IR 05000321/2012007: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 3: | Line 3: | ||
| issue date = 03/29/2012 | | issue date = 03/29/2012 | ||
| title = IR 05000321-12-007; February 27 to March 2, 2012; Edwin I. Hatch Nuclear Plant Unit 1; Post Approval Site Inspection for License Renewal, Phase 1 | | title = IR 05000321-12-007; February 27 to March 2, 2012; Edwin I. Hatch Nuclear Plant Unit 1; Post Approval Site Inspection for License Renewal, Phase 1 | ||
| author name = Vias S | | author name = Vias S | ||
| author affiliation = NRC/RGN-II/DRS/EB3 | | author affiliation = NRC/RGN-II/DRS/EB3 | ||
| addressee name = Madison D | | addressee name = Madison D | ||
| addressee affiliation = Southern Nuclear Operating Co, Inc | | addressee affiliation = Southern Nuclear Operating Co, Inc | ||
| docket = 05000321 | | docket = 05000321 | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter | {{#Wiki_filter:March 29, 2012 | ||
==SUBJECT:== | |||
EDWIN I. HATCH NUCLEAR PLANT - NRC POST-APPROVAL SITE | |||
INSPECTION FOR LICENSE RENEWAL, INSPECTION REPORT | |||
05000321/2012007 | |||
==Dear Mr. Madison:== | ==Dear Mr. Madison:== | ||
On March 2, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a Post-Approval Site Inspection for License Renewal at your Edwin I. Hatch Nuclear Plant, Unit 1, in accordance with NRC Inspection Procedure (IP) 71003. The enclosed report documents the inspection results, which were discussed on March 2, 2012, with Mr. W. L. Bargeron, Plant Manager, and other members of your staff. The inspection examined activities conducted under your license as they relate to safety and compliance with the | On March 2, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a Post-Approval Site Inspection for License Renewal at your Edwin I. Hatch Nuclear Plant, Unit 1, in accordance with NRC Inspection Procedure (IP) 71003. The enclosed report documents the inspection results, which were discussed on March 2, 2012, with Mr. W. L. Bargeron, Plant Manager, and other members of your staff. | ||
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed plant activities, and interviewed personnel. | |||
Based on the inspection sample selected for review, no findings were identified. The inspectors identified two observations associated with the implementation of one-time inspections for two Aging Management Programs (AMPs). These observations consisted of issues of concern that, if found during the period of extended operation (PEO), would be characterized as performance deficiencies in the NRC Reactor Oversight Process. These observations are subject to further NRC inspection during the second phase of IP 71003 to provide reasonable assurance that your license renewal commitments are met. However, the inspectors determined that the overall implementation of AMPs activities reviewed during the Unit 1 refueling outage was consistent with the license renewal commitments. | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its Enclosure, and your response (if any), will be available electronically for public inspection in | |||
SNC, Inc. | |||
the NRC Public Document Room or from the Publicly Available Records System (PARS) | |||
component of NRC's Agencywide Documents Access and Management System (ADAMS), | |||
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Steven J. Vias, Chief | |||
Engineering Branch 3 | |||
Division of Reactor Safety | |||
Docket Nos. 50-321 License Nos. DPR-57 | |||
===Enclosure:=== | ===Enclosure:=== | ||
NRC Post-Approval Site Inspection For License Renewal, Inspection Report 05000321/2012007 | NRC Post-Approval Site Inspection For License Renewal, Inspection Report 05000321/2012007 w/Attachment: Supplemental Information | ||
REGION II== | |||
Docket Nos: | |||
50-321 | |||
License Nos: | |||
DPR-57 | |||
Report No: | |||
05000321/2012007 | |||
Licensee: | |||
Southern Nuclear Operating Company, Inc. | |||
Facility: | |||
Edwin I. Hatch Nuclear Plant, Unit 1 | |||
Location: | |||
Baxley, Georgia 31513 | |||
Dates: | |||
February 27 to March 2, 2012 | |||
Inspectors: | |||
J. Rivera-Ortiz, Senior Reactor Inspector (Lead) | |||
B. Collins, Reactor Inspector | |||
Approved by: | |||
Steven J. Vias, Chief | |||
Engineering Branch 3 | |||
Division of Reactor Safety | |||
=SUMMARY OF FINDINGS= | =SUMMARY OF FINDINGS= | ||
IR 05000321/2012007; February 27 to March 2, 2012; Edwin I. Hatch Nuclear Plant Unit 1; Post Approval Site Inspection for License Renewal, Phase 1. | IR 05000321/2012007; February 27 to March 2, 2012; Edwin I. Hatch Nuclear Plant Unit 1; Post | ||
Approval Site Inspection for License Renewal, Phase 1. | |||
The report covers an inspection conducted by two regional inspectors in accordance with NRC Manual Chapter 2515 and NRC Inspection Procedure 71003. | |||
Based on the sample selected for review, the inspectors determined that commitments, license conditions, and regulatory requirements associated with the renewed facility operating license were met. The inspectors also determined that the licensee had administrative controls in place to ensure completion of pending actions scheduled both prior and during the period of extended operation (PEO). | |||
The inspectors identified two observations associated with the implementation of one-time inspections for two Aging Management Programs (AMPs). These observations consisted of issues of concern that, if found during the PEO, would be characterized as performance deficiencies in the NRC Reactor Oversight Process. The licensee entered all observations into the stations Corrective Action Program (CAP) for evaluation and resolution. | |||
=== | The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG 1649, Reactor Oversight Process, Revision 4, dated December 2006. | ||
None | |||
===NRC-Identified=== | |||
and Self-Revealed Findings | |||
None | |||
===Licensee-Identified Violations=== | |||
None | |||
=REPORT DETAILS= | =REPORT DETAILS= | ||
| Line 75: | Line 115: | ||
==OTHER ACTIVITIES== | ==OTHER ACTIVITIES== | ||
{{a|4OA5}} | {{a|4OA5}} | ||
==4OA5 Other Activities== | ==4OA5 Other Activities== | ||
===.1 Post-Approval Site Inspection for License Renewal - IP 71003 (Phase 1)=== | ===.1 Post-Approval Site Inspection for License Renewal - IP 71003 (Phase 1)=== | ||
====a. Inspection Scope==== | |||
: (1) Implementation of License Conditions and Commitments, including Aging Management Programs | |||
