ML11182B053: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML11182B053
| number = ML11182B053
| issue date = 06/29/2011
| issue date = 06/29/2011
| title = 2011/06/29 NRR E-mail Capture - HNP Supplement to Mur Power Uprate LAR
| title = NRR E-mail Capture - HNP Supplement to MUR Power Uprate LAR
| author name = Som S
| author name = Som S
| author affiliation = NRC/NRR/DE/EEEB
| author affiliation = NRC/NRR/DE/EEEB
| addressee name = Mozafari B L
| addressee name = Mozafari B
| addressee affiliation = NRC/NRR/DORL
| addressee affiliation = NRC/NRR/DORL
| docket = 05000400
| docket = 05000400
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:1 NRR-PMDAPEm Resource From: Som, Swagata Sent: Wednesday, June 29, 2011 10:11 AM To: Mozafari, Brenda Cc: Goel, Vijay; Mathew, Roy
{{#Wiki_filter:1 NRR-PMDAPEm Resource From:
Som, Swagata Sent:
Wednesday, June 29, 2011 10:11 AM To:
Mozafari, Brenda Cc:
Goel, Vijay; Mathew, Roy


==Subject:==
==Subject:==
RE: HNP Supplement to MUR Power Uprate LARBrenda - As discussed, we can now accept the revised LAR for further review. This is our branch position.  
RE: HNP Supplement to MUR Power Uprate LAR Brenda - As discussed, we can now accept the revised LAR for further review. This is our branch position.
 
Thanks Swagata From: Mozafari, Brenda Sent: Wednesday, June 29, 2011 9:27 AM To: Som, Swagata  
Thanks Swagata From: Mozafari, Brenda Sent: Wednesday, June 29, 2011 9:27 AM To: Som, Swagata  


==Subject:==
==Subject:==
FW: HNP Supplement to MUR Power Uprate LAR Can you please send the acceptance review eMail you sent and retracted,  I assume that will be the LIC 109 status fir EEEB.
FW: HNP Supplement to MUR Power Uprate LAR  


Thanks Brenda415 2020 From: Goel, Vijay Sent: Tuesday, June 28, 2011 6:51 PM To: Mozafari, Brenda; Som, Swagata Cc: Mathew, Roy  
Can you please send the acceptance review eMail you sent and retracted, I assume that will be the LIC 109 status fir EEEB.
Thanks Brenda
 
4152020 From: Goel, Vijay Sent: Tuesday, June 28, 2011 6:51 PM To: Mozafari, Brenda; Som, Swagata Cc: Mathew, Roy  


==Subject:==
==Subject:==
RE: HNP Supplement to MUR Power Uprate LAR Brenda/Som, I have looked at the revised "Electrical Equipment Design" descriptions provided in Enclosure 2 of the
RE: HNP Supplement to MUR Power Uprate LAR  


supplement to the LAR.
Brenda/Som, I have looked at the revised Electrical Equipment Design descriptions provided in Enclosure 2 of the supplement to the LAR.
Although, the description relating to the iso-phase bus is still somewhat not clear (i.e., further clarifications will be required during RAI process), we can accept the LAR for further review.  
Although, the description relating to the iso-phase bus is still somewhat not clear (i.e., further clarifications will be required during RAI process), we can accept the LAR for further review.
Vijay From: Mozafari, Brenda Sent: Monday, June 27, 2011 8:22 AM To: Som, Swagata; Goel, Vijay; Mathew, Roy


Vijay  From: Mozafari, Brenda Sent: Monday, June 27, 2011 8:22 AM To: Som, Swagata; Goel, Vijay; Mathew, Roy
==Subject:==
FW: HNP Supplement to MUR Power Uprate LAR


==Subject:==
This is the supplemental information for the MUR. Provided the information is robust enough to start your review I will be expecting to be able to send the LIC-109 letter today. Let me know.
FW: HNP Supplement to MUR Power Uprate LAR This is the supplemental information for the MUR. Provided the information is robust enough to start your review I will be expecting to be able to send the LIC-109 letter today. Let me know.  
Brenda
 
4152020


Brenda 415 2020 2 From: Bass, Kimberly [mailto:Kimberly.Bass@pgnmail.com]
2 From: Bass, Kimberly [mailto:Kimberly.Bass@pgnmail.com]
Sent: Thursday, June 23, 2011 4:56 PM To: Mozafari, Brenda Cc: Caves, John  
Sent: Thursday, June 23, 2011 4:56 PM To: Mozafari, Brenda Cc: Caves, John  


==Subject:==
==Subject:==
HNP Supplement to MUR Power Uprate LAR Brenda, IhaveattachedanelectronicversionoftheHNPMURPowerUprateLAR(Supplement)withtheinformationthatwasrequestedduringdiscussionsheldwiththeNRCoverthelastmonth.Theattachedversionexcludestwoenclosures(enclosures5&6)becauseofproprietaryinformation.TheoriginalMURUprateLAR(submittedApril28,2011)containstheidenticalenclosures.Noinformationwaschangesinthoseenclosures.Afullcopyoftherevisedapplicationhasbeenplacedinthemail.
HNP Supplement to MUR Power Uprate LAR
KimBassLicensingEngineerLicensing&RegulatoryProgramsProgressEnergyHarrisNuclearPlant919 3622326kimberly.bass@pgnmail.com Hearing Identifier: NRR_PMDA Email Number: 88   Mail Envelope Properties   (AF843158D8D87443918BD3AA953ABF782B68068ED5)
: Brenda,
 
IhaveattachedanelectronicversionoftheHNPMURPowerUprateLAR(Supplement)withtheinformationthatwas requestedduringdiscussionsheldwiththeNRCoverthelastmonth.Theattachedversionexcludestwoenclosures (enclosures5&6)becauseofproprietaryinformation.TheoriginalMURUprateLAR(submittedApril28,2011)contains theidenticalenclosures.Noinformationwaschangesinthoseenclosures.Afullcopyoftherevisedapplicationhasbeen placedinthemail.
 
