{{#Wiki_filter:ust 30, 2010
{{#Wiki_filter:August 30, 2010


==SUBJECT:==
==SUBJECT:==
FERMI POWER PLANT, UNIT 2 NRC SECURITY BASELINE INSPECTION REPORT  
FERMI POWER PLANT, UNIT 2 NRC SECURITY BASELINE INSPECTION REPORT 05000341/2010403(DRS)


05000341/2010403(DRS)
==Dear Mr. Davis:==
On July 30, 2010, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection of your Fermi Power Plant, Unit 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process.
 
The enclosed inspection report documents the inspection results, which were discussed on July 30, 2010, with Mr. T. Conner and other members of your staff.
 
The inspection examined activities conducted under your licenses as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.


==Dear Mr. Davis:==
Based on the results of this inspection, no findings were identified.
On July 30, 2010, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection of your Fermi Power Plant, Unit 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on July 30, 2010, with Mr. T. Conner and other members of your staff.


The inspection examined activities conducted under your licenses as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letters enclosures will not be available for public inspection.


Based on the results of this inspection, no findings were identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letter's enclosures will not be available for public inspection. Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.


Sincerely,
Sincerely,
/RA/ Eric Duncan, Chief
/RA/  


Plant Support Branch  
Eric Duncan, Chief Plant Support Branch Division of Reactor Safety


Division of Reactor Safety
Docket No. 50-341 License No. NPF-43


Docket No. 50-341 License No. NPF-43
Nonpublic Enclosure: Inspection Report 05000341/2010403(DRS)
 
w/Attachment: Supplemental Information


Nonpublic Enclosure: Inspection Report 05000341/2010403(DRS) w/Attachment: Supplemental Information cc w/encl: S. Coker, NSIR/DSO/DDSO/ST C. Johnson, NSIR J. Trapp, Region I  
cc w/encl:
S. Coker, NSIR/DSO/DDSO/ST C. Johnson, NSIR J. Trapp, Region I M. Ernstes, RII M. Shannon, RIV


M. Ernstes, RII M. Shannon, RIV T. Strong, State Liaison Officer, State of Michigan  
T. Strong, State Liaison Officer, State of Michigan  


cc w/o encl: Distribution via ListServ
cc w/o encl:
Distribution via ListServ
}}
}}

Latest revision as of 03:08, 14 January 2025

IR 05000341-10-403 (DRS) on 07/26/2010 - 07/30/2010 for Fermi Power Plant, Unit 2, Routine Security Baseline Inspection - Cover Letter
ML102440361
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 08/30/2010
From: Eric Duncan
Plant Support Branch II
To: Jennifer Davis
Detroit Edison
References
IR-10-403
Download: ML102440361 (3)


Text

August 30, 2010

SUBJECT:

FERMI POWER PLANT, UNIT 2 NRC SECURITY BASELINE INSPECTION REPORT 05000341/2010403(DRS)

Dear Mr. Davis:

On July 30, 2010, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection of your Fermi Power Plant, Unit 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process.

The enclosed inspection report documents the inspection results, which were discussed on July 30, 2010, with Mr. T. Conner and other members of your staff.

The inspection examined activities conducted under your licenses as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings were identified.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letters enclosures will not be available for public inspection.

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Eric Duncan, Chief Plant Support Branch Division of Reactor Safety

Docket No. 50-341 License No. NPF-43

Nonpublic Enclosure: Inspection Report 05000341/2010403(DRS)

w/Attachment: Supplemental Information

cc w/encl:

S. Coker, NSIR/DSO/DDSO/ST C. Johnson, NSIR J. Trapp, Region I M. Ernstes, RII M. Shannon, RIV

T. Strong, State Liaison Officer, State of Michigan

cc w/o encl:

Distribution via ListServ