| title = IR 05000458-11-005, on 11/14/2011, River Bend Station - Notification of Inspection and Request for Information
| title = IR 05000458-11-005, on 11/14/2011, River Bend Station - Notification of Inspection and Request for Information
| author name = Farnholtz T R
| author name = Farnholtz T
| author affiliation = NRC/RGN-IV/DRS/EB-1
| author affiliation = NRC/RGN-IV/DRS/EB-1
| addressee name = Olson E W
| addressee name = Olson E
| addressee affiliation = Entergy Operations, Inc
| addressee affiliation = Entergy Operations, Inc
| docket = 05000458
| docket = 05000458
Line 14: Line 14:
| page count = 6
| page count = 6
}}
}}
See also: [[followed by::IR 05000458/2011005]]
See also: [[see also::IR 05000458/2011005]]


=Text=
=Text=
{{#Wiki_filter:September 7, 2011  
{{#Wiki_filter:September 7, 2011  
  Mr. Eric W. Olson  
Site Vice President Entergy Operations, Inc. River Bend Station 5485 US Highway 61N St. Francisville, LA  70775  
Mr. Eric W. Olson  
Site Vice President  
Entergy Operations, Inc.  
River Bend Station  
5485 US Highway 61N  
St. Francisville, LA  70775  
SUBJECT: RIVER BEND STATION- NOTIFICATION OF INSPECTION (INSPECTION
REPORT 05000458/2011005) AND REQUEST FOR INFORMATION
Dear Mr. Olson:
On November 14, 2011, the NRC will begin the on-site portion of the Gas Accumulation
Management in Emergency Core Cooling, Decay Heat Removal, and Containment Spray
Systems Temporary Instruction at your River Bend Station.  This inspection will be performed in
accordance with NRC Temporary Instruction (TI) 2515/177.
Experience has shown that this inspection is resource intensive, both for the NRC inspectors
and your staff.  In order to minimize the impact to your on-site resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.   
The documents have been divided into two groups.
* The first group lists information necessary for our initial inspection scoping and in-office
preparation activities.  This information should be separated by information request number,
especially if provided electronically (e.g., folder with the information request number).  This
information should be available to the inspector no later than October 31, 2011.  Upon review
of these documents, the inspectors will select additional documentation for review upon
arrival.  By November 3, 2011, the inspector will communicate the initial selected samples. 
* The second group of documents requested is needed to support our on-site inspection
activities.  This set of documents should be available to the inspector on November 14, 2011. 
It is also requested that corrective action documents and responses to questions developed
during the inspection be provided to the inspector as the documents are generated. 
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Danny Williamson of your licensing
organization.  If there are any questions about this inspection or the material requested, please
contact the inspector, Matt Young, at 817-276-6545 or by email at matt.young@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection
requirements were approved by the Office of Management and Budget, control
number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
UNITED STATES
NUCLEAR REGULATORY COMMISSION
R E GI ON  I V
612 EAST LAMAR BLVD, SUITE 400
ARLINGTON, TEXAS 76011-4125


  SUBJECT: RIVER BEND STATION- NOTIFICATION OF INSPECTION (INSPECTION REPORT 05000458/2011005)
Entergy Operations, Inc.
  AND REQUEST FOR INFORMATION
- 2 -
  Dear Mr. Olson:  
   
requesting document displays a currently valid Office of Management and Budget control
number.
In accordance with Code of Federal Regulations, Title 10, Part 2.390 of the NRC's Rules of
Practice, a copy of this letter and its enclosure will be available electronically for public
inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)
component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web
site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, 
/RA/  
   
   
Thomas R. Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
Docket:  50-458
License: NPF-47
Enclosure:
Management of Gas Accumulation in Emergency Core Cooling, Decay Heat
Removal, and Containment Spray Systems Temporary Instruction Document
Request
cc w/encl:  
Distribution via ListServ for River Bend Station


  On November 14, 2011, the NRC will begin the on-site portion of the Gas Accumulation Management in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems Temporary Instruction at your River Bend Station. This inspection will be performed in accordance with NRC Temporary Instruction (TI) 2515/177.  
Entergy Operations, Inc.
- 3 -
   