The inspectors reviewed a sample of license renewal activities scheduled for the Unit 1 spring 2012 refueling outage, which was the second-to-last outage prior to the period of extended operation (PEO). The inspectors selected this refueling outage because it would present the best opportunity to observe the majority of the one-time inspections associated with license renewal commitments. The inspections objective was to maximize observations of the actual implementation of license renewal activities before the beginning of the PEO (August 7, 2014), and verify that the licensee completed the necessary actions to: | |||
: (a) comply with the conditions stipulated in the renewed facility operating license; | |||
: (b) meet the license renewal commitments described in NRC Memorandum dated March 6, 2007, (ADAMS Accession Number ML070640041), and | |||
: (c) meet the future inspection activities described in the Updated Final Safety Analysis Report (UFSAR) supplement submitted pursuant to 10 CFR 54.21(d). The license renewal application (LRA) for Edwin I. Hatch Nuclear Plant and the corresponding NRC Safety Evaluation Report (SER) documented in NUREG-1803 are publicly available on ADAMS under accession numbers ML003688151, and ML020020307, respectively. | |||
The inspectors reviewed supporting documents; conducted interviews with licensee staff; observed in-process outage activities; and performed visual inspection of structures, systems, and components (SSCs) including those not accessible during power operation. The commitment items and AMPs selected for the inspection sample are summarized below based on their description in Appendix A of the LRA. The specific inspection activities conducted for each AMP are also described below. Specific documents reviewed are listed in the report attachment. | The inspectors reviewed supporting documents; conducted interviews with licensee staff; observed in-process outage activities; and performed visual inspection of structures, systems, and components (SSCs) including those not accessible during power operation. The commitment items and AMPs selected for the inspection sample are summarized below based on their description in Appendix A of the LRA. The specific inspection activities conducted for each AMP are also described below. Specific documents reviewed are listed in the report attachment. | ||
Commitment Item 6 - Galvanic Susceptibility Inspections: | Commitment Item 6 - Galvanic Susceptibility Inspections: | ||
The LRA described the Galvanic Susceptibility Inspections as a new AMP that would provide for condition monitoring via one-time inspections to provide objective evidence that galvanic susceptibility is being managed for specific components within the scope of license renewal. The first one-time inspections would consider the more corrosive raw water environment and include a sample population of carbon-to-stainless-steel weld connections that should exhibit the largest electrochemical potential difference among the existing galvanic couples. The inspection samples would be expanded to other water systems if the examined carbon-to-stainless welds show galvanic corrosion. The inspection of in-scope components would use one or more examination methods, which may include ultrasonic thickness determinations, radiographic testing, depth gauges, and pipe removal and analysis. These one-time inspections would be performed prior to the beginning of the PEO of each Unit. | |||
The inspectors reviewed licensing basis documents, AMP administrative procedures, and implementing inspection and test procedures to verify that the program was developed as described in the LRA and corresponding SER. The inspectors also discussed the process used to select the inspection samples under this AMP and the criteria to be used for scope expansion with licensee personnel. The inspectors reviewed the examination reports listed below to verify that the implementation of the program was in accordance with the established procedures and consistent with the program attributes described in the licensing basis documents. | The inspectors reviewed licensing basis documents, AMP administrative procedures, and implementing inspection and test procedures to verify that the program was developed as described in the LRA and corresponding SER. The inspectors also discussed the process used to select the inspection samples under this AMP and the criteria to be used for scope expansion with licensee personnel. The inspectors reviewed the examination reports listed below to verify that the implementation of the program was in accordance with the established procedures and consistent with the program attributes described in the licensing basis documents. | ||
* Work Order (WO) SNC105364 - License Renewal Inspection: Inspect | * Work Order (WO) SNC105364 - License Renewal Inspection: Inspect | ||
* WO SNC339429 - License Renewal Inspection: Inspect Component | |||
Dissimilar Metal Welds in Component 1P41N002 (Service Water System) | |||
* WO SNC339429 - License Renewal Inspection: Inspect Component | |||
1E11F103A (Residual Heat Removal(RHR)/Low Pressure Coolant | |||
Injection (LPCI) System) | |||
Commitment Item 7 - Treated Water Systems Piping Inspection Program: | |||
The LRA described the Treated Water Systems Piping Inspections (TWSPI) as a new AMP that would provide for condition monitoring via one-time examinations intended to provide objective evidence that existing chemistry control is managing aging in piping that is not examined under another inspection program. This AMP would examine a sample population of carbon and stainless steel tubing and piping in the treated water systems. The expansion of inspection points and the subsequent examination of in-scope components would depend on the results of the initial inspections. The inspections would be conducted using various techniques including, but not be limited to, volumetric or destructive examination. The specific sample population, examination methods, and acceptance criteria would be defined in the inspection and trending procedures. These one-time inspections would be performed prior to the PEO of each Unit. | |||
The inspectors reviewed licensing basis documents, AMP administrative procedures, implementing inspection and test procedures, and inspection records to verify that the program was developed as described in the LRA, and the corresponding SER. The inspectors also discussed the process used to select the inspection samples under this AMP, and the criteria to be used for scope expansion with licensee personnel. | The inspectors reviewed licensing basis documents, AMP administrative procedures, implementing inspection and test procedures, and inspection records to verify that the program was developed as described in the LRA, and the corresponding SER. The inspectors also discussed the process used to select the inspection samples under this AMP, and the criteria to be used for scope expansion with licensee personnel. | ||
