ML111470448: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:May 25, 2011 Mr. Michael A. Brasel, Plant Manager La Crosse Boiling Water Reactor Dairyland Power Cooperative S4601 State Highway 35 Genoa, WI 54632-8846
{{#Wiki_filter:May 25, 2011 Mr. Michael A. Brasel, Plant Manager La Crosse Boiling Water Reactor Dairyland Power Cooperative S4601 State Highway 35 Genoa, WI 54632-8846  


==SUBJECT:==
==SUBJECT:==
INFORMATION REQUEST TO SUPPORT ONGOING PRE-OPERATIONAL TESTING OF AN INDEPENDENT SPENT FUEL STORAGE INSTALLATION INSPECTION AT THE PERMANENTLY SHUTDOWN LA CROSSE BOILING WATER REACTOR SITE
INFORMATION REQUEST TO SUPPORT ONGOING PRE-OPERATIONAL TESTING OF AN INDEPENDENT SPENT FUEL STORAGE INSTALLATION INSPECTION AT THE PERMANENTLY SHUTDOWN LA CROSSE BOILING WATER REACTOR SITE  


==Dear Mr. Brasel:==
==Dear Mr. Brasel:==
This letter is to request information to support our Pre-Operational Testing of an Independent Spent Fuel Storage Installation (ISFSI) inspection that is currently ongoing at the permanently shutdown La Crosse Boiling Water Reactor site. The inspection is being performed in accordance with the U.S. Nuclear Regulatory Commission (NRC) Inspection Procedure 60854.1.
This letter is to request information to support our Pre-Operational Testing of an Independent Spent Fuel Storage Installation (ISFSI) inspection that is currently ongoing at the permanently shutdown La Crosse Boiling Water Reactor site. The inspection is being performed in accordance with the U.S. Nuclear Regulatory Commission (NRC) Inspection Procedure 60854.1.
The inspection consists of four exclusive elements: (1) an offsite review of calculations used to support heavy loads movements throughout the site with onsite inspection of the structures; (2) an onsite review of your 10 Code of Federal Regulations (CFR) 72.212 Report; (3) an offsite review of procedures, evaluations, and programs to demonstrate site readiness to load spent fuel; and 4) onsite observations of dry run operations.
The inspection consists of four exclusive elements: (1) an offsite review of calculations used to support heavy loads movements throughout the site with onsite inspection of the structures; (2) an onsite review of your 10 Code of Federal Regulations (CFR) 72.212 Report; (3) an offsite review of procedures, evaluations, and programs to demonstrate site readiness to load spent fuel; and 4) onsite observations of dry run operations.
Line 27: Line 26:
The documents requested are necessary to ensure the inspection team is adequately prepared for the inspection. The information may be provided either electronically or in hard copy.
The documents requested are necessary to ensure the inspection team is adequately prepared for the inspection. The information may be provided either electronically or in hard copy.
If there are any questions about the material requested, or the inspection in general, please do not hesitate to call or e-mail Mr. Jeremy Tapp at 630-829-9862 or Jeremy.Tapp@nrc.gov or Mr. Lionel Rodriguez at 630-829-9609 or Lionel.Rodriguez@nrc.gov.
If there are any questions about the material requested, or the inspection in general, please do not hesitate to call or e-mail Mr. Jeremy Tapp at 630-829-9862 or Jeremy.Tapp@nrc.gov or Mr. Lionel Rodriguez at 630-829-9609 or Lionel.Rodriguez@nrc.gov.
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  


M. Brasel                                        This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget Control Number 3150-0011.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget Control Number 3150-0011.
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
Sincerely,
Sincerely,  
                                              /RA/ By Wayne J. Slawinski For/
/RA/ By Wayne J. Slawinski For/
Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No. 050-00409 License No. DPR-45
Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No. 050-00409 License No. DPR-45  