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov )
Deputy Regional Administrator (Art.Howell@nrc.gov )
DRP Director (Kriss.Kennedy@nrc.gov )
Acting DRP Deputy Director (Jeff.Clark@nrc.gov )
DRS Director (Anton.Vegel@nrc.gov )
DRS Deputy Director (Tom.Blount@nrc.gov )
Senior Resident Inspector (Grant.Larkin@nrc.gov )
Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov )
Resident Inspector (Andy.Barrett@nrc.gov )
RBS Administrative Assistant (Lisa.Day@nrc.gov )
Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov )
Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov )
Project Engineer, DRP/C (Jonathan.Braisted@nrc.gov )
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov )
Project Manager (Alan.Wang@nrc.gov )  
Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov )
RITS Coordinator (Marisa.Herrera@nrc.gov )
Regional Counsel (Karla.Fuller@nrc.gov )
Congressional Affairs Officer (Jenny.Weil@nrc.gov )
OEMail Resource
S:\\DRS\\REPORTS\\RB TI-177 RFI-MRY                                                            ML     
ADAMS
No
  Yes
SUNSI Review Complete
Reviewer Initials:  MRY
Category B.1
  Publicly Available
  Non-sensitive
Category A
  Non-publicly Available
  Sensitive
KEYWORD:  A.X
Sensitive - XXX
RIV:DRS\\RI
C:EB1
M. Young
T. Farnholtz
/RA/
/RA/
9/7/11
9/7/11
OFFICIAL RECORD COPY 
T=Telephone          E=E-mail        F=Fax


  Experience has shown that this inspection is resource intensive, both for the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.   The documents have been divided into two groups.  
MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY
  * The first group lists information necessary for our initial inspection scoping and in-office preparation activities.  This information should be separated by information request number, especially if provided electronically (e.g., folder with the information request number).  This information should be available to the inspector no later than October 31, 2011.  Upon review of these documents, the inspectors will select additional documentation for review upon arrivalBy November 3, 2011, the inspector will communicate the initial selected samples. 
HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION
* The second group of documents requested is needed to support our on-site inspection activitiesThis set of documents should be available to the inspector on November 14, 2011It is also requested that corrective action documents and responses to questions developed during the inspection be provided to the inspector as the documents are generated. 
DOCUMENT REQUEST
We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Danny Williamson of your licensing organization.  If there are any questions about this inspection or the material requested, please contact the inspector, Matt Young, at 817-276-6545 or by email at matt.young@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV612 EAST LAMAR BLVD, SUITE 400ARLINGTON, TEXAS 76011-4125
Entergy Operations, Inc. - 2 - requesting document displays a currently valid Office of Management and Budget control
- 1 -
number. In accordance with Code of Federal Regulations, Title 10, Part 2.390 of the NRC's Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).  
Enclosure
      Sincerely,  
Inspection Report:  
05000458/2011005
Inspection Dates:
November 14-17, 2011
Inspection Procedure:
TI 2515/177, Management of Gas Accumulation in Emergency
Core Cooling, Decay Heat Removal, and Containment Spray
Systems
Inspectors:
Matthew Young, Reactor Inspector
   
(817) 276-6545
matt.young@nrc.gov 
   
The following information should be sent to the Region IV office in hard copy or electronic
format (ims.certrec.com or compact disc, preferred), in care of Matt Young, to facilitate the  
selection of specific items that will be reviewed during the on-site inspection weekThe
inspector will select specific items from the information requested below and then request from
your staff additional documents needed during the on-site inspection weeksAlso, we request
that you categorize the documents in your response with the numbered list below.  Please
provide requested documentation electronically if possibleIf requested documents are large
and only hard copy formats are available, please inform the inspector(s), and provide subject
documentation during the first day of the on-site inspection.  If you have any questions  
regarding this information request, please call the inspector as soon as possible.  
I. Information Requested By October 31, 2011
1. List of corrective action program documents (with a short description) associated with
GL 2008-01, voids in piping, and pressure transients for the previous three years.  
   
2. List of changes (with a short description and tracking number) to the final safety analysis
report (FSAR), technical specifications, technical specification bases, and technical
requirements manual associated with the resolution of GL 2008-01.
3. List of calculations associated with GL 2008-01, including calculations that have been
changed or created in response to GL 2008-01 (with a short description of the
calculation and the change).
4. List (with a short description) of gas intrusion mechanisms that apply to the plant and the  
affected system locations (e.g. identify the source, conditions, and expected void
locations).  Also include a short description of how each gas intrusion mechanism has
been addressed (eg. plant hardware modification, procedure change).  
   


