| issue date = 12/21/2012
| issue date = 12/21/2012
| title = IR 05000254-12-010, 05000265-12-010; 10/22/12 - 11/09/12; Quad Cities Nuclear Power Station, Units 1 and 2; Post Approval Site Inspection for License Renewal
| title = IR 05000254-12-010, 05000265-12-010; 10/22/12 - 11/09/12; Quad Cities Nuclear Power Station, Units 1 and 2; Post Approval Site Inspection for License Renewal
| author name = Stone A M
| author name = Stone A
| author affiliation = NRC/RGN-III/DRS/EB2
| author affiliation = NRC/RGN-III/DRS/EB2
| addressee name = Pacilio M J
| addressee name = Pacilio M
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000254, 05000265
| docket = 05000254, 05000265
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:December 21, 2012
[[Issue date::December 21, 2012]]


Mr. Michael Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
==SUBJECT:==
QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 NRC POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL REPORT 05000254/2012010; 05000265/2012010


SUBJECT: QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 NRC POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL REPORT 05000254/2012010; 05000265/2012010
==Dear Mr. Pacilio:==
On November 9, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed Post-Approval Site Inspection for License Renewal at your Quad Cities Nuclear Power Station, Units 1 and 2. The enclosed report documents the results of this inspection, which were discussed on November 9, 2012, with Mr. T. Hanley, and other members of your staff.
 
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.
 
The inspectors reviewed selected procedures and records, and interviewed personnel. Based on the results of this inspection, there were no findings of significance identified.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS)
component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


==Dear Mr. Pacilio:==
Sincerely,
On November 9, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed Post-Approval Site Inspection for License Renewal at your Quad Cities Nuclear Power Station, Units 1 and 2. The enclosed report documents the results of this inspection, which were discussed on November 9, 2012, with Mr. T. Hanley, and other members of your staff. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, and interviewed personnel. Based on the results of this inspection, there were no findings of significance identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
/RA/  


Sincerely,/RA/
Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR 30  
Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR 30  


===Enclosure:===
===Enclosure:===
Inspection Report 05000254/2012010; 05000265/201210  
Inspection Report 05000254/2012010; 05000265/201210 w/Attachment: Supplemental Information
 
REGION III==
Docket Nos:
50-254; 50-265 License Nos:
DPR-29, DPR-30 Report No:
05000254/2012010; 05000265/2012010 Licensee:
Exelon Generation Company, LLC Facility:
Quad Cities Nuclear Power Station, Units 1 and 2 Location:
Cordova, IL Dates:
October 22, 2012 - November 9, 2012 Inspectors:
B. Jose, Senior Reactor Engineer (Lead)
 
N. Féliz Adorno, Reactor Engineer
 
G. ODwyer, Reactor Engineer
 
J. Bozga, Reactor Engineer
 
E. Sanchez, Reactor Engineer
 
J. Corujo, Reactor Engineer
 
J. Gilliam, Reactor Engineer
 
D. Betancourt, Reactor Engineer Approved by:
A. M. Stone, Chief
 
Engineering Branch 2
 
Division of Reactor Safety


===w/Attachment:===
Enclosure  
Supplemental Information cc w/encl: Distribution via ListServŽ Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION III Docket Nos: 50-254; 50-265 License Nos: DPR-29, DPR-30 Report No: 05000254/2012010; 05000265/2012010 Licensee: Exelon Generation Company, LLC Facility: Quad Cities Nuclear Power Station, Units 1 and 2 Location: Cordova, IL Dates: October 22, 2012 - November 9, 2012 Inspectors: B. Jose, Senior Reactor Engineer (Lead) N. Féliz Adorno, Reactor Engineer G. O'Dwyer, Reactor Engineer J. Bozga, Reactor Engineer E. Sanchez, Reactor Engineer J. Corujo, Reactor Engineer J. Gilliam, Reactor Engineer D. Betancourt, Reactor Engineer Approved by: A. M. Stone, Chief Engineering Branch 2 Division of Reactor Safety 1 Enclosure  


=SUMMARY OF FINDINGS=
=SUMMARY OF FINDINGS=
IR 05000254/2012010, 05000265/2012010; 10/22/12 - 11/09/12; Quad Cities Nuclear Power Station, Units 1 and 2; Post Approval Site Inspection for License Renewal. The report covers a team inspection conducted by region-based engineering inspectors. The inspectors concluded that items, license conditions, and regulatory requirements associated with the issuance of the renewed operating license were being met. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 4, dated December 2006. A.
IR 05000254/2012010, 05000265/2012010; 10/22/12 - 11/09/12; Quad Cities Nuclear Power  
 
Station, Units 1 and 2; Post Approval Site Inspection for License Renewal.
 
The report covers a team inspection conducted by region-based engineering inspectors. The inspectors concluded that items, license conditions, and regulatory requirements associated with the issuance of the renewed operating license were being met. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 4, dated December 2006.


===Cornerstone: Initiating Events, Mitigating Systems, Barrier Integrity
A.


===Cornerstone: Initiating Events, Mitigating Systems, Barrier Integrity===
===NRC-Identified===
===NRC-Identified===
and Self-Revealed Findings No findings of significance were identified. B. No violations of significance were identified.
and Self-Revealed Findings No findings of significance were identified.
 
B.
 
No violations of significance were identified.


=== Licensee-Identified Violations===
===Licensee-Identified Violations===
===
4.


