IR 05000409/2012007: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 26: Line 26:
On June 6, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the permanently shut down La Crosse Boiling Water Reactor (LACBWR) with the spent fuel in Safe Storage (SAFSTOR), and an initial security inspection of the physical security program for the Independent Spent Fuel Storage Installation (ISFSI) located near the La Crosse Boiling Water Reactor (LACBWR), Genoa, Wisconsin. The purpose of the inspection was to evaluate whether the protection of the spent fuel in SAFSTOR was in compliance with the LACBWR Physical Security Plan (PSP), NRC regulations and the NRC Interim Compensatory Measures (ICM) Order EA-02-077, and Security Orders EA-03-099, EA-06-243, and EA-06-244. In addition, the inspectors also verified that the security protection for the ISFSI was in compliance with the ISFSI PSP (Addendum III of the LACBWR PSP), NRC regulations, and NRC Security Order EA-09-118 before fuel transfer to the ISFSI pad occurs. At the conclusion of the on-site inspection on June 6, 2012, the inspectors discussed the inspection findings with your plant manager, and members of your security and ISFSI project management staff.
On June 6, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the permanently shut down La Crosse Boiling Water Reactor (LACBWR) with the spent fuel in Safe Storage (SAFSTOR), and an initial security inspection of the physical security program for the Independent Spent Fuel Storage Installation (ISFSI) located near the La Crosse Boiling Water Reactor (LACBWR), Genoa, Wisconsin. The purpose of the inspection was to evaluate whether the protection of the spent fuel in SAFSTOR was in compliance with the LACBWR Physical Security Plan (PSP), NRC regulations and the NRC Interim Compensatory Measures (ICM) Order EA-02-077, and Security Orders EA-03-099, EA-06-243, and EA-06-244. In addition, the inspectors also verified that the security protection for the ISFSI was in compliance with the ISFSI PSP (Addendum III of the LACBWR PSP), NRC regulations, and NRC Security Order EA-09-118 before fuel transfer to the ISFSI pad occurs. At the conclusion of the on-site inspection on June 6, 2012, the inspectors discussed the inspection findings with your plant manager, and members of your security and ISFSI project management staff.


The inspection also examined activities conducted under your license as they relate to security and compliance with the NRC's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. The enclosed inspection report documents the inspection results. Based on the results of this inspection, no findings of significance were identified.
The inspection also examined activities conducted under your license as they relate to security and compliance with the NRCs rules and regulations and with the conditions of your license.


Enclosure Contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. The enclosed inspection report documents the inspection results.


document is decontrolled. In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/ reading-rm/adams.html. However, because of the security-related discussion contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
Based on the results of this inspection, no findings of significance were identified.
 
Enclosure Contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/ reading-rm/adams.html. However, because of the security-related discussion contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.


We will gladly discuss any questions you may have regarding this inspection.
We will gladly discuss any questions you may have regarding this inspection.


Sincerely,
Sincerely,
/RA/
/RA/  
Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Docket No. 050-00409, 072-00046 License No. DPR-45, General License (ISFSI)
 
Enclosures: IR 05000409/2012007(DNMS) (Non Public) IR 07200046/2011401(DNMS) (Non Public)
Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch  
cc w/encl: D. Egge, Plant Manager, Dairyland Power Cooperative cc w/o encl: T. Zaremba, Wheeler, Van Sickle and Anderson J. Kitsembel, Chairman, Wisconsin Public Service Commission S. Burmaster, Coulee Region Energy Coalition G. Kruck, Chairman, Town of Genoa P. Schmidt, Manager, Radiation Protection, Wisconsin Department of Health Services J. McRill, Technical Support Engineer Chief, Radiation Protection Section, Wisconsin Department of Health State Liaison Officer, State of Wisconsin In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/ reading-rm/adams.html. However, because of the security-related discussion contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
 
Docket No. 050-00409, 072-00046 License No. DPR-45, General License (ISFSI)  
 
Enclosures:
IR 05000409/2012007(DNMS) (Non Public)
IR 07200046/2011401(DNMS) (Non Public)  
 
cc w/encl: D. Egge, Plant Manager, Dairyland Power Cooperative  
 
cc w/o encl: T. Zaremba, Wheeler, Van Sickle and Anderson  
 
J. Kitsembel, Chairman, Wisconsin Public  
 
Service Commission  
 
S. Burmaster, Coulee Region Energy Coalition  
 
G. Kruck, Chairman, Town of Genoa  
 
P. Schmidt, Manager, Radiation Protection,  
 
Wisconsin Department of Health Services  
 
J. McRill, Technical Support Engineer  
 
Chief, Radiation Protection Section, Wisconsin  
 
Department of Health  
 
State Liaison Officer, State of Wisconsin In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/ reading-rm/adams.html. However, because of the security-related discussion contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.


We will gladly discuss any questions you may have regarding this inspection.
We will gladly discuss any questions you may have regarding this inspection.


Sincerely,
Sincerely,
/RA/
/RA/  
Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Docket No. 050-00409, 072-00046 License No. DPR-45, General License (ISFSI)
 
Enclosures: IR 05000409/2012007(DNMS) (Non Public) IR 07200046/2011401(DNMS) (Non Public)
Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch  
cc w/encl: D. Egge, Plant Manager, Dairyland Power Cooperative cc w/o encl: T. Zaremba, Wheeler, Van Sickle and Anderson J. Kitsembel, Chairman, Wisconsin Public Service Commission S. Burmaster, Coulee Region Energy Coalition G. Kruck, Chairman, Town of Genoa P. Schmidt, Manager, Radiation Protection, Wisconsin Department of Health Services J. McRill, Technical Support Engineer Chief, Radiation Protection Section, Wisconsin Department of Health State Liaison Office, State of Wisconsin DISTRIBUTION
 
: See next page ADAMS Accession Number: ML12188A586 DOCUMENT NAME: G:\DNMSIII\Work in progress\IR- Security- LACBWR 2012 ISFSI OUO-SRIcover_ltr_only.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII DNMS E RIII DNNMS NAME EABonano: jm EAB CALipa CAL DATE 07/05/12 07/05/12 OFFICIAL RECORD COPY Letter to William from Christine A. Lipa dated July 5, 2012 SUBJECT: LA CROSSE BOILING WATER REACTOR (PERMANENTLY SHUT DOWN) AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION NRC SECURITY INSPECTION REPORT NOS. 05000409/2012007(DNMS), AND 07200046/2011401(DNMS)
Docket No. 050-00409, 072-00046 License No. DPR-45, General License (ISFSI)  
DISTRIBUTION w/encl
 
: D. Garner, NSIR/DSP/DDMS/MWISB C. Lipa, RIII MCID Branch DISTRIBUTION w/o encl:
Enclosures:
IR 05000409/2012007(DNMS) (Non Public)
IR 07200046/2011401(DNMS) (Non Public)  
 
cc w/encl: D. Egge, Plant Manager, Dairyland Power Cooperative  
 
cc w/o encl:
T. Zaremba, Wheeler, Van Sickle and Anderson  
 
J. Kitsembel, Chairman, Wisconsin Public  
 
Service Commission  
 
S. Burmaster, Coulee Region Energy Coalition  
 
G. Kruck, Chairman, Town of Genoa  
 
P. Schmidt, Manager, Radiation Protection,  
 
Wisconsin Department of Health Services  
 
J. McRill, Technical Support Engineer  
 
Chief, Radiation Protection Section, Wisconsin  
 
Department of Health  
 
State Liaison Office, State of Wisconsin  
 
DISTRIBUTION:
See next page  
 
ADAMS Accession Number: ML12188A586 DOCUMENT NAME: G:\\DNMSIII\\Work in progress\\IR-Security-LACBWR 2012 ISFSI OUO-SRIcover_ltr_only.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII DNMS E
RIII DNNMS  
 
NAME EABonano: jm EAB CALipa CAL  
 
DATE 07/05/12 07/05/12  
 
OFFICIAL RECORD COPY Letter to William from Christine A. Lipa dated July 5, 2012  
 
SUBJECT:
LA CROSSE BOILING WATER REACTOR (PERMANENTLY SHUT DOWN) AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION NRC SECURITY INSPECTION REPORT NOS. 05000409/2012007(DNMS), AND 07200046/2011401(DNMS)  
 
DISTRIBUTION w/encl:
D. Garner, NSIR/DSP/DDMS/MWISB C. Lipa, RIII MCID Branch  
 
DISTRIBUTION w/o encl:
R. Wharton, NMSS B. Watson, FSME J. Hickman, FSME C. Pederson, RIII S. Reynolds, RIII A. Boland, RIII J. Giessner, RIII H. Logaras, RIII C. Ariano, RIII L. Linn, RIII P. Buckley, RIII T. Tomczak, RIII
R. Wharton, NMSS B. Watson, FSME J. Hickman, FSME C. Pederson, RIII S. Reynolds, RIII A. Boland, RIII J. Giessner, RIII H. Logaras, RIII C. Ariano, RIII L. Linn, RIII P. Buckley, RIII T. Tomczak, RIII
}}
}}

Latest revision as of 01:06, 12 January 2025

IR 05000409-12-007 (DNMS) and 07200046-11-401 (Dnms), 06/6/2012, La Crosse Boiling Water Reactor (Permanently Shut Down) and Independent Spent Fuel Storage Installation - Cover Letter
ML12192A081
Person / Time
Site: La Crosse  File:Dairyland Power Cooperative icon.png
Issue date: 07/05/2012
From: Christine Lipa
NRC/RGN-III/DNMS/DB
To: Berg W
Dairyland Power Cooperative
Bonano E
References
IR-11-401, IR-12-007
Download: ML12192A081 (4)


