{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA  30303-1257               May 5, 2011  
{{#Wiki_filter:UNITED STATES  
 
NUCLEAR REGULATORY COMMISSION  
REGION II  
245 PEACHTREE CENTER AVENUE NE, SUITE 1200  
ATLANTA, GEORGIA  30303-1257  
        May 5, 2011  
Mr. Jon A. Franke  
Mr. Jon A. Franke  
Vice President, Crystal River Nuclear Plant  
Vice President, Crystal River Nuclear Plant  
Line 24: Line 37:
15760 W. Power Line Street  
15760 W. Power Line Street  
Crystal River, FL 34428-6708  
Crystal River, FL 34428-6708  
SUBJECT:
CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT - NOTIFICATION
OF INSPECTION AND REQUEST FOR INFORMATION 05000302/2011003
Dear Mr. Franke:
During the period of June 13 -17, 2011, the NRC will conduct baseline radiation safety
inspection activities at the Crystal River 3 Nuclear Plant.  The inspection will focus on the Public
Radiation Safety Inspection cornerstone using NRC Inspection Procedure (IP) 71124. 07.   
Experience has shown that this inspection is resource intensive both for the NRC inspectors
and your staff.  In order to minimize the impact to your on-site resources and to conduct a
productive inspection, we have enclosed a request for documents needed for this inspection.  It
is important that all of these documents are up to date and complete in order to minimize the
number of additional documents requested during the preparation and/or the onsite portions of
the inspection.  The lead inspector has requested that the subject informational material be
made available to the NRC staff by June 6, 2011, to allow preparation for the upcoming
inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory on-site contact for this inspection will be Mr. Dennis Herrin of your
organization.  If there are any questions about this inspection or the material requested, please
contact the lead inspector, George B. Kuzo at (404) 997-4658. 
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document


FPC
2
   
   
SUBJECT: CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION 05000302/2011003
Room or from the Publicly Available Records (PARS) component of NRC's document system
Dear Mr. Franke:
(ADAMS)ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-
  During the period of June 13 -17, 2011, the NRC will conduct baseline radiation safety inspection activities at the Crystal River 3 Nuclear Plant. The inspection will focus on the Public Radiation Safety Inspection cornerstone using NRC Inspection Procedure (IP) 71124. 07.    
rm/adams.html (the Public Electronic Reading Room).  
   
   
Experience has shown that this inspection is resource intensive both for the NRC inspectors and your staff.  In order to minimize the impact to your on-site resources and to conduct a productive inspection, we have enclosed a request for documents needed for this inspection.  It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of
Sincerely,  
the inspection.  The lead inspector has requested that the subject informational material be made available to the NRC staff by June 6, 2011, to allow preparation for the upcoming inspection.
   
We have discussed the schedule for these inspection activities with your staff and understand
/RA/  
that our regulatory on-site contact for this inspection will be Mr. Dennis Herrin of your organization.  If there are any questions about this inspection or the material requested, please contact the lead inspector, George B. Kuzo at (404) 997-4658. 
   
  In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
   
enclosure will be available electronically for public inspection in the NRC Public Document
Brian Bonser, Chief  
 
Plant Support Branch 1  
FPC 2  Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-rm/adams.html (the Public Electronic Reading Room).
Division of Reactor Safety  
  Sincerely, /RA/
   
  Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety  
Docket No.:  50-302  
  Docket No.:  50-302  
License No.:  DPR-72  
License No.:  DPR-72  
Enclosure: 
Public Radiation Protection Inspection Document Request
cc w/encl.:  (See page 3)


Enclosure:  Public Radiation Protection Inspection Document Request
FPC
cc w/encl.:  (See page 3)  
3  
FPC 3  cc w/encl: Kelvin Henderson General Manager Nuclear Fleet Operations Progress Energy Electronic Mail Distribution  
   
 
cc w/encl:  
Brian C. McCabe Manager, Nuclear Oversight Shearon Harris Nuclear Power Plant Progress Energy  
Kelvin Henderson  
General Manager  
Nuclear Fleet Operations  
Progress Energy  
Electronic Mail Distribution  
Brian C. McCabe  
Manager, Nuclear Oversight  
Shearon Harris Nuclear Power Plant  
Progress Energy  
Electronic Mail Distribution
James W. Holt
Plant General Manager
Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution
Stephen J. Cahill
Director - Engineering Nuclear
Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution
R. Alexander Glenn
General Counsel
Progress Energy
Electronic Mail Distribution
Jeffrey R. Swartz
Director Site Operations
Crystal River Nuclear Plant
Electronic Mail Distribution  
Electronic Mail Distribution  
James W. Holt Plant General Manager Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution
   
   
Stephen J. Cahill Director - Engineering Nuclear Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution  
Donna B. Alexander
Manager, Nuclear Regulatory Affairs
(interim)  
Progress Energy
Electronic Mail Distribution  
   
   
R. Alexander Glenn General Counsel Progress Energy Electronic Mail Distribution
Thomas Sapporito
Consulting Associate
(Public Correspondence Only)
Post Office Box 8413
Jupiter, FL  33468
   
   
Jeffrey R. Swartz Director Site Operations Crystal River Nuclear Plant Electronic Mail Distribution  
William A. Passetti
Chief
Florida Bureau of Radiation Control
Department of Health
Electronic Mail Distribution  
   
   
Donna B. Alexander Manager, Nuclear Regulatory Affairs (interim) Progress Energy Electronic Mail Distribution  
Daniel R. Westcott
 
Supervisor
Thomas Sapporito Consulting Associate (Public Correspondence Only) Post Office Box 8413 Jupiter, FL  33468
Licensing & Regulatory Programs
Crystal River Nuclear Plant (NA1B)  
Electronic Mail Distribution
Joseph W. Donahue
Vice President
Nuclear Oversight
Progress Energy  
Electronic Mail Distribution  
   
   
William A. Passetti Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution
Jack E. Huegel
 
Manager, Nuclear Oversight
Daniel R. Westcott Supervisor Licensing & Regulatory Programs Crystal River Nuclear Plant (NA1B) Electronic Mail Distribution  
Crystal River Nuclear Plant  
Electronic Mail Distribution  
   
   
Joseph W. Donahue Vice President Nuclear Oversight Progress Energy Electronic Mail Distribution
David T. Conley  
 
Senior Counsel  
Jack E. Huegel Manager, Nuclear Oversight Crystal River Nuclear Plant Electronic Mail Distribution
Legal Department  
David T. Conley  
Progress Energy  
Senior Counsel Legal Department Progress Energy Electronic Mail Distribution  
Electronic Mail Distribution  
   
   
Mark Rigsby Manager, Support Services - Nuclear Crystal River Nuclear Plant (NA2C) Electronic Mail Distribution  
Mark Rigsby  
Manager, Support Services - Nuclear  
Crystal River Nuclear Plant (NA2C)  
Electronic Mail Distribution  
   
   
Senior Resident Inspector U.S. Nuclear Regulatory Commission Crystal River Nuclear Generating Plant U.S. NRC 6745 N Tallahassee Rd  
Senior Resident Inspector  
U.S. Nuclear Regulatory Commission  
Crystal River Nuclear Generating Plant  
U.S. NRC  
6745 N Tallahassee Rd  
Crystal River, FL  34428  
Crystal River, FL  34428  
  Attorney General Department of Legal Affairs The Capitol PL-01  
   
Attorney General  
Department of Legal Affairs  
The Capitol PL-01  
Tallahassee, FL  32399-1050  
Tallahassee, FL  32399-1050  
Bryan Koon Director Florida Division of Emergency Management Electronic Mail Distribution
   
   
Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL  36250  
Bryan Koon
Director
Florida Division of Emergency Management
Electronic Mail Distribution
Chairman  
Board of County Commissioners  
Citrus County  
110 N. Apopka Avenue  
Inverness, FL  36250  


