{{#Wiki_filter:Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data                                                                                                                                                                                                                                                                                                                                   Page 1 A - Action Completed (date)
{{#Wiki_filter:Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 1 1 - Audit Sample No.
G - Closed RgCm implemented                                        I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process                                                                                                              H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS                                    E - Affected implementing 1 - Audit Sample No.
2 - DEK Submittal 3 - NRC TAC No.
4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)
Action in Prgress (no date)
Not Changed / Changed to what?
B - KPS Tracking #
B - KPS Tracking #
2 - DEK Submittal    3 - NRC TAC No.          4 - NRC Issuance Action in Prgress (no date)
LC#,, CAP#
LC#,, CAP#
in timely manner (Yes / No / NA) closeout information document document # (See Note LI*)                                                                                                                Maintained (Yes / No / NA) managed (Yes / No / NA)
C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)
E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)
H - Open RgCm is adequately Maintained (Yes / No / NA)
I - Changed RgCm is adequately managed (Yes / No / NA) 1 10/29/2007 07-0436B ML073100354 None None An updated description of the station blackout alternate alternating current source, including the quality assurance program requirements for the TSC DG as defined in the Dominion Nuclear Facility Quality Assurance Program Description, will be incorporated into the KPS Updated Safety Analysis Report (USAR) and provided to the Nuclear Regulatory Commission (NRC) in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 50.71 (e).
complete 4/18/2008; NC LC000111 LA000697 No ML#,
since no separate response to the NRC LI*
USAR 8.2.4.3, 8.2.4.12, 8.2 Reference none Yes NA NA
 
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 2 1 - Audit Sample No.
2 - DEK Submittal 3 - NRC TAC No.
4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)
Action in Prgress (no date)
Not Changed / Changed to what?
Not Changed / Changed to what?
An updated description of the station blackout alternate alternating current source, including the quality assurance program requirements for the TSC DG as defined in the Dominion Nuclear Facility                                                        No ML#,
B - KPS Tracking #
10/29/2007                                                                                                                                                                                                                    USAR Quality Assurance Program complete                                      LC000111 since no 07-0436B                                                                                                                                                                                                                      8.2.4.3, 1                                        None                None                      Description, will be         4/18/2008;                                ,       separate                                LI*                                                          none                                  Yes                                NA                              NA ML073100354                                                                                                                                                                                                                    8.2.4.12, 8.2 incorporated into the KPS    NC                                        LA000697 response to Reference Updated Safety Analysis                                                          the NRC Report (USAR) and provided to the Nuclear Regulatory Commission (NRC) in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 50.71 (e).
LC#,, CAP#
C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)
E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)
H - Open RgCm is adequately Maintained (Yes / No / NA)
I - Changed RgCm is adequately managed (Yes / No / NA) 2 11/9/07 07-0416A ML073106750 MD6144 Letter of 2/25/08 granting relief, ML080240029 Prior to use of nonwelded valves with end connections other than flanges at KPS, procedures will be developed for installation of nonwelded valves with end connections other than flanges that address operating experience of NRC Information Notices 92-15, 84-55 and 84-55, Supplement 1. The specific provisions include: a) not mixing the parts from one manufacturer to another, b) following manufacturer's recommended instructions for installing compression fittings, and c) the training or familiarity with the procedure(s) for personnel doing this work.
complete 1/2/2008; NC LC000142 LA000741
("LA type"soluti on was incorrect.
Data entry was performed by inexperien ced person -
self corrected) no response to the NRC required LI*
Maintenance Procedure MA-KW-GMP-103 None Yes NA NA


Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data                                                                                                                                                                                                                                                                                                       Page 2 A - Action Completed (date)
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 3 1 - Audit Sample No.
G - Closed RgCm implemented                                        I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process                                                                                                      H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS                                    E - Affected implementing 1 - Audit Sample No.
2 - DEK Submittal 3 - NRC TAC No.
4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)
Action in Prgress (no date)
Not Changed / Changed to what?
B - KPS Tracking #
B - KPS Tracking #
2 - DEK Submittal    3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)
LC#,, CAP#
LC#,, CAP#
in timely manner (Yes / No / NA) closeout information document document # (See Note LI*)                                                                                                       Maintained (Yes / No / NA) managed (Yes / No / NA)
C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)
Not Changed / Changed to what?
E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)
Prior to use of nonwelded valves with end connections other than flanges at KPS, procedures will be                                                        LC000142 developed for installation of                                              ,
H - Open RgCm is adequately Maintained (Yes / No / NA)
nonwelded valves with end                                                  LA000741 connections other than                                                    ("LA flanges that address                                                      type"soluti operating experience of                                                    on was 11/9/07                                           NRC Information Notices 92-                                               incorrect.                                                                     Maintenance Letter of 2/25/08                                                                                       no response 07-0416A                                          15, 84-55 and 84-55,          complete                                     Data entry                                                                    Procedure 2                                        MD6144 granting relief,                                                                                        to the NRC LI*                                                                None                                              Yes                                NA                              NA ML073106750                                      Supplement 1. The specific 1/2/2008; NC                                   was                                                                            MA-KW-GMP-ML080240029                                                                                              required provisions include: a) not                                                performed                                                                      103 mixing the parts from one                                                  by manufacturer to another, b)                                                inexperien following manufacturer's                                                  ced recommended instructions                                                  person -
I - Changed RgCm is adequately managed (Yes / No / NA) 3 11/9/07 07-0352 ML073170705 MD7300 Amend. No.
for installing compression                                                self fittings, and c) the training                                              corrected) or familiarity with the procedure(s) for personnel doing this work.
200, 11/20/08, ML082971079 Notify the NRC when the modifications to the Auxiliary Building (AB) crane to make it single-failure proof are complete complete 6/12/08; NC LC000141 LA000133 Note 03-C LI*
CA069210 says to update procedure GNP-08.12.02 plus tags.
None Yes-it was timely since it accomplis hed a design change.
NA NA


3                          1 - Audit Sample No.
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 4 1 - Audit Sample No.
11/9/07 07-0352                          2 - DEK Submittal ML073170705 Amend. No.                      3 - NRC TAC No.
2 - DEK Submittal 3 - NRC TAC No.
MD7300 200, 11/20/08, 4 - NRC Issuance ML082971079 Notify the NRC when the modifications to the Auxiliary Building (AB)                5 - Summary of Commitment crane to make it single-failure proof are complete A - Action Completed (date)
4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)
Action in Prgress (no date)
Action in Prgress (no date)
Not Changed / Changed to what?
Not Changed / Changed to what?
LC000141 Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data complete B - KPS Tracking #
                  ,        Note 03-C            LC#,, CAP#
6/12/08; NC C - If closed, then KPS LA000133                  closeout information LI*                    D - Governed by KPS process document # (See Note LI*)
CA069210 says to                                    E - Affected implementing update                                            document procedure    None GNP-08.12.02 plus tags.
F - Affected change document Yes- it was timely                              G - Closed RgCm implemented since it accomplis NA                            in timely manner (Yes / No / NA) hed a design change.                                  H - Open RgCm is adequately Maintained (Yes / No / NA)
NA I - Changed RgCm is adequately managed (Yes / No / NA)
Page 3
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data                                                                                                                                                                                                                                                                                                                          Page 4 A - Action Completed (date)
G - Closed RgCm implemented                                        I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process                                                                                                            H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS                                    E - Affected implementing 1 - Audit Sample No.
B - KPS Tracking #
B - KPS Tracking #
2 - DEK Submittal    3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)
LC#,, CAP#
LC#,, CAP#
in timely manner (Yes / No / NA) closeout information document document # (See Note LI*)                                                                                                              Maintained (Yes / No / NA) managed (Yes / No / NA)
C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)
Not Changed / Changed to what?
E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)
All heavy load lifts in or around the spent fuel pool made using the upgraded AB crane lifting system will meet the guidance in NUREG-0612, Section 5.1.6, as follows:
H - Open RgCm is adequately Maintained (Yes / No / NA)
* Special lifting devices, as defined in American National Standards Institutes (ANSI) N14.6 will meet the guidance in NUREG-0612, Section 5.1.6(1 )(a) and ANSI N14.6-1993, as clarified in Attachment 5 to this license                     Addressed in                                                                                                                                                              Yes.
I - Changed RgCm is adequately managed (Yes / No / NA) 4 11/9/07 07-0352 ML073170705 MD7300 Amend. No.
amendment request (LAR).                         TRM [a                                                                                                                                                                    Completio 11/9/07                        Amend. No.                                                              LC000141 licensee                                                                                            TRM 3.8.1,                                                          n took Complete 4                07-0352                  MD7300 200, 11/20/08,
200, 11/20/08, ML082971079 All heavy load lifts in or around the spent fuel pool made using the upgraded AB crane lifting system will meet the guidance in NUREG-0612, Section 5.1.6, as follows:
* Lifting devices not                   ,        controlled  LI*                                                                                    Rev 0,                        none                                  place    NA                                                        NA 1/16/09; NC ML073170705                    ML082971079                    specially designed will meet             LA000135 document                                                                                            1/15/09.                                                            within 60 the guidance in NUREG-                           kdf] See                                                                                                                                                                  days, as 0612, Section 5.1.6(1)(b)                         Note 04-C                                                                                                                                                                planned.
* Special lifting devices, as defined in American National Standards Institutes (ANSI) N14.6 will meet the guidance in NUREG-0612, Section 5.1.6(1 )(a) and ANSI N14.6-1993, as clarified in to this license amendment request (LAR).
and American Society of Mechanical Engineers (ASME) B30.9-2003, as clarified in Attachment 5 to this LAR.
* Lifting devices not specially designed will meet the guidance in NUREG-0612, Section 5.1.6(1)(b) and American Society of Mechanical Engineers (ASME) B30.9-2003, as clarified in Attachment 5 to this LAR.
* The AB crane will meet the guidance in NUREG-0612, Section 5.1.6(2) and NUREG-0554 as clarified in Attachments 5 and 6 to this LAR
* The AB crane will meet the guidance in NUREG-0612, Section 5.1.6(2) and NUREG-0554 as clarified in Attachments 5 and 6 to this LAR
* Interfacing lift points will meet the guidance in NUREG-0612, Section
* Interfacing lift points will meet the guidance in NUREG-0612, Section Complete 1/16/09; NC LC000141 LA000135 Addressed in TRM [a licensee controlled document kdf] See Note 04-C LI*
TRM 3.8.1, Rev 0, 1/15/09.
none Yes.
Completio n took place within 60 days, as planned.
NA NA


5                               1 - Audit Sample No.
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 5 1 - Audit Sample No.
11/9/07 07-0352                                2 - DEK Submittal ML073170705 Amend. No.                              3 - NRC TAC No.
2 - DEK Submittal 3 - NRC TAC No.
MD7300 200, 11/20/08, 4 - NRC Issuance ML082971079 Crane operator training will 5 - Summary of Commitment complete meet the guidance in ASME 12/15/08 A - Action Completed (date)
4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)
B30.2-2005.                                Action in Prgress (no date)
Action in Prgress (no date)
Not Changed / Changed to what?
Not Changed / Changed to what?
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data LC000141                                      B - KPS Tracking #
B - KPS Tracking #
None to                                  LC#,, CAP#
LC#,, CAP#
NRC LA000736                                    C - If closed, then KPS closeout information LI*                          D - Governed by KPS process document # (See Note LI*)
C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)
Lesson Plan M-MD-LP 2.2.1                                          E - Affected implementing "Cranes"; M-                                            document None PM2-LP 1.9.1 "Crane Maintenance
E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)
/ Inspection" F - Affected change document Yes.
H - Open RgCm is adequately Maintained (Yes / No / NA)
Lesson Plans had                                    G - Closed RgCm implemented guidance incorporat NA                                in timely manner (Yes / No / NA) ed in reference to this Amd's approval.                                      H - Open RgCm is adequately Maintained (Yes / No / NA)
I - Changed RgCm is adequately managed (Yes / No / NA) 5 11/9/07 07-0352 ML073170705 MD7300 Amend. No.
NA I - Changed RgCm is adequately managed (Yes / No / NA)
200, 11/20/08, ML082971079 Crane operator training will meet the guidance in ASME B30.2-2005.
Page 5
complete 12/15/08 LC000141 LA000736 None to NRC LI*
Lesson Plan M-MD-LP 2.2.1 "Cranes"; M-PM2-LP 1.9.1 "Crane Maintenance
/ Inspection" None Yes.
Lesson Plans had guidance incorporat ed in reference to this Amd's approval.
NA NA


Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data                                                                                                                                                                                                                                                                                                                   Page 6 A - Action Completed (date)
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 6 1 - Audit Sample No.
G - Closed RgCm implemented                                        I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process                                                                                                      H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS                                    E - Affected implementing 1 - Audit Sample No.
2 - DEK Submittal 3 - NRC TAC No.
4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)
Action in Prgress (no date)
Not Changed / Changed to what?
B - KPS Tracking #
B - KPS Tracking #
2 - DEK Submittal    3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)
LC#,, CAP#
LC#,, CAP#
in timely manner (Yes / No / NA) closeout information document document # (See Note LI*)                                                                                                        Maintained (Yes / No / NA) managed (Yes / No / NA)
C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)
Not Changed / Changed to what?
E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)
Yes.
H - Open RgCm is adequately Maintained (Yes / No / NA)
I - Changed RgCm is adequately managed (Yes / No / NA) 6 11/9/07 07-0352 ML073170705 MD7300 Amend. No.
200, 11/20/08, ML082971079 Crane maintenance and inspections will meet the guidance in ASME B30.2-1976.
complete 1/16/09, NC LC000141 LA000740 TRM Bases, USAR LI*
TRM Bases (TRM 3.8.1 pg 381-2)
USAR Rev22 Sec. 9, pp 9.5-9, -10 (6/30 None Yes.
During NRC ISFSI Inspection (6/09) issues were identified with crane inspection procedure s
During NRC ISFSI Inspection (6/09) issues were identified with crane inspection procedure s
TRM Bases concernin (TRM 3.8.1 11/9/07                                                        Crane maintenance and                                                                                                                                                                                                g B30.2 Amend. No.                                                                          LC000141                                                                                          pg 381-2) 07-0352                                                        inspections will meet the              complete            TRM Bases,                                                                                                                                              guidance.
concernin g B30.2 guidance.
6                                        MD7300 200, 11/20/08,                                                                      ,                  LI*                                                                            USAR Rev22 None                                                          NA                                                      NA ML073170705                                                    guidance in ASME B30.2-                1/16/09, NC          USAR                                                                                                                                                    REF CR ML082971079                                                                        LA000740                                                                                          Sec. 9, pp 1976.                                                                                                                                                                                                                337889.
REF CR 337889.
9.5-9, -10 Revised (6/30 MA-KW-MPM-CRN-007 Rev.
Revised MA-KW-MPM-CRN-007 Rev.
2 and TEC-MA-KW-MPM-CRN-002 Rev
2 and TEC-MA-KW-MPM-CRN-002 Rev
: 3. ASME B30.2 is referenced in procedure s.
: 3. ASME B30.2 is referenced in procedure s.
NA NA


7                                         1 - Audit Sample No.
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 7 1 - Audit Sample No.
11/9/07 07-0352                                            2 - DEK Submittal ML073170705 Amend. No.                                            3 - NRC TAC No.
2 - DEK Submittal 3 - NRC TAC No.
MD7300 200, 11/20/08, 4 - NRC Issuance ML082971079 Revise USAR Section 9.5.2              LC000141          5 - Summary of Commitment complete A - Action Completed (date)
4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)
Action in Prgress (no date)
Action in Prgress (no date)
Not Changed / Changed to what?
Not Changed / Changed to what?
to remove the dropped cask            ,        USAR Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data 1/15/09: NC                      B - KPS Tracking #
B - KPS Tracking #
LC#,, CAP#
LC#,, CAP#
C - If closed, then KPS analysis from the USAR.                LA000737 closeout information LI*                                  D - Governed by KPS process document # (See Note LI*)
C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)
E - Affected implementing USAR 14.2.1, document none 9.5 F - Affected change document
E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)
H - Open RgCm is adequately Maintained (Yes / No / NA)
I - Changed RgCm is adequately managed (Yes / No / NA) 7 11/9/07 07-0352 ML073170705 MD7300 Amend. No.
200, 11/20/08, ML082971079 Revise USAR Section 9.5.2 to remove the dropped cask analysis from the USAR.
complete 1/15/09: NC LC000141 LA000737 USAR LI*
USAR 14.2.1, 9.5 none
: Yes, implement ed in a timely manner.
: Yes, implement ed in a timely manner.
Amd was issued 11/08 and                                                   G - Closed RgCm implemented implement ed 1/09.
Amd was issued 11/08 and implement ed 1/09.
Much work took place NA                                              in timely manner (Yes / No / NA)
Much work took place  
- USAR revision submitted 9/09 with the next scheduled update of USAR being 3/31/10.                                                     H - Open RgCm is adequately Maintained (Yes / No / NA)
- USAR revision submitted 9/09 with the next scheduled update of USAR being 3/31/10.
NA I - Changed RgCm is adequately managed (Yes / No / NA)
NA NA
Page 7


Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data                                                                                                                                                                                                                                                                                                                                     Page 8 A - Action Completed (date)
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 8 1 - Audit Sample No.
G - Closed RgCm implemented                                        I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process                                                                                                              H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS                                    E - Affected implementing 1 - Audit Sample No.
2 - DEK Submittal 3 - NRC TAC No.
4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)
Action in Prgress (no date)
Not Changed / Changed to what?
B - KPS Tracking #
B - KPS Tracking #
2 - DEK Submittal    3 - NRC TAC No.        4 - NRC Issuance Action in Prgress (no date)
LC#,, CAP#
LC#,, CAP#
in timely manner (Yes / No / NA) closeout information document document # (See Note LI*)                                                                                                                Maintained (Yes / No / NA) managed (Yes / No / NA)
C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)
E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)
H - Open RgCm is adequately Maintained (Yes / No / NA)
I - Changed RgCm is adequately managed (Yes / No / NA) 8 11/9/07 07-0352 ML073170705 MD7300 Amend. No.
200, 11/20/08, ML082971079 After LAR approval and relocation of TS 3.8.a.7 to the technical requirements manual (TRM) is authorized, add to the TRM required actions to take if the AB crane lifting system is found not to meet the TRM requirements during a heavy load lift.
complete 1/16/09; NC LC000141 LA000735 TRM LI*
: TRM, licensee controlled none Yes NA NA 9
11/9/07 07-0465 ML073180499 MD7301 Letter of 5/9/08 (ML081150741),
notice of withdrawal of application for amendment DEK will complete required modifications to the AB crane bridge girder to end-tie connections and confirm bolting material as described in Section 4.2.2.9 of this LAR.
NC, design change recorded as completed on 5/5/08 according to tTrack LAR ML073180499 withdrawn by letter dated 4/11/08 LC000141 LA000732 None to NRC; Design change DCR3629 was completed on 4/22/09; ready to install 9/10/07, which is RgCm closure.
LI*
DCR3629 is the implementing document none Yes.
Bolting material is confirmed, per ECN3629-06.
NA NA 10 2/8/2008 08-0017 ML080650314 MC4691 Review is ongoing The KPS USAR will be modified upon final resolution of GSI-191 and response to Generic Letter 2004-02.
In progress; NC LC000181 LA000907 None to NRC LI*
USAR 6.2.9.3 are planned to be changed.
USAR Change Request (UCR) R21-108 dated 9/19/08.
NA Yes -
tTrack shows completi on date changed to 6/1/11.
NA
 
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 9 1 - Audit Sample No.
2 - DEK Submittal 3 - NRC TAC No.
4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)
Action in Prgress (no date)
Not Changed / Changed to what?
Not Changed / Changed to what?
After LAR approval and relocation of TS 3.8.a.7 to the technical requirements 11/9/07                                                              manual (TRM) is Amend. No.                                                                    LC000141                                                                                                          TRM, 07-0352                                                              authorized, add to the TRM complete 8                                        MD7300 200, 11/20/08,                                                                ,        TRM                                                                        LI*                          licensee                        none                                  Yes                                  NA                              NA ML073170705                                                          required actions to take if 1/16/09; NC ML082971079                                                                  LA000735                                                                                                          controlled the AB crane lifting system is found not to meet the TRM requirements during a heavy load lift.
None to NC, design NRC; Design change change recorded as DEK will complete required                        DCR3629                                                                                                                                                                                          Yes.
Letter of 5/9/08                              completed modifications to the AB                            was                                                                                                                                                                                              Bolting 11/9/07                        (ML081150741),                                on 5/5/08                                                                                                                                        DCR3629 is crane bridge girder to end-              LC000141 completed                                                                                                                                                                                        material is 07-0465                        notice of                                    according to                                                                                                                                      the 9                                        MD7301                  tie connections and confirm              ,        on 4/22/09; LI*                                                                                                                          none                                                    confirmed, NA                                                        NA ML073180499                    withdrawal of                                tTrack LAR                                                                                                                                        implementing bolting material as                      LA000732 ready to                                                                                                                                                                                          per application for                              ML07318049                                                                                                                                        document described in Section 4.2.2.9                      install                                                                                                                                                                                          ECN3629-amendment                                    9 withdrawn of this LAR.                                      9/10/07,                                                                                                                                                                                          06.
by letter which is dated RgCm 4/11/08 closure.
Yes -
USAR                                                                                          tTrack The KPS USAR will be 2/8/2008                                                                                                                                                                                                                                          USAR 6.2.9.3 Change                                                                                        shows modified upon final                                                        LC000181 08-0017                                                        Review is                                                        In progress;                                None to                                                              are planned Request                                                                                        completi 10                                            MC4691                                      resolution of GSI-191 and                                                  ,                                                LI*                                                                                                NA                                            NA ML080650314                                                    ongoing                                                          NC                                          NRC                                                                  to be        (UCR) R21-                                                                                    on date response to Generic Letter                                                LA000907 changed. 108 dated                                                                                    changed 2004-02.
9/19/08.                                                                                      to 6/1/11.
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data                                                                                                                                                                                                                                                                                                                        Page 9 A - Action Completed (date)
G - Closed RgCm implemented                                        I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process                                                                                                            H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS                                    E - Affected implementing 1 - Audit Sample No.
B - KPS Tracking #
B - KPS Tracking #
2 - DEK Submittal    3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)
LC#,, CAP#
LC#,, CAP#
in timely manner (Yes / No / NA) closeout information document document # (See Note LI*)                                                                                                              Maintained (Yes / No / NA) managed (Yes / No / NA)
C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)
E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)
H - Open RgCm is adequately Maintained (Yes / No / NA)
I - Changed RgCm is adequately managed (Yes / No / NA) 11a 6/2/08 08-0113 ML081550342 MD7300 Amend. No.
200, 11/20/08, ML082971079
: 1. DEK will place a restriction in the Kewaunee procedure governing the use of the AB crane prohibiting the use of synthetic slings for heavy load lifts with the AB crane when this crane is in the "Cask Handling" or "Override" modes of operation.
complete 1/16/09, NC LC000141 LA000997 None to NRC LI*
Changed procedure GNP-08.12.02 none Yes.
Verified Step 4.15 of GNP-08.12.02 Rev 26, 7/18/2010 NA NA 11b 6/2/08 08-0113 ML081550342 MD7300 Amend. No.
200, 11/20/08, ML082971079
: 2. For the AB crane bridge welds whose failure could result in a drop of the critical load, DEK will perform nondestructive examinations at least once every four years following completion of initial cold proof load testing of the AB crane.
complete 1/16/09, NC LC000141 LA000998 None to NRC; entered Preventive Maintenance
: Program, RE89105 LI*
Preventive Maintenance (PM) Task -
PM 53065.
Examinations IAW AWS-01.1-1994.
PM Card has TS Amend.
Referenced.
none Yes.
Preventive Maintenan ce Program
: RE89105, which notes it is a RgCm.
NA NA
 
