{{#Wiki_filter:UNITED NUCLEAR REGULATORY REGION 475 ALLENDAlE KING OF PRUSSIA, PA September 27, 2010
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDAlE ROAD KING OF PRUSSIA, PA 19406-1415 September 27, 2010 EA-09-00J EA-09-05~~
* EA-09-00J Mr. Michael J. Pacilio Senior Vice President, Exelon Generating Company, llC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, Il 60555 PEACH BOTTOM RESPONSE TO CONFIRMATORY NRC INVESTIGATION REPORT NOS. 1-2008-023,  
Mr. Michael J. Pacilio Senior Vice President, Exelon Generating Company, llC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, Il 60555  
 
==SUBJECT:==
PEACH BOTTOM RESPONSE TO CONFIRMATORY ORDER NRC INVESTIGATION REPORT NOS. 1-2008-023, 1-2008-004


==Dear Mr. Pacilio:==
==Dear Mr. Pacilio:==
Thank you for your letter of July 23, 2010 (Ml1 02150454) in response to our December 1, 2009, letter and Confirmatory Order regarding two former Reach Bottom employees who deliberately violated NRC requirements by reporting inaccurate information in one instance, and failing to inform Exelon of information required to be reported in the other. We . acknowledge that the actions required in Section V.A of the Confirmatory Order have been completed.
Thank you for your letter of July 23, 2010 (Ml1 02150454) in response to our {{letter dated|date=December 1, 2009|text=December 1, 2009, letter}} and Confirmatory Order regarding two former Reach Bottom employees who deliberately violated NRC requirements by reporting inaccurate information in one instance, and failing to inform Exelon of information required to be reported in the other. We.
We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained.
acknowledge that the actions required in Section V.A of the Confirmatory Order have been completed. We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained.
In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspections in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room). Sincerely, Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects cc: Distribution via ListServ EA-09-007 EA..Q9-05fl Mr.
In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspections in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).
J. Pacilio Senior Vic,s President, Exelon Generating Company. LlC President
Sincerely, Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects cc: Distribution via ListServ  
:and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road I L 60555 PEACH BOTTOM RESPONSE TO CONFIRMATORY NRC INVESTIGATION REPORT NOS. 1-2008-023, 1-2008-004  
 
EA-09-007 EA..Q9-05fl Mr. Michal~1 J. Pacilio Senior Vic,s President, Exelon Generating Company. LlC President :and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenvilh~, I L 60555  
 
==SUBJECT:==
PEACH BOTTOM RESPONSE TO CONFIRMATORY ORDER NRC INVESTIGATION REPORT NOS. 1-2008-023, 1-2008-004  


==Dear Mr. Pacilio:==
==Dear Mr. Pacilio:==
Thank you for your letter of July 23, 2010 (ML102150454) in response to our December 1, 2009, letter and Confirmatory Order regarding two former Peach Bottom employees who deliberately violated NRC requirements by reporting inaccurate information in one instance, and failing to inform Exelon of information required to be reported in the other. We acknowledge that the actions required in Section V.A of the Confirmatory Order have been completed.
Thank you for your letter of July 23, 2010 (ML102150454) in response to our {{letter dated|date=December 1, 2009|text=December 1, 2009, letter}} and Confirmatory Order regarding two former Peach Bottom employees who deliberately violated NRC requirements by reporting inaccurate information in one instance, and failing to inform Exelon of information required to be reported in the other. We acknowledge that the actions required in Section V.A of the Confirmatory Order have been completed. We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained.
We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained.
In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspections in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web Site at http://www.nrc.qovtreading-rm/adams.html(the Public Electronic Reading Room).
In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspections in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web Site at http://www.nrc.qovtreading-rm/adams.html(the Public Electronic Reading Room). Sincerely, IRN Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects co: Distribution via ListServ Distribution w/encl:(via E-mail) J. Clifford, DRP D. COllins, DRP P. Krohn, DRP A. Rosebrook.
Sincerely, IRN Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects co: Distribution via ListServ Distribution w/encl:(via E-mail)
DRP E. Torres, DRP J. Bream. DRP F. Bower, DRP, SRI M. Mclaughlin, ORA D. Holody, ORA F. Bower, DRP, SRI A. Ziedonis, DRP, Rr S. Schmitt, DRP, OA SUNSI Review Complete:
J. Clifford, DRP D. COllins, DRP P. Krohn, DRP A. Rosebrook. DRP E. Torres, DRP J. Bream. DRP F. Bower, DRP, SRI M. Mclaughlin, ORA D. Holody, ORA F. Bower, DRP, SRI A. Ziedonis, DRP, Rr S. Schmitt, DRP, OA SUNSI Review Complete:
AAR (Reviewer'S ML102700185 DOC NAME: G:\DRP\BRANCH4\
AAR (Reviewer'S Initials)
PEACH BOTTOM\ACKNOWlEDGMENT LETTER CONFIRMATORY ORDER RESPONSE DOCX After declaring this document uAn Official Agency Record" it be released to the Public. To receive a ropy of this document, indicate in the box:'C'::
ML102700185 DOC NAME: G:\\DRP\\BRANCH4\\ PEACH BOTTOM\\ACKNOWlEDGMENT LETTER CONFIRMATORY ORDER RESPONSE DOCX  
Copy without atlachmenllenclosure "E' :: Copy wlattachmenllenclosure'N'::;
 
