{{#Wiki_filter:August 1, 2011 Mr. Michael J. Pacilio President & Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
{{#Wiki_filter:August 1, 2011 Mr. Michael J. Pacilio President & Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555  


==SUBJECT:==
==SUBJECT:==
PEACH BOTTOM ATOMIC POWER STATION UNIT 1 - ISSUANCE OF EXEMPTION FROM SECURITY REQUIREMENTS OF 10 CFR PART 50 AND 10 CFR PART 73 (TAC NO. J00384)
PEACH BOTTOM ATOMIC POWER STATION UNIT 1 - ISSUANCE OF EXEMPTION FROM SECURITY REQUIREMENTS OF 10 CFR PART 50 AND 10 CFR PART 73 (TAC NO. J00384)  


==Dear Mr. Pacilio:==
==Dear Mr. Pacilio:==
 
The Commission has granted Exelon Nuclear, the licensee for Peach Bottom Atomic Power Station, Unit 1, the enclosed exemption from the requirements of 10 CFR 50.54(p) and the fixed site physical protection requirements of 10 CFR Part 73. This action is in response to your {{letter dated|date=November 18, 2010|text=letter dated November 18, 2010}}.
The Commission has granted Exelon Nuclear, the licensee for Peach Bottom Atomic Power Station, Unit 1, the enclosed exemption from the requirements of 10 CFR 50.54(p) and the fixed site physical protection requirements of 10 CFR Part 73. This action is in response to your letter dated November 18, 2010.
The Commission has determined that, pursuant to 10 CFR 50.12(a), an exemption is authorized by law, will not present an undue risk to the public health and safety, and is consistent with the common defense and security based on the continued maintenance of appropriate security requirements for special nuclear material (SNM). Additionally, special circumstances are present based on the removal of the spent nuclear fuel containing SNM from the 10 CFR Part 50 licensed site. Therefore, the Commission hereby grants Exelon Nuclear an exemption from the requirements of 10 CFR 50.54(p) at Peach Bottom Atomic Power Station, Unit 1.
The Commission has determined that, pursuant to 10 CFR 50.12(a), an exemption is authorized by law, will not present an undue risk to the public health and safety, and is consistent with the common defense and security based on the continued maintenance of appropriate security requirements for special nuclear material (SNM). Additionally, special circumstances are present based on the removal of the spent nuclear fuel containing SNM from the 10 CFR Part 50 licensed site. Therefore, the Commission hereby grants Exelon Nuclear an exemption from the requirements of 10 CFR 50.54(p) at Peach Bottom Atomic Power Station, Unit 1.
The Commission has determined that, pursuant to 10 CFR 73.5, an exemption is authorized by law, will not endanger life or property or the common defense and security, and is otherwise in the public interest based on the security requirements for the spent fuel containing SNM no longer being the responsibility of the licensee. Therefore, the Commission hereby grants Exelon Nuclear an exemption from the physical protection requirements of 10 CFR Part 73 at Peach Bottom Atomic Power Station, Unit 1.
The Commission has determined that, pursuant to 10 CFR 73.5, an exemption is authorized by law, will not endanger life or property or the common defense and security, and is otherwise in the public interest based on the security requirements for the spent fuel containing SNM no longer being the responsibility of the licensee. Therefore, the Commission hereby grants Exelon Nuclear an exemption from the physical protection requirements of 10 CFR Part 73 at Peach Bottom Atomic Power Station, Unit 1.
Pursuant to 10 CFR 51.21, 51.32, and 51.35, an environmental assessment and finding of no significant impact related to the part of this exemption not dealing with safeguards plans was published in the Federal Register on June 28, 2011 (76 FR 37842). Based upon the environmental assessment, the Commission has determined that issuance of this exemption will not have a significant effect on the quality of the human environment.
Pursuant to 10 CFR 51.21, 51.32, and 51.35, an environmental assessment and finding of no significant impact related to the part of this exemption not dealing with safeguards plans was published in the Federal Register on June 28, 2011 (76 FR 37842). Based upon the environmental assessment, the Commission has determined that issuance of this exemption will not have a significant effect on the quality of the human environment.  


M.J. Pacilio                                       2 The part of this licensing action dealing with safeguards plans meets the categorical exclusion provision in 10 CFR Part 51.22(c)(25), as that part of this action is an exemption from the requirements of the Commissions regulations and (i) there is no significant hazards consideration; (ii) there is no significant change in the types or significant increase in the amounts of any effluents that may be released offsite; (iii) there is no significant increase in individual or cumulative public or occupational radiation exposure; (iv) there is no significant construction impact; (v) there is no significant increase in the potential for or consequences from radiological accidents; and (vi) the requirements from which an exemption is sought involve safeguard plans. Therefore, that part of the action does not require either an environmental assessment or an environmental impact statement.
M.J. Pacilio 2
The part of this licensing action dealing with safeguards plans meets the categorical exclusion provision in 10 CFR Part 51.22(c)(25), as that part of this action is an exemption from the requirements of the Commissions regulations and (i) there is no significant hazards consideration; (ii) there is no significant change in the types or significant increase in the amounts of any effluents that may be released offsite; (iii) there is no significant increase in individual or cumulative public or occupational radiation exposure; (iv) there is no significant construction impact; (v) there is no significant increase in the potential for or consequences from radiological accidents; and (vi) the requirements from which an exemption is sought involve safeguard plans. Therefore, that part of the action does not require either an environmental assessment or an environmental impact statement.
The exemption will be published in the Federal Register. In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC=s Agency-wide Documents Access and Management System (ADAMS).
The exemption will be published in the Federal Register. In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC=s Agency-wide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
Sincerely,  
                                                /RA/
/RA/
Stephen Giebel, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No.: 50-171 License No.: DPR-12
Stephen Giebel, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No.: 50-171 License No.: DPR-12  


==Enclosure:==
==Enclosure:==
Exemption cc: see next page
Exemption cc: see next page  


M.J. Pacilio                                       2 The part of this licensing action dealing with safeguards plans meets the categorical exclusion provision in 10 CFR Part 51.22(c)(25), as that part of this action is an exemption from the requirements of the Commissions regulations and (i) there is no significant hazards consideration; (ii) there is no significant change in the types or significant increase in the amounts of any effluents that may be released offsite; (iii) there is no significant increase in individual or cumulative public or occupational radiation exposure; (iv) there is no significant construction impact; (v) there is no significant increase in the potential for or consequences from radiological accidents; and (vi) the requirements from which an exemption is sought involve safeguard plans. Therefore, that part of the action does not require either an environmental assessment or an environmental impact statement.
M.J. Pacilio 2
The part of this licensing action dealing with safeguards plans meets the categorical exclusion provision in 10 CFR Part 51.22(c)(25), as that part of this action is an exemption from the requirements of the Commissions regulations and (i) there is no significant hazards consideration; (ii) there is no significant change in the types or significant increase in the amounts of any effluents that may be released offsite; (iii) there is no significant increase in individual or cumulative public or occupational radiation exposure; (iv) there is no significant construction impact; (v) there is no significant increase in the potential for or consequences from radiological accidents; and (vi) the requirements from which an exemption is sought involve safeguard plans. Therefore, that part of the action does not require either an environmental assessment or an environmental impact statement.
The exemption will be published in the Federal Register. In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC=s Agency-wide Documents Access and Management System (ADAMS).
The exemption will be published in the Federal Register. In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC=s Agency-wide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, Stephen Giebel, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No.: 50-171 License No.: DPR-12
Sincerely, Stephen Giebel, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No.: 50-171 License No.: DPR-12  


==Enclosure:==
==Enclosure:==
Exemption cc: see next page Distribution:
Exemption cc: see next page Distribution:
DWMEP r/f               J Joustra, RI           D Garner, NSIR         L Kauffman, RI ML103410375 OFC   DWMEP           DWMEP         DWMEP         NSIR           OGC             DWMEP           DWMEP NAME   JHickman       CHolston       BWatson       SWastler       CHair           KMcConnell       SGiebel DATE     7/20/11       12 / 9 / 10   12 / 09 / 10   12 / 16 / 10     6 / 2 / 11       8/1/11         8/1/11 OFFICIAL RECORD COPY
DWMEP r/f J Joustra, RI D Garner, NSIR L Kauffman, RI ML103410375 OFC DWMEP DWMEP DWMEP NSIR OGC DWMEP DWMEP NAME JHickman CHolston BWatson SWastler CHair KMcConnell SGiebel DATE 7/20/11 12 / 9 / 10 12 / 09 / 10 12 / 16 / 10 6 / 2 / 11 8/1/11 8/1/11 OFFICIAL RECORD COPY  