4. OTHER ACTIVITIES
OTHER ACTIVITIES


=REPORT DETAILS=
=REPORT DETAILS=


{{a|4OA5}}
4OA5
==4OA5 ==
 
===.1 Other Activities The purpose of this inspection is to verify committed actions and license conditions associated with the renewed license for Units 1 and 2 are implemented in accordance with 10 CFR Part 54.===
===.1 Other Activities===
Post-Approval Site Inspection for License Renewal (Phase II) - IP 71003 a. (1) Inspection Scope The inspectors discussed the identification of new SSCs, under the purview of title 10 of the code of federal regulations (CFR) 54.37(b), with the licensee's license renewal staff. The licensee personnel indicated newly identified components had resulted from a change to the Environmental Qualification (EQ) Program. The components were subsequently added to the site EQ Program, which is also credited as the license renewal (LR) Aging Management Program (AMP) B1.35. The AMP will manage the effects of aging for those newly identified components. Review of Newly Identified SSCs [Systems Structures and Components] The license renewal Updated Final Safety Analysis Report (UFSAR) Supplement, Appendix A.1.35, "Environmental Qualification (EQ) of electrical components," remains an accurate summary of the AMP, and does not require revision as a result of the newly identified components. (2) As part of reviewing the Aging Management Programs (AMPs) associated with the Commitment Items, the inspectors reviewed the UFSAR descriptions to confirm the implemented programs were consistent with the UFSAR descriptions. Review of Updated Final Safety Analysis Report and Commitment Item Change Process The inspectors reviewed the licensee's procedures to ensure that Commitment Item revisions would follow the guidance in NEI 99-04, "Guidelines for Managing NRC Commitment Item Changes," including the elimination of commitment, and would properly evaluate, report, and approve changes to license renewal commitments listed in the UFSAR in accordance with 10 CFR 50.59. The inspectors also reviewed the licensee's Commitment Item tracking program to evaluate its effectiveness. With respect to implementation, the inspectors reviewed changes associated with each commitment. One Unresolved Item (URI) was identified and is documented in Section 4OA5.1.b (1). (3) The inspectors reviewed supporting documents including completed surveillance records, conducted interviews, performed visual inspection of structures and components to verify the licensee completed the necessary actions to comply with the license conditions that are a part of the renewed operating license. The inspectors verified the licensee implemented the Aging Management Programs and time-limited Review of Commitment Items 3 Enclosure aging analyses (TLAA) included in NUREG-1796, "Safety Evaluation Report (SER) Related to the License Renewal of Dresden Nuclear Power Station Units 2 and 3 and Quad Cities Nuclear Power Station, Units 1 and 2," in accordance with Title 10 of the Code of Federal Regulations (CFR) Part 54, "Requirements for the Renewal of Operating Licenses for Nuclear Power Plants.The inspectors verified a selected sample of corrective actions taken to address issues identified during the Dresden Units 2 and 3 license renewal inspections, which was documented in Inspection Reports 05000237/2009007 and 05000249/2010010, and were also applicable to Quad Cities Units 1 and 2. When changes to these items were identified, the inspectors reviewed the Commitment Item Change Evaluation Form (CCEF) to verify the licensee followed the guidance in NEI 99-04 for the license renewal Commitment Item change process, including the elimination of commitments, and properly evaluated, reported, and approved where necessary, changes to license renewal commitments listed in the UFSAR in accordance with 10 CFR 50.59.
The purpose of this inspection is to verify committed actions and license conditions associated with the renewed license for Units 1 and 2 are implemented in accordance with 10 CFR Part 54.
 
Post-Approval Site Inspection for License Renewal (Phase II) - IP 71003 a.
: (1) Inspection Scope The inspectors discussed the identification of new SSCs, under the purview of title 10 of the code of federal regulations (CFR) 54.37(b), with the licensees license renewal staff.
 
The licensee personnel indicated newly identified components had resulted from a change to the Environmental Qualification (EQ) Program. The components were subsequently added to the site EQ Program, which is also credited as the license renewal (LR) Aging Management Program (AMP) B1.35. The AMP will manage the effects of aging for those newly identified components.
 
Review of Newly Identified SSCs [Systems Structures and Components]
The license renewal Updated Final Safety Analysis Report (UFSAR) Supplement, Appendix A.1.35, Environmental Qualification (EQ) of electrical components, remains an accurate summary of the AMP, and does not require revision as a result of the newly identified components.
: (2) As part of reviewing the Aging Management Programs (AMPs) associated with the Commitment Items, the inspectors reviewed the UFSAR descriptions to confirm the implemented programs were consistent with the UFSAR descriptions.
 
Review of Updated Final Safety Analysis Report and Commitment Item Change Process The inspectors reviewed the licensees procedures to ensure that Commitment Item revisions would follow the guidance in NEI 99-04, Guidelines for Managing NRC Commitment Item Changes, including the elimination of commitment, and would properly evaluate, report, and approve changes to license renewal commitments listed in the UFSAR in accordance with 10 CFR 50.59. The inspectors also reviewed the licensees Commitment Item tracking program to evaluate its effectiveness.
 
With respect to implementation, the inspectors reviewed changes associated with each commitment. One Unresolved Item (URI) was identified and is documented in Section 4OA5.1.b (1).
: (3) The inspectors reviewed supporting documents including completed surveillance records, conducted interviews, performed visual inspection of structures and components to verify the licensee completed the necessary actions to comply with the license conditions that are a part of the renewed operating license. The inspectors verified the licensee implemented the Aging Management Programs and time-limited Review of Commitment Items aging analyses (TLAA) included in NUREG-1796, Safety Evaluation Report (SER)
Related to the License Renewal of Dresden Nuclear Power Station Units 2 and 3 and Quad Cities Nuclear Power Station, Units 1 and 2, in accordance with Title 10 of the Code of Federal Regulations (CFR) Part 54, Requirements for the Renewal of Operating Licenses for Nuclear Power Plants. The inspectors verified a selected sample of corrective actions taken to address issues identified during the Dresden Units 2 and 3 license renewal inspections, which was documented in Inspection Reports 05000237/2009007 and 05000249/2010010, and were also applicable to Quad Cities Units 1 and 2.
 
When changes to these items were identified, the inspectors reviewed the Commitment Item Change Evaluation Form (CCEF) to verify the licensee followed the guidance in NEI 99-04 for the license renewal Commitment Item change process, including the elimination of commitments, and properly evaluated, reported, and approved where necessary, changes to license renewal commitments listed in the UFSAR in accordance with 10 CFR 50.59.
 
The inspectors reviewed the Commitment Items listed below which are referenced to Appendix A of the SER. Specific documents reviewed are listed in the enclosure.
 
===1. Commitment Item 1 specified the existing ASME Section XI, Subsections IWB, IWC,===
and IWD Aging Management Program, is part of the Inservice Inspection (ISI)
Program. It provides identification of signs of degradation, and establishment of corrective actions for condition monitoring of reactor coolant pressure retaining piping and components within the scope of license renewal. The inspections will be implemented in accordance with 10 CFR 50.55(a). Also Quad Cities implemented Risk Informed Inservice Inspection and the alternative Risk Informed Inservice Inspection programs for Class 1 and 2 piping.
 
Commitment Item 1, ASME [American Society of Mechanical Engineers] Code, Section XI Inservice Inspection, Subsections IWB, IWC, and IWD The inspectors reviewed the licensing basis, program basis documents, implementing procedures, non-destructive examination (NDE) records, and related condition reports; and interviewed the responsible plant personnel regarding these documents. The inspectors verified the licensee incorporated the Risk Informed ISI Program for Class 1 and 2 Systems.
 
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 1.
 
===2. Commitment Item 2 specified the existing water chemistry program was credited for===
license renewal for both Units 1 and 2 and that the program was enhanced prior to the period of extended operation.
 
Commitment Item 2, Water Chemistry The inspectors reviewed changes and enhancements to the program and ensured the program remained effective for both units. The inspectors verified procedure CY-QC-110-608, Reactor/Turbine Building Sample Panel Sample Collection, Revision 21 was revised to ensure the integrity of the samples collected.
 
The inspectors reviewed the licensing basis, program basis documents, planned and completed work orders, Commitment Item changes, Issue Reports, inspection procedures and interviewed the plant personnel responsible for the program.
 
Planned and completed chemistry surveillance tests and related Issue Reports demonstrated the water chemistry program was appropriately applied to Units 1 and 2.
 
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 2 for Units 1 and 2.
 
===3. Commitment Item 3 specified the existing Reactor Head Closure Studs Aging===
Management Program was credited. The program is implemented through station procedures, ISI program plan for Quad Cities, and corporate procedures for inservice inspection of welds and components. The program implements inspection requirements of ASME Section XI and preventive measures described in Regulatory Guide 1.65, "Materials and Inspection for Reactor Vessel Closure Studs." The reactor head studs at Quad Cities are not metal plated and have had manganese phosphate coatings applied.
 
Commitment Item 3, Reactor Head Closure Studs The inspectors interviewed the plant personnel responsible for the program and reviewed the program basis documents, implementing procedures, work orders, and related IRs to verify the program was being implemented on Units 1 and 2.
 
Based on review of the licensee actions, the inspectors determined the licensee met Commitment Item 3.
 
===4. Commitment Item 4 specified the existing BWR Vessel Attachment Welds Aging===
Management Program activities incorporated the inspection and evaluation recommendations of BWRVIP-48, 'Vessel ID Attachment Weld Inspection and Evaluation Guidelines," as well as the water chemistry recommendations of EPRI TR-103515-R2, "BWR Water Chemistry Guidelines." The program is implemented through station procedures that provide for mitigation of cracking through water chemistry and monitoring for cracking through in vessel examinations.
 
Commitment Item 4, BWR [Boiling Water Reactor] Vessel ID [Internal Diameter]
Welds The inspectors reviewed the licensing basis, program basis documents, implementing procedures, NDE examination records, and interviewed the plant personnel responsible for the program regarding these documents to verify the program is being implemented on Units 1 and 2.
 
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 4.
 
===5. Commitment Items 5 specified the existing BWR Feedwater Nozzle program was===
credited for license renewal and would be enhanced prior to the period of extended operation. This program implemented inservice inspection specified in ASME Code, Section XI and enhanced it with recommendations from General Electric NE-523-A71-0594-A, Revision 1 Alternate BWR Feedwater Nozzle Inspection Requirements. Per their enhancements, the licensee will perform periodic ultrasonic testing inspection of certain critical regions of the BWR feedwater nozzles.
 
Commitment Item 5, BWR Feedwater Nozzle The inspectors reviewed the licensing basis, program basis documents, implementing procedures, NDE examination records, related condition reports, and interviewed the responsible plant personnel. The inspectors verified the licensee implemented the recommendations of report GE-NE-523-A71-0594-A, Revision 1, which was approved by the NRC staff.
 
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 5.
 
===6. Commitment Item 6 specified the existing BWR Control Rod Drive Return Line===
Nozzle inspection program was credited for license renewal. This program implemented inservice inspection in accordance with ASME Code Section XI. The licensee cut and capped the CRD return line nozzle. As a result, the augmented inspections described in NUREG-0619 BWR Feedwater Nozzle and Control Rod Drive Return Line Nozzle Cracking or GE NE-523-A71-0594, Alternative BWR Feedwater Nozzle Inspection Requirements are not required.
 
Commitment Item 6, Control Rod Drive (CRD) Return Line Nozzle The inspectors reviewed the licensing basis, program basis documents, implementing procedures, NDE examination records, related condition reports, and interviewed the plant personnel regarding these documents.
 
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 6.
 
===7. Commitment Item 7 specified the existing BWR SCC Program was credited for===
license renewal. The BWR SCC Program is credited for managing the aging effects of crack initiation and growth, loss of fracture toughness, and loss of material in susceptible components. The program was also enhanced to include an additional ultrasonic examination of the Quad Cities Unit 2 reactor vessel head crack (detected in 1990) to verify the relevant indication has remained essentially unchanged.
 
Commitment Item 7, BWR Stress Corrosion Cracking (SCC)
The inspectors reviewed the licensing basis, program basis documents, implementing procedures, weld examination records, and related IRs; and interviewed the plant personnel responsible for the program regarding these documents to verify the program is being implemented.
 
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 7.
 
===8. Commitment Item 8 specified the existing BWR reactor vessel penetration inspection===
program was credited for license renewal. The license renewal program applies only to the Standby Liquid Control/Core Plate DP penetrations and Instrument penetrations N11A/B and N12A/B. This program implemented inspection and flaw evaluation in conformance with BWRVIP-27 and BWRVIP-49.
 
Commitment Item 8, BWR Penetrations The inspectors reviewed the program basis documents, procedures, and NDE examination records to verify the program was adequately implemented.
 
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 8.
 
===9. Commitment Item 9 specified the existing BWR Vessel Internals Program (VIP)===
would be credited for license renewal and enhanced with inspections consistent with BWRVIP-48. The BWR Vessel internals Aging Management Program mitigates the effect of stress corrosion cracking, intergranular stress corrosion cracking (IGSCC),and irradiation assisted stress corrosion cracking in reactor pressure vessels internals through water chemistry activities that are implemented through station procedures and are consistent with the guidelines of year 2000 revision of EPRI TR-103515-R2, BWR Water Chemistry Guidelines. The program also manages cracking of reactor pressure vessel internals through condition monitoring activities that consist of examinations and the BWRVIP guidelines, as well as the requirements of ASME Section XI.
 
Commitment Item 9, BWR Vessel Internals The inspectors reviewed the licensing basis, program basis documents, implementing procedures, NDE examination records; and interviewed the plant personnel responsible for the program regarding these documents to verify the program is being implemented.
 
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 9.
 
10.
 
Commitment Item 10 specified a new Aging Management Program for thermal aging and neutron irradiation embrittlement of CASS reactor internal components within the scope of license renewal, to ensure the integrity of the CASS components exposed to high temperature and neutron fluence present in the reactor environment. This program includes a component specific evaluation of the loss of fracture toughness. For those components, where the loss of fracture toughness may affect function of the component, an enhanced VT-1 inspection will be conducted. These inspections will be in accordance with BWRVIP-03, and will be performed as part of the ISI program.
 