==Enclosure:==
==Enclosure:==
Requested Information for a Pre-Operational Testing of an Independent Spent Fuel Storage Installation (ISFSI) Inspection cc w/encl:
J. McRill, Technical Support Engineer T. Zaremba, Wheeler, Van Sickle and Anderson G. Kruck, Chairman, Town of Genoa J. Kitsembel, Wisconsin Public Service Service Commission P. Schmidt, Manager, Radiation Protection Section B. D. Burks, P.E., Director, Bureau of Field Operations Spark Burmaster, Coulee Region Energy Coalition


Requested Information for a Pre-Operational Testing of an Independent Spent Fuel Storage Installation (ISFSI) Inspection cc w/encl:      J. McRill, Technical Support Engineer T. Zaremba, Wheeler, Van Sickle and Anderson G. Kruck, Chairman, Town of Genoa J. Kitsembel, Wisconsin Public Service Service Commission P. Schmidt, Manager, Radiation Protection Section B. D. Burks, P.E., Director, Bureau of Field Operations Spark Burmaster, Coulee Region Energy Coalition
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget Control Number 3150-0011.
 
M. Brasel                                                        This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget Control Number 3150-0011.
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
Sincerely,
Sincerely,  
                                                              /RA/ By Wayne J. Slawinski For/
/RA/ By Wayne J. Slawinski For/
Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No. 050-00409 License No. DPR-45
Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No. 050-00409 License No. DPR-45  


==Enclosure:==
==Enclosure:==
Requested Information for a Pre-Operational Testing of an Independent Spent Fuel Storage Installation (ISFSI) Inspection cc w/encl:
J. McRill, Technical Support Engineer T. Zaremba, Wheeler, Van Sickle and Anderson G. Kruck, Chairman, Town of Genoa J. Kitsembel, Wisconsin Public Service Service Commission P. Schmidt, Manager, Radiation Protection Section B. D. Burks, P.E., Director, Bureau of Field Operations Spark Burmaster, Coulee Region Energy Coalition DISTRIBUTION:
Cynthia Pederson Anne Boland Patrick Louden John Hickman, FSME Steven Orth Carole Ariano Paul Pelke Matthew Learn Jeremy Tapp Rhex Edwards Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\\DNMSIII\\Work in progress\\LTR-LaCrosse RFI.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII DNMS RIII DNMS RIII DNMS RIII DNMS NAME LNRodriguez:rj LNL CALipa WJS for DATE 05/25/11 05/25/11 OFFICIAL RECORD COPY


Requested Information for a Pre-Operational Testing of an Independent Spent Fuel Storage Installation (ISFSI) Inspection cc w/encl:            J. McRill, Technical Support Engineer T. Zaremba, Wheeler, Van Sickle and Anderson G. Kruck, Chairman, Town of Genoa J. Kitsembel, Wisconsin Public Service Service Commission P. Schmidt, Manager, Radiation Protection Section B. D. Burks, P.E., Director, Bureau of Field Operations Spark Burmaster, Coulee Region Energy Coalition DISTRIBUTION:
Enclosure Requested Information for a Pre-Operational Testing of an Independent Spent Fuel Storage Installation (ISFSI) Inspection
Cynthia Pederson                                  Steven Orth                                    Jeremy Tapp Anne Boland                                      Carole Ariano                                  Rhex Edwards Patrick Louden                                    Paul Pelke                                    Patricia Buckley John Hickman, FSME                                Matthew Learn                                  Tammy Tomczak DOCUMENT NAME: G:\DNMSIII\Work in progress\LTR-LaCrosse RFI.docx Publicly Available                  Non-Publicly Available              Sensitive                      Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE          RIII DNMS                    RIII DNMS                  RIII DNMS                    RIII DNMS NAME            LNRodriguez:rj LNL            CALipa WJS for DATE              05/25/11                    05/25/11 OFFICIAL RECORD COPY
 
Requested Information for a Pre-Operational Testing of an Independent Spent Fuel Storage Installation (ISFSI) Inspection
: 1. A current electronic copy of the following documents:
: 1. A current electronic copy of the following documents:
: 1. Site Decommissioning Plan
: 1. Site Decommissioning Plan
Line 84: Line 83:
: 1. Last periodic inspection
: 1. Last periodic inspection
: 2. Last frequent inspection
: 2. Last frequent inspection
: 3. Vendor recommendations, site procedures, and documentation of the crane preventive maintenance Enclosure
: 3. Vendor recommendations, site procedures, and documentation of the crane preventive maintenance
 