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 10 1 - Audit Sample No.
2 - DEK Submittal 3 - NRC TAC No.
4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)
Action in Prgress (no date)
Not Changed / Changed to what?
Not Changed / Changed to what?
: 1. DEK will place a restriction in the Kewaunee procedure governing the                                                                                                                                                                                                  Yes.
use of the AB crane                                                                                                                                                                                                      Verified 6/2/08                                                                                                                                                                                                                                  Changed Amend. No.                      prohibiting the use of                  LC000141                                                                                                                                                                        Step 4.15 08-0113                                                                                                        complete            None to                                                                                            procedure 11a                                            MD7300 200, 11/20/08,                  synthetic slings for heavy              ,                                                                            LI*                                                          none                                  of GNP-  NA                                                        NA ML081550342                                                                                                    1/16/09, NC          NRC                                                                                                GNP-ML082971079                    load lifts with the AB crane            LA000997                                                                                                                                                                        08.12.02 08.12.02 when this crane is in the                                                                                                                                                                                                Rev 26, "Cask Handling" or                                                                                                                                                                                                        7/18/2010 "Override" modes of operation.
: 2. For the AB crane bridge                                                                                                                          Preventive Yes.
welds whose failure could                                                                                                                            Maintenance None to                                                                                                                                                                Preventive result in a drop of the critical                                                                                                                    (PM) Task -
NRC;                                                                                                                                                                  Maintenan 6/2/08                                                          load, DEK will perform                                                                                                                              PM 53065.
Amend. No.                                                                LC000141 entered                                                                                                                                                                ce 08-0113                                                        nondestructive                  complete                                                                                                            Examinations 11b                                            MD7300 200, 11/20/08,                                                            ,        Preventive  LI*                                                                                                none                                                    Program NA                                                          NA ML081550342                                                    examinations at least once 1/16/09, NC                                                                                                              IAW AWS-ML082971079                                                              LA000998 Maintenance                                                                                                                                                            RE89105, every four years following                                                                                                                          01.1-1994.
Program,                                                                                                                                                              which completion of initial cold                                                                                                                          PM Card has RE89105                                                                                                                                                                notes it is proof load testing of the AB                                                                                                                        TS Amend.
a RgCm.
crane.                                                                                                                                              Referenced.
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data                                                                                                                                                                                                                                                                                                          Page 10 A - Action Completed (date)
G - Closed RgCm implemented                                        I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process                                                                                                            H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS                                    E - Affected implementing 1 - Audit Sample No.
B - KPS Tracking #
B - KPS Tracking #
2 - DEK Submittal    3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)
LC#,, CAP#
LC#,, CAP#
in timely manner (Yes / No / NA) closeout information document document # (See Note LI*)                                                                                                              Maintained (Yes / No / NA) managed (Yes / No / NA)
C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)
E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)
H - Open RgCm is adequately Maintained (Yes / No / NA)
I - Changed RgCm is adequately managed (Yes / No / NA) 11c 6/2/08 08-0113 ML081550342 MD7300 Amend. No.
200, 11/20/08, ML082971079
: 3. DEK will not perform a heavy lift greater than 50 tons using the AB crane.
This commitment will be superseded when a seismic analysis, using NRC-approved methods, demonstrates acceptable results are achieved for the AB crane and establishes a new limit based on lifting heavy loads greater than 50 tons.
complete 1/27/09, NC LC000141 LA000999 None to NRC; changed procedure GNP-08.12.02, "Control for use of cranes in protected area" LI*
Chnged procedure GNP-08.12.02 none Yes. GNP-08.12.02 change done 7/8/10 NA NA
 
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 11 1 - Audit Sample No.
2 - DEK Submittal 3 - NRC TAC No.
4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)
Action in Prgress (no date)
Not Changed / Changed to what?
Not Changed / Changed to what?
: 3. DEK will not perform a heavy lift greater than 50 None to tons using the AB crane.
NRC; This commitment will be changed superseded when a seismic procedure                                                                                                                                                              Yes. GNP-6/2/08                                                                        analysis, using NRC-                                                                                                                                Chnged Amend. No.                                                              LC000141 GNP-                                                                                                                                                                    08.12.02 08-0113                                                                      approved methods,            complete                                                                                                                procedure 11c                                        MD7300 200, 11/20/08,                                                          ,        08.12.02,                                                            LI*                                                          none                                  change    NA                                                        NA ML081550342                                                                  demonstrates acceptable      1/27/09, NC                                                                                                            GNP-ML082971079                                                              LA000999 "Control for                                                                                                                                                            done results are achieved for the                                                                                                                        08.12.02 use of                                                                                                                                                                  7/8/10 AB crane and establishes a cranes in new limit based on lifting protected heavy loads greater than 50 area" tons.
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data                                                                                                                                                                                                                                                                                                                  Page 11 A - Action Completed (date)
G - Closed RgCm implemented                                        I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process                                                                                                            H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS                                    E - Affected implementing 1 - Audit Sample No.
B - KPS Tracking #
B - KPS Tracking #
2 - DEK Submittal  3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)
LC#,, CAP#
LC#,, CAP#
in timely manner (Yes / No / NA) closeout information document document # (See Note LI*)                                                                                                              Maintained (Yes / No / NA) managed (Yes / No / NA)
C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)
Not Changed / Changed to what?
E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)
H - Open RgCm is adequately Maintained (Yes / No / NA)
I - Changed RgCm is adequately managed (Yes / No / NA) 12 7/7/08 08-0211 ML081930317 is a resubmittal of an amendment request from 11/9/07.
(i.e.,Audit Sample #12 is a pickup from
#9 with supplements dated 9/19/08 and 3/17/09)
Note 12-2 MD9221 Amend. No, 205, 4/30/09, ML090570710
: 1. DEK will submit the results of the analyses performed using the nonlinear seismic analysis methodology described in this LAR.
: 1. DEK will submit the results of the analyses performed using the nonlinear seismic analysis methodology described in this LAR.
: 2. DEK will perform a "push" test to provide empirical data documenting 7/7/08 the force required to induce 08-0211 crane trolley and bridge ML081930317                                                                                                                                                                    SN 08-211 drive wheel rolling with the           LC000228 is a resubmittal                                                                                                                                                                sent to NRC brakes applied. The results           (No LAs of an                                                                                                                                                                          on 7/7/08 of the test will be provided           are amendment                                                                                                                                                                      (DEK to the NRC.                           needed request from                                                                                                complete                                                          accomplishe                                                Push Test since the 11/9/07.                Amend. No,                                                                          7/15/10; NC                                                        d all RgCm                                                details
: 2. DEK will perform a "push" test to provide empirical data documenting the force required to induce crane trolley and bridge drive wheel rolling with the brakes applied. The results of the test will be provided to the NRC.
: 3. DEK will have an                   actions 12 (i.e.,Audit      MD9221 205, 4/30/09,                                                                        [All 3                                                            in the      LI*                                          provided in                    none                                  Yes                                NA                              NA independent peer review               can be Sample #12 is          ML090570710                                                                          managed as                                                        sample.                                                    9/19/08 performed of the nonlinear             managed a pickup from                                                                                                one - kdf]                                                        Submitted to                                              Supplement structural model and                   as a group
: 3. DEK will have an independent peer review performed of the nonlinear structural model and outputs of the nonlinear analysis to confirm the methodology is appropriate for the application and provide a summary of the review to the NRC.
    #9 with                                                                                                                                                                        the NRC outputs of the nonlinear               within the supplements                                                                                                                                                                    within the analysis to confirm the               LC dated 9/19/08                                                                                                                                                                  9/19/08 methodology is appropriate             number.)
and 3/17/09)                                                                                                                                                                    sample) for the application and provide a summary of the Note 12-2 review to the NRC.
[The three items are managed as one. The 4th (RgCm) Regulatory Requirement in the 9/19/09 supplement was not selected for the audit sample - kdf]
[The three items are managed as one. The 4th (RgCm) Regulatory Requirement in the 9/19/09 supplement was not selected for the audit sample - kdf]
complete 7/15/10; NC
[All 3 managed as one - kdf]
LC000228 (No LAs are needed since the actions can be managed as a group within the LC number.)
SN 08-211 sent to NRC on 7/7/08 (DEK accomplishe d all RgCm in the sample.
Submitted to the NRC within the 9/19/08 sample)
LI*
Push Test details provided in 9/19/08 Supplement none Yes NA NA


Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data                                                                                                                                                                                                                                                                                                     Page 12 A - Action Completed (date)
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 12 1 - Audit Sample No.
G - Closed RgCm implemented                                        I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process                                                                                                              H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS                                    E - Affected implementing 1 - Audit Sample No.
2 - DEK Submittal 3 - NRC TAC No.
4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)
Action in Prgress (no date)
Not Changed / Changed to what?
B - KPS Tracking #
B - KPS Tracking #
2 - DEK Submittal    3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)
LC#,, CAP#
LC#,, CAP#
in timely manner (Yes / No / NA) closeout information document document # (See Note LI*)                                                                                                                Maintained (Yes / No / NA) managed (Yes / No / NA)
C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)
Not Changed / Changed to what?
E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)
DEK commits to administratively control the amount of fuel oil in each fuel oil storage tank such Letter approving that a minimum usable                                                                                                                                       USAR Rev LC000315 1/27/09                                      notice of        amount of 32,858 gallons                                                                                                                                     22 update (No LA                                                                                                                                              Yes.
H - Open RgCm is adequately Maintained (Yes / No / NA)
09-061                                        enforcement      (including the day tanks) is complete                                                  None to                                                              6/30/10 13                                        ME0435                                                                                                number -                                        LI*                                                          none                                  Control is NA                                                        NA ML090510149                                  discretion,      available to supply each     6/10/09; NC                                              NRC                                                                  pg 8.2-18, one item                                                                                                                                            USAR edit 1/29/09,        emergency diesel generator                                                                                                                                   Section only)
I - Changed RgCm is adequately managed (Yes / No / NA) 13 1/27/09 09-061 ML090510149 ME0435 Letter approving notice of enforcement discretion, 1/29/09, ML090291061 DEK commits to administratively control the amount of fuel oil in each fuel oil storage tank such that a minimum usable amount of 32,858 gallons (including the day tanks) is available to supply each emergency diesel generator (EDG) (without reliance on a portable transfer pump),
ML090291061 (EDG) (without reliance on                                                                                                                                       8.2.3.1 a portable transfer pump),
for the duration of the enforcement discretion.
for the duration of the enforcement discretion.
The installation of EDG 6/1/09                                                       exhaust duct insulation LC000345 09-291                                                      (SAMA 160) will be further                   In progress;                               None to                                                                                               Not yet 14                                        MD9408 Review ongoing                                                                                ,                                                LI*                           Note 14-E                                                             No                                   Yes                             NA ML091600037                                                  evaluated as part of DEK's                  NC                                          NRC                                                                                                  determined LA001560 ongoing performance improvement programs.
complete 6/10/09; NC LC000315 (No LA number -
Sample deleted at request of                                                                       sample                            sample      sample                                                            sample                          sample                                sample      sample sample 15 Sample deleted MD9408 Project Manager See Note 15-5                                                       results not                       results not results not                         LI*                           results not                     results not                           results not results results making the                                                                          used.                              used        used                                                              used                            used                                  used        not used not used selection..
one item only)
None to NRC LI*
USAR Rev 22 update 6/30/10 pg 8.2-18, Section 8.2.3.1 none Yes.
Control is USAR edit NA NA 14 6/1/09 09-291 ML091600037 MD9408 Review ongoing The installation of EDG exhaust duct insulation (SAMA 160) will be further evaluated as part of DEK's ongoing performance improvement programs.
In progress; NC LC000345 LA001560 None to NRC LI*
Note 14-E Not yet determined No Yes NA 15 Sample deleted MD9408 Sample deleted at request of Project Manager making the selection..
See Note 15-5 sample results not used.
sample results not used sample results not used LI*
sample results not used sample results not used sample results not used sample results not used sample results not used


Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data                                                                                                                                                                                                                                                                                           Page 13 A - Action Completed (date)
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 13 1 - Audit Sample No.
G - Closed RgCm implemented                                        I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process                                                                                                      H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS                                    E - Affected implementing 1 - Audit Sample No.
2 - DEK Submittal 3 - NRC TAC No.
4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)
Action in Prgress (no date)
Not Changed / Changed to what?
B - KPS Tracking #
B - KPS Tracking #
2 - DEK Submittal      3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)
LC#,, CAP#
LC#,, CAP#
in timely manner (Yes / No / NA) closeout information document document # (See Note LI*)                                                                                                        Maintained (Yes / No / NA) managed (Yes / No / NA)
C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)
Not Changed / Changed to what?
E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)
H - Open RgCm is adequately Maintained (Yes / No / NA)
I - Changed RgCm is adequately managed (Yes / No / NA) 16a 8/17/09 09-469 ML092320093 MD9408 License renewal review ongoing
: 1. Additional information will be included in the USAR Supplement (License Renewal Application, Appendix A), including license renewal commitments identified in Table A6.0-1, as applicable.
: 1. Additional information will be included in the USAR Supplement (License Renewal Application, Appendix A), including license renewal commitments identified in Table A6.0-1, as applicable.
These USAR Supplement                                                                                                                                       USAR (pages 8/17/09                                                                                                                                              Reportable changes will be consistent                                                   LC000343                                                                      to be defined; 09-469                                        License renewal                                In progress;                                            through 16a                                        MD9408                with the responses to                                                         ,                                                LI*                          expected to none                                              NA                                  Yes                            NA ML092320093                                  review ongoing                                NC                                                      USAR Requests for Additional                                                       LA001541                                                                      be complete change Information (RAIs) B2.1.13-                                                                                                                                 4/4/11) 5, B2.1.14-3, B2.1.15-1, B2.1.18-1, B2.1.21-1, B.2.1.31-1, and B3.1-1, are proposed to support approval of the renewed operating license, and may change during the NRC review period.
These USAR Supplement changes will be consistent with the responses to Requests for Additional Information (RAIs) B2.1.13-5, B2.1.14-3, B2.1.15-1, B2.1.18-1, B2.1.21-1, B.2.1.31-1, and B3.1-1, are proposed to support approval of the renewed operating license, and may change during the NRC review period.
In progress; NC LC000343 LA001541 Reportable through USAR change LI*
USAR (pages to be defined; expected to be complete 4/4/11) none NA Yes NA


Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data                                                                                                                                                                                                                                                                                                               Page 14 A - Action Completed (date)
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 14 1 - Audit Sample No.
G - Closed RgCm implemented                                          I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process                                                                                                            H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS                                    E - Affected implementing 1 - Audit Sample No.
2 - DEK Submittal 3 - NRC TAC No.
4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)
Action in Prgress (no date)
Not Changed / Changed to what?
B - KPS Tracking #
B - KPS Tracking #
2 - DEK Submittal    3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)
LC#,, CAP#
LC#,, CAP#
in timely manner (Yes / No / NA) closeout information document document # (See Note LI*)                                                                                                              Maintained (Yes / No / NA) managed (Yes / No / NA)
C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)
Not Changed / Changed to what?
E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)
LC000343
H - Open RgCm is adequately Maintained (Yes / No / NA)
: 2. The response to RAI                     LA001542                                                                                                                                                  No change to                                                                                              Yes.
I - Changed RgCm is adequately managed (Yes / No / NA) 16b 8/17/09 09-469 ML092320093 MD9408 License renewal review ongoing
B3.2-2 will be provided                     [original                                                                                                                                                  RgCm.                                                                                                    RgCm Complete                                                                                                                                  Letter SN 10-8/17/09                                                      following reevaluation of the               tracking]                                                                                                                                                  Change was                                                                                                itself not and                                                                                                                                      033 dated 09-469                                        License renewal environmental effects of                   transferre Transferred                                                                                                                                    to tTrack to                                                                                              changed 16b                                        MD9408                                              transferred                          LI*                                                                                                  dated 2/2/10                                Yes                                                        NA ML092320093                                  review ongoing fatigue for the NUREG/CR-                   d to      to LA001848                                                                                                                                    record                                                                                                    (transfer for action by                                                                                                                            (responded to 6260-required evaluations                   LC000392                                                                                                                                                  transfer from                                                                                            was LA001848                                                                                                                                  RAI B3.2-2) that used stress-based                     ,                                                                                                                                                          LA001542 to                                                                                              successfu fatigue monitoring.                         LA001848                                                                                                                                                   LA001848                                                                                                 l)
: 2. The response to RAI B3.2-2 will be provided following reevaluation of the environmental effects of fatigue for the NUREG/CR-6260-required evaluations that used stress-based fatigue monitoring.
Complete and transferred for action by LA001848 LC000343 LA001542
[original tracking]
transferre d to LC000392 LA001848
[Observati on 16b-B]
[Observati on 16b-B]
(The following commitments are selected from Attachment 5) [Three of nine commitments were selected for audit - kdf]
Transferred to LA001848 LI*
9/24/09 Conversion to                                                                                            LC000407                                                                      Tech Spec 09-491                                                                                                    In progress;                                        None to 17a                                        ME2139 Improved TS                    2. DEK will establish the                                               ,                                                LI*                          Bases LCO                      none                                  NA                                  Yes                            NA ML092440398                                                                                                NC                                                  NRC review ongoing                  Technical Specification                                                 LA001897                                                                      3.0.8 Bases for Limiting Condition for Operation (LCO) 3.0.8, as adopted, with the applicable license amendment.
Letter SN 10-033 dated dated 2/2/10 (responded to RAI B3.2-2)
No change to RgCm.
Change was to tTrack to record transfer from LA001542 to LA001848 Yes NA Yes.
RgCm itself not changed (transfer was successfu l) 17a 9/24/09 09-491 ML092440398 ME2139 Conversion to Improved TS review ongoing (The following commitments are selected from ) [Three of nine commitments were selected for audit - kdf]
: 2. DEK will establish the Technical Specification Bases for Limiting Condition for Operation (LCO) 3.0.8, as adopted, with the applicable license amendment.
In progress; NC LC000407 LA001897 None to NRC LI*
Tech Spec Bases LCO 3.0.8 none NA Yes NA


Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data                                                                                                                                                                                                                                                                                                     Page 15 A - Action Completed (date)
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 15 1 - Audit Sample No.
G - Closed RgCm implemented                                        I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process                                                                                                      H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS                                    E - Affected implementing 1 - Audit Sample No.
2 - DEK Submittal 3 - NRC TAC No.
4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)
Action in Prgress (no date)
Not Changed / Changed to what?
B - KPS Tracking #
B - KPS Tracking #
2 - DEK Submittal    3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)
LC#,, CAP#
LC#,, CAP#
in timely manner (Yes / No / NA) closeout information document document # (See Note LI*)                                                                                                        Maintained (Yes / No / NA) managed (Yes / No / NA)
C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)
E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)
H - Open RgCm is adequately Maintained (Yes / No / NA)
I - Changed RgCm is adequately managed (Yes / No / NA) 17b 9/24/09 09-491 ML092440398 ME2139 Conversion to Improved TS review ongoing
: 7. DEK will have written procedures available describing compensatory measures to be taken in the event of an intentional or unintentional entry into LCO 3.7.12, Auxiliary Building Special Ventilation (ASV) System, Condition B, Two ASV trains inoperable due to inoperable ASV boundary.
Complete 12/6/10; NC LC000407 LA001902 Procedure LI*
Procedure OP-KW-AOP-GEN-005 "Unplanned Barrier Control none Yes NA NA 17c 9/24/09 09-491 ML092440398 ME2139 Conversion to Improved TS review ongoing
: 8. DEK will add procedural direction to perform an extent of condition evaluation and perform additional testing for plausible common failure modes associated with the reactor protection system and the engineered safety features actuation system instrument analog channels.
Withdrew 12/6/10; NC LC000407
, LA1903 Withdrew via 8/18/2010 Supple LI*
Letter SN10-457 to NRC withdrew commitment (Letter is 8/18/10 supplement on TAC ME2139) none Withdrew NA NA
 
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 16 1 - Audit Sample No.
2 - DEK Submittal 3 - NRC TAC No.
4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)
Action in Prgress (no date)
Not Changed / Changed to what?
Not Changed / Changed to what?
: 7. DEK will have written procedures available describing compensatory measures to be taken in the Procedure event of an intentional or 9/24/09                                                                                                                                                                                                                            OP-KW-AOP-Conversion to                  unintentional entry                      LC000407 09-491                                                                                                    Complete                                                                                                                GEN-005 17b                                        ME2139 Improved TS                    into LCO 3.7.12, Auxiliary              ,        Procedure                                                            LI*                                      none                                              Yes                                  NA                              NA ML092440398                                                                                                12/6/10; NC                                                                                                            "Unplanned review ongoing                  Building Special Ventilation            LA001902 Barrier (ASV) System, Condition B, Control Two ASV trains inoperable due to inoperable ASV boundary.
: 8. DEK will add procedural direction to perform an Letter SN10-extent of condition 457 to NRC evaluation and perform withdrew 9/24/09                                                                      additional testing for Conversion to                                                                  Withdrew via                                                                                          commitment 09-491                                                                        plausible common failure    Withdrew  LC000407 17c                                        ME2139 Improved TS                                                                    8/18/2010    LI*                                                                                      (Letter is  none                                            Withdrew                            NA                              NA ML092440398                                                                  modes associated with the 12/6/10; NC , LA1903 review ongoing                                                                Supple                                                                                                8/18/10 reactor protection system supplement and the engineered safety on TAC features actuation system ME2139) instrument analog channels.
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data                                                                                                                                                                                                                                                                                                            Page 16 A - Action Completed (date)
G - Closed RgCm implemented                                        I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process                                                                                                          H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS                                    E - Affected implementing 1 - Audit Sample No.
B - KPS Tracking #
B - KPS Tracking #
2 - DEK Submittal      3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)
LC#,, CAP#
LC#,, CAP#
in timely manner (Yes / No / NA) closeout information document document # (See Note LI*)                                                                                                             Maintained (Yes / No / NA) managed (Yes / No / NA)
C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)
Not Changed / Changed to what?
E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)
The revised Work Control                                                                                                                                                Revised work 9/25/09 Process program will be                                                                  LC000394                                                                      control 09-597                                       License renewal                           In progress; 18                                        MD9408                developed and implemented                                                                 ,        Not closed                              LI*                          program      none                                                  NA                                  Yes                            NA ML092710045                                  review ongoing                            NC prior to the period of                                                                   LA001858                                                                      document extended operation.                                                                                                                                                     (TBD)
H - Open RgCm is adequately Maintained (Yes / No / NA)
The completion dates for the following two commitments have been revised from October 1, 2009, to October 15, 2009.
I - Changed RgCm is adequately managed (Yes / No / NA) 18 9/25/09 09-597 ML092710045 MD9408 License renewal review ongoing The revised Work Control Process program will be developed and implemented prior to the period of extended operation.
In progress; NC LC000394 LA001858 Not closed LI*
Revised work control program document (TBD) none NA Yes NA 19a 10/15/09 09-645 ML092890560 MD7838 Letter of 4/1/10, ML100880212 The completion dates for the following two commitments have been revised from October 1, 2009, to October 15, 2009.
[This RgCm was managed as two separate items - kdf]
[This RgCm was managed as two separate items - kdf]
Complete 10/15/09                                                                                                              Leter SN 09-                                                                                                                                    Change to (This RgCm LC000239 09-645                                        Letter of 4/1/10, 1. DEK will revise current fill                       645 dated                                                                                                                                      date only 19a                                        MD7838                                                  was changed ,                      LI*                                                                                                Note 19-E                                                          Yes                                NA                              Yes ML092890560                                  ML100880212 and vent procedures to                                     9/15/09 to                                                                                                                                      (10/1/09 to from 10/1/09 LA001178 provide a means and                                   NRC                                                                                                                                            10/15/09) to 10/15/09) acceptance criteria to ensure that piping is sufficiently full after system fill and vent. This may include confirmation by ultrasonic testing or other appropriate means.
: 1. DEK will revise current fill and vent procedures to provide a means and acceptance criteria to ensure that piping is sufficiently full after system fill and vent. This may include confirmation by ultrasonic testing or other appropriate means.
Complete (This RgCm was changed from 10/1/09 to 10/15/09)
LC000239 LA001178 Leter SN 09-645 dated 9/15/09 to NRC LI*
Note 19-E Change to date only (10/1/09 to 10/15/09)
Yes NA Yes


1 - Audit Sample No.
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 17 1 - Audit Sample No.
10/15/09 09-645 2 - DEK Submittal 19b ML092890560
2 - DEK Submittal 3 - NRC TAC No.
: 2. DEK will revise current            3 - NRC TAC No.
4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)
inservice test procedures to 4 - NRC Issuance provide dynamic sweeping Letter of 4/1/10, MD7838                  as part of the filling of the ML100880212 systems where needed to 5 - Summary of Commitment ensure systems are sufficiently full.
Complete                                            A - Action Completed (date)
Action in Prgress (no date)
Action in Prgress (no date)
(This RgCm LC000239 Not Changed / Changed to what?
Not Changed / Changed to what?
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data was changed ,
B - KPS Tracking #
from 10/1/09 LA001179                                  B - KPS Tracking #
LC#,, CAP#
LC#,, CAP#
to 10/15/09)
C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)
C - If closed, then KPS closeout information LI*                                D - Governed by KPS process document # (See Note LI*)
E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)
E - Affected implementing Note 19-E                                    document Uses LI* -
H - Open RgCm is adequately Maintained (Yes / No / NA)
commitment change evaluation Change to                                                F - Affected change document date only (10/1/09 to 10/15/09)
I - Changed RgCm is adequately managed (Yes / No / NA) 19b 10/15/09 09-645 ML092890560 MD7838 Letter of 4/1/10, ML100880212
Yes G - Closed RgCm implemented in timely manner (Yes / No / NA)
: 2. DEK will revise current inservice test procedures to provide dynamic sweeping as part of the filling of the systems where needed to ensure systems are sufficiently full.
NA H - Open RgCm is adequately Maintained (Yes / No / NA)
Complete (This RgCm was changed from 10/1/09 to 10/15/09)
Yes                              I - Changed RgCm is adequately managed (Yes / No / NA)
LC000239 LA001179 LI*
Page 17
Note 19-E Uses LI* -
commitment change evaluation Change to date only (10/1/09 to 10/15/09)
Yes NA Yes


Table 3 - Kewaunee Power Station RgCm Data Table - Notes and Legend                                                                           Page 18 Topic or Word / Symbol           Note, legend or discussion ADAMS                             Agencywide Document Access and Management System Amd or Amend.                     amendment The Preventive Maintenance Program would be improved if the Comment field on the PM (preventive Audit observation (general) maintenance) Data Sheet informed the user that the sheet had a RgCm associated with it.
Table 3 - Kewaunee Power Station RgCm Data Table - Notes and Legend Page 18 Topic or Word / Symbol Note, legend or discussion ADAMS Agencywide Document Access and Management System Amd or Amend.
Commitment management staff should consider preparing a Guideline to ensure consistent input to tTrack by Audit observation (training) stakeholders making infrequent use of tTrack.
amendment Audit observation (general)
The ability to transfer tracking from one LC/LA set to another is demonstrated in Sample 16b. The rationale for Audit observation 16b-B          the transfer is explained in LA001848: The NRC wanted more items for another purpose. KPS consolidated LA001542 with LA001848.
The Preventive Maintenance Program would be improved if the Comment field on the PM (preventive maintenance) Data Sheet informed the user that the sheet had a RgCm associated with it.
CFR                               Code of Federal Regulations Column headings and cell         Columns are labeled numbers 1 through 5 and letters A through I. Sample numbers are listed in column 1.
Audit observation (training)
designations                      Notes are designated as "Note (row) - (column)"
Commitment management staff should consider preparing a Guideline to ensure consistent input to tTrack by stakeholders making infrequent use of tTrack.
Persons identified as making routine, standardized data entry into tTrack, identified as Noreen Wenborne, Commitment management staff MaryJo Haese, and Thomas Breene during the course of RgCm data collection.
Audit observation 16b-B The ability to transfer tracking from one LC/LA set to another is demonstrated in Sample 16b. The rationale for the transfer is explained in LA001848: The NRC wanted more items for another purpose. KPS consolidated LA001542 with LA001848.
ECN                               Engineering Change Notice "Potential Impact of Debris Blockage on Emergency Recirculation during Design Bais Accidents at Pressurized-Generic Letter 2004-02 Water Reactors," September 13, 2004 "Experimental Studies of Loss-of-Coolant Accident-Generated Debris Accumulation and Head Loss with GSI-191 Emphasis on the Effects of Calcium Silicate Insulation," May 2005 kdf                               Karl D. Feintuch (Mainly used in combination with brackets to indicate an auditor comment.)
CFR Code of Federal Regulations Column headings and cell designations Columns are labeled numbers 1 through 5 and letters A through I. Sample numbers are listed in column 1.
KPS                               Kewaunee Power Station LA                               Licensing Action;one or more LA can be associated with one LC LC                               Licensing Commitment In this report LI* represents LI-AA-110, Rev. 0, "Commitment Management," which governs the management of RgCm. In addition, GNP-03.01.01, Rev. 41 during RgCm Audit and Rev 42 when the Report was issued, LI*                              "Directive, Implementing Document, and Procedure Administrative Controls" (commonly referred to at KPS as the "Procedure on procedures") governs tracing the effect of RgCm on procedures. Therefore, the management of RgCm, when it affects procedures is controlled by a combination of these 2 procedures.
Notes are designated as "Note (row) - (column)"
                                  "MLnnnnnnnnn" (i.e. ML followed by 9 digits) is the identifier used by the NRC to access documents and records ML#
Commitment management staff Persons identified as making routine, standardized data entry into tTrack, identified as Noreen Wenborne, MaryJo Haese, and Thomas Breene during the course of RgCm data collection.
within its Agencywide Document Access and Management System (ADAMS) document control system.
ECN Engineering Change Notice Generic Letter 2004-02 "Potential Impact of Debris Blockage on Emergency Recirculation during Design Bais Accidents at Pressurized-Water Reactors," September 13, 2004 GSI-191 "Experimental Studies of Loss-of-Coolant Accident-Generated Debris Accumulation and Head Loss with Emphasis on the Effects of Calcium Silicate Insulation," May 2005 kdf Karl D. Feintuch (Mainly used in combination with brackets to indicate an auditor comment.)
NC                               Not Changed (as used in column A)
KPS Kewaunee Power Station LA Licensing Action;one or more LA can be associated with one LC LC Licensing Commitment LI*
In this report LI* represents LI-AA-110, Rev. 0, "Commitment Management," which governs the management of RgCm. In addition, GNP-03.01.01, Rev. 41 during RgCm Audit and Rev 42 when the Report was issued, "Directive, Implementing Document, and Procedure Administrative Controls" (commonly referred to at KPS as the "Procedure on procedures") governs tracing the effect of RgCm on procedures. Therefore, the management of RgCm, when it affects procedures is controlled by a combination of these 2 procedures.
ML#
"MLnnnnnnnnn" (i.e. ML followed by 9 digits) is the identifier used by the NRC to access documents and records within its Agencywide Document Access and Management System (ADAMS) document control system.
NC Not Changed (as used in column A)


Table 3 - Kewaunee Power Station RgCm Data Table - Notes and Legend                                                                                     Page 19 Topic or Word / Symbol               Note, legend or discussion A "Yes" in Column G, H, or I indicates that the RgCm was successfully managed according to the description in the heading.
Table 3 - Kewaunee Power Station RgCm Data Table - Notes and Legend Page 19 Topic or Word / Symbol Note, legend or discussion Note 01-G, -H, -I (i.e., headings in column G, H and I)
Note 01-G, -H, -I (i.e., headings in NA applies if the particilar column does not apply. As examples, for a closed RgCm, "open" is NA; for column G, H and I) unchanged RgCm, "changed" does not apply.
A "Yes" in Column G, H, or I indicates that the RgCm was successfully managed according to the description in the heading.
NA applies if the particilar column does not apply. As examples, for a closed RgCm, "open" is NA; for unchanged RgCm, "changed" does not apply.
Thus "No" would only appear in Columns G, H or I if the RgCm was not adequately managed.
Thus "No" would only appear in Columns G, H or I if the RgCm was not adequately managed.
Note 03-C                           NRC notified via suubmitted document SN 08-0113 dated 6/2/08, ML081550342 The Technical Requirements Manual (TRM) is a licensee controlled document for managing requirements that Note 04-C the NRC has approved to be transferred from control by the Technical Specifications.(TS)
Note 03-C NRC notified via suubmitted document SN 08-0113 dated 6/2/08, ML081550342 Note 04-C The Technical Requirements Manual (TRM) is a licensee controlled document for managing requirements that the NRC has approved to be transferred from control by the Technical Specifications.(TS)
Observation: Regarding the July 7, 2008 application, the licensing group should define a closeout event at which to terminate its ownership of a RgCm intended for its doownstream stakeholders (i.e., Design, Operations, Training, as examples)
Note 12-2, Audit Observation and Audit Finding Observation: Regarding the July 7, 2008 application, the licensing group should define a closeout event at which to terminate its ownership of a RgCm intended for its doownstream stakeholders (i.e., Design, Operations, Training, as examples)
Note 12-2, Audit Observation and Audit Finding: DEK lacks a documented instruction in LI-AA-110, "Commitment Management," that the instructs Audit Finding the commitment management staff to review all incoming / outgoing correspondence for impact on existing RgCm. Heretofore, commitment management staff has been performing this action without a documented instruction, within LI-AA-110, to do so.
Audit Finding: DEK lacks a documented instruction in LI-AA-110, "Commitment Management," that the instructs the commitment management staff to review all incoming / outgoing correspondence for impact on existing RgCm. Heretofore, commitment management staff has been performing this action without a documented instruction, within LI-AA-110, to do so.
[Suggestion pertaining to on-going RgCm: Stakeholders should report completion plans to Licensing staff for Note 14-E tTrack entry and for future reference.- kdf]
Note 14-E
The sample contained proprietary information, an attribute not needed to assemble a valid audit sample. The audit results for the sample were consistent with results from other samples, and its removal did not change the Note 15-5                            findings of the audit. Further, the sample population grew from the original 19 selections to a net population of 24 (1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11a, 11b, 11c, 12, 13, 14, 15 omitted, 16a, 16b, 17a, 17b, 17c, 18, 19a, 19b) to track the management of separate RgCm parts.
[Suggestion pertaining to on-going RgCm: Stakeholders should report completion plans to Licensing staff for tTrack entry and for future reference.- kdf]
Affected procedures (21 documents, as indicated by separate serial numbers):
Note 15-5 The sample contained proprietary information, an attribute not needed to assemble a valid audit sample. The audit results for the sample were consistent with results from other samples, and its removal did not change the findings of the audit. Further, the sample population grew from the original 19 selections to a net population of 24 (1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11a, 11b, 11c, 12, 13, 14, 15 omitted, 16a, 16b, 17a, 17b, 17c, 18, 19a, 19b) to track the management of separate RgCm parts.
OP-KW-NOP-RHR-001, -003 SP-34-099A, -099B Note 19-E                            OP-KW-NOP-SI-002 OP-KW-MOP-RHR-001A, -001B, -002A, -002B, -003A, -005A, -005B, -006, -006A, -006B OP-KW-NOP-SI-001 [possible typo in KPS text: NOP should possibly be MOP - kdf], -002, -004 OP-KW-MOP-ICS-001, -002, -003 In this audit TS references are to the Custom Technical Specifications (CTS), which preceded the conversion to Note on references to TS Improved Technical Specifications (ITS) on February 2, 2011.
Note 19-E Affected procedures (21 documents, as indicated by separate serial numbers):
RgCm items closed and remaining the same = 1, 2, 3, 4, 5, 6, 7, 8, 9, 11a, 11b, 11c, 12, 13, 17b, 17c (16 items)
OP-KW-NOP-RHR-001, -003 SP-34-099A, -099B OP-KW-NOP-SI-002 OP-KW-MOP-RHR-001A, -001B, -002A, -002B, -003A, -005A, -005B, -006, -006A, -006B OP-KW-NOP-SI-001 [possible typo in KPS text: NOP should possibly be MOP - kdf], -002, -004 OP-KW-MOP-ICS-001, -002, -003 Note on references to TS In this audit TS references are to the Custom Technical Specifications (CTS), which preceded the conversion to Improved Technical Specifications (ITS) on February 2, 2011.
Note on sample characteristics for RgCm items changed and closed = 16b, 19a, 19b (3 items) the sample size of 24, categorized RgCm items open and remaining the same = 10, 14, 16a, 17a, 18 (5 items) from audit results RgCm items open and changed = none
Note on sample characteristics for the sample size of 24, categorized from audit results RgCm items closed and remaining the same = 1, 2, 3, 4, 5, 6, 7, 8, 9, 11a, 11b, 11c, 12, 13, 17b, 17c (16 items)
RgCm items changed and closed = 16b, 19a, 19b (3 items)
RgCm items open and remaining the same = 10, 14, 16a, 17a, 18 (5 items)
RgCm items open and changed = none


Table 3 - Kewaunee Power Station RgCm Data Table - Notes and Legend                                                                           Page 20 Topic or Word / Symbol           Note, legend or discussion A discussion pertaining to Table 2, row number and column number, which is inserted in Table 3 due to space Note row-column limitation. (Example: Note 01-G, pertains to row 01, column G on Table 2.
Table 3 - Kewaunee Power Station RgCm Data Table - Notes and Legend Page 20 Topic or Word / Symbol Note, legend or discussion Note row-column A discussion pertaining to Table 2, row number and column number, which is inserted in Table 3 due to space limitation. (Example: Note 01-G, pertains to row 01, column G on Table 2.
NRC Information Notice 84-55     "Seal Table Leaks at PWRs," July 6, 1984 NRC Information Notice 84-55, "Seal Table Leaks at PWRs," May 14, 1985 Supplement 1 NRC Information Notice 92-15     "Failure of Primary System Compression Fitting," February 24, 1992 NUREG/CR-6260                     "Application of NUREG/CR-59999 Interim Fatigue Curves to Selected Nuclear Power Plant Components," 1995 NUREG-0554                       "Single-Failure-Proof Cranes for Nuclear Power Plants," May 1979 NUREG-0612                       "Control of Heavy Loads at Nuclear Power Plants: Resolution of Generic Technical Activity A-36," July 1980 Regulatory Commitment, as interpreted by NEI 99-04 (the industry document governing RgCm management)
NRC Information Notice 84-55 "Seal Table Leaks at PWRs," July 6, 1984 NRC Information Notice 84-55, Supplement 1 "Seal Table Leaks at PWRs," May 14, 1985 NRC Information Notice 92-15 "Failure of Primary System Compression Fitting," February 24, 1992 NUREG/CR-6260 "Application of NUREG/CR-59999 Interim Fatigue Curves to Selected Nuclear Power Plant Components," 1995 NUREG-0554 "Single-Failure-Proof Cranes for Nuclear Power Plants," May 1979 NUREG-0612 "Control of Heavy Loads at Nuclear Power Plants: Resolution of Generic Technical Activity A-36," July 1980 RgCm Regulatory Commitment, as interpreted by NEI 99-04 (the industry document governing RgCm management) and LIC-105 (the NRC document governing RgCm audits)
RgCm and LIC-105 (the NRC document governing RgCm audits)
SAMA 160 SAMA 160 is described in the license renewal submittal as "Insulate EDG Exhaust Ducts." The context is that insulating the EDG exhaust ducts would reduce the heat load in thhe room and provide additional time to align alternate room cooling in the event that room cooling has failed.
SAMA 160 is described in the license renewal submittal as "Insulate EDG Exhaust Ducts." The context is that SAMA 160                          insulating the EDG exhaust ducts would reduce the heat load in thhe room and provide additional time to align alternate room cooling in the event that room cooling has failed.
Suggestion A comment by auditor kdf, not specific to a RgCm, but offered as a suggestion. No action or response is expected.
A comment by auditor kdf, not specific to a RgCm, but offered as a suggestion. No action or response is Suggestion expected.
Suggestion (based on Audit Items 11a, b, c)
Suggestion (based on Audit Items [Commitment management staff should monitor processes that cause users to contact them for RgCm 11a, b, c)                        information and arrange to add RgCm information to relevant databases. - kdf]
[Commitment management staff should monitor processes that cause users to contact them for RgCm information and arrange to add RgCm information to relevant databases. - kdf]
Supple                           Supplement Title 10                         The section of the Code of Federal Regulations pertaining to "Energy" Technical Requirements Manual - a licensee controlled document for managing plant specific technical TRM requirements. The TRM is incorporated by reference into the Updated Safety Analysis Report (USAR)
Supple Supplement Title 10 The section of the Code of Federal Regulations pertaining to "Energy" TRM Technical Requirements Manual - a licensee controlled document for managing plant specific technical requirements. The TRM is incorporated by reference into the Updated Safety Analysis Report (USAR)
TS                               Technical Specifications, as described in 10 CFR 50.36 tTrack                           Name of database used to track RgCm.
TS Technical Specifications, as described in 10 CFR 50.36 tTrack Name of database used to track RgCm.
UCR                               USAR Change Request USAR                             Updated Safety Analysis Report}}
UCR USAR Change Request USAR Updated Safety Analysis Report}}

Latest revision as of 07:25, 13 January 2025

Audit Report Tables 2 and 3
ML110900537
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 04/11/2011
From: Feintuch K
Plant Licensing Branch III
To: Heacock D
Dominion Energy Kewaunee
Feintuch K, NRR/DORL/LPL3-1, 415-3079
Shared Package
ML110900569 List:
References
TAC ME3804
Download: ML110900537 (10)


Text

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 1 1 - Audit Sample No.

2 - DEK Submittal 3 - NRC TAC No.

4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)

E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)

H - Open RgCm is adequately Maintained (Yes / No / NA)

I - Changed RgCm is adequately managed (Yes / No / NA) 1 10/29/2007 07-0436B ML073100354 None None An updated description of the station blackout alternate alternating current source, including the quality assurance program requirements for the TSC DG as defined in the Dominion Nuclear Facility Quality Assurance Program Description, will be incorporated into the KPS Updated Safety Analysis Report (USAR) and provided to the Nuclear Regulatory Commission (NRC) in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 50.71 (e).

complete 4/18/2008; NC LC000111 LA000697 No ML#,

since no separate response to the NRC LI*

USAR 8.2.4.3, 8.2.4.12, 8.2 Reference none Yes NA NA

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 2 1 - Audit Sample No.

2 - DEK Submittal 3 - NRC TAC No.

4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)

E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)

H - Open RgCm is adequately Maintained (Yes / No / NA)

I - Changed RgCm is adequately managed (Yes / No / NA) 2 11/9/07 07-0416A ML073106750 MD6144 Letter of 2/25/08 granting relief, ML080240029 Prior to use of nonwelded valves with end connections other than flanges at KPS, procedures will be developed for installation of nonwelded valves with end connections other than flanges that address operating experience of NRC Information Notices 92-15, 84-55 and 84-55, Supplement 1. The specific provisions include: a) not mixing the parts from one manufacturer to another, b) following manufacturer's recommended instructions for installing compression fittings, and c) the training or familiarity with the procedure(s) for personnel doing this work.

complete 1/2/2008; NC LC000142 LA000741

("LA type"soluti on was incorrect.

Data entry was performed by inexperien ced person -

self corrected) no response to the NRC required LI*

Maintenance Procedure MA-KW-GMP-103 None Yes NA NA

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 3 1 - Audit Sample No.

2 - DEK Submittal 3 - NRC TAC No.

4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)

E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)

H - Open RgCm is adequately Maintained (Yes / No / NA)

I - Changed RgCm is adequately managed (Yes / No / NA) 3 11/9/07 07-0352 ML073170705 MD7300 Amend. No.

200, 11/20/08, ML082971079 Notify the NRC when the modifications to the Auxiliary Building (AB) crane to make it single-failure proof are complete complete 6/12/08; NC LC000141 LA000133 Note 03-C LI*

CA069210 says to update procedure GNP-08.12.02 plus tags.

None Yes-it was timely since it accomplis hed a design change.

NA NA

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 4 1 - Audit Sample No.

2 - DEK Submittal 3 - NRC TAC No.

4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)

E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)

H - Open RgCm is adequately Maintained (Yes / No / NA)

I - Changed RgCm is adequately managed (Yes / No / NA) 4 11/9/07 07-0352 ML073170705 MD7300 Amend. No.