Additionally, the inspectors directly observed licensee personnel during the execution of the one-time inspections listed below to verify that the implementation of the program was in accordance with the established procedures and consistent with the program attributes described in the licensing basis documents. | Additionally, the inspectors directly observed licensee personnel during the execution of the one-time inspections listed below to verify that the implementation of the program was in accordance with the established procedures and consistent with the program attributes described in the licensing basis documents. | ||
* WO SNC360464 - License Renewal Inspection: Perform Visual | * WO SNC360464 - License Renewal Inspection: Perform Visual | ||
* WO SNC99460 - License Renewal Inspection: 1E11-F028A Valve | |||
* WO SNC106965 - License Renewal Inspection: TWSPI of 1E21D001B | Inspection of Minimum Flow Bypass Check Valve 1E51F021 and | ||
* WO SNC108088 - License Renewal Inspection: Disassemble/Inspect | |||
* WO SNC108091 - License Renewal Inspection: Disassemble/Inspect 1 E51D005 Minimum Flow Bypass Restrictive Orifice (RCIC System)* WO SNC108319 - License Renewal Inspection: Inspect Outboard and | Connecting Piping up to MOV 1E51F019 (Reactor Core Isolation Cooling | ||
* WO SNC108343 - License Renewal Inspection: Drywell Sump Cooler, | |||
* WO SNC108354 - License Renewal Inspection: 1P42/1B31 Sample D-1- 1 (Reactor Building Closed Cooling Water System) | (RCIC) System) | ||
* WO SNC99460 - License Renewal Inspection: 1E11-F028A Valve | |||
Modification (RHR/LPCI System) | |||
* WO SNC106965 - License Renewal Inspection: TWSPI of 1E21D001B | |||
Restricting Orifice and Piping (Core Spray System) | |||
* WO SNC108088 - License Renewal Inspection: Disassemble/Inspect | |||
1E51D003 Steam Supply Steam Trap in RCIC Room (RCIC System) | |||
* WO SNC108091 - License Renewal Inspection: Disassemble/Inspect 1 | |||
E51D005 Minimum Flow Bypass Restrictive Orifice (RCIC System) | |||
* WO SNC108319 - License Renewal Inspection: Inspect Outboard and | |||
Inboard Steam Isolation Valve 1E41F003/F002 (High Pressure Coolant | |||
Injection (HPCI) System) | |||
* WO SNC108343 - License Renewal Inspection: Drywell Sump Cooler, | |||
1G11B001 Inlet (Radwaste System) | |||
* WO SNC108354 - License Renewal Inspection: 1P42/1B31 Sample D-1- | |||
1 (Reactor Building Closed Cooling Water System) | |||
Commitment Item 8 - Gas Systems Component Inspections: | |||
The LRA described the Gas Systems Component Inspections as a new AMP that would provide for condition monitoring via one-time condition monitoring aging management activities designed to provide objective evidence that the aging effects predicted for systems with gases as internal environments are being adequately managed. The scope of this program would include susceptible locations in several systems within the scope of license renewal. The inspection activities will use examination techniques designed to ascertain whether significant loss of material or cracking has occurred in the sample population. These one-time inspections would be performed prior to the beginning of the PEO of each Unit. | |||
The inspectors reviewed licensing basis documents, AMP administrative procedures, and implementing inspection and test procedures to verify that the program was developed as described in the LRA and the corresponding SER. The inspectors also discussed with licensee personnel the process used to select the inspection samples under this AMP and the criteria to be used for scope expansion. Additionally, the inspectors directly observed licensee personnel during the execution of the one-time inspections listed below to verify that the implementation of the program was in accordance with the established procedures and consistent with the program attributes described in the licensing basis documents. | The inspectors reviewed licensing basis documents, AMP administrative procedures, and implementing inspection and test procedures to verify that the program was developed as described in the LRA and the corresponding SER. The inspectors also discussed with licensee personnel the process used to select the inspection samples under this AMP and the criteria to be used for scope expansion. Additionally, the inspectors directly observed licensee personnel during the execution of the one-time inspections listed below to verify that the implementation of the program was in accordance with the established procedures and consistent with the program attributes described in the licensing basis documents. | ||
* WO SNC106929 - License Renewal Inspection: Remove Pipe | * WO SNC106929 - License Renewal Inspection: Remove Pipe | ||
Cap/Inspect 1E41F123B Test Valve (HPCI System) | |||
Commitment Item 11 - Residual Heat Removal Heat Exchanger Augmented Inspection and Testing Program: | |||
The LRA described the residual heat removal (RHR) Heat Exchanger Augmented Inspection and Testing Program as a new condition monitoring program that would provide enhanced aging management of both the shell and tube sides of the Unit 1, and Unit 2 RHR heat exchangers. The RHR heat exchangers would be visually inspected, and eddy current testing would be done on a regular basis. This inspection program would be implemented prior to the beginning of the PEO of each Unit. | The LRA described the residual heat removal (RHR) Heat Exchanger Augmented Inspection and Testing Program as a new condition monitoring program that would provide enhanced aging management of both the shell and tube sides of the Unit 1, and Unit 2 RHR heat exchangers. The RHR heat exchangers would be visually inspected, and eddy current testing would be done on a regular basis. This inspection program would be implemented prior to the beginning of the PEO of each Unit. | ||