No oopy AARf 09/27/10 OFFICIAL USE ONLY}}
After declaring this document uAn Official Agency Record" it ~ be released to the Public.
To receive aropy of this document, indicate in the box:'C':: Copy without atlachmenllenclosure "E' :: Copy wlattachmenllenclosure'N'::; No oopy mmt RIIDRP AARf AAR 09/27/10 OFFICIAL USE ONLY}}

Latest revision as of 02:47, 14 January 2025

Response to Confirmatory Order 1-2008-023, 1-2008-004, Dated 09-27-2010
ML102700185
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 09/27/2010
From: Paul Krohn
Reactor Projects Region 1 Branch 4
To: Pacilio M
Exelon Nuclear, Exelon Generation Co
KROHN P, RI/DRP/PB4/610-337-5120
References
1-2008-004, 1-2008-023, EA-09-007, EA-09-059
Download: ML102700185 (1)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDAlE ROAD KING OF PRUSSIA, PA 19406-1415 September 27, 2010 EA-09-00J EA-09-05~~

Mr. Michael J. Pacilio Senior Vice President, Exelon Generating Company, llC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenville, Il 60555

SUBJECT:

PEACH BOTTOM RESPONSE TO CONFIRMATORY ORDER NRC INVESTIGATION REPORT NOS. 1-2008-023, 1-2008-004

Dear Mr. Pacilio:

Thank you for your letter of July 23, 2010 (Ml1 02150454) in response to our December 1, 2009, letter and Confirmatory Order regarding two former Reach Bottom employees who deliberately violated NRC requirements by reporting inaccurate information in one instance, and failing to inform Exelon of information required to be reported in the other. We.

acknowledge that the actions required in Section V.A of the Confirmatory Order have been completed. We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained.

In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspections in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html(the Public Electronic Reading Room).

Sincerely, Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects cc: Distribution via ListServ

EA-09-007 EA..Q9-05fl Mr. Michal~1 J. Pacilio Senior Vic,s President, Exelon Generating Company. LlC President :and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Road Warrenvilh~, I L 60555

SUBJECT:

PEACH BOTTOM RESPONSE TO CONFIRMATORY ORDER NRC INVESTIGATION REPORT NOS. 1-2008-023, 1-2008-004

Dear Mr. Pacilio:

Thank you for your letter of July 23, 2010 (ML102150454) in response to our December 1, 2009, letter and Confirmatory Order regarding two former Peach Bottom employees who deliberately violated NRC requirements by reporting inaccurate information in one instance, and failing to inform Exelon of information required to be reported in the other. We acknowledge that the actions required in Section V.A of the Confirmatory Order have been completed. We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained.

In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspections in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web Site at http://www.nrc.qovtreading-rm/adams.html(the Public Electronic Reading Room).

Sincerely, IRN Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects co: Distribution via ListServ Distribution w/encl:(via E-mail)

J. Clifford, DRP D. COllins, DRP P. Krohn, DRP A. Rosebrook. DRP E. Torres, DRP J. Bream. DRP F. Bower, DRP, SRI M. Mclaughlin, ORA D. Holody, ORA F. Bower, DRP, SRI A. Ziedonis, DRP, Rr S. Schmitt, DRP, OA SUNSI Review Complete:

AAR (Reviewer'S Initials)

ML102700185 DOC NAME: G:\\DRP\\BRANCH4\\ PEACH BOTTOM\\ACKNOWlEDGMENT LETTER CONFIRMATORY ORDER RESPONSE DOCX

After declaring this document uAn Official Agency Record" it ~ be released to the Public.

To receive aropy of this document, indicate in the box:'C':: Copy without atlachmenllenclosure "E' :: Copy wlattachmenllenclosure'N'::; No oopy mmt RIIDRP AARf AAR 09/27/10 OFFICIAL USE ONLY