200, 11/20/08, ML082971079 All heavy load lifts in or around the spent fuel pool made using the upgraded AB crane lifting system will meet the guidance in NUREG-0612, Section 5.1.6, as follows:

  • Special lifting devices, as defined in American National Standards Institutes (ANSI) N14.6 will meet the guidance in NUREG-0612, Section 5.1.6(1 )(a) and ANSI N14.6-1993, as clarified in to this license amendment request (LAR).
  • Lifting devices not specially designed will meet the guidance in NUREG-0612, Section 5.1.6(1)(b) and American Society of Mechanical Engineers (ASME) B30.9-2003, as clarified in Attachment 5 to this LAR.
  • The AB crane will meet the guidance in NUREG-0612, Section 5.1.6(2) and NUREG-0554 as clarified in Attachments 5 and 6 to this LAR
  • Interfacing lift points will meet the guidance in NUREG-0612, Section Complete 1/16/09; NC LC000141 LA000135 Addressed in TRM [a licensee controlled document kdf] See Note 04-C LI*

TRM 3.8.1, Rev 0, 1/15/09.

none Yes.

Completio n took place within 60 days, as planned.

NA NA

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 5 1 - Audit Sample No.

2 - DEK Submittal 3 - NRC TAC No.

4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)

E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)

H - Open RgCm is adequately Maintained (Yes / No / NA)

I - Changed RgCm is adequately managed (Yes / No / NA) 5 11/9/07 07-0352 ML073170705 MD7300 Amend. No.

200, 11/20/08, ML082971079 Crane operator training will meet the guidance in ASME B30.2-2005.

complete 12/15/08 LC000141 LA000736 None to NRC LI*

Lesson Plan M-MD-LP 2.2.1 "Cranes"; M-PM2-LP 1.9.1 "Crane Maintenance

/ Inspection" None Yes.

Lesson Plans had guidance incorporat ed in reference to this Amd's approval.

NA NA

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 6 1 - Audit Sample No.

2 - DEK Submittal 3 - NRC TAC No.

4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)

E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)

H - Open RgCm is adequately Maintained (Yes / No / NA)

I - Changed RgCm is adequately managed (Yes / No / NA) 6 11/9/07 07-0352 ML073170705 MD7300 Amend. No.

200, 11/20/08, ML082971079 Crane maintenance and inspections will meet the guidance in ASME B30.2-1976.

complete 1/16/09, NC LC000141 LA000740 TRM Bases, USAR LI*

TRM Bases (TRM 3.8.1 pg 381-2)

USAR Rev22 Sec. 9, pp 9.5-9, -10 (6/30 None Yes.

During NRC ISFSI Inspection (6/09) issues were identified with crane inspection procedure s

concernin g B30.2 guidance.

REF CR 337889.

Revised MA-KW-MPM-CRN-007 Rev.

2 and TEC-MA-KW-MPM-CRN-002 Rev

3. ASME B30.2 is referenced in procedure s.

NA NA

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 7 1 - Audit Sample No.

2 - DEK Submittal 3 - NRC TAC No.

4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)

E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)

H - Open RgCm is adequately Maintained (Yes / No / NA)

I - Changed RgCm is adequately managed (Yes / No / NA) 7 11/9/07 07-0352 ML073170705 MD7300 Amend. No.

200, 11/20/08, ML082971079 Revise USAR Section 9.5.2 to remove the dropped cask analysis from the USAR.

complete 1/15/09: NC LC000141 LA000737 USAR LI*

USAR 14.2.1, 9.5 none

Yes, implement ed in a timely manner.

Amd was issued 11/08 and implement ed 1/09.

Much work took place

- USAR revision submitted 9/09 with the next scheduled update of USAR being 3/31/10.

NA NA

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 8 1 - Audit Sample No.

2 - DEK Submittal 3 - NRC TAC No.

4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)

E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)

H - Open RgCm is adequately Maintained (Yes / No / NA)

I - Changed RgCm is adequately managed (Yes / No / NA) 8 11/9/07 07-0352 ML073170705 MD7300 Amend. No.

200, 11/20/08, ML082971079 After LAR approval and relocation of TS 3.8.a.7 to the technical requirements manual (TRM) is authorized, add to the TRM required actions to take if the AB crane lifting system is found not to meet the TRM requirements during a heavy load lift.

complete 1/16/09; NC LC000141 LA000735 TRM LI*

TRM, licensee controlled none Yes NA NA 9

11/9/07 07-0465 ML073180499 MD7301 Letter of 5/9/08 (ML081150741),

notice of withdrawal of application for amendment DEK will complete required modifications to the AB crane bridge girder to end-tie connections and confirm bolting material as described in Section 4.2.2.9 of this LAR.

NC, design change recorded as completed on 5/5/08 according to tTrack LAR ML073180499 withdrawn by letter dated 4/11/08 LC000141 LA000732 None to NRC; Design change DCR3629 was completed on 4/22/09; ready to install 9/10/07, which is RgCm closure.

LI*

DCR3629 is the implementing document none Yes.

Bolting material is confirmed, per ECN3629-06.

NA NA 10 2/8/2008 08-0017 ML080650314 MC4691 Review is ongoing The KPS USAR will be modified upon final resolution of GSI-191 and response to Generic Letter 2004-02.

In progress; NC LC000181 LA000907 None to NRC LI*

USAR 6.2.9.3 are planned to be changed.

USAR Change Request (UCR) R21-108 dated 9/19/08.

NA Yes -

tTrack shows completi on date changed to 6/1/11.

NA

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 9 1 - Audit Sample No.

2 - DEK Submittal 3 - NRC TAC No.

4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)

E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)

H - Open RgCm is adequately Maintained (Yes / No / NA)

I - Changed RgCm is adequately managed (Yes / No / NA) 11a 6/2/08 08-0113 ML081550342 MD7300 Amend. No.

200, 11/20/08, ML082971079

1. DEK will place a restriction in the Kewaunee procedure governing the use of the AB crane prohibiting the use of synthetic slings for heavy load lifts with the AB crane when this crane is in the "Cask Handling" or "Override" modes of operation.

complete 1/16/09, NC LC000141 LA000997 None to NRC LI*

Changed procedure GNP-08.12.02 none Yes.

Verified Step 4.15 of GNP-08.12.02 Rev 26, 7/18/2010 NA NA 11b 6/2/08 08-0113 ML081550342 MD7300 Amend. No.

200, 11/20/08, ML082971079

2. For the AB crane bridge welds whose failure could result in a drop of the critical load, DEK will perform nondestructive examinations at least once every four years following completion of initial cold proof load testing of the AB crane.

complete 1/16/09, NC LC000141 LA000998 None to NRC; entered Preventive Maintenance

Program, RE89105 LI*

Preventive Maintenance (PM) Task -

PM 53065.

Examinations IAW AWS-01.1-1994.

PM Card has TS Amend.

Referenced.

none Yes.

Preventive Maintenan ce Program

RE89105, which notes it is a RgCm.

NA NA

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 10 1 - Audit Sample No.

2 - DEK Submittal 3 - NRC TAC No.

4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)

E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)

H - Open RgCm is adequately Maintained (Yes / No / NA)

I - Changed RgCm is adequately managed (Yes / No / NA) 11c 6/2/08 08-0113 ML081550342 MD7300 Amend. No.

200, 11/20/08, ML082971079

3. DEK will not perform a heavy lift greater than 50 tons using the AB crane.

This commitment will be superseded when a seismic analysis, using NRC-approved methods, demonstrates acceptable results are achieved for the AB crane and establishes a new limit based on lifting heavy loads greater than 50 tons.

complete 1/27/09, NC LC000141 LA000999 None to NRC; changed procedure GNP-08.12.02, "Control for use of cranes in protected area" LI*

Chnged procedure GNP-08.12.02 none Yes. GNP-08.12.02 change done 7/8/10 NA NA

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 11 1 - Audit Sample No.

2 - DEK Submittal 3 - NRC TAC No.

4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)

E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)

H - Open RgCm is adequately Maintained (Yes / No / NA)

I - Changed RgCm is adequately managed (Yes / No / NA) 12 7/7/08 08-0211 ML081930317 is a resubmittal of an amendment request from 11/9/07.

(i.e.,Audit Sample #12 is a pickup from

  1. 9 with supplements dated 9/19/08 and 3/17/09)

Note 12-2 MD9221 Amend. No, 205, 4/30/09, ML090570710

1. DEK will submit the results of the analyses performed using the nonlinear seismic analysis methodology described in this LAR.
2. DEK will perform a "push" test to provide empirical data documenting the force required to induce crane trolley and bridge drive wheel rolling with the brakes applied. The results of the test will be provided to the NRC.
3. DEK will have an independent peer review performed of the nonlinear structural model and outputs of the nonlinear analysis to confirm the methodology is appropriate for the application and provide a summary of the review to the NRC.

[The three items are managed as one. The 4th (RgCm) Regulatory Requirement in the 9/19/09 supplement was not selected for the audit sample - kdf]

complete 7/15/10; NC

[All 3 managed as one - kdf]

LC000228 (No LAs are needed since the actions can be managed as a group within the LC number.)

SN 08-211 sent to NRC on 7/7/08 (DEK accomplishe d all RgCm in the sample.

Submitted to the NRC within the 9/19/08 sample)

LI*

Push Test details provided in 9/19/08 Supplement none Yes NA NA

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 12 1 - Audit Sample No.

2 - DEK Submittal 3 - NRC TAC No.

4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)

E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)

H - Open RgCm is adequately Maintained (Yes / No / NA)

I - Changed RgCm is adequately managed (Yes / No / NA) 13 1/27/09 09-061 ML090510149 ME0435 Letter approving notice of enforcement discretion, 1/29/09, ML090291061 DEK commits to administratively control the amount of fuel oil in each fuel oil storage tank such that a minimum usable amount of 32,858 gallons (including the day tanks) is available to supply each emergency diesel generator (EDG) (without reliance on a portable transfer pump),

for the duration of the enforcement discretion.

complete 6/10/09; NC LC000315 (No LA number -

one item only)

None to NRC LI*

USAR Rev 22 update 6/30/10 pg 8.2-18, Section 8.2.3.1 none Yes.

Control is USAR edit NA NA 14 6/1/09 09-291 ML091600037 MD9408 Review ongoing The installation of EDG exhaust duct insulation (SAMA 160) will be further evaluated as part of DEK's ongoing performance improvement programs.

In progress; NC LC000345 LA001560 None to NRC LI*

Note 14-E Not yet determined No Yes NA 15 Sample deleted MD9408 Sample deleted at request of Project Manager making the selection..

See Note 15-5 sample results not used.

sample results not used sample results not used LI*

sample results not used sample results not used sample results not used sample results not used sample results not used

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 13 1 - Audit Sample No.

2 - DEK Submittal 3 - NRC TAC No.

4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)

E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)

H - Open RgCm is adequately Maintained (Yes / No / NA)

I - Changed RgCm is adequately managed (Yes / No / NA) 16a 8/17/09 09-469 ML092320093 MD9408 License renewal review ongoing

1. Additional information will be included in the USAR Supplement (License Renewal Application, Appendix A), including license renewal commitments identified in Table A6.0-1, as applicable.

These USAR Supplement changes will be consistent with the responses to Requests for Additional Information (RAIs) B2.1.13-5, B2.1.14-3, B2.1.15-1, B2.1.18-1, B2.1.21-1, B.2.1.31-1, and B3.1-1, are proposed to support approval of the renewed operating license, and may change during the NRC review period.

In progress; NC LC000343 LA001541 Reportable through USAR change LI*

USAR (pages to be defined; expected to be complete 4/4/11) none NA Yes NA

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 14 1 - Audit Sample No.

2 - DEK Submittal 3 - NRC TAC No.

4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)

E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)

H - Open RgCm is adequately Maintained (Yes / No / NA)

I - Changed RgCm is adequately managed (Yes / No / NA) 16b 8/17/09 09-469 ML092320093 MD9408 License renewal review ongoing

2. The response to RAI B3.2-2 will be provided following reevaluation of the environmental effects of fatigue for the NUREG/CR-6260-required evaluations that used stress-based fatigue monitoring.