2 Enclosure
: 11. A copy of helium quality certificates used for helium backfilling of dry cask storage canisters.
: 11. A copy of helium quality certificates used for helium backfilling of dry cask storage canisters.
: 12. A copy of the internal QA review associated with the ISFSI program if one has been performed.
: 12. A copy of the internal QA review associated with the ISFSI program if one has been performed.
Line 111: Line 112:
: 17. A copy of a readiness document, if prepared, based on lessons learned from audits at other sites.
: 17. A copy of a readiness document, if prepared, based on lessons learned from audits at other sites.
: 18. A copy of the latest Transfer Cask trunnion annual testing report.
: 18. A copy of the latest Transfer Cask trunnion annual testing report.
: 19. Procedures for implementing NAC 72.48s, information notices, and manufacturing deviation reports.
: 19. Procedures for implementing NAC 72.48s, information notices, and manufacturing deviation reports.}}
2                                            Enclosure}}

Latest revision as of 06:04, 13 January 2025

Letter Information Request to Support Ongoing pre-Operational Testing an Independent Spent Fuel Storage Installation Inspection at the Permanently Shutdown La Crosse Boiling Water Reactor Site
ML111470448
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 05/25/2011
From: Christine Lipa
Division of Nuclear Materials Safety III
To: Brasel M
Dairyland Power Cooperative
References
Download: ML111470448 (5)


Text

May 25, 2011 Mr. Michael A. Brasel, Plant Manager La Crosse Boiling Water Reactor Dairyland Power Cooperative S4601 State Highway 35 Genoa, WI 54632-8846

SUBJECT:

INFORMATION REQUEST TO SUPPORT ONGOING PRE-OPERATIONAL TESTING OF AN INDEPENDENT SPENT FUEL STORAGE INSTALLATION INSPECTION AT THE PERMANENTLY SHUTDOWN LA CROSSE BOILING WATER REACTOR SITE

Dear Mr. Brasel:

This letter is to request information to support our Pre-Operational Testing of an Independent Spent Fuel Storage Installation (ISFSI) inspection that is currently ongoing at the permanently shutdown La Crosse Boiling Water Reactor site. The inspection is being performed in accordance with the U.S. Nuclear Regulatory Commission (NRC) Inspection Procedure 60854.1.

The inspection consists of four exclusive elements: (1) an offsite review of calculations used to support heavy loads movements throughout the site with onsite inspection of the structures; (2) an onsite review of your 10 Code of Federal Regulations (CFR) 72.212 Report; (3) an offsite review of procedures, evaluations, and programs to demonstrate site readiness to load spent fuel; and 4) onsite observations of dry run operations.

Experience has shown that these inspections are resource intensive both for the NRC inspectors and the utility staff. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents required for the inspection. Please provide this information to the NRC Region III office no later than July 26, 2011 or upon its site approval.

The documents requested are necessary to ensure the inspection team is adequately prepared for the inspection. The information may be provided either electronically or in hard copy.

If there are any questions about the material requested, or the inspection in general, please do not hesitate to call or e-mail Mr. Jeremy Tapp at 630-829-9862 or Jeremy.Tapp@nrc.gov or Mr. Lionel Rodriguez at 630-829-9609 or Lionel.Rodriguez@nrc.gov.

In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget Control Number 3150-0011.

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.

Sincerely,

/RA/ By Wayne J. Slawinski For/

Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No. 050-00409 License No. DPR-45

Enclosure:

Requested Information for a Pre-Operational Testing of an Independent Spent Fuel Storage Installation (ISFSI) Inspection cc w/encl:

J. McRill, Technical Support Engineer T. Zaremba, Wheeler, Van Sickle and Anderson G. Kruck, Chairman, Town of Genoa J. Kitsembel, Wisconsin Public Service Service Commission P. Schmidt, Manager, Radiation Protection Section B. D. Burks, P.E., Director, Bureau of Field Operations Spark Burmaster, Coulee Region Energy Coalition

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget Control Number 3150-0011.

