{{#Wiki_filter: | {{#Wiki_filter:November 9, 2012 | ||
==SUBJECT:== | ==SUBJECT:== | ||
| Line 24: | Line 24: | ||
==Dear Mr. Rausch:== | ==Dear Mr. Rausch:== | ||
On September 27, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Susquehanna Steam Electric Station. The inspection covered one or more of the key attributes of the security cornerstone of the | On September 27, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Susquehanna Steam Electric Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed via telephone on September 27, 2012, with Mr. James Gorman, Nuclear Security Manager and other members of your staff. | ||
The inspection examined activities conducted under your license as they relate to security and compliance with the | The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license. | ||
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | ||
| Line 32: | Line 32: | ||
No findings were identified during this inspection. | No findings were identified during this inspection. | ||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and | In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's | ||
"Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. | |||
Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide an acceptable response, please mark your entire response | |||
Sincerely, | Sincerely, | ||
/RA by Michael J. Buckley for/ | /RA by Michael J. Buckley for/ | ||
Robert C. Johnson, Chief | Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response | ||
Docket Nos. 50-387, 50-388 License Nos. NPF-14, NPF-22 | |||
License Nos. NPF-14, NPF-22 | |||
Nonpublic Enclosure: Inspection Report 05000387/2012201 and 05000388/2012201 w/Attachments: Supplemental Information | Nonpublic Enclosure: Inspection Report 05000387/2012201 and 05000388/2012201 w/Attachments: Supplemental Information | ||
| Line 58: | Line 50: | ||
D. Allard, Director, PA DEP | D. Allard, Director, PA DEP | ||
ML12276A352 OFFICE NSIR/DSO/SPEB NSIR/ | ML12276A352 OFFICE NSIR/DSO/SPEB NSIR/DSO NSIR/DSO/SPEB RI NSIR/DSO/SPEB NAME J. Clark J. Curry D. Willis A. Dimitriadis C. Johnson DATE 9/27/12 10/11/12 10/11/12 via Routing Sheet 10/11/12 11/9/12 for by M. | ||
Buckley | |||
}} | }} | ||
Latest revision as of 22:11, 11 January 2025
| ML12276A352 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 11/09/2012 |
| From: | Rachel Johnson NRC/NSIR/DSO/DDSO |
| To: | Rausch T Susquehanna |
| References | |
| IR-12-201 | |
| Download: ML12276A352 (3) | |
Text
November 9, 2012
SUBJECT:
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000387/2012201, 05000388/2012201
Dear Mr. Rausch:
On September 27, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Susquehanna Steam Electric Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed via telephone on September 27, 2012, with Mr. James Gorman, Nuclear Security Manager and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings were identified during this inspection.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's
"Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA by Michael J. Buckley for/
Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response
Docket Nos. 50-387, 50-388 License Nos. NPF-14, NPF-22
Nonpublic Enclosure: Inspection Report 05000387/2012201 and 05000388/2012201 w/Attachments: Supplemental Information
cc w/encl:
J. Gorman, Manager, Nuclear Security
cc w/o encl: