| issue date = 05/11/2011
| issue date = 05/11/2011
| title = 06/01/11 Notice of Meeting with the Public to the Nrc'S Assessment of Safety Performance at Pilgrim Nuclear Power Station for 2010
| title = Notice of Meeting with the Public to the NRCs Assessment of Safety Performance at Pilgrim Nuclear Power Station for 2010
| author name = Jackson D
| author name = Jackson D
| author affiliation = NRC/RGN-I/DRP/PB5
| author affiliation = NRC/RGN-I/DRP/PB5
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Licensee: Facilities:
{{#Wiki_filter:Licensee:
Docket No: Date/ Time: Location: Purpose: NRC Attendees:
Facilities:
Docket No:
Date/ Time:
Location:
 
==Purpose:==
NRC Attendees:
Public Participation:
Public Participation:
Meeting Contact: MN No. 11-008 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING May 11, 2011 Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station 50-293 Wednesday June 1,2011 6:00 p.m. to 8:00 p.m.Hilton Garden Inn Four Home Depot Drive Plymouth, MA 02360 The U. S. Nuclear Regulatory Commission (NRC) will meet with the public to discuss the NRC's assessment of safety performance at Pilgrim Nuclear Power Station tor 2010, as described in the annual assessment letter dated March 4,2011. The NRC will respond to questions on specific performance issues at the plant and our role in ensuring safe plant operations.
Meeting
 
==Contact:==
MN No. 11-008 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING May 11, 2011 Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 50-293 Wednesday June 1,2011 6:00 p.m. to 8:00 p.m.
Hilton Garden Inn Four Home Depot Drive Plymouth, MA 02360 The U. S. Nuclear Regulatory Commission (NRC) will meet with the public to discuss the NRC's assessment of safety performance at Pilgrim Nuclear Power Station tor 2010, as described in the annual assessment {{letter dated|date=March 4, 2011|text=letter dated March 4,2011}}. The NRC will respond to questions on specific performance issues at the plant and our role in ensuring safe plant operations.
J. Clifford, Deputy Director, Division of Reactor Projects D. Jackson, Chief, Division of Reactor Projects, Branch 5 M. Schneider, Senior Resident lnspector K. Dunham, Acting Resident lnspector This is a Category 3 Meeting. The public will have an opportunity to communicate with NRC staff following the presentation.
J. Clifford, Deputy Director, Division of Reactor Projects D. Jackson, Chief, Division of Reactor Projects, Branch 5 M. Schneider, Senior Resident lnspector K. Dunham, Acting Resident lnspector This is a Category 3 Meeting. The public will have an opportunity to communicate with NRC staff following the presentation.
D. Jackson , Chief, Projects Branch 5 61 0-337-5306 E-mail: Donald.Jackson@nrc.gov The NRC's annual assessment letter regarding Pilgrim Nuclear Power Station performance during 2010 can be found in ADAMS with Accession Number M1110620493.
D. Jackson, Chief, Projects Branch 5 61 0-337-5306 E-mail: Donald.Jackson@nrc.gov The NRC's annual assessment letter regarding Pilgrim Nuclear Power Station performance during 2010 can be found in ADAMS with Accession Number M1110620493. ADAMS is accessible from the N RC website at: http://nrc.qov/read i nq-rmiadams. htm l.
ADAMS is accessible from the N RC website at: http://nrc.qov/read i nq-rmiadams.
Additional information relative to the NRC's annual assessment process and the safety performance of Pilgrim Nuclear Power Station can be found on the NRC's website at:
htm l.Additional information relative to the NRC's annual assessment process and the safety performance of Pilgrim Nuclear Power Station can be found on the NRC's website at: http://www.
http://www. nrc.qov/NRR/OVERSI GHT/ASSESS/index. html.
nrc.qov/NRR/OVERSI GHT/ASSESS/index.
 
html.
2 The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.oov/readinq-rm/doc-collections/commission/policv/67fr36920.htm1, and contains information regarding visitors and security.
2 The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.oov/readinq-rm/doc-collections/commission/policv/67fr36920.htm1, and contains information regarding visitors and security.The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
lf you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.9., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.Attendance by other NRC personnel at this meeting should be made known by May 22,2011 via telephone to the NRC meeting contact.Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.
lf you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.9., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.
Please confirm the meeting schedule on the NRCyebsitq under Approved by: Donald E.Chief Projects Branch 5 Division of Reactor Projects Distribution via ListServ 2 The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.qov/readinq-rm/doc-collections/commissionlpolicvl6Tfr36920.html, and contains information regarding visitors and security.The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
Attendance by other NRC personnel at this meeting should be made known by May 22,2011 via telephone to the NRC meeting contact.
lf you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.9., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.Attendance by other NRC personnel at this meeting should be made known by May 22,2011, via telephone to the NRC meeting contact.Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.
Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.
Please confirm the meeting schedule on the NRC website under public meetings.Approved by:/RA/Donald E. Jackson, Chief Projects Branch 5 Division of Reactor Projects Distribution: (via email - see attached)SUNSI Review Complete:
Please confirm the meeting schedule on the NRCyebsitq under Approved by:
DEJ (Reviewer's Initials)DOCUMENT NAME: G:\DRP\BRANCHS\AnnualAssessment Meetings\2010 EOC\Meeting Notices\Pilgrim Annual Assessment Meeting Category 3.docx After declaring this document "An Official Agency Record" it will be released to the Public.To receive a copy of this document, indicate in the box: "C" = Copy without attachmenVenclosure"E" = Copy with attachmenUenclosure "N" = No copy MLl11310295)FFICE RI/DRP RI/DRP NAME TSetzer/deifor DJackson/dei
Donald E.
]ATE 5 t11t11 5 t11111 OFFICIAL RECORD COPY 3 Aqenda NRC's Annual Assessment Meeting Pilgrim Nuclear Power Station Wednesday Jun e 1, 2011 6:00 p.m. to 8:00 p.m.Hilton Garden Inn Four Home Depot Drive Plymouth, MA 02360 Formal Meetinq lntroduction Discussion of Pilgrim Nuclear Power Station performance in 2010..................(10 minutes)Discussion of U.S. plant safe operation in light of Japan event ......(10 minutes)NRC to address public questions (as needed)Closing Remarks ....... (5 minutes) 4 Distribution (via eEmail)Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)
Chief Projects Branch 5 Division of Reactor Projects Distribution via ListServ
 
2 The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.qov/readinq-rm/doc-collections/commissionlpolicvl6Tfr36920.html, and contains information regarding visitors and security.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
lf you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.9., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.
Attendance by other NRC personnel at this meeting should be made known by May 22,2011, via telephone to the NRC meeting contact.
Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.
Please confirm the meeting schedule on the NRC website under public meetings.
Approved by:
/RA/
Donald E. Jackson, Chief Projects Branch 5 Division of Reactor Projects Distribution: (via email - see attached)
SUNSI Review Complete: DEJ (Reviewer's Initials)
DOCUMENT NAME: G:\\DRP\\BRANCHS\\AnnualAssessment Meetings\\2010 EOC\\Meeting Notices\\Pilgrim Annual Assessment Meeting Category 3.docx After declaring this document "An Official Agency Record" it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachmenVenclosure "E" = Copy with attachmenUenclosure "N" = No copy MLl11310295
)FFICE RI/DRP RI/DRP NAME TSetzer/deifor DJackson/dei
]ATE 5 t11t11 5 t11111 OFFICIAL RECORD COPY
 
3 Aqenda NRC's Annual Assessment Meeting Pilgrim Nuclear Power Station Wednesday Jun e 1, 2011 6:00 p.m. to 8:00 p.m.
Hilton Garden Inn Four Home Depot Drive Plymouth, MA 02360 Formal Meetinq lntroduction Discussion of Pilgrim Nuclear Power Station performance in 2010..................(10 minutes)
Discussion of U.S. plant safe operation in light of Japan event  
......(10 minutes)
NRC to address public questions (as needed)
Closing Remarks  
....... (5 minutes)
 
