IR 05000293/2011010: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 06/10/2011
| issue date = 06/10/2011
| title = IR 05000293/2011010; on 04/25/2011 - 04/29/2011; Pilgrim Nuclear Power Station; Review of License Renewal Activities
| title = IR 05000293/2011010; on 04/25/2011 - 04/29/2011; Pilgrim Nuclear Power Station; Review of License Renewal Activities
| author name = Conte R J
| author name = Conte R
| author affiliation = NRC/RGN-I/DRS/EB1
| author affiliation = NRC/RGN-I/DRS/EB1
| addressee name = Smith R G
| addressee name = Smith R
| addressee affiliation = Entergy Nuclear Operations, Inc
| addressee affiliation = Entergy Nuclear Operations, Inc
| docket = 05000293
| docket = 05000293
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Robert G. SmithSite Vice PresidentEntergy Nuclear OPerations, Inc.Pilgrim Nuclear Power Station600 Rocky Hill RoadPlymouth, MA 02360-5508
{{#Wiki_filter:==SUBJECT:==
 
PILGRIM NUCLEAR POWER 05000293/201 1010
SUBJECT: PILGRIM NUCLEAR POWER05000293/201 1010


==Dear Mr. Smith:==
==Dear Mr. Smith:==
June 10, 2011STATION - NRC INSPECTION REPORTon April 29,2011, the U.S. Nuclear Regulatory commission (NRC) completed an inspection atthe pilgrim Nuclear Power Station. The-encloied report documents the results of theinspection, which *"r" dir"rssed on April 29, 2011, with you and members of your staff'This inspection was an examination of license renewal activities under Temporary lnstruction(Tl) 2516/001, Review of License Renewal Activities. The inspection was directed toward thoseactivities and facilities accessible during the refueling outage. The inspection also reviewed thecompletion of commitments made duririg the renewed license application process andcompliance with the commission's rules-and regulations and the conditions of your operatinglicense. Within these areas, the inspeciion invoived examination of selected procedures andrepresentative records, observations of activities, and interviews with personnel'On the basis of the samples selected for review, there were no findings of significance identifiedduring this inspection. tne NRC staff identified two instances of commitments which could notbe considered completed at this time. Given the scheduled completion of June 8, 2012'forthese commitments, we will incorporate a followup review as a part of our planned teaminspection in this area prior to June 8,2012, to verify completion along with the completion ofother commitments. ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and itsenclosure will be available electronically for public inspection in the NRC Public DocumentRoom or from the Publicly Available Records (PARS) component of NRC's document systemAgencywide Document Access and Management System (ADAMS). ADAMS is accessible fromthe NRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic ReadingRoom).
UNITED STATES NUCLEAR REGULATORY COMMISSION


Sincerely,A*l*-['] e-},Richard J. Conte, CMefEngineering BranchlDivision of Reactor Safety
==REGION I==
475 ALLENDALE ROAD KING OF PRUSSIA. PA 19406-1415 June 10, 2011 STATION - NRC INSPECTION REPORT on April 29,2011, the U.S. Nuclear Regulatory commission (NRC) completed an inspection at the pilgrim Nuclear Power Station. The-encloied report documents the results of the inspection, which *"r" dir"rssed on April 29, 2011, with you and members of your staff'
This inspection was an examination of license renewal activities under Temporary lnstruction (Tl) 2516/001, Review of License Renewal Activities. The inspection was directed toward those activities and facilities accessible during the refueling outage. The inspection also reviewed the completion of commitments made duririg the renewed license application process and compliance with the commission's rules-and regulations and the conditions of your operating license. Within these areas, the inspeciion invoived examination of selected procedures and representative records, observations of activities, and interviews with personnel'
On the basis of the samples selected for review, there were no findings of significance identified during this inspection. tne NRC staff identified two instances of commitments which could not be considered completed at this time. Given the scheduled completion of June 8, 2012'for these commitments, we will incorporate a followup review as a part of our planned team inspection in this area prior to June 8,2012, to verify completion along with the completion of other commitments. ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room).


===Enclosure:===
Sincerely, A*l*-['] e-},
NRC f nspection Report 0500029312011301cc w/enclosure: Distribution via ListServ
Richard J. Conte, CMef Engineering Branchl Division of Reactor Safety Enclosure:
NRC f nspection Report 0500029312011301 cc w/enclosure: Distribution via ListServ
}}
}}

Latest revision as of 05:54, 13 January 2025

IR 05000293/2011010; on 04/25/2011 - 04/29/2011; Pilgrim Nuclear Power Station; Review of License Renewal Activities
ML111610030
Person / Time
Site: Pilgrim
Issue date: 06/10/2011
From: Conte R
Engineering Region 1 Branch 1
To: Rich Smith
Entergy Nuclear Operations
References
IR-11-010
Download: ML111610030 (12)


Text

SUBJECT:

PILGRIM NUCLEAR POWER 05000293/201 1010

Dear Mr. Smith:

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION I

475 ALLENDALE ROAD KING OF PRUSSIA. PA 19406-1415 June 10, 2011 STATION - NRC INSPECTION REPORT on April 29,2011, the U.S. Nuclear Regulatory commission (NRC) completed an inspection at the pilgrim Nuclear Power Station. The-encloied report documents the results of the inspection, which *"r" dir"rssed on April 29, 2011, with you and members of your staff'

This inspection was an examination of license renewal activities under Temporary lnstruction (Tl) 2516/001, Review of License Renewal Activities. The inspection was directed toward those activities and facilities accessible during the refueling outage. The inspection also reviewed the completion of commitments made duririg the renewed license application process and compliance with the commission's rules-and regulations and the conditions of your operating license. Within these areas, the inspeciion invoived examination of selected procedures and representative records, observations of activities, and interviews with personnel'

On the basis of the samples selected for review, there were no findings of significance identified during this inspection. tne NRC staff identified two instances of commitments which could not be considered completed at this time. Given the scheduled completion of June 8, 2012'for these commitments, we will incorporate a followup review as a part of our planned team inspection in this area prior to June 8,2012, to verify completion along with the completion of other commitments. ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room).

Sincerely, A*l*-['] e-},

Richard J. Conte, CMef Engineering Branchl Division of Reactor Safety Enclosure:

NRC f nspection Report 0500029312011301 cc w/enclosure: Distribution via ListServ