Text

July 5, 2012

SUBJECT:

LA CROSSE BOILING WATER REACTOR (PERMANENTLY SHUT DOWN) AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION NRC SECURITY INSPECTION REPORT NOS. 05000409/2012007(DNMS), AND 07200046/2011401(DNMS)

Dear Mr. Berg:

On June 6, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the permanently shut down La Crosse Boiling Water Reactor (LACBWR) with the spent fuel in Safe Storage (SAFSTOR), and an initial security inspection of the physical security program for the Independent Spent Fuel Storage Installation (ISFSI) located near the La Crosse Boiling Water Reactor (LACBWR), Genoa, Wisconsin. The purpose of the inspection was to evaluate whether the protection of the spent fuel in SAFSTOR was in compliance with the LACBWR Physical Security Plan (PSP), NRC regulations and the NRC Interim Compensatory Measures (ICM) Order EA-02-077, and Security Orders EA-03-099, EA-06-243, and EA-06-244. In addition, the inspectors also verified that the security protection for the ISFSI was in compliance with the ISFSI PSP (Addendum III of the LACBWR PSP), NRC regulations, and NRC Security Order EA-09-118 before fuel transfer to the ISFSI pad occurs. At the conclusion of the on-site inspection on June 6, 2012, the inspectors discussed the inspection findings with your plant manager, and members of your security and ISFSI project management staff.

The inspection also examined activities conducted under your license as they relate to security and compliance with the NRCs rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. The enclosed inspection report documents the inspection results.

Based on the results of this inspection, no findings of significance were identified.

Enclosure Contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/ reading-rm/adams.html. However, because of the security-related discussion contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

We will gladly discuss any questions you may have regarding this inspection.

Sincerely,

/RA/

Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch

Docket No. 050-00409, 072-00046 License No. DPR-45, General License (ISFSI)

Enclosures:

IR 05000409/2012007(DNMS) (Non Public)

IR 07200046/2011401(DNMS) (Non Public)

cc w/encl: D. Egge, Plant Manager, Dairyland Power Cooperative

cc w/o encl: T. Zaremba, Wheeler, Van Sickle and Anderson

J. Kitsembel, Chairman, Wisconsin Public

Service Commission

S. Burmaster, Coulee Region Energy Coalition

G. Kruck, Chairman, Town of Genoa

P. Schmidt, Manager, Radiation Protection,

Wisconsin Department of Health Services

J. McRill, Technical Support Engineer

Chief, Radiation Protection Section, Wisconsin

Department of Health

State Liaison Officer, State of Wisconsin In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/ reading-rm/adams.html. However, because of the security-related discussion contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

We will gladly discuss any questions you may have regarding this inspection.

Sincerely,

/RA/

Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch

Docket No. 050-00409, 072-00046 License No. DPR-45, General License (ISFSI)

Enclosures:

IR 05000409/2012007(DNMS) (Non Public)

IR 07200046/2011401(DNMS) (Non Public)

cc w/encl: D. Egge, Plant Manager, Dairyland Power Cooperative

cc w/o encl:

T. Zaremba, Wheeler, Van Sickle and Anderson

J. Kitsembel, Chairman, Wisconsin Public

Service Commission

S. Burmaster, Coulee Region Energy Coalition

G. Kruck, Chairman, Town of Genoa

P. Schmidt, Manager, Radiation Protection,

Wisconsin Department of Health Services

J. McRill, Technical Support Engineer

Chief, Radiation Protection Section, Wisconsin

Department of Health

State Liaison Office, State of Wisconsin

DISTRIBUTION:

See next page

ADAMS Accession Number: ML12188A586 DOCUMENT NAME: G:\\DNMSIII\\Work in progress\\IR-Security-LACBWR 2012 ISFSI OUO-SRIcover_ltr_only.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII DNMS E

RIII DNNMS

NAME EABonano: jm EAB CALipa CAL

DATE 07/05/12 07/05/12

OFFICIAL RECORD COPY Letter to William from Christine A. Lipa dated July 5, 2012

SUBJECT:

LA CROSSE BOILING WATER REACTOR (PERMANENTLY SHUT DOWN) AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION NRC SECURITY INSPECTION REPORT NOS. 05000409/2012007(DNMS), AND 07200046/2011401(DNMS)

DISTRIBUTION w/encl:

D. Garner, NSIR/DSP/DDMS/MWISB C. Lipa, RIII MCID Branch

DISTRIBUTION w/o encl:

R. Wharton, NMSS B. Watson, FSME J. Hickman, FSME C. Pederson, RIII S. Reynolds, RIII A. Boland, RIII J. Giessner, RIII H. Logaras, RIII C. Ariano, RIII L. Linn, RIII P. Buckley, RIII T. Tomczak, RIII