IR 05000454/2011502: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (4 intermediate revisions by the same user not shown) | |||
| Line 5: | Line 5: | ||
| author name = Peterson H | | author name = Peterson H | ||
| author affiliation = NRC/RGN-III/DRS/OB | | author affiliation = NRC/RGN-III/DRS/OB | ||
| addressee name = Pacilio M | | addressee name = Pacilio M | ||
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | | addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | ||
| docket = 05000454, 05000455 | | docket = 05000454, 05000455 | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:August 16, 2011 | ||
SUBJECT: BYRON STATION, UNITS 1 AND 2 BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000454/ | ==SUBJECT:== | ||
BYRON STATION, UNITS 1 AND 2 BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000454/2011502(DRS); 05000455/2011502(DRS) | |||
==Dear Mr. Pacilio:== | ==Dear Mr. Pacilio:== | ||
On July 29, 2011, the U. S. Nuclear Regulatory Commission (NRC) completed a Baseline Emergency Preparedness Biennial Exercise inspection at your Byron Station, Units 1 and 2 | On July 29, 2011, the U. S. Nuclear Regulatory Commission (NRC) completed a Baseline Emergency Preparedness Biennial Exercise inspection at your Byron Station, Units 1 and 2. | ||
The inspection examined activities conducted under your license as they relate to safety and compliance with the | The enclosed inspection report documents the inspection findings which were discussed on July 29, 2011, with Mr. T. Tulon and other members of your staff. | ||
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license. | |||
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | |||
Based on the results of this inspection, there were no findings of significance identified during this inspection. | Based on the results of this inspection, there were no findings of significance identified during this inspection. | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning this inspection, we will be pleased to discuss them with you. | ||
-rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning this inspection, we will be pleased to discuss them with you. | |||
Sincerely,/RA/ | Sincerely, | ||
/RA/ | |||
NPF-37; NPF-66 | Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 | ||
===Enclosure:=== | ===Enclosure:=== | ||
Inspection Report No. 05000454/ | Inspection Report No. 05000454/2011502(DRS); | ||
05000455/2011502(DRS) | |||
w/Attachment: Supplemental Information | |||
Supplemental Information | |||
REGION III== | |||
Docket Nos: | |||
50-454; 50-455 License Nos: | |||
NPF-37; NPF-66 Report Nos: | NPF-37; NPF-66 Report Nos: | ||
05000454/ | 05000454/2011502(DRS); 05000455/2011502(DRS) | ||
Robert Jickling, Sr. Emergency Preparedness Inspector James Beavers, Emergency Preparedness Inspector Jeff Laughlin, Sr. Emergency Preparedness Specialist Nicholas Valos, Sr. Risk Analyst Alex Garmoe, Resident Inspector | Licensee: | ||
Exelon Generation Company, LLC Facility: | |||
Byron Station, Units 1 and 2 Location: | |||
Byron, Illinois Dates: | |||
July 25 through 29, 2011 Inspectors: | |||
Robert Jickling, Sr. Emergency Preparedness Inspector | |||
James Beavers, Emergency Preparedness Inspector | |||
Jeff Laughlin, Sr. Emergency Preparedness Specialist | |||
Nicholas Valos, Sr. Risk Analyst | |||
Alex Garmoe, Resident Inspector | |||
Approved by: | |||
Hironori Peterson, Chief Operations Branch Division of Reactor Safety | |||
Enclosure | |||
=SUMMARY OF FINDINGS= | |||
IR 05000454/2011502(DRS), 05000455/2011502(DRS); 07/25/2011 - 07/29/2011; | |||
Byron Station, Units 1 and 2; Baseline Emergency Preparedness Biennial Exercise Inspection. | |||
The NRC | This report covers a one week period of announced baseline inspection by three regional inspectors, one emergency preparedness specialist and one resident inspector. The significance of most findings is indicated by their color (Green, White, Yellow, Red) using Inspection Manual Chapter (IMC) 0609, Significance Determination Process (SDP). Findings for which the SDP does not apply may be Green or be assigned a severity level after NRC management review. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 4, dated December 2006. | ||
-1649, | |||
=== | ===NRC-Identified=== | ||
and Self-Revealed Findings | and Self-Revealed Findings | ||
===Cornerstone: Emergency Preparedness=== | ===Cornerstone: Emergency Preparedness=== | ||
No findings were identified. | No findings were identified. | ||
=== | ===Licensee-Identified Violations=== | ||
No violations were identified. | No violations were identified. | ||
=REPORT DETAILS= | =REPORT DETAILS= | ||
==REACTOR SAFETY== | |||
===Cornerstone: Emergency Preparedness=== | |||
{{a|1EP1}} | |||
=== | ==1EP1 Exercise Evaluation== | ||
{{IP sample|IP=IP 71114.01}} | |||
===.1 Exercise Evaluation=== | ===.1 Exercise Evaluation=== | ||
====a. Inspection Scope==== | |||
The inspectors reviewed the July 27, 2011, biennial emergency preparedness exercises objectives and scenario to ensure that the exercise would acceptably test major elements of the licensees emergency plan and to verify that the exercises simulated problems provided an acceptable framework to support demonstration of the licensees capability to implement its plan. The inspectors also reviewed records of other drills and exercises conducted in 2009, 2010, and 2011, to verify that those drills scenarios were sufficiently different from the scenario used in the July 27, 2011, exercise. | |||
The inspectors evaluated the licensees exercise performance, focusing on the risk significant activities of emergency classification, notification, and protective action decision making, implementation of accident mitigation strategies, and correction of past exercise weaknesses in the following emergency response facilities: | |||
The inspectors | * Control Room Simulator (CRS); | ||
* Technical Support Center (TSC); | |||
* Operations Support Center (OSC); | |||
* Emergency Operations Facility (EOF); and | |||
* Joint Information Center (JIC). | |||
The inspectors also assessed the licensees recognition of abnormal plant conditions, transfer of responsibilities between facilities, internal communications, interfaces with offsite officials, readiness of emergency facilities and related equipment, and overall implementation of the licensees emergency plan. | |||
The inspectors attended post | The inspectors attended post-exercise critiques in the CRS, OSC, TSC and EOF to evaluate the licensees initial self-assessment of its exercise performance. The inspectors later met with the licensees lead exercise evaluators and managers to obtain the licensees findings and assessments of its exercise participants performances. | ||
-exercise critiques in the CRS, OSC, TSC and EOF to evaluate the | |||
-assessment of its exercise performance. The inspectors later met with the | |||
These self-assessments were then compared with the inspectors independent observations and assessments to assess the licensees ability to adequately critique its exercise performance. Documents reviewed are listed in the Attachment to this report. | |||
This exercise evaluation inspection constituted one sample as defined in Inspection Procedure (IP) 71114.01-05. | |||
====b. Findings==== | ====b. Findings==== | ||
| Line 108: | Line 120: | ||
==OTHER ACTIVITIES== | ==OTHER ACTIVITIES== | ||
===Cornerstone: Emergency Preparedness=== | |||
{{a|4OA1}} | |||
==4OA1 Performance Indicator (PI) Verification== | ==4OA1 Performance Indicator (PI) Verification== | ||
{{IP sample|IP=IP 71151}} | |||
===.1 Drill/Exercise Performance=== | ===.1 Drill/Exercise Performance=== | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
The inspectors sampled licensee submittals for the Drill/Exercise Performance PI for the period from the second quarter 2010 through second quarter 2011. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the Nuclear Energy Institute (NEI) Document 99 | The inspectors sampled licensee submittals for the Drill/Exercise Performance PI for the period from the second quarter 2010 through second quarter 2011. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the Nuclear Energy Institute (NEI) Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, were used. The inspectors reviewed the licensees records associated with the performance indicator to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI, assessments of PI opportunities during pre-designated control room simulator training sessions, and performance during other drills. Documents reviewed are listed in the to this report. | ||
-02, | |||
-designated control room simulator training sessions, and performance during other drills. Documents reviewed are listed in the | |||
This inspection constituted one drill/exercise performance sample as defined in IP 71151-05. | This inspection constituted one drill/exercise performance sample as defined in IP 71151-05. | ||
| Line 130: | Line 136: | ||
===.2 Emergency Response Organization Drill Participation=== | ===.2 Emergency Response Organization Drill Participation=== | ||
====a. Inspection Scope==== | |||
The inspectors sampled licensee submittals for the Emergency Response Organization (ERO) Drill Participation PI for the period from the second quarter 2010 through second quarter 2011. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, were used. | |||
The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI; performance during the 2010 and 2011 drills; and revisions of the roster of personnel assigned to key emergency response organization positions. Documents reviewed are listed in the to this report. | |||
This inspection constituted one ERO drill participation sample as defined in IP 71151-05. | This inspection constituted one ERO drill participation sample as defined in IP 71151-05. | ||
| Line 141: | Line 147: | ||
===.3 Alert and Notification System=== | ===.3 Alert and Notification System=== | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
The inspectors sampled licensee submittals for the Alert and Notification System (ANS) PI for the period from the second quarter 2010 through second quarter 2011. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, | The inspectors sampled licensee submittals for the Alert and Notification System (ANS) | ||
PI for the period from the second quarter 2010 through second quarter 2011. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, were used. The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI and results of periodic scheduled ANS operability tests. Documents reviewed are listed in the Attachment to this report. | |||
This inspection constituted one alert and notification system sample as defined in IP 71151-05. | This inspection constituted one alert and notification system sample as defined in IP 71151-05. | ||
| Line 149: | Line 155: | ||
====b. Findings==== | ====b. Findings==== | ||
No findings were identified. | No findings were identified. | ||
{{a|4OA6}} | |||
==4OA6 Management Meetings== | ==4OA6 Management Meetings== | ||
===.1=== | |||
===.1 Exit Meeting Summary=== | ===Exit Meeting Summary=== | ||
On July 29, 2011, the inspectors presented the biennial exercise inspection results to Mr. T. Tulon and other members of the licensee staff. The licensee acknowledged the issues presented. The inspectors confirmed that none of the potential report input discussed was considered proprietary. | |||
===.2 Public and Media Briefing=== | ===.2 Public and Media Briefing=== | ||
On July 29, 2011, the inspector summarized the NRC's preliminary exercise inspection conclusions at a public and media briefings hosted by Department of Homeland Security/Federal Emergency Management Agency Region V Field Office staff at the Ogle County Building in Oregon, Illinois. | On July 29, 2011, the inspector summarized the NRC's preliminary exercise inspection conclusions at a public and media briefings hosted by Department of Homeland Security/Federal Emergency Management Agency Region V Field Office staff at the Ogle County Building in Oregon, Illinois. | ||
ATTACHMENT: | ATTACHMENT: | ||
=SUPPLEMENTAL INFORMATION= | =SUPPLEMENTAL INFORMATION= | ||
==KEY POINTS OF CONTACT== | |||
Licensee | |||
: [[contact::T. Tulon]], Site Vice President | |||
: [[contact::T. Tulon]], Site Vice President | : [[contact::B. Adams]], Plant Manager | ||
: [[contact::B. Adams]], Plant Manager | : [[contact::J. Bottomley]], Outage Manager | ||
: [[contact::J. Bottomley]], Outage Manager | : [[contact::A. Daniels]], Corporate Emergency Preparedness Manager | ||
: [[contact::A. Daniels]], Corporate Emergency Preparedness Manager | : [[contact::P. Dempsey]], Site Communications | ||
: [[contact::P. Dempsey]], Site Communications | : [[contact::D. Drawbaugh]], Emergency Preparedness Manager | ||
: [[contact::D. Drawbaugh]], Emergency Preparedness Manager | : [[contact::T. Hulbert]], NRC Coordinator | ||
: [[contact::T. Hulbert]], NRC Coordinator | : [[contact::B. Kartheiser]], Emergency Preparedness Coordinator | ||
: [[contact::B. Kartheiser]], Emergency Preparedness Coordinator | : [[contact::S. Merrell]], Corporate Emergency Preparedness | ||
: [[contact::S. Merrell]], Corporate Emergency Preparedness | : [[contact::B. Spahr]], Maintenance Director | ||
: [[contact::B. Spahr]], Maintenance Director | : [[contact::D. Spitzer]], Regulatory Assurance Manager (Acting) | ||
: [[contact::D. Spitzer]], Regulatory Assurance Manager (Acting) | : [[contact::S. Swanson]], Nuclear Oversight Manager | ||
: [[contact::S. Swanson]], Nuclear Oversight Manager | : [[contact::M. Wolfe]], Reactor Services Manager | ||
: [[contact::M. Wolfe]], Reactor Services Manager | : [[contact::B. Youman]], Operations Director | ||
: [[contact::B. Youman]], Operations | Nuclear Regulatory Commission | ||
: [[contact::B. Bartlett]], Senior Resident Inspector | |||
: [[contact::B. Bartlett]], Senior Resident Inspector | : [[contact::J. Robbins]], Resident Inspector | ||
: [[contact::J. Robbins]], Resident Inspector | |||
==LIST OF ITEMS== | |||
===OPENED, CLOSED AND DISCUSSED=== | |||
Opened, Closed and | |||
LIST OF | |||
===Discussed=== | |||
None | |||
==LIST OF DOCUMENTS REVIEWED== | |||
}} | }} | ||
Latest revision as of 04:31, 13 January 2025
| ML11230A354 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 08/16/2011 |
| From: | Hironori Peterson Operations Branch III |
| To: | Pacilio M Exelon Generation Co, Exelon Nuclear |
| References | |
| IR-11-502 | |
| Download: ML11230A354 (12) | |
Text
August 16, 2011
SUBJECT:
BYRON STATION, UNITS 1 AND 2 BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000454/2011502(DRS); 05000455/2011502(DRS)
Dear Mr. Pacilio:
On July 29, 2011, the U. S. Nuclear Regulatory Commission (NRC) completed a Baseline Emergency Preparedness Biennial Exercise inspection at your Byron Station, Units 1 and 2.
The enclosed inspection report documents the inspection findings which were discussed on July 29, 2011, with Mr. T. Tulon and other members of your staff.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, there were no findings of significance identified during this inspection.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66
Enclosure:
Inspection Report No. 05000454/2011502(DRS);
w/Attachment: Supplemental Information
REGION III==
Docket Nos:
50-454; 50-455 License Nos:
05000454/2011502(DRS); 05000455/2011502(DRS)
Licensee:
Exelon Generation Company, LLC Facility:
Byron Station, Units 1 and 2 Location:
Byron, Illinois Dates:
July 25 through 29, 2011 Inspectors:
Robert Jickling, Sr. Emergency Preparedness Inspector
James Beavers, Emergency Preparedness Inspector
Jeff Laughlin, Sr. Emergency Preparedness Specialist
Nicholas Valos, Sr. Risk Analyst
Alex Garmoe, Resident Inspector
Approved by:
Hironori Peterson, Chief Operations Branch Division of Reactor Safety
Enclosure
SUMMARY OF FINDINGS
IR 05000454/2011502(DRS), 05000455/2011502(DRS); 07/25/2011 - 07/29/2011;
Byron Station, Units 1 and 2; Baseline Emergency Preparedness Biennial Exercise Inspection.
This report covers a one week period of announced baseline inspection by three regional inspectors, one emergency preparedness specialist and one resident inspector. The significance of most findings is indicated by their color (Green, White, Yellow, Red) using Inspection Manual Chapter (IMC) 0609, Significance Determination Process (SDP). Findings for which the SDP does not apply may be Green or be assigned a severity level after NRC management review. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 4, dated December 2006.
NRC-Identified
and Self-Revealed Findings
Cornerstone: Emergency Preparedness
No findings were identified.
Licensee-Identified Violations
No violations were identified.
REPORT DETAILS
REACTOR SAFETY
Cornerstone: Emergency Preparedness
1EP1 Exercise Evaluation
.1 Exercise Evaluation
a. Inspection Scope
The inspectors reviewed the July 27, 2011, biennial emergency preparedness exercises objectives and scenario to ensure that the exercise would acceptably test major elements of the licensees emergency plan and to verify that the exercises simulated problems provided an acceptable framework to support demonstration of the licensees capability to implement its plan. The inspectors also reviewed records of other drills and exercises conducted in 2009, 2010, and 2011, to verify that those drills scenarios were sufficiently different from the scenario used in the July 27, 2011, exercise.
The inspectors evaluated the licensees exercise performance, focusing on the risk significant activities of emergency classification, notification, and protective action decision making, implementation of accident mitigation strategies, and correction of past exercise weaknesses in the following emergency response facilities:
- Control Room Simulator (CRS);
- Operations Support Center (OSC);
- Emergency Operations Facility (EOF); and
The inspectors also assessed the licensees recognition of abnormal plant conditions, transfer of responsibilities between facilities, internal communications, interfaces with offsite officials, readiness of emergency facilities and related equipment, and overall implementation of the licensees emergency plan.
The inspectors attended post-exercise critiques in the CRS, OSC, TSC and EOF to evaluate the licensees initial self-assessment of its exercise performance. The inspectors later met with the licensees lead exercise evaluators and managers to obtain the licensees findings and assessments of its exercise participants performances.
These self-assessments were then compared with the inspectors independent observations and assessments to assess the licensees ability to adequately critique its exercise performance. Documents reviewed are listed in the Attachment to this report.
This exercise evaluation inspection constituted one sample as defined in Inspection Procedure (IP) 71114.01-05.
b. Findings
No findings were identified.
OTHER ACTIVITIES
Cornerstone: Emergency Preparedness
4OA1 Performance Indicator (PI) Verification
.1 Drill/Exercise Performance
a. Inspection Scope
The inspectors sampled licensee submittals for the Drill/Exercise Performance PI for the period from the second quarter 2010 through second quarter 2011. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the Nuclear Energy Institute (NEI) Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, were used. The inspectors reviewed the licensees records associated with the performance indicator to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI, assessments of PI opportunities during pre-designated control room simulator training sessions, and performance during other drills. Documents reviewed are listed in the to this report.
This inspection constituted one drill/exercise performance sample as defined in IP 71151-05.
b. Findings
No findings were identified.
.2 Emergency Response Organization Drill Participation
a. Inspection Scope
The inspectors sampled licensee submittals for the Emergency Response Organization (ERO) Drill Participation PI for the period from the second quarter 2010 through second quarter 2011. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, were used.
The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI; performance during the 2010 and 2011 drills; and revisions of the roster of personnel assigned to key emergency response organization positions. Documents reviewed are listed in the to this report.
This inspection constituted one ERO drill participation sample as defined in IP 71151-05.
b. Findings
No findings were identified.
.3 Alert and Notification System
a. Inspection Scope
The inspectors sampled licensee submittals for the Alert and Notification System (ANS)
PI for the period from the second quarter 2010 through second quarter 2011. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, were used. The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI and results of periodic scheduled ANS operability tests. Documents reviewed are listed in the Attachment to this report.
This inspection constituted one alert and notification system sample as defined in IP 71151-05.
b. Findings
No findings were identified.
4OA6 Management Meetings
.1
Exit Meeting Summary
On July 29, 2011, the inspectors presented the biennial exercise inspection results to Mr. T. Tulon and other members of the licensee staff. The licensee acknowledged the issues presented. The inspectors confirmed that none of the potential report input discussed was considered proprietary.
.2 Public and Media Briefing
On July 29, 2011, the inspector summarized the NRC's preliminary exercise inspection conclusions at a public and media briefings hosted by Department of Homeland Security/Federal Emergency Management Agency Region V Field Office staff at the Ogle County Building in Oregon, Illinois.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- T. Tulon, Site Vice President
- B. Adams, Plant Manager
- J. Bottomley, Outage Manager
- A. Daniels, Corporate Emergency Preparedness Manager
- P. Dempsey, Site Communications
- D. Drawbaugh, Emergency Preparedness Manager
- T. Hulbert, NRC Coordinator
- B. Kartheiser, Emergency Preparedness Coordinator
- S. Merrell, Corporate Emergency Preparedness
- B. Spahr, Maintenance Director
- D. Spitzer, Regulatory Assurance Manager (Acting)
- S. Swanson, Nuclear Oversight Manager
- M. Wolfe, Reactor Services Manager
- B. Youman, Operations Director
Nuclear Regulatory Commission
- B. Bartlett, Senior Resident Inspector
- J. Robbins, Resident Inspector
LIST OF ITEMS
OPENED, CLOSED AND DISCUSSED
Opened, Closed and
Discussed
None