The inspectors reviewed licensing basis documents, AMP administrative procedures, and implementing inspection and test procedures to verify that the program was developed as described in the LRA and the corresponding SER. Additionally, the inspectors discussed with the license the preliminary eddy current inspection results for the Unit 1 RHR-1A heat exchanger inspection, conducted during the Unit 1 spring 2012 outage, and reviewed the final report for the Unit 1 RHR-1B heat exchanger eddy current inspection, completed in 2006, to verify that the implementation of the program was in accordance with the established procedures and consistent with the program attributes described in the licensing basis documents. | The inspectors reviewed licensing basis documents, AMP administrative procedures, and implementing inspection and test procedures to verify that the program was developed as described in the LRA and the corresponding SER. Additionally, the inspectors discussed with the license the preliminary eddy current inspection results for the Unit 1 RHR-1A heat exchanger inspection, conducted during the Unit 1 spring 2012 outage, and reviewed the final report for the Unit 1 RHR-1B heat exchanger eddy current inspection, completed in 2006, to verify that the implementation of the program was in accordance with the established procedures and consistent with the program attributes described in the licensing basis documents. | ||
Flow Accelerated Corrosion Aging Management Program: | Flow Accelerated Corrosion Aging Management Program: | ||
The LRA described the Flow Accelerated Corrosion (FAC) Program as an enhanced AMP designed to monitor pipe wear in those systems that have been determined to be susceptible to FAC-related loss of material. The susceptibility of piping to FAC would be predicted using a computer model specifically developed for FAC analysis. The FAC model would predict FAC rates in piping, and calculates the time remaining until reaching the defined critical wall thickness. The detection of wall thinning would include various examination methods such as Ultrasonic testing (UT), Radiographic testing (RT),and visual examinations. The enhanced examination methods and frequencies would be based on industry and plant specific operating experience as opposed to computer modeling. Examinations to detect erosion, erosion-corrosion, as well as FAC, would be performed as part of the enhanced program. For both units, the FAC Program would be expanded to include additional piping for certain systems that are already included in the current program. For Unit 2 only, portions of the radioactive decay hold-up volume (main steam and steam line drains, and condensate drains) will also be included. These program enhancements would be implemented prior to the beginning of the PEO of each Unit. | |||
The inspectors reviewed licensing basis documents, AMP administrative procedures, and implementing inspection and test procedures to verify that the program was developed as described in the LRA and the corresponding SER. The inspectors also discussed the criteria for scope expansion for an UT examination of component 1-MSD-10 with licensee staff. The examination of 1-MSD-10 revealed wall thinning indications during the Unit 1 spring 2012 outage requiring scope expansion. Additionally, the inspectors directly observed and reviewed the final examination report for the UT examination of component 1-MSD-14, which was selected as a result of the scope expansion from 1-MSD-10. The inspectors reviewed these activities to verify that the implementation of the program was in accordance with the established procedures and consistent with the program attributes described in the licensing basis documents. | |||
Boiling Water Reactor Vessel And Internals Aging Management Program: | |||
The LRA described the Boiling Water Reactor Vessel and Internals Project (BWRVIP) as an existing AMP resulting from the association of utilities to focus on resolution of BWR vessel and internals issues. The BWRVIP Program inspection and evaluation reports would specifically address the reactor vessel components and reactor internals relative to the requirements of 10 CFR 54. The BWRVIP Program inspection and evaluation documents would provide for reactor pressure vessel (RPV) and reactor internals examination utilizing a combination of ultrasonic, visual, and surface methods, including pressure testing. The specific methods to be used and the frequency of examination would be in accordance with the applicable BWRVIP inspection and evaluation report, unless a specific exception is identified to the NRC. The BWRVIP inspection and evaluation reports applicable to Plant Hatch reactor assembly components would be: | |||
* BWRVIP-18 Core Spray Internals | * BWRVIP-18 Core Spray Internals | ||
* BWRVIP-26 | * BWRVIP-26 Top Guide | ||
* BWRVIP-27 | * BWRVIP-27 Penetrations | ||
* BWRVIP-41 | * BWRVIP-38 Shroud Support and Connecting Welds | ||
* BWRVIP-47 | * BWRVIP-41 Jet Pump Assembly | ||
* BWRVIP-48 | * BWRVIP-47 Control Rod Guide Tube | ||
* BWRVIP-74 | * BWRVIP-48 RPV Inside Diameter Attachment Welds | ||
* BWRVIP-74 RPV Shell and Heads, Nozzles, and Appurtenances | |||
* BWRVIP-76 Shroud (including repair hardware) | |||
The inspectors reviewed licensing basis documents, AMP administrative procedures, and implementing inspection and test procedures to verify that the program was developed as described in the LRA and the corresponding SER. Additionally, the inspectors reviewed final examination data sheets, and portions of the corresponding digital video disks (DVDs), for the visual examinations of the reactor vessel internal components listed below, to verify that the implementation of the program was in accordance with the established procedures, and consistent with the program attributes described in the in the licensing basis documents. | |||
* RPV Interior Surfaces - Component ID: RPV Int 045-090 deg (DVD 31) | * RPV Interior Surfaces - Component ID: RPV Int 045-090 deg (DVD 31) | ||
* Jet Pump Riser Welds - Component ID: JP 16 RS-2 (DVD 17) | * Jet Pump Riser Welds - Component ID: JP 16 RS-2 (DVD 17) | ||
* Steam Dryer Vertical Partition Welds - Component ID: Bank 3 to 2 | * Steam Dryer Vertical Partition Welds - Component ID: Bank 3 to 2 | ||
* Steam Dryer Horizontal Welds - Component ID: Upper Horizontal Hood 5 | |||
Vertical Partition Weld 3 (DVD 4) | |||
* Steam Dryer Horizontal Welds - Component ID: Upper Horizontal Hood 5 | |||
Weld (DVD 01) | |||
: (2) Review of License Renewal Commitment Changes | |||
The inspectors identified that no changes were made to the commitment items selected for review. The review of remaining license renewal commitment changes would be completed during the second implementation phase of inspection procedure 71003. | |||
: (3) Review of Newly-Identified SSCs | |||
This inspection requirement would be completed during the second implementation phase of inspection procedure 71003. | |||
: (4) Review of the Description of AMPs and Time-Limited Aging Analysis (TLAA) in | |||
the UFSAR Supplement | |||
