{{Adams|number = ML103010433}} | {{Adams | ||
| number = ML103010433 | |||
| issue date = 10/26/2010 | |||
| title = IR 05000254-10-403 (Drs), 05000265-10-403 (Drs), on 09/13/2010 - 09/16/2010, Quad Cities Nuclear Power Station; Routine Security Baseline Inspection - Cover Letter | |||
| author name = Skokowski R | |||
| author affiliation = NRC/RGN-III/DRS/PSB | |||
| addressee name = Pacilio M | |||
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | |||
| docket = 05000254, 05000265 | |||
| license number = DPR-029, DPR-030 | |||
| contact person = | |||
| document report number = IR-10-403 | |||
| document type = Letter | |||
| page count = 3 | |||
}} | |||
{{IR-Nav| site = 05000254 | year = 2010 | report number = 403 }} | {{IR-Nav| site = 05000254 | year = 2010 | report number = 403 }} | ||
=Text= | =Text= | ||
{{#Wiki_filter | {{#Wiki_filter:October 26, 2010 | ||
==SUBJECT:== | |||
QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 NRC SECURITY BASELINE INSPECTION REPORT 05000254/2010403(DRS); | |||
SUBJECT: | 05000265/2010403(DRS) | ||
==Dear Mr. Pacilio:== | ==Dear Mr. Pacilio:== | ||
On September 16, 2010, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Quad Cities Nuclear Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the | On September 16, 2010, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Quad Cities Nuclear Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. | ||
The enclosed inspection report documents the inspection results, which were discussed on September 16, 2010, with Mr. R. Gideon and other members of your staff. | The enclosed inspection report documents the inspection results, which were discussed on September 16, 2010, with Mr. R. Gideon and other members of your staff. | ||
The inspection examined activities conducted under your license as they relate to security and compliance with the | The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license. | ||
Based on the results of this inspection no findings were identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at | The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | ||
Based on the results of this inspection no findings were identified. | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. | |||
Should you have any questions concerning this inspection, we will be pleased to discuss them with you. | Should you have any questions concerning this inspection, we will be pleased to discuss them with you. | ||
Sincerely,/RA/ | Sincerely, | ||
/RA/ | |||
Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety | |||
Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 | |||
Nonpublic Enclosure: Inspection Report 05000254/2010403(DRS); | |||
05000265/2010403(DRS) | |||
w/Attachment: Supplemental Information | |||
cc w/encl: | |||
S. Coker, NSIR/DSO/DDSO/ST C. Johnson, NSIR J. Trapp, Region I M. Ernstes, RII M. Shannon, RIV | |||
D. Thompson, Quad Cities Station Security Manager | |||
J. Klinger, State Liaison Officer, | |||
Illinois Emergency Management Agency | |||
M. Rasmusson, State Liaison Officer, State of Iowa | |||
cc w/o encl: | |||
Distribution via ListServ | |||
}} | }} | ||
Latest revision as of 02:11, 14 January 2025
| ML103010433 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 10/26/2010 |
| From: | Richard Skokowski Plant Support Branch II |
| To: | Pacilio M Exelon Generation Co, Exelon Nuclear |
| References | |
| IR-10-403 | |
| Download: ML103010433 (3) | |
Text
October 26, 2010
SUBJECT:
QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 NRC SECURITY BASELINE INSPECTION REPORT 05000254/2010403(DRS);
Dear Mr. Pacilio:
On September 16, 2010, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Quad Cities Nuclear Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process.
The enclosed inspection report documents the inspection results, which were discussed on September 16, 2010, with Mr. R. Gideon and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection no findings were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
/RA/
Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety
Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30
Nonpublic Enclosure: Inspection Report 05000254/2010403(DRS);
w/Attachment: Supplemental Information
cc w/encl:
S. Coker, NSIR/DSO/DDSO/ST C. Johnson, NSIR J. Trapp, Region I M. Ernstes, RII M. Shannon, RIV
D. Thompson, Quad Cities Station Security Manager
J. Klinger, State Liaison Officer,
Illinois Emergency Management Agency
M. Rasmusson, State Liaison Officer, State of Iowa
cc w/o encl:
Distribution via ListServ