 


  ML111250159  
  ML111250159
X  SUNSI REVIEW COMPLETE OFFICE RII: DRS RII:DRS     SIGNATURE  
R A R A      NAME G. KUZO B. BONSER     DATE 05/05/2011 05/05/2011     E-MAIL COPY?    YES NO  YES NO  YES NO  YES NO  YES NO  YES NO  YES NO
Enclosure PUBLIC RADIATION PROTECTION INSPECTION DOCUMENT REQUEST 
X  SUNSI REVIEW COMPLETE  
  SITE: Crystal River Unit 3 (CR3) Report Number:  05000302/2011003
OFFICE  
         
RII: DRS  
INSPECTION DATES:  June 13 - 17, 2011
RII:DRS  
NRC INSPECTOR:  George B. Kuzo  George.Kuzo@NRC.GOV        (404) 997-4658
PRELIMINARY LICENSEE CONTACTS:  Radiation Controls - Bryan Akins at (352) 464-7964(c); Effluents/Process Monitors/Radiological Environmental Monitoring Program - Lee Hughes at (352) 563-4715 or (352) 464-7421(c) and/or Rudy Pinner at (352) 795-6486 ext. 3141; and Licensing - D. Herrin at (352) 563-4633.
Inspection Procedure (IP):  IP 71124.07 Radiological Environmental Monitoring Program      Exposure Controls
SIGNATURE  
RA
RA
NAME  
G. KUZO  
B. BONSER  
DATE  
05/05/2011  
05/05/2011  
E-MAIL COPY?  
     YES  
NO  YES  
NO  YES  
NO  YES  
NO  YES  
NO  YES  
NO  YES  
NO  


   
   
Note:  This is a broad list of the documents the lead NRC inspector will be interested in reviewing and obtaining during the pre-inspection visit.  The current version of these documents  
Enclosure
is expected unless specified otherwise.  Electronic media is preferred, if readily available.  (The preferred file format is Word, WordPerfect, or searchable "pdf" files on electronic media, e.g.  
PUBLIC RADIATION PROTECTION INSPECTION
CD-ROM.  Please provide 3 copies of each electronic device that is submitted.)  Information in the "document lists" should contain enough information to be easily understood by someone who has knowledge of the subject.  During the inspection, the inspectors may request additional documents.  
DOCUMENT REQUEST 
SITE: Crystal River Unit 3 (CR3) Report Number:  05000302/2011003
INSPECTION DATES: 
June 13 - 17, 2011
NRC INSPECTOR:
George B. Kuzo  George.Kuzo@NRC.GOV        (404) 997-4658
PRELIMINARY LICENSEE CONTACTS:  Radiation Controls - Bryan Akins at (352) 464-
7964(c); Effluents/Process Monitors/Radiological Environmental Monitoring Program - Lee
Hughes at (352) 563-4715 or (352) 464-7421(c) and/or Rudy Pinner at (352) 795-6486 ext.
3141; and Licensing - D. Herrin at (352) 563-4633.
Inspection Procedure (IP):  IP 71124.07
Radiological Environmental Monitoring Program
Exposure Controls
Note:  This is a broad list of the documents the lead NRC inspector will be interested in  
reviewing and obtaining during the pre-inspection visit.  The current version of these documents  
is expected unless specified otherwise.  Electronic media is preferred, if readily available.  (The  
preferred file format is Word, WordPerfect, or searchable pdf files on electronic media, e.g.  
CD-ROM.  Please provide 3 copies of each electronic device that is submitted.)  Information in  
the document lists should contain enough information to be easily understood by someone  
who has knowledge of the subject.  During the inspection, the inspectors may request additional  
documents.
GENERAL INFORMATION NEEDED
  Organization Charts and Contact Phone Numbers for:
      Radiation Protection
      Chemistry
  Procedure for issuing Condition Report (CR) documents and assessing issues for risk 
    significance and follow-up actions.
  Updated Final Safety Analysis Report Chapter 11, Effluents/Radwaste; and Chapter 12
    Radiation Protection.
  Current version/revision of the Offsite Dose Calculation Manual (ODCM).
  Annual Radiological Environmental Operating Report (AREOR) for Calendar Year (CY) 
    2008, CY 2009, and CY 2010.
  Annual Radiological Effluent Release Report (ARERR) documents for CY 2008, CY 2009,
    and CY 2010.  
RADIOLOGICAL ENVIRONMENTAL MONITORING PROGRAM [IP 71124.07]
  Site and corporate procedures associated with radiological environmental monitoring
    including: 
                    Collection, preparation, and analysis of environmental samples including air samples, 
                      TLD stations, ground and surface water, sediment, vegetation, milk, fish, etc.;
 