Peach Bottom Atomic Power Station, Unit 1 Service List cc:
Peach Bottom Atomic Power Station, Unit 1 Service List cc:
Mr. Christopher M. Crane                         Mr. Stephen E. Kuczynski President and Chief Operating Officer           Senior Vice President, Engineering and (COO), Exelon Corporation                         Technical Services, Exelon Generation President, Exelon Generation Company,             Company, LLC LLC                                             4300 Winfield Road 4300 Winfield Road                              Warrenville, IL 60555 Warrenville, IL 60555 Mr. Bryan C. Hanson Mr. Charles G. Pardee                           Senior Vice President, Midwest Operations, Chief Operating Officer (COO), Exelon           Exelon Generation Company, LLC Generation Company, LLC                         4300 Winfield Road 4300 Winfield Road                              Warrenville, IL 60555 Warrenville, IL 60555 Mr. Keith R. Jury Mr. Michael J. Pacilio                           Vice President, Licensing and Regulatory Senior Vice President, Exelon Generation          Affairs Company, LLC                                    Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO),       4300 Winfield Road Exelon Nuclear                                 Warrenville, IL 60555 4300 Winfield Road Warrenville, IL 60555                           Mr. Timothy J. Tulon Vice President, Midwest Operations, Exelon Ms. Susan R. Landahl                             Generation Company, LLC Senior Vice President, Exelon Generation         4300 Winfield Road Company, LLC                                   Warrenville, IL 60555 Chief Operating Officer (COO), Exelon Nuclear                                         Mr. Christopher H. Mudrick 4300 Winfield Road                              Vice President, Mid-Atlantic Operations, Warrenville, IL 60555                              Exelon Generation Company, LLC 200 Exelon Way, KSA 3-N Mr. Ronald J. De Gregorio                        Kennett Square, PA 19348 Senior Vice President, Operations Support, Exelon Generation Company, LLC                 Mr. Robert J. Hovey 200 Exelon Way, KSA 3-N                         Vice President, Nuclear Oversight, Exelon Kennett Square, PA 19348                          Generation Company, LLC 4300 Winfield Road Mr. Joseph P. Grimes, Jr.                       Warrenville, IL 60555 Senior Vice President, Mid-Atlantic Operations, Exelon Generation Company,         Mr. Tom Dougherty LLC                                             Site Vice President - Peach Bottom Atomic 200 Exelon Way, KSA 3-N                           Power Station Kennett Square, PA 19348                         Exelon Generation Company, LLC 1848 Lay Road Delta, PA 17314
Mr. Christopher M. Crane President and Chief Operating Officer (COO), Exelon Corporation President, Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. Charles G. Pardee Chief Operating Officer (COO), Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO),
Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Ms. Susan R. Landahl Senior Vice President, Exelon Generation Company, LLC Chief Operating Officer (COO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Mr. Ronald J. De Gregorio Senior Vice President, Operations Support, Exelon Generation Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348 Mr. Joseph P. Grimes, Jr.
Senior Vice President, Mid-Atlantic Operations, Exelon Generation Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348 Mr. Stephen E. Kuczynski Senior Vice President, Engineering and Technical Services, Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. Bryan C. Hanson Senior Vice President, Midwest Operations, Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. Keith R. Jury Vice President, Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. Timothy J. Tulon Vice President, Midwest Operations, Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. Christopher H. Mudrick Vice President, Mid-Atlantic Operations, Exelon Generation Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348 Mr. Robert J. Hovey Vice President, Nuclear Oversight, Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. Tom Dougherty Site Vice President - Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA 17314  


Plant Manager - Peach Bottom Atomic       Ms. Susan Grey Power Station                             Power Plant and Environmental Exelon Generation Company, LLC             Review Division 1848 Lay Road                             Department of Natural Resources Delta, PA 17314                           B-3, Tawes State Office Building Annapolis, MD 21401 Manager Regulatory Assurance - Peach Bottom Atomic Power Station               Manager-Financial Control & Co-Owner Exelon Generation Company, LLC             Affairs 1848 Lay Road                             Public Service Electric and Gas Company Delta, PA 17314                           P.O. Box 236 Hancocks Bridge, NJ 08038-0236 Mr. Roland Fletcher Department of Environment                 Vice President, Licensing and Regulatory Radiological Health Program                 Affairs 2400 Broening Highway                     Exelon Generation Company, LLC Baltimore, MD 21224                       4300 Winfield Road Warrenville, IL 60555 Director, Licensing and Regulatory Affairs Exelon Generation Company, LLC             Associate General Counsel Correspondence Control                     Exelon Generation Company, LLC P.O. Box 160                               4300 Winfield Road Kennett Square, PA 19348                   Warrenville, IL 60555 Manager Licensing                         Correspondence Control Desk Exelon Generation Company, LLC            Exelon Generation Company, LLC Correspondence Control                     200 Exelon Way, KSA 1-N-1 P.O. Box 160                               Kennett Square, PA 19348 Kennett Square, PA 19348 Chief-Division of Nuclear Safety PA Bureau of Radiation Protection Dept. of Environmental Protection P.O. Box 8469 Harrisburg, PA 17105-8469 Board of Supervisors Peach Bottom Township R. D. #1 Delta, PA 17314 Public Service Commission of Maryland Engineering Division Chief Engineer 6 St. Paul Center Baltimore, MD 21202-6806}}
Plant Manager - Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA 17314 Manager Regulatory Assurance - Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA 17314 Mr. Roland Fletcher Department of Environment Radiological Health Program 2400 Broening Highway Baltimore, MD 21224 Director, Licensing and Regulatory Affairs Exelon Generation Company, LLC Correspondence Control P.O. Box 160 Kennett Square, PA 19348 Manager Licensing Exelon Generation Company, LLC Correspondence Control P.O. Box 160 Kennett Square, PA 19348 Chief-Division of Nuclear Safety PA Bureau of Radiation Protection Dept. of Environmental Protection P.O. Box 8469 Harrisburg, PA 17105-8469 Board of Supervisors Peach Bottom Township R. D. #1 Delta, PA 17314 Public Service Commission of Maryland Engineering Division Chief Engineer 6 St. Paul Center Baltimore, MD 21202-6806 Ms. Susan Grey Power Plant and Environmental Review Division Department of Natural Resources B-3, Tawes State Office Building Annapolis, MD 21401 Manager-Financial Control & Co-Owner Affairs Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, NJ 08038-0236 Vice President, Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Associate General Counsel Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Correspondence Control Desk Exelon Generation Company, LLC 200 Exelon Way, KSA 1-N-1 Kennett Square, PA 19348}}

Latest revision as of 01:07, 14 January 2025

Letter Peach Bottom Atomic Power Station Unit 1- Issuance of Exemption from Security Requirements of 10 CFR Part 50 and 10 CFR Part 73 (TAC No. J00384)
ML103410383
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 08/01/2011
From: Stephen Giebel
NRC/FSME/DWMEP/DURLD/RDB
To: Pacilio M
Exelon Nuclear
Stephen Giebel, 415-5526
Shared Package
ML103410375 List:
References
TAC J00384
Download: ML103410383 (5)


Text

August 1, 2011 Mr. Michael J. Pacilio President & Chief Nuclear Officer Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION UNIT 1 - ISSUANCE OF EXEMPTION FROM SECURITY REQUIREMENTS OF 10 CFR PART 50 AND 10 CFR PART 73 (TAC NO. J00384)

Dear Mr. Pacilio:

The Commission has granted Exelon Nuclear, the licensee for Peach Bottom Atomic Power Station, Unit 1, the enclosed exemption from the requirements of 10 CFR 50.54(p) and the fixed site physical protection requirements of 10 CFR Part 73. This action is in response to your letter dated November 18, 2010.

The Commission has determined that, pursuant to 10 CFR 50.12(a), an exemption is authorized by law, will not present an undue risk to the public health and safety, and is consistent with the common defense and security based on the continued maintenance of appropriate security requirements for special nuclear material (SNM). Additionally, special circumstances are present based on the removal of the spent nuclear fuel containing SNM from the 10 CFR Part 50 licensed site. Therefore, the Commission hereby grants Exelon Nuclear an exemption from the requirements of 10 CFR 50.54(p) at Peach Bottom Atomic Power Station, Unit 1.

The Commission has determined that, pursuant to 10 CFR 73.5, an exemption is authorized by law, will not endanger life or property or the common defense and security, and is otherwise in the public interest based on the security requirements for the spent fuel containing SNM no longer being the responsibility of the licensee. Therefore, the Commission hereby grants Exelon Nuclear an exemption from the physical protection requirements of 10 CFR Part 73 at Peach Bottom Atomic Power Station, Unit 1.

Pursuant to 10 CFR 51.21, 51.32, and 51.35, an environmental assessment and finding of no significant impact related to the part of this exemption not dealing with safeguards plans was published in the Federal Register on June 28, 2011 (76 FR 37842). Based upon the environmental assessment, the Commission has determined that issuance of this exemption will not have a significant effect on the quality of the human environment.

M.J. Pacilio 2

The part of this licensing action dealing with safeguards plans meets the categorical exclusion provision in 10 CFR Part 51.22(c)(25), as that part of this action is an exemption from the requirements of the Commissions regulations and (i) there is no significant hazards consideration; (ii) there is no significant change in the types or significant increase in the amounts of any effluents that may be released offsite; (iii) there is no significant increase in individual or cumulative public or occupational radiation exposure; (iv) there is no significant construction impact; (v) there is no significant increase in the potential for or consequences from radiological accidents; and (vi) the requirements from which an exemption is sought involve safeguard plans. Therefore, that part of the action does not require either an environmental assessment or an environmental impact statement.

The exemption will be published in the Federal Register. In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC=s Agency-wide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Stephen Giebel, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No.: 50-171 License No.: DPR-12

Enclosure:

Exemption cc: see next page

M.J. Pacilio 2

The part of this licensing action dealing with safeguards plans meets the categorical exclusion provision in 10 CFR Part 51.22(c)(25), as that part of this action is an exemption from the requirements of the Commissions regulations and (i) there is no significant hazards consideration; (ii) there is no significant change in the types or significant increase in the amounts of any effluents that may be released offsite; (iii) there is no significant increase in individual or cumulative public or occupational radiation exposure; (iv) there is no significant construction impact; (v) there is no significant increase in the potential for or consequences from radiological accidents; and (vi) the requirements from which an exemption is sought involve safeguard plans. Therefore, that part of the action does not require either an environmental assessment or an environmental impact statement.

The exemption will be published in the Federal Register. In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC=s Agency-wide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, Stephen Giebel, Project Manager Reactor Decommissioning Branch Decommissioning and Uranium Recovery Licensing Directorate Division of Waste Management and Environmental Protection Office of Federal and State Materials and Environmental Management Programs Docket No.: 50-171 License No.: DPR-12

Enclosure:

Exemption cc: see next page Distribution:

DWMEP r/f J Joustra, RI D Garner, NSIR L Kauffman, RI ML103410375 OFC DWMEP DWMEP DWMEP NSIR OGC DWMEP DWMEP NAME JHickman CHolston BWatson SWastler CHair KMcConnell SGiebel DATE 7/20/11 12 / 9 / 10 12 / 09 / 10 12 / 16 / 10 6 / 2 / 11 8/1/11 8/1/11 OFFICIAL RECORD COPY

Peach Bottom Atomic Power Station, Unit 1 Service List cc:

Mr. Christopher M. Crane President and Chief Operating Officer (COO), Exelon Corporation President, Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. Charles G. Pardee Chief Operating Officer (COO), Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO),

Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Ms. Susan R. Landahl Senior Vice President, Exelon Generation Company, LLC Chief Operating Officer (COO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 Mr. Ronald J. De Gregorio Senior Vice President, Operations Support, Exelon Generation Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348 Mr. Joseph P. Grimes, Jr.

Senior Vice President, Mid-Atlantic Operations, Exelon Generation Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348 Mr. Stephen E. Kuczynski Senior Vice President, Engineering and Technical Services, Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. Bryan C. Hanson Senior Vice President, Midwest Operations, Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. Keith R. Jury Vice President, Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. Timothy J. Tulon Vice President, Midwest Operations, Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. Christopher H. Mudrick Vice President, Mid-Atlantic Operations, Exelon Generation Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348 Mr. Robert J. Hovey Vice President, Nuclear Oversight, Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Mr. Tom Dougherty Site Vice President - Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA 17314

Plant Manager - Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA 17314 Manager Regulatory Assurance - Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA 17314 Mr. Roland Fletcher Department of Environment Radiological Health Program 2400 Broening Highway Baltimore, MD 21224 Director, Licensing and Regulatory Affairs Exelon Generation Company, LLC Correspondence Control P.O. Box 160 Kennett Square, PA 19348 Manager Licensing Exelon Generation Company, LLC Correspondence Control P.O. Box 160 Kennett Square, PA 19348 Chief-Division of Nuclear Safety PA Bureau of Radiation Protection Dept. of Environmental Protection P.O. Box 8469 Harrisburg, PA 17105-8469 Board of Supervisors Peach Bottom Township R. D. #1 Delta, PA 17314 Public Service Commission of Maryland Engineering Division Chief Engineer 6 St. Paul Center Baltimore, MD 21202-6806 Ms. Susan Grey Power Plant and Environmental Review Division Department of Natural Resources B-3, Tawes State Office Building Annapolis, MD 21401 Manager-Financial Control & Co-Owner Affairs Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, NJ 08038-0236 Vice President, Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Associate General Counsel Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Correspondence Control Desk Exelon Generation Company, LLC 200 Exelon Way, KSA 1-N-1 Kennett Square, PA 19348