{{#Wiki_filter:REGULATORY ANALYSIS
{{#Wiki_filter:Page 1 REGULATORY ANALYSIS  
                        REGULATORY GUIDE 1.50, REVISION 1, CONTROL OF PREHEAT TEMPERATURE FOR
                            WELDING OF LOW-ALLOY STEEL.


Statement of the Problem The U.S. Nuclear Regulatory Commission (NRC) initially issued Regulatory Guide 1.50,
REGULATORY GUIDE 1.50, REVISION 1, CONTROL OF PREHEAT TEMPERATURE FOR 
Control of Preheat Temperature for Welding of Low-Alloy Steel, in May 1973. The guidance does not reflect changes in the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME B&PV Code) since 1973. Therefore, revision of this regulatory guidance is necessary to reflect updates in the ASME B&PV Code.
WELDING OF LOW-ALLOY STEEL.


Objective The objective of this regulatory action is to update the NRCs guidance for the control of preheat temperature for welding of low-alloy steel, consistent with changes in the ASME B&PV Code since May 1973.
Statement of the Problem


Alternative Approaches The NRC staff considered the following alternative approaches:
The U.S. Nuclear Regulatory Commission (NRC) initially issued Regulatory Guide 1.50,
*        Do not revise Regulatory Guide 1.50.
Control of Preheat Temperature for Welding of Low-Alloy Steel, in May 1973.  The guidance does not reflect changes in the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME B&PV Code) since 1973.  Therefore, revision of this regulatory guidance is necessary to reflect updates in the ASME B&PV Code.


*        Revise Regulatory Guide 1.50.
Objective


Alternative 1: Do Not Revise Regulatory Guide 1.50
The objective of this regulatory action is to update the NRCs guidance for the control of preheat temperature for welding of low-alloy steel, consistent with changes in the ASME B&PV Code since May 1973.
        Under this alternative, the NRC would not revise the guidance, and the current guidance would be retained. If the NRC does not take action, there would not be any changes in costs or benefit to the public, the licensees, or the NRC. However, the no-action alternative would not address identified concerns with the current version of the regulatory guide. The NRC would continue to review each application on a case-by-case basis. This alternative provides a baseline condition from which any other alternatives will be assessed.


Alternative 2: Revise Regulatory Guide 1.50
Alternative Approaches
        Under this alternative, the NRC would revise Regulatory Guide 1.50, taking into consideration the changes in the ASME B&PV Code.


One benefit of this action is that it would clarify the guidance and references to the ASME B&PV
The NRC staff considered the following alternative approaches:
Code for applicants building new nuclear power plants, as well as for licensees. The impact to the NRC
would be the costs associated with preparing and issuing the regulatory guide revision. The impact to the public would be the voluntary costs associated with reviewing and providing comments to the NRC
during the public comment period. The value to the NRC staff and its applicants would be the benefits associated with enhanced efficiency and effectiveness in using a common guidance document as the technical basis for license applications and other interactions between the NRC and its regulated entities.


Page 1
*
Do not revise Regulatory Guide 1.50.


Conclusion Based on this regulatory analysis, the NRC staff recommends revision of Regulatory Guide 1.50.
*
Revise Regulatory Guide 1.50.


The staff concludes that the proposed action will reduce unnecessary confusion when referencing the ASME B&PV Code. It could also lead to cost savings for the industry, especially with regard to applications for standard plant design certifications and combined licenses.
Alternative 1:  Do Not Revise Regulatory Guide 1.50


Page 2}}
Under this alternative, the NRC would not revise the guidance, and the current guidance would be retained.  If the NRC does not take action, there would not be any changes in costs or benefit to the public, the licensees, or the NRC.  However, the no-action alternative would not address identified concerns with the current version of the regulatory guide.  The NRC would continue to review each application on a case-by-case basis.  This alternative provides a baseline condition from which any other alternatives will be assessed.
 
Alternative 2:  Revise Regulatory Guide 1.50
 
Under this alternative, the NRC would revise Regulatory Guide 1.50, taking into consideration the changes in the ASME B&PV Code.
 
One benefit of this action is that it would clarify the guidance and references to the ASME B&PV
Code for applicants building new nuclear power plants, as well as for licensees.  The impact to the NRC
would be the costs associated with preparing and issuing the regulatory guide revision.  The impact to the public would be the voluntary costs associated with reviewing and providing comments to the NRC
during the public comment period.  The value to the NRC staff and its applicants would be the benefits associated with enhanced efficiency and effectiveness in using a common guidance document as the technical basis for license applications and other interactions between the NRC and its regulated entities.
 
Page 2 Conclusion
 
Based on this regulatory analysis, the NRC staff recommends revision of Regulatory Guide 1.50.
 
The staff concludes that the proposed action will reduce unnecessary confusion when referencing the ASME B&PV Code.  It could also lead to cost savings for the industry, especially with regard to applications for standard plant design certifications and combined licenses.}}


{{RG-Nav}}
{{RG-Nav}}

Revision as of 04:16, 14 January 2025

Regulatory Analysis
ML101870625
Person / Time
Issue date: 03/31/2011
From:
Office of Nuclear Regulatory Research
To:
Bayssie Mekonen/RES 251-7489
Shared Package
ML101870548 List:
References
DG-1222 RG-1.050, Rev. 1
Download: ML101870625 (2)


Page 1 REGULATORY ANALYSIS

REGULATORY GUIDE 1.50, REVISION 1, CONTROL OF PREHEAT TEMPERATURE FOR

WELDING OF LOW-ALLOY STEEL.

Statement of the Problem

The U.S. Nuclear Regulatory Commission (NRC) initially issued Regulatory Guide 1.50,

Control of Preheat Temperature for Welding of Low-Alloy Steel, in May 1973. The guidance does not reflect changes in the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME B&PV Code) since 1973. Therefore, revision of this regulatory guidance is necessary to reflect updates in the ASME B&PV Code.

Objective

The objective of this regulatory action is to update the NRCs guidance for the control of preheat temperature for welding of low-alloy steel, consistent with changes in the ASME B&PV Code since May 1973.

Alternative Approaches

The NRC staff considered the following alternative approaches:

Do not revise Regulatory Guide 1.50.

Revise Regulatory Guide 1.50.

Alternative 1: Do Not Revise Regulatory Guide 1.50

Under this alternative, the NRC would not revise the guidance, and the current guidance would be retained. If the NRC does not take action, there would not be any changes in costs or benefit to the public, the licensees, or the NRC. However, the no-action alternative would not address identified concerns with the current version of the regulatory guide. The NRC would continue to review each application on a case-by-case basis. This alternative provides a baseline condition from which any other alternatives will be assessed.

Alternative 2: Revise Regulatory Guide 1.50

Under this alternative, the NRC would revise Regulatory Guide 1.50, taking into consideration the changes in the ASME B&PV Code.

One benefit of this action is that it would clarify the guidance and references to the ASME B&PV

Code for applicants building new nuclear power plants, as well as for licensees. The impact to the NRC

would be the costs associated with preparing and issuing the regulatory guide revision. The impact to the public would be the voluntary costs associated with reviewing and providing comments to the NRC

during the public comment period. The value to the NRC staff and its applicants would be the benefits associated with enhanced efficiency and effectiveness in using a common guidance document as the technical basis for license applications and other interactions between the NRC and its regulated entities.

Page 2 Conclusion

Based on this regulatory analysis, the NRC staff recommends revision of Regulatory Guide 1.50.

The staff concludes that the proposed action will reduce unnecessary confusion when referencing the ASME B&PV Code. It could also lead to cost savings for the industry, especially with regard to applications for standard plant design certifications and combined licenses.