Complete and transferred for action by LA001848 LC000343 LA001542

[original tracking]

transferre d to LC000392 LA001848

[Observati on 16b-B]

Transferred to LA001848 LI*

Letter SN 10-033 dated dated 2/2/10 (responded to RAI B3.2-2)

No change to RgCm.

Change was to tTrack to record transfer from LA001542 to LA001848 Yes NA Yes.

RgCm itself not changed (transfer was successfu l) 17a 9/24/09 09-491 ML092440398 ME2139 Conversion to Improved TS review ongoing (The following commitments are selected from ) [Three of nine commitments were selected for audit - kdf]

2. DEK will establish the Technical Specification Bases for Limiting Condition for Operation (LCO) 3.0.8, as adopted, with the applicable license amendment.

In progress; NC LC000407 LA001897 None to NRC LI*

Tech Spec Bases LCO 3.0.8 none NA Yes NA

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 15 1 - Audit Sample No.

2 - DEK Submittal 3 - NRC TAC No.

4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)

E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)

H - Open RgCm is adequately Maintained (Yes / No / NA)

I - Changed RgCm is adequately managed (Yes / No / NA) 17b 9/24/09 09-491 ML092440398 ME2139 Conversion to Improved TS review ongoing

7. DEK will have written procedures available describing compensatory measures to be taken in the event of an intentional or unintentional entry into LCO 3.7.12, Auxiliary Building Special Ventilation (ASV) System, Condition B, Two ASV trains inoperable due to inoperable ASV boundary.

Complete 12/6/10; NC LC000407 LA001902 Procedure LI*

Procedure OP-KW-AOP-GEN-005 "Unplanned Barrier Control none Yes NA NA 17c 9/24/09 09-491 ML092440398 ME2139 Conversion to Improved TS review ongoing

8. DEK will add procedural direction to perform an extent of condition evaluation and perform additional testing for plausible common failure modes associated with the reactor protection system and the engineered safety features actuation system instrument analog channels.

Withdrew 12/6/10; NC LC000407

, LA1903 Withdrew via 8/18/2010 Supple LI*

Letter SN10-457 to NRC withdrew commitment (Letter is 8/18/10 supplement on TAC ME2139) none Withdrew NA NA

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 16 1 - Audit Sample No.

2 - DEK Submittal 3 - NRC TAC No.

4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)

E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)

H - Open RgCm is adequately Maintained (Yes / No / NA)

I - Changed RgCm is adequately managed (Yes / No / NA) 18 9/25/09 09-597 ML092710045 MD9408 License renewal review ongoing The revised Work Control Process program will be developed and implemented prior to the period of extended operation.

In progress; NC LC000394 LA001858 Not closed LI*

Revised work control program document (TBD) none NA Yes NA 19a 10/15/09 09-645 ML092890560 MD7838 Letter of 4/1/10, ML100880212 The completion dates for the following two commitments have been revised from October 1, 2009, to October 15, 2009.

[This RgCm was managed as two separate items - kdf]

1. DEK will revise current fill and vent procedures to provide a means and acceptance criteria to ensure that piping is sufficiently full after system fill and vent. This may include confirmation by ultrasonic testing or other appropriate means.

Complete (This RgCm was changed from 10/1/09 to 10/15/09)

LC000239 LA001178 Leter SN 09-645 dated 9/15/09 to NRC LI*

Note 19-E Change to date only (10/1/09 to 10/15/09)

Yes NA Yes

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 17 1 - Audit Sample No.

2 - DEK Submittal 3 - NRC TAC No.

4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)

E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)

H - Open RgCm is adequately Maintained (Yes / No / NA)

I - Changed RgCm is adequately managed (Yes / No / NA) 19b 10/15/09 09-645 ML092890560 MD7838 Letter of 4/1/10, ML100880212

2. DEK will revise current inservice test procedures to provide dynamic sweeping as part of the filling of the systems where needed to ensure systems are sufficiently full.

Complete (This RgCm was changed from 10/1/09 to 10/15/09)

LC000239 LA001179 LI*

Note 19-E Uses LI* -

commitment change evaluation Change to date only (10/1/09 to 10/15/09)

Yes NA Yes

Table 3 - Kewaunee Power Station RgCm Data Table - Notes and Legend Page 18 Topic or Word / Symbol Note, legend or discussion ADAMS Agencywide Document Access and Management System Amd or Amend.

amendment Audit observation (general)

The Preventive Maintenance Program would be improved if the Comment field on the PM (preventive maintenance) Data Sheet informed the user that the sheet had a RgCm associated with it.

Audit observation (training)

Commitment management staff should consider preparing a Guideline to ensure consistent input to tTrack by stakeholders making infrequent use of tTrack.

Audit observation 16b-B The ability to transfer tracking from one LC/LA set to another is demonstrated in Sample 16b. The rationale for the transfer is explained in LA001848: The NRC wanted more items for another purpose. KPS consolidated LA001542 with LA001848.

CFR Code of Federal Regulations Column headings and cell designations Columns are labeled numbers 1 through 5 and letters A through I. Sample numbers are listed in column 1.

Notes are designated as "Note (row) - (column)"

Commitment management staff Persons identified as making routine, standardized data entry into tTrack, identified as Noreen Wenborne, MaryJo Haese, and Thomas Breene during the course of RgCm data collection.

ECN Engineering Change Notice Generic Letter 2004-02 "Potential Impact of Debris Blockage on Emergency Recirculation during Design Bais Accidents at Pressurized-Water Reactors," September 13, 2004 GSI-191 "Experimental Studies of Loss-of-Coolant Accident-Generated Debris Accumulation and Head Loss with Emphasis on the Effects of Calcium Silicate Insulation," May 2005 kdf Karl D. Feintuch (Mainly used in combination with brackets to indicate an auditor comment.)

KPS Kewaunee Power Station LA Licensing Action;one or more LA can be associated with one LC LC Licensing Commitment LI*

In this report LI* represents LI-AA-110, Rev. 0, "Commitment Management," which governs the management of RgCm. In addition, GNP-03.01.01, Rev. 41 during RgCm Audit and Rev 42 when the Report was issued, "Directive, Implementing Document, and Procedure Administrative Controls" (commonly referred to at KPS as the "Procedure on procedures") governs tracing the effect of RgCm on procedures. Therefore, the management of RgCm, when it affects procedures is controlled by a combination of these 2 procedures.

ML#

"MLnnnnnnnnn" (i.e. ML followed by 9 digits) is the identifier used by the NRC to access documents and records within its Agencywide Document Access and Management System (ADAMS) document control system.

NC Not Changed (as used in column A)

Table 3 - Kewaunee Power Station RgCm Data Table - Notes and Legend Page 19 Topic or Word / Symbol Note, legend or discussion Note 01-G, -H, -I (i.e., headings in column G, H and I)

A "Yes" in Column G, H, or I indicates that the RgCm was successfully managed according to the description in the heading.

NA applies if the particilar column does not apply. As examples, for a closed RgCm, "open" is NA; for unchanged RgCm, "changed" does not apply.

Thus "No" would only appear in Columns G, H or I if the RgCm was not adequately managed.

Note 03-C NRC notified via suubmitted document SN 08-0113 dated 6/2/08, ML081550342 Note 04-C The Technical Requirements Manual (TRM) is a licensee controlled document for managing requirements that the NRC has approved to be transferred from control by the Technical Specifications.(TS)

Note 12-2, Audit Observation and Audit Finding Observation: Regarding the July 7, 2008 application, the licensing group should define a closeout event at which to terminate its ownership of a RgCm intended for its doownstream stakeholders (i.e., Design, Operations, Training, as examples)

Audit Finding: DEK lacks a documented instruction in LI-AA-110, "Commitment Management," that the instructs the commitment management staff to review all incoming / outgoing correspondence for impact on existing RgCm. Heretofore, commitment management staff has been performing this action without a documented instruction, within LI-AA-110, to do so.

Note 14-E

[Suggestion pertaining to on-going RgCm: Stakeholders should report completion plans to Licensing staff for tTrack entry and for future reference.- kdf]

Note 15-5 The sample contained proprietary information, an attribute not needed to assemble a valid audit sample. The audit results for the sample were consistent with results from other samples, and its removal did not change the findings of the audit. Further, the sample population grew from the original 19 selections to a net population of 24 (1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11a, 11b, 11c, 12, 13, 14, 15 omitted, 16a, 16b, 17a, 17b, 17c, 18, 19a, 19b) to track the management of separate RgCm parts.

Note 19-E Affected procedures (21 documents, as indicated by separate serial numbers):

OP-KW-NOP-RHR-001, -003 SP-34-099A, -099B OP-KW-NOP-SI-002 OP-KW-MOP-RHR-001A, -001B, -002A, -002B, -003A, -005A, -005B, -006, -006A, -006B OP-KW-NOP-SI-001 [possible typo in KPS text: NOP should possibly be MOP - kdf], -002, -004 OP-KW-MOP-ICS-001, -002, -003 Note on references to TS In this audit TS references are to the Custom Technical Specifications (CTS), which preceded the conversion to Improved Technical Specifications (ITS) on February 2, 2011.

Note on sample characteristics for the sample size of 24, categorized from audit results RgCm items closed and remaining the same = 1, 2, 3, 4, 5, 6, 7, 8, 9, 11a, 11b, 11c, 12, 13, 17b, 17c (16 items)

RgCm items changed and closed = 16b, 19a, 19b (3 items)

RgCm items open and remaining the same = 10, 14, 16a, 17a, 18 (5 items)

RgCm items open and changed = none

Table 3 - Kewaunee Power Station RgCm Data Table - Notes and Legend Page 20 Topic or Word / Symbol Note, legend or discussion Note row-column A discussion pertaining to Table 2, row number and column number, which is inserted in Table 3 due to space limitation. (Example: Note 01-G, pertains to row 01, column G on Table 2.

NRC Information Notice 84-55 "Seal Table Leaks at PWRs," July 6, 1984 NRC Information Notice 84-55, Supplement 1 "Seal Table Leaks at PWRs," May 14, 1985 NRC Information Notice 92-15 "Failure of Primary System Compression Fitting," February 24, 1992 NUREG/CR-6260 "Application of NUREG/CR-59999 Interim Fatigue Curves to Selected Nuclear Power Plant Components," 1995 NUREG-0554 "Single-Failure-Proof Cranes for Nuclear Power Plants," May 1979 NUREG-0612 "Control of Heavy Loads at Nuclear Power Plants: Resolution of Generic Technical Activity A-36," July 1980 RgCm Regulatory Commitment, as interpreted by NEI 99-04 (the industry document governing RgCm management) and LIC-105 (the NRC document governing RgCm audits)

SAMA 160 SAMA 160 is described in the license renewal submittal as "Insulate EDG Exhaust Ducts." The context is that insulating the EDG exhaust ducts would reduce the heat load in thhe room and provide additional time to align alternate room cooling in the event that room cooling has failed.

Suggestion A comment by auditor kdf, not specific to a RgCm, but offered as a suggestion. No action or response is expected.

Suggestion (based on Audit Items 11a, b, c)

[Commitment management staff should monitor processes that cause users to contact them for RgCm information and arrange to add RgCm information to relevant databases. - kdf]

Supple Supplement Title 10 The section of the Code of Federal Regulations pertaining to "Energy" TRM Technical Requirements Manual - a licensee controlled document for managing plant specific technical requirements. The TRM is incorporated by reference into the Updated Safety Analysis Report (USAR)

TS Technical Specifications, as described in 10 CFR 50.36 tTrack Name of database used to track RgCm.

UCR USAR Change Request USAR Updated Safety Analysis Report