KimBass LicensingEngineer Licensing&RegulatoryPrograms ProgressEnergyHarrisNuclearPlant 9193622326 kimberly.bass@pgnmail.com
 
Hearing Identifier:
NRR_PMDA Email Number:
88 Mail Envelope Properties (AF843158D8D87443918BD3AA953ABF782B68068ED5)  


==Subject:==
==Subject:==
RE: HNP Supplement to MUR Power Uprate LAR Sent Date:   6/29/2011 10:10:40 AM Received Date: 6/29/2011 10:10:40 AM From:   Som, Swagata Created By:   Swagata.Som@nrc.gov Recipients:     "Goel, Vijay" <Vijay.Goel@nrc.gov>
RE: HNP Supplement to MUR Power Uprate LAR Sent Date:
Tracking Status: None "Mathew, Roy" <Roy.Mathew@nrc.gov>
6/29/2011 10:10:40 AM Received Date:
Tracking Status: None "Mozafari, Brenda" <Brenda.Mozafari@nrc.gov> Tracking Status: None  
6/29/2011 10:10:40 AM From:
 
Som, Swagata Created By:
Post Office:   HQCLSTR02.nrc.gov Files     Size     Date & Time MESSAGE   2264     6/29/2011 10:10:40 AM Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}
Swagata.Som@nrc.gov Recipients:  
"Goel, Vijay" <Vijay.Goel@nrc.gov>
Tracking Status: None "Mathew, Roy" <Roy.Mathew@nrc.gov>
Tracking Status: None "Mozafari, Brenda" <Brenda.Mozafari@nrc.gov>
Tracking Status: None Post Office:
HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 2264 6/29/2011 10:10:40 AM Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:}}

Latest revision as of 05:35, 13 January 2025

NRR E-mail Capture - HNP Supplement to MUR Power Uprate LAR
ML11182B053
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 06/29/2011
From: Som S
Electrical Engineering Branch
To: Mozafari B
Division of Operating Reactor Licensing
References
Download: ML11182B053 (3)


Text

1 NRR-PMDAPEm Resource From:

Som, Swagata Sent:

Wednesday, June 29, 2011 10:11 AM To:

Mozafari, Brenda Cc:

Goel, Vijay; Mathew, Roy

Subject:

RE: HNP Supplement to MUR Power Uprate LAR Brenda - As discussed, we can now accept the revised LAR for further review. This is our branch position.

Thanks Swagata From: Mozafari, Brenda Sent: Wednesday, June 29, 2011 9:27 AM To: Som, Swagata

Subject:

FW: HNP Supplement to MUR Power Uprate LAR

Can you please send the acceptance review eMail you sent and retracted, I assume that will be the LIC 109 status fir EEEB.

Thanks Brenda

4152020 From: Goel, Vijay Sent: Tuesday, June 28, 2011 6:51 PM To: Mozafari, Brenda; Som, Swagata Cc: Mathew, Roy

Subject:

RE: HNP Supplement to MUR Power Uprate LAR

Brenda/Som, I have looked at the revised Electrical Equipment Design descriptions provided in Enclosure 2 of the supplement to the LAR.

Although, the description relating to the iso-phase bus is still somewhat not clear (i.e., further clarifications will be required during RAI process), we can accept the LAR for further review.

Vijay From: Mozafari, Brenda Sent: Monday, June 27, 2011 8:22 AM To: Som, Swagata; Goel, Vijay; Mathew, Roy

Subject:

FW: HNP Supplement to MUR Power Uprate LAR

This is the supplemental information for the MUR. Provided the information is robust enough to start your review I will be expecting to be able to send the LIC-109 letter today. Let me know.

Brenda

4152020

2 From: Bass, Kimberly [1]

Sent: Thursday, June 23, 2011 4:56 PM To: Mozafari, Brenda Cc: Caves, John

Subject:

HNP Supplement to MUR Power Uprate LAR

Brenda,

IhaveattachedanelectronicversionoftheHNPMURPowerUprateLAR(Supplement)withtheinformationthatwas requestedduringdiscussionsheldwiththeNRCoverthelastmonth.Theattachedversionexcludestwoenclosures (enclosures5&6)becauseofproprietaryinformation.TheoriginalMURUprateLAR(submittedApril28,2011)contains theidenticalenclosures.Noinformationwaschangesinthoseenclosures.Afullcopyoftherevisedapplicationhasbeen placedinthemail.

KimBass LicensingEngineer Licensing&RegulatoryPrograms ProgressEnergyHarrisNuclearPlant 9193622326 kimberly.bass@pgnmail.com

Hearing Identifier:

NRR_PMDA Email Number:

88 Mail Envelope Properties (AF843158D8D87443918BD3AA953ABF782B68068ED5)

Subject:

RE: HNP Supplement to MUR Power Uprate LAR Sent Date:

6/29/2011 10:10:40 AM Received Date:

6/29/2011 10:10:40 AM From:

Som, Swagata Created By:

Swagata.Som@nrc.gov Recipients:

"Goel, Vijay" <Vijay.Goel@nrc.gov>

Tracking Status: None "Mathew, Roy" <Roy.Mathew@nrc.gov>

Tracking Status: None "Mozafari, Brenda" <Brenda.Mozafari@nrc.gov>

Tracking Status: None Post Office:

HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 2264 6/29/2011 10:10:40 AM Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received: