ML103200310: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML103200310
| number = ML103200310
| issue date = 11/04/2010
| issue date = 11/04/2010
| title = Revision 2 to Emergency Plan Implementing Procedure IP-EP-360, Core Damage Assessment.
| title = To Emergency Plan Implementing Procedure IP-EP-360, Core Damage Assessment
| author name = Vogle R
| author name = Vogle R
| author affiliation = Entergy Corp
| author affiliation = Entergy Corp
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:. November 4, 2010 DISTRIBUTION CONTROL LIST Document Name:            IPEC EMERGENCY PLAN CC#     NAME                     DEPARTMENT                      LOCATION CC/STMP CROULET, DON             INSTRUC TECH TRNG (E-PLAN ONLY) 48-2-A CC/STMP   IRAOLA, TONY         FOR THE JIC                    EOF CC/STMP SHIFT MANAGER           OPERATIONS                      IP3 CC/STMP CONTROL ROOM             OPERATIONS                      IP3 CC/STMP EOF                      E-PLAN (ALL EP'S),             EOF CC/STMP PEREZ, ROSE              E-PLAN (ALL EP'S)               WPO-12D CC/STMP TSC (IP3)                EEC BUILDING                   IP2 CC/STMP BARR, STEVE              NRC (ALL EP'S)                 OFFSITE CC/STMP BARR, STEVE .- __        NRC (ALL EP'S)                 OFFSITE
{{#Wiki_filter:.
  -CC/STMP DOC CONTROL DESK        NRC (ALL EP'S)                 OFFSITE CC/STMP   DOC CONTROL DESK NRC FOR (E-PLAN ONLY)               OFFSITE (USE ATTENTION TO DIRECTOR OF SPENT FUEL ADDRESS)
November 4, 2010 Document Name:
CC/STMP CULLINAN, P             J A (PLAN ONLY)                 OFFSITE CC/STMP E-PLAN STAFF             E-PLAN (ALL EP'S)               GSB-2ND FL CC/STMP MCDONALD,MICHELLE       ST. EMERG. MGMT. OFFICE (ALL)   OFFSITE CC/STMP DELBORGO, D (PLAN ONLY) DISASTER & EMERGENCY           OFFSITE CC/STMP LONGO, N (PLAN ONLY)     EMERGENCY SERVICES             OFFSITE CC/STMP KARSTEN,C (PLAN ONLY)   DISASTER & CIVIL DEFENSE       OFFSITE CC/STMP STIEBELING A (PLAN ONLY) OFF OF EMERG MANAGEMENT         OFFSITE CC/STMP GRANT, LEAH             SIMULATOR (TRAINING)           48-2-A CC/STMP GRANT,LEAH               LRQ TRAINING                   48-2-A CC/STMP CONTROL ROOM             OPERATONS                       IP2 CC/STMP CHIUSANO, J             SIMULATOR (TRAINING 5 COPIES)   EEC CC/STMP CHIUSANO, J             CLASSROOM 2                     EEC CC/STMP CHIUSANO, J             TRAINING                       48-2-A CC/STMP NRC RESIDENT INSPECTOR   US NRC (88' ELEVATION)         IP2 TONY IRAOLA GETS:.... E-PLAN, IP-EP-115 (FORMS), IP-EP-260(JOINT CENTER INFORMATION) "NO FORMS GO TO THE OFFSITERS"
DISTRIBUTION CONTROL LIST IPEC EMERGENCY PLAN CC#
  ***CC/STMP.....CONTROL COPY STAMP***
NAME CC/STMP CROULET, DON CC/STMP IRAOLA, TONY CC/STMP SHIFT MANAGER CC/STMP CONTROL ROOM CC/STMP EOF CC/STMP PEREZ, ROSE CC/STMP TSC (IP3)
CC/STMP BARR, STEVE CC/STMP BARR, STEVE.-__
-CC/STMP DOC CONTROL DESK DEPARTMENT INSTRUC TECH TRNG (E-PLAN ONLY)
FOR THE JIC OPERATIONS OPERATIONS E-PLAN (ALL EP'S),
E-PLAN (ALL EP'S)
EEC BUILDING NRC (ALL EP'S)
NRC (ALL EP'S)
NRC (ALL EP'S)
LOCATION 48-2-A EOF IP3 IP3 EOF WPO-12D IP2 OFFSITE OFFSITE OFFSITE CC/STMP DOC CONTROL DESK NRC FOR (E-PLAN ONLY)
(USE ATTENTION TO DIRECTOR OF SPENT FUEL ADDRESS)
CC/STMP CULLINAN, P J A (PLAN ONLY)
CC/STMP E-PLAN STAFF E-PLAN (ALL EP'S)
CC/STMP MCDONALD,MICHELLE ST. EMERG. MGMT. OFFICE (ALL)
CC/STMP DELBORGO, D (PLAN ONLY) DISASTER & EMERGENCY CC/STMP LONGO, N (PLAN ONLY)
EMERGENCY SERVICES CC/STMP KARSTEN,C (PLAN ONLY)
DISASTER & CIVIL DEFENSE CC/STMP STIEBELING A (PLAN ONLY) OFF OF EMERG MANAGEMENT CC/STMP GRANT, LEAH SIMULATOR (TRAINING)
CC/STMP GRANT,LEAH LRQ TRAINING CC/STMP CONTROL ROOM OPERATONS CC/STMP CHIUSANO, J SIMULATOR (TRAINING 5 COPIES)
CC/STMP CHIUSANO, J CLASSROOM 2 CC/STMP CHIUSANO, J TRAINING CC/STMP NRC RESIDENT INSPECTOR US NRC (88' ELEVATION)
OFFSITE OFFSITE GSB-2ND FL OFFSITE OFFSITE OFFSITE OFFSITE OFFSITE 48-2-A 48-2-A IP2 EEC EEC 48-2-A IP2 TONY IRAOLA GETS:.... E-PLAN, IP-EP-115 (FORMS), IP-EP-260(JOINT CENTER INFORMATION) "NO FORMS GO TO THE OFFSITERS"
***CC/STMP.....CONTROL COPY STAMP***
EFFECTIVE DATE:
EFFECTIVE DATE:


IPEC SITE                         QUALITY RELATED           IP-SMM-AD-103       Revision 0 E----ELe°gy                     MANAGEMENT                 ADMINISTRATIVE PROCEDURE MANUAL INFORMATIONAL USE               Page         13 of   21 ATTACHMENT     10.1                                                       SMM CONTROLLED DOCUMENT TRANSMITTAL FORM SITE MANAGEMENT MANUAL CONTROLLED DOCUMENT TRANSMITTAL FORM - PROCEDURES Page 1 of 1
IPEC SITE QUALITY RELATED IP-SMM-AD-103 Revision 0 E----ELe°gy MANAGEMENT ADMINISTRATIVE PROCEDURE MANUAL INFORMATIONAL USE Page 13 of 21 ATTACHMENT 10.1 SMM CONTROLLED DOCUMENT TRANSMITTAL FORM SITE MANAGEMENT MANUAL CONTROLLED DOCUMENT TRANSMITTAL FORM - PROCEDURES Page 1 of 1
            -Ent                                                                       CONTROLLED DOCUMENT TRANSMITTAL FORM - PROCEDURES IPEC, P.O. Box 308, Buchanan, NY 10511 TO: DISTRIBUTION                         DATE: 11/4/10                                 TRANSMITTAL NO:
-Ent CONTROLLED DOCUMENT TRANSMITTAL FORM - PROCEDURES IPEC, P.O. Box 308, Buchanan, NY 10511 TO: DISTRIBUTION DATE: 11/4/10 TRANSMITTAL NO:
                                                                    ,Circle   one)
,Circle one)
FROM: IPEC DOCUMENT CONTROL: E                                     or IP2 53'EL     PHONE NUMBER: (914) 271-7054 The Document(s) identified below are forwarded for use. In accordance with IP-SMM-AD-103, please review to verify receipt, incorporate the document(s) into your controlled document file, properly disposition superseded, void, or inactive document(s). Sign and return the receipt acknowledgement below within fifteen (15) working days.
FROM: IPEC DOCUMENT CONTROL: E or IP2 53'EL PHONE NUMBER: (914) 271-7054 The Document(s) identified below are forwarded for use. In accordance with IP-SMM-AD-103, please review to verify receipt, incorporate the document(s) into your controlled document file, properly disposition superseded, void, or inactive document(s). Sign and return the receipt acknowledgement below within fifteen (15) working days.
AFFECTED DOCUMENT:                   IPEC EMERGENCY PLAN PROCEDURES DOC#                 I   REV#   I                           TITLE                           INSTRUCTIONS THE FOLLOWING PROCEDURE HAS BEEN REVISED, PLEASE REMOVE YOUR CURRENT COPY AND REPLACE WITH ATTACHED REVISIED PROCEDURE:
AFFECTED DOCUMENT:
IPEC EMERGENCY PLAN PROCEDURES DOC#
I REV#
I TITLE INSTRUCTIONS THE FOLLOWING PROCEDURE HAS BEEN REVISED, PLEASE REMOVE YOUR CURRENT COPY AND REPLACE WITH ATTACHED REVISIED PROCEDURE:
IP-EP-360 REV.2
IP-EP-360 REV.2
                                  ***********PLEASE NOTE EFFECTIVE DATE***********
***********PLEASE NOTE EFFECTIVE DATE***********
RECEIPT OF THE ABOVE LISTED DOCUMENT(S) IS HEREBY ACKNOWLEDGED. I CERTIFY THAT ALL SUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S) IN MY POSSESSION HAVE BEEN REMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVE DATE(S) (IF APPLICABLE) AS SHOWN ON                                               CU IN   V     \of-       I) 1-4/,vIr L:kr- n ,, -4 )
RECEIPT OF THE ABOVE LISTED DOCUMENT(S) IS HEREBY ACKNOWLEDGED. I CERTIFY THAT ALL SUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S) IN MY POSSESSION HAVE BEEN REMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVE DATE(S) (IF APPLICABLE) AS SHOWN ON CU IN V  
\\of-I)
O/'3IIJIT l
O/'3IIJIT l
O~3*/*I Purtr-UT11LJP-                    A~r" I,
UT11LJP-I, A~r" kk 1-4/,vIr L:kr-n,, -4 )
Lim I F-           L*LHf
O~3*/*I Purtr-Lim I F-L*LHf
                                                                                                                    .
kk


