ML110900537: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(4 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 04/11/2011
| issue date = 04/11/2011
| title = Audit Report Tables 2 and 3
| title = Audit Report Tables 2 and 3
| author name = Feintuch K D
| author name = Feintuch K
| author affiliation = NRC/NRR/DORL/LPLIII-1
| author affiliation = NRC/NRR/DORL/LPLIII-1
| addressee name = Heacock D A
| addressee name = Heacock D
| addressee affiliation = Dominion Energy Kewaunee, Inc
| addressee affiliation = Dominion Energy Kewaunee, Inc
| docket = 05000305
| docket = 05000305
| license number = DPR-043
| license number = DPR-043
| contact person = Feintuch K D, NRR/DORL/LPL3-1, 415-3079
| contact person = Feintuch K, NRR/DORL/LPL3-1, 415-3079
| case reference number = TAC ME3804
| case reference number = TAC ME3804
| package number = ML110900569
| package number = ML110900569
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 11 - Audit Sample No.2 - DEK Submittal 3 - NRC TAC No.4 - NRC Issuance5 - Summary of CommitmentA - Action Completed (date)Action in Prgress (no date)Not Changed / Changed to what?B - KPS Tracking #LC#,, CAP#C - If closed, then KPS closeout informationD - Governed by KPS process document # (See Note LI*)E - Affected implementing documentF - Affected change documentG - Closed RgCm implemented in timely manner (Yes / No / NA)H - Open RgCm is adequately Maintained (Yes / No / NA)I - Changed RgCm is adequately managed (Yes / No / NA) 1 10/29/2007 07-0436B ML073100354NoneNone An updated description of the station blackout  
{{#Wiki_filter:Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 1 1 - Audit Sample No.
2 - DEK Submittal 3 - NRC TAC No.
4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)
Action in Prgress (no date)
Not Changed / Changed to what?
B - KPS Tracking #
LC#,, CAP#
C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)
E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)
H - Open RgCm is adequately Maintained (Yes / No / NA)
I - Changed RgCm is adequately managed (Yes / No / NA) 1 10/29/2007 07-0436B ML073100354 None None An updated description of the station blackout alternate alternating current source, including the quality assurance program requirements for the TSC DG as defined in the Dominion Nuclear Facility Quality Assurance Program Description, will be incorporated into the KPS Updated Safety Analysis Report (USAR) and provided to the Nuclear Regulatory Commission (NRC) in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 50.71 (e).
complete 4/18/2008; NC LC000111 LA000697 No ML#,
since no separate response to the NRC LI*
USAR 8.2.4.3, 8.2.4.12, 8.2 Reference none Yes NA NA


alternate alternating current
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 2 1 - Audit Sample No.
2 - DEK Submittal 3 - NRC TAC No.
4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)
Action in Prgress (no date)
Not Changed / Changed to what?
B - KPS Tracking #
LC#,, CAP#
C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)
E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)
H - Open RgCm is adequately Maintained (Yes / No / NA)
I - Changed RgCm is adequately managed (Yes / No / NA) 2 11/9/07 07-0416A ML073106750 MD6144 Letter of 2/25/08 granting relief, ML080240029 Prior to use of nonwelded valves with end connections other than flanges at KPS, procedures will be developed for installation of nonwelded valves with end connections other than flanges that address operating experience of NRC Information Notices 92-15, 84-55 and 84-55, Supplement 1. The specific provisions include: a) not mixing the parts from one manufacturer to another, b) following manufacturer's recommended instructions for installing compression fittings, and c) the training or familiarity with the procedure(s) for personnel doing this work.
complete 1/2/2008; NC LC000142 LA000741
("LA type"soluti on was incorrect.
Data entry was performed by inexperien ced person -
self corrected) no response to the NRC required LI*
Maintenance Procedure MA-KW-GMP-103 None Yes NA NA


source, including the quality
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 3 1 - Audit Sample No.
2 - DEK Submittal 3 - NRC TAC No.
4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)
Action in Prgress (no date)
Not Changed / Changed to what?
B - KPS Tracking #
LC#,, CAP#
C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)
E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)
H - Open RgCm is adequately Maintained (Yes / No / NA)
I - Changed RgCm is adequately managed (Yes / No / NA) 3 11/9/07 07-0352 ML073170705 MD7300 Amend. No.
200, 11/20/08, ML082971079 Notify the NRC when the modifications to the Auxiliary Building (AB) crane to make it single-failure proof are complete complete 6/12/08; NC LC000141 LA000133 Note 03-C LI*
CA069210 says to update procedure GNP-08.12.02 plus tags.
None Yes-it was timely since it accomplis hed a design change.
NA NA


assurance program
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 4 1 - Audit Sample No.
2 - DEK Submittal 3 - NRC TAC No.
4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)
Action in Prgress (no date)
Not Changed / Changed to what?
B - KPS Tracking #
LC#,, CAP#
C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)
E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)
H - Open RgCm is adequately Maintained (Yes / No / NA)
I - Changed RgCm is adequately managed (Yes / No / NA) 4 11/9/07 07-0352 ML073170705 MD7300 Amend. No.
200, 11/20/08, ML082971079 All heavy load lifts in or around the spent fuel pool made using the upgraded AB crane lifting system will meet the guidance in NUREG-0612, Section 5.1.6, as follows:
* Special lifting devices, as defined in American National Standards Institutes (ANSI) N14.6 will meet the guidance in NUREG-0612, Section 5.1.6(1 )(a) and ANSI N14.6-1993, as clarified in to this license amendment request (LAR).
* Lifting devices not specially designed will meet the guidance in NUREG-0612, Section 5.1.6(1)(b) and American Society of Mechanical Engineers (ASME) B30.9-2003, as clarified in Attachment 5 to this LAR.
* The AB crane will meet the guidance in NUREG-0612, Section 5.1.6(2) and NUREG-0554 as clarified in Attachments 5 and 6 to this LAR
* Interfacing lift points will meet the guidance in NUREG-0612, Section Complete 1/16/09; NC LC000141 LA000135 Addressed in TRM [a licensee controlled document kdf] See Note 04-C LI*
TRM 3.8.1, Rev 0, 1/15/09.
none Yes.
Completio n took place within 60 days, as planned.
NA NA


requirements for the TSC
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 5 1 - Audit Sample No.
 
2 - DEK Submittal 3 - NRC TAC No.
DG as defined in the
4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)
 
Action in Prgress (no date)
Dominion Nuclear Facility
Not Changed / Changed to what?
 
B - KPS Tracking #
Quality Assurance Program
LC#,, CAP#
 
C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)
Description, will be
E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)
 
H - Open RgCm is adequately Maintained (Yes / No / NA)
incorporated into the KPS
I - Changed RgCm is adequately managed (Yes / No / NA) 5 11/9/07 07-0352 ML073170705 MD7300 Amend. No.
 
200, 11/20/08, ML082971079 Crane operator training will meet the guidance in ASME B30.2-2005.
Updated Safety Analysis
complete 12/15/08 LC000141 LA000736 None to NRC LI*
 
Lesson Plan M-MD-LP 2.2.1 "Cranes"; M-PM2-LP 1.9.1 "Crane Maintenance  
Report (USAR) and
/ Inspection" None Yes.
 
Lesson Plans had guidance incorporat ed in reference to this Amd's approval.
provided to the Nuclear
NA NA
 
Regulatory Commission (NRC) in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 50.71 (e)
.complete 4/18/2008;
 
NC LC000111 ,
LA000697 No ML#, since no separate response to
 
the NRC LI*USAR 8.2.4.3, 8.2.4.12, 8.2
 
ReferencenoneYesNANA Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 21 - Audit Sample No.2 - DEK Submittal 3 - NRC TAC No.4 - NRC Issuance5 - Summary of CommitmentA - Action Completed (date)Action in Prgress (no date)Not Changed / Changed to what?B - KPS Tracking #LC#,, CAP#C - If closed, then KPS closeout informationD - Governed by KPS process document # (See Note LI*)E - Affected implementing documentF - Affected change documentG - Closed RgCm implemented in timely manner (Yes / No / NA)H - Open RgCm is adequately Maintained (Yes / No / NA)I - Changed RgCm is adequately managed (Yes / No / NA) 2 11/9/07 07-0416A ML073106750 MD6144 Letter of 2/25/08 granting relief, ML080240029 Prior to use of nonwelded valves with end connections
 
other than flanges at KPS, procedures will be
 
developed for installation of
 
nonwelded valves with end
 
connections other than
 
flanges that address
 
operating experience of
 
NRC Information Notices 92
-15, 84-55 and 84-55, Supplement 1. The specific
 
provisions include: a) not
 
mixing the parts from one
 
manufacturer to another, b)
 
following manufacturer's
 
recommended instructions
 
for installing compression
 
fittings, and c) the training
 
or familiarity with the
 
procedure(s) for personnel
 
doing this work.
complete 1/2/2008; NC LC000142 ,
LA000741
("LA type"soluti
 
on was incorrect. 
 
Data entry
 
was performed
 
by inexperien
 
ced person -
self corrected) no response to the NRC
 
required LI*Maintenance Procedure
 
MA-KW-GMP-103NoneYesNANA Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 31 - Audit Sample No.2 - DEK Submittal 3 - NRC TAC No.4 - NRC Issuance5 - Summary of CommitmentA - Action Completed (date)Action in Prgress (no date)Not Changed / Changed to what?B - KPS Tracking #LC#,, CAP#C - If closed, then KPS closeout informationD - Governed by KPS process document # (See Note LI*)E - Affected implementing documentF - Affected change documentG - Closed RgCm implemented in timely manner (Yes / No / NA)H - Open RgCm is adequately Maintained (Yes / No / NA)I - Changed RgCm is adequately managed (Yes / No / NA) 3 11/9/07 07-0352 ML073170705 MD7300 Amend. No.
200, 11/20/08, ML082971079 Notify the NRC when the modifications to the
 
Auxiliary Building (AB)
 
crane to make it single-
 
failure proof are complete complete 6/12/08; NC LC000141 ,
LA000133Note 03-CLI*
CA069210 says to update procedure
 
GNP-08.12.02 plus
 
tags.None Yes- it was timely
 
since it accomplis hed a design change.NANA Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 41 - Audit Sample No.2 - DEK Submittal 3 - NRC TAC No.4 - NRC Issuance5 - Summary of CommitmentA - Action Completed (date)Action in Prgress (no date)Not Changed / Changed to what?B - KPS Tracking #LC#,, CAP#C - If closed, then KPS closeout informationD - Governed by KPS process document # (See Note LI*)E - Affected implementing documentF - Affected change documentG - Closed RgCm implemented in timely manner (Yes / No / NA)H - Open RgCm is adequately Maintained (Yes / No / NA)I - Changed RgCm is adequately managed (Yes / No / NA) 4 11/9/07 07-0352 ML073170705 MD7300 Amend. No.
200, 11/20/08, ML082971079 All heavy load lifts in or around the spent fuel pool
 
made using the upgraded
 
AB crane lifting system will
 
meet the guidance in
 
NUREG-0612, Section
 
5.1.6, as follows:
* Special lifting devices, as defined in American
 
National Standards
 
Institutes (ANSI) N14.6 will
 
meet the guidance in
 
NUREG-0612, Section
 
5.1.6(1 )(a) and ANSI N14.6
-1993, as clarified in to this license
 
amendment request (LAR).
* Lifting devices not specially designed will meet
 
the guidance in NUREG-
 
0612, Section 5.1.6(1)(b)
 
and American Society of
 
Mechanical Engineers (ASME) B30.9-2003, as
 
clarified in Attachment 5 to
 
this LAR.* The AB crane will meet the guidance in NUREG-
 
0612, Section 5.1.6(2) and
 
NUREG-0554 as clarified in
 
Attachments 5 and 6 to this
 
LAR
.
* Interfacing lift points will
 
meet the guidance in
 
NUREG-0612
, Section Complete 1/16/09; NC LC000141 ,
LA000135 Addressed in TRM [a licensee controlled
 
document kdf] See Note 04-C LI*TRM 3.8.1, Rev 0, 1/15/09.none Yes. Completio n took place within 60
 
days, as planned.NANA Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 51 - Audit Sample No.2 - DEK Submittal 3 - NRC TAC No.4 - NRC Issuance5 - Summary of CommitmentA - Action Completed (date)Action in Prgress (no date)Not Changed / Changed to what?B - KPS Tracking #LC#,, CAP#C - If closed, then KPS closeout informationD - Governed by KPS process document # (See Note LI*)E - Affected implementing documentF - Affected change documentG - Closed RgCm implemented in timely manner (Yes / No / NA)H - Open RgCm is adequately Maintained (Yes / No / NA)I - Changed RgCm is adequately managed (Yes / No / NA) 5 11/9/07 07-0352 ML073170705 MD7300 Amend. No.
200, 11/20/08, ML082971079 Crane operator training will meet the guidance in ASME  
 