4 Distribution (via eEmail)
Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)
Deputy Executive Director for Reactor Programs OEDO (RIDSEDOMAILCENTER)
Deputy Executive Director for Reactor Programs OEDO (RIDSEDOMAILCENTER)
Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)
Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)
Deputy Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)
Deputy Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)
Director, Division of lnspection  
Director, Division of lnspection & RegionalSupport, NRR/DIRS (RIDSNRRDIRS)
& RegionalSupport, NRR/DIRS (RIDSNRRDIRS)
Director, Division of Operating Reactor Licensing, NRR/DORL (RIDSNRRDORL)
Director, Division of Operating Reactor Licensing, NRR/DORL (RIDSNRRDORL)
Asst. General Counsel Materials Litigation  
Asst. General Counsel Materials Litigation & Enforcement OGC (RIDSOGCMAILCENTER)
& Enforcement OGC (RIDSOGCMAILCENTER)
W. Dean. RA D. Lew, DRA D. Roberts, DRP J. Clifford. DRP P. Wilson. DRS C. Miller, DRS S. Weerakkody, DRS J. Trapp, Rl OEDO D. Jackson, DRP T. Setzer. DRP D. Dodson, DRP E. Keighley, DRP K. Dunham, DRP M. Schneider, DRP, SRI B. Smith, DRP, Rl S. Campbell, DRP RidsNrrPMPilgrim Resource RO Preports. Resou rce@n rc. g ov N. Sheehan, PAO D. Screnci, PAO N. McNamara, SLO D. Tifft, SLO G. Matakas, ORA C. O'Daniell, ORA K. Heater, DRP L. Pinkham, DRP D. Bearde. DRS T. Haverkamp, DNMS L. Larche. DRM Rl Receptionist PMNS}}
W. Dean. RA D. Lew, DRA D. Roberts, DRP J. Clifford.
DRP P. Wilson. DRS C. Miller, DRS S. Weerakkody, DRS J. Trapp, Rl OEDO D. Jackson, DRP T. Setzer. DRP D. Dodson, DRP E. Keighley, DRP K. Dunham, DRP M. Schneider, DRP, SRI B. Smith, DRP, Rl S. Campbell, DRP RidsNrrPMPilgrim Resource RO Preports.
Resou rce@n rc. g ov N. Sheehan, PAO D. Screnci, PAO N. McNamara, SLO D. Tifft, SLO G. Matakas, ORA C. O'Daniell, ORA K. Heater, DRP L. Pinkham, DRP D. Bearde. DRS T. Haverkamp, DNMS L. Larche. DRM Rl Receptionist PMNS}}

Latest revision as of 06:23, 13 January 2025

Notice of Meeting with the Public to the NRCs Assessment of Safety Performance at Pilgrim Nuclear Power Station for 2010
ML111310295
Person / Time
Site: Pilgrim
Issue date: 05/11/2011
From: Diane Jackson
NRC/RGN-I/DRP/PB5
To:
Jackson, D E RI/DRP/PB5/610-337-5306
Shared Package
ML110610693 List:
References
Download: ML111310295 (5)


Text

Licensee:

Facilities:

Docket No:

Date/ Time:

Location:

Purpose:

NRC Attendees:

Public Participation:

Meeting

Contact:

MN No.11-008 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING May 11, 2011 Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 50-293 Wednesday June 1,2011 6:00 p.m. to 8:00 p.m.

Hilton Garden Inn Four Home Depot Drive Plymouth, MA 02360 The U. S. Nuclear Regulatory Commission (NRC) will meet with the public to discuss the NRC's assessment of safety performance at Pilgrim Nuclear Power Station tor 2010, as described in the annual assessment letter dated March 4,2011. The NRC will respond to questions on specific performance issues at the plant and our role in ensuring safe plant operations.

