ML110970360: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (4 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML110970360 | | number = ML110970360 | ||
| issue date = 04/07/2011 | | issue date = 04/07/2011 | ||
| title = | | title = Meeting Announcement - Public Meeting Watts Bar Nuclear, Unit 2, Docket No. 05-391 | ||
| author name = Haag R | | author name = Haag R | ||
| author affiliation = NRC/RGN-II/DCP/CPB3 | | author affiliation = NRC/RGN-II/DCP/CPB3 | ||
| addressee name = Bhatnagar A | | addressee name = Bhatnagar A | ||
| addressee affiliation = Tennessee Valley Authority | | addressee affiliation = Tennessee Valley Authority | ||
| docket = 05000391 | | docket = 05000391 | ||
| Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:TVA | {{#Wiki_filter:TVA April 7, 2011 Mr. Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 | ||
Mr. Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction | |||
==SUBJECT:== | ==SUBJECT:== | ||
MEETING ANNOUNCEMENT - PUBLIC MEETING WATTS BAR NUCLEAR UNIT 2, DOCKET NO. 05-391 | MEETING ANNOUNCEMENT - PUBLIC MEETING WATTS BAR NUCLEAR UNIT 2, DOCKET NO. 05-391 | ||
==Dear Mr. Bhatnagar:== | ==Dear Mr. Bhatnagar:== | ||
This letter confirms a Category 3 public meeting which has been scheduled for April 28, 2011, at 3:00p.m. - 5:00p.m. (EST). The enclosed meeting notice provides additional details. The purpose of the meeting is to provide opportunities to discuss the annual assessment of the Watts Bar Unit 2 Construction Project, as well as the status of the NRC Inspection Program and licensing efforts of the Watts Bar Unit 2 Construction Project with the public. The NRC will be available to ensure the publics issues and concerns are understood and considered. | |||
This letter confirms a Category 3 public meeting which has been scheduled for April 28, 2011, at 3:00p.m. - 5:00p.m. (EST). The enclosed meeting notice provides additional details. The purpose of the meeting is to provide opportunities to discuss the annual assessment of the Watts Bar Unit 2 Construction Project, as well as the status of the NRC Inspection Program and licensing efforts of the Watts Bar Unit 2 Construction Project with the public. The NRC will be available to ensure the | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). | ||
In accordance with 10 CFR 2.390 of the | ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
Should you have any questions concerning this meeting, please contact me at (404) 997-4446. | |||
Should you have any questions concerning this meeting, please contact me at (404) 997-4446. | Sincerely, | ||
/RA/ | |||
Sincerely, | Robert C. Haag, Chief Construction Projects Branch 3 Division of Construction Projects Docket No. 50-391 Construction Permit No: CPPR-92 | ||
Robert C. Haag, Chief | |||
==Enclosure:== | ==Enclosure:== | ||
As stated UNITED STATES | As stated UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 | ||
TVA 2 | TVA 2 | ||
cc w/encl: | |||
Mr. Gordon P. Arent Manager New Generation Licensing Nuclear Generation Development and Construction WBN Nuclear Plant P.O. Box 2000 Spring City, Tennessee 37381 Mr. David Stinson Vice President WBN Unit Two WBN Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381 Mr. C.J. Riedl, Manager Licensing and Industry Affairs WBN Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381 Mr. Preston D. Swafford Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 3R Lookout Place 1101 Market Place Chattanooga, Tennessee 37402-2801 County Executive 375 Church Street Suite 215 Dayton, Tennessee 37321 Mr. W. D. Crouch, Manager WBN Unit 2 Licensing Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381 Mr. Gregory A. Boerschig Plant Manager, WBN Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381 Mr. T. J. Neissen General Manager Quality Assurance Nuclear Generation and Development and Construction 1101 Market Street Blue Ridge 3A Chattanooga, Tennessee 37402-2801 Mr. R. M. Krich Vice President Nuclear Licensing Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801 Mr. E. J. Vigluicci Assistant General Counsel Tennessee Valley Authority 6A West Tower 400 West Summit Hill Drive Knoxville, Tennessee 37402 Mr. Lawrence E. Nanney, Director Tennessee Department of Environmental Health & Conservation Division of Radiological Health 3rd Floor, L&C Annex 401 Church Street Nashville, TN 37243-1532 Mr. D. E. Grissette Site Vice President WBN Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381 County Mayor P.O. Box 156 Decatur, Tennessee 37322 Mr. T. A. Nazario Senior Resident Inspector WBN Nuclear Plant Unit 2 U.S. NRC 1260 Nuclear Plant Road Spring City, Tennessee 37381-2000 | |||
TVA 3 | |||
cc email distribution w/encl: | |||
Greg Scott Tennessee Valley Authority Electronic Mail Distribution Watts Bar 2 Licensing Tennessee Valley Authority Electronic Mail Distribution | |||
ML110970360 G SUNSI REVIEW COMPLETE | |||
Letter to Ashok S. Bhatnagar from Robert C. Haag dated April 7, 2011. | |||
==SUBJECT:== | ==SUBJECT:== | ||
MEETING ANNOUNCEMENT - PUBLIC MEETING NOTICE | MEETING ANNOUNCEMENT - PUBLIC MEETING NOTICE WATTS BAR NUCLEAR UNIT 2, DOCKET NO. 50-391 Distribution w/encl: | ||
L. Raghavan, NRR S. Campbell, NRR P. Milano, NRR C. Evans, RII L. Douglas, RII EICS E. Guthrie, RII DRP R. Monk, RII WBN Unit 1 SRI OE Mail (email address if applicable) | |||
PUBLIC | |||
Enclosure MEETING NOTICE | |||
==SUBJECT:== | ==SUBJECT:== | ||
PUBLIC MEETING WATTS BAR NUCLEAR UNIT 2 FACILITY: | PUBLIC MEETING WATTS BAR NUCLEAR UNIT 2 FACILITY: | ||
Watts Bar Nuclear Plant Unit 2 Construction Project DOCKET: | |||
DOCKET: | 50-391 DATE & TIME: | ||
Thursday, April 28, 2011 3:00 p.m. - 5:00 p.m. (EST) | |||
LOCATION: | LOCATION: | ||
Comfort Inn, Meeting Room 2811 Decatur Pike Athens, TN 37303 PURPOSE: | |||
CATEGORY: This is a Category 3 meeting: | The purpose of the meeting is to provide opportunities to discuss the annual assessment of the Watts Bar Unit 2 Construction Project, as well as the status of the NRC Inspection Program and licensing efforts of the Watts Bar Unit 2 Construction Project with the public. The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002 applies to this meeting. The policy statement may be found on the NRC Website, www.nrc.gov. The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., Braille, large print), | ||
NRC OFFICE(S) Region II PARTICIPATING: | please notify the NRCs meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. | ||
CATEGORY: | |||
This is a Category 3 meeting: The public is invited to fully participate in this meeting. The NRC will be available to ensure the publics issues and concerns are understood and considered by the NRC. | |||
NRC OFFICE(S) | |||
Region II PARTICIPATING: | |||
OTHER None ORGANIZATIONS PARTICIPATING: | OTHER None ORGANIZATIONS PARTICIPATING: | ||
PARTICIPANTS: NRC (partial list) | PARTICIPANTS: | ||
NRC (partial list) | |||
V. McCree, Regional Administrator, Region II R. Haag, Chief, Construction Projects Branch 3, Division of Construction Projects (DCP) | |||
T. Nazario, Senior Resident Inspector, Watts Bar Nuclear Plant Unit 2 J. Baptist, Senior Project Inspector, DCP G. Khouri, Senior Project Inspector, DCP MEETING Robert C. Haag, NRC, RII CONTACT: | |||
(404) 997-4446 Robert.Haag@nrc.gov}} | |||
Latest revision as of 07:16, 13 January 2025
| ML110970360 | |
| Person / Time | |
|---|---|
| Site: | Watts Bar |
| Issue date: | 04/07/2011 |
| From: | Haag R NRC/RGN-II/DCP/CPB3 |
| To: | Bhatnagar A Tennessee Valley Authority |
| References | |
| Download: ML110970360 (6) | |
Text
TVA April 7, 2011 Mr. Ashok S. Bhatnagar Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801
SUBJECT:
MEETING ANNOUNCEMENT - PUBLIC MEETING WATTS BAR NUCLEAR UNIT 2, DOCKET NO.05-391
Dear Mr. Bhatnagar:
This letter confirms a Category 3 public meeting which has been scheduled for April 28, 2011, at 3:00p.m. - 5:00p.m. (EST). The enclosed meeting notice provides additional details. The purpose of the meeting is to provide opportunities to discuss the annual assessment of the Watts Bar Unit 2 Construction Project, as well as the status of the NRC Inspection Program and licensing efforts of the Watts Bar Unit 2 Construction Project with the public. The NRC will be available to ensure the publics issues and concerns are understood and considered.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this meeting, please contact me at (404) 997-4446.
Sincerely,
/RA/
Robert C. Haag, Chief Construction Projects Branch 3 Division of Construction Projects Docket No. 50-391 Construction Permit No: CPPR-92
Enclosure:
As stated UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257
TVA 2
cc w/encl:
Mr. Gordon P. Arent Manager New Generation Licensing Nuclear Generation Development and Construction WBN Nuclear Plant P.O. Box 2000 Spring City, Tennessee 37381 Mr. David Stinson Vice President WBN Unit Two WBN Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381 Mr. C.J. Riedl, Manager Licensing and Industry Affairs WBN Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381 Mr. Preston D. Swafford Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 3R Lookout Place 1101 Market Place Chattanooga, Tennessee 37402-2801 County Executive 375 Church Street Suite 215 Dayton, Tennessee 37321 Mr. W. D. Crouch, Manager WBN Unit 2 Licensing Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381 Mr. Gregory A. Boerschig Plant Manager, WBN Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381 Mr. T. J. Neissen General Manager Quality Assurance Nuclear Generation and Development and Construction 1101 Market Street Blue Ridge 3A Chattanooga, Tennessee 37402-2801 Mr. R. M. Krich Vice President Nuclear Licensing Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801 Mr. E. J. Vigluicci Assistant General Counsel Tennessee Valley Authority 6A West Tower 400 West Summit Hill Drive Knoxville, Tennessee 37402 Mr. Lawrence E. Nanney, Director Tennessee Department of Environmental Health & Conservation Division of Radiological Health 3rd Floor, L&C Annex 401 Church Street Nashville, TN 37243-1532 Mr. D. E. Grissette Site Vice President WBN Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381 County Mayor P.O. Box 156 Decatur, Tennessee 37322 Mr. T. A. Nazario Senior Resident Inspector WBN Nuclear Plant Unit 2 U.S. NRC 1260 Nuclear Plant Road Spring City, Tennessee 37381-2000
TVA 3
cc email distribution w/encl:
Greg Scott Tennessee Valley Authority Electronic Mail Distribution Watts Bar 2 Licensing Tennessee Valley Authority Electronic Mail Distribution
ML110970360 G SUNSI REVIEW COMPLETE
Letter to Ashok S. Bhatnagar from Robert C. Haag dated April 7, 2011.
SUBJECT:
MEETING ANNOUNCEMENT - PUBLIC MEETING NOTICE WATTS BAR NUCLEAR UNIT 2, DOCKET NO. 50-391 Distribution w/encl:
L. Raghavan, NRR S. Campbell, NRR P. Milano, NRR C. Evans, RII L. Douglas, RII EICS E. Guthrie, RII DRP R. Monk, RII WBN Unit 1 SRI OE Mail (email address if applicable)
PUBLIC
Enclosure MEETING NOTICE
SUBJECT:
PUBLIC MEETING WATTS BAR NUCLEAR UNIT 2 FACILITY:
Watts Bar Nuclear Plant Unit 2 Construction Project DOCKET:
50-391 DATE & TIME:
Thursday, April 28, 2011 3:00 p.m. - 5:00 p.m. (EST)
LOCATION:
Comfort Inn, Meeting Room 2811 Decatur Pike Athens, TN 37303 PURPOSE:
The purpose of the meeting is to provide opportunities to discuss the annual assessment of the Watts Bar Unit 2 Construction Project, as well as the status of the NRC Inspection Program and licensing efforts of the Watts Bar Unit 2 Construction Project with the public. The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002 applies to this meeting. The policy statement may be found on the NRC Website, www.nrc.gov. The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., Braille, large print),
please notify the NRCs meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
CATEGORY:
This is a Category 3 meeting: The public is invited to fully participate in this meeting. The NRC will be available to ensure the publics issues and concerns are understood and considered by the NRC.
NRC OFFICE(S)
Region II PARTICIPATING:
OTHER None ORGANIZATIONS PARTICIPATING:
PARTICIPANTS:
NRC (partial list)
V. McCree, Regional Administrator, Region II R. Haag, Chief, Construction Projects Branch 3, Division of Construction Projects (DCP)
T. Nazario, Senior Resident Inspector, Watts Bar Nuclear Plant Unit 2 J. Baptist, Senior Project Inspector, DCP G. Khouri, Senior Project Inspector, DCP MEETING Robert C. Haag, NRC, RII CONTACT:
(404) 997-4446 Robert.Haag@nrc.gov