| issue date = 06/21/2012
| title = Region III Quarterly Feeder Reports_2QCY12
| title = Region III Quarterly Feeder Reports_2QCY12
| author name = Anderson J D
| author name = Anderson J
| author affiliation = NRC/NSIR
| author affiliation = NRC/NSIR
| addressee name = Holmberg M S
| addressee name = Holmberg M
| addressee affiliation = NRC/RGN-III/DRS
| addressee affiliation = NRC/RGN-III/DRS
| docket = 05000010, 05000237, 05000249, 05000255, 05000263, 05000265, 05000266, 05000282, 05000301, 05000306, 05000315, 05000316, 05000331, 05000346, 05000373, 05000374, 05000440, 05000441, 05000461
| docket = 05000010, 05000237, 05000249, 05000255, 05000263, 05000265, 05000266, 05000282, 05000301, 05000306, 05000315, 05000316, 05000331, 05000346, 05000373, 05000374, 05000440, 05000441, 05000461
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:1 Anderson, Joseph From: Anderson, Joseph Sent: Thursday, June 21, 2012 8:02 AM To: Holmberg, Mel; Skokowski, Richard Cc: Jickling, Robert; Beavers, James; Thaggar d, Mark; Norris, Michael; Laughlin, Jeff
{{#Wiki_filter:1 Anderson, Joseph From:
Anderson, Joseph Sent:
Thursday, June 21, 2012 8:02 AM To:
Holmberg, Mel; Skokowski, Richard Cc:
Jickling, Robert; Beavers, James; Thaggard, Mark; Norris, Michael; Laughlin, Jeff


==Subject:==
==Subject:==
Region III Quarterly Inspection Report Feeders Attachments:
Region III Quarterly Inspection Report Feeders Attachments:
Braidwood Qrtly IR Feeder Memo 02 2012.docx; Byron Qrtly IR Feeder Memo 02 2012.docx; Clinton Qrtly IR Feeder Memo 02 2012.docx; Davis Besse Qrtly IR Feeder Memo 02 2012.docx; DC Cook Qrtly IR Feeder Memo 02 2012.docx; Dresden Qrtly IR Feeder Memo 02 2012.docx; Duane Arnold IR Feeder Memo 02 2012.docx; LaSalle Qrtly IR Feeder Memo 02 2012.docx; Monticello Qrtly IR Feeder Me mo 02 2012.docx; Palisades Qrtly IR Feeder Memo 02 2012.docx; Perry Qrtly IR Feeder Memo 02 2012.docx; Point Beach Qrtly IR Feeder Memo 02 2012.docx; Prairie Island Qrtl y IR Feeder Memo 02 2012.docx; Quad Cities Qrtly IR Feeder Memo 02 2012.docxAttached are feeder inputs to the Region III Resident Inspector Quarterly Inspection Reports. These feeder inputs document NSIR staff reviews of the Emergency Plan and Emergency Plan Implementing Procedures that were submitted to the NRC Document Control Desk during the 2 nd Quarter CY 2012.
Braidwood Qrtly IR Feeder Memo 02 2012.docx; Byron Qrtly IR Feeder Memo 02 2012.docx; Clinton Qrtly IR Feeder Memo 02 2012.docx; Davis Besse Qrtly IR Feeder Memo 02 2012.docx; DC Cook Qrtly IR Feeder Memo 02 2012.docx; Dresden Qrtly IR Feeder Memo 02 2012.docx; Duane Arnold IR Feeder Memo 02 2012.docx; LaSalle Qrtly IR Feeder Memo 02 2012.docx; Monticello Qrtly IR Feeder Memo 02 2012.docx; Palisades Qrtly IR Feeder Memo 02 2012.docx; Perry Qrtly IR Feeder Memo 02 2012.docx; Point Beach Qrtly IR Feeder Memo 02 2012.docx; Prairie Island Qrtly IR Feeder Memo 02 2012.docx; Quad Cities Qrtly IR Feeder Memo 02 2012.docx Attached are feeder inputs to the Region III Resident Inspector Quarterly Inspection Reports. These feeder inputs document NSIR staff reviews of the Emergency Plan and Emergency Plan Implementing Procedures that were submitted to the NRC Document Control Desk during the 2nd Quarter CY 2012.
If you have any questions regarding the content of these feeder reports, please contact either Mike Norris (301) 415-4114 or Jeff Laughlin (301) 415-1113.  
If you have any questions regarding the content of these feeder reports, please contact either Mike Norris (301) 415-4114 or Jeff Laughlin (301) 415-1113.
Joseph D. Anderson, Chief Operating Reactor Licensing and Outreach Branch Division of Preparedness and Response Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission Work: (301) 415-4114 Blackberry: (202) 236-6417 Email: joseph.anderson@nrc.gov


Joseph D. Anderson, Chief Operating Reactor Licensing and Outreach Branch Division of Preparedness and Response Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission Work: (301) 415-4114 Blackberry: (202) 236-6417 Email: joseph.anderson@nrc.gov
1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000331/2012003 FOR DUANE ARNOLD ENERGY CENTER The following is a feeder for integration into the Duane Arnold Energy Center Inspection Report No. 05000331/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 2nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
 
1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000331/2012003 FOR DUANE ARNOLD ENERGY CENTER The following is a feeder for integration into the Duane Arnold Energy Center Inspection Report No. 05000331/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, "Emergency Action Level and Emergency Plan Changes" during the 2 nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
No findings were identified during this inspection.
No findings were identified during this inspection.
CONTACT: Michael Norris, NSIR/DPR   (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
CONTACT:
: 1. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
: a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revision of an Emergency Plan Implementing Procedure (EPIP) located under ADAMS accession number ML12150A252 as listed in the Attachment.
: 1.
The licensee transmitted the EPIP revision to the NRC pursuant to the requirements of 10 CFR 50, Appendix E, Section V, "Implementing Procedures.The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
: b. Findings No findings were identified.
: a.
2    ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A  LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revision of an Emergency Plan Implementing Procedure (EPIP) located under ADAMS accession number ML12150A252 as listed in the Attachment.
 