J. Clifford, Deputy Director, Division of Reactor Projects D. Jackson, Chief, Division of Reactor Projects, Branch 5 M. Schneider, Senior Resident lnspector K. Dunham, Acting Resident lnspector This is a Category 3 Meeting. The public will have an opportunity to communicate with NRC staff following the presentation.

D. Jackson, Chief, Projects Branch 5 61 0-337-5306 E-mail: Donald.Jackson@nrc.gov The NRC's annual assessment letter regarding Pilgrim Nuclear Power Station performance during 2010 can be found in ADAMS with Accession Number M1110620493. ADAMS is accessible from the N RC website at: http://nrc.qov/read i nq-rmiadams. htm l.

Additional information relative to the NRC's annual assessment process and the safety performance of Pilgrim Nuclear Power Station can be found on the NRC's website at:

http://www. nrc.qov/NRR/OVERSI GHT/ASSESS/index. html.

2 The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.oov/readinq-rm/doc-collections/commission/policv/67fr36920.htm1, and contains information regarding visitors and security.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

lf you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.9., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by other NRC personnel at this meeting should be made known by May 22,2011 via telephone to the NRC meeting contact.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.

Please confirm the meeting schedule on the NRCyebsitq under Approved by:

Donald E.

Chief Projects Branch 5 Division of Reactor Projects Distribution via ListServ

2 The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.qov/readinq-rm/doc-collections/commissionlpolicvl6Tfr36920.html, and contains information regarding visitors and security.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

lf you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.9., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by other NRC personnel at this meeting should be made known by May 22,2011, via telephone to the NRC meeting contact.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.

Please confirm the meeting schedule on the NRC website under public meetings.

Approved by:

/RA/

Donald E. Jackson, Chief Projects Branch 5 Division of Reactor Projects Distribution: (via email - see attached)

SUNSI Review Complete: DEJ (Reviewer's Initials)

DOCUMENT NAME: G:\\DRP\\BRANCHS\\AnnualAssessment Meetings\\2010 EOC\\Meeting Notices\\Pilgrim Annual Assessment Meeting Category 3.docx After declaring this document "An Official Agency Record" it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachmenVenclosure "E" = Copy with attachmenUenclosure "N" = No copy MLl11310295

)FFICE RI/DRP RI/DRP NAME TSetzer/deifor DJackson/dei

]ATE 5 t11t11 5 t11111 OFFICIAL RECORD COPY

3 Aqenda NRC's Annual Assessment Meeting Pilgrim Nuclear Power Station Wednesday Jun e 1, 2011 6:00 p.m. to 8:00 p.m.

Hilton Garden Inn Four Home Depot Drive Plymouth, MA 02360 Formal Meetinq lntroduction Discussion of Pilgrim Nuclear Power Station performance in 2010..................(10 minutes)

Discussion of U.S. plant safe operation in light of Japan event

......(10 minutes)

NRC to address public questions (as needed)

Closing Remarks

....... (5 minutes)

4 Distribution (via eEmail)

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs OEDO (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Director, Division of lnspection & RegionalSupport, NRR/DIRS (RIDSNRRDIRS)

Director, Division of Operating Reactor Licensing, NRR/DORL (RIDSNRRDORL)

Asst. General Counsel Materials Litigation & Enforcement OGC (RIDSOGCMAILCENTER)

W. Dean. RA D. Lew, DRA D. Roberts, DRP J. Clifford. DRP P. Wilson. DRS C. Miller, DRS S. Weerakkody, DRS J. Trapp, Rl OEDO D. Jackson, DRP T. Setzer. DRP D. Dodson, DRP E. Keighley, DRP K. Dunham, DRP M. Schneider, DRP, SRI B. Smith, DRP, Rl S. Campbell, DRP RidsNrrPMPilgrim Resource RO Preports. Resou rce@n rc. g ov N. Sheehan, PAO D. Screnci, PAO N. McNamara, SLO D. Tifft, SLO G. Matakas, ORA C. O'Daniell, ORA K. Heater, DRP L. Pinkham, DRP D. Bearde. DRS T. Haverkamp, DNMS L. Larche. DRM Rl Receptionist PMNS