{{#Wiki_filter: | {{#Wiki_filter:August 16, 2012 | ||
Mr. Eric W. Olson | Mr. Eric W. Olson | ||
Site Vice President | Site Vice President | ||
Entergy Operations, Inc. | Entergy Operations, Inc. | ||
River Bend Station | River Bend Station | ||
5485 U.S. Highway 61 | 5485 U.S. Highway 61 | ||
St. Francisville, LA 70775 | St. Francisville, LA 70775 | ||
SUBJECT: | |||
SUBJECT: | |||
RIVER BEND STATION - NRC AUGMENTED INSPECTION TEAM | |||
Dear Mr. Olson: | FOLLOW-UP INSPECTION PLANNING LETTER, INSPECTION REPORT | ||
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission Region IV | 05000458/2012010 | ||
staff will conduct an augmented inspection team follow-up inspection at your River Bend | Dear Mr. Olson: | ||
Station. The inspection will be comprised of resident inspectors and a regional reactor inspector | The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission Region IV | ||
from the NRC Region IV office. The inspection will be conducted in accordance with Inspection | staff will conduct an augmented inspection team follow-up inspection at your River Bend | ||
Procedure 93800 and multiple reactor oversight process baseline inspection procedures. | Station. The inspection will be comprised of resident inspectors and a regional reactor inspector | ||
The schedule for the inspection is as follows: | from the NRC Region IV office. The inspection will be conducted in accordance with Inspection | ||
Procedure 93800 and multiple reactor oversight process baseline inspection procedures. | |||
The schedule for the inspection is as follows: | |||
This inspection is resource intensive both for the NRC inspectors and your staff. In order to | |||
minimize the impact to your onsite resources and to ensure a productive inspection, we have | In-office preparation: September 10 - 14, 2012 | ||
enclosed a request for documents needed for this inspection. Please note that the documents | |||
are requested to be provided by September 4, 2012. In addition, we request that appropriate | Onsite inspection: | ||
personnel knowledgeable of each of the unresolved items documented in NRC Inspection | September 17 - 21, 2012 | ||
Report 0500458/2012009 be available to support the inspectors during the onsite inspection | This inspection is resource intensive both for the NRC inspectors and your staff. In order to | ||
week. | minimize the impact to your onsite resources and to ensure a productive inspection, we have | ||
We have discussed this inspection activity with your staff. If there are any questions about this | enclosed a request for documents needed for this inspection. Please note that the documents | ||
inspection or the material requested, please contact the team lead, Brian Tindell, at | are requested to be provided by September 4, 2012. In addition, we request that appropriate | ||
254-897-1500 or by email at brian.tindell@nrc.gov. | personnel knowledgeable of each of the unresolved items documented in NRC Inspection | ||
Report 0500458/2012009 be available to support the inspectors during the onsite inspection | |||
week. | |||
We have discussed this inspection activity with your staff. If there are any questions about this | |||
inspection or the material requested, please contact the team lead, Brian Tindell, at | |||
254-897-1500 or by email at brian.tindell@nrc.gov. | |||
UNITED STATES | |||
NUCLEAR REGULATORY COMMISSION | |||
REGION IV | |||
1600 EAST LAMAR BLVD | |||
ARLINGTON, TEXAS 76011-4511 | |||
E. Olson | E. Olson | ||
This letter does not contain new or amended information collection requirements subject to the | - 2 - | ||
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection | |||
requirements were approved by the Office of Management and Budget, Control No. 3150 0011. | This letter does not contain new or amended information collection requirements subject to the | ||
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for | Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection | ||
information or an information collection requirement unless the requesting document displays a | requirements were approved by the Office of Management and Budget, Control No. 3150 0011. | ||
currently valid Office of Management and Budget Control No. | The NRC may not conduct or sponsor, and a person is not required to respond to, a request for | ||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and | information or an information collection requirement unless the requesting document displays a | ||
its enclosure will be available electronically for public inspection in the NRC Public | currently valid Office of Management and Budget Control No. | ||
Document Room or from the Publicly Available Records (PARS) component of NRC's | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and | ||
document system (ADAMS). ADAMS is accessible from the NRC Web site at | its enclosure will be available electronically for public inspection in the NRC Public | ||
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | Document Room or from the Publicly Available Records (PARS) component of NRC's | ||
document system (ADAMS). ADAMS is accessible from the NRC Web site at | |||
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
Docket: 05000458 | |||
License: NPF-47 | /RA/ | ||
Enclosure: Augmented Inspection Team Follow-up Inspection Document Request | |||
cc w/ encl: Electronic Distribution | Vincent G. Gaddy, Chief | ||
Project Branch C | |||
Division of Reactor Projects | |||
Docket: 05000458 | |||
License: NPF-47 | |||
Enclosure: Augmented Inspection Team Follow-up Inspection Document Request | |||
cc w/ encl: Electronic Distribution | |||
E. Olson | E. Olson | ||
Electronic distribution by RIV: | - 3 - | ||
Regional Administrator (Elmo.Collins@nrc.gov) | |||
Deputy Regional Administrator (Art.Howell@nrc.gov) | |||
DRP Director (Kriss.Kennedy@nrc.gov) | Electronic distribution by RIV: | ||
Acting DRP Deputy Director (Alan.Howe@nrc.gov) | Regional Administrator (Elmo.Collins@nrc.gov) | ||
Acting DRS Director (Tom.Blount@nrc.gov) | Deputy Regional Administrator (Art.Howell@nrc.gov) | ||
Acting DRS Deputy Director (Patrick.Louden@nrc.gov) | DRP Director (Kriss.Kennedy@nrc.gov) | ||
Senior Resident Inspector (Grant.Larkin@nrc.gov) | Acting DRP Deputy Director (Alan.Howe@nrc.gov) | ||
Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov) | Acting DRS Director (Tom.Blount@nrc.gov) | ||
Resident Inspector (Andy.Barrett@nrc.gov) | Acting DRS Deputy Director (Patrick.Louden@nrc.gov) | ||
RBS Administrative Assistant (Lisa.Day@nrc.gov) | Senior Resident Inspector (Grant.Larkin@nrc.gov) | ||
Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov) | Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov) | ||
Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov) | Resident Inspector (Andy.Barrett@nrc.gov) | ||
Public Affairs Officer (Victor.Dricks@nrc.gov) | RBS Administrative Assistant (Lisa.Day@nrc.gov) | ||
Public Affairs Officer (Lara.Uselding@nrc.gov) | Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov) | ||
Project Manager (Alan.Wang@nrc.gov) | Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov) | ||
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov) | Public Affairs Officer (Victor.Dricks@nrc.gov) | ||
RITS Coordinator (Marisa.Herrera@nrc.gov) | Public Affairs Officer (Lara.Uselding@nrc.gov) | ||
Regional Counsel (Karla.Fuller@nrc.gov) | Project Manager (Alan.Wang@nrc.gov) | ||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) | Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov) | ||
OEMail Resource | RITS Coordinator (Marisa.Herrera@nrc.gov) | ||
RIV/ETA: OEDO (Silas.Kennedy@nrc.gov) | Regional Counsel (Karla.Fuller@nrc.gov) | ||
DRS/TSB STA (Dale.Powers@nrc.gov) | Congressional Affairs Officer (Jenny.Weil@nrc.gov) | ||
R:\_REACTORS\_RB\2012\RBS2012010 Inspection Planning Ltr.doc | OEMail Resource | ||
SUNSI Rev | RIV/ETA: OEDO (Silas.Kennedy@nrc.gov) | ||
DRS/TSB STA (Dale.Powers@nrc.gov) | |||
Publicly Avail | |||
RI:DRP/A | |||
BTindell | |||
/RA via Email | |||
08/16/2012 | |||
OFFICIAL RECORD COPY | |||
R:\\_REACTORS\\_RB\\2012\\RBS2012010 Inspection Planning Ltr.doc | |||
SUNSI Rev | |||
Compl. | |||
Yes No | |||
ADAMS | |||
Yes No | |||
Reviewer Initials | |||
VGG | |||
Publicly Avail | |||
Yes No | |||
Sensitive | |||
Yes No | |||
Sens. Type Initials VGG | |||
RI:DRP/A | |||
BC:DRP/C | |||
BTindell | |||
VGGaddy | |||
/RA via Email | |||
/RA/ | |||
08/16/2012 | |||
08/16/2012 | |||
OFFICIAL RECORD COPY | |||
T=Telephone E=E-mail F=Fax | |||
ML 12229A511 | |||
Inspection Dates: | |||
- 1 - | |||
Inspection Procedures: | Enclosure | ||
Augmented Inspection Team Follow-up Inspection Document Request | |||
Team Lead: | |||
The following information should be sent to the Region IV office in hard copy or electronic | |||
format in care of Brian Tindell, by September 4, 2012. Please provide requested documentation | Inspection Dates: | ||
electronically if possible. Also, we request that you categorize the documents with the | |||
numbered list below. If you are unable to send the requested information, please inform the | In-office preparation: September 10 - 14, 2012 | ||