      /RA/
MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY
      Thomas R. Farnholtz, Chief Engineering Branch 1      Division of Reactor Safety
HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION
DOCUMENT REQUEST
- 2 -
Enclosure
5. List of the suction piping sections identified as susceptible to gas accumulation (the list
should identify the corresponding system).
6. List of the discharge piping sections identified as susceptible to gas accumulation (the
list should identify the corresponding system).
7. Copies of isometric drawings of the plant systems within scope of GL 2008-01 (hard-
copies are preferred).
8. Copies of piping and instrumentation diagrams (P&IDs) of the plant systems within
scope of GL 2008-01 (hard-copies are preferred).  Please highlight any components that
were part of hardware modifications installed as part of the resolution of GL 2008-01 and
all high point vents that are monitored during void surveillances.
9. Copies of program documents and procedures developed to implement the resolution of
GL 2008-01.
10. List of actions that were completed in response to GL 2008-01.
11. Copies of the modification packages for hardware modifications as part of the resolution
of GL 2008-01.
12. Design basis documents of the plant systems within scope of GL 2008-01.
   
   
Docket:  50-458 License: NPF-47
13. Design basis documents of keep-full systems of the plant systems within scope of   
Enclosure: Management of Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems Temporary Instruction Document
GL 2008-01.  
Request  cc w/encl: Distribution via ListServ for River Bend Station
 
Entergy Operations, Inc. - 3 -  Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov ) Deputy Regional Administrator (Art.Howell@nrc.gov ) DRP Director (Kriss.Kennedy@nrc.gov ) Acting DRP Deputy Director (Jeff.Clark@nrc.gov ) DRS Director (Anton.Vegel@nrc.gov ) DRS Deputy Director (Tom.Blount@nrc.gov ) Senior Resident Inspector (Grant.Larkin@nrc.gov ) Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov ) Resident Inspector (Andy.Barrett@nrc.gov ) RBS Administrative Assistant (Lisa.Day@nrc.gov ) Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov ) Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov ) Project Engineer, DRP/C (Jonathan.Braisted@nrc.gov ) Public Affairs Officer (Victor.Dricks@nrc.gov) Public Affairs Officer (Lara.Uselding@nrc.gov ) Project Manager (Alan.Wang@nrc.gov ) Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov ) RITS Coordinator (Marisa.Herrera@nrc.gov ) Regional Counsel (Karla.Fuller@nrc.gov ) Congressional Affairs Officer (Jenny.Weil@nrc.gov ) OEMail Resource
 
    S:\DRS\REPORTS\RB TI-177 RFI-MRY                                                            ML      ADAMS  No  Yes  SUNSI Review Complete Reviewer Initials:  MRY Category B.1  Publicly Available  Non-sensitive Category A  Non-publicly Available  Sensitive KEYWORD:  A.
X Sensitive
-XXX RIV:DRS\RI
  C:EB1 M. Young    T. Farnholtz /RA/    /RA/ 9/7/11    9/7/11 OFFICIAL RECORD COPY  T=Telephone          E=E-mail        F=Fax
MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION DOCUMENT REQUEST
- 1 - Enclosure
Inspection Report
:  05000458/2011005
Inspection Dates
:  November 14-17, 2011 Inspection Procedure
: TI 2515/177, "Management of Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray
Systems" Inspectors:  Matthew Young, Reactor Inspector      (817) 276-6545
    matt.young@nrc.gov
        The following information should be sent to the Region IV office in hard copy or electronic format (ims.certrec.com or compact disc, preferred), in care of Matt Young, to facilitate the selection of specific items that will be reviewed during the on-site inspection week.  The
inspector will select specific items from the information requested below and then request from your staff additional documents needed during the on-site inspection weeks.  Also, we request that you categorize the documents in your response with the numbered list below.  Please provide requested documentation electronically if possible.  If requested documents are large and only hard copy formats are available, please inform the inspector(s), and provide subject
documentation during the first day of the on-site inspection.  If you have any questions regarding this information request, please call the inspector as soon as possible.
  I.  Information Requested By October 31, 2011
1. List of corrective action program documents (with a short description) associated with GL 2008-01, voids in piping, and pressure transients for the previous three years.
  2. List of changes (with a short description and tracking number) to the final safety analysis report (FSAR), technical specifications, technical specification bases, and technical requirements manual associated with the resolution of GL 2008-01.
3. List of calculations associated with GL 2008-01, including calculations that have been changed or created in response to GL 2008-01 (with a short description of the
calculation and the change).
4. List (with a short description) of gas intrusion mechanisms that apply to the plant and the affected system locations (e.g. identify the source, conditions, and expected void locations).
  Also include a short description of how each gas intrusion mechanism has been addressed (eg. plant hardware modification, procedure change).  
   