The licensee transmitted the EPIP revision to the NRC pursuant to the requirements of 10 CFR 50, Appendix E, Section V, Implementing Procedures. The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
None.
: b.
LIST OF DOCUMENTS REVIEWED
Findings No findings were identified.  


The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.  
2 ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
Section 1EP4:.1 Emergency Action Level and Emergency Plan Changes EPIP 3.3, Dose Assessment and Protective Action, Revision 30


Section 1EP4:  .1 Emergency Action Level and Emergency Plan Changes EPIP 3.3, "Dose Assessment and Protective Action," Revision 30 1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 0500237/2012003 AND 05000249/2012003 FOR DRESDEN NUCLEAR POWER STATION UNITS 2 AND 3 The following is a feeder for integration into the Dresden Nuclear Power Station Inspection Report Nos. 05000237/2012003 and 05000249/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, "Emergency Action Level and Emergency Plan Changes" during the 2 nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 0500237/2012003 AND 05000249/2012003 FOR DRESDEN NUCLEAR POWER STATION UNITS 2 AND 3 The following is a feeder for integration into the Dresden Nuclear Power Station Inspection Report Nos. 05000237/2012003 and 05000249/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 2nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
No findings were identified during this inspection.
No findings were identified during this inspection.
CONTACT: Michael Norris, NSIR/DPR   (301) 415-4098  
CONTACT:
 
Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
: 1.
: 1. REACTOR SAFETY Cornerstone: Emergency Preparedness
REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
 
: a.
1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) located under ADAMS accession number ML12088A343 as listed in the Attachment.
: a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) located under ADAMS accession number ML12088A343 as listed in the Attachment.  
The licensee transmitted the EPIP [and/or Emergency Plan] revisions to the NRC pursuant to the requirements of 10 CFR 50, Appendix E, Section V, Implementing Procedures. The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
 
: b.
The licensee transmitted the EPIP [and/or Emergency Plan] revisions to the NRC pursuant to the requirements of 10 CFR 50, Appendix E, Section V, "Implementing Procedures.The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
Findings No findings were identified.  
: b. Findings No findings were identified.
2    ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A  LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
 
None.
LIST OF DOCUMENTS REVIEWED


The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.  
2 ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
Section 1EP4:.1 Emergency Action Level and Emergency Plan Changes EP-AA-112-200, TSC Activation and Operation, Revision 8 EP-AA-112-400, Emergency Operations Facility Activation and Operation, Revision 11


Section 1EP4:  .1 Emergency Action Level and Emergency Plan Changes EP-AA-112-200, "TSC Activation and Operation," Revision 8 EP-AA-112-400, "Emergency Operations Facilit y Activation and Operation," Revision 11 1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000315/2012003 AND 05000316/2012003 FOR DONALD C. COOK NUCLEAR PLANT UNITS 1 AND 2 The following is a feeder for integration into the Donald C. Cook Nuclear Plant Inspection Report Nos. 05000315/2012003 and 05000316/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, "Emergency Action Level and Emergency Plan Changes" during the 2 nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000315/2012003 AND 05000316/2012003 FOR DONALD C. COOK NUCLEAR PLANT UNITS 1 AND 2 The following is a feeder for integration into the Donald C. Cook Nuclear Plant Inspection Report Nos. 05000315/2012003 and 05000316/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 2nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
No findings were identified during this inspection.
No findings were identified during this inspection.
CONTACT: Michael Norris, NSIR/DPR   (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
CONTACT:
: 1. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
: a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revision of the Emergency Plan located under ADAMS acce ssion number ML120481718 as listed in the Attachment.
: 1.
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revision resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50. The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
: b. Findings No findings were identified.
: a.
2    ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A  LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revision of the Emergency Plan located under ADAMS accession number ML120481718 as listed in the Attachment.
 
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revision resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.
None.
The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection.
LIST OF DOCUMENTS REVIEWED
The specific documents reviewed during this inspection are listed in the Attachment.
: b.
Findings No findings were identified.  


The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.  
2 ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
Section 1EP4:.1 Emergency Action Level and Emergency Plan Changes Donald C. Cook Nuclear Plant Emergency Plan, Revision 29


Section 1EP4:  .1 Emergency Action Level and Emergency Plan Changes Donald C. Cook Nuclear Plant Emergency Plan, Revision 29 1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 0500346/2012003 FOR DAVIS-BESSE NUCLEAR POWER STATION The following is a feeder for integration into the Davis-Besse Nuclear Power Station Inspection Report No. 05000346/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, "Emergency Action Level and Emergency Plan Changes" during the 2 nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 0500346/2012003 FOR DAVIS-BESSE NUCLEAR POWER STATION The following is a feeder for integration into the Davis-Besse Nuclear Power Station Inspection Report No. 05000346/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 2nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
No findings were identified during this inspection.
No findings were identified during this inspection.
CONTACT: Michael Norris, NSIR/DPR   (301) 415-4098  
CONTACT:
Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
: 1.
REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
: a.
Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) located under ADAMS accession numbers ML12094A370 and ML12144A414 as listed in the Attachment.
The licensee transmitted the EPIP revisions to the NRC pursuant to the requirements of 10 CFR 50, Appendix E, Section V, Implementing Procedures. The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
: b.
Findings No findings were identified.


TITLE PAGE Inspector:  Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
2 ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.
: 1. REACTOR SAFETY Cornerstone:  Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
: a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) located under ADAMS accession numbers ML12094A370 and ML12144A414 as listed in the Attachment.
Section 1EP4:.1 Emergency Action Level and Emergency Plan Changes RA-EP-02010, Emergency Management, Revision 13 RA-EP-02230, Dose Assessment Center Activation and Response, Revision 5 RA-EP-02310, Technical Support Center Activation and Response, Revisions 9 and 10 RA-EP-02410, Operations Support Center Activation and Response, Revision 17
The licensee transmitted the EPIP revisions to the NRC pursuant to the requirements of 10 CFR 50, Appendix E, Section V, "Implementing Procedures."  The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
: b. Findings No findings were identified. 