CON 'u"     FIG LLE0 aE               IPEC                     NON-QUAuTY RELATED       IP-EP-360   Revision 2 y     EMERGENCY PLAN               PROCEDURE IMPLEMENTING PROCEDURES                 REFERENCE USE         Page       1   of     20 CORE DAMAGE ASSESSMENT Prepared by:                 Robert Vogle Print Name 4VMwx1i,11                  /DatVe Approval:                    Brian A. Sullivan Date Print Name Effective Date: November 4, 2010 This procedureexcluded from further L*-100 reviews.
C ON 'u" FIG L L E 0 aE IPEC NON-QUAuTY RELATED IP-EP-360 Revision 2 y
EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE Page 1
of 20 CORE DAMAGE ASSESSMENT 4VMwx1i,11 Prepared by:
Approval:
Robert Vogle Print Name
/DatVe Date Brian A. Sullivan Print Name Effective Date: November 4, 2010 This procedure excluded from further L*-100 reviews.
IP-EP-360 (Core) R2.doc
IP-EP-360 (Core) R2.doc


IPEC                                           NON-QUALITY             RELATED                     IP-EP-360                         Revision 2 EMERGENCY PLAN                                          PROCEDURE IMPLEMENTING PROCEDURES                                           REFERENCE USE                               Page                   2             of           20 Table of Contents 1.0   PURPO SE ..............................................................................................................................................                   3
IPEC NON-QUALITY RELATED EMERGENCY PLAN PROCEDURE IP-EP-360 Revision 2 IMPLEMENTING PROCEDURES REFERENCE USE Page 2
of 20 Table of Contents 1.0 PURPO SE..............................................................................................................................................
3


==2.0   REFERENCES==
==2.0 REFERENCES==
........................................................................................................................................                        3 3.0   DEFINITIO NS .........................................................................................................................................                     3 4.0   RESPONSIBILITIES ......................................................                                                                                                   4 5.0   DETAILS ..................................................................................................................................................                 4 6.0     INTERFACES .........................................................................................................................................                     8 7.0     RECO RDS ...............................................................................................................................................                 8 8.0     REQ UIREM ENTS AND CO MMITM ENTS .........................................................................................                                               8 9.0     ATTACHM ENTS ...........................................................................................................                     I.......................... 8 9.1   Attachm ent 1, Fuel Rod Clad Dam age ...........................................................................................                                       9 9.2   Attachm ent 2, Fuel Overtem perature Dam age ............................................................................                                             14
3 3.0 DEFINITIO NS.........................................................................................................................................
* IPEC.                 NON-QUALITY RELATED       IP-EP-360       Revision 2 EMERGENCY PLAN             PROCEDURE
3 4.0 RESPONSIBILITIES......................................................
        -   nerg   IMPLEMENTING PROCEDURES               REFERENCE USE         Page       3     of     20 CORE DAMAGE ASSESSENT 1.0   PURPOSE This guideline provides a methodology for the assessment of:
4 5.0 DETAILS..................................................................................................................................................
          " The degree of damage to the fuel rod cladding that results in the release of the fission product inventory in the fuel rod gap space.
4 6.0 INTERFACES.........................................................................................................................................
8 7.0 RECO RDS...............................................................................................................................................
8 8.0 REQ UIREM ENTS AND CO M M ITM ENTS.........................................................................................
8 9.0 ATTACHM ENTS...........................................................................................................
I.......................... 8 9.1 Attachm ent 1, Fuel Rod Clad Dam age...........................................................................................
9 9.2 Attachm ent 2, Fuel Overtem perature Dam age............................................................................
14
 
IPEC.
NON-QUALITY RELATED IP-EP-360 Revision 2 EMERGENCY PLAN PROCEDURE
- nerg IMPLEMENTING PROCEDURES REFERENCE USE Page 3
of 20 CORE DAMAGE ASSESSENT 1.0 PURPOSE This guideline provides a methodology for the assessment of:
" The degree of damage to the fuel rod cladding that results in the release of the fission product inventory in the fuel rod gap space.
* The degree of core overheating that results in the release of the fission product inventory in the fuel pellets.
* The degree of core overheating that results in the release of the fission product inventory in the fuel pellets.
9 The appropriate Emergency Action Level for off-site radiological protective actions based on the degree of damage to the reactor core.
9 The appropriate Emergency Action Level for off-site radiological protective actions based on the degree of damage to the reactor core.
This guideline should be used when the reactor is shutdown and either:
This guideline should be used when the reactor is shutdown and either:
* Core temperatures are at or above 7000 F, or
* Core temperatures are at or above 7000F, or
* Containment radiation level is at or above 1 R/hr
* Containment radiation level is at or above 1 R/hr
,
==2.0  REFERENCES==


2.1   WCAP-14696-A, Westinghouse Owners Group Core Damage Assessment Guideline, Rev. 1 2.2   "Containment Radiation Level Using Core Damage Assessment Guideline, Revision 1 (1996) For Specific Indian Point Unit 2 EAL Application: A Summary," by Dave Smith, 12/2000.
==2.0 REFERENCES==
2.3   PGI-00467-00, 4/5/01 "Containment Radiation Monitor Response/Core Damage Assessment Procedure Support" 2.4   IP-CA-3, Hydrogen Flammability in Containment, Pg 2, Rev. 0 3.0   DEFINITIONS None
2.1 WCAP-14696-A, Westinghouse Owners Group Core Damage Assessment Guideline, Rev. 1 2.2 "Containment Radiation Level Using Core Damage Assessment Guideline, Revision 1 (1996) For Specific Indian Point Unit 2 EAL Application: A Summary," by Dave Smith, 12/2000.
2.3 PGI-00467-00, 4/5/01 "Containment Radiation Monitor Response/Core Damage Assessment Procedure Support" 2.4 IP-CA-3, Hydrogen Flammability in Containment, Pg 2, Rev. 0 3.0 DEFINITIONS None


En/Ier IPEC EMERGENCY PLAN IMPLEMENTING NON-QUAuTY RELATED PROCEDURE        I IP-EP-360       Revision 2 PROCEDURES               REFERENCE USE.       Page       4     of     20 4.0     RESPONSIBILITIES 4.1     Upon recognition of EITHER core exit thermocouple temperature.(s) > 700 'F OR containment radiation levels > 1 R/hr, the Reactor Engineer shall implement this procedure to assess the existence and extent of core damage.
IPEC NON-QUAuTY RELATED IP-EP-360 Revision 2 En/ Ier EMERGENCY PLAN PROCEDURE I
4.2     The Reactor Engineer shall immediately inform.the Technical Assessment Coordinator /TSC Manager of the results of any core damage assessment performed.
IMPLEMENTING PROCEDURES REFERENCE USE.
5.0     DETAILS NOTE:
Page 4
of 20 4.0 RESPONSIBILITIES 4.1 Upon recognition of EITHER core exit thermocouple temperature.(s) > 700 'F OR containment radiation levels > 1 R/hr, the Reactor Engineer shall implement this procedure to assess the existence and extent of core damage.
4.2 The Reactor Engineer shall immediately inform.the Technical Assessment Coordinator /TSC Manager of the results of any core damage assessment performed.
5.0 DETAILS NOTE:
Core Damage Estimate may be base on historical monitor readings. For Example: If core thermocouple readings were high 4 hours into an event but are now off-scale or inoperable use values and time after shutdown for when readings were valid.
Core Damage Estimate may be base on historical monitor readings. For Example: If core thermocouple readings were high 4 hours into an event but are now off-scale or inoperable use values and time after shutdown for when readings were valid.
NOTE:
NOTE:
Containment Hi Range Radiation Monitor R-25 and R-26 bottom scale reading is approximately -1 R/hr. Because of this scale limitation of R-25 and R-26, radiation monitors R-2, VC 80ft and R-7, VC Seal table should be used to observe anrincreasing trend towards 1 R/hr (1000 mr/hr), when assessing core damage using the "High level-Core Damage Assessment Flowchart'. Due to containment positions, R-2/R-7 readings of approximately 200 mr/hr, should relate to 1 R/hr on R-25/R-26.
Containment Hi Range Radiation Monitor R-25 and R-26 bottom scale reading is approximately -1 R/hr. Because of this scale limitation of R-25 and R-26, radiation monitors R-2, VC 80ft and R-7, VC Seal table should be used to observe anrincreasing trend towards 1 R/hr (1000 mr/hr), when assessing core damage using the "High level-Core Damage Assessment Flowchart'. Due to containment positions, R-2/R-7 readings of approximately 200 mr/hr, should relate to 1 R/hr on R-25/R-26.
5.1     Determine the possible status of the reactor core using the following flowchart and perform the associated action.
5.1 Determine the possible status of the reactor core using the following flowchart and perform the associated action.


P                         Y                     I.                             i IPEC               NON-QUAUTY RELATED IP-E *P-360I Revision 2 E*ngyS EMERGENCY PLAN          PROCEDURE IMPLEMENTING PROCEDURES            REFERENCE USE          Page          5 of     20 High Level Core Damage Assessment Flowchart Possible fuel over-.
P Y
2f temperature damage, go to Attachment
I.
i IPEC E*ngy EMERGENCY PLAN S
IMPLEMENTING PROCEDURES NON-QUAUTY RELATED PROCEDURE REFERENCE USE IP-E Page
*P-360I Revision 2 5
of 20 High Level Core Damage Assessment Flowchart Possible fuel over-.
temperature damage, go to Attachment 2f


A               IPEC               NON-QUALITY RELATED PROCEDURE            I IP-EP-360     Revision 2 i     nery EMERGENCY PLAN IMPLEMENTING PROCEDURES             REFERENCE USE           Page       6   of     20 Figure 1A Containment Radiation Level for 1% Fuel Overtemperature Flowchart (0 to 6 hours after shutdown) 3.OOE+03 2.50E+03 I
A IPEC NON-QUALITY RELATED IP-EP-360 Revision 2 i
2.OOE+03 0)
EMERGENCY PLAN PROCEDURE I
  '0 04 cc 1.OOE+03 5.OOE+02 O.OOE+OO 0       1         2         3   S   d4           5         6       7 Time Since Shutdown (hr)
nery IMPLEMENTING PROCEDURES REFERENCE USE Page 6
of 20 Figure 1A Containment Radiation Level for 1% Fuel Overtemperature Flowchart (0 to 6 hours after shutdown) 3.OOE+03 2.50E+03 2.OOE+03 0)
'004 cc 1.OOE+03 5.OOE+02 O.OOE+OO I
0 1
2 3
S d4 5
6 7
Time Since Shutdown (hr)


IPEC               NON-QUALITY RELATED         IP-EP-360   Revision 2 EMERGENCY PLAN         PROCEDURE IMPLEMENTING PROCEDURES           REFERENCE USE           Page       7 of     20 Figure 1B Containment Radiation Level for 1% Fuel Overtemperature Release
IPEC NON-QUALITY RELATED IP-EP-360 Revision 2 EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE Page 7
(>5 hours after shutdown) 1.40E+03 1.20E+03 1.OOE+03 8.OOE+02 u2) i   6.OOE+02 c\-
of 20 Figure 1B Containment Radiation Level for 1% Fuel Overtemperature Release
4.0OE+02 O.OOE+O0 0         5         10           15         20         25     30 Time Since Shutdown (hr)
(>5 hours after shutdown) 1.40E+03 1.20E+03 1.OOE+03 8.OOE+02 u2) i 6.OOE+02 c\\-
4.0OE+02 O.OOE+O0 0
5 10 15 20 25 Time Since Shutdown (hr) 30


a             IPEC                 NON-QUALITY RELATED Enlewo,     EMERGENCY PLAN           PROCEDURE       IPEP360     Revision 2
a IPEC NON-QUALITY RELATED
        *e'*   IMPLEMENTING PROCEDURES             REFERENCE USE   Page     8     of     20 6.0   INTERFACES 6.1   IP-EP-120, Emergency Classification 6.2   IP-EP-220, Technical Support Center 7.0   RECORDS This procedure generates completed Fuel Rod Clad Damage (Attachment 1) and/or Fuel Overtemperature Damage (Attachment 2) worksheets.
: Enlewo, EMERGENCY PLAN PROCEDURE IPEP360 Revision 2
8.0   REQUIREMENTS AND COMMITMENTS None 9.0   ATTACHMENTS 9.1  Attachment 1, Fuel Rod Clad Damage 9.2  Attachment 2, Fuel Overtemperature Damage
*e'*
IMPLEMENTING PROCEDURES REFERENCE USE Page 8
of 20 6.0 INTERFACES 6.1 IP-EP-120, Emergency Classification 6.2 IP-EP-220, Technical Support Center 7.0 RECORDS This procedure generates completed Fuel Rod Clad Damage (Attachment 1) and/or Fuel Overtemperature Damage (Attachment 2) worksheets.
8.0 REQUIREMENTS AND COMMITMENTS None 9.0 ATTACHMENTS 9.1, Fuel Rod Clad Damage 9.2, Fuel Overtemperature Damage


IP-EP-360   Revision 2 Fnit E
IPEC NON-QUAUTY RELATED IP-EP-360 Revision 2 Fnit ls EMERGENCY PLAN PROCEDURE I
ls IPEC EMERGENCY PLAN IMPLEMENTING NON-QUAUTY RELATED PROCEDURE     I PROCEDURES               REFERENCE USE     Page       9 of     20 Attachment 1 Fuel Rod Clad Damage Sheet 1 of 5 Estimate fuel rod clad damage based on containment radiation (CRM) levels.
E IMPLEMENTING PROCEDURES REFERENCE USE Page 9
1.1   Determine the following:
of 20 Fuel Rod Clad Damage Sheet 1 of 5 Estimate fuel rod clad damage based on containment radiation (CRM) levels.
          " Time since shutdown (hr)
1.1 Determine the following:
" Time since shutdown (hr)
* RCS pressure (psig)
* RCS pressure (psig)
          " Containment sprays operating (yes/no) 1.2   Find the following containment radiation dose rates:
" Containment sprays operating (yes/no) 1.2 Find the following containment radiation dose rates:
* Containment radiation level (R/hr) for 100% clad damage (Figure 2NB)                       A=
* Containment radiation level (R/hr) for 100% clad damage (Figure 2NB)
* Current containment radiation level (R/hr)             B=
A =
1.3   Estimate clad damage (%):
* Current containment radiation level (R/hr)
B =
1.3 Estimate clad damage (%):
B x 100
B x 100
                  % Clad Damage     CRM = ------------
% Clad Damage CRM = ------------
A
A
: 2. Estimate fuel rod clad damage based on Core Exit Thermocouples (CETs).
: 2.
2.1   Determine the following:
Estimate fuel rod clad damage based on Core Exit Thermocouples (CETs).
* Total number of operable CETs.                         D=
2.1 Determine the following:
* Total number of operable CETs.
D =
(Refer to PICS [Unit-2] or SPDS [Unit 3])
(Refer to PICS [Unit-2] or SPDS [Unit 3])
* Number of CETs at or above 1400°F                       E=
* Number of CETs at or above 1400°F E =
* Number of CETs afor abo-v0e1200°F                   F=
Number of CETs afor abo-v0e1200°F F =
2.2   For RCS pressure at or above 1600 psig:
2.2 For RCS pressure at or above 1600 psig:
E x 100
E x 100
                  % Clad DamageCET      = ------------   =
% Clad Damage CET = ------------  
D 2.3   For RCS pressure below 1600 psig::
=
D 2.3 For RCS pressure below 1600 psig::
F x 100
F x 100
                  % Clad Damage     CET = --------.. .---
% Clad Damage CET =
D
D