   
14. System walkdown reports associated with the resolution of GL 2008-01.
    
    
MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION DOCUMENT REQUEST
15. If applicable, provide a list of inaccessible locations where plant walkdowns of the plant  
- 2 - Enclosure 5. List of the suction piping sections identified as susceptible to gas accumulation (the list should identify the corresponding system).
systems within scope of GL 2008-01 have not been completed.  Include an explanation  
6. List of the discharge piping sections identified as susceptible to gas accumulation (the list should identify the corresponding system).
of why each area is considered inaccessible.  
7. Copies of isometric drawings of the plant systems within scope of GL 2008-01 (hard-copies are preferred).
   
8. Copies of piping and instrumentation diagrams (P&IDs) of the plant systems within scope of GL 2008-01 (hard-copies are preferred).
16. Copies of surveillance procedures associated with the resolution of GL 2008-01 and the  
  Please highlight any components that were part of hardware modifications installed as part of the resolution of GL 2008-01 and all high point vents that are monitored during void surveillances.
results of the last two surveillances for the plant systems within scope of GL 2008-01.  
9. Copies of program documents and procedures developed to implement the resolution of GL 2008-01.
   
10. List of actions that were completed in response to GL 2008-01.
17. Copies of procedures used for filling and venting.  
11. Copies of the modification packages for hardware modifications as part of the resolution of GL 2008-01.
   
12. Design basis documents of the plant systems within scope of GL 2008-01.
18. Copies of trends of periodic venting results.  
13. Design basis documents of keep-full systems of the plant systems within scope of  GL 2008-01.
   
14. System walkdown reports associated with the resolution of GL 2008-01.
19. Copies of the engineering evaluations performed for all identified voids.  
  15. If applicable, provide a list of inaccessible locations where plant walkdowns of the plant systems within scope of GL 2008-01 have not been completed.  Include an explanation of why each area is considered inaccessible.  
   
  16. Copies of surveillance procedures associated with the resolution of GL 2008-01 and the results of the last two surveillances for the plant systems within scope of GL 2008-01.  
20. Basis for the void acceptance criteria (e.g. calculation).  If applicable, provide the  
  17. Copies of procedures used for filling and venting.  
justification for any deviation from the void acceptance criteria established by the Office  
  18. Copies of trends of periodic venting results.  
of Nuclear Reactor Regulation (NRR).  
  19. Copies of the engineering evaluations performed for all identified voids.  
   
  20. Basis for the void acceptance criteria (e.g. calculation).  If applicable, provide the justification for any deviation from the void acceptance criteria established by the Office of Nuclear Reactor Regulation (NRR).  
 
MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION DOCUMENT REQUEST
- 3 - Enclosure 21. Copies of any void transport analyses.
22. Copies of vortexing calculations associated with systems under the scope of GL 2008-
01.  23. Copies of self-assessments associated with the implementation of the GL 2008-01 program.  II.  Information Requested By November 14, 2011
  24. Copies of the selected corrective action program documents.
25. Copies of the selected licensing and design basis document changes.
26. Copies of the selected calculations.
27. Copies of training modules and attendance records that ensure that personnel are aware of gas-related concerns.


  28. Copies of corrective action program implementing procedures.  
MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY
  29. Electronic copies of the current technical specifications, technical specification bases, final safety analysis report, and technical requirements manual.  
HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION
  Inspector Contact Information:  
DOCUMENT REQUEST
  US NRC Region IV  
Attn:  Matt Young 612 E. Lamar Blvd., Suite 400 Arlington, TX  76011-4125
- 3 -
Enclosure
21. Copies of any void transport analyses.
22. Copies of vortexing calculations associated with systems under the scope of GL 2008-
01.
   
23. Copies of self-assessments associated with the implementation of the GL 2008-01
program.
II.  Information Requested By November 14, 2011
24. Copies of the selected corrective action program documents.
25. Copies of the selected licensing and design basis document changes.
26. Copies of the selected calculations.
27. Copies of training modules and attendance records that ensure that personnel are aware
of gas-related concerns.
28. Copies of corrective action program implementing procedures.  
   
