ML110820737: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:U ml Participation Drill                   - Plume Only
{{#Wiki_filter:U ml Participation Drill
- Plume Only
* March 1,2011
* March 1,2011
* Bridgman, MI "PA
* Bridgman, MI iNDIANA MICHIGAN P0OWER*
* iNDIANA MICHIGAN P0OWER*
A unit of American Electric Power "PA Donald C. Cook Nuclear Plant USNRC Region III Incident Response Program
A unit ofAmerican Electric Power Donald C. Cook Nuclear Plant             USNRC Region III Incident Response Program


oo       ucer       ln Safety and Human Performance Guiding Principles
oo ucer ln Safety and Human Performance Guiding Principles
            ,,-,a dhu a errors 1e.
,,-,a dhu a errors 1e.
: 2.                     !d hip and
: 2.  
                      ,-accuotaility prevent
!d hip and
: 3. an safety and human error duction into our work.
,-accuotaility prevent
: 3.
an safety and human error duction into our work.
4.
4.
I


Personal Protective Equipment
Personal Protective Equipment
Line 33: Line 36:
Hardhat, ANSI footwear with protective toe, safety glasses with installed side shields and hearing protection.
Hardhat, ANSI footwear with protective toe, safety glasses with installed side shields and hearing protection.


u-u El 0 OrientationGoals
u-u El 0 Orientation Goals
        *Plant Overview
*Plant Overview
        *Organizational Match-ups eFacility Locations
*Organizational Match-ups eFacility Locations
        *NRC Incident Response Team Entrance
*NRC Incident Response Team Entrance
        *Logistics 4.
*Logistics 4.


.Ed D.C. Cook Nuclear Plant
.E d D.C. Cook Nuclear Plant
  *.**Two- 1100 Mw Four Loop Westinghouse PWR
*.**Two-1100 Mw Four Loop Westinghouse PWR
  **o 10 Mile EPZ is inside Berrien County o:o EAL Scheme -
**o 10 Mile EPZ is inside Berrien County o:o EAL Scheme -
NUMARC/NESP-007 o:o NUREG-0654 based Emergency Plan
NUMARC/NESP-007 o:o NUREG-0654 based Emergency Plan


Line 49: Line 52:
* Extra seating exists. IRT members are encouraged to move to any seat with a Incident Response Team sign above the workstation.
* Extra seating exists. IRT members are encouraged to move to any seat with a Incident Response Team sign above the workstation.


U Site Team NRC Region III Site Team   Director Site: D.C. COOK                                 Deputy Site Team DatelShift: March , 2011 Anne Boland                 Director I   Gary Shear NRC GLM at FEMA RRCC N/A Site Team Rev. 1 - January 28, 2011 Evaluator/Controller Desiree Smith
U Site Team NRC Region III Site Team Director Site: D.C. COOK Deputy Site Team DatelShift: March, 2011 Anne Boland Director I
Gary Shear NRC GLM at FEMA RRCC N/A Site Team Evaluator/Controller Desiree Smith Rev. 1 - January 28, 2011


NU
NU
                                                  *itA T*m NIr*ctnr Integrated Organizational Chart                     Ann;Boland NRC Region III Site Team                       Emergency Director                 Dept Site Team Dir D.C. COOK EOF Emergency Response Team               Shane Lies IAssistantGary Shear ED Randy Keppeler 1
*itA T*m NIr*ctnr Integrated Organizational Chart Ann;Boland NRC Region III Site Team Emergency Director Dept Site Team Dir Shane Lies Gary Shear D.C. COOK EOF Emergency Response Team IAssistant ED March 1, 2011 1
March 1, 2011 TA Specialist/
Randy Keppeler TA Specialist/
Chuck Zoia       Radiation Safety Engineering Design Coordinator Manager              (TSC)
Chuck Zoia Engineering Design Manager Madan Goel Communicator:
Madan Goel            Tony Go Communicator:    Radiation Assessment Jim Neurauter      Coordinator Boadwriter Milt Paquette Tony McMutuary NRC GLM at FEMA RRCC Dose Assessor Wayne Slawinski                                                                         N/A Env Assessment Coordinator David Raye Mike Allard Site Team Rev. 1 - February 19, 2011 Evaluator/Controller Desiree Smith
Jim Neurauter Boadwriter Tony McMutuary Radiation Safety Coordinator (TSC)
Tony Go Radiation Assessment Coordinator Milt Paquette Dose Assessor Wayne Slawinski Env Assessment Coordinator David Raye Mike Allard NRC GLM at FEMA RRCC N/A Site Team Evaluator/Controller Desiree Smith Rev. 1 - February 19, 2011


EOF/JIC Sequence of Events
EOF/JIC Sequence of Events AEP EOF Liaison will greet NRC in the lobby & escort to 2nd Floor Conference Room NRC will await phone call for deployment to briefing area When notified, NRC will be escorted to East Entrance and process into briefing area Group briefing provided by Assistant Emergency Director L
" AEP EOF Liaison will greet NRC in the lobby & escort to 2nd Floor Conference Room
Current emergency classification o, Reason for classification Current plant status Status of radiological release if any Current protective action recommendation, if any Mitigative actions - description and status o
" NRC will await phone call for deployment to briefing area
Challenges Questions from the NRC team AEP EOF Liaison escorts NRC to the JIC for individual briefings with counterparts Asst Emergency Director escorts NRC to the EOF for individual briefings with counterparts
" When notified, NRC will be escorted to East Entrance and process into briefing area
" Group briefing provided by Assistant Emergency Director L   Current emergency classification o, Reason for classification
  "  Current plant status
  "  Status of radiological release if any Current protective action recommendation, if any Mitigative actions - description and status o   Challenges
" Questions from the NRC team
" AEP EOF Liaison escorts NRC to the JIC for individual briefings with counterparts
" Asst Emergency Director escorts NRC to the EOF for individual briefings with counterparts


AEP Nuclear Generation Group 500 Circle Drive Buchanan, MI 49107
AEP Nuclear Generation Group 500 Circle Drive Buchanan, MI 49107


AEP NGG Building Front of building 4/7   I S
AEP NGG Building Front of building S
r-I
4/7 I
I
--- r-


U-NGG First Floor North TOVVER
U-NGG First Floor North TOVVER


Front Lobby Inside JIC/EOF Entrance Briefing Room for the IRT EOF/JIC EOF Layout Emergency U                                  PBX Room                                      I1 Operations II Pull-Down                Moio              II                Pull-Down    11 Facility      Screen      2o90Bndq. Monitor Reg Affairs Coord      Computer AnalystRck r*                                    Including IMgr's 2919          2911      *'ge, IRT Scheduling and Planning Mgr.
Front Lobby
IRT  Telecom


Emergency Operations Facility Dose Assessment Facility JIC Layout Ul (1) Public Information Technical Briefer (2) Public Information Leader 1 (3) Public Information Leader 2 SUPPORT MEDIA WORK AREA                    STAFF 5890 FRE          S FF O
Inside JIC/EOF Entrance
                                                  ý IMo RESTROOM


Joint Information Center JIC Media Area Media Work Area Looking back towards BOB Lobby Area
Briefing Room for the IRT EOF/JIC


JIC Auditorium Uj TSC Sequence of events
EOF Layout
  " Deputy Technical Assessment Branch Leader and Radiation Safety Coordinator will meet at the Resident Inspectors Office located in the fourth floor of the East Office Building.
  " When deployed, the NRC IRT will be escorted to the TSC by an AEP staff member.
  " IRT receives briefing from the Assistant Site Emergency Coordinator
* Current emergency classification
* Reason for classification
      "  Current plant status
      "  Status of radiological release if any
* Current protective action recommendation, if any
* Mitigative actions - description and status
* Challenges
* Questions from the NRC IRT
* Assistant Site Emergency Coordinator introduces IRT to TSC ERO


U Cook3Nula ln ieLyu 7/ AMMUCM E&MCUM POW=
Emergency Operations U
PBX Room I 1 Facility II Pull-Down Moio Screen 2o90 Bndq.
Monitor I I Pull-Down 11 Reg Affairs Coord Computer AnalystRck r*
Including IMgr's 2919 2911
*'ge, IRT Scheduling and Planning Mgr.
IRT Telecom
 
Emergency Operations Facility
 
Dose Assessment Facility
 
JIC Layout
 
Ul (1) Public Information Technical Briefer (2) Public Information Leader 1 (3) Public Information Leader 2 MEDIA WORK AREA SUPPORT STAFF 5890 FRE S
O FF
ý I Mo RESTROOM
 
Joint Information Center
 
JIC Media Area
 
Media Work Area Looking back towards BOB Lobby Area
 
JIC Auditorium
 
Uj TSC Sequence of events Deputy Technical Assessment Branch Leader and Radiation Safety Coordinator will meet at the Resident Inspectors Office located in the fourth floor of the East Office Building.
When deployed, the NRC IRT will be escorted to the TSC by an AEP staff member.
IRT receives briefing from the Assistant Site Emergency Coordinator Current emergency classification Reason for classification Current plant status
" Status of radiological release if any Current protective action recommendation, if any Mitigative actions - description and status Challenges Questions from the NRC IRT Assistant Site Emergency Coordinator introduces IRT to TSC ERO
 
U Cook3 Nula ln ieLyu 7/
AMMUCM E&MCUM POW=


USNRC Residents Office is on the Fourth Floor in the Northeast corner
USNRC Residents Office is on the Fourth Floor in the Northeast corner
                  .Maintenance
.Maintenance


U TSC                                                             I                                      1202                  1 203 TSCReference Material                                                                                     Asst.
U TSC TSC Reference Material LC, i*
SEC        EROS LC, i*   COMMUNICATIONS                                                     Security            PET        PET Director        Training    Operations ROOM
COMMUNICATIONS ROOM
_SPP 21150-SFI-216                       1063         ý   STA           1302
_SPP 211 1088 Phone Jack 1034 Computer Analyst TSC Drawngs Public Affairs Hotline DAP Computer 1092 Administrative 2
                                                      .E CABINET"  Asst. 1451                       STI           STA RAC                               HOTLINE       HOTLINE (1824)         186 ENS           HPN 1088                                            RAC     1032   FTS-2001   FTS-2001                                 SEC Phone Jack                                                        371-6772     371-6779 1034      Computer                                                            NRC Analyst TSC Drawngs                                          1204               1621       1030 Public Affairs                                                                                          Maint. Reactor Hotline RSC (2) DTABL           Eng'r. Physics DAP (1)
Coordinator IN I
Computer                                                    PLANT EVALUATION TEAM ROOM 1092      Administrative                  2                                                        Team         Boardwnter         2080 Coordinator                   IN                                                    Coordinator        Brdge     [       odge
50-SFI-216
                                                                                                  .I 8
.E CABINET" 1202 1
FAX Operator/
Security PET PET Director Training Operations 1063  
Runner NRC ROOM (1) Deputy Technical Assessment Branch Leader (2) Radiological Safety Coordinator PMCL (3R (3) Protective Measures Coordinator Link                                                                             FTS-200t-2 (4) Reactor Safety Coordinator Link                               Conference                                         371-6775 Table RSCL (46r FTS-200T-371-6776 ENS             HPN FTS-2001       FTS-2001 37   6772       371-6779 P[nmary Copier                           S    1683                      1682
ý STA 1302 Asst.
1451 STI STA RAC HOTLINE HOTLINE (1824) 186 ENS HPN RAC 1032 FTS-2001 FTS-2001 371-6772 371-6779 NRC 1204 1621 1030 Maint.
Reactor RSC (2) DTABL Eng'r.
Physics (1)
PLANT EVALUATION TEAM ROOM 203 Asst.
SEC EROS SEC Team Boardwnter 2080 Coordinator Brdge
[
odge 8
.I FAX Operator/
Runner NRC ROOM (1) Deputy Technical Assessment Branch Leader (2) Radiological Safety Coordinator (3) Protective Measures Coordinator Link (4) Reactor Safety Coordinator Link Conference Table PMCL (3R FTS-200t-2 371-6775 RSCL (46r FTS-200T-371-6776 ENS HPN FTS-2001 FTS-2001 37 6772 371-6779 S
1683 1682 P[nmary Copier


U Logistics - GPS addre sses D. C. Cook Nuclear Plant One Cook Place Bridgman, MI 49106 TSC, OSC, SCR AEP Buchanan Office Building 500 Circle Drive Buchanan, MI 49107 EOF, ENC/JIC Contact the CNP Switchboard at (269) 465-5901 should you need assistance in your travels
U Logistics - GPS addre D. C. Cook Nuclear Plant One Cook Place Bridgman, MI 49106 TSC, OSC, SCR AEP Buchanan Office Building 500 Circle Drive Buchanan, MI 49107 EOF, ENC/JIC Contact the CNP Switchboard at (269) 465-5901 should you need assistance in your travels sses


N Southwest Michigan
N Southwest Michigan Driving Distance to Lisle, II 105 miles New Buffalo, MI 15 miles South Bend, IN 35 miles Stevensville, MI 5 miles St. Joseph, MI 11 miles Plant
  - Driving Distance to Plant
* Driving Distance to the EOF/JIC Buchanan, MI U
  " Lisle, II         105 miles
U U
  " New Buffalo, MI     15 miles
U U
  " South Bend, IN       35 miles
U Cook Nuclear Plant Lisle, II New Buffalo, MI South Bend, IN Stevensville, MI St. Joseph, MI 19 miles 112 miles 27 miles 18 miles 24 miles 22 miles
  " Stevensville, MI     5 miles
  " St. Joseph, MI       11 miles
* Driving Distance to the EOF/JIC Buchanan, MI U Cook Nuclear Plant   19 miles U Lisle, II         112 miles U New Buffalo, MI     27 miles U South Bend, IN     18 miles U Stevensville, MI   24 miles U St. Joseph, MI     22 miles


Questions?}}
Questions?}}

Latest revision as of 07:32, 13 January 2025

Summary of Meeting Between NRC and D. C. Cook Emergency Preparedness and Regulatory Affairs to Discuss the Upcoming March 2011 Emergency Preparedness Exercise
ML110820737
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/21/2011
From: Billy Dickson
Division of Reactor Safety III
To: Weber L
Indiana Michigan Power Co
References
Download: ML110820737 (36)


Text

U ml Participation Drill

- Plume Only

  • March 1,2011

A unit of American Electric Power "PA Donald C. Cook Nuclear Plant USNRC Region III Incident Response Program

oo ucer ln Safety and Human Performance Guiding Principles

,,-,a dhu a errors 1e.

2.

!d hip and

,-accuotaility prevent

3.

an safety and human error duction into our work.

4.

I

Personal Protective Equipment

  • EOF, ENC/JIC, SCR, OSC are outside the powerblock and PPE is not required.

" TSC and Damage Control Teams dispatched from the OSC require:

Hardhat, ANSI footwear with protective toe, safety glasses with installed side shields and hearing protection.

u-u El 0 Orientation Goals

  • Plant Overview
  • Organizational Match-ups eFacility Locations
  • NRC Incident Response Team Entrance
  • Logistics 4.

.E d D.C. Cook Nuclear Plant

    • o 10 Mile EPZ is inside Berrien County o:o EAL Scheme -

NUMARC/NESP-007 o:o NUREG-0654 based Emergency Plan

Organizational Overlay

  • NRC IRT and D.C. Cook ERO positions are not perfectly matched
  • Aligned positions as closely as possible and arranged seating accordingly
  • Extra seating exists. IRT members are encouraged to move to any seat with a Incident Response Team sign above the workstation.

U Site Team NRC Region III Site Team Director Site: D.C. COOK Deputy Site Team DatelShift: March, 2011 Anne Boland Director I

Gary Shear NRC GLM at FEMA RRCC N/A Site Team Evaluator/Controller Desiree Smith Rev. 1 - January 28, 2011

NU

  • itA T*m NIr*ctnr Integrated Organizational Chart Ann;Boland NRC Region III Site Team Emergency Director Dept Site Team Dir Shane Lies Gary Shear D.C. COOK EOF Emergency Response Team IAssistant ED March 1, 2011 1

Randy Keppeler TA Specialist/

Chuck Zoia Engineering Design Manager Madan Goel Communicator:

Jim Neurauter Boadwriter Tony McMutuary Radiation Safety Coordinator (TSC)

Tony Go Radiation Assessment Coordinator Milt Paquette Dose Assessor Wayne Slawinski Env Assessment Coordinator David Raye Mike Allard NRC GLM at FEMA RRCC N/A Site Team Evaluator/Controller Desiree Smith Rev. 1 - February 19, 2011

EOF/JIC Sequence of Events AEP EOF Liaison will greet NRC in the lobby & escort to 2nd Floor Conference Room NRC will await phone call for deployment to briefing area When notified, NRC will be escorted to East Entrance and process into briefing area Group briefing provided by Assistant Emergency Director L

Current emergency classification o, Reason for classification Current plant status Status of radiological release if any Current protective action recommendation, if any Mitigative actions - description and status o

Challenges Questions from the NRC team AEP EOF Liaison escorts NRC to the JIC for individual briefings with counterparts Asst Emergency Director escorts NRC to the EOF for individual briefings with counterparts

AEP Nuclear Generation Group 500 Circle Drive Buchanan, MI 49107

AEP NGG Building Front of building S

4/7 I

I

--- r-

U-NGG First Floor North TOVVER

Front Lobby

Inside JIC/EOF Entrance

Briefing Room for the IRT EOF/JIC

EOF Layout

Emergency Operations U

PBX Room I 1 Facility II Pull-Down Moio Screen 2o90 Bndq.

Monitor I I Pull-Down 11 Reg Affairs Coord Computer AnalystRck r*

Including IMgr's 2919 2911

  • 'ge, IRT Scheduling and Planning Mgr.

IRT Telecom

Emergency Operations Facility

Dose Assessment Facility

JIC Layout

Ul (1) Public Information Technical Briefer (2) Public Information Leader 1 (3) Public Information Leader 2 MEDIA WORK AREA SUPPORT STAFF 5890 FRE S

O FF

ý I Mo RESTROOM

Joint Information Center

JIC Media Area

Media Work Area Looking back towards BOB Lobby Area

JIC Auditorium

Uj TSC Sequence of events Deputy Technical Assessment Branch Leader and Radiation Safety Coordinator will meet at the Resident Inspectors Office located in the fourth floor of the East Office Building.

When deployed, the NRC IRT will be escorted to the TSC by an AEP staff member.

IRT receives briefing from the Assistant Site Emergency Coordinator Current emergency classification Reason for classification Current plant status

" Status of radiological release if any Current protective action recommendation, if any Mitigative actions - description and status Challenges Questions from the NRC IRT Assistant Site Emergency Coordinator introduces IRT to TSC ERO

U Cook3 Nula ln ieLyu 7/

AMMUCM E&MCUM POW=

USNRC Residents Office is on the Fourth Floor in the Northeast corner

.Maintenance

U TSC TSC Reference Material LC, i*

COMMUNICATIONS ROOM

_SPP 211 1088 Phone Jack 1034 Computer Analyst TSC Drawngs Public Affairs Hotline DAP Computer 1092 Administrative 2

Coordinator IN I

50-SFI-216

.E CABINET" 1202 1

Security PET PET Director Training Operations 1063

ý STA 1302 Asst.

1451 STI STA RAC HOTLINE HOTLINE (1824) 186 ENS HPN RAC 1032 FTS-2001 FTS-2001 371-6772 371-6779 NRC 1204 1621 1030 Maint.

Reactor RSC (2) DTABL Eng'r.

Physics (1)

PLANT EVALUATION TEAM ROOM 203 Asst.

SEC EROS SEC Team Boardwnter 2080 Coordinator Brdge

[

odge 8

.I FAX Operator/

Runner NRC ROOM (1) Deputy Technical Assessment Branch Leader (2) Radiological Safety Coordinator (3) Protective Measures Coordinator Link (4) Reactor Safety Coordinator Link Conference Table PMCL (3R FTS-200t-2 371-6775 RSCL (46r FTS-200T-371-6776 ENS HPN FTS-2001 FTS-2001 37 6772 371-6779 S

1683 1682 P[nmary Copier

U Logistics - GPS addre D. C. Cook Nuclear Plant One Cook Place Bridgman, MI 49106 TSC, OSC, SCR AEP Buchanan Office Building 500 Circle Drive Buchanan, MI 49107 EOF, ENC/JIC Contact the CNP Switchboard at (269) 465-5901 should you need assistance in your travels sses

N Southwest Michigan Driving Distance to Lisle, II 105 miles New Buffalo, MI 15 miles South Bend, IN 35 miles Stevensville, MI 5 miles St. Joseph, MI 11 miles Plant

  • Driving Distance to the EOF/JIC Buchanan, MI U

U U

U U

U Cook Nuclear Plant Lisle, II New Buffalo, MI South Bend, IN Stevensville, MI St. Joseph, MI 19 miles 112 miles 27 miles 18 miles 24 miles 22 miles

Questions?