   
   
GENERAL INFORMATION NEEDED
Enclosure  
    Organization Charts and Contact Phone Numbers for:      Radiation Protection      Chemistry    Procedure for issuing Condition Report (CR) documents and assessing issues for risk      significance and follow-up actions.    Updated Final Safety Analysis Report Chapter 11, Effluents/Radwaste; and Chapter 12      Radiation Protection.
2
  Current version/revision of the Offsite Dose Calculation Manual (ODCM).    Annual Radiological Environmental Operating Report (AREOR) for Calendar Year (CY)      2008, CY 2009, and CY 2010.    Annual Radiological Effluent Release Report (ARERR) documents for CY 2008, CY 2009,      and CY 2010.
                    Calibration and maintenance of air/water sampling equipment;  
  RADIOLOGICAL ENVIRONMENTAL MONITORING PROGRAM [IP 71124.07]
                     Calibration and QC activities for sample counting instruments;  
    Site and corporate procedures associated with radiological environmental monitoring      including:                      Collection, preparation, and analysis of environmental samples including air samples,                        TLD stations, ground and surface water, sediment, vegetation, milk, fish, etc.; 
                     Sampling and monitoring program to detect leaks from contaminated or potentially
Enclosure  
                      contaminated systems, structures, or components;  
2                     Calibration and maintenance of air/water sampling equipment;                      Calibration and QC activities for sample counting instruments;                      Sampling and monitoring program to detect leaks from contaminated or potentially                         contaminated systems, structures, or components;                      Meteorological instrument calibration, operation, and routine surveillances;    AREOR CYs 2008, 2009 and CY 2010. [Note: provided as part of the General Information      Request and do not need to be duplicated].    List of structures, systems, or components that contain or could contain licensed material for       which there is a credible mechanism for the radioactive material to reach ground water.    Summary of leaks and/or spills since October 1, 2008, i.e. additions to the 50.75(g) file.    Calibration and maintenance records for REMP air and composite water samplers since       October 1, 2008.    Inter-laboratory comparison program results for the past two years (in-house or vendor       laboratory).    Last two calibration /surveillance/maintenance records for the meteorological monitoring       instruments since October 1, 2008.    List of CAP CR and audit documents generated since October 1, 2008, related to       Radiological Environmental Monitoring Program and meteorological monitoring activities.
                     Meteorological instrument calibration, operation, and routine surveillances;  
   AREOR CYs 2008, 2009 and CY 2010. [Note: provided as part of the General Information  
     Request and do not need to be duplicated].  
   List of structures, systems, or components that contain or could contain licensed material for
    which there is a credible mechanism for the radioactive material to reach ground water.  
   Summary of leaks and/or spills since October 1, 2008, i.e. additions to the 50.75(g) file.  
   Calibration and maintenance records for REMP air and composite water samplers since
    October 1, 2008.  
   Inter-laboratory comparison program results for the past two years (in-house or vendor
    laboratory).  
   Last two calibration /surveillance/maintenance records for the meteorological monitoring
    instruments since October 1, 2008.  
   List of CAP CR and audit documents generated since October 1, 2008, related to
    Radiological Environmental Monitoring Program and meteorological monitoring activities.
}}
}}

Latest revision as of 06:32, 13 January 2025

Notice of Inspection and Request for Information 05000302/2011003
ML111250159
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/05/2011
From: Brian Bonser
NRC/RGN-II/DRS/PSB1
To: Franke J
FirstEnergy Nuclear Operating Co, Florida Power & Light Co
References
IR-11-003
Download: ML111250159 (6)


See also: IR 05000302/2011003

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

May 5, 2011

Mr. Jon A. Franke

Vice President, Crystal River Nuclear Plant

Crystal River Nuclear Plant (NA2C)

15760 W. Power Line Street

Crystal River, FL 34428-6708

SUBJECT:

CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING PLANT - NOTIFICATION

OF INSPECTION AND REQUEST FOR INFORMATION 05000302/2011003

Dear Mr. Franke:

During the period of June 13 -17, 2011, the NRC will conduct baseline radiation safety

inspection activities at the Crystal River 3 Nuclear Plant. The inspection will focus on the Public

Radiation Safety Inspection cornerstone using NRC Inspection Procedure (IP) 71124. 07.

Experience has shown that this inspection is resource intensive both for the NRC inspectors

and your staff. In order to minimize the impact to your on-site resources and to conduct a

productive inspection, we have enclosed a request for documents needed for this inspection. It

is important that all of these documents are up to date and complete in order to minimize the

number of additional documents requested during the preparation and/or the onsite portions of

the inspection. The lead inspector has requested that the subject informational material be

made available to the NRC staff by June 6, 2011, to allow preparation for the upcoming

inspection.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory on-site contact for this inspection will be Mr. Dennis Herrin of your

organization. If there are any questions about this inspection or the material requested, please

contact the lead inspector, George B. Kuzo at (404) 997-4658.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

FPC

2

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Brian Bonser, Chief

Plant Support Branch 1

Division of Reactor Safety

Docket No.: 50-302

License No.: DPR-72

Enclosure:

Public Radiation Protection Inspection Document Request

cc w/encl.: (See page 3)

FPC

3

cc w/encl:

Kelvin Henderson

General Manager

Nuclear Fleet Operations

Progress Energy

Electronic Mail Distribution

Brian C. McCabe

Manager, Nuclear Oversight

Shearon Harris Nuclear Power Plant

Progress Energy

Electronic Mail Distribution

James W. Holt

Plant General Manager

Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution

Stephen J. Cahill

Director - Engineering Nuclear

Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution

R. Alexander Glenn

General Counsel

Progress Energy

Electronic Mail Distribution

Jeffrey R. Swartz

Director Site Operations

Crystal River Nuclear Plant

Electronic Mail Distribution

Donna B. Alexander

Manager, Nuclear Regulatory Affairs

(interim)

Progress Energy

Electronic Mail Distribution

Thomas Sapporito

Consulting Associate

(Public Correspondence Only)

Post Office Box 8413

Jupiter, FL 33468

William A. Passetti

Chief

Florida Bureau of Radiation Control

Department of Health

Electronic Mail Distribution

Daniel R. Westcott

Supervisor

Licensing & Regulatory Programs

Crystal River Nuclear Plant (NA1B)

Electronic Mail Distribution

Joseph W. Donahue

Vice President

Nuclear Oversight

Progress Energy

Electronic Mail Distribution

Jack E. Huegel

Manager, Nuclear Oversight

Crystal River Nuclear Plant

Electronic Mail Distribution

David T. Conley

Senior Counsel

Legal Department

Progress Energy

Electronic Mail Distribution

Mark Rigsby

Manager, Support Services - Nuclear

Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution

Senior Resident Inspector

U.S. Nuclear Regulatory Commission

Crystal River Nuclear Generating Plant

U.S. NRC

6745 N Tallahassee Rd

Crystal River, FL 34428

Attorney General

Department of Legal Affairs

The Capitol PL-01

Tallahassee, FL 32399-1050

Bryan Koon

Director

Florida Division of Emergency Management

Electronic Mail Distribution

Chairman

Board of County Commissioners

Citrus County

110 N. Apopka Avenue

Inverness, FL 36250

ML111250159

X SUNSI REVIEW COMPLETE

OFFICE

RII: DRS

RII:DRS

SIGNATURE

RA

RA

NAME

G. KUZO

B. BONSER

DATE

05/05/2011

05/05/2011

E-MAIL COPY?

YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO

Enclosure

PUBLIC RADIATION PROTECTION INSPECTION

DOCUMENT REQUEST

SITE: Crystal River Unit 3 (CR3) Report Number: 05000302/2011003

INSPECTION DATES:

June 13 - 17, 2011

NRC INSPECTOR:

George B. Kuzo George.Kuzo@NRC.GOV (404) 997-4658

PRELIMINARY LICENSEE CONTACTS: Radiation Controls - Bryan Akins at (352) 464-

7964(c); Effluents/Process Monitors/Radiological Environmental Monitoring Program - Lee

Hughes at (352) 563-4715 or (352) 464-7421(c) and/or Rudy Pinner at (352) 795-6486 ext.

3141; and Licensing - D. Herrin at (352) 563-4633.

Inspection Procedure (IP): IP 71124.07

Radiological Environmental Monitoring Program

Exposure Controls

Note: This is a broad list of the documents the lead NRC inspector will be interested in

reviewing and obtaining during the pre-inspection visit. The current version of these documents

is expected unless specified otherwise. Electronic media is preferred, if readily available. (The

preferred file format is Word, WordPerfect, or searchable pdf files on electronic media, e.g.

CD-ROM. Please provide 3 copies of each electronic device that is submitted.) Information in

the document lists should contain enough information to be easily understood by someone

who has knowledge of the subject. During the inspection, the inspectors may request additional

documents.

GENERAL INFORMATION NEEDED

Organization Charts and Contact Phone Numbers for:

Radiation Protection

Chemistry

Procedure for issuing Condition Report (CR) documents and assessing issues for risk

significance and follow-up actions.

Updated Final Safety Analysis Report Chapter 11, Effluents/Radwaste; and Chapter 12

Radiation Protection.

Current version/revision of the Offsite Dose Calculation Manual (ODCM).

Annual Radiological Environmental Operating Report (AREOR) for Calendar Year (CY)

2008, CY 2009, and CY 2010.

Annual Radiological Effluent Release Report (ARERR) documents for CY 2008, CY 2009,

and CY 2010.

RADIOLOGICAL ENVIRONMENTAL MONITORING PROGRAM [IP 71124.07]

Site and corporate procedures associated with radiological environmental monitoring

including:

Collection, preparation, and analysis of environmental samples including air samples,

TLD stations, ground and surface water, sediment, vegetation, milk, fish, etc.;

Enclosure

2

Calibration and maintenance of air/water sampling equipment;

Calibration and QC activities for sample counting instruments;

Sampling and monitoring program to detect leaks from contaminated or potentially

contaminated systems, structures, or components;

Meteorological instrument calibration, operation, and routine surveillances;

AREOR CYs 2008, 2009 and CY 2010. [Note: provided as part of the General Information

Request and do not need to be duplicated].

List of structures, systems, or components that contain or could contain licensed material for

which there is a credible mechanism for the radioactive material to reach ground water.

Summary of leaks and/or spills since October 1, 2008, i.e. additions to the 50.75(g) file.

Calibration and maintenance records for REMP air and composite water samplers since

October 1, 2008.

Inter-laboratory comparison program results for the past two years (in-house or vendor

laboratory).

Last two calibration /surveillance/maintenance records for the meteorological monitoring

instruments since October 1, 2008.

List of CAP CR and audit documents generated since October 1, 2008, related to