29. Electronic copies of the current technical specifications, technical specification bases,  
final safety analysis report, and technical requirements manual.  
Inspector Contact Information:  
   
US NRC Region IV  
Attn:  Matt Young  
612 E. Lamar Blvd., Suite 400  
Arlington, TX  76011-4125
}}
}}

Latest revision as of 02:12, 13 January 2025

IR 05000458-11-005, on 11/14/2011, River Bend Station - Notification of Inspection and Request for Information
ML11250A063
Person / Time
Site: River Bend Entergy icon.png
Issue date: 09/07/2011
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Olson E
Entergy Operations
References
IR-11-005
Download: ML11250A063 (6)


See also: IR 05000458/2011005

Text

September 7, 2011

Mr. Eric W. Olson

Site Vice President

Entergy Operations, Inc.

River Bend Station

5485 US Highway 61N

St. Francisville, LA 70775

SUBJECT: RIVER BEND STATION- NOTIFICATION OF INSPECTION (INSPECTION

REPORT 05000458/2011005) AND REQUEST FOR INFORMATION

Dear Mr. Olson:

On November 14, 2011, the NRC will begin the on-site portion of the Gas Accumulation

Management in Emergency Core Cooling, Decay Heat Removal, and Containment Spray

Systems Temporary Instruction at your River Bend Station. This inspection will be performed in

accordance with NRC Temporary Instruction (TI) 2515/177.

Experience has shown that this inspection is resource intensive, both for the NRC inspectors

and your staff. In order to minimize the impact to your on-site resources and to ensure a

productive inspection, we have enclosed a request for documents needed for this inspection.

The documents have been divided into two groups.

  • The first group lists information necessary for our initial inspection scoping and in-office

preparation activities. This information should be separated by information request number,

especially if provided electronically (e.g., folder with the information request number). This

information should be available to the inspector no later than October 31, 2011. Upon review

of these documents, the inspectors will select additional documentation for review upon

arrival. By November 3, 2011, the inspector will communicate the initial selected samples.

  • The second group of documents requested is needed to support our on-site inspection

activities. This set of documents should be available to the inspector on November 14, 2011.

It is also requested that corrective action documents and responses to questions developed

during the inspection be provided to the inspector as the documents are generated.

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Danny Williamson of your licensing

organization. If there are any questions about this inspection or the material requested, please

contact the inspector, Matt Young, at 817-276-6545 or by email at matt.young@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control

number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

UNITED STATES

NUCLEAR REGULATORY COMMISSION

R E GI ON I V

612 EAST LAMAR BLVD, SUITE 400

ARLINGTON, TEXAS 76011-4125

Entergy Operations, Inc.

- 2 -

requesting document displays a currently valid Office of Management and Budget control

number.

In accordance with Code of Federal Regulations, Title 10, Part 2.390 of the NRC's Rules of

Practice, a copy of this letter and its enclosure will be available electronically for public

inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)

component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web

site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz, Chief

Engineering Branch 1

Division of Reactor Safety

Docket: 50-458

License: NPF-47

Enclosure:

Management of Gas Accumulation in Emergency Core Cooling, Decay Heat

Removal, and Containment Spray Systems Temporary Instruction Document

Request

cc w/encl:

Distribution via ListServ for River Bend Station

Entergy Operations, Inc.

- 3 -

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov )

Deputy Regional Administrator (Art.Howell@nrc.gov )

DRP Director (Kriss.Kennedy@nrc.gov )

Acting DRP Deputy Director (Jeff.Clark@nrc.gov )

DRS Director (Anton.Vegel@nrc.gov )

DRS Deputy Director (Tom.Blount@nrc.gov )

Senior Resident Inspector (Grant.Larkin@nrc.gov )

Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov )

Resident Inspector (Andy.Barrett@nrc.gov )

RBS Administrative Assistant (Lisa.Day@nrc.gov )

Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov )

Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov )

Project Engineer, DRP/C (Jonathan.Braisted@nrc.gov )

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov )

Project Manager (Alan.Wang@nrc.gov )

Acting Branch Chief, DRS/TSB (Dale.Powers@nrc.gov )

RITS Coordinator (Marisa.Herrera@nrc.gov )

Regional Counsel (Karla.Fuller@nrc.gov )

Congressional Affairs Officer (Jenny.Weil@nrc.gov )

OEMail Resource

S:\\DRS\\REPORTS\\RB TI-177 RFI-MRY ML

ADAMS

No

Yes

SUNSI Review Complete

Reviewer Initials: MRY

Category B.1

Publicly Available

Non-sensitive

Category A

Non-publicly Available

Sensitive

KEYWORD: A.X

Sensitive - XXX

RIV:DRS\\RI

C:EB1

M. Young

T. Farnholtz

/RA/

/RA/

9/7/11

9/7/11

OFFICIAL RECORD COPY

T=Telephone E=E-mail F=Fax

MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY

HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION

DOCUMENT REQUEST

- 1 -

Enclosure

Inspection Report: 05000458/2011005

Inspection Dates:

November 14-17, 2011

Inspection Procedure:

TI 2515/177, Management of Gas Accumulation in Emergency

Core Cooling, Decay Heat Removal, and Containment Spray

Systems

Inspectors:

Matthew Young, Reactor Inspector

(817) 276-6545

matt.young@nrc.gov

The following information should be sent to the Region IV office in hard copy or electronic

format (ims.certrec.com or compact disc, preferred), in care of Matt Young, to facilitate the

selection of specific items that will be reviewed during the on-site inspection week. The

inspector will select specific items from the information requested below and then request from

your staff additional documents needed during the on-site inspection weeks. Also, we request

that you categorize the documents in your response with the numbered list below. Please

provide requested documentation electronically if possible. If requested documents are large

and only hard copy formats are available, please inform the inspector(s), and provide subject

documentation during the first day of the on-site inspection. If you have any questions

regarding this information request, please call the inspector as soon as possible.

I. Information Requested By October 31, 2011

1. List of corrective action program documents (with a short description) associated with

GL 2008-01, voids in piping, and pressure transients for the previous three years.

2. List of changes (with a short description and tracking number) to the final safety analysis

report (FSAR), technical specifications, technical specification bases, and technical

requirements manual associated with the resolution of GL 2008-01.

3. List of calculations associated with GL 2008-01, including calculations that have been

changed or created in response to GL 2008-01 (with a short description of the

calculation and the change).

4. List (with a short description) of gas intrusion mechanisms that apply to the plant and the

affected system locations (e.g. identify the source, conditions, and expected void

locations). Also include a short description of how each gas intrusion mechanism has

been addressed (eg. plant hardware modification, procedure change).

MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY

HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION

DOCUMENT REQUEST

- 2 -

Enclosure

5. List of the suction piping sections identified as susceptible to gas accumulation (the list

should identify the corresponding system).

6. List of the discharge piping sections identified as susceptible to gas accumulation (the

list should identify the corresponding system).

7. Copies of isometric drawings of the plant systems within scope of GL 2008-01 (hard-

copies are preferred).

8. Copies of piping and instrumentation diagrams (P&IDs) of the plant systems within

scope of GL 2008-01 (hard-copies are preferred). Please highlight any components that

were part of hardware modifications installed as part of the resolution of GL 2008-01 and

all high point vents that are monitored during void surveillances.

9. Copies of program documents and procedures developed to implement the resolution of

GL 2008-01.

10. List of actions that were completed in response to GL 2008-01.

11. Copies of the modification packages for hardware modifications as part of the resolution

of GL 2008-01.

12. Design basis documents of the plant systems within scope of GL 2008-01.

13. Design basis documents of keep-full systems of the plant systems within scope of

GL 2008-01.

14. System walkdown reports associated with the resolution of GL 2008-01.

15. If applicable, provide a list of inaccessible locations where plant walkdowns of the plant

systems within scope of GL 2008-01 have not been completed. Include an explanation

of why each area is considered inaccessible.

16. Copies of surveillance procedures associated with the resolution of GL 2008-01 and the

results of the last two surveillances for the plant systems within scope of GL 2008-01.

17. Copies of procedures used for filling and venting.

18. Copies of trends of periodic venting results.

19. Copies of the engineering evaluations performed for all identified voids.

20. Basis for the void acceptance criteria (e.g. calculation). If applicable, provide the

justification for any deviation from the void acceptance criteria established by the Office

of Nuclear Reactor Regulation (NRR).

MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY

HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION

DOCUMENT REQUEST

- 3 -

Enclosure

21. Copies of any void transport analyses.

22. Copies of vortexing calculations associated with systems under the scope of GL 2008-

01.

23. Copies of self-assessments associated with the implementation of the GL 2008-01

program.

II. Information Requested By November 14, 2011

24. Copies of the selected corrective action program documents.

25. Copies of the selected licensing and design basis document changes.

26. Copies of the selected calculations.

27. Copies of training modules and attendance records that ensure that personnel are aware

of gas-related concerns.

28. Copies of corrective action program implementing procedures.

29. Electronic copies of the current technical specifications, technical specification bases,

final safety analysis report, and technical requirements manual.

Inspector Contact Information:

US NRC Region IV

Attn: Matt Young

612 E. Lamar Blvd., Suite 400

Arlington, TX 76011-4125