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.

Sincerely,

/RA/ By Wayne J. Slawinski For/

Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket No. 050-00409 License No. DPR-45

Enclosure:

Requested Information for a Pre-Operational Testing of an Independent Spent Fuel Storage Installation (ISFSI) Inspection cc w/encl:

J. McRill, Technical Support Engineer T. Zaremba, Wheeler, Van Sickle and Anderson G. Kruck, Chairman, Town of Genoa J. Kitsembel, Wisconsin Public Service Service Commission P. Schmidt, Manager, Radiation Protection Section B. D. Burks, P.E., Director, Bureau of Field Operations Spark Burmaster, Coulee Region Energy Coalition DISTRIBUTION:

Cynthia Pederson Anne Boland Patrick Louden John Hickman, FSME Steven Orth Carole Ariano Paul Pelke Matthew Learn Jeremy Tapp Rhex Edwards Patricia Buckley Tammy Tomczak DOCUMENT NAME: G:\\DNMSIII\\Work in progress\\LTR-LaCrosse RFI.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII DNMS RIII DNMS RIII DNMS RIII DNMS NAME LNRodriguez:rj LNL CALipa WJS for DATE 05/25/11 05/25/11 OFFICIAL RECORD COPY

Enclosure Requested Information for a Pre-Operational Testing of an Independent Spent Fuel Storage Installation (ISFSI) Inspection

1. A current electronic copy of the following documents:
1. Site Decommissioning Plan
2. Site License
3. Site Technical Specifications
4. NAC FSAR
5. NAC CoC
6. NAC Technical Specifications
7. NAC Approved Contents
2. A copy of the 10 CFR 72.212 report.
3. A copy of all 72.48 Screenings performed to date.
4. A copy of the ISFSI ALARA plan.
5. A copy of calculations and / or drawings described below:
1. Tornado missile analysis
2. Offsite ISFSI dose analysis
3. Pad cask layout
4. Fire hazards analysis
6. A list of condition reports since January 2010 related to:
1. Dry cask storage program
2. Dry cask storage pad
3. Reactor building polar crane
4. Cask handling crane
7. A compliance matrix for fuel selected for this campaign indicating that it meets Technical Specifications.
8. A copy of the sites emergency plan (as updated to include the ISFSI).
9. A copy of cask handling crane:
1. Trolley factory acceptance test
2. Trolley site acceptance test
3. Last periodic inspection
4. Last frequent inspection
5. Single failure proof compliance matrix
6. Vendor recommendations, site procedures, and documentation of the crane preventive maintenance
10. A copy of polar building crane:
1. Last periodic inspection
2. Last frequent inspection
3. Vendor recommendations, site procedures, and documentation of the crane preventive maintenance

2 Enclosure

11. A copy of helium quality certificates used for helium backfilling of dry cask storage canisters.
12. A copy of the internal QA review associated with the ISFSI program if one has been performed.
13. A copy of ISFSI related training records for personnel.
14. A copy of an ISFSI organizational chart that identifies roles and responsibilities of site and corporate personnel.
15. A copy of procedures used for ISFSI operations including:
1. Transfer Cask, Vertical Concrete Cask (VCC), and Transportable Storage Canister (TSC) receipt inspection
2. Transfer Cask, VCC, and TSC preparation
3. TSC loading
4. TSC processing
5. TSC welding
6. TSC non-destructive testing
7. TSC unloading
8. Transfer Cask movement
9. VCC movement
10. VCC processing
11. VCC radiation surveys
12. VCC technical specification monitoring
13. Fuel selection
14. 72.48 screening and evaluation process
15. Manual movement of the cask handling crane
16. Rigging and lifting
17. Daily inspection of slings, yoke, and Transfer Cask trunnions
18. Abnormal ISFSI operations
16. A copy of the QA program guidance document.
17. A copy of a readiness document, if prepared, based on lessons learned from audits at other sites.
18. A copy of the latest Transfer Cask trunnion annual testing report.
19. Procedures for implementing NAC 72.48s, information notices, and manufacturing deviation reports.