B30.2-2005.
complete 12/15/08 LC000141 ,
LA000736 None to NRC LI*Lesson Plan M-MD-LP 2.2.1 "Cranes"; M-
 
PM2-LP 1.9.1 "Crane Maintenance  
 
/ Inspection" None Yes. Lesson Plans had  
 
guidance incorporat
 
ed in reference  
 
to this Amd's approval.NANA Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 61 - Audit Sample No.2 - DEK Submittal 3 - NRC TAC No.4 - NRC Issuance5 - Summary of CommitmentA - Action Completed (date)Action in Prgress (no date)Not Changed / Changed to what?B - KPS Tracking #LC#,, CAP#C - If closed, then KPS closeout informationD - Governed by KPS process document # (See Note LI*)E - Affected implementing documentF - Affected change documentG - Closed RgCm implemented in timely manner (Yes / No / NA)H - Open RgCm is adequately Maintained (Yes / No / NA)I - Changed RgCm is adequately managed (Yes / No / NA) 6 11/9/07 07-0352 ML073170705 MD7300 Amend. No.
200, 11/20/08, ML082971079 Crane maintenance and inspections will meet the
 
guidance in ASME B30.2-
 
1976.complete 1/16/09, NC LC000141 ,
LA000740 TRM Bases, USAR LI*TRM Bases (TRM 3.8.1
 
pg 381-2)
USAR Rev22
 
Sec. 9, pp
 
9.5-9, -10
 
(6/30 None Yes. During NRC ISFSI Inspection
 
(6/09) issues were identified
 
with crane
 
inspection
 
procedure s
concernin g B30.2 guidance.
 
REF CR 337889. 


Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 6 1 - Audit Sample No.
2 - DEK Submittal 3 - NRC TAC No.
4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)
Action in Prgress (no date)
Not Changed / Changed to what?
B - KPS Tracking #
LC#,, CAP#
C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)
E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)
H - Open RgCm is adequately Maintained (Yes / No / NA)
I - Changed RgCm is adequately managed (Yes / No / NA) 6 11/9/07 07-0352 ML073170705 MD7300 Amend. No.
200, 11/20/08, ML082971079 Crane maintenance and inspections will meet the guidance in ASME B30.2-1976.
complete 1/16/09, NC LC000141 LA000740 TRM Bases, USAR LI*
TRM Bases (TRM 3.8.1 pg 381-2)
USAR Rev22 Sec. 9, pp 9.5-9, -10 (6/30 None Yes.
During NRC ISFSI Inspection (6/09) issues were identified with crane inspection procedure s
concernin g B30.2 guidance.
REF CR 337889.
Revised MA-KW-MPM-CRN-007 Rev.
Revised MA-KW-MPM-CRN-007 Rev.
2 and TEC-MA-KW-MPM-CRN-002 Rev  
2 and TEC-MA-KW-MPM-CRN-002 Rev
: 3. ASME B30.2 is referenced  
: 3. ASME B30.2 is referenced in procedure s.
NA NA


in procedure s.NANA Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 71 - Audit Sample No.2 - DEK Submittal 3 - NRC TAC No.4 - NRC Issuance5 - Summary of CommitmentA - Action Completed (date)Action in Prgress (no date)Not Changed / Changed to what?B - KPS Tracking #LC#,, CAP#C - If closed, then KPS closeout informationD - Governed by KPS process document # (See Note LI*)E - Affected implementing documentF - Affected change documentG - Closed RgCm implemented in timely manner (Yes / No / NA)H - Open RgCm is adequately Maintained (Yes / No / NA)I - Changed RgCm is adequately managed (Yes / No / NA) 7 11/9/07 07-0352 ML073170705 MD7300 Amend. No.
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 7 1 - Audit Sample No.
200, 11/20/08, ML082971079 Revise USAR Section 9.5.2 to remove the dropped cask  
2 - DEK Submittal 3 - NRC TAC No.
4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)
Action in Prgress (no date)
Not Changed / Changed to what?
B - KPS Tracking #
LC#,, CAP#
C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)
E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)
H - Open RgCm is adequately Maintained (Yes / No / NA)
I - Changed RgCm is adequately managed (Yes / No / NA) 7 11/9/07 07-0352 ML073170705 MD7300 Amend. No.
200, 11/20/08, ML082971079 Revise USAR Section 9.5.2 to remove the dropped cask analysis from the USAR.
complete 1/15/09: NC LC000141 LA000737 USAR LI*
USAR 14.2.1, 9.5 none
: Yes, implement ed in a timely manner.
Amd was issued 11/08 and implement ed 1/09.
Much work took place
- USAR revision submitted 9/09 with the next scheduled update of USAR being 3/31/10.
NA NA


analysis from the USAR.
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 8 1 - Audit Sample No.
complete 1/15/09: NC LC000141 ,
2 - DEK Submittal 3 - NRC TAC No.
LA000737USARLI*USAR 14.2.1, 9.5 none Yes, implement ed in a timely manner.
4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)
Amd was issued 11/08 and  
Action in Prgress (no date)
Not Changed / Changed to what?
B - KPS Tracking #
LC#,, CAP#
C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)
E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)
H - Open RgCm is adequately Maintained (Yes / No / NA)
I - Changed RgCm is adequately managed (Yes / No / NA) 8 11/9/07 07-0352 ML073170705 MD7300 Amend. No.
200, 11/20/08, ML082971079 After LAR approval and relocation of TS 3.8.a.7 to the technical requirements manual (TRM) is authorized, add to the TRM required actions to take if the AB crane lifting system is found not to meet the TRM requirements during a heavy load lift.
complete 1/16/09; NC LC000141 LA000735 TRM LI*
: TRM, licensee controlled none Yes NA NA 9
11/9/07 07-0465 ML073180499 MD7301 Letter of 5/9/08 (ML081150741),
notice of withdrawal of application for amendment DEK will complete required modifications to the AB crane bridge girder to end-tie connections and confirm bolting material as described in Section 4.2.2.9 of this LAR.
NC, design change recorded as completed on 5/5/08 according to tTrack LAR ML073180499 withdrawn by letter dated 4/11/08 LC000141 LA000732 None to NRC; Design change DCR3629 was completed on 4/22/09; ready to install 9/10/07, which is RgCm closure.
LI*
DCR3629 is the implementing document none Yes.
Bolting material is confirmed, per ECN3629-06.
NA NA 10 2/8/2008 08-0017 ML080650314 MC4691 Review is ongoing The KPS USAR will be modified upon final resolution of GSI-191 and response to Generic Letter 2004-02.
In progress; NC LC000181 LA000907 None to NRC LI*
USAR 6.2.9.3 are planned to be changed.
USAR Change Request (UCR) R21-108 dated 9/19/08.
NA Yes -
tTrack shows completi on date changed to 6/1/11.
NA


implement ed 1/09. 
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 9 1 - Audit Sample No.
 
2 - DEK Submittal 3 - NRC TAC No.
Much work
4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)
 
Action in Prgress (no date)
took place
Not Changed / Changed to what?
- USAR revision submitted
B - KPS Tracking #
 
LC#,, CAP#
9/09 with
C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)
 
E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)
the next scheduled
H - Open RgCm is adequately Maintained (Yes / No / NA)
 
I - Changed RgCm is adequately managed (Yes / No / NA) 11a 6/2/08 08-0113 ML081550342 MD7300 Amend. No.
update of
 
USAR being 3/31/10.NANA Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 81 - Audit Sample No.2 - DEK Submittal 3 - NRC TAC No.4 - NRC Issuance5 - Summary of CommitmentA - Action Completed (date)Action in Prgress (no date)Not Changed / Changed to what?B - KPS Tracking #LC#,, CAP#C - If closed, then KPS closeout informationD - Governed by KPS process document # (See Note LI*)E - Affected implementing documentF - Affected change documentG - Closed RgCm implemented in timely manner (Yes / No / NA)H - Open RgCm is adequately Maintained (Yes / No / NA)I - Changed RgCm is adequately managed (Yes / No / NA) 8 11/9/07 07-0352 ML073170705 MD7300 Amend. No.
200, 11/20/08, ML082971079 After LAR approval and relocation of TS 3.8.a.7 to
 
the technical requirements
 
manual (TRM) is
 
authorized, add to the TRM
 
required actions to take if
 
the AB crane lifting system
 
is found not to meet the
 
TRM requirements during a
 
heavy load lift.
complete 1/16/09; NC LC000141 ,
LA000735 TRM LI*TRM, licensee controllednoneYesNANA 9 11/9/07 07-0465 ML073180499 MD7301 Letter of 5/9/08 (ML081150741),
notice of
 
withdrawal of
 
application for
 
amendment DEK will complete required modifications to the AB
 
crane bridge girder to end-
 
tie connections and confirm
 
bolting material as
 
described in Section 4.2.2.9
 
of this LAR.
NC, design change recorded as
 
completed
 
on 5/5/08
 
according to
 
tTrack LAR
 
ML07318049
 
9 withdrawn
 
by letter
 
dated 4/11/08 LC000141 ,
LA000732 None to NRC; Design
 
change DCR3629 was completed
 
on 4/22/09;
 
ready to install 9/10/07, which is RgCm closure.LI*DCR3629 is the implementing
 
document none Yes. Bolting material is
 
confirmed, per ECN3629-06.NANA 10 2/8/2008 08-0017 ML080650314 MC4691 Review is ongoing The KPS USAR will be modified upon final
 
resolution of GSI-191 and
 
response to Generic Letter
 
2004-02.In progress; NC LC000181 ,
LA000907 None to NRC LI*USAR 6.2.9.3 are planned
 
to be changed.USAR Change Request (UCR) R21-
 
108 dated
 
9/19/08.NA Yes - tTrack shows completi on date changed to 6/1/11.NA Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 91 - Audit Sample No.2 - DEK Submittal 3 - NRC TAC No.4 - NRC Issuance5 - Summary of CommitmentA - Action Completed (date)Action in Prgress (no date)Not Changed / Changed to what?B - KPS Tracking #LC#,, CAP#C - If closed, then KPS closeout informationD - Governed by KPS process document # (See Note LI*)E - Affected implementing documentF - Affected change documentG - Closed RgCm implemented in timely manner (Yes / No / NA)H - Open RgCm is adequately Maintained (Yes / No / NA)I - Changed RgCm is adequately managed (Yes / No / NA) 11a 6/2/08 08-0113 ML081550342 MD7300 Amend. No.
200, 11/20/08, ML082971079
200, 11/20/08, ML082971079
: 1. DEK will place a restriction in the Kewaunee  
: 1. DEK will place a restriction in the Kewaunee procedure governing the use of the AB crane prohibiting the use of synthetic slings for heavy load lifts with the AB crane when this crane is in the "Cask Handling" or "Override" modes of operation.
 
complete 1/16/09, NC LC000141 LA000997 None to NRC LI*
procedure governing the  
Changed procedure GNP-08.12.02 none Yes.
 
