{{#Wiki_filter:James A. Fitzpatrick LOI-12-2 NRC Exam Written Examination Review In accordance with Entergy Procedure EN-TQ-105, NRC Initial License Examination, Development and Administration, and NUREG 1021, Revision 9, Supplement 1, Sections ES-402, ES-403, and ES-501, an examination analysis was conducted on the James A. Fitzpatrick LOI-12-2 NRC Written Examination. This analysis included a detailed review of each question missed by 50% or more of the applicants. The table below summarizes the findings of this detailed question review.
{{#Wiki_filter:James A. Fitzpatrick LOI-12-2 NRC Exam Written Examination Review In accordance with Entergy Procedure EN-TQ-105, NRC Initial License Examination, Development and Administration, and NUREG 1021, Revision 9, Supplement 1, Sections ES-402, ES-403, and ES-501, an examination analysis was conducted on the James A. Fitzpatrick LOI-12-2 NRC Written Examination. This analysis included a detailed review of each question missed by 50% or more of the applicants. The table below summarizes the findings of this detailed question review.
James A. Fitzpatrick LOI-12-2 NRC Exam Analysis - High Miss Questions New,   Higher or Percent Modified,    Lower     System Question Correct      Bank    Cognitive or Topic                   Justification Two candidates selected choice B and one candidate selected choice D.
James A. Fitzpatrick LOI-12-2 NRC Exam Analysis - High Miss Questions Question Percent Correct
These incorrect choices were due to not fully remembering interlocks for Higher      RHR /    LPCI injection valves and the RHR 28        40%        New Cognitive    LPCI    heat exchanger bypass valve.
: New, Modified, Bank Higher or Lower Cognitive System or Topic Justification 28 40%
New Higher Cognitive RHR /
LPCI Two candidates selected choice B and one candidate selected choice D.
These incorrect choices were due to not fully remembering interlocks for LPCI injection valves and the RHR heat exchanger bypass valve.
No discrepancies were noted in this question based on the examination review.
No discrepancies were noted in this question based on the examination review.
Four candidates selected choice D due to not knowing that AOP-30 provided specific guidance on re-establishing RPS /    Shutdown Cooling with a de-energized Lower 36        20%        New              Shutdown RPS bus.
36 20%
Cognitive Cooling No discrepancies were noted in this question based on the examination review.}}
New Lower Cognitive RPS /
Shutdown Cooling Four candidates selected choice D due to not knowing that AOP-30 provided specific guidance on re-establishing Shutdown Cooling with a de-energized RPS bus.
No discrepancies were noted in this question based on the examination review.}}

Latest revision as of 22:18, 11 January 2025

Post Exam Analysis
ML122710033
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/27/2012
From:
Operations Branch I
To:
Entergy Nuclear Northeast
Jackson D
Shared Package
ML120270122 List:
References
TAC U01879
Download: ML122710033 (1)


Text

James A. Fitzpatrick LOI-12-2 NRC Exam Written Examination Review In accordance with Entergy Procedure EN-TQ-105, NRC Initial License Examination, Development and Administration, and NUREG 1021, Revision 9, Supplement 1, Sections ES-402, ES-403, and ES-501, an examination analysis was conducted on the James A. Fitzpatrick LOI-12-2 NRC Written Examination. This analysis included a detailed review of each question missed by 50% or more of the applicants. The table below summarizes the findings of this detailed question review.

James A. Fitzpatrick LOI-12-2 NRC Exam Analysis - High Miss Questions Question Percent Correct

New, Modified, Bank Higher or Lower Cognitive System or Topic Justification 28 40%

New Higher Cognitive RHR /

LPCI Two candidates selected choice B and one candidate selected choice D.

These incorrect choices were due to not fully remembering interlocks for LPCI injection valves and the RHR heat exchanger bypass valve.

No discrepancies were noted in this question based on the examination review.

36 20%

New Lower Cognitive RPS /

Shutdown Cooling Four candidates selected choice D due to not knowing that AOP-30 provided specific guidance on re-establishing Shutdown Cooling with a de-energized RPS bus.

No discrepancies were noted in this question based on the examination review.