussed on May 4, 2010, with you and other members of your staff.

This inspection examined activities conducted under your license as they relate to security and compliance with the Commission=s rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

This report documents one finding of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process). The finding is NRC identified. The deficiency was corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector left the site. The finding had a cross-cutting aspect in the area of Problem Identification

& Resolution P.2 (b). If you disagree with the characterization of any finding in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, D.C. 20555-0001; with copies to the Regional Administrator Region II; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, D.C. 20555-0001; and the NRC Resident Inspector at the Catawba Nuclear Station. The information you provide will be considered in accordance with Inspection Manual Chapter 0305. DEC, LLC 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this letter, please contact us.

Sincerely,

/RA/

James C. Shehee, Acting Chief

Plant Support Branch 2 Division of Reactor Safety

Docket Nos.: 50-413, 50-414 License Nos.: NPF-35, NPF-52

Enclosure: Inspection Report 05000413/2010403 and 05000414/2010403

w/Attachment: Supplemental Information

cc: See Page 3 DEC,LLC 3 Regulatory Compliance Manager Duke Power Company, LLC d/b/a Duke Energy Carolinas, LLC CN01RC 4800 Concord Road York, SC 29745-9635

Lisa F. Vaughn Associate General Counsel Duke Energy Corporation 526 South Church Street-EC07H Charlotte, NC 28202

Kathryn B. Nolan Senior Counsel Duke Energy Corporation 526 South Church Street-EC07H Charlotte, NC 28202

R. L. Gill, Jr.

Manager Nuclear Regulatory Issues and Industry Affairs Duke Power Company, LLC d/b/a Duke Energy Carolinas, LLC 526 South Church Street Charlotte, NC 28201-0006

cc w/o encl:

David A. Repka Winston Strawn LLP 1400 L Street NW Washington, DC 20005

Susan E. Jenkins Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control

Elizabeth McMahon Assistant Attorney General S.C. Attorney General's Office P.O. Box 11549 Columbia, SC 29211

Vanessa Quinn Federal Emergency Management Agency 500 C Street, SW Room 840 Washington, DC 20472

Peggy Force Assistant Attorney General State of North Carolina P.O. Box 629 Raleigh, NC 27602

North Carolina MPA-1 Suite 600 P. O. Box 29513 Raleigh, NC 27525=0513

Steve Weatherman, Operations Analyst North Carolina Electric Membership Corp.

P. O. Box 27306 Raleigh, NC 27611-7306

County Manager of York County York County Courthouse York, SC 29745

Piedmont Municipal Power Agency 121 Village Drive Greer, SC 29651

2600 Bull Street Columbia, SC 29201 Letter to J. from James C. Shehee dated May 10, 2010.

SUBJECT:

CATAWBA NUCLEAR STATION - NRC SECURITY SPECIAL INSPECTION REPORT 05000413/2010403 AND 05000414/2010403

Distribution w/encl:

B. Westreich, NSIR D. Riffle, NSIR RIDSNRRDIRS

Distribution w/o encl:

PUBLIC

(*) - SEE PREVIOUS PAGE FOR CONCURRENCES

G PUBLICLY AVAILABLE x NON-PUBLICLY AVAILABLE x SENSITIVE G NON-SENSITIVE ADAMS: G Yes ACCESSION NUMBER:_________________________

G SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS RII:DRS HQ:NSIR RII:DRP RII:DRS

SIGNATURE RA *

RA *

RA *

NAME JWALLO MERNSTES JTORNOW SOPARA JBARTLEY JLUBINSKI

DATE 4/5/2010

4/5/2010

5/6/2010

E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES N

OFFICIAL RECORD COPY DOCUMENT NAME:

G:\\DRSII\\PSBII\\REACTORS\\CATAWBA\\REPORTS\\2010\\CATAWBA SI IR 2010403 REVISION 1 OUO.DOC