The review of the description of AMPs and TLAAs in the UFSAR supplement submitted pursuant 10 CFR 54.21(d) would be completed during the second implementation phase of inspection procedure 71003. | |||
====b. Findings and Observations==== | ====b. Findings and Observations==== | ||
No findings were identified. The inspectors determined that the licensee met the license renewal commitments, license conditions, and applicable regulatory requirements for the | No findings were identified. The inspectors determined that the licensee met the license renewal commitments, license conditions, and applicable regulatory requirements for the inspection samples selected for review. The inspectors determined that the overall implementation of Aging Management Program activities reviewed during the Unit 1 spring 2012 refueling outage was consistent with the license renewal commitments. The inspectors also determined that the licensee had administrative controls in place to ensure completion of pending actions scheduled both prior and during the period of extended operation. | ||
The inspectors identified the two observations described below, which if identified during the PEO, would be characterized as performance deficiencies, and processed in accordance with NRC Inspection Manual Chapter 0612, | The inspectors identified the two observations described below, which if identified during the PEO, would be characterized as performance deficiencies, and processed in accordance with NRC Inspection Manual Chapter 0612, Power Reactor Inspection Reports. These observations are subject to follow-up inspection during the second implementation phase of inspection procedure 71003 to provide reasonable assurance that the license renewal commitments are met. | ||
: (1) Observation for Commitment Item 6, Galvanic Susceptibility Inspections | |||
The licensee | The inspectors identified that the licensee did not conduct a non-destructive examination (NDE) activity for WO SNC105364 in accordance with the administrative controls described in the UFSAR supplement for license renewal. The team identified that a radiographic examination performed under this WO was not fully prescribed by documented instructions, procedures, or drawings of a type appropriate to the circumstances, in accordance with the applicable quality assurance controls described in the UFSAR supplement. Specifically, the licensee selected a radiographic examination method (i.e., digital radiography) which was not discussed in any of the implementing procedures for the Aging Management Program. While the selected method provided effective results to identify the aging effects of concern under this program, the activity was not performed following the quality assurance standards described in the UFSAR for license renewal activities. This issue had no impact on plant safety and the selected examination method was demonstrated to be effective in identifying the aging effects of concern. | ||
The licensee entered this issue into the | The licensee entered this issue into the sites CAP as Condition Report (CR) 417114. | ||
: (2) Observation for Commitment Item 7, Treated Water Systems Piping Inspection | |||
Program | |||
The inspectors noted that one of the criteria for unacceptable relevant indications in implementing visual inspection procedure 42IT-QCX-006-0 of this AMP was, any corrosion or erosion that is judged to reduce the pressure retaining wall thickness by more than 10% before the end of the period of extended operation. Based on discussions with the licenses NDE examiners during field observations, the inspectors identified that the examiners were looking for actual indications of 10% or more in wall thickness reduction rather than indications that could reach the 10% wall reduction during the PEO. The inspectors determined that the examiners understanding of the inspection criterion for percentage of wall reduction was inconsistent with the criteria established in the implementing procedures for this AMP. Additionally, the implementing visual inspection procedure did not provide specific guidance for the examiners to identify what indications could reduce the pressure retaining wall thickness by more than 10% before the end of the PEO. This issue had no impact on plant safety and the selected examinations observed by the inspectors did not identify unacceptable relevant indications that would be affected by the misapplication of the 10% wall thickness criterion. | |||
The licensee entered this issue into the sites CAP as CR 417115. | |||
{{a|4OA6}} | {{a|4OA6}} | ||
==4OA6 Management Meetings== | ==4OA6 Management Meetings== | ||
===.1=== | |||
===Exit Meeting Summary=== | |||
On March 02, 2012, the inspectors presented the inspection results to Mr. W. L. | |||
Bargeron, Plant Manager, and other members of the licensee staff. The licensee acknowledged the issues presented. The inspectors confirmed that none of the potential report input discussed was considered proprietary. | |||
ATTACHMENT: | ATTACHMENT: | ||
=SUPPLEMENTAL INFORMATION= | =SUPPLEMENTAL INFORMATION= | ||
==KEY POINTS OF CONTACT== | ==KEY POINTS OF CONTACT== | ||
===Licensee Personnel=== | ===Licensee Personnel=== | ||
: | : | ||
: [[contact::D. So]], License Renewal Engineer | : [[contact::D. So]], License Renewal Engineer | ||
: [[contact::J. Hornbuckle]], Materials Programs-Corporate | : [[contact::J. Hornbuckle]], Materials Programs-Corporate | ||
| Line 151: | Line 274: | ||
==LIST OF REPORT ITEMS== | ==LIST OF REPORT ITEMS== | ||
===Opened=== | |||
None | |||
===Opened and Closed=== | ===Opened and Closed=== | ||
None | None | ||
===Closed=== | ===Closed=== | ||
None | |||
==DOCUMENTS REVIEWED== | ==DOCUMENTS REVIEWED== | ||
}} | }} | ||
Latest revision as of 03:07, 12 January 2025
| ML12089A130 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 03/29/2012 |
| From: | Vias S NRC/RGN-II/DRS/EB3 |
| To: | Madison D Southern Nuclear Operating Co |
| Linda Gruhler 404-997-4614 | |
| References | |
| IR-12-007 | |
| Download: ML12089A130 (17) | |
Text
March 29, 2012
SUBJECT:
EDWIN I. HATCH NUCLEAR PLANT - NRC POST-APPROVAL SITE
INSPECTION FOR LICENSE RENEWAL, INSPECTION REPORT
Dear Mr. Madison:
On March 2, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a Post-Approval Site Inspection for License Renewal at your Edwin I. Hatch Nuclear Plant, Unit 1, in accordance with NRC Inspection Procedure (IP) 71003. The enclosed report documents the inspection results, which were discussed on March 2, 2012, with Mr. W. L. Bargeron, Plant Manager, and other members of your staff.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed plant activities, and interviewed personnel.