r LfEni Enl'gy IPEC EMERGENCY PLAN IMPLEMENTING
IPEC  
                                  } NON-QUAUTY RELATED PROCEDURE        t    IP-EP-360         Revision 2 PROCEDURES             REFERENCE USE           Page       10     of     20 Attachment 1 Fuel Rod Clad Damage Sheet 2 of 5 Figure 2A Containment Radiation Level for 100% Clad Damage Release (0 to 6 hours after shutdown) 1.80E+04 ---                       RSpressure >160.0 psig, NO containment spray RCS pressure >1600 psig, NO containment spray RCS pressure <1600 psig, NO containment spray RCS pressure <1600 psig, with containment spray 1.40E+04 1.20E+04 T) 1.20E+04 a)
}
W) 0 8.OOE+03 N
NON-QUAUTY RELATED IP-EP-360 Revision 2 LfEni r EMERGENCY PLAN PROCEDURE t
cc) 6.OOE+03 4.OOE+03 2.OOE+03 -
Enl'gy IMPLEMENTING PROCEDURES REFERENCE USE Page 10 of 20 Fuel Rod Clad Damage Sheet 2 of 5 Figure 2A Containment Radiation Level for 100% Clad Damage Release (0 to 6 hours after shutdown) 1.80E+04 ---
RSpressure >160.0 psig, NO containment spray RCS pressure >1600 psig, NO containment spray RCS pressure <1600 psig, NO containment spray RCS pressure <1600 psig, with containment spray 1.40E+04 1.20E+04 1.20E+04 8.OOE+03 6.OOE+03 4.OOE+03 2.OOE+03 -
0.OOE+00...........
0.OOE+00...........
0         1           2           3             4           5           6 Time Since Shutdown (hr)
T) a)
W) 0 N
cc) 0 1
2 3
4 5
6 Time Since Shutdown (hr)


Aft             IPEC                   NoN-QuAuTY RELATED           IP-EP-360       Revision 2 EMERGENCY PLAN               PROCEDURE IMPLEMENTING PROCEDURES                 REFERENCE USE           Page       11     of     20 Attachment 1 Fuel Rod Clad Damage Sheet 3 of 5 Figure 2B Containment Radiation Level for 100% Clad Damage Release
Aft IPEC NoN-QuAuTY RELATED IP-EP-360 Revision 2 EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE Page 11 of 20 Fuel Rod Clad Damage Sheet 3 of 5 Figure 2B Containment Radiation Level for 100% Clad Damage Release
(> 1 hour after shutdown)
(> 1 hour after shutdown) 0 CID 04 cc 4.00E+03 3.60E+03 3.20E+03 2.80E+03 2.40E+03 2.OOE+03 1.60E+03 1.20E+03 8.OOE-i02-4.OOE+02 0.OOE+00 I
I              I          I            I 4.00E+03                     ---- RCS pressure >1600 psig, NO containment spray
I I
                                  -.- RCS pressure <1600 psig, NO containment spray
I
                                    -e-- RCS pressure <1600
---- RCS pressure >1600 psig, NO containment spray RCS pressure <1600 psig, NO containment spray
                                  ----                  >1600 psig, psig, with containment spray r 3.60E+03 3.20E+03 2.80E+03 2.40E+03                             \      kN" 0
---- RCS pressure >1600 psig, with containment spray
CID 2.OOE+03 04 cc 1.60E+03           \\-A 1.20E+03 8.OOE-i02-4.OOE+02 0.OOE+00 0         5           1C 0            15         2.0            25          30 Time Since Shutdown (hr)
-e-- RCS pressure <1600 psig, with containment spray r
\\
kN"
\\\\-A 0
5 1C0 15 2
Time Since Shutdown (hr)
.0 25 30


IPEC                       NON-QUALITY RELATED               IP-EP-360     Revision 1 EMERGENCY PLAN IMPLEMENTING PROCEDURES J        PROCEDURE REFERENCE USE               Page         12 of     19 Attachment 1 Fuel Rod Clad Damage Sheet 4 of 5
IPEC NON-QUALITY RELATED IP-EP-360 Revision 1 EMERGENCY PLAN PROCEDURE IMPLEMENTING J
: 3. Confirm reasonableness of clad damage estimates.
PROCEDURES REFERENCE USE Page 12 of 19 Fuel Rod Clad Damage Sheet 4 of 5
3.1   Determine the following:
: 3.
          " Containment hydrogen concentration (vol. %)
Confirm reasonableness of clad damage estimates.
          "    RVILS reading (%)
3.1 Determine the following:
" Containment hydrogen concentration (vol. %)
RVILS reading (%)
* RCS saturation temperature (OF)
* RCS saturation temperature (OF)
          " Hot leg RTD temperature (OF) 3.2   Compare estimated clad damage to expected response by answering the following questions (yes/no)
" Hot leg RTD temperature (OF) 3.2 Compare estimated clad damage to expected response by answering the following questions (yes/no)
* Is containment hydrogen concentration less than 0.5%?
Is containment hydrogen concentration less than 0.5%?
* Is RVLIS between 64% and 47%?
Is RVLIS between 64% and 47%?
* Is hot leg RTD between Tsat and 650&deg;F?
Is hot leg RTD between Tsat and 650&deg;F?
* Is the absolute difference (% Diff) between estimated containment radiation clad damage and estimated core exit thermocouple clad damage less than 50%?
Is the absolute difference (% Diff) between estimated containment radiation clad damage and estimated core exit thermocouple clad damage less than 50%?
1%Clad Damage CRM             - % Clad damage CETI
1% Clad Damage CRM - % Clad damage CETI
            % Diffcdi,     --------------------- -------------------------------------- x 100
% Diffcdi,  
                                            % Clad Damage CRM 3.3     If all of the answers to the questions in Step 3.2 are YES, the expected response has been obtained; continue at Step 4.
--------------------- -------------------------------------- x 100
3.4     If any answer to the questions in Step 3.2 is NO, the expected response has not been obtained; determine if the deviation can be explained from either:
% Clad Damage CRM 3.3 If all of the answers to the questions in Step 3.2 are YES, the expected response has been obtained; continue at Step 4.
3.4 If any answer to the questions in Step 3.2 is NO, the expected response has not been obtained; determine if the deviation can be explained from either:
3.4.1 Accident progression:
3.4.1 Accident progression:
* Injection of water to the RCS 0     Bleed paths from the RCS
Injection of water to the RCS 0
* Direct radiation to the containment radiation monitors
Bleed paths from the RCS Direct radiation to the containment radiation monitors


IPEC               NON-QUALITY RELATED     IP-EP-360     Revision 2 QEn1erg         EMERGENCY PLAN           PROCEDURE       I t'*       IMPLEMENTING PROCEDURES             REFERENCE USE       Page     13   of     20 Attachment 1 Fuel Rod Clad Damage Sheet 5 of 5 3.4.2 Conservatisms in the predictive model:
IPEC NON-QUALITY RELATED IP-EP-360 Revision 2 QEn1erg EMERGENCY PLAN PROCEDURE I
* Fuel burnup
t'*
* Fission product retention in the RCS
IMPLEMENTING PROCEDURES REFERENCE USE Page 13 of 20 Fuel Rod Clad Damage Sheet 5 of 5 3.4.2 Conservatisms in the predictive model:
* Fission product removal from containment
Fuel burnup Fission product retention in the RCS Fission product removal from containment
: 4. Report findings 4.1     If clad damage estimates have increased by more than 1% in the past 30 minutes OR Estimates exceed 2% clad damage Then report possible impact on emergency classification based upon Emergency Action Level thresholds to the Emergency Plant Manager/Plant Operations Manager.
: 4.
4.2     Report clad damage estimate to the Technical Assessment Coordinator/TSC Manager.
Report findings 4.1 If clad damage estimates have increased by more than 1% in the past 30 minutes OR Estimates exceed 2% clad damage Then report possible impact on emergency classification based upon Emergency Action Level thresholds to the Emergency Plant Manager/Plant Operations Manager.
: 5. Return to Step 5.1 of the procedure to continue assessment of the reactor core.
4.2 Report clad damage estimate to the Technical Assessment Coordinator/TSC Manager.
: 5.
Return to Step 5.1 of the procedure to continue assessment of the reactor core.


IPEC                   NON-QUALITY RELATED     IP-EP-360   Revision 2 EMERGENCY PLAN             PROCEDURE IMPLEMENTING PROCEDURES               REFERENCE USE       Page       14 of     20 Attachment 2 Fuel Overtemperature Damage Sheet 1 of 7 Estimate Fuel Overtemperature Damage Based on Containment Radiation (CRM)
IPEC NON-QUALITY RELATED IP-EP-360 Revision 2 EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE Page 14 of 20 Fuel Overtemperature Damage Sheet 1 of 7 Estimate Fuel Overtemperature Damage Based on Containment Radiation (CRM)
Levels.
Levels.
1.1     Determine the following:
1.1 Determine the following:
            " Time since shutdown (hr)
" Time since shutdown (hr)
* RCS pressure (psig)
* RCS pressure (psig)
            " Containment sprays operating (yes/no) 1.2     Find the following containment radiation dose rates:
" Containment sprays operating (yes/no) 1.2 Find the following containment radiation dose rates:
            " Containment radiation level (R/hr) for 100% core overtemperature damage (Figure 3A/B) G
" Containment radiation level (R/hr) for 100% core overtemperature damage (Figure 3A/B)
            " Current containment radiation level (R/hr)             H 1.3     Estimate fuel overtemperature damage (%):
" Current containment radiation level (R/hr) 1.3 Estimate fuel overtemperature damage (%):
H x 100
H x 100
                  % Core Damage     CRM =   ------------
% Core Damage CRM = ------------
G
G G
: 2. Estimate fuel overtemperature damage based on Core Exit Thermocouple (CETs).
H
  -2.i     Determine the following:
: 2.
* Total number of operable CETs.                         J=
Estimate fuel overtemperature damage based on Core Exit Thermocouple (CETs).
(Refer to PICS [Unit 2] or SPDS [Unit 3])                   ....
-2.i Determine the following:
* Number of CETs at or above 2000OF                       K=
* Total number of operable CETs.
2.2     Estimate fuel overtemperature damage (%):
J =
(Refer to PICS [Unit 2] or SPDS [Unit 3])
* Number of CETs at or above 2000OF K =
2.2 Estimate fuel overtemperature damage (%):
K x 100
K x 100
                  % Core Damage cET     = --------------
% Core Damage cET = --------------
J
J


IPEC                 NON-OUALITY RELATED       IP-EP-360   Revision 2 EMERGENCY PLAN           PROCEDURE IMPLEMENTING PROCEDURES             REFERENCE USE           Page       15 of     20 Attachment 2 Fuel Overtemperature Damage Sheet 2 of 7 Figure 3A Containment Radiation Level for 100% Fuel Overtemperature Release (0 to 6 hours after. shutdown) 3.OOE+O5 2.50E+05 2.OOE+05 0 1.50E+.05 0
IPEC NON-OUALITY RELATED IP-EP-360 Revision 2 EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE Page 15 of 20 Fuel Overtemperature Damage Sheet 2 of 7 Figure 3A Containment Radiation Level for 100% Fuel Overtemperature Release (0 to 6 hours after. shutdown) 3.OOE+O5 2.50E+05 2.OOE+05 0
LO)
0 LO)
C\1 1.OOE+05 5.OOE+04 O.OOE+O0 0       1           2           3             4           5       6 Time Since Shutdown (hr)
C\\1 1.50E+.05 1.OOE+05 5.OOE+04 O.OOE+O0 0
1 2
3 4
5 6
Time Since Shutdown (hr)


IPEC EMERGENCY PLAN        NON-QUALITY PROCEDURERELATED      I-P30             Rvso IMPLEMENTING PROCEDURES               REFERENCE USE           Page       16     of   20 Attachment 2 Fuel Overtemperature Damage Sheet 3 of 7 Figure 3B Containment Radiation Level for 100% Fuel Overtemperature Release
IPEC NON-QUALITY RELATED EMERGENCY PLAN PROCEDURE I-P30 Rvso IMPLEMENTING PROCEDURES REFERENCE USE Page 16 of 20 Fuel Overtemperature Damage Sheet 3 of 7 Figure 3B Containment Radiation Level for 100% Fuel Overtemperature Release
(>5 hours after shutdown)
(>5 hours after shutdown)
                              ----  RCS pressure >1600 psig, NO containment spray 1.40E+05                     -*-   RCS pressure <1600 psig, NO containment spray
RCS pressure >1600 psig, NO containment spray 1.40E+05  
                              -m- RCS pressure >1600 psig, with containment spray I-4             RCS pressure <1600 psig, with containment spray 1.20E+05 -
-*- RCS pressure <1600 psig, NO containment spray
1.2OE+05 U) 8.OOE+04 a)
-m-RCS pressure >1600 psig, with containment spray I-4 RCS pressure <1600 psig, with containment spray 1.20E+05 -
L0 0l cc 6.OOE+04 4.OOE+04 2.OOE+04                                     -
1.2OE+05 8.OOE+04 6.OOE+04 4.OOE+04 2.OOE+04 0.OOE+00 U) a)
0.OOE+00 0       5           10           15           20           25         30 Time Since Shutdown (hr)
L00l cc 0
5 10 15 20 25 Time Since Shutdown (hr) 30


IPEC                 NON-QUALITY RELATED     IP-EP-360     Revision 2 EMERGENCY PLAN             PROCEDURE IMPLEMENTING PROCEDURES               REFERENCE USE       Page     17     of     20 Attachment 2 Fuel Overtemperature Damage Sheet 4 of 7
IPEC NON-QUALITY RELATED IP-EP-360 Revision 2 EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE Page 17 of 20 Fuel Overtemperature Damage Sheet 4 of 7
: 3. Estimate fuel overtemperature damage based on containment hydrogen (Hyd) concentration.
: 3.
3.1   Determine the following:
Estimate fuel overtemperature damage based on containment hydrogen (Hyd) concentration.
        " RCS pressure (psig)
3.1 Determine the following:
* Current containment hydrogen concentration (vol. %)                               L=
" RCS pressure (psig)
        " Predicted containment hydrogen concentration at 100% core overtemperature, Table 2 (vol. %)                   M=
* Current containment hydrogen concentration (vol. %)
Table 2 - Core Overtemperature Estimate Based on Containment Hydrogen Concentration RCS Pressure (psig)     Water Injection Predicted Containment into RCS?     Hydrogen Concentration from Figure 4 (vol. %)
L=
Below 1050                 Yes                 CH2 No                 CH3 At or above1050               Yes                 CH4 No .CH3 3.2   Estimate fuel overtemperature damage (%):
" Predicted containment hydrogen concentration at 100% core overtemperature, Table 2 (vol. %)
M =
Table 2 - Core Overtemperature Estimate Based on Containment Hydrogen Concentration RCS Pressure (psig)
Water Injection Predicted Containment into RCS?
Hydrogen Concentration from Figure 4 (vol. %)
Below 1050 Yes CH2 No CH3 At or above1050 Yes CH4 No  
.CH3 3.2 Estimate fuel overtemperature damage (%):
Lx 100
Lx 100
                % Core Damage   Hyd = ------------
% Core Damage Hyd = ------------
M
M


IPEC                   NON-QUALITY RELATED       IP-EP-360     Revision 2 EMERGENCY. PLAN               PROCEDURE E         IMPLEMENTING PROCEDURES                 REFERENCE USE         Page     18   of     20 Attachment 2 Fuel Overtemperature Damage Sheet 5 of 7 Figure 4 Predicted Containment Hydrogen Concentration for 100% Fuel Overtemperature Note:   The wet hydrogen curves are used when superheated conditions inside containment exist or when a manual sample is used.
IPEC NON-QUALITY RELATED IP-EP-360 Revision 2 EMERGENCY. PLAN PROCEDURE E
IMPLEMENTING PROCEDURES REFERENCE USE Page 18 of 20 Fuel Overtemperature Damage Sheet 5 of 7 Figure 4 Predicted Containment Hydrogen Concentration for 100% Fuel Overtemperature Note:
The wet hydrogen curves are used when superheated conditions inside containment exist or when a manual sample is used.
10 9
10 9
8 7
8 C
C 0
C ci)  6 0
C 0
0 C
0 C
ci) 5 0) 0
ci) 0 C
    *0 I
00 C
C ci) 4 E
ci) 0)
C C
0
0    3 0
*0 I
Cci)
E C
C 00 7
6 5
4 3
2 1
2 1
0 0   5   10   15   20     25     30   35     40 45   50   55   60 Containment Pressure (psig)
0 0
5 10 15 20 25 30 35 40 45 50 55 60 Containment Pressure (psig)


IPEC                             NON-QUALITY RELATED                   IP-EP-360   Revision 2
IPEC NON-QUALITY RELATED IP-EP-360 Revision 2 EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE Page 19 of 20 Fuel Overtemperature Damage Sheet 6 of 7
  -              EMERGENCY PLAN                         PROCEDURE
: 4.
        '*      IMPLEMENTING PROCEDURES                           REFERENCE USE                   Page       19 of     20 Attachment 2 Fuel Overtemperature Damage Sheet 6 of 7
Confirm reasonableness of fuel overtemperature damage estimates.
: 4. Confirm reasonableness of fuel overtemperature damage estimates.
4.1 Determine the following:
4.1     Determine the following:
RVILS reading (%)
* RVILS reading (%)
Hot leg RTD temperature (TF) 4.2 Compare estimated core damage to expected response by answering the following questions (yes/no)
            ,  Hot leg RTD temperature (TF) 4.2     Compare estimated core damage to expected response by answering the following questions (yes/no)
Is RVLIS below 47%?
* Is RVLIS below 47%?
Is hot leg RTD at or above 650&deg;F?
* Is hot leg RTD at or above 650&deg;F?
* Is the absolute difference (% Diff) between estimated containment radiation core damage and estimated core exit thermocouple core damage less than 50%?
* Is the absolute difference (% Diff) between estimated containment radiation core damage and estimated core exit thermocouple core damage less than 50%?
1%Core Damage cRM - % Core damage cETi
1% Core Damage cRM - % Core damage cETi
              % Diffdiff        ----------------------------------------------------------      x100
% Diff diff x100
                                                  % Core Damage CRM
% Core Damage CRM Is the absolute difference (% Diff) between estimated containment hydrogen core damage and 'estimated radiation core damage less than 25%?
* Is the absolute difference (% Diff) between estimated containment hydrogen core damage and 'estimated radiation core damage less than 25%?
1% Core Damage Hyd - % Core damage CRMI
1%Core Damage               Hyd -   % Core damage CRMI
%/9Diff diff&#xfd;.*=-,-.  
              %/9Diffdiff&#xfd;.*=-,-.                                                         -x     100
-x 100
                                                  % Core Damage Hyd
% Core Damage Hyd Is the absolute difference (% Diff) between estimated containment hydrogen core damage and estimated core exit thermocouple core damage less than 25%?
* Is the absolute difference (% Diff) between estimated containment hydrogen core damage and estimated core exit thermocouple core damage less than 25%?
1% Core Damage Hyd - % Core damage cETi
1%Core Damage             Hyd -   % Core damage cETi
% Diff diff = ----------------------------------------------------------
              %Diffdiff    = ----------------------------------------------------------         x100
x100
                                                  % Core Damage Hyd
% Core Damage Hyd


IPEC                   NON-QUATY RELATED       IP-EP-360     Revision 2 E             EMERGENCY PLAN             PROCEDURE IMPLEMENTING PROCEDURES               REFERENCE USE       Page       20   of     20 Attachment 2 Fuel Overtemperature Damage Sheet 7 of 7 4.3   If all of the answers to the questions in Step 4.2 are YES, the expected response has been obtained; continue at Step 6.
IPEC NON-QUATY RELATED IP-EP-360 Revision 2 E
4.4   If any answer to the questions in Step 4.2 is NO, the expected response has not been obtained; determine if the deviation can be explained from either:
EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE Page 20 of 20 Fuel Overtemperature Damage Sheet 7 of 7 4.3 If all of the answers to the questions in Step 4.2 are YES, the expected response has been obtained; continue at Step 6.
4.4 If any answer to the questions in Step 4.2 is NO, the expected response has not been obtained; determine if the deviation can be explained from either:
4.4.1 Accident progression:
4.4.1 Accident progression:
0     Injection of water to the RCS
0 Injection of water to the RCS Bleed paths from the RCS a
* Bleed paths from the RCS a     Direct radiation to the containment radiation monitors
Direct radiation to the containment radiation monitors Hydrogen burn in containment or affects of passive autocatalytic hydrogen recombination (Unit 2) 4.4.2 Conservatisms in the predictive model:
* Hydrogen burn in containment or affects of passive autocatalytic hydrogen recombination (Unit 2) 4.4.2 Conservatisms in the predictive model:
Fuel burnup Fission product retention in the RCS
* Fuel burnup
*Fission product removal from containment
* Fission product retention in the RCS
: 5.
                    *    *Fission product removal from containment
Report fuel overtemperature estimate to the Technical Assessment Coordinator/TSC Manager.
: 5. Report fuel overtemperature estimate to the Technical Assessment Coordinator/TSC Manager.
: 6.
: 6. Return to Step 5.1 of the procedure to continue assessment of the reactor core.}}
Return to Step 5.1 of the procedure to continue assessment of the reactor core.}}

Latest revision as of 01:22, 14 January 2025

To Emergency Plan Implementing Procedure IP-EP-360, Core Damage Assessment
ML103200310
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 11/04/2010
From: Vogle R
Entergy Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
FOIA/PA-2011-0181, FOIA/PA-2011-0262 IP-EP-360, Rev 2
Download: ML103200310 (22)


Text

.

November 4, 2010 Document Name:

DISTRIBUTION CONTROL LIST IPEC EMERGENCY PLAN CC#

NAME CC/STMP CROULET, DON CC/STMP IRAOLA, TONY CC/STMP SHIFT MANAGER CC/STMP CONTROL ROOM CC/STMP EOF CC/STMP PEREZ, ROSE CC/STMP TSC (IP3)

CC/STMP BARR, STEVE CC/STMP BARR, STEVE.-__

-CC/STMP DOC CONTROL DESK DEPARTMENT INSTRUC TECH TRNG (E-PLAN ONLY)

FOR THE JIC OPERATIONS OPERATIONS E-PLAN (ALL EP'S),

E-PLAN (ALL EP'S)

EEC BUILDING NRC (ALL EP'S)

NRC (ALL EP'S)

NRC (ALL EP'S)

LOCATION 48-2-A EOF IP3 IP3 EOF WPO-12D IP2 OFFSITE OFFSITE OFFSITE CC/STMP DOC CONTROL DESK NRC FOR (E-PLAN ONLY)

(USE ATTENTION TO DIRECTOR OF SPENT FUEL ADDRESS)

CC/STMP CULLINAN, P J A (PLAN ONLY)

CC/STMP E-PLAN STAFF E-PLAN (ALL EP'S)

CC/STMP MCDONALD,MICHELLE ST. EMERG. MGMT. OFFICE (ALL)

CC/STMP DELBORGO, D (PLAN ONLY) DISASTER & EMERGENCY CC/STMP LONGO, N (PLAN ONLY)

EMERGENCY SERVICES CC/STMP KARSTEN,C (PLAN ONLY)

DISASTER & CIVIL DEFENSE CC/STMP STIEBELING A (PLAN ONLY) OFF OF EMERG MANAGEMENT CC/STMP GRANT, LEAH SIMULATOR (TRAINING)

CC/STMP GRANT,LEAH LRQ TRAINING CC/STMP CONTROL ROOM OPERATONS CC/STMP CHIUSANO, J SIMULATOR (TRAINING 5 COPIES)

CC/STMP CHIUSANO, J CLASSROOM 2 CC/STMP CHIUSANO, J TRAINING CC/STMP NRC RESIDENT INSPECTOR US NRC (88' ELEVATION)

OFFSITE OFFSITE GSB-2ND FL OFFSITE OFFSITE OFFSITE OFFSITE OFFSITE 48-2-A 48-2-A IP2 EEC EEC 48-2-A IP2 TONY IRAOLA GETS:.... E-PLAN, IP-EP-115 (FORMS), IP-EP-260(JOINT CENTER INFORMATION) "NO FORMS GO TO THE OFFSITERS"

      • CC/STMP.....CONTROL COPY STAMP***

EFFECTIVE DATE:

IPEC SITE QUALITY RELATED IP-SMM-AD-103 Revision 0 E----ELe°gy MANAGEMENT ADMINISTRATIVE PROCEDURE MANUAL INFORMATIONAL USE Page 13 of 21 ATTACHMENT 10.1 SMM CONTROLLED DOCUMENT TRANSMITTAL FORM SITE MANAGEMENT MANUAL CONTROLLED DOCUMENT TRANSMITTAL FORM - PROCEDURES Page 1 of 1

-Ent CONTROLLED DOCUMENT TRANSMITTAL FORM - PROCEDURES IPEC, P.O. Box 308, Buchanan, NY 10511 TO: DISTRIBUTION DATE: 11/4/10 TRANSMITTAL NO:

,Circle one)

FROM: IPEC DOCUMENT CONTROL: E or IP2 53'EL PHONE NUMBER: (914) 271-7054 The Document(s) identified below are forwarded for use. In accordance with IP-SMM-AD-103, please review to verify receipt, incorporate the document(s) into your controlled document file, properly disposition superseded, void, or inactive document(s). Sign and return the receipt acknowledgement below within fifteen (15) working days.

AFFECTED DOCUMENT:

IPEC EMERGENCY PLAN PROCEDURES DOC#

I REV#

I TITLE INSTRUCTIONS THE FOLLOWING PROCEDURE HAS BEEN REVISED, PLEASE REMOVE YOUR CURRENT COPY AND REPLACE WITH ATTACHED REVISIED PROCEDURE:

IP-EP-360 REV.2

                      • PLEASE NOTE EFFECTIVE DATE***********

RECEIPT OF THE ABOVE LISTED DOCUMENT(S) IS HEREBY ACKNOWLEDGED. I CERTIFY THAT ALL SUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S) IN MY POSSESSION HAVE BEEN REMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVE DATE(S) (IF APPLICABLE) AS SHOWN ON CU IN V

\\of-I)

O/'3IIJIT l

UT11LJP-I, A~r" kk 1-4/,vIr L:kr-n,, -4 )

O~3*/*I Purtr-Lim I F-L*LHf

C ON 'u" FIG L L E 0 aE IPEC NON-QUAuTY RELATED IP-EP-360 Revision 2 y

EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE Page 1

of 20 CORE DAMAGE ASSESSMENT 4VMwx1i,11 Prepared by:

Approval:

Robert Vogle Print Name

/DatVe Date Brian A. Sullivan Print Name Effective Date: November 4, 2010 This procedure excluded from further L*-100 reviews.

IP-EP-360 (Core) R2.doc

IPEC NON-QUALITY RELATED EMERGENCY PLAN PROCEDURE IP-EP-360 Revision 2 IMPLEMENTING PROCEDURES REFERENCE USE Page 2

of 20 Table of Contents 1.0 PURPO SE..............................................................................................................................................

3

2.0 REFERENCES

3 3.0 DEFINITIO NS.........................................................................................................................................

3 4.0 RESPONSIBILITIES......................................................

4 5.0 DETAILS..................................................................................................................................................

4 6.0 INTERFACES.........................................................................................................................................

8 7.0 RECO RDS...............................................................................................................................................

8 8.0 REQ UIREM ENTS AND CO M M ITM ENTS.........................................................................................

8 9.0 ATTACHM ENTS...........................................................................................................

I.......................... 8 9.1 Attachm ent 1, Fuel Rod Clad Dam age...........................................................................................

9 9.2 Attachm ent 2, Fuel Overtem perature Dam age............................................................................

14

IPEC.

NON-QUALITY RELATED IP-EP-360 Revision 2 EMERGENCY PLAN PROCEDURE

- nerg IMPLEMENTING PROCEDURES REFERENCE USE Page 3

of 20 CORE DAMAGE ASSESSENT 1.0 PURPOSE This guideline provides a methodology for the assessment of:

" The degree of damage to the fuel rod cladding that results in the release of the fission product inventory in the fuel rod gap space.

  • The degree of core overheating that results in the release of the fission product inventory in the fuel pellets.

9 The appropriate Emergency Action Level for off-site radiological protective actions based on the degree of damage to the reactor core.

This guideline should be used when the reactor is shutdown and either:

  • Core temperatures are at or above 7000F, or
  • Containment radiation level is at or above 1 R/hr

2.0 REFERENCES

2.1 WCAP-14696-A, Westinghouse Owners Group Core Damage Assessment Guideline, Rev. 1 2.2 "Containment Radiation Level Using Core Damage Assessment Guideline, Revision 1 (1996) For Specific Indian Point Unit 2 EAL Application: A Summary," by Dave Smith, 12/2000.

2.3 PGI-00467-00, 4/5/01 "Containment Radiation Monitor Response/Core Damage Assessment Procedure Support" 2.4 IP-CA-3, Hydrogen Flammability in Containment, Pg 2, Rev. 0 3.0 DEFINITIONS None

IPEC NON-QUAuTY RELATED IP-EP-360 Revision 2 En/ Ier EMERGENCY PLAN PROCEDURE I

IMPLEMENTING PROCEDURES REFERENCE USE.

Page 4

of 20 4.0 RESPONSIBILITIES 4.1 Upon recognition of EITHER core exit thermocouple temperature.(s) > 700 'F OR containment radiation levels > 1 R/hr, the Reactor Engineer shall implement this procedure to assess the existence and extent of core damage.

4.2 The Reactor Engineer shall immediately inform.the Technical Assessment Coordinator /TSC Manager of the results of any core damage assessment performed.

5.0 DETAILS NOTE:

Core Damage Estimate may be base on historical monitor readings. For Example: If core thermocouple readings were high 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> into an event but are now off-scale or inoperable use values and time after shutdown for when readings were valid.

NOTE:

Containment Hi Range Radiation Monitor R-25 and R-26 bottom scale reading is approximately -1 R/hr. Because of this scale limitation of R-25 and R-26, radiation monitors R-2, VC 80ft and R-7, VC Seal table should be used to observe anrincreasing trend towards 1 R/hr (1000 mr/hr), when assessing core damage using the "High level-Core Damage Assessment Flowchart'. Due to containment positions, R-2/R-7 readings of approximately 200 mr/hr, should relate to 1 R/hr on R-25/R-26.

5.1 Determine the possible status of the reactor core using the following flowchart and perform the associated action.

P Y

I.

i IPEC E*ngy EMERGENCY PLAN S

IMPLEMENTING PROCEDURES NON-QUAUTY RELATED PROCEDURE REFERENCE USE IP-E Page

  • P-360I Revision 2 5

of 20 High Level Core Damage Assessment Flowchart Possible fuel over-.

temperature damage, go to Attachment 2f

A IPEC NON-QUALITY RELATED IP-EP-360 Revision 2 i

EMERGENCY PLAN PROCEDURE I

nery IMPLEMENTING PROCEDURES REFERENCE USE Page 6

of 20 Figure 1A Containment Radiation Level for 1% Fuel Overtemperature Flowchart (0 to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after shutdown) 3.OOE+03 2.50E+03 2.OOE+03 0)

'004 cc 1.OOE+03 5.OOE+02 O.OOE+OO I

0 1

2 3

S d4 5

6 7

Time Since Shutdown (hr)

IPEC NON-QUALITY RELATED IP-EP-360 Revision 2 EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE Page 7

of 20 Figure 1B Containment Radiation Level for 1% Fuel Overtemperature Release

(>5 hours after shutdown) 1.40E+03 1.20E+03 1.OOE+03 8.OOE+02 u2) i 6.OOE+02 c\\-

4.0OE+02 O.OOE+O0 0

5 10 15 20 25 Time Since Shutdown (hr) 30

a IPEC NON-QUALITY RELATED

Enlewo, EMERGENCY PLAN PROCEDURE IPEP360 Revision 2
  • e'*

IMPLEMENTING PROCEDURES REFERENCE USE Page 8

of 20 6.0 INTERFACES 6.1 IP-EP-120, Emergency Classification 6.2 IP-EP-220, Technical Support Center 7.0 RECORDS This procedure generates completed Fuel Rod Clad Damage (Attachment 1) and/or Fuel Overtemperature Damage (Attachment 2) worksheets.

8.0 REQUIREMENTS AND COMMITMENTS None 9.0 ATTACHMENTS 9.1, Fuel Rod Clad Damage 9.2, Fuel Overtemperature Damage

IPEC NON-QUAUTY RELATED IP-EP-360 Revision 2 Fnit ls EMERGENCY PLAN PROCEDURE I

E IMPLEMENTING PROCEDURES REFERENCE USE Page 9

of 20 Fuel Rod Clad Damage Sheet 1 of 5 Estimate fuel rod clad damage based on containment radiation (CRM) levels.

1.1 Determine the following:

" Time since shutdown (hr)

  • RCS pressure (psig)

" Containment sprays operating (yes/no) 1.2 Find the following containment radiation dose rates:

  • Containment radiation level (R/hr) for 100% clad damage (Figure 2NB)

A =

  • Current containment radiation level (R/hr)

B =

1.3 Estimate clad damage (%):

B x 100

% Clad Damage CRM = ------------

A

2.

Estimate fuel rod clad damage based on Core Exit Thermocouples (CETs).

2.1 Determine the following:

D =

(Refer to PICS [Unit-2] or SPDS [Unit 3])

  • Number of CETs at or above 1400°F E =

Number of CETs afor abo-v0e1200°F F =

2.2 For RCS pressure at or above 1600 psig:

E x 100

% Clad Damage CET = ------------

=

D 2.3 For RCS pressure below 1600 psig::

F x 100

% Clad Damage CET =

D

IPEC

}

NON-QUAUTY RELATED IP-EP-360 Revision 2 LfEni r EMERGENCY PLAN PROCEDURE t

Enl'gy IMPLEMENTING PROCEDURES REFERENCE USE Page 10 of 20 Fuel Rod Clad Damage Sheet 2 of 5 Figure 2A Containment Radiation Level for 100% Clad Damage Release (0 to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after shutdown) 1.80E+04 ---

RSpressure >160.0 psig, NO containment spray RCS pressure >1600 psig, NO containment spray RCS pressure <1600 psig, NO containment spray RCS pressure <1600 psig, with containment spray 1.40E+04 1.20E+04 1.20E+04 8.OOE+03 6.OOE+03 4.OOE+03 2.OOE+03 -

0.OOE+00...........

T) a)

W) 0 N

cc) 0 1

2 3

4 5

6 Time Since Shutdown (hr)

Aft IPEC NoN-QuAuTY RELATED IP-EP-360 Revision 2 EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE Page 11 of 20 Fuel Rod Clad Damage Sheet 3 of 5 Figure 2B Containment Radiation Level for 100% Clad Damage Release

(> 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after shutdown) 0 CID 04 cc 4.00E+03 3.60E+03 3.20E+03 2.80E+03 2.40E+03 2.OOE+03 1.60E+03 1.20E+03 8.OOE-i02-4.OOE+02 0.OOE+00 I

I I

I


RCS pressure >1600 psig, NO containment spray RCS pressure <1600 psig, NO containment spray


RCS pressure >1600 psig, with containment spray

-e-- RCS pressure <1600 psig, with containment spray r

\\

kN"

\\\\-A 0

5 1C0 15 2

Time Since Shutdown (hr)

.0 25 30

IPEC NON-QUALITY RELATED IP-EP-360 Revision 1 EMERGENCY PLAN PROCEDURE IMPLEMENTING J

PROCEDURES REFERENCE USE Page 12 of 19 Fuel Rod Clad Damage Sheet 4 of 5

3.

Confirm reasonableness of clad damage estimates.

3.1 Determine the following:

" Containment hydrogen concentration (vol. %)

RVILS reading (%)

  • RCS saturation temperature (OF)

" Hot leg RTD temperature (OF) 3.2 Compare estimated clad damage to expected response by answering the following questions (yes/no)

Is containment hydrogen concentration less than 0.5%?

Is RVLIS between 64% and 47%?

Is hot leg RTD between Tsat and 650°F?

Is the absolute difference (% Diff) between estimated containment radiation clad damage and estimated core exit thermocouple clad damage less than 50%?

1% Clad Damage CRM - % Clad damage CETI

% Diffcdi,


-------------------------------------- x 100

% Clad Damage CRM 3.3 If all of the answers to the questions in Step 3.2 are YES, the expected response has been obtained; continue at Step 4.

3.4 If any answer to the questions in Step 3.2 is NO, the expected response has not been obtained; determine if the deviation can be explained from either:

3.4.1 Accident progression:

Injection of water to the RCS 0

Bleed paths from the RCS Direct radiation to the containment radiation monitors

IPEC NON-QUALITY RELATED IP-EP-360 Revision 2 QEn1erg EMERGENCY PLAN PROCEDURE I

t'*

IMPLEMENTING PROCEDURES REFERENCE USE Page 13 of 20 Fuel Rod Clad Damage Sheet 5 of 5 3.4.2 Conservatisms in the predictive model:

Fuel burnup Fission product retention in the RCS Fission product removal from containment

4.

Report findings 4.1 If clad damage estimates have increased by more than 1% in the past 30 minutes OR Estimates exceed 2% clad damage Then report possible impact on emergency classification based upon Emergency Action Level thresholds to the Emergency Plant Manager/Plant Operations Manager.

4.2 Report clad damage estimate to the Technical Assessment Coordinator/TSC Manager.

5.

Return to Step 5.1 of the procedure to continue assessment of the reactor core.

IPEC NON-QUALITY RELATED IP-EP-360 Revision 2 EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE Page 14 of 20 Fuel Overtemperature Damage Sheet 1 of 7 Estimate Fuel Overtemperature Damage Based on Containment Radiation (CRM)

Levels.

1.1 Determine the following:

" Time since shutdown (hr)

  • RCS pressure (psig)

" Containment sprays operating (yes/no) 1.2 Find the following containment radiation dose rates:

" Containment radiation level (R/hr) for 100% core overtemperature damage (Figure 3A/B)

" Current containment radiation level (R/hr) 1.3 Estimate fuel overtemperature damage (%):

H x 100

% Core Damage CRM = ------------

G G

H

2.

Estimate fuel overtemperature damage based on Core Exit Thermocouple (CETs).

-2.i Determine the following:

J =

(Refer to PICS [Unit 2] or SPDS [Unit 3])

  • Number of CETs at or above 2000OF K =

2.2 Estimate fuel overtemperature damage (%):

K x 100

% Core Damage cET = --------------

J

IPEC NON-OUALITY RELATED IP-EP-360 Revision 2 EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE Page 15 of 20 Fuel Overtemperature Damage Sheet 2 of 7 Figure 3A Containment Radiation Level for 100% Fuel Overtemperature Release (0 to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> after. shutdown) 3.OOE+O5 2.50E+05 2.OOE+05 0

0 LO)

C\\1 1.50E+.05 1.OOE+05 5.OOE+04 O.OOE+O0 0

1 2

3 4

5 6

Time Since Shutdown (hr)

IPEC NON-QUALITY RELATED EMERGENCY PLAN PROCEDURE I-P30 Rvso IMPLEMENTING PROCEDURES REFERENCE USE Page 16 of 20 Fuel Overtemperature Damage Sheet 3 of 7 Figure 3B Containment Radiation Level for 100% Fuel Overtemperature Release

(>5 hours after shutdown)

RCS pressure >1600 psig, NO containment spray 1.40E+05

-*- RCS pressure <1600 psig, NO containment spray

-m-RCS pressure >1600 psig, with containment spray I-4 RCS pressure <1600 psig, with containment spray 1.20E+05 -

1.2OE+05 8.OOE+04 6.OOE+04 4.OOE+04 2.OOE+04 0.OOE+00 U) a)

L00l cc 0

5 10 15 20 25 Time Since Shutdown (hr) 30

IPEC NON-QUALITY RELATED IP-EP-360 Revision 2 EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE Page 17 of 20 Fuel Overtemperature Damage Sheet 4 of 7

3.

Estimate fuel overtemperature damage based on containment hydrogen (Hyd) concentration.

3.1 Determine the following:

" RCS pressure (psig)

  • Current containment hydrogen concentration (vol. %)

L=

" Predicted containment hydrogen concentration at 100% core overtemperature, Table 2 (vol. %)

M =

Table 2 - Core Overtemperature Estimate Based on Containment Hydrogen Concentration RCS Pressure (psig)

Water Injection Predicted Containment into RCS?

Hydrogen Concentration from Figure 4 (vol. %)

Below 1050 Yes CH2 No CH3 At or above1050 Yes CH4 No

.CH3 3.2 Estimate fuel overtemperature damage (%):

Lx 100

% Core Damage Hyd = ------------

M

IPEC NON-QUALITY RELATED IP-EP-360 Revision 2 EMERGENCY. PLAN PROCEDURE E

IMPLEMENTING PROCEDURES REFERENCE USE Page 18 of 20 Fuel Overtemperature Damage Sheet 5 of 7 Figure 4 Predicted Containment Hydrogen Concentration for 100% Fuel Overtemperature Note:

The wet hydrogen curves are used when superheated conditions inside containment exist or when a manual sample is used.

10 9

8 C

0 C

ci) 0 C

00 C

ci) 0)

0

  • 0 I

Cci)

E C

C 00 7

6 5

4 3

2 1

0 0

5 10 15 20 25 30 35 40 45 50 55 60 Containment Pressure (psig)

IPEC NON-QUALITY RELATED IP-EP-360 Revision 2 EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE Page 19 of 20 Fuel Overtemperature Damage Sheet 6 of 7

4.

Confirm reasonableness of fuel overtemperature damage estimates.

4.1 Determine the following:

RVILS reading (%)

Hot leg RTD temperature (TF) 4.2 Compare estimated core damage to expected response by answering the following questions (yes/no)

Is RVLIS below 47%?

Is hot leg RTD at or above 650°F?

  • Is the absolute difference (% Diff) between estimated containment radiation core damage and estimated core exit thermocouple core damage less than 50%?

1% Core Damage cRM - % Core damage cETi

% Diff diff x100

% Core Damage CRM Is the absolute difference (% Diff) between estimated containment hydrogen core damage and 'estimated radiation core damage less than 25%?

1% Core Damage Hyd - % Core damage CRMI

%/9Diff diffý.*=-,-.

-x 100

% Core Damage Hyd Is the absolute difference (% Diff) between estimated containment hydrogen core damage and estimated core exit thermocouple core damage less than 25%?

1% Core Damage Hyd - % Core damage cETi

% Diff diff = ----------------------------------------------------------

x100

% Core Damage Hyd

IPEC NON-QUATY RELATED IP-EP-360 Revision 2 E

EMERGENCY PLAN PROCEDURE IMPLEMENTING PROCEDURES REFERENCE USE Page 20 of 20 Fuel Overtemperature Damage Sheet 7 of 7 4.3 If all of the answers to the questions in Step 4.2 are YES, the expected response has been obtained; continue at Step 6.

4.4 If any answer to the questions in Step 4.2 is NO, the expected response has not been obtained; determine if the deviation can be explained from either:

4.4.1 Accident progression:

0 Injection of water to the RCS Bleed paths from the RCS a

Direct radiation to the containment radiation monitors Hydrogen burn in containment or affects of passive autocatalytic hydrogen recombination (Unit 2) 4.4.2 Conservatisms in the predictive model:

Fuel burnup Fission product retention in the RCS

  • Fission product removal from containment
5.

Report fuel overtemperature estimate to the Technical Assessment Coordinator/TSC Manager.

6.

Return to Step 5.1 of the procedure to continue assessment of the reactor core.