2    ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT
1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 0500461/2012003 FOR CLINTON POWER STATION The following is a feeder for integration into the Clinton Power Station Inspection Report No. 05000461/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 2nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
 
Licensee Personnel N/A  LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
 
Section 1EP4:  .1 Emergency Action Level and Emergency Plan Changes RA-EP-02010, "Emergency Management," Revision 13 RA-EP-02230, "Dose Assessment Center Activation and Response," Revision 5 RA-EP-02310, "Technical Support Center Activation and Response," Revisions 9 and 10 RA-EP-02410, "Operations Support Center Activation and Response," Revision 17 1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 0500461/2012003 FOR CLINTON POWER STATION The following is a feeder for integration into the Clinton Power Station Inspection Report No. 05000461/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, "Emergency Action Level and Emergency Plan Changes" during the 2 nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
No findings were identified during this inspection.
No findings were identified during this inspection.
CONTACT: Michael Norris, NSIR/DPR   (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
CONTACT:
: 1. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
: a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) located under ADAMS accession number ML12088A343 as listed in the Attachment.
: 1.
The licensee transmitted the EPIP [and/or Emergency Plan] revisions to the NRC pursuant to the requirements of 10 CFR 50, Appendix E, Section V, "Implementing Procedures.The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
: b. Findings No findings were identified.  
: a.
 
Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) located under ADAMS accession number ML12088A343 as listed in the Attachment.
2    ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT
The licensee transmitted the EPIP [and/or Emergency Plan] revisions to the NRC pursuant to the requirements of 10 CFR 50, Appendix E, Section V, Implementing Procedures. The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
: b.
Findings No findings were identified.  


Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.
2 ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.  
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
Section 1EP4:.1 Emergency Action Level and Emergency Plan Changes EP-AA-112-200, TSC Activation and Operation, Revision 8 EP-AA-112-400, Emergency Operations Facility Activation and Operation, Revision 11


Section 1EP4:  .1 Emergency Action Level and Emergency Plan Changes EP-AA-112-200, "TSC Activation and Operation," Revision 8 EP-AA-112-400, "Emergency Operations Facilit y Activation and Operation," Revision 11 1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 0500454/2012003 AND 05000455/2012003 FOR BYRON STATION UNITS 1 AND 2 The following is a feeder for integration into the Byron Station Inspection Report Nos. 05000454/2012003 and 05000455/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, "Emergency Action Level and Emergency Plan Changes" during the 2 nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 0500454/2012003 AND 05000455/2012003 FOR BYRON STATION UNITS 1 AND 2 The following is a feeder for integration into the Byron Station Inspection Report Nos. 05000454/2012003 and 05000455/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 2nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
No findings were identified during this inspection.
No findings were identified during this inspection.
CONTACT: Michael Norris, NSIR/DPR   (301) 415-4098  
CONTACT:
 
Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
: 1.
: 1. REACTOR SAFETY Cornerstone: Emergency Preparedness
REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
: a.
Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) located under ADAMS accession number ML12088A343 as listed in the Attachment.
The licensee transmitted the EPIP revisions to the NRC pursuant to the requirements of 10 CFR 50, Appendix E, Section V, Implementing Procedures. The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
: b.
Findings No findings were identified.


1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
2 ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.
: a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) located under ADAMS accession number ML12088A343 as listed in the Attachment.  
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
Section 1EP4:.1 Emergency Action Level and Emergency Plan Changes EP-AA-112-200, TSC Activation and Operation, Revision 8 EP-AA-112-400, Emergency Operations Facility Activation and Operation, Revision 11


The licensee transmitted the EPIP revisions to the NRC pursuant to the requirements of 10 CFR 50, Appendix E, Section V, "Implementing Procedures."  The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 0500456/2012003 AND 05000457/2012003 FOR BRAIDWOOD STATION UNITS 1 AND 2 The following is a feeder for integration into the Braidwood Station Inspection Report Nos. 05000456/2012003 and 05000457/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 2nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
: b. Findings No findings were identified.
2    ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT
 
Licensee Personnel N/A  LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
 
Section 1EP4:  .1 Emergency Action Level and Emergency Plan Changes EP-AA-112-200, "TSC Activation and Operation," Revision 8 EP-AA-112-400, "Emergency Operations Facilit y Activation and Operation," Revision 11 1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 0500456/2012003 AND 05000457/2012003 FOR BRAIDWOOD STATION UNITS 1 AND 2 The following is a feeder for integration into the Braidwood Station Inspection Report Nos. 05000456/2012003 and 05000457/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, "Emergency Action Level and Emergency Plan Changes" during the 2 nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
No findings were identified during this inspection.
No findings were identified during this inspection.
CONTACT: Michael Norris, NSIR/DPR   (301) 415-4098  
CONTACT:
 
Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
: 1.
: 1. REACTOR SAFETY Cornerstone: Emergency Preparedness
REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
 
: a.
1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) located under ADAMS accession number ML12088A343 as listed in the Attachment.
: a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) located under ADAMS accession number ML12088A343 as listed in the Attachment.  
The licensee transmitted the EPIP revisions to the NRC pursuant to the requirements of 10 CFR 50, Appendix E, Section V, Implementing Procedures. The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
 
: b.
The licensee transmitted the EPIP revisions to the NRC pursuant to the requirements of 10 CFR 50, Appendix E, Section V, "Implementing Procedures.The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
Findings No findings were identified.  
: b. Findings No findings were identified.
2    ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A  LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
 
None.
LIST OF DOCUMENTS REVIEWED


The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.  
2 ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
Section 1EP4:.1 Emergency Action Level and Emergency Plan Changes EP-AA-112-200, TSC Activation and Operation, Revision 8 EP-AA-112-400, Emergency Operations Facility Activation and Operation, Revision 11


Section 1EP4:  .1 Emergency Action Level and Emergency Plan Changes EP-AA-112-200, "TSC Activation and Operation," Revision 8 EP-AA-112-400, "Emergency Operations Facilit y Activation and Operation," Revision 11 1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000373/2012003 AND 05000374/2012003 FOR LASALLE COUNTY STATION UNITS 1 AND 2 The following is a feeder for integration into the LaSalle County Station Inspection Report Nos. 05000373/2012003 and 05000374/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, "Emergency Action Level and Emergency Plan Changes" during the 2 nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000373/2012003 AND 05000374/2012003 FOR LASALLE COUNTY STATION UNITS 1 AND 2 The following is a feeder for integration into the LaSalle County Station Inspection Report Nos. 05000373/2012003 and 05000374/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 2nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
No findings were identified during this inspection.
No findings were identified during this inspection.
CONTACT: Michael Norris, NSIR/DPR   (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
CONTACT:
: 1. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
: a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revision of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan Annex located under ADAMS accession numbers ML12066A051 and ML12088A343 as listed in the Attachment.  
: 1.
 
REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
The licensee transmitted the Emergency Plan procedure revisions to the NRC pursuant to the requirements of 10 CFR 50, Appendix E, Section V, "Implementing Procedures.The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
: a.
: b. Findings No findings were identified.
Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revision of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan Annex located under ADAMS accession numbers ML12066A051 and ML12088A343 as listed in the Attachment.
2    ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A  LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
The licensee transmitted the Emergency Plan procedure revisions to the NRC pursuant to the requirements of 10 CFR 50, Appendix E, Section V, Implementing Procedures. The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
 
: b.
None.
Findings No findings were identified.  
LIST OF DOCUMENTS REVIEWED


The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.  
2 ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
Section 1EP4:.1 Emergency Action Level and Emergency Plan Changes EP-AA-1005, Radiological Emergency Plan Annex for LaSalle Station, Revision 33 EP-AA-112-200, TSC Activation and Operation, Revision 8 EP-AA-112-400, Emergency Operations Facility Activation and Operation, Revision 11


Section 1EP4:  .1 Emergency Action Level and Emergency Plan Changes EP-AA-1005, "Radiological Emergency Plan Annex for LaSalle Station," Revision 33 EP-AA-112-200, "TSC Activation and Operation," Revision 8 EP-AA-112-400, "Emergency Operations Facilit y Activation and Operation," Revision 11 1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000282/2012003 AND 05000306/2012003 FOR PRAIRIE ISLAND NUCLEAR GENERATING PLANT UNITS 1 AND 2 The following is a feeder for integration into the Prairie Island Nuclear Generating Plant Inspection Report Nos. 05000282/2012003 and 05000306/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, "Emergency Action Level and Emergency Plan Changes" during the 2 nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000282/2012003 AND 05000306/2012003 FOR PRAIRIE ISLAND NUCLEAR GENERATING PLANT UNITS 1 AND 2 The following is a feeder for integration into the Prairie Island Nuclear Generating Plant Inspection Report Nos. 05000282/2012003 and 05000306/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 2nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
No findings were identified during this inspection.
No findings were identified during this inspection.
CONTACT: Michael Norris, NSIR/DPR   (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
CONTACT:
: 1. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
: a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) located under ADAMS accession number ML121220226 as listed in the Attachment.
: 1.
The licensee transmitted the EPIP [and/or Emergency Plan] revisions to the NRC pursuant to the requirements of 10 CFR 50, Appendix E, Section V, "Implementing Procedures.The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
: b. Findings No findings were identified.  
: a.
 
Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) located under ADAMS accession number ML121220226 as listed in the Attachment.
2    ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT
The licensee transmitted the EPIP [and/or Emergency Plan] revisions to the NRC pursuant to the requirements of 10 CFR 50, Appendix E, Section V, Implementing Procedures. The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
: b.
Findings No findings were identified.  


Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.
2 ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.  
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
Section 1EP4:.1 Emergency Action Level and Emergency Plan Changes F3-2.1, Emergency Action Level Technical Bases, Revision 8 F3-8, Recommendations for Offsite Protective Actions, Revision 34 PINGP 1576, Emergency Action Level Matrix, Revision 7


Section 1EP4:  .1 Emergency Action Level and Emergency Plan Changes F3-2.1, "Emergency Action Level Technical Bases," Revision 8 F3-8, "Recommendations for Offsite Protective Actions," Revision 34 PINGP 1576, "Emergency Action Level Matrix," Revision 7 1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000266/2012003 AND 05000301/2012003 FOR POINT BEACH NUCLEAR PLANT UNITS 1 AND 2 The following is a feeder for integration into the Point Beach Nuclear Plant Inspection Report Nos. 05000266/2012003 and 05000301/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, "Emergency Action Level and Emergency Plan Changes" during the 2 nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000266/2012003 AND 05000301/2012003 FOR POINT BEACH NUCLEAR PLANT UNITS 1 AND 2 The following is a feeder for integration into the Point Beach Nuclear Plant Inspection Report Nos. 05000266/2012003 and 05000301/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 2nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
No findings were identified during this inspection.
No findings were identified during this inspection.
CONTACT: Michael Norris, NSIR/DPR   (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
CONTACT:
: 1. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
: a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) located under ADAMS accession number ML12143A192 as listed in the Attachment.
: 1.
The licensee transmitted the EPIP revisions to the NRC pursuant to the requirements of 10 CFR 50, Appendix E, Section V, "Implementing Procedures.The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, these revisions are subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
: b. Findings No findings were identified.  
: a.
 
Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) located under ADAMS accession number ML12143A192 as listed in the Attachment.
2    ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT
The licensee transmitted the EPIP revisions to the NRC pursuant to the requirements of 10 CFR 50, Appendix E, Section V, Implementing Procedures. The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, these revisions are subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
: b.
Findings No findings were identified.  


Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.
2 ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.  
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
Section 1EP4:.1 Emergency Action Level and Emergency Plan Changes EPIP 1.1, Course of Actions, Revision 63 EPIP 1.3, Dose Assessment and Protective Action Recommendations, Revision 43


Section 1EP4:  .1 Emergency Action Level and Emergency Plan Changes EPIP 1.1, "Course of Actions," Revision 63 EPIP 1.3, "Dose Assessment and Protective Action Recommendations," Revision 43 1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 0500440/2012003 FOR PERRY NUCLEAR POWER PLANT The following is a feeder for integration into the Perry Nuclear Power Plant Inspection Report No. 05000440/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, "Emergency Action Level and Emergency Plan Changes" during the 2 nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 0500440/2012003 FOR PERRY NUCLEAR POWER PLANT The following is a feeder for integration into the Perry Nuclear Power Plant Inspection Report No. 05000440/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 2nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
No findings were identified during this inspection.
No findings were identified during this inspection.
CONTACT: Michael Norris, NSIR/DPR   (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
CONTACT:
: 1. REACTOR SAFETY Cornerstone: Emergency Preparedness
Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
 
: 1.
1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
: a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession numbers ML12096A030, ML12096A 031, and ML12138A279 as listed in the Attachment.
: a.
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50. The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession numbers ML12096A030, ML12096A031, and ML12138A279 as listed in the Attachment.
: b. Findings No findings were identified.
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.
2    ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A  LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection.
The specific documents reviewed during this inspection are listed in the Attachment.
: b.
Findings No findings were identified.  


None.
2 ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.
LIST OF DOCUMENTS REVIEWED
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
Section 1EP4:.1 Emergency Action Level and Emergency Plan Changes Perry Nuclear Power Plant Emergency Plan, Revisions 33 and 34 EPI-A-0001, Emergency Action Levels, Revision 24


The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000255/2012003 FOR PALISADES NUCLEAR PLANT The following is a feeder for integration into the Palisades Nuclear Plant Inspection Report No. 05000255/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 2nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
 
Section 1EP4:  .1 Emergency Action Level and Emergency Plan Changes Perry Nuclear Power Plant Emergency Plan, Revisions 33 and 34 EPI-A-0001, "Emergency Action Levels," Revision 24 1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000255/2012003 FOR PALISADES NUCLEAR PLANT The following is a feeder for integration into the Palisades Nuclear Plant Inspection Report No. 05000255/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, "Emergency Action Level and Emergency Plan Changes" during the 2 nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
No findings were identified during this inspection.
No findings were identified during this inspection.
CONTACT: Michael Norris, NSIR/DPR   (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
CONTACT:
: 1. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
: a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) located under ADAMS accession number ML12019A197 as listed in the Attachment.
: 1.
The licensee transmitted the EPIP [and/or Emergency Plan] revisions to the NRC pursuant to the requirements of 10 CFR 50, Appendix E, Section V, "Implementing Procedures.The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
: b. Findings No findings were identified.  
: a.
Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) located under ADAMS accession number ML12019A197 as listed in the Attachment.
The licensee transmitted the EPIP [and/or Emergency Plan] revisions to the NRC pursuant to the requirements of 10 CFR 50, Appendix E, Section V, Implementing Procedures. The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
: b.
Findings No findings were identified.  


2   ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT
2 ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
Section 1EP4:.1 Emergency Action Level and Emergency Plan Changes EI-4.1, Technical Support Center Activation, Revision 22 EI-4.2, Operations Support Center Activation, Revision 23 EI-4.3, Emergency Operations Facility Activation, Revision 24 EI-7.0, Emergency Post Accident Sampling and Determination of Fuel Failure Using Dose Rates, Revision 13


Licensee Personnel N/A  LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.
1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000263/2012003 FOR MONTICELLO NUCLEAR GENERATING PLANT The following is a feeder for integration into the Monticello Nuclear Generating Plant Inspection Report No. 05000263/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 2nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
 
Section 1EP4:  .1 Emergency Action Level and Emergency Plan Changes EI-4.1, "Technical Support Center Activation," Revision 22 EI-4.2, "Operations Support Center Activation," Revision 23 EI-4.3, "Emergency Operations Facility Activation," Revision 24 EI-7.0, "Emergency Post Accident Sampling and Determination of Fuel Failure Using Dose Rates," Revision 13 1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000263/2012003 FOR MONTICELLO NUCLEAR GENERATING PLANT The following is a feeder for integration into the Monticello Nuclear Generating Plant Inspection Report No. 05000263/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, "Emergency Action Level and Emergency Plan Changes" during the 2 nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
No findings were identified during this inspection.
No findings were identified during this inspection.
CONTACT: Michael Norris, NSIR/DPR   (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
CONTACT:
: 1. REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
: a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession numbers ML12065A158 and ML12121A240 as listed in the Attachment.
: 1.
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50. The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
: b. Findings No findings were identified.
: a.
2    ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A  LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession numbers ML12065A158 and ML12121A240 as listed in the Attachment.
 
The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.
None.
The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection.
LIST OF DOCUMENTS REVIEWED
The specific documents reviewed during this inspection are listed in the Attachment.
: b.
Findings No findings were identified.  


The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.  
2 ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
Section 1EP4:.1 Emergency Action Level and Emergency Plan Changes A.2-101, Classification of Emergencies, Revision 45 A.2-204, Off-Site Protective Action Recommendations, Revision 25 A.2-406, Off-Site Dose Projection, Revision 23 A.2-501, Communications During an Emergency, Revisions 22 and 23 A.2-504, Emergency Communicator Duties in the TSC and Operations Support Center (OSC),
Revision 14 A.2-802, Activation and Operation of the Emergency Operations Facility (EOF), Revision 15 A.2-803, Emergency Communications at the EOF, Revision 12 A.2-807, Off-Site Dose Assessment and Protective Action Recommendations, Revision 21 Emergency Plan, Revision 36


Section 1EP4:  .1 Emergency Action Level and Emergency Plan Changes A.2-101, "Classification of Emergencies," Revision 45 A.2-204, "Off-Site Protective Action Recommendations," Revision 25 A.2-406, "Off-Site Dose Projection," Revision 23 A.2-501, "Communications During an Emergency," Revisions 22 and 23 A.2-504, "Emergency Communicator Duties in the TSC and Operations Support Center (OSC),"
1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000254/2012003 AND 05000265/2012003 FOR QUAD CITIES NUCLEAR POWER STATION UNITS 1 AND 2 The following is a feeder for integration into the Quad Cities Nuclear Power Station Inspection Report Nos. 05000254/2012003 and 05000265/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 2nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
Revision 14 A.2-802, "Activation and Operation of the Emergency Operations Facility (EOF)," Revision 15 A.2-803, "Emergency Communications at the EOF," Revision 12 A.2-807, "Off-Site Dose Assessment and Protective Action Recommendations," Revision 21 Emergency Plan, Revision 36 1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000254/2012003 AND 05000265/2012003 FOR QUAD CITIES NUCLEAR POWER STATION UNITS 1 AND 2 The following is a feeder for integration into the Quad Cities Nuclear Power Station Inspection Report Nos. 05000254/2012003 and 05000265/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, "Emergency Action Level and Emergency Plan Changes" during the 2 nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.
No findings were identified during this inspection.
No findings were identified during this inspection.
CONTACT: Michael Norris, NSIR/DPR   (301) 415-4098  
CONTACT:
 
Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS
: 1.
: 1. REACTOR SAFETY Cornerstone: Emergency Preparedness
REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
 
: a.
1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)
Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) located under ADAMS accession number ML12088A343 as listed in the Attachment.
: a. Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) located under ADAMS accession number ML12088A343 as listed in the Attachment.  
The licensee transmitted the EPIP revisions to the NRC pursuant to the requirements of 10 CFR 50, Appendix E, Section V, Implementing Procedures. The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
 
: b.
The licensee transmitted the EPIP revisions to the NRC pursuant to the requirements of 10 CFR 50, Appendix E, Section V, "Implementing Procedures.The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.
Findings No findings were identified.  
: b. Findings No findings were identified.
2    ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A  LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
 
None.
LIST OF DOCUMENTS REVIEWED
 
The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.  


Section 1EP4: .1 Emergency Action Level and Emergency Plan Changes EP-AA-112-200, "TSC Activation and Operation," Revision 8 EP-AA-112-400, "Emergency Operations Facilit y Activation and Operation," Revision 11}}
2 ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.
LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.
Section 1EP4:.1 Emergency Action Level and Emergency Plan Changes EP-AA-112-200, TSC Activation and Operation, Revision 8 EP-AA-112-400, Emergency Operations Facility Activation and Operation, Revision 11}}

Latest revision as of 22:27, 11 January 2025

Region III Quarterly Feeder Reports_2QCY12
ML12263A129
Person / Time
Site: Monticello, Dresden, Davis Besse, Palisades, Perry, Point Beach, Prairie Island, Duane Arnold, Clinton, Cook, Quad Cities, LaSalle  Constellation icon.png
Issue date: 06/21/2012
From: James Anderson
Office of Nuclear Security and Incident Response
To: Mel Holmberg
Division of Reactor Safety III
Michael Norris
References
IR-12-003
Download: ML12263A129 (29)


Text

1 Anderson, Joseph From:

Anderson, Joseph Sent:

Thursday, June 21, 2012 8:02 AM To:

Holmberg, Mel; Skokowski, Richard Cc:

Jickling, Robert; Beavers, James; Thaggard, Mark; Norris, Michael; Laughlin, Jeff

Subject:

Region III Quarterly Inspection Report Feeders Attachments:

Braidwood Qrtly IR Feeder Memo 02 2012.docx; Byron Qrtly IR Feeder Memo 02 2012.docx; Clinton Qrtly IR Feeder Memo 02 2012.docx; Davis Besse Qrtly IR Feeder Memo 02 2012.docx; DC Cook Qrtly IR Feeder Memo 02 2012.docx; Dresden Qrtly IR Feeder Memo 02 2012.docx; Duane Arnold IR Feeder Memo 02 2012.docx; LaSalle Qrtly IR Feeder Memo 02 2012.docx; Monticello Qrtly IR Feeder Memo 02 2012.docx; Palisades Qrtly IR Feeder Memo 02 2012.docx; Perry Qrtly IR Feeder Memo 02 2012.docx; Point Beach Qrtly IR Feeder Memo 02 2012.docx; Prairie Island Qrtly IR Feeder Memo 02 2012.docx; Quad Cities Qrtly IR Feeder Memo 02 2012.docx Attached are feeder inputs to the Region III Resident Inspector Quarterly Inspection Reports. These feeder inputs document NSIR staff reviews of the Emergency Plan and Emergency Plan Implementing Procedures that were submitted to the NRC Document Control Desk during the 2nd Quarter CY 2012.

If you have any questions regarding the content of these feeder reports, please contact either Mike Norris (301) 415-4114 or Jeff Laughlin (301) 415-1113.

Joseph D. Anderson, Chief Operating Reactor Licensing and Outreach Branch Division of Preparedness and Response Office of Nuclear Security and Incident Response U.S. Nuclear Regulatory Commission Work: (301) 415-4114 Blackberry: (202) 236-6417 Email: joseph.anderson@nrc.gov

1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000331/2012003 FOR DUANE ARNOLD ENERGY CENTER The following is a feeder for integration into the Duane Arnold Energy Center Inspection Report No. 05000331/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 2nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.

No findings were identified during this inspection.

CONTACT:

Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS

1.

REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)

a.

Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revision of an Emergency Plan Implementing Procedure (EPIP) located under ADAMS accession number ML12150A252 as listed in the Attachment.

The licensee transmitted the EPIP revision to the NRC pursuant to the requirements of 10 CFR 50, Appendix E, Section V, Implementing Procedures. The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.

b.

Findings No findings were identified.

2 ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.

LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.

Section 1EP4:.1 Emergency Action Level and Emergency Plan Changes EPIP 3.3, Dose Assessment and Protective Action, Revision 30

1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 0500237/2012003 AND 05000249/2012003 FOR DRESDEN NUCLEAR POWER STATION UNITS 2 AND 3 The following is a feeder for integration into the Dresden Nuclear Power Station Inspection Report Nos. 05000237/2012003 and 05000249/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 2nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.

No findings were identified during this inspection.

CONTACT:

Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS

1.

REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)

a.

Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) located under ADAMS accession number ML12088A343 as listed in the Attachment.

The licensee transmitted the EPIP [and/or Emergency Plan] revisions to the NRC pursuant to the requirements of 10 CFR 50, Appendix E, Section V, Implementing Procedures. The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.

b.

Findings No findings were identified.

2 ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.

LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.

Section 1EP4:.1 Emergency Action Level and Emergency Plan Changes EP-AA-112-200, TSC Activation and Operation, Revision 8 EP-AA-112-400, Emergency Operations Facility Activation and Operation, Revision 11

1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000315/2012003 AND 05000316/2012003 FOR DONALD C. COOK NUCLEAR PLANT UNITS 1 AND 2 The following is a feeder for integration into the Donald C. Cook Nuclear Plant Inspection Report Nos. 05000315/2012003 and 05000316/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 2nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.

No findings were identified during this inspection.

CONTACT:

Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS

1.

REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)

a.

Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revision of the Emergency Plan located under ADAMS accession number ML120481718 as listed in the Attachment.

The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revision resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.

The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection.

The specific documents reviewed during this inspection are listed in the Attachment.

b.

Findings No findings were identified.

2 ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.

LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.

Section 1EP4:.1 Emergency Action Level and Emergency Plan Changes Donald C. Cook Nuclear Plant Emergency Plan, Revision 29

1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 0500346/2012003 FOR DAVIS-BESSE NUCLEAR POWER STATION The following is a feeder for integration into the Davis-Besse Nuclear Power Station Inspection Report No. 05000346/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 2nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.

No findings were identified during this inspection.

CONTACT:

Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS

1.

REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)

a.

Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) located under ADAMS accession numbers ML12094A370 and ML12144A414 as listed in the Attachment.

The licensee transmitted the EPIP revisions to the NRC pursuant to the requirements of 10 CFR 50, Appendix E, Section V, Implementing Procedures. The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.

b.

Findings No findings were identified.

2 ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.

LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.

Section 1EP4:.1 Emergency Action Level and Emergency Plan Changes RA-EP-02010, Emergency Management, Revision 13 RA-EP-02230, Dose Assessment Center Activation and Response, Revision 5 RA-EP-02310, Technical Support Center Activation and Response, Revisions 9 and 10 RA-EP-02410, Operations Support Center Activation and Response, Revision 17

1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 0500461/2012003 FOR CLINTON POWER STATION The following is a feeder for integration into the Clinton Power Station Inspection Report No. 05000461/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 2nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.

No findings were identified during this inspection.

CONTACT:

Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS

1.

REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)

a.

Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) located under ADAMS accession number ML12088A343 as listed in the Attachment.

The licensee transmitted the EPIP [and/or Emergency Plan] revisions to the NRC pursuant to the requirements of 10 CFR 50, Appendix E, Section V, Implementing Procedures. The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.

b.

Findings No findings were identified.

2 ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.

LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.

Section 1EP4:.1 Emergency Action Level and Emergency Plan Changes EP-AA-112-200, TSC Activation and Operation, Revision 8 EP-AA-112-400, Emergency Operations Facility Activation and Operation, Revision 11

1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 0500454/2012003 AND 05000455/2012003 FOR BYRON STATION UNITS 1 AND 2 The following is a feeder for integration into the Byron Station Inspection Report Nos. 05000454/2012003 and 05000455/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 2nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.

No findings were identified during this inspection.

CONTACT:

Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS

1.

REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)

a.

Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) located under ADAMS accession number ML12088A343 as listed in the Attachment.

The licensee transmitted the EPIP revisions to the NRC pursuant to the requirements of 10 CFR 50, Appendix E, Section V, Implementing Procedures. The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.

b.

Findings No findings were identified.

2 ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.

LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.

Section 1EP4:.1 Emergency Action Level and Emergency Plan Changes EP-AA-112-200, TSC Activation and Operation, Revision 8 EP-AA-112-400, Emergency Operations Facility Activation and Operation, Revision 11

1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 0500456/2012003 AND 05000457/2012003 FOR BRAIDWOOD STATION UNITS 1 AND 2 The following is a feeder for integration into the Braidwood Station Inspection Report Nos. 05000456/2012003 and 05000457/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 2nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.

No findings were identified during this inspection.

CONTACT:

Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS

1.

REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)

a.

Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) located under ADAMS accession number ML12088A343 as listed in the Attachment.

The licensee transmitted the EPIP revisions to the NRC pursuant to the requirements of 10 CFR 50, Appendix E, Section V, Implementing Procedures. The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.

b.

Findings No findings were identified.

2 ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.

LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.

Section 1EP4:.1 Emergency Action Level and Emergency Plan Changes EP-AA-112-200, TSC Activation and Operation, Revision 8 EP-AA-112-400, Emergency Operations Facility Activation and Operation, Revision 11

1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000373/2012003 AND 05000374/2012003 FOR LASALLE COUNTY STATION UNITS 1 AND 2 The following is a feeder for integration into the LaSalle County Station Inspection Report Nos. 05000373/2012003 and 05000374/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 2nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.

No findings were identified during this inspection.

CONTACT:

Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS

1.

REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)

a.

Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revision of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan Annex located under ADAMS accession numbers ML12066A051 and ML12088A343 as listed in the Attachment.

The licensee transmitted the Emergency Plan procedure revisions to the NRC pursuant to the requirements of 10 CFR 50, Appendix E, Section V, Implementing Procedures. The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.

b.

Findings No findings were identified.

2 ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.

LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.

Section 1EP4:.1 Emergency Action Level and Emergency Plan Changes EP-AA-1005, Radiological Emergency Plan Annex for LaSalle Station, Revision 33 EP-AA-112-200, TSC Activation and Operation, Revision 8 EP-AA-112-400, Emergency Operations Facility Activation and Operation, Revision 11

1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000282/2012003 AND 05000306/2012003 FOR PRAIRIE ISLAND NUCLEAR GENERATING PLANT UNITS 1 AND 2 The following is a feeder for integration into the Prairie Island Nuclear Generating Plant Inspection Report Nos. 05000282/2012003 and 05000306/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 2nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.

No findings were identified during this inspection.

CONTACT:

Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS

1.

REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)

a.

Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) located under ADAMS accession number ML121220226 as listed in the Attachment.

The licensee transmitted the EPIP [and/or Emergency Plan] revisions to the NRC pursuant to the requirements of 10 CFR 50, Appendix E, Section V, Implementing Procedures. The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.

b.

Findings No findings were identified.

2 ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.

LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.

Section 1EP4:.1 Emergency Action Level and Emergency Plan Changes F3-2.1, Emergency Action Level Technical Bases, Revision 8 F3-8, Recommendations for Offsite Protective Actions, Revision 34 PINGP 1576, Emergency Action Level Matrix, Revision 7

1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000266/2012003 AND 05000301/2012003 FOR POINT BEACH NUCLEAR PLANT UNITS 1 AND 2 The following is a feeder for integration into the Point Beach Nuclear Plant Inspection Report Nos. 05000266/2012003 and 05000301/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 2nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.

No findings were identified during this inspection.

CONTACT:

Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS

1.

REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)

a.

Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) located under ADAMS accession number ML12143A192 as listed in the Attachment.

The licensee transmitted the EPIP revisions to the NRC pursuant to the requirements of 10 CFR 50, Appendix E, Section V, Implementing Procedures. The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, these revisions are subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.

b.

Findings No findings were identified.

2 ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.

LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.

Section 1EP4:.1 Emergency Action Level and Emergency Plan Changes EPIP 1.1, Course of Actions, Revision 63 EPIP 1.3, Dose Assessment and Protective Action Recommendations, Revision 43

1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 0500440/2012003 FOR PERRY NUCLEAR POWER PLANT The following is a feeder for integration into the Perry Nuclear Power Plant Inspection Report No. 05000440/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 2nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.

No findings were identified during this inspection.

CONTACT:

Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS

1.

REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)

a.

Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession numbers ML12096A030, ML12096A031, and ML12138A279 as listed in the Attachment.

The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.

The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection.

The specific documents reviewed during this inspection are listed in the Attachment.

b.

Findings No findings were identified.

2 ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.

LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.

Section 1EP4:.1 Emergency Action Level and Emergency Plan Changes Perry Nuclear Power Plant Emergency Plan, Revisions 33 and 34 EPI-A-0001, Emergency Action Levels, Revision 24

1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000255/2012003 FOR PALISADES NUCLEAR PLANT The following is a feeder for integration into the Palisades Nuclear Plant Inspection Report No. 05000255/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 2nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.

No findings were identified during this inspection.

CONTACT:

Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS

1.

REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)

a.

Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) located under ADAMS accession number ML12019A197 as listed in the Attachment.

The licensee transmitted the EPIP [and/or Emergency Plan] revisions to the NRC pursuant to the requirements of 10 CFR 50, Appendix E, Section V, Implementing Procedures. The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.

b.

Findings No findings were identified.

2 ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.

LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.

Section 1EP4:.1 Emergency Action Level and Emergency Plan Changes EI-4.1, Technical Support Center Activation, Revision 22 EI-4.2, Operations Support Center Activation, Revision 23 EI-4.3, Emergency Operations Facility Activation, Revision 24 EI-7.0, Emergency Post Accident Sampling and Determination of Fuel Failure Using Dose Rates, Revision 13

1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000263/2012003 FOR MONTICELLO NUCLEAR GENERATING PLANT The following is a feeder for integration into the Monticello Nuclear Generating Plant Inspection Report No. 05000263/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 2nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.

No findings were identified during this inspection.

CONTACT:

Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS

1.

REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)

a.

Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) and the Emergency Plan located under ADAMS accession numbers ML12065A158 and ML12121A240 as listed in the Attachment.

The licensee determined that in accordance with 10 CFR 50.54(q), the changes made in the revisions resulted in no reduction in the effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR Part 50.

The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection.

The specific documents reviewed during this inspection are listed in the Attachment.

b.

Findings No findings were identified.

2 ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.

LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.

Section 1EP4:.1 Emergency Action Level and Emergency Plan Changes A.2-101, Classification of Emergencies, Revision 45 A.2-204, Off-Site Protective Action Recommendations, Revision 25 A.2-406, Off-Site Dose Projection, Revision 23 A.2-501, Communications During an Emergency, Revisions 22 and 23 A.2-504, Emergency Communicator Duties in the TSC and Operations Support Center (OSC),

Revision 14 A.2-802, Activation and Operation of the Emergency Operations Facility (EOF), Revision 15 A.2-803, Emergency Communications at the EOF, Revision 12 A.2-807, Off-Site Dose Assessment and Protective Action Recommendations, Revision 21 Emergency Plan, Revision 36

1 OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE INPUT TO INTEGRATED REPORT 05000254/2012003 AND 05000265/2012003 FOR QUAD CITIES NUCLEAR POWER STATION UNITS 1 AND 2 The following is a feeder for integration into the Quad Cities Nuclear Power Station Inspection Report Nos. 05000254/2012003 and 05000265/2012003. This report input documents completion of an Emergency Preparedness Baseline Inspection conducted by NSIR headquarters staff, in accordance with IP 71114.04, Emergency Action Level and Emergency Plan Changes during the 2nd Quarter Calendar Year 2012. This input is ready for inclusion into the quarterly integrated resident report and dissemination to the public.

No findings were identified during this inspection.

CONTACT:

Michael Norris, NSIR/DPR (301) 415-4098 TITLE PAGE Inspector: Jeff Laughlin, Emergency Preparedness Inspector, NSIR REPORT DETAILS

1.

REACTOR SAFETY Cornerstone: Emergency Preparedness 1EP4 Emergency Action Level and Emergency Plan Changes (IP 71114.04)

a.

Inspection Scope The NSIR headquarters staff performed an in-office review of the latest revisions of various Emergency Plan Implementing Procedures (EPIPs) located under ADAMS accession number ML12088A343 as listed in the Attachment.

The licensee transmitted the EPIP revisions to the NRC pursuant to the requirements of 10 CFR 50, Appendix E, Section V, Implementing Procedures. The NRC review was not documented in a safety evaluation report and did not constitute approval of licensee-generated changes; therefore, this revision is subject to future inspection. The specific documents reviewed during this inspection are listed in the Attachment.

b.

Findings No findings were identified.

2 ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel N/A LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None.

LIST OF DOCUMENTS REVIEWED The following is a list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather, that selected sections of portions of the documents were evaluated as part of the overall inspection effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report.

Section 1EP4:.1 Emergency Action Level and Emergency Plan Changes EP-AA-112-200, TSC Activation and Operation, Revision 8 EP-AA-112-400, Emergency Operations Facility Activation and Operation, Revision 11