Based on the inspection sample selected for review, no findings were identified. The inspectors identified two observations associated with the implementation of one-time inspections for two Aging Management Programs (AMPs). These observations consisted of issues of concern that, if found during the period of extended operation (PEO), would be characterized as performance deficiencies in the NRC Reactor Oversight Process. These observations are subject to further NRC inspection during the second phase of IP 71003 to provide reasonable assurance that your license renewal commitments are met. However, the inspectors determined that the overall implementation of AMPs activities reviewed during the Unit 1 refueling outage was consistent with the license renewal commitments.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its Enclosure, and your response (if any), will be available electronically for public inspection in
SNC, Inc.
the NRC Public Document Room or from the Publicly Available Records System (PARS)
component of NRC's Agencywide Documents Access and Management System (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Steven J. Vias, Chief
Engineering Branch 3
Division of Reactor Safety
Docket Nos. 50-321 License Nos. DPR-57
Enclosure:
NRC Post-Approval Site Inspection For License Renewal, Inspection Report 05000321/2012007 w/Attachment: Supplemental Information
REGION II==
Docket Nos:
50-321
License Nos:
Report No:
Licensee:
Southern Nuclear Operating Company, Inc.
Facility:
Edwin I. Hatch Nuclear Plant, Unit 1
Location:
Baxley, Georgia 31513
Dates:
February 27 to March 2, 2012
Inspectors:
J. Rivera-Ortiz, Senior Reactor Inspector (Lead)
B. Collins, Reactor Inspector
Approved by:
Steven J. Vias, Chief
Engineering Branch 3
Division of Reactor Safety
SUMMARY OF FINDINGS
IR 05000321/2012007; February 27 to March 2, 2012; Edwin I. Hatch Nuclear Plant Unit 1; Post
Approval Site Inspection for License Renewal, Phase 1.
The report covers an inspection conducted by two regional inspectors in accordance with NRC Manual Chapter 2515 and NRC Inspection Procedure 71003.
Based on the sample selected for review, the inspectors determined that commitments, license conditions, and regulatory requirements associated with the renewed facility operating license were met. The inspectors also determined that the licensee had administrative controls in place to ensure completion of pending actions scheduled both prior and during the period of extended operation (PEO).
The inspectors identified two observations associated with the implementation of one-time inspections for two Aging Management Programs (AMPs). These observations consisted of issues of concern that, if found during the PEO, would be characterized as performance deficiencies in the NRC Reactor Oversight Process. The licensee entered all observations into the stations Corrective Action Program (CAP) for evaluation and resolution.
The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG 1649, Reactor Oversight Process, Revision 4, dated December 2006.
NRC-Identified
and Self-Revealed Findings
None
Licensee-Identified Violations
None
REPORT DETAILS
OTHER ACTIVITIES
4OA5 Other Activities
.1 Post-Approval Site Inspection for License Renewal - IP 71003 (Phase 1)
a. Inspection Scope
- (1) Implementation of License Conditions and Commitments, including Aging Management Programs
The inspectors reviewed a sample of license renewal activities scheduled for the Unit 1 spring 2012 refueling outage, which was the second-to-last outage prior to the period of extended operation (PEO). The inspectors selected this refueling outage because it would present the best opportunity to observe the majority of the one-time inspections associated with license renewal commitments. The inspections objective was to maximize observations of the actual implementation of license renewal activities before the beginning of the PEO (August 7, 2014), and verify that the licensee completed the necessary actions to:
- (a) comply with the conditions stipulated in the renewed facility operating license;
- (b) meet the license renewal commitments described in NRC Memorandum dated March 6, 2007, (ADAMS Accession Number ML070640041), and
- (c) meet the future inspection activities described in the Updated Final Safety Analysis Report (UFSAR) supplement submitted pursuant to 10 CFR 54.21(d). The license renewal application (LRA) for Edwin I. Hatch Nuclear Plant and the corresponding NRC Safety Evaluation Report (SER) documented in NUREG-1803 are publicly available on ADAMS under accession numbers ML003688151, and ML020020307, respectively.
The inspectors reviewed supporting documents; conducted interviews with licensee staff; observed in-process outage activities; and performed visual inspection of structures, systems, and components (SSCs) including those not accessible during power operation. The commitment items and AMPs selected for the inspection sample are summarized below based on their description in Appendix A of the LRA. The specific inspection activities conducted for each AMP are also described below. Specific documents reviewed are listed in the report attachment.
Commitment Item 6 - Galvanic Susceptibility Inspections:
The LRA described the Galvanic Susceptibility Inspections as a new AMP that would provide for condition monitoring via one-time inspections to provide objective evidence that galvanic susceptibility is being managed for specific components within the scope of license renewal. The first one-time inspections would consider the more corrosive raw water environment and include a sample population of carbon-to-stainless-steel weld connections that should exhibit the largest electrochemical potential difference among the existing galvanic couples. The inspection samples would be expanded to other water systems if the examined carbon-to-stainless welds show galvanic corrosion. The inspection of in-scope components would use one or more examination methods, which may include ultrasonic thickness determinations, radiographic testing, depth gauges, and pipe removal and analysis. These one-time inspections would be performed prior to the beginning of the PEO of each Unit.
The inspectors reviewed licensing basis documents, AMP administrative procedures, and implementing inspection and test procedures to verify that the program was developed as described in the LRA and corresponding SER. The inspectors also discussed the process used to select the inspection samples under this AMP and the criteria to be used for scope expansion with licensee personnel. The inspectors reviewed the examination reports listed below to verify that the implementation of the program was in accordance with the established procedures and consistent with the program attributes described in the licensing basis documents.
- Work Order (WO) SNC105364 - License Renewal Inspection: Inspect
Dissimilar Metal Welds in Component 1P41N002 (Service Water System)
- WO SNC339429 - License Renewal Inspection: Inspect Component
1E11F103A (Residual Heat Removal(RHR)/Low Pressure Coolant
Injection (LPCI) System)
Commitment Item 7 - Treated Water Systems Piping Inspection Program:
The LRA described the Treated Water Systems Piping Inspections (TWSPI) as a new AMP that would provide for condition monitoring via one-time examinations intended to provide objective evidence that existing chemistry control is managing aging in piping that is not examined under another inspection program. This AMP would examine a sample population of carbon and stainless steel tubing and piping in the treated water systems. The expansion of inspection points and the subsequent examination of in-scope components would depend on the results of the initial inspections. The inspections would be conducted using various techniques including, but not be limited to, volumetric or destructive examination. The specific sample population, examination methods, and acceptance criteria would be defined in the inspection and trending procedures. These one-time inspections would be performed prior to the PEO of each Unit.
The inspectors reviewed licensing basis documents, AMP administrative procedures, implementing inspection and test procedures, and inspection records to verify that the program was developed as described in the LRA, and the corresponding SER. The inspectors also discussed the process used to select the inspection samples under this AMP, and the criteria to be used for scope expansion with licensee personnel.
Additionally, the inspectors directly observed licensee personnel during the execution of the one-time inspections listed below to verify that the implementation of the program was in accordance with the established procedures and consistent with the program attributes described in the licensing basis documents.
- WO SNC360464 - License Renewal Inspection: Perform Visual
Inspection of Minimum Flow Bypass Check Valve 1E51F021 and
Connecting Piping up to MOV 1E51F019 (Reactor Core Isolation Cooling
(RCIC) System)
- WO SNC99460 - License Renewal Inspection: 1E11-F028A Valve
Modification (RHR/LPCI System)
- WO SNC106965 - License Renewal Inspection: TWSPI of 1E21D001B
Restricting Orifice and Piping (Core Spray System)
- WO SNC108088 - License Renewal Inspection: Disassemble/Inspect
1E51D003 Steam Supply Steam Trap in RCIC Room (RCIC System)
- WO SNC108091 - License Renewal Inspection: Disassemble/Inspect 1
E51D005 Minimum Flow Bypass Restrictive Orifice (RCIC System)
- WO SNC108319 - License Renewal Inspection: Inspect Outboard and
Inboard Steam Isolation Valve 1E41F003/F002 (High Pressure Coolant
Injection (HPCI) System)
- WO SNC108343 - License Renewal Inspection: Drywell Sump Cooler,
1G11B001 Inlet (Radwaste System)
- WO SNC108354 - License Renewal Inspection: 1P42/1B31 Sample D-1-
1 (Reactor Building Closed Cooling Water System)
Commitment Item 8 - Gas Systems Component Inspections:
The LRA described the Gas Systems Component Inspections as a new AMP that would provide for condition monitoring via one-time condition monitoring aging management activities designed to provide objective evidence that the aging effects predicted for systems with gases as internal environments are being adequately managed. The scope of this program would include susceptible locations in several systems within the scope of license renewal. The inspection activities will use examination techniques designed to ascertain whether significant loss of material or cracking has occurred in the sample population. These one-time inspections would be performed prior to the beginning of the PEO of each Unit.
The inspectors reviewed licensing basis documents, AMP administrative procedures, and implementing inspection and test procedures to verify that the program was developed as described in the LRA and the corresponding SER. The inspectors also discussed with licensee personnel the process used to select the inspection samples under this AMP and the criteria to be used for scope expansion. Additionally, the inspectors directly observed licensee personnel during the execution of the one-time inspections listed below to verify that the implementation of the program was in accordance with the established procedures and consistent with the program attributes described in the licensing basis documents.
- WO SNC106929 - License Renewal Inspection: Remove Pipe
Cap/Inspect 1E41F123B Test Valve (HPCI System)
Commitment Item 11 - Residual Heat Removal Heat Exchanger Augmented Inspection and Testing Program:
The LRA described the residual heat removal (RHR) Heat Exchanger Augmented Inspection and Testing Program as a new condition monitoring program that would provide enhanced aging management of both the shell and tube sides of the Unit 1, and Unit 2 RHR heat exchangers. The RHR heat exchangers would be visually inspected, and eddy current testing would be done on a regular basis. This inspection program would be implemented prior to the beginning of the PEO of each Unit.
The inspectors reviewed licensing basis documents, AMP administrative procedures, and implementing inspection and test procedures to verify that the program was developed as described in the LRA and the corresponding SER. Additionally, the inspectors discussed with the license the preliminary eddy current inspection results for the Unit 1 RHR-1A heat exchanger inspection, conducted during the Unit 1 spring 2012 outage, and reviewed the final report for the Unit 1 RHR-1B heat exchanger eddy current inspection, completed in 2006, to verify that the implementation of the program was in accordance with the established procedures and consistent with the program attributes described in the licensing basis documents.
Flow Accelerated Corrosion Aging Management Program:
The LRA described the Flow Accelerated Corrosion (FAC) Program as an enhanced AMP designed to monitor pipe wear in those systems that have been determined to be susceptible to FAC-related loss of material. The susceptibility of piping to FAC would be predicted using a computer model specifically developed for FAC analysis. The FAC model would predict FAC rates in piping, and calculates the time remaining until reaching the defined critical wall thickness. The detection of wall thinning would include various examination methods such as Ultrasonic testing (UT), Radiographic testing (RT),and visual examinations. The enhanced examination methods and frequencies would be based on industry and plant specific operating experience as opposed to computer modeling. Examinations to detect erosion, erosion-corrosion, as well as FAC, would be performed as part of the enhanced program. For both units, the FAC Program would be expanded to include additional piping for certain systems that are already included in the current program. For Unit 2 only, portions of the radioactive decay hold-up volume (main steam and steam line drains, and condensate drains) will also be included. These program enhancements would be implemented prior to the beginning of the PEO of each Unit.
The inspectors reviewed licensing basis documents, AMP administrative procedures, and implementing inspection and test procedures to verify that the program was developed as described in the LRA and the corresponding SER. The inspectors also discussed the criteria for scope expansion for an UT examination of component 1-MSD-10 with licensee staff. The examination of 1-MSD-10 revealed wall thinning indications during the Unit 1 spring 2012 outage requiring scope expansion. Additionally, the inspectors directly observed and reviewed the final examination report for the UT examination of component 1-MSD-14, which was selected as a result of the scope expansion from 1-MSD-10. The inspectors reviewed these activities to verify that the implementation of the program was in accordance with the established procedures and consistent with the program attributes described in the licensing basis documents.
Boiling Water Reactor Vessel And Internals Aging Management Program:
The LRA described the Boiling Water Reactor Vessel and Internals Project (BWRVIP) as an existing AMP resulting from the association of utilities to focus on resolution of BWR vessel and internals issues. The BWRVIP Program inspection and evaluation reports would specifically address the reactor vessel components and reactor internals relative to the requirements of 10 CFR 54. The BWRVIP Program inspection and evaluation documents would provide for reactor pressure vessel (RPV) and reactor internals examination utilizing a combination of ultrasonic, visual, and surface methods, including pressure testing. The specific methods to be used and the frequency of examination would be in accordance with the applicable BWRVIP inspection and evaluation report, unless a specific exception is identified to the NRC. The BWRVIP inspection and evaluation reports applicable to Plant Hatch reactor assembly components would be:
- BWRVIP-18 Core Spray Internals
- BWRVIP-26 Top Guide
- BWRVIP-41 Jet Pump Assembly
- BWRVIP-47 Control Rod Guide Tube
- BWRVIP-76 Shroud (including repair hardware)
The inspectors reviewed licensing basis documents, AMP administrative procedures, and implementing inspection and test procedures to verify that the program was developed as described in the LRA and the corresponding SER. Additionally, the inspectors reviewed final examination data sheets, and portions of the corresponding digital video disks (DVDs), for the visual examinations of the reactor vessel internal components listed below, to verify that the implementation of the program was in accordance with the established procedures, and consistent with the program attributes described in the in the licensing basis documents.
- Jet Pump Riser Welds - Component ID: JP 16 RS-2 (DVD 17)
- Steam Dryer Vertical Partition Welds - Component ID: Bank 3 to 2
Vertical Partition Weld 3 (DVD 4)
- Steam Dryer Horizontal Welds - Component ID: Upper Horizontal Hood 5
Weld (DVD 01)
- (2) Review of License Renewal Commitment Changes
The inspectors identified that no changes were made to the commitment items selected for review. The review of remaining license renewal commitment changes would be completed during the second implementation phase of inspection procedure 71003.
- (3) Review of Newly-Identified SSCs
This inspection requirement would be completed during the second implementation phase of inspection procedure 71003.
the UFSAR Supplement
The review of the description of AMPs and TLAAs in the UFSAR supplement submitted pursuant 10 CFR 54.21(d) would be completed during the second implementation phase of inspection procedure 71003.
b. Findings and Observations
No findings were identified. The inspectors determined that the licensee met the license renewal commitments, license conditions, and applicable regulatory requirements for the inspection samples selected for review. The inspectors determined that the overall implementation of Aging Management Program activities reviewed during the Unit 1 spring 2012 refueling outage was consistent with the license renewal commitments. The inspectors also determined that the licensee had administrative controls in place to ensure completion of pending actions scheduled both prior and during the period of extended operation.
The inspectors identified the two observations described below, which if identified during the PEO, would be characterized as performance deficiencies, and processed in accordance with NRC Inspection Manual Chapter 0612, Power Reactor Inspection Reports. These observations are subject to follow-up inspection during the second implementation phase of inspection procedure 71003 to provide reasonable assurance that the license renewal commitments are met.
- (1) Observation for Commitment Item 6, Galvanic Susceptibility Inspections
The inspectors identified that the licensee did not conduct a non-destructive examination (NDE) activity for WO SNC105364 in accordance with the administrative controls described in the UFSAR supplement for license renewal. The team identified that a radiographic examination performed under this WO was not fully prescribed by documented instructions, procedures, or drawings of a type appropriate to the circumstances, in accordance with the applicable quality assurance controls described in the UFSAR supplement. Specifically, the licensee selected a radiographic examination method (i.e., digital radiography) which was not discussed in any of the implementing procedures for the Aging Management Program. While the selected method provided effective results to identify the aging effects of concern under this program, the activity was not performed following the quality assurance standards described in the UFSAR for license renewal activities. This issue had no impact on plant safety and the selected examination method was demonstrated to be effective in identifying the aging effects of concern.
The licensee entered this issue into the sites CAP as Condition Report (CR) 417114.
- (2) Observation for Commitment Item 7, Treated Water Systems Piping Inspection
Program
The inspectors noted that one of the criteria for unacceptable relevant indications in implementing visual inspection procedure 42IT-QCX-006-0 of this AMP was, any corrosion or erosion that is judged to reduce the pressure retaining wall thickness by more than 10% before the end of the period of extended operation. Based on discussions with the licenses NDE examiners during field observations, the inspectors identified that the examiners were looking for actual indications of 10% or more in wall thickness reduction rather than indications that could reach the 10% wall reduction during the PEO. The inspectors determined that the examiners understanding of the inspection criterion for percentage of wall reduction was inconsistent with the criteria established in the implementing procedures for this AMP. Additionally, the implementing visual inspection procedure did not provide specific guidance for the examiners to identify what indications could reduce the pressure retaining wall thickness by more than 10% before the end of the PEO. This issue had no impact on plant safety and the selected examinations observed by the inspectors did not identify unacceptable relevant indications that would be affected by the misapplication of the 10% wall thickness criterion.
The licensee entered this issue into the sites CAP as CR 417115.
4OA6 Management Meetings
.1
Exit Meeting Summary
On March 02, 2012, the inspectors presented the inspection results to Mr. W. L.
Bargeron, Plant Manager, and other members of the licensee staff. The licensee acknowledged the issues presented. The inspectors confirmed that none of the potential report input discussed was considered proprietary.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- D. So, License Renewal Engineer
- J. Hornbuckle, Materials Programs-Corporate
- S. Tipps, Principal Licensing Engineer
- W.L. Bargeron, Plant Manager
LIST OF REPORT ITEMS
Opened
None
Opened and Closed
None
Closed
None