Verified Step 4.15 of GNP-08.12.02 Rev 26, 7/18/2010 NA NA 11b 6/2/08 08-0113 ML081550342 MD7300 Amend. No.
use of the AB crane  
 
prohibiting the use of  
 
synthetic slings for heavy  
 
load lifts with the AB crane  
 
when this crane is in the "Cask Handling" or "Override" modes of  
 
operation.
complete 1/16/09, NC LC000141 ,
LA000997 None to NRC LI*Changed procedure  
 
GNP-08.12.02 none Yes. Verified Step 4.15  
 
of GNP-08.12.02 Rev 26, 7/18/2010NANA 11b 6/2/08 08-0113 ML081550342 MD7300 Amend. No.
200, 11/20/08, ML082971079
200, 11/20/08, ML082971079
: 2. For the AB crane bridge welds whose failure could  
: 2. For the AB crane bridge welds whose failure could result in a drop of the critical load, DEK will perform nondestructive examinations at least once every four years following completion of initial cold proof load testing of the AB crane.
 
complete 1/16/09, NC LC000141 LA000998 None to NRC; entered Preventive Maintenance
result in a drop of the critical  
: Program, RE89105 LI*
 
Preventive Maintenance (PM) Task -
load, DEK will perform  
PM 53065.
 
Examinations IAW AWS-01.1-1994.
nondestructive  
PM Card has TS Amend.
 
examinations at least once  
 
every four years following  
 
completion of initial cold  
 
proof load testing of the AB  
 
crane.complete 1/16/09, NC LC000141 ,
LA000998 None to NRC; entered Preventive  
 
Maintenance  
: Program, RE89105 LI*Preventive Maintenance (PM) Task -
 
PM 53065.
 
Examinations  
 
IAW AWS-01.1-1994.
 
PM Card has  
 
TS Amend.  
 
Referenced.
Referenced.
none Yes. Preventive  
none Yes.
Preventive Maintenan ce Program
: RE89105, which notes it is a RgCm.
NA NA


Maintenan ce Program
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 10 1 - Audit Sample No.
: RE89105, which notes it is
2 - DEK Submittal 3 - NRC TAC No.
 
4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)
a RgCm.NANA Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit DataPage 101 - Audit Sample No.2 - DEK Submittal 3 - NRC TAC No.4 - NRC Issuance5 - Summary of CommitmentA - Action Completed (date)Action in Prgress (no date)Not Changed / Changed to what?B - KPS Tracking #LC#,, CAP#C - If closed, then KPS closeout informationD - Governed by KPS process document # (See Note LI*)E - Affected implementing documentF - Affected change documentG - Closed RgCm implemented in timely manner (Yes / No / NA)H - Open RgCm is adequately Maintained (Yes / No / NA)I - Changed RgCm is adequately managed (Yes / No / NA) 11c 6/2/08 08-0113 ML081550342 MD7300 Amend. No.
Action in Prgress (no date)
Not Changed / Changed to what?
B - KPS Tracking #
LC#,, CAP#
C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)
E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)
H - Open RgCm is adequately Maintained (Yes / No / NA)
I - Changed RgCm is adequately managed (Yes / No / NA) 11c 6/2/08 08-0113 ML081550342 MD7300 Amend. No.
200, 11/20/08, ML082971079
200, 11/20/08, ML082971079
: 3. DEK will not perform a heavy lift greater than 50  
: 3. DEK will not perform a heavy lift greater than 50 tons using the AB crane.
 
This commitment will be superseded when a seismic analysis, using NRC-approved methods, demonstrates acceptable results are achieved for the AB crane and establishes a new limit based on lifting heavy loads greater than 50 tons.
tons using the AB crane.  
complete 1/27/09, NC LC000141 LA000999 None to NRC; changed procedure GNP-08.12.02, "Control for use of cranes in protected area" LI*
 
Chnged procedure GNP-08.12.02 none Yes. GNP-08.12.02 change done 7/8/10 NA NA
This commitment will be  
 
superseded when a seismic  
 
analysis, using NRC-
 
approved methods, demonstrates acceptable  
 
results are achieved for the  
 
AB crane and establishes a  
 
new limit based on lifting  
 
heavy loads greater than 50  
 
tons.complete 1/27/09, NC LC000141 ,
LA000999 None to NRC; changed procedure  
 
GNP-08.12.02, "Control for  
 
use of cranes in  
 
protected  
 
area" LI*Chnged procedure  
 
GNP-08.12.02 none Yes. GNP-08.12.02 change done 7/8/10NANA Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit DataPage 111 - Audit Sample No.2 - DEK Submittal 3 - NRC TAC No.4 - NRC Issuance5 - Summary of CommitmentA - Action Completed (date)Action in Prgress (no date)Not Changed / Changed to what?B - KPS Tracking #LC#,, CAP#C - If closed, then KPS closeout informationD - Governed by KPS process document # (See Note LI*)E - Affected implementing documentF - Affected change documentG - Closed RgCm implemented in timely manner (Yes / No / NA)H - Open RgCm is adequately Maintained (Yes / No / NA)I - Changed RgCm is adequately managed (Yes / No / NA) 12 7/7/08 08-0211 ML081930317
 
is a resubmittal
 
of an amendment
 
request from
 
11/9/07. 
(i.e.,Audit
 
Sample #12 is


a pickup from  
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 11 1 - Audit Sample No.
 
2 - DEK Submittal 3 - NRC TAC No.
#9 with supplements  
4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)
 
Action in Prgress (no date)
dated 9/19/08  
Not Changed / Changed to what?
 
B - KPS Tracking #
and 3/17/09)
LC#,, CAP#
C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)
E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)
H - Open RgCm is adequately Maintained (Yes / No / NA)
I - Changed RgCm is adequately managed (Yes / No / NA) 12 7/7/08 08-0211 ML081930317 is a resubmittal of an amendment request from 11/9/07.
(i.e.,Audit Sample #12 is a pickup from  
#9 with supplements dated 9/19/08 and 3/17/09)
Note 12-2 MD9221 Amend. No, 205, 4/30/09, ML090570710
Note 12-2 MD9221 Amend. No, 205, 4/30/09, ML090570710
: 1. DEK will submit the results of the analyses  
: 1. DEK will submit the results of the analyses performed using the nonlinear seismic analysis methodology described in this LAR.
 
: 2. DEK will perform a "push" test to provide empirical data documenting the force required to induce crane trolley and bridge drive wheel rolling with the brakes applied. The results of the test will be provided to the NRC.
performed using the  
: 3. DEK will have an independent peer review performed of the nonlinear structural model and outputs of the nonlinear analysis to confirm the methodology is appropriate for the application and provide a summary of the review to the NRC.
 
[The three items are managed as one. The 4th (RgCm) Regulatory Requirement in the 9/19/09 supplement was not selected for the audit sample - kdf]
nonlinear seismic analysis  
complete 7/15/10; NC
 
[All 3 managed as one - kdf]
methodology described in  
LC000228 (No LAs are needed since the actions can be managed as a group within the LC number.)
 
SN 08-211 sent to NRC on 7/7/08 (DEK accomplishe d all RgCm in the sample.
this LAR.2. DEK will perform a "push" test to provide  
Submitted to the NRC within the 9/19/08 sample)
 
LI*
empirical data documenting  
Push Test details provided in 9/19/08 Supplement none Yes NA NA
 
the force required to induce  
 
crane trolley and bridge  
 
drive wheel rolling with the  
 
brakes applied. The results  
 
of the test will be provided  
 
to the NRC.
: 3. DEK will have an independent peer review  
 
performed of the nonlinear  
 
structural model and  
 
outputs of the nonlinear  


analysis to confirm the
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 12 1 - Audit Sample No.
 
2 - DEK Submittal 3 - NRC TAC No.
methodology is appropriate
4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)
 
Action in Prgress (no date)
for the application and
Not Changed / Changed to what?
 
B - KPS Tracking #
provide a summary of the
LC#,, CAP#
 
C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)
review to the NRC.
E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)
[The three items are managed as one. The 4th (RgCm) Regulatory
H - Open RgCm is adequately Maintained (Yes / No / NA)
 
I - Changed RgCm is adequately managed (Yes / No / NA) 13 1/27/09 09-061 ML090510149 ME0435 Letter approving notice of enforcement discretion, 1/29/09, ML090291061 DEK commits to administratively control the amount of fuel oil in each fuel oil storage tank such that a minimum usable amount of 32,858 gallons (including the day tanks) is available to supply each emergency diesel generator (EDG) (without reliance on a portable transfer pump),
Requirement in the 9/19/09
for the duration of the enforcement discretion.
 
supplement was not
 
selected for the audit
 
sample - kdf]
complete 7/15/10; NC
 
[All 3 managed as
 
one - kdf]
LC000228 (No LAs are needed since the
 
actions can be managed as a group
 
within the
 
LC number.)SN 08-211 sent to NRC
 
on 7/7/08 (DEK accomplishe
 
d all RgCm
 
in the sample.
Submitted to
 
the NRC within the
 
9/19/08 sample)LI*Push Test details provided in
 
9/19/08 SupplementnoneYesNANA Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit DataPage 121 - Audit Sample No.2 - DEK Submittal 3 - NRC TAC No.4 - NRC Issuance5 - Summary of CommitmentA - Action Completed (date)Action in Prgress (no date)Not Changed / Changed to what?B - KPS Tracking #LC#,, CAP#C - If closed, then KPS closeout informationD - Governed by KPS process document # (See Note LI*)E - Affected implementing documentF - Affected change documentG - Closed RgCm implemented in timely manner (Yes / No / NA)H - Open RgCm is adequately Maintained (Yes / No / NA)I - Changed RgCm is adequately managed (Yes / No / NA) 13 1/27/09 09-061 ML090510149 ME0435 Letter approving notice of  
 
enforcement  
 
discretion, 1/29/09, ML090291061 DEK commits to administratively control the  
 
amount of fuel oil in each  
 
fuel oil storage tank such  
 
that a minimum usable  
 
amount of 32,858 gallons (including the day tanks) is  
 
available to supply each  
 
emergency diesel generator (EDG) (without reliance on  
 
a portable transfer pump),
for the duration of the  
 
enforcement discretion.
complete 6/10/09; NC LC000315 (No LA number -
complete 6/10/09; NC LC000315 (No LA number -
one item only)None to NRC LI*USAR Rev 22 update  
one item only)
None to NRC LI*
USAR Rev 22 update 6/30/10 pg 8.2-18, Section 8.2.3.1 none Yes.
Control is USAR edit NA NA 14 6/1/09 09-291 ML091600037 MD9408 Review ongoing The installation of EDG exhaust duct insulation (SAMA 160) will be further evaluated as part of DEK's ongoing performance improvement programs.
In progress; NC LC000345 LA001560 None to NRC LI*
Note 14-E Not yet determined No Yes NA 15 Sample deleted MD9408 Sample deleted at request of Project Manager making the selection..
See Note 15-5 sample results not used.
sample results not used sample results not used LI*
sample results not used sample results not used sample results not used sample results not used sample results not used


6/30/10 pg 8.2-18, Section 8.2.3.1 none Yes. Control is 
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 13 1 - Audit Sample No.
2 - DEK Submittal 3 - NRC TAC No.
4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)
Action in Prgress (no date)
Not Changed / Changed to what?
B - KPS Tracking #
LC#,, CAP#
C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)
E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)
H - Open RgCm is adequately Maintained (Yes / No / NA)
I - Changed RgCm is adequately managed (Yes / No / NA) 16a 8/17/09 09-469 ML092320093 MD9408 License renewal review ongoing
: 1. Additional information will be included in the USAR Supplement (License Renewal Application, Appendix A), including license renewal commitments identified in Table A6.0-1, as applicable.
These USAR Supplement changes will be consistent with the responses to Requests for Additional Information (RAIs) B2.1.13-5, B2.1.14-3, B2.1.15-1, B2.1.18-1, B2.1.21-1, B.2.1.31-1, and B3.1-1, are proposed to support approval of the renewed operating license, and may change during the NRC review period.
In progress; NC LC000343 LA001541 Reportable through USAR change LI*
USAR (pages to be defined; expected to be complete 4/4/11) none NA Yes NA


USAR editNANA 14 6/1/09 09-291 ML091600037MD9408Review ongoing The installation of EDG exhaust duct insulation (SAMA 160) will be further
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 14 1 - Audit Sample No.
 