inspectors and provide the documentation during the first day of the onsite inspection. The | |||
inspectors will request additional documents during the preparation and onsite inspection | |||
weeks. If you have any questions regarding this information request, please contact the team | |||
lead. | |||
For the following items from Augmented Inspection Team Inspection Report | Onsite: September 17 - 21, 2012 | ||
05000458/2012009, please provide current copies, as applicable, of related condition reports, | |||
work orders, root cause analysis and/or apparent cause evaluations, system design criteria, | Inspection Procedures: | ||
vendor manuals, UFSAR descriptions, technical specification requirements, technical | IP 93800, Augmented Inspection Team | ||
requirements manual requirements, fire protection report descriptions, procedures, drawings, | Various Reactor Oversight Process Baseline Inspection | ||
plant safety index records, fire incident reports, scram reports, industry operating experience | Procedures | ||
screenings, and post-event risk analysis: | |||
Team Lead: | |||
Brian Tindell, Resident Inspector, Comanche Peak NPP | |||
The following information should be sent to the Region IV office in hard copy or electronic | |||
format in care of Brian Tindell, by September 4, 2012. Please provide requested documentation | |||
electronically if possible. Also, we request that you categorize the documents with the | |||
numbered list below. If you are unable to send the requested information, please inform the | |||
inspectors and provide the documentation during the first day of the onsite inspection. The | |||
inspectors will request additional documents during the preparation and onsite inspection | |||
weeks. If you have any questions regarding this information request, please contact the team | |||
lead. | |||
For the following items from Augmented Inspection Team Inspection Report | |||
05000458/2012009, please provide current copies, as applicable, of related condition reports, | |||
work orders, root cause analysis and/or apparent cause evaluations, system design criteria, | |||
vendor manuals, UFSAR descriptions, technical specification requirements, technical | |||
requirements manual requirements, fire protection report descriptions, procedures, drawings, | |||
plant safety index records, fire incident reports, scram reports, industry operating experience | |||
screenings, and post-event risk analysis: | |||
1. Main Control Room Annunciator Control and Conduct of Operations | |||
2. Past Operability of the Reactor Core Isolation Cooling System | |||
3. Implementation of the Procedure for Infrequently Performed Tests or Evolutions | |||
4. Corrective Action Program Implementation for Prior Lockout Relay Failure in | |||
February 2011 | |||
5. Implementation of Vendor and Industry Recommended Relay Testing and Maintenance | |||
6. Implementation of the Station Cable Reliability Program | |||
7. Onsite Safety Review Committee Implementation | |||
8. Ability to Promptly Staff the Fire Brigade at All Times During Plant Operation | |||
Inspector Contact Information: | |||
Brian Tindell | |||
Resident Inspector | - 2 - | ||
254-897-1500 | Enclosure | ||
brian.tindell@nrc.gov | Inspector Contact Information: | ||
Mailing Address: | Brian Tindell | ||
US NRC Region IV | Resident Inspector | ||
Attn: Brian Tindell | 254-897-1500 | ||
1600 East Lamar Blvd. | brian.tindell@nrc.gov | ||
Mailing Address: | |||
US NRC Region IV | |||
Attn: Brian Tindell | |||
1600 East Lamar Blvd. | |||
Arlington, TX 76011-4511 | Arlington, TX 76011-4511 | ||
}} | }} | ||
Latest revision as of 22:55, 11 January 2025
| ML12229A511 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 08/16/2012 |
| From: | Vincent Gaddy NRC/RGN-IV/DRP/RPB-C |
| To: | Olson E Entergy Operations |
| Gaddy V | |
| References | |
| IR-12-010 | |
| Download: ML12229A511 (5) | |
See also: IR 05000458/2012010
Text
August 16, 2012
Mr. Eric W. Olson
Site Vice President
Entergy Operations, Inc.
River Bend Station
5485 U.S. Highway 61
St. Francisville, LA 70775
SUBJECT:
RIVER BEND STATION - NRC AUGMENTED INSPECTION TEAM
FOLLOW-UP INSPECTION PLANNING LETTER, INSPECTION REPORT
Dear Mr. Olson:
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission Region IV
staff will conduct an augmented inspection team follow-up inspection at your River Bend
Station. The inspection will be comprised of resident inspectors and a regional reactor inspector
from the NRC Region IV office. The inspection will be conducted in accordance with Inspection
Procedure 93800 and multiple reactor oversight process baseline inspection procedures.
The schedule for the inspection is as follows:
In-office preparation: September 10 - 14, 2012
Onsite inspection:
September 17 - 21, 2012
This inspection is resource intensive both for the NRC inspectors and your staff. In order to
minimize the impact to your onsite resources and to ensure a productive inspection, we have
enclosed a request for documents needed for this inspection. Please note that the documents
are requested to be provided by September 4, 2012. In addition, we request that appropriate
personnel knowledgeable of each of the unresolved items documented in NRC Inspection
Report 0500458/2012009 be available to support the inspectors during the onsite inspection
week.
We have discussed this inspection activity with your staff. If there are any questions about this
inspection or the material requested, please contact the team lead, Brian Tindell, at
254-897-1500 or by email at brian.tindell@nrc.gov.
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 EAST LAMAR BLVD
ARLINGTON, TEXAS 76011-4511
E. Olson
- 2 -
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control No. 3150 0011.
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for
information or an information collection requirement unless the requesting document displays a
currently valid Office of Management and Budget Control No.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and
its enclosure will be available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's
document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Vincent G. Gaddy, Chief
Project Branch C
Division of Reactor Projects
Docket: 05000458
License: NPF-47
Enclosure: Augmented Inspection Team Follow-up Inspection Document Request
cc w/ encl: Electronic Distribution
E. Olson
- 3 -
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
Acting DRP Deputy Director (Alan.Howe@nrc.gov)
Acting DRS Director (Tom.Blount@nrc.gov)
Acting DRS Deputy Director (Patrick.Louden@nrc.gov)
Senior Resident Inspector (Grant.Larkin@nrc.gov)
Branch Chief, DRP/C (Vincent.Gaddy@nrc.gov)
Resident Inspector (Andy.Barrett@nrc.gov)
RBS Administrative Assistant (Lisa.Day@nrc.gov)
Senior Project Engineer, DRP/C (Bob.Hagar@nrc.gov)
Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Alan.Wang@nrc.gov)
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
RIV/ETA: OEDO (Silas.Kennedy@nrc.gov)
DRS/TSB STA (Dale.Powers@nrc.gov)
R:\\_REACTORS\\_RB\\2012\\RBS2012010 Inspection Planning Ltr.doc
SUNSI Rev
Compl.
Yes No
Yes No
Reviewer Initials
VGG
Publicly Avail
Yes No
Sensitive
Yes No
Sens. Type Initials VGG
RI:DRP/A
BC:DRP/C
BTindell
VGGaddy
/RA via Email
/RA/
08/16/2012
08/16/2012
OFFICIAL RECORD COPY
T=Telephone E=E-mail F=Fax
- 1 -
Enclosure
Augmented Inspection Team Follow-up Inspection Document Request
Inspection Dates:
In-office preparation: September 10 - 14, 2012
Onsite: September 17 - 21, 2012
Inspection Procedures:
IP 93800, Augmented Inspection Team
Various Reactor Oversight Process Baseline Inspection
Procedures
Team Lead:
Brian Tindell, Resident Inspector, Comanche Peak NPP
The following information should be sent to the Region IV office in hard copy or electronic
format in care of Brian Tindell, by September 4, 2012. Please provide requested documentation
electronically if possible. Also, we request that you categorize the documents with the
numbered list below. If you are unable to send the requested information, please inform the
inspectors and provide the documentation during the first day of the onsite inspection. The
inspectors will request additional documents during the preparation and onsite inspection
weeks. If you have any questions regarding this information request, please contact the team
lead.
For the following items from Augmented Inspection Team Inspection Report 05000458/2012009, please provide current copies, as applicable, of related condition reports,
work orders, root cause analysis and/or apparent cause evaluations, system design criteria,
vendor manuals, UFSAR descriptions, technical specification requirements, technical
requirements manual requirements, fire protection report descriptions, procedures, drawings,
plant safety index records, fire incident reports, scram reports, industry operating experience
screenings, and post-event risk analysis:
1. Main Control Room Annunciator Control and Conduct of Operations
2. Past Operability of the Reactor Core Isolation Cooling System
3. Implementation of the Procedure for Infrequently Performed Tests or Evolutions
4. Corrective Action Program Implementation for Prior Lockout Relay Failure in
February 2011
5. Implementation of Vendor and Industry Recommended Relay Testing and Maintenance
6. Implementation of the Station Cable Reliability Program
7. Onsite Safety Review Committee Implementation
8. Ability to Promptly Staff the Fire Brigade at All Times During Plant Operation
- 2 -
Enclosure
Inspector Contact Information:
Resident Inspector
254-897-1500
brian.tindell@nrc.gov
Mailing Address:
US NRC Region IV
Attn: Brian Tindell
1600 East Lamar Blvd.
Arlington, TX 76011-4511