2 - DEK Submittal 3 - NRC TAC No.
evaluated as part of DEK's
4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)
 
Action in Prgress (no date)
ongoing performance
Not Changed / Changed to what?
 
B - KPS Tracking #
improvement programs.
LC#,, CAP#
In progress; NC LC000345 ,
C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)
LA001560 None to NRCLI*Note 14-E Not yet determinedNoYesNA15Sample deletedMD9408 Sample deleted at request of
E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)
 
H - Open RgCm is adequately Maintained (Yes / No / NA)
Project Manager
I - Changed RgCm is adequately managed (Yes / No / NA) 16b 8/17/09 09-469 ML092320093 MD9408 License renewal review ongoing
 
: 2. The response to RAI B3.2-2 will be provided following reevaluation of the environmental effects of fatigue for the NUREG/CR-6260-required evaluations that used stress-based fatigue monitoring.
making the
Complete and transferred for action by LA001848 LC000343 LA001542
 
[original tracking]
selection..
transferre d to LC000392 LA001848
See Note 15-5 sample results not
[Observati on 16b-B]
 
Transferred to LA001848 LI*
used.sample results not
Letter SN 10-033 dated dated 2/2/10 (responded to RAI B3.2-2)
 
used sample results not
 
used LI*sample results not
 
used sample results not
 
used sample results not
 
used sample results not used sample results not used Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit DataPage 131 - Audit Sample No.2 - DEK Submittal 3 - NRC TAC No.4 - NRC Issuance5 - Summary of CommitmentA - Action Completed (date)Action in Prgress (no date)Not Changed / Changed to what?B - KPS Tracking #LC#,, CAP#C - If closed, then KPS closeout informationD - Governed by KPS process document # (See Note LI*)E - Affected implementing documentF - Affected change documentG - Closed RgCm implemented in timely manner (Yes / No / NA)H - Open RgCm is adequately Maintained (Yes / No / NA)I - Changed RgCm is adequately managed (Yes / No / NA) 16a 8/17/09 09-469 ML092320093 MD9408 License renewal review ongoing
: 1. Additional information will be included in the USAR
 
Supplement (License
 
Renewal Application, Appendix A), including
 
license renewal
 
commitments identified in
 
Table A6.0-1, as applicable.
 
These USAR Supplement
 
changes will be consistent
 
with the responses to
 
Requests for Additional
 
Information (RAIs) B2.1.13-
 
5, B2.1.14-3, B2.1.15-1, B2.1.18-1, B2.1.21-1, B.2.1.31-1, and B3.1-1, are
 
proposed to support
 
approval of the renewed
 
operating license, and may
 
change during the NRC
 
review period.
In progress; NC LC000343 ,
LA001541 Reportable through USAR change LI*USAR (pages to be defined;
 
expected to
 
be complete
 
4/4/11)noneNAYesNA Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit DataPage 141 - Audit Sample No.2 - DEK Submittal 3 - NRC TAC No.4 - NRC Issuance5 - Summary of CommitmentA - Action Completed (date)Action in Prgress (no date)Not Changed / Changed to what?B - KPS Tracking #LC#,, CAP#C - If closed, then KPS closeout informationD - Governed by KPS process document # (See Note LI*)E - Affected implementing documentF - Affected change documentG - Closed RgCm implemented in timely manner (Yes / No / NA)H - Open RgCm is adequately Maintained (Yes / No / NA)I - Changed RgCm is adequately managed (Yes / No / NA) 16b 8/17/09 09-469 ML092320093 MD9408 License renewal review ongoing
: 2. The response to RAI B3.2-2 will be provided  
 
following reevaluation of the  
 
environmental effects of  
 
fatigue for the NUREG/CR-
 
6260-required evaluations  
 
that used stress-based  
 
fatigue monitoring.
Complete and transferred  
 
for action by  
 
LA001848 LC000343 ,
LA001542  
[original  
 
tracking]  
 
transferre
 
d to LC000392
,
LA001848  
[Observati
 
on 16b-B]Transferred to LA001848 LI*Letter SN 10-033 dated  
 
dated 2/2/10 (responded to  
 
RAI B3.2-2)
No change to RgCm.
No change to RgCm.
Change was  
Change was to tTrack to record transfer from LA001542 to LA001848 Yes NA Yes.
RgCm itself not changed (transfer was successfu l) 17a 9/24/09 09-491 ML092440398 ME2139 Conversion to Improved TS review ongoing (The following commitments are selected from ) [Three of nine commitments were selected for audit - kdf]
: 2. DEK will establish the Technical Specification Bases for Limiting Condition for Operation (LCO) 3.0.8, as adopted, with the applicable license amendment.
In progress; NC LC000407 LA001897 None to NRC LI*
Tech Spec Bases LCO 3.0.8 none NA Yes NA


to tTrack to  
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 15 1 - Audit Sample No.
2 - DEK Submittal 3 - NRC TAC No.
4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)
Action in Prgress (no date)
Not Changed / Changed to what?
B - KPS Tracking #
LC#,, CAP#
C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)
E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)
H - Open RgCm is adequately Maintained (Yes / No / NA)
I - Changed RgCm is adequately managed (Yes / No / NA) 17b 9/24/09 09-491 ML092440398 ME2139 Conversion to Improved TS review ongoing
: 7. DEK will have written procedures available describing compensatory measures to be taken in the event of an intentional or unintentional entry into LCO 3.7.12, Auxiliary Building Special Ventilation (ASV) System, Condition B, Two ASV trains inoperable due to inoperable ASV boundary.
Complete 12/6/10; NC LC000407 LA001902 Procedure LI*
Procedure OP-KW-AOP-GEN-005 "Unplanned Barrier Control none Yes NA NA 17c 9/24/09 09-491 ML092440398 ME2139 Conversion to Improved TS review ongoing
: 8. DEK will add procedural direction to perform an extent of condition evaluation and perform additional testing for plausible common failure modes associated with the reactor protection system and the engineered safety features actuation system instrument analog channels.
Withdrew 12/6/10; NC LC000407
, LA1903 Withdrew via 8/18/2010 Supple LI*
Letter SN10-457 to NRC withdrew commitment (Letter is 8/18/10 supplement on TAC ME2139) none Withdrew NA NA


record transfer from  
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 16 1 - Audit Sample No.
2 - DEK Submittal 3 - NRC TAC No.
4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)
Action in Prgress (no date)
Not Changed / Changed to what?
B - KPS Tracking #
LC#,, CAP#
C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)
E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)
H - Open RgCm is adequately Maintained (Yes / No / NA)
I - Changed RgCm is adequately managed (Yes / No / NA) 18 9/25/09 09-597 ML092710045 MD9408 License renewal review ongoing The revised Work Control Process program will be developed and implemented prior to the period of extended operation.
In progress; NC LC000394 LA001858 Not closed LI*
Revised work control program document (TBD) none NA Yes NA 19a 10/15/09 09-645 ML092890560 MD7838 Letter of 4/1/10, ML100880212 The completion dates for the following two commitments have been revised from October 1, 2009, to October 15, 2009.
[This RgCm was managed as two separate items - kdf]
: 1. DEK will revise current fill and vent procedures to provide a means and acceptance criteria to ensure that piping is sufficiently full after system fill and vent. This may include confirmation by ultrasonic testing or other appropriate means.
Complete (This RgCm was changed from 10/1/09 to 10/15/09)
LC000239 LA001178 Leter SN 09-645 dated 9/15/09 to NRC LI*
Note 19-E Change to date only (10/1/09 to 10/15/09)
Yes NA Yes


LA001542 to  
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 17 1 - Audit Sample No.
2 - DEK Submittal 3 - NRC TAC No.
4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)
Action in Prgress (no date)
Not Changed / Changed to what?
B - KPS Tracking #
LC#,, CAP#
C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)
E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)
H - Open RgCm is adequately Maintained (Yes / No / NA)
I - Changed RgCm is adequately managed (Yes / No / NA) 19b 10/15/09 09-645 ML092890560 MD7838 Letter of 4/1/10, ML100880212
: 2. DEK will revise current inservice test procedures to provide dynamic sweeping as part of the filling of the systems where needed to ensure systems are sufficiently full.
Complete (This RgCm was changed from 10/1/09 to 10/15/09)
LC000239 LA001179 LI*
Note 19-E Uses LI* -
commitment change evaluation Change to date only (10/1/09 to 10/15/09)
Yes NA Yes


LA001848YesNA Yes. RgCm itself not
Table 3 - Kewaunee Power Station RgCm Data Table - Notes and Legend Page 18 Topic or Word / Symbol Note, legend or discussion ADAMS Agencywide Document Access and Management System Amd or Amend.
 
amendment Audit observation (general)
changed (transfer
The Preventive Maintenance Program would be improved if the Comment field on the PM (preventive maintenance) Data Sheet informed the user that the sheet had a RgCm associated with it.
 
was successfu l)17a 9/24/09 09-491 ML092440398 ME2139 Conversion to Improved TS
 
review ongoing (The following commitments are selected from
) [Three of
 
nine commitments were
 
selected for audit - kdf]
: 2. DEK will establish the Technical Specification
 
Bases for Limiting Condition
 
for Operation (LCO) 3.0.8, as adopted, with the
 
applicable license
 
amendment.
In progress; NC LC000407 ,
LA001897 None to NRC LI*Tech Spec Bases LCO
 
3.0.8noneNAYesNA Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit DataPage 151 - Audit Sample No.2 - DEK Submittal 3 - NRC TAC No.4 - NRC Issuance5 - Summary of CommitmentA - Action Completed (date)Action in Prgress (no date)Not Changed / Changed to what?B - KPS Tracking #LC#,, CAP#C - If closed, then KPS closeout informationD - Governed by KPS process document # (See Note LI*)E - Affected implementing documentF - Affected change documentG - Closed RgCm implemented in timely manner (Yes / No / NA)H - Open RgCm is adequately Maintained (Yes / No / NA)I - Changed RgCm is adequately managed (Yes / No / NA) 17b 9/24/09 09-491 ML092440398 ME2139 Conversion to Improved TS
 
review ongoing
: 7. DEK will have written procedures available
 
describing compensatory
 
measures to be taken in the
 
event of an intentional or
 
unintentional entry
 
into LCO 3.7.12, Auxiliary
 
Building Special Ventilation (ASV) System, Condition B, "Two ASV trains inoperable
 
due to inoperable ASV
 
boundary."
Complete 12/6/10; NC LC000407 ,
LA001902ProcedureLI*
Procedure OP-KW-AOP-
 
GEN-005 "Unplanned
 
Barrier ControlnoneYesNANA 17c 9/24/09 09-491 ML092440398 ME2139 Conversion to Improved TS
 
review ongoing
: 8. DEK will add procedural direction to perform an
 
extent of condition
 
evaluation and perform
 
additional testing for
 
plausible common failure
 
modes associated with the
 
reactor protection system
 
and the engineered safety
 
features actuation system
 
instrument analog channels.
 
.Withdrew 12/6/10; NC LC000407 , LA1903 Withdrew via 8/18/2010
 
Supple LI*Letter SN10-457 to NRC
 
withdrew commitment (Letter is
 
8/18/10 supplement
 
on TAC ME2139)noneWithdrewNANA Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit DataPage 161 - Audit Sample No.2 - DEK Submittal 3 - NRC TAC No.4 - NRC Issuance5 - Summary of CommitmentA - Action Completed (date)Action in Prgress (no date)Not Changed / Changed to what?B - KPS Tracking #LC#,, CAP#C - If closed, then KPS closeout informationD - Governed by KPS process document # (See Note LI*)E - Affected implementing documentF - Affected change documentG - Closed RgCm implemented in timely manner (Yes / No / NA)H - Open RgCm is adequately Maintained (Yes / No / NA)I - Changed RgCm is adequately managed (Yes / No / NA) 18 9/25/09 09-597 ML092710045 MD9408 License renewal review ongoing The revised Work Control Process program will be
 
developed and implemented
 
prior to the period of
 
extended operation.
In progress; NC LC000394 ,
LA001858Not closedLI*
Revised work control program document (TBD)noneNAYesNA 19a 10/15/09 09-645 ML092890560 MD7838 Letter of 4/1/10, ML100880212 The completion dates for the following two
 
commitments have been
 
revised from October 1, 2009, to October 15, 2009.
 
[This RgCm was managed
 
as two separate items - kdf]
: 1. DEK will revise current fill and vent procedures to
 
provide a means and
 
acceptance criteria to
 
ensure that piping is
 
sufficiently full after system
 
fill and vent. This may
 
include confirmation by
 
ultrasonic testing or other
 
appropriate means.
Complete (This RgCm
 
was changed
 
from 10/1/09
 
to 10/15/09)
LC000239 ,
LA001178 Leter SN 09-645 dated
 
9/15/09 to
 
NRCLI*Note 19-E Change to date only
 
(10/1/09 to
 
10/15/09)YesNAYes Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit DataPage 171 - Audit Sample No.2 - DEK Submittal 3 - NRC TAC No.4 - NRC Issuance5 - Summary of CommitmentA - Action Completed (date)Action in Prgress (no date)Not Changed / Changed to what?B - KPS Tracking #LC#,, CAP#C - If closed, then KPS closeout informationD - Governed by KPS process document # (See Note LI*)E - Affected implementing documentF - Affected change documentG - Closed RgCm implemented in timely manner (Yes / No / NA)H - Open RgCm is adequately Maintained (Yes / No / NA)I - Changed RgCm is adequately managed (Yes / No / NA) 19b 10/15/09 09-645 ML092890560 MD7838 Letter of 4/1/10, ML100880212
: 2. DEK will revise current inservice test procedures to
 
provide dynamic sweeping
 
as part of the filling of the
 
systems where needed to
 
ensure systems are
 
sufficiently full.
Complete (This RgCm
 
was changed
 
from 10/1/09
 
to 10/15/09)
LC000239 ,
LA001179LI*Note 19-E Uses LI* -
commitment
 
change evaluation
 
Change to
 
date only
 
(10/1/09 to
 
10/15/09)YesNAYes Table 3 - Kewaunee Power Station RgCm Data Table - Notes and LegendPage 18 To p ic or Word / S ymbolNote, le g end or discussionADAMSAgencywide Document Access and Management SystemAmd or Amend.amendment Audit observation (general)
The Preventive Maintenance Program would be improved if the Comment field on the PM (preventive maintenance) Data Sheet informed the user that the sheet had a RgCm associated with it.
Audit observation (training)
Audit observation (training)
Commitment management staff should consider preparing a Guideline to ensure consistent input to tTrack by stakeholders making infrequent use of tTrack.
Commitment management staff should consider preparing a Guideline to ensure consistent input to tTrack by stakeholders making infrequent use of tTrack.
Audit observation 16b-B The ability to transfer tracking from one LC/LA set to another is demonstrated in Sample 16b. The rationale for the transfer is explained in LA001848: The NRC wanted more items for another purpose. KPS consolidated  
Audit observation 16b-B The ability to transfer tracking from one LC/LA set to another is demonstrated in Sample 16b. The rationale for the transfer is explained in LA001848: The NRC wanted more items for another purpose. KPS consolidated LA001542 with LA001848.
 
CFR Code of Federal Regulations Column headings and cell designations Columns are labeled numbers 1 through 5 and letters A through I. Sample numbers are listed in column 1.
LA001542 with LA001848.CFRCode of Federal Regulations  
Notes are designated as "Note (row) - (column)"
 
Commitment management staff Persons identified as making routine, standardized data entry into tTrack, identified as Noreen Wenborne, MaryJo Haese, and Thomas Breene during the course of RgCm data collection.
Column headings and cell  
ECN Engineering Change Notice Generic Letter 2004-02 "Potential Impact of Debris Blockage on Emergency Recirculation during Design Bais Accidents at Pressurized-Water Reactors," September 13, 2004 GSI-191 "Experimental Studies of Loss-of-Coolant Accident-Generated Debris Accumulation and Head Loss with Emphasis on the Effects of Calcium Silicate Insulation," May 2005 kdf Karl D. Feintuch (Mainly used in combination with brackets to indicate an auditor comment.)
 
KPS Kewaunee Power Station LA Licensing Action;one or more LA can be associated with one LC LC Licensing Commitment LI*
designations Columns are labeled numbers 1 through 5 and letters A through I. Sample numbers are listed in column 1.
In this report LI* represents LI-AA-110, Rev. 0, "Commitment Management," which governs the management of RgCm. In addition, GNP-03.01.01, Rev. 41 during RgCm Audit and Rev 42 when the Report was issued, "Directive, Implementing Document, and Procedure Administrative Controls" (commonly referred to at KPS as the "Procedure on procedures") governs tracing the effect of RgCm on procedures. Therefore, the management of RgCm, when it affects procedures is controlled by a combination of these 2 procedures.
Notes are designated as "Note (row) - (column)" Commitment management staff Persons identified as making routine, standardized data entry into tTrack, identified as Noreen Wenborne, MaryJo Haese, and Thomas Breene during the course of RgCm data collection.ECNEngineering Change Notice Generic Letter 2004-02"Potential Impact of Debris Blockage on Emergency Recirculation during Design Bais Accidents at Pressurized-Water Reactors," September 13, 2004 GSI-191"Experimental Studies of Loss-of-Coolant Accident-Generated Debris Accumulation and Head Loss with Emphasis on the Effects of Calcium Silicate Insulation," May 2005kdfKarl D. Feintuch (Mainly used in combination with brackets to indicate an auditor comment.)
ML#
KPSKewaunee Power Station LALicensing Action;one or more LA can be associated with one LC LCLicensing Commitment LI*In this report LI* represents LI-AA-110, Rev. 0, "Commitment Management," which governs the management of RgCm. In addition, GNP-03.01.01, Rev. 41 during RgCm Audit and Rev 42 when the Report was issued, "Directive, Implementing Document, and Procedure Administrative Controls" (commonly referred to at KPS as  
"MLnnnnnnnnn" (i.e. ML followed by 9 digits) is the identifier used by the NRC to access documents and records within its Agencywide Document Access and Management System (ADAMS) document control system.
 
NC Not Changed (as used in column A)
the "Procedure on procedures") governs tracing the effect of RgCm on procedures. Therefore, the  
 
management of RgCm, when it affects procedures is controlled by a combination of these 2 procedures.
ML#"MLnnnnnnnnn" (i.e. ML followed by 9 digits) is the identifier used by the NRC to access documents and records within its Agencywide Document Access and Management System (ADAMS) document control system.NCNot Changed (as used in column A)
Table 3 - Kewaunee Power Station RgCm Data Table - Notes and LegendPage 19 To p ic or Word / S ymbolNote, le g end or discussion Note 01-G, -H, -I (i.e., headings in column G, H and I)
A "Yes" in Column G, H, or I indicates that the RgCm was successfully managed according to the description in the heading. 
 
NA applies if the particilar column does not apply. As examples, for a closed RgCm, "open" is NA; for
 
unchanged RgCm, "changed" does not apply.
 
Thus "No" would only appear in Columns G, H or I if the RgCm was not adequately managed.Note 03-CNRC notified via suubmitted document SN 08-0113 dated 6/2/08, ML081550342 Note 04-C The Technical Requirements Manual (TRM) is a licensee controlled document for managing requirements that the NRC has approved to be transferred from control by the Technical Specifications.(TS)
Note 12-2, Audit Observation and Audit Finding Observation:  Regarding the July 7, 2008 application, the licensing group should define a closeout event at which to terminate its ownership of a RgCm intended for its doownstream stakeholders (i.e., Design, Operations, Training, as examples)
A udit Finding:  DEK lacks a documented instruction in LI-AA-110, "Commitment Management," that the instructs the commitment management staff to review all incoming / outgoing correspondence for impact on existing
 
RgCm. Heretofore, commitment management staff has been performing this action without a documented
 
instruction, within LI-AA-110, to do so.
Note 14-E[Suggestion pertaining to on-going RgCm:  Stakeholders should report completion plans to Licensing staff for tTrack entry and for future reference.- kdf]
Note 15-5 The sample contained proprietary information, an attribute not needed to assemble a valid audit sample. The audit results for the sample were consistent with results from other samples, and its removal did not change the
 
findings of the audit. Further, the sample population grew from the original 19 selections to a net population of
 
24 (1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11a, 11b, 11c, 12, 13, 14, 15 omitted, 16a, 16b, 17a, 17b, 17c, 18, 19a, 19b) to


track the management of separate RgCm parts.
Table 3 - Kewaunee Power Station RgCm Data Table - Notes and Legend Page 19 Topic or Word / Symbol Note, legend or discussion Note 01-G, -H, -I (i.e., headings in column G, H and I)
A "Yes" in Column G, H, or I indicates that the RgCm was successfully managed according to the description in the heading.
NA applies if the particilar column does not apply. As examples, for a closed RgCm, "open" is NA; for unchanged RgCm, "changed" does not apply.
Thus "No" would only appear in Columns G, H or I if the RgCm was not adequately managed.
Note 03-C NRC notified via suubmitted document SN 08-0113 dated 6/2/08, ML081550342 Note 04-C The Technical Requirements Manual (TRM) is a licensee controlled document for managing requirements that the NRC has approved to be transferred from control by the Technical Specifications.(TS)
Note 12-2, Audit Observation and Audit Finding Observation: Regarding the July 7, 2008 application, the licensing group should define a closeout event at which to terminate its ownership of a RgCm intended for its doownstream stakeholders (i.e., Design, Operations, Training, as examples)
Audit Finding: DEK lacks a documented instruction in LI-AA-110, "Commitment Management," that the instructs the commitment management staff to review all incoming / outgoing correspondence for impact on existing RgCm. Heretofore, commitment management staff has been performing this action without a documented instruction, within LI-AA-110, to do so.
Note 14-E
[Suggestion pertaining to on-going RgCm: Stakeholders should report completion plans to Licensing staff for tTrack entry and for future reference.- kdf]
Note 15-5 The sample contained proprietary information, an attribute not needed to assemble a valid audit sample. The audit results for the sample were consistent with results from other samples, and its removal did not change the findings of the audit. Further, the sample population grew from the original 19 selections to a net population of 24 (1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11a, 11b, 11c, 12, 13, 14, 15 omitted, 16a, 16b, 17a, 17b, 17c, 18, 19a, 19b) to track the management of separate RgCm parts.
Note 19-E Affected procedures (21 documents, as indicated by separate serial numbers):
Note 19-E Affected procedures (21 documents, as indicated by separate serial numbers):
OP-KW-NOP-RHR-001, -003
OP-KW-NOP-RHR-001, -003 SP-34-099A, -099B OP-KW-NOP-SI-002 OP-KW-MOP-RHR-001A, -001B, -002A, -002B, -003A, -005A, -005B, -006, -006A, -006B OP-KW-NOP-SI-001 [possible typo in KPS text: NOP should possibly be MOP - kdf], -002, -004 OP-KW-MOP-ICS-001, -002, -003 Note on references to TS In this audit TS references are to the Custom Technical Specifications (CTS), which preceded the conversion to Improved Technical Specifications (ITS) on February 2, 2011.
 
Note on sample characteristics for the sample size of 24, categorized from audit results RgCm items closed and remaining the same = 1, 2, 3, 4, 5, 6, 7, 8, 9, 11a, 11b, 11c, 12, 13, 17b, 17c (16 items)
SP-34-099A, -099B
 
OP-KW-NOP-SI-002
 
OP-KW-MOP-RHR-001A, -001B, -002A, -002B, -003A, -005A, -005B, -006, -006A, -006B
 
OP-KW-NOP-SI-001 [possible typo in KPS text: NOP should possibly be MOP - kdf], -002, -004
 
OP-KW-MOP-ICS-001, -002, -003 Note on references to TS In this audit TS references are to the Custom Technical Specifications (CTS), which preceded the conversion to Improved Technical Specifications (ITS) on February 2, 2011.
Note on sample characteristics for the sample size of 24, categorized  
 
from audit results RgCm items closed and remaining the same = 1, 2, 3, 4, 5, 6, 7, 8, 9, 11a, 11b, 11c, 12, 13, 17b, 17c (16 items)
RgCm items changed and closed = 16b, 19a, 19b (3 items)
RgCm items changed and closed = 16b, 19a, 19b (3 items)
RgCm items open and remaining the same = 10, 14, 16a, 17a, 18 (5 items)
RgCm items open and remaining the same = 10, 14, 16a, 17a, 18 (5 items)
RgCm items open and changed = none


RgCm items open and changed = none Table 3 - Kewaunee Power Station RgCm Data Table - Notes and LegendPage 20 To p ic or Word / S ymbolNote, le g end or discussion Note row-column A discussion pertaining to Table 2, row number and column number, which is inserted in Table 3 due to space limitation. (Example: Note 01-G, pertains to row 01, column G on Table 2.NRC Information Notice 84-55"Seal Table Leaks at PWRs," July 6, 1984
Table 3 - Kewaunee Power Station RgCm Data Table - Notes and Legend Page 20 Topic or Word / Symbol Note, legend or discussion Note row-column A discussion pertaining to Table 2, row number and column number, which is inserted in Table 3 due to space limitation. (Example: Note 01-G, pertains to row 01, column G on Table 2.
 
NRC Information Notice 84-55 "Seal Table Leaks at PWRs," July 6, 1984 NRC Information Notice 84-55, Supplement 1 "Seal Table Leaks at PWRs," May 14, 1985 NRC Information Notice 92-15 "Failure of Primary System Compression Fitting," February 24, 1992 NUREG/CR-6260 "Application of NUREG/CR-59999 Interim Fatigue Curves to Selected Nuclear Power Plant Components," 1995 NUREG-0554 "Single-Failure-Proof Cranes for Nuclear Power Plants," May 1979 NUREG-0612 "Control of Heavy Loads at Nuclear Power Plants: Resolution of Generic Technical Activity A-36," July 1980 RgCm Regulatory Commitment, as interpreted by NEI 99-04 (the industry document governing RgCm management) and LIC-105 (the NRC document governing RgCm audits)
NRC Information Notice 84-55, Supplement 1"Seal Table Leaks at PWRs," May 14, 1985NRC Information Notice 92-15"Failure of Primary System Compression Fitting," February 24, 1992NUREG/CR-6260"Application of NUREG/CR-59999 Interim Fatigue Curves to Selected Nuclear Power Plant Components," 1995 NUREG-0554"Single-Failure-Proof Cranes for Nuclear Power Plants," May 1979NUREG-0612"Control of Heavy Loads at Nuclear Power Plants: Resolution of Generic Technical Activity A-36," July 1980 RgCm Regulatory Commitment, as interpreted by NEI 99-04 (the industry document governing RgCm management) and LIC-105 (the NRC document governing RgCm audits)
SAMA 160 SAMA 160 is described in the license renewal submittal as "Insulate EDG Exhaust Ducts." The context is that insulating the EDG exhaust ducts would reduce the heat load in thhe room and provide additional time to align alternate room cooling in the event that room cooling has failed.
SAMA 160 SAMA 160 is described in the license renewal submittal as "Insulate EDG Exhaust Ducts." The context is that insulating the EDG exhaust ducts would reduce the heat load in thhe room and provide additional time to align  
Suggestion A comment by auditor kdf, not specific to a RgCm, but offered as a suggestion. No action or response is expected.
 
Suggestion (based on Audit Items 11a, b, c)
alternate room cooling in the event that room cooling has failed.
[Commitment management staff should monitor processes that cause users to contact them for RgCm information and arrange to add RgCm information to relevant databases. - kdf]
Suggestion A comment by auditor kdf, not specific to a RgCm, but offered as a suggestion. No action or response is expected.Suggestion (based on Audit Items  
Supple Supplement Title 10 The section of the Code of Federal Regulations pertaining to "Energy" TRM Technical Requirements Manual - a licensee controlled document for managing plant specific technical requirements. The TRM is incorporated by reference into the Updated Safety Analysis Report (USAR)
 
TS Technical Specifications, as described in 10 CFR 50.36 tTrack Name of database used to track RgCm.
11a, b, c)
UCR USAR Change Request USAR Updated Safety Analysis Report}}
[Commitment management staff should monitor processes that cause users to contact them for RgCm information and arrange to add RgCm information to relevant databases. - kdf]SuppleSupplement Title 10The section of the Code of Federal Regulations pertaining to "Energy" TRM Technical Requirements Manual - a licensee controlled document for managing plant specific technical requirements. The TRM is incorporated by reference into the Updated Safety Analysis Report (USAR)TSTechnical Specifications, as described in 10 CFR 50.36 tTrackName of database used to track RgCm.
UCRUSAR Change Request USARUpdated Safety Analysis Report}}

Latest revision as of 07:25, 13 January 2025

Audit Report Tables 2 and 3
ML110900537
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 04/11/2011
From: Feintuch K
Plant Licensing Branch III
To: Heacock D
Dominion Energy Kewaunee
Feintuch K, NRR/DORL/LPL3-1, 415-3079
Shared Package
ML110900569 List:
References
TAC ME3804
Download: ML110900537 (10)


Text

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 1 1 - Audit Sample No.

2 - DEK Submittal 3 - NRC TAC No.

4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)

E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)

H - Open RgCm is adequately Maintained (Yes / No / NA)

I - Changed RgCm is adequately managed (Yes / No / NA) 1 10/29/2007 07-0436B ML073100354 None None An updated description of the station blackout alternate alternating current source, including the quality assurance program requirements for the TSC DG as defined in the Dominion Nuclear Facility Quality Assurance Program Description, will be incorporated into the KPS Updated Safety Analysis Report (USAR) and provided to the Nuclear Regulatory Commission (NRC) in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 50.71 (e).

complete 4/18/2008; NC LC000111 LA000697 No ML#,

since no separate response to the NRC LI*

USAR 8.2.4.3, 8.2.4.12, 8.2 Reference none Yes NA NA

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 2 1 - Audit Sample No.

2 - DEK Submittal 3 - NRC TAC No.

4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)

E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)

H - Open RgCm is adequately Maintained (Yes / No / NA)

I - Changed RgCm is adequately managed (Yes / No / NA) 2 11/9/07 07-0416A ML073106750 MD6144 Letter of 2/25/08 granting relief, ML080240029 Prior to use of nonwelded valves with end connections other than flanges at KPS, procedures will be developed for installation of nonwelded valves with end connections other than flanges that address operating experience of NRC Information Notices 92-15, 84-55 and 84-55, Supplement 1. The specific provisions include: a) not mixing the parts from one manufacturer to another, b) following manufacturer's recommended instructions for installing compression fittings, and c) the training or familiarity with the procedure(s) for personnel doing this work.

complete 1/2/2008; NC LC000142 LA000741

("LA type"soluti on was incorrect.

Data entry was performed by inexperien ced person -

self corrected) no response to the NRC required LI*

Maintenance Procedure MA-KW-GMP-103 None Yes NA NA

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 3 1 - Audit Sample No.

2 - DEK Submittal 3 - NRC TAC No.

4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)

E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)

H - Open RgCm is adequately Maintained (Yes / No / NA)

I - Changed RgCm is adequately managed (Yes / No / NA) 3 11/9/07 07-0352 ML073170705 MD7300 Amend. No.

200, 11/20/08, ML082971079 Notify the NRC when the modifications to the Auxiliary Building (AB) crane to make it single-failure proof are complete complete 6/12/08; NC LC000141 LA000133 Note 03-C LI*

CA069210 says to update procedure GNP-08.12.02 plus tags.

None Yes-it was timely since it accomplis hed a design change.

NA NA

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 4 1 - Audit Sample No.

2 - DEK Submittal 3 - NRC TAC No.

4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)

E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)

H - Open RgCm is adequately Maintained (Yes / No / NA)

I - Changed RgCm is adequately managed (Yes / No / NA) 4 11/9/07 07-0352 ML073170705 MD7300 Amend. No.

200, 11/20/08, ML082971079 All heavy load lifts in or around the spent fuel pool made using the upgraded AB crane lifting system will meet the guidance in NUREG-0612, Section 5.1.6, as follows:

  • Special lifting devices, as defined in American National Standards Institutes (ANSI) N14.6 will meet the guidance in NUREG-0612, Section 5.1.6(1 )(a) and ANSI N14.6-1993, as clarified in to this license amendment request (LAR).
  • Lifting devices not specially designed will meet the guidance in NUREG-0612, Section 5.1.6(1)(b) and American Society of Mechanical Engineers (ASME) B30.9-2003, as clarified in Attachment 5 to this LAR.
  • The AB crane will meet the guidance in NUREG-0612, Section 5.1.6(2) and NUREG-0554 as clarified in Attachments 5 and 6 to this LAR
  • Interfacing lift points will meet the guidance in NUREG-0612, Section Complete 1/16/09; NC LC000141 LA000135 Addressed in TRM [a licensee controlled document kdf] See Note 04-C LI*

TRM 3.8.1, Rev 0, 1/15/09.

none Yes.

Completio n took place within 60 days, as planned.

NA NA

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 5 1 - Audit Sample No.

2 - DEK Submittal 3 - NRC TAC No.

4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)

E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)

H - Open RgCm is adequately Maintained (Yes / No / NA)

I - Changed RgCm is adequately managed (Yes / No / NA) 5 11/9/07 07-0352 ML073170705 MD7300 Amend. No.

200, 11/20/08, ML082971079 Crane operator training will meet the guidance in ASME B30.2-2005.

complete 12/15/08 LC000141 LA000736 None to NRC LI*

Lesson Plan M-MD-LP 2.2.1 "Cranes"; M-PM2-LP 1.9.1 "Crane Maintenance

/ Inspection" None Yes.

Lesson Plans had guidance incorporat ed in reference to this Amd's approval.

NA NA

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 6 1 - Audit Sample No.

2 - DEK Submittal 3 - NRC TAC No.

4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)

E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)

H - Open RgCm is adequately Maintained (Yes / No / NA)

I - Changed RgCm is adequately managed (Yes / No / NA) 6 11/9/07 07-0352 ML073170705 MD7300 Amend. No.

200, 11/20/08, ML082971079 Crane maintenance and inspections will meet the guidance in ASME B30.2-1976.

complete 1/16/09, NC LC000141 LA000740 TRM Bases, USAR LI*

TRM Bases (TRM 3.8.1 pg 381-2)

USAR Rev22 Sec. 9, pp 9.5-9, -10 (6/30 None Yes.

During NRC ISFSI Inspection (6/09) issues were identified with crane inspection procedure s

concernin g B30.2 guidance.

REF CR 337889.

Revised MA-KW-MPM-CRN-007 Rev.

2 and TEC-MA-KW-MPM-CRN-002 Rev

3. ASME B30.2 is referenced in procedure s.

NA NA

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 7 1 - Audit Sample No.

2 - DEK Submittal 3 - NRC TAC No.

4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)

E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)

H - Open RgCm is adequately Maintained (Yes / No / NA)

I - Changed RgCm is adequately managed (Yes / No / NA) 7 11/9/07 07-0352 ML073170705 MD7300 Amend. No.

200, 11/20/08, ML082971079 Revise USAR Section 9.5.2 to remove the dropped cask analysis from the USAR.

complete 1/15/09: NC LC000141 LA000737 USAR LI*

USAR 14.2.1, 9.5 none

Yes, implement ed in a timely manner.

Amd was issued 11/08 and implement ed 1/09.

Much work took place

- USAR revision submitted 9/09 with the next scheduled update of USAR being 3/31/10.

NA NA

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 8 1 - Audit Sample No.

2 - DEK Submittal 3 - NRC TAC No.

4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)

E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)

H - Open RgCm is adequately Maintained (Yes / No / NA)

I - Changed RgCm is adequately managed (Yes / No / NA) 8 11/9/07 07-0352 ML073170705 MD7300 Amend. No.

200, 11/20/08, ML082971079 After LAR approval and relocation of TS 3.8.a.7 to the technical requirements manual (TRM) is authorized, add to the TRM required actions to take if the AB crane lifting system is found not to meet the TRM requirements during a heavy load lift.

complete 1/16/09; NC LC000141 LA000735 TRM LI*

TRM, licensee controlled none Yes NA NA 9

11/9/07 07-0465 ML073180499 MD7301 Letter of 5/9/08 (ML081150741),

notice of withdrawal of application for amendment DEK will complete required modifications to the AB crane bridge girder to end-tie connections and confirm bolting material as described in Section 4.2.2.9 of this LAR.

NC, design change recorded as completed on 5/5/08 according to tTrack LAR ML073180499 withdrawn by letter dated 4/11/08 LC000141 LA000732 None to NRC; Design change DCR3629 was completed on 4/22/09; ready to install 9/10/07, which is RgCm closure.

LI*

DCR3629 is the implementing document none Yes.

Bolting material is confirmed, per ECN3629-06.

NA NA 10 2/8/2008 08-0017 ML080650314 MC4691 Review is ongoing The KPS USAR will be modified upon final resolution of GSI-191 and response to Generic Letter 2004-02.

In progress; NC LC000181 LA000907 None to NRC LI*

USAR 6.2.9.3 are planned to be changed.

USAR Change Request (UCR) R21-108 dated 9/19/08.

NA Yes -

tTrack shows completi on date changed to 6/1/11.

NA

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 9 1 - Audit Sample No.

2 - DEK Submittal 3 - NRC TAC No.

4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)

E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)

H - Open RgCm is adequately Maintained (Yes / No / NA)

I - Changed RgCm is adequately managed (Yes / No / NA) 11a 6/2/08 08-0113 ML081550342 MD7300 Amend. No.

200, 11/20/08, ML082971079

1. DEK will place a restriction in the Kewaunee procedure governing the use of the AB crane prohibiting the use of synthetic slings for heavy load lifts with the AB crane when this crane is in the "Cask Handling" or "Override" modes of operation.

complete 1/16/09, NC LC000141 LA000997 None to NRC LI*

Changed procedure GNP-08.12.02 none Yes.

Verified Step 4.15 of GNP-08.12.02 Rev 26, 7/18/2010 NA NA 11b 6/2/08 08-0113 ML081550342 MD7300 Amend. No.

200, 11/20/08, ML082971079

2. For the AB crane bridge welds whose failure could result in a drop of the critical load, DEK will perform nondestructive examinations at least once every four years following completion of initial cold proof load testing of the AB crane.

complete 1/16/09, NC LC000141 LA000998 None to NRC; entered Preventive Maintenance

Program, RE89105 LI*

Preventive Maintenance (PM) Task -

PM 53065.

Examinations IAW AWS-01.1-1994.

PM Card has TS Amend.

Referenced.

none Yes.

Preventive Maintenan ce Program

RE89105, which notes it is a RgCm.

NA NA

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 10 1 - Audit Sample No.

2 - DEK Submittal 3 - NRC TAC No.

4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)

E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)

H - Open RgCm is adequately Maintained (Yes / No / NA)

I - Changed RgCm is adequately managed (Yes / No / NA) 11c 6/2/08 08-0113 ML081550342 MD7300 Amend. No.

200, 11/20/08, ML082971079

3. DEK will not perform a heavy lift greater than 50 tons using the AB crane.

This commitment will be superseded when a seismic analysis, using NRC-approved methods, demonstrates acceptable results are achieved for the AB crane and establishes a new limit based on lifting heavy loads greater than 50 tons.

complete 1/27/09, NC LC000141 LA000999 None to NRC; changed procedure GNP-08.12.02, "Control for use of cranes in protected area" LI*

Chnged procedure GNP-08.12.02 none Yes. GNP-08.12.02 change done 7/8/10 NA NA

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 11 1 - Audit Sample No.

2 - DEK Submittal 3 - NRC TAC No.

4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)

E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)

H - Open RgCm is adequately Maintained (Yes / No / NA)

I - Changed RgCm is adequately managed (Yes / No / NA) 12 7/7/08 08-0211 ML081930317 is a resubmittal of an amendment request from 11/9/07.

(i.e.,Audit Sample #12 is a pickup from

  1. 9 with supplements dated 9/19/08 and 3/17/09)

Note 12-2 MD9221 Amend. No, 205, 4/30/09, ML090570710

1. DEK will submit the results of the analyses performed using the nonlinear seismic analysis methodology described in this LAR.
2. DEK will perform a "push" test to provide empirical data documenting the force required to induce crane trolley and bridge drive wheel rolling with the brakes applied. The results of the test will be provided to the NRC.
3. DEK will have an independent peer review performed of the nonlinear structural model and outputs of the nonlinear analysis to confirm the methodology is appropriate for the application and provide a summary of the review to the NRC.

[The three items are managed as one. The 4th (RgCm) Regulatory Requirement in the 9/19/09 supplement was not selected for the audit sample - kdf]

complete 7/15/10; NC

[All 3 managed as one - kdf]

LC000228 (No LAs are needed since the actions can be managed as a group within the LC number.)

SN 08-211 sent to NRC on 7/7/08 (DEK accomplishe d all RgCm in the sample.

Submitted to the NRC within the 9/19/08 sample)

LI*

Push Test details provided in 9/19/08 Supplement none Yes NA NA

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 12 1 - Audit Sample No.

2 - DEK Submittal 3 - NRC TAC No.

4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)

E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)

H - Open RgCm is adequately Maintained (Yes / No / NA)

I - Changed RgCm is adequately managed (Yes / No / NA) 13 1/27/09 09-061 ML090510149 ME0435 Letter approving notice of enforcement discretion, 1/29/09, ML090291061 DEK commits to administratively control the amount of fuel oil in each fuel oil storage tank such that a minimum usable amount of 32,858 gallons (including the day tanks) is available to supply each emergency diesel generator (EDG) (without reliance on a portable transfer pump),

for the duration of the enforcement discretion.

complete 6/10/09; NC LC000315 (No LA number -

one item only)

None to NRC LI*

USAR Rev 22 update 6/30/10 pg 8.2-18, Section 8.2.3.1 none Yes.

Control is USAR edit NA NA 14 6/1/09 09-291 ML091600037 MD9408 Review ongoing The installation of EDG exhaust duct insulation (SAMA 160) will be further evaluated as part of DEK's ongoing performance improvement programs.

In progress; NC LC000345 LA001560 None to NRC LI*

Note 14-E Not yet determined No Yes NA 15 Sample deleted MD9408 Sample deleted at request of Project Manager making the selection..

See Note 15-5 sample results not used.

sample results not used sample results not used LI*

sample results not used sample results not used sample results not used sample results not used sample results not used

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 13 1 - Audit Sample No.

2 - DEK Submittal 3 - NRC TAC No.

4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)

E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)

H - Open RgCm is adequately Maintained (Yes / No / NA)

I - Changed RgCm is adequately managed (Yes / No / NA) 16a 8/17/09 09-469 ML092320093 MD9408 License renewal review ongoing

1. Additional information will be included in the USAR Supplement (License Renewal Application, Appendix A), including license renewal commitments identified in Table A6.0-1, as applicable.

These USAR Supplement changes will be consistent with the responses to Requests for Additional Information (RAIs) B2.1.13-5, B2.1.14-3, B2.1.15-1, B2.1.18-1, B2.1.21-1, B.2.1.31-1, and B3.1-1, are proposed to support approval of the renewed operating license, and may change during the NRC review period.

In progress; NC LC000343 LA001541 Reportable through USAR change LI*

USAR (pages to be defined; expected to be complete 4/4/11) none NA Yes NA

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 14 1 - Audit Sample No.

2 - DEK Submittal 3 - NRC TAC No.

4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)

E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)

H - Open RgCm is adequately Maintained (Yes / No / NA)

I - Changed RgCm is adequately managed (Yes / No / NA) 16b 8/17/09 09-469 ML092320093 MD9408 License renewal review ongoing

2. The response to RAI B3.2-2 will be provided following reevaluation of the environmental effects of fatigue for the NUREG/CR-6260-required evaluations that used stress-based fatigue monitoring.

Complete and transferred for action by LA001848 LC000343 LA001542

[original tracking]

transferre d to LC000392 LA001848

[Observati on 16b-B]

Transferred to LA001848 LI*

Letter SN 10-033 dated dated 2/2/10 (responded to RAI B3.2-2)

No change to RgCm.

Change was to tTrack to record transfer from LA001542 to LA001848 Yes NA Yes.

RgCm itself not changed (transfer was successfu l) 17a 9/24/09 09-491 ML092440398 ME2139 Conversion to Improved TS review ongoing (The following commitments are selected from ) [Three of nine commitments were selected for audit - kdf]

2. DEK will establish the Technical Specification Bases for Limiting Condition for Operation (LCO) 3.0.8, as adopted, with the applicable license amendment.

In progress; NC LC000407 LA001897 None to NRC LI*

Tech Spec Bases LCO 3.0.8 none NA Yes NA

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 15 1 - Audit Sample No.

2 - DEK Submittal 3 - NRC TAC No.

4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)

E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)

H - Open RgCm is adequately Maintained (Yes / No / NA)

I - Changed RgCm is adequately managed (Yes / No / NA) 17b 9/24/09 09-491 ML092440398 ME2139 Conversion to Improved TS review ongoing

7. DEK will have written procedures available describing compensatory measures to be taken in the event of an intentional or unintentional entry into LCO 3.7.12, Auxiliary Building Special Ventilation (ASV) System, Condition B, Two ASV trains inoperable due to inoperable ASV boundary.

Complete 12/6/10; NC LC000407 LA001902 Procedure LI*

Procedure OP-KW-AOP-GEN-005 "Unplanned Barrier Control none Yes NA NA 17c 9/24/09 09-491 ML092440398 ME2139 Conversion to Improved TS review ongoing

8. DEK will add procedural direction to perform an extent of condition evaluation and perform additional testing for plausible common failure modes associated with the reactor protection system and the engineered safety features actuation system instrument analog channels.

Withdrew 12/6/10; NC LC000407

, LA1903 Withdrew via 8/18/2010 Supple LI*

Letter SN10-457 to NRC withdrew commitment (Letter is 8/18/10 supplement on TAC ME2139) none Withdrew NA NA

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 16 1 - Audit Sample No.

2 - DEK Submittal 3 - NRC TAC No.

4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)

E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)

H - Open RgCm is adequately Maintained (Yes / No / NA)

I - Changed RgCm is adequately managed (Yes / No / NA) 18 9/25/09 09-597 ML092710045 MD9408 License renewal review ongoing The revised Work Control Process program will be developed and implemented prior to the period of extended operation.

In progress; NC LC000394 LA001858 Not closed LI*

Revised work control program document (TBD) none NA Yes NA 19a 10/15/09 09-645 ML092890560 MD7838 Letter of 4/1/10, ML100880212 The completion dates for the following two commitments have been revised from October 1, 2009, to October 15, 2009.

[This RgCm was managed as two separate items - kdf]

1. DEK will revise current fill and vent procedures to provide a means and acceptance criteria to ensure that piping is sufficiently full after system fill and vent. This may include confirmation by ultrasonic testing or other appropriate means.

Complete (This RgCm was changed from 10/1/09 to 10/15/09)

LC000239 LA001178 Leter SN 09-645 dated 9/15/09 to NRC LI*

Note 19-E Change to date only (10/1/09 to 10/15/09)

Yes NA Yes

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 17 1 - Audit Sample No.

2 - DEK Submittal 3 - NRC TAC No.

4 - NRC Issuance 5 - Summary of Commitment A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS closeout information D - Governed by KPS process document # (See Note LI*)

E - Affected implementing document F - Affected change document G - Closed RgCm implemented in timely manner (Yes / No / NA)

H - Open RgCm is adequately Maintained (Yes / No / NA)

I - Changed RgCm is adequately managed (Yes / No / NA) 19b 10/15/09 09-645 ML092890560 MD7838 Letter of 4/1/10, ML100880212

2. DEK will revise current inservice test procedures to provide dynamic sweeping as part of the filling of the systems where needed to ensure systems are sufficiently full.

Complete (This RgCm was changed from 10/1/09 to 10/15/09)

LC000239 LA001179 LI*

Note 19-E Uses LI* -

commitment change evaluation Change to date only (10/1/09 to 10/15/09)

Yes NA Yes

Table 3 - Kewaunee Power Station RgCm Data Table - Notes and Legend Page 18 Topic or Word / Symbol Note, legend or discussion ADAMS Agencywide Document Access and Management System Amd or Amend.

amendment Audit observation (general)

The Preventive Maintenance Program would be improved if the Comment field on the PM (preventive maintenance) Data Sheet informed the user that the sheet had a RgCm associated with it.

Audit observation (training)

Commitment management staff should consider preparing a Guideline to ensure consistent input to tTrack by stakeholders making infrequent use of tTrack.

Audit observation 16b-B The ability to transfer tracking from one LC/LA set to another is demonstrated in Sample 16b. The rationale for the transfer is explained in LA001848: The NRC wanted more items for another purpose. KPS consolidated LA001542 with LA001848.

CFR Code of Federal Regulations Column headings and cell designations Columns are labeled numbers 1 through 5 and letters A through I. Sample numbers are listed in column 1.

Notes are designated as "Note (row) - (column)"

Commitment management staff Persons identified as making routine, standardized data entry into tTrack, identified as Noreen Wenborne, MaryJo Haese, and Thomas Breene during the course of RgCm data collection.

ECN Engineering Change Notice Generic Letter 2004-02 "Potential Impact of Debris Blockage on Emergency Recirculation during Design Bais Accidents at Pressurized-Water Reactors," September 13, 2004 GSI-191 "Experimental Studies of Loss-of-Coolant Accident-Generated Debris Accumulation and Head Loss with Emphasis on the Effects of Calcium Silicate Insulation," May 2005 kdf Karl D. Feintuch (Mainly used in combination with brackets to indicate an auditor comment.)

KPS Kewaunee Power Station LA Licensing Action;one or more LA can be associated with one LC LC Licensing Commitment LI*

In this report LI* represents LI-AA-110, Rev. 0, "Commitment Management," which governs the management of RgCm. In addition, GNP-03.01.01, Rev. 41 during RgCm Audit and Rev 42 when the Report was issued, "Directive, Implementing Document, and Procedure Administrative Controls" (commonly referred to at KPS as the "Procedure on procedures") governs tracing the effect of RgCm on procedures. Therefore, the management of RgCm, when it affects procedures is controlled by a combination of these 2 procedures.

ML#

"MLnnnnnnnnn" (i.e. ML followed by 9 digits) is the identifier used by the NRC to access documents and records within its Agencywide Document Access and Management System (ADAMS) document control system.

NC Not Changed (as used in column A)

Table 3 - Kewaunee Power Station RgCm Data Table - Notes and Legend Page 19 Topic or Word / Symbol Note, legend or discussion Note 01-G, -H, -I (i.e., headings in column G, H and I)

A "Yes" in Column G, H, or I indicates that the RgCm was successfully managed according to the description in the heading.

NA applies if the particilar column does not apply. As examples, for a closed RgCm, "open" is NA; for unchanged RgCm, "changed" does not apply.

Thus "No" would only appear in Columns G, H or I if the RgCm was not adequately managed.

Note 03-C NRC notified via suubmitted document SN 08-0113 dated 6/2/08, ML081550342 Note 04-C The Technical Requirements Manual (TRM) is a licensee controlled document for managing requirements that the NRC has approved to be transferred from control by the Technical Specifications.(TS)

Note 12-2, Audit Observation and Audit Finding Observation: Regarding the July 7, 2008 application, the licensing group should define a closeout event at which to terminate its ownership of a RgCm intended for its doownstream stakeholders (i.e., Design, Operations, Training, as examples)

Audit Finding: DEK lacks a documented instruction in LI-AA-110, "Commitment Management," that the instructs the commitment management staff to review all incoming / outgoing correspondence for impact on existing RgCm. Heretofore, commitment management staff has been performing this action without a documented instruction, within LI-AA-110, to do so.

Note 14-E

[Suggestion pertaining to on-going RgCm: Stakeholders should report completion plans to Licensing staff for tTrack entry and for future reference.- kdf]

Note 15-5 The sample contained proprietary information, an attribute not needed to assemble a valid audit sample. The audit results for the sample were consistent with results from other samples, and its removal did not change the findings of the audit. Further, the sample population grew from the original 19 selections to a net population of 24 (1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11a, 11b, 11c, 12, 13, 14, 15 omitted, 16a, 16b, 17a, 17b, 17c, 18, 19a, 19b) to track the management of separate RgCm parts.

Note 19-E Affected procedures (21 documents, as indicated by separate serial numbers):

OP-KW-NOP-RHR-001, -003 SP-34-099A, -099B OP-KW-NOP-SI-002 OP-KW-MOP-RHR-001A, -001B, -002A, -002B, -003A, -005A, -005B, -006, -006A, -006B OP-KW-NOP-SI-001 [possible typo in KPS text: NOP should possibly be MOP - kdf], -002, -004 OP-KW-MOP-ICS-001, -002, -003 Note on references to TS In this audit TS references are to the Custom Technical Specifications (CTS), which preceded the conversion to Improved Technical Specifications (ITS) on February 2, 2011.

Note on sample characteristics for the sample size of 24, categorized from audit results RgCm items closed and remaining the same = 1, 2, 3, 4, 5, 6, 7, 8, 9, 11a, 11b, 11c, 12, 13, 17b, 17c (16 items)

RgCm items changed and closed = 16b, 19a, 19b (3 items)

RgCm items open and remaining the same = 10, 14, 16a, 17a, 18 (5 items)

RgCm items open and changed = none

Table 3 - Kewaunee Power Station RgCm Data Table - Notes and Legend Page 20 Topic or Word / Symbol Note, legend or discussion Note row-column A discussion pertaining to Table 2, row number and column number, which is inserted in Table 3 due to space limitation. (Example: Note 01-G, pertains to row 01, column G on Table 2.

NRC Information Notice 84-55 "Seal Table Leaks at PWRs," July 6, 1984 NRC Information Notice 84-55, Supplement 1 "Seal Table Leaks at PWRs," May 14, 1985 NRC Information Notice 92-15 "Failure of Primary System Compression Fitting," February 24, 1992 NUREG/CR-6260 "Application of NUREG/CR-59999 Interim Fatigue Curves to Selected Nuclear Power Plant Components," 1995 NUREG-0554 "Single-Failure-Proof Cranes for Nuclear Power Plants," May 1979 NUREG-0612 "Control of Heavy Loads at Nuclear Power Plants: Resolution of Generic Technical Activity A-36," July 1980 RgCm Regulatory Commitment, as interpreted by NEI 99-04 (the industry document governing RgCm management) and LIC-105 (the NRC document governing RgCm audits)

SAMA 160 SAMA 160 is described in the license renewal submittal as "Insulate EDG Exhaust Ducts." The context is that insulating the EDG exhaust ducts would reduce the heat load in thhe room and provide additional time to align alternate room cooling in the event that room cooling has failed.

Suggestion A comment by auditor kdf, not specific to a RgCm, but offered as a suggestion. No action or response is expected.

Suggestion (based on Audit Items 11a, b, c)

[Commitment management staff should monitor processes that cause users to contact them for RgCm information and arrange to add RgCm information to relevant databases. - kdf]

Supple Supplement Title 10 The section of the Code of Federal Regulations pertaining to "Energy" TRM Technical Requirements Manual - a licensee controlled document for managing plant specific technical requirements. The TRM is incorporated by reference into the Updated Safety Analysis Report (USAR)

TS Technical Specifications, as described in 10 CFR 50.36 tTrack Name of database used to track RgCm.

UCR USAR Change Request USAR Updated Safety Analysis Report