Commitment Item 10, Thermal Aging and Neutron Irradiation Embrittlement of Cast Austenitic Stainless Steel (CASS)
The inspectors reviewed the licensing basis, program basis documents, implementing procedures, completed inspections and interviewed the plant personnel responsible for the program regarding these documents to verify the program is being implemented.
 
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 10.
 
11.
 
Commitment Item 11 specified the existing FAC Program was credited for license renewal with enhancements to include portions of the main steam and the reactor vessel head vent systems prior to the period of extended operation. The sites FAC program is based on EPRI guidelines found in NSAC-202L-R3, Recommendations for an Effective Flow Accelerated Corrosion Program. The program is credited for Commitment Item 11, Flow Accelerated Corrosion (FAC)predicting, detecting, and monitoring for loss of material by wall thinning in piping, fittings, and valve bodies due to FAC.
 
The inspectors reviewed the licensing basis, program basis documents, implementing procedures, pipe examination records and related IRs and interviewed the responsible plant personnel regarding these documents.
 
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 11.
 
12.
 
Commitment Item 12 specified the existing bolting integrity program was credited for license renewal and that the program would be enhanced prior to the period of extended operation. The Bolting Integrity Program is an existing program that consists of the preventive and condition monitoring of pressure retaining bolted joints of piping and components for age-related degradation to discover and correct conditions that could lead to a loss of intended function.
 
Commitment Item 12, Bolting Integrity The inspectors reviewed the licensing basis, the Bolting Integrity Program basis documentation, implementing procedures, planned and completed work orders, related corrective action documents, and interviewed responsible program personnel regarding these documents.
 
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 12.
 
13.
 
Commitment Item 13 specified the existing program was credited for license renewal and had been enhanced, prior to the period of extended operation, to include periodic inspections of cooling water pump internal linings, additional heat exchangers and sub-components, external surfaces of various submerged pumps, components in the high humidity/moisture environments of the pump vaults, and piping.
 
Commitment Item 13, Open-Cycle Cooling Water Program The inspectors reviewed changes and enhancements to the program and ensured that the program remained effective for both units. The inspectors reviewed the licensing basis, program basis documents, planned and completed work orders, Commitment Item changes, Issue Reports, inspection procedures and interviewed the plant personnel responsible for the program to verify the program was being implemented. General program requirements for this commitment were inspected and determined to be complete for Quad Cities Units 1 and 2.
 
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 13 for Units 1 and 2.
 
14.
 
Commitment Item 14 specified the existing closed-cycle cooling water chemistry program was enhanced and credited for license renewal for both Units 1 and 2.
 
Commitment Item 14, Closed-Cycle Cooling Water Chemistry The inspectors reviewed the licensing basis, program basis documents, planned and completed work orders, Issue Reports, inspection procedures and interviewed plant personnel responsible for the program to verify the program was being implemented. General program requirements for this commitment were inspected and determined to be complete for Quad Cities Unit 1 and 2.
 
The licensee changed this commitment Item to use the guidance from the latest Electric Power Research Institute (EPRI) guidance document, EPRI TR 1007820, Closed Cooling Water Chemistry Guideline, Revision 1 instead of a previous EPRI Guidance procedure. The inspectors noted Revision 2 of the GALL endorsed the latest EPRI guidance document, EPRI TR 1007820. The inspectors verified this commitment change was appropriate.
 
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 14.
 
15.
 
Commitment Item 15 specified the existing inspection of overhead heavy load and light load (related to refueling) handling systems program was credited for license renewal and that the program would be enhanced prior to the period of extended operation.
 
Commitment Item 15, Overhead Heavy Load and Light Load (Related to Refueling)
Handling Systems The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders, related corrective action documents and interviewed personnel responsible for the program regarding these documents.
 
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 15.
 
16.
 
Commitment Item 16 specified the existing compressed air monitoring program was credited for license renewal and that the program would be enhanced prior to the period of extended operation.
 
Commitment Item 16, Compressed Air Monitoring The inspectors reviewed the licensing basis, program basis documents, planned and completed work orders, Issue Reports, inspection procedures and interviewed the plant personnel responsible for the program to verify the program was being implemented. General program requirements for this commitment were inspected and determined to be complete for Quad Cities Unit 1 and 2.
 
Based on review of the timeliness and adequacy of the licensees actions the inspectors determined the licensee met Commitment Item 16.
 
17.
 
Commitment Item 17 specified the existing program was credited for license renewal and was consistent with NUREG-1801 Generic Aging Lessons Learned (GALL).
 
Commitment Item 17, BWR Reactor Water Cleanup (RWCU) System The inspectors reviewed the licensing basis, program basis documents, and work orders. The licensee has replaced all in-scope portions of the RWCU system piping with IGSCC resistant piping. The RWCU portions that are inboard of the second isolation valve are being managed by the ISI program. The inspectors reviewed selected samples to confirm the ISI program was being utilized for the sections of the RWCU previously mentioned.
 
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 17.
 
18.
 
Commitment Item 18 specified the licensee would enhance the existing fire protection program as follows:
Commitment Item 18, Fire Protection (non-water)
* Provide specific guidance to check fire doors for wear and holes in skin that could affect intended function during weekly tours as well as check the fire door clearances.
* Inspect external surfaces of the carbon dioxide system.
* Perform a visual inspection (VT-1 or equivalent) on a 10 percent sample population of each type of fire seal on a refueling outage frequency. Expand the sample population by 10 percent if any of the inspected seals are found to have abnormal degradation that could prevent the seal from performing its intended function.
 
The inspectors reviewed the licensing basis, program basis documents, and existing implementing procedures. The inspectors verified the above enhancements were incorporated into the existing program documents and implementing procedures. The inspectors also reviewed the completed inspections and training requirements.
 
Based on the review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 18.
 
19.
 
Commitment Item 19 specified the existing fire water system program was credited for license renewal and that the program would include several enhancements prior to the period of extended operation.
 
Commitment Item 19, Fire Water System The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders and related corrective action documents.
 
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 19.
 
20.
 
Commitment Item 20 specified the existing above-ground carbon steel tanks program was credited for license renewal and that the program would be enhanced prior to the period of extended operation. The enhancements included periodic system engineer walkdowns on the nitrogen storage tanks utilizing a standalone procedure and a one-time UT thickness inspection will be performed on the aluminum condensate storage tank or demineralized water storage tank.
 
Commitment Item 20, Above-ground Carbon Steel Tanks The inspectors reviewed the licensing basis, program basis documents, implementing procedures, scheduled, and completed work orders, related action requests, engineering changes, and evaluations. The inspectors verified the licensee has implemented procedure changes to address the documentation of inspection results by system engineers. In addition, the inspectors verified the licensee has implemented procedures to address internal/external inspections as well as committed UT inspections.
 
During this review, the inspectors identified the B Contaminated Condensate Storage Tank (CCST) inspection performed in 2007 time frame did not include NDE. Specifically, the license renewal commitment specified NDE would be performed once before the period of extended operation (PEO) and every five years thereafter. The inspectors noted this omission in 2007 was a failure to follow the requirements of the commitment. However, since the licensee performed a UT inspection of the B CCST in November 2012 (before the PEO) in accordance with the requirements of the commitment, this commitment was met.
 
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 20.
 
21.
 
Commitment Item 21 specified the existing fuel oil chemistry program was credited for license renewal and that the program would be enhanced prior to the period of extended operation. The program was to be enhanced to include inspection of the fuel oil tank interiors for corrosion during regularly scheduled tank cleanings.
 
Commitment Item 21, Fuel Oil Chemistry The inspectors interviewed the program owner, reviewed the licensing basis, program basis documents, scheduled, and completed work orders and implementing procedures. The inspectors verified the licensee has implemented a program that evaluates the material condition and bottom thickness of the fuel oil storage tanks to ensure aging effects are effectively managed.
 
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 21.
 
22.
 
Commitment Item 22 specified the existing reactor vessel surveillance Aging Management Program was credited for license renewal and that the program would be enhanced prior to the period of extended operation. The program is implemented through station procedures that conform to the requirements of 10 CFR Part 50, Appendix H, "Reactor Vessel Material Surveillance Program Requirements." Neutron embrittlement is predicted utilizing chemistry tables and Position 1.3 limitations as described in Regulatory Guide 1.99, Revision 2, "Radiation Embrittlement of Reactor Vessel Materials."
 
Commitment Item 22, Reactor Vessel Surveillance The inspectors reviewed the licensing basis, program basis documents, implementing procedures and interviewed the AMP owner regarding these documents. The inspectors verified the licensee incorporated the testing requirements for reactor vessel test capsules have been incorporated into station programs and procedures.
 
Based on review and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 22.
 
23.
 
Commitment Item 23 specified the licensee perform one-time inspections of selected plant equipment to verify current plant Aging Management Programs were effective in managing the effects of aging prior to the period of extended operation.


The inspectors reviewed the Commitment Items listed below which are referenced to Appendix A of the SER. Specific documents reviewed are listed in the enclosure. 1. Commitment Item 1 specified the existing ASME Section XI, Subsections IWB, IWC, and IWD Aging Management Program, is part of the Inservice Inspection (ISI) Program. It provides identification of signs of degradation, and establishment of corrective actions for condition monitoring of reactor coolant pressure retaining piping and components within the scope of license renewal. The inspections will be implemented in accordance with 10 CFR 50.55(a). Also Quad Cities implemented Risk Informed Inservice Inspection and the alternative Risk Informed Inservice Inspection programs for Class 1 and 2 piping. Commitment Item 1, ASME [American Society of Mechanical Engineers] Code, Section XI Inservice Inspection, Subsections IWB, IWC, and IWD The inspectors reviewed the licensing basis, program basis documents, implementing procedures, non-destructive examination (NDE) records, and related condition reports; and interviewed the responsible plant personnel regarding these documents. The inspectors verified the licensee incorporated the Risk Informed ISI Program for Class 1 and 2 Systems. Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 1. 2. Commitment Item 2 specified the existing water chemistry program was credited for license renewal for both Units 1 and 2 and that the program was enhanced prior to the period of extended operation. Commitment Item 2, Water Chemistry  The inspectors reviewed changes and enhancements to the program and ensured the program remained effective for both units. The inspectors verified procedure CY-QC-110-608, Reactor/Turbine Building Sample Panel Sample Collection, Revision 21 was revised to ensure the integrity of the samples collected. The inspectors reviewed the licensing basis, program basis documents, planned and completed work orders, Commitment Item changes, Issue Reports, inspection 4 Enclosure procedures and interviewed the plant personnel responsible for the program. Planned and completed chemistry surveillance tests and related Issue Reports demonstrated the water chemistry program was appropriately applied to Units 1 and 2. Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 2 for Units 1 and 2. 3. Commitment Item 3 specified the existing Reactor Head Closure Studs Aging Management Program was credited. The program is implemented through station procedures, ISI program plan for Quad Cities, and corporate procedures for inservice inspection of welds and components. The program implements inspection requirements of ASME Section XI and preventive measures described in Regulatory Guide 1.65, "Materials and Inspection for Reactor Vessel Closure Studs."  The reactor head studs at Quad Cities are not metal plated and have had manganese phosphate coatings applied.
Commitment Item 23, One-Time Inspection The licensee had established separate one-time inspection programs covering the specific commitments listed in the SER. The inspectors reviewed the licensing basis, each program basis document, implementing procedures, inspection results and related IRs, and interviewed the responsible plant personnel regarding these documents.


Commitment Item 3, Reactor Head Closure Studs The inspectors interviewed the plant personnel responsible for the program and reviewed the program basis documents, implementing procedures, work orders, and related IRs to verify the program was being implemented on Units 1 and 2. Based on review of the licensee actions, the inspectors determined the licensee met Commitment Item 3. 4. Commitment Item 4 specified the existing BWR Vessel Attachment Welds Aging Management Program activities incorporated the inspection and evaluation recommendations of BWRVIP-48, 'Vessel ID Attachment Weld Inspection and Evaluation Guidelines," as well as the water chemistry recommendations of EPRI TR-103515-R2, "BWR Water Chemistry Guidelines."  The program is implemented through station procedures that provide for mitigation of cracking through water chemistry and monitoring for cracking through in vessel examinations. Commitment Item 4, BWR [Boiling Water Reactor] Vessel ID [Internal Diameter] Attachment Welds The inspectors reviewed the licensing basis, program basis documents, implementing procedures, NDE examination records, and interviewed the plant personnel responsible for the program regarding these documents to verify the program is being implemented on Units 1 and 2. Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 4. 5. Commitment Items 5 specified the existing BWR Feedwater Nozzle program was credited for license renewal and would be enhanced prior to the period of extended operation. This program implemented inservice inspection specified in ASME Code, Section XI and enhanced it with recommendations from General Electric NE-523-A71-0594-A, Revision 1 "Alternate BWR Feedwater Nozzle Inspection Requirements."  Per their enhancements, the licensee will perform periodic ultrasonic testing inspection of certain critical regions of the BWR feedwater nozzles. Commitment Item 5, BWR Feedwater Nozzle 5 Enclosure The inspectors reviewed the licensing basis, program basis documents, implementing procedures, NDE examination records, related condition reports, and interviewed the responsible plant personnel. The inspectors verified the licensee implemented the recommendations of report GE-NE-523-A71-0594-A, Revision 1, which was approved by the NRC staff.
The inspectors verified the licensee had documented the results of the one-time inspections, and with one exception, had followed up appropriately when aging effects were identified. For the one exception, a one-time inspection of the clean demineralized water check valve 0-4399-16 was performed and the results showed significant corrosion in the seating surface. In addition, all internal surfaces revealed moderate corrosion with some material wastage. The valve was replaced and the licensee performed an evaluation to determine if any aging management actions were needed. The site performed additional inspections at other valves belonging to the same sample group and those were found in good condition.


Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 5. 6. Commitment Item 6 specified the existing BWR Control Rod Drive Return Line Nozzle inspection program was credited for license renewal. This program implemented inservice inspection in accordance with ASME Code Section XI. The licensee cut and capped the CRD return line nozzle. As a result, the augmented inspections described in NUREG-0619 "BWR Feedwater Nozzle and Control Rod Drive Return Line Nozzle Cracking" or GE NE-523-A71-0594, "Alternative BWR Feedwater Nozzle Inspection Requirements" are not required. Commitment Item 6, Control Rod Drive (CRD) Return Line Nozzle The inspectors reviewed the licensing basis, program basis documents, implementing procedures, NDE examination records, related condition reports, and interviewed the plant personnel regarding these documents. Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 6. 7. Commitment Item 7 specified the existing BWR SCC Program was credited for license renewal. The BWR SCC Program is credited for managing the aging effects of crack initiation and growth, loss of fracture toughness, and loss of material in susceptible components. The program was also enhanced to include an additional ultrasonic examination of the Quad Cities Unit 2 reactor vessel head crack (detected in 1990) to verify the relevant indication has remained essentially unchanged. Commitment Item 7, BWR Stress Corrosion Cracking (SCC) The inspectors reviewed the licensing basis, program basis documents, implementing procedures, weld examination records, and related IRs; and interviewed the plant personnel responsible for the program regarding these documents to verify the program is being implemented. Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 7. 8. Commitment Item 8 specified the existing BWR reactor vessel penetration inspection program was credited for license renewal. The license renewal program applies only to the Standby Liquid Control/Core Plate DP penetrations and Instrument penetrations N11A/B and N12A/B. This program implemented inspection and flaw evaluation in conformance with BWRVIP-27 and BWRVIP-49. Commitment Item 8, BWR Penetrations The inspectors reviewed the program basis documents, procedures, and NDE examination records to verify the program was adequately implemented.
Based on those results the licensee determined the valve that had been replaced was an outlier and no aging management was needed. However, the licensee did not address the two additional check valves that shared the same environment as the one affected. During the inspection, the inspectors questioned why these other valves didnt need to be age managed. The licensee was able to provide additional information that showed based on the replacement history of the other two valves and the physical state of the pressure boundary (the license renewal function) there was reasonable assurance that the components could meet the function for another 20 years.


6 Enclosure Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 8. 9. Commitment Item 9 specified the existing BWR Vessel Internals Program (VIP) would be credited for license renewal and enhanced with inspections consistent with BWRVIP-48. The BWR Vessel internals Aging Management Program mitigates the effect of stress corrosion cracking, intergranular stress corrosion cracking (IGSCC), and irradiation assisted stress corrosion cracking in reactor pressure vessels internals through water chemistry activities that are implemented through station procedures and are consistent with the guidelines of year 2000 revision of EPRI TR-103515-R2, BWR Water Chemistry Guidelines. The program also manages cracking of reactor pressure vessel internals through condition monitoring activities that consist of examinations and the BWRVIP guidelines, as well as the requirements of ASME Section XI.
Also, the inspectors determined in some cases the licensee had performed inspections on only one Unit. For eleven cases, the inspectors could not find a justification for the basis of selecting one Unit as a representative sample of both Units. Specifically, no evaluation was performed to demonstrate the most susceptible environment was selected. During the inspection, the licensee was able to provide additional information to show the environment in both Units is similar enough that sampling one Unit was representative of both.


Commitment Item 9, BWR Vessel Internals The inspectors reviewed the licensing basis, program basis documents, implementing procedures, NDE examination records; and interviewed the plant personnel responsible for the program regarding these documents to verify the program is being implemented. Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 9. 10. Commitment Item 10 specified a new Aging Management Program for thermal aging and neutron irradiation embrittlement of CASS reactor internal components within the scope of license renewal, to ensure the integrity of the CASS components exposed to high temperature and neutron fluence present in the reactor environment. This program includes a component specific evaluation of the loss of fracture toughness. For those components, where the loss of fracture toughness may affect function of the component, an enhanced VT-1 inspection will be conducted. These inspections will be in accordance with BWRVIP-03, and will be performed as part of the ISI program. Commitment Item 10, Thermal Aging and Neutron Irradiation Embrittlement of Cast Austenitic Stainless Steel (CASS) The inspectors reviewed the licensing basis, program basis documents, implementing procedures, completed inspections and interviewed the plant personnel responsible for the program regarding these documents to verify the program is being implemented. Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 10. 11. Commitment Item 11 specified the existing FAC Program was credited for license renewal with enhancements to include portions of the main steam and the reactor vessel head vent systems prior to the period of extended operation. The site's FAC program is based on EPRI guidelines found in NSAC-202L-R3, "Recommendations for an Effective Flow Accelerated Corrosion Program."  The program is credited for Commitment Item 11, Flow Accelerated Corrosion (FAC)7 Enclosure predicting, detecting, and monitoring for loss of material by wall thinning in piping, fittings, and valve bodies due to FAC. The inspectors reviewed the licensing basis, program basis documents, implementing procedures, pipe examination records and related IRs and interviewed the responsible plant personnel regarding these documents. Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 11. 12. Commitment Item 12 specified the existing bolting integrity program was credited for license renewal and that the program would be enhanced prior to the period of extended operation. The Bolting Integrity Program is an existing program that consists of the preventive and condition monitoring of pressure retaining bolted joints of piping and components for age-related degradation to discover and correct conditions that could lead to a loss of intended function. Commitment Item 12, Bolting Integrity The inspectors reviewed the licensing basis, the Bolting Integrity Program basis documentation, implementing procedures, planned and completed work orders, related corrective action documents, and interviewed responsible program personnel regarding these documents. Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 12. 13. Commitment Item 13 specified the existing program was credited for license renewal and had been enhanced, prior to the period of extended operation, to include periodic inspections of cooling water pump internal linings, additional heat exchangers and sub-components, external surfaces of various submerged pumps, components in the high humidity/moisture environments of the pump vaults, and piping. Commitment Item 13, Open-Cycle Cooling Water Program The inspectors reviewed changes and enhancements to the program and ensured that the program remained effective for both units. The inspectors reviewed the licensing basis, program basis documents, planned and completed work orders, Commitment Item changes, Issue Reports, inspection procedures and interviewed the plant personnel responsible for the program to verify the program was being implemented. General program requirements for this commitment were inspected and determined to be complete for Quad Cities Units 1 and 2. Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 13 for Units 1 and 2. 14. Commitment Item 14 specified the existing closed-cycle cooling water chemistry program was enhanced and credited for license renewal for both Units 1 and 2.
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 23 with the exception of the URI documented in Section 4OA5.1.b(1).


Commitment Item 14, Closed-Cycle Cooling Water Chemistry The inspectors reviewed the licensing basis, program basis documents, planned and completed work orders, Issue Reports, inspection procedures and interviewed 8 Enclosure plant personnel responsible for the program to verify the program was being implemented. General program requirements for this commitment were inspected and determined to be complete for Quad Cities Unit 1 and 2. The licensee changed this commitment Item to use the guidance from the latest Electric Power Research Institute (EPRI) guidance document, EPRI TR 1007820, "Closed Cooling Water Chemistry Guideline," Revision 1 instead of a previous EPRI Guidance procedure. The inspectors noted Revision 2 of the GALL endorsed the latest EPRI guidance document, EPRI TR 1007820. The inspectors verified this commitment change was appropriate. Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 14. 15. Commitment Item 15 specified the existing inspection of overhead heavy load and light load (related to refueling) handling systems program was credited for license renewal and that the program would be enhanced prior to the period of extended operation.
24.


Commitment Item 15, Overhead Heavy Load and Light Load (Related to Refueling) Handling Systems The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders, related corrective action documents and interviewed personnel responsible for the program regarding these documents.
Commitment Item 24 specified one-time visual inspection of a sample of materials susceptible to selective leaching of materials prior to the period of extended operation.


Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 15. 16. Commitment Item 16 specified the existing compressed air monitoring program was credited for license renewal and that the program would be enhanced prior to the period of extended operation. Commitment Item 16, Compressed Air Monitoring The inspectors reviewed the licensing basis, program basis documents, planned and completed work orders, Issue Reports, inspection procedures and interviewed the plant personnel responsible for the program to verify the program was being implemented. General program requirements for this commitment were inspected and determined to be complete for Quad Cities Unit 1 and 2. Based on review of the timeliness and adequacy of the licensee's actions the inspectors determined the licensee met Commitment Item 16. 17. Commitment Item 17 specified the existing program was credited for license renewal and was consistent with NUREG-1801 "Generic Aging Lessons Learned (GALL)." Commitment Item 17, BWR Reactor Water Cleanup (RWCU) System The inspectors reviewed the licensing basis, program basis documents, and work orders. The licensee has replaced all in-scope portions of the RWCU system piping with IGSCC resistant piping. The RWCU portions that are inboard of the second 9 Enclosure isolation valve are being managed by the ISI program. The inspectors reviewed selected samples to confirm the ISI program was being utilized for the sections of the RWCU previously mentioned. Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 17. 18. Commitment Item 18 specified the licensee would enhance the existing fire protection program as follows: Commitment Item 18, Fire Protection (non-water)  Provide specific guidance to check fire doors for wear and holes in skin that could affect intended function during weekly tours as well as check the fire door clearances. Inspect external surfaces of the carbon dioxide system. Perform a visual inspection (VT-1 or equivalent) on a 10 percent sample population of each type of fire seal on a refueling outage frequency. Expand the sample population by 10 percent if any of the inspected seals are found to have abnormal degradation that could prevent the seal from performing its intended function. The inspectors reviewed the licensing basis, program basis documents, and existing implementing procedures. The inspectors verified the above enhancements were incorporated into the existing program documents and implementing procedures. The inspectors also reviewed the completed inspections and training requirements. Based on the review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 18. 19. Commitment Item 19 specified the existing fire water system program was credited for license renewal and that the program would include several enhancements prior to the period of extended operation. Commitment Item 19, Fire Water System The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders and related corrective action documents. Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 19. 20. Commitment Item 20 specified the existing above-ground carbon steel tanks program was credited for license renewal and that the program would be enhanced prior to the period of extended operation. The enhancements included periodic system engineer walkdowns on the nitrogen storage tanks utilizing a standalone procedure and a one-time UT thickness inspection will be performed on the aluminum condensate storage tank or demineralized water storage tank.Commitment Item 20, Above-ground Carbon Steel Tanks 10 Enclosure The inspectors reviewed the licensing basis, program basis documents, implementing procedures, scheduled, and completed work orders, related action requests, engineering changes, and evaluations. The inspectors verified the licensee has implemented procedure changes to address the documentation of inspection results by system engineers. In addition, the inspectors verified the licensee has implemented procedures to address internal/external inspections as well as committed UT inspections. During this review, the inspectors identified the 'B' Contaminated Condensate Storage Tank (CCST) inspection performed in 2007 time frame did not include NDE. Specifically, the license renewal commitment specified NDE would be performed once before the period of extended operation (PEO) and every five years thereafter. The inspectors noted this omission in 2007 was a failure to follow the requirements of the commitment. However, since the licensee performed a UT inspection of the 'B' CCST in November 2012 (before the PEO) in accordance with the requirements of the commitment, this commitment was met. Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 20. 21. Commitment Item 21 specified the existing fuel oil chemistry program was credited for license renewal and that the program would be enhanced prior to the period of extended operation. The program was to be enhanced to include inspection of the fuel oil tank interiors for corrosion during regularly scheduled tank cleanings. Commitment Item 21, Fuel Oil Chemistry The inspectors interviewed the program owner, reviewed the licensing basis, program basis documents, scheduled, and completed work orders and implementing procedures. The inspectors verified the licensee has implemented a program that evaluates the material condition and bottom thickness of the fuel oil storage tanks to ensure aging effects are effectively managed. Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 21. 22. Commitment Item 22 specified the existing reactor vessel surveillance Aging Management Program was credited for license renewal and that the program would be enhanced prior to the period of extended operation. The program is implemented through station procedures that conform to the requirements of 10 CFR Part 50, Appendix H, "Reactor Vessel Material Surveillance Program Requirements."  Neutron embrittlement is predicted utilizing chemistry tables and Position 1.3 limitations as described in Regulatory Guide 1.99, Revision 2, "Radiation Embrittlement of Reactor Vessel Materials." Commitment Item 22, Reactor Vessel Surveillance The inspectors reviewed the licensing basis, program basis documents, implementing procedures and interviewed the AMP owner regarding these documents. The inspectors verified the licensee incorporated the testing requirements for reactor vessel test capsules have been incorporated into station programs and procedures.
Commitment Item 24, Selective Leaching of Materials The inspectors reviewed the licensing basis, the Selective Leaching of Materials Program basis documentation, completed work orders, and interviewed personnel responsible for the program regarding these documents and verified the program was appropriately applied to both Units 1 and 2.


11 Enclosure Based on review and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 22. 23. Commitment Item 23 specified the licensee perform one-time inspections of selected plant equipment to verify current plant Aging Management Programs were effective in managing the effects of aging prior to the period of extended operation. Commitment Item 23, One-Time Inspection The licensee had established separate one-time inspection programs covering the specific commitments listed in the SER. The inspectors reviewed the licensing basis, each program basis document, implementing procedures, inspection results and related IRs, and interviewed the responsible plant personnel regarding these documents. The inspectors verified the licensee had documented the results of the one-time inspections, and with one exception, had followed up appropriately when aging effects were identified. For the one exception, a one-time inspection of the clean demineralized water check valve 0-4399-16 was performed and the results showed significant corrosion in the seating surface. In addition, all internal surfaces revealed moderate corrosion with some material wastage. The valve was replaced and the licensee performed an evaluation to determine if any aging management actions were needed. The site performed additional inspections at other valves belonging to the same sample group and those were found in good condition. Based on those results the licensee determined the valve that had been replaced was an outlier and no aging management was needed. However, the licensee did not address the two additional check valves that shared the same environment as the one affected. During the inspection, the inspectors questioned why these other valves didn't need to be age managed. The licensee was able to provide additional information that showed based on the replacement history of the other two valves and the physical state of the pressure boundary (the license renewal function) there was reasonable assurance that the components could meet the function for another 20 years. Also, the inspectors determined in some cases the licensee had performed inspections on only one Unit. For eleven cases, the inspectors could not find a justification for the basis of selecting one Unit as a representative sample of both Units. Specifically, no evaluation was performed to demonstrate the most susceptible environment was selected. During the inspection, the licensee was able to provide additional information to show the environment in both Units is similar enough that sampling one Unit was representative of both. Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 23 with the exception of the URI documented in Section 4OA5.1.b(1). 24. Commitment Item 24 specified one-time visual inspection of a sample of materials susceptible to selective leaching of materials prior to the period of extended operation.Commitment Item 24, Selective Leaching of Materials 12 Enclosure The inspectors reviewed the licensing basis, the Selective Leaching of Materials Program basis documentation, completed work orders, and interviewed personnel responsible for the program regarding these documents and verified the program was appropriately applied to both Units 1 and 2. Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 24 with the exception of the URI documented in Section 4OA5.1.b(1). 25. Commitment Item 25 specified an enhancement to complete one-time inspections prior to the period of extended operation as well as periodic checks on buried carbon steel fuel oil storage tanks. The Buried Piping and Tanks Inspection Program was an existing program that provided preventive and condition monitoring measures to manage loss of material, due to either corrosion of ferrous piping and tanks or aggressive chemical attack of asbestos concrete piping, from external environments for buried piping and tanks. Commitment Item 25, Buried Piping and Tanks Inspection The inspectors reviewed the licensing basis, the Buried Piping and Tanks Inspection Program basis documentation, implementing procedures, completed work orders, the results of the onetime inspections, related corrective action documents, and interviewed responsible program personnel regarding these documents. The inspectors verified planned and completed work orders and related IRs demonstrated that the program was appropriately applied Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 25. 26. Commitment Item 26 specified the existing ASME Code, Section XI, Subsection IWE program was credited for license renewal and would be enhanced prior to the period of extended operation.
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 24 with the exception of the URI documented in Section 4OA5.1.b(1).
 
25.
 
Commitment Item 25 specified an enhancement to complete one-time inspections prior to the period of extended operation as well as periodic checks on buried carbon steel fuel oil storage tanks. The Buried Piping and Tanks Inspection Program was an existing program that provided preventive and condition monitoring measures to manage loss of material, due to either corrosion of ferrous piping and tanks or aggressive chemical attack of asbestos concrete piping, from external environments for buried piping and tanks.
 
Commitment Item 25, Buried Piping and Tanks Inspection The inspectors reviewed the licensing basis, the Buried Piping and Tanks Inspection Program basis documentation, implementing procedures, completed work orders, the results of the onetime inspections, related corrective action documents, and interviewed responsible program personnel regarding these documents. The inspectors verified planned and completed work orders and related IRs demonstrated that the program was appropriately applied Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 25.
 
26.
 
Commitment Item 26 specified the existing ASME Code, Section XI, Subsection IWE program was credited for license renewal and would be enhanced prior to the period of extended operation.


Commitment Item 26, ASME Code, Section XI, Subsection IWE The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders, related corrective action documents and interviewed personnel responsible for the program regarding these documents.
Commitment Item 26, ASME Code, Section XI, Subsection IWE The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders, related corrective action documents and interviewed personnel responsible for the program regarding these documents.


Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 26. 27. Commitment Item 27 ASME Code Section XI, Subsection IWF Component Support Program specified the existing ASME Code Section XI, Subsection IWF Component Support Program was credited for license renewal with enhancement to include inspection of Code Class MC supports. Commitment Item 27, ASME Code, Section XI, Subsection IWF The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders, related corrective action documents, and interviewed personnel responsible for the program regarding these documents.
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 26.
 
27.
 
Commitment Item 27 ASME Code Section XI, Subsection IWF Component Support Program specified the existing ASME Code Section XI, Subsection IWF Component Support Program was credited for license renewal with enhancement to include inspection of Code Class MC supports.
 
Commitment Item 27, ASME Code, Section XI, Subsection IWF The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders, related corrective action documents, and interviewed personnel responsible for the program regarding these documents.
 
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 27.
 
28.
 
Commitment Item 28 specified the existing 10 CFR Part 50; Appendix J Aging Management Program was credited for license renewal. The program provides for aging management of pressure boundary degradation due to loss of material in the primary containment and various systems penetrating primary containment. The program also manages changes in material properties of gaskets, O rings, and packing materials for the primary containment pressure boundary access points.
 
Commitment Item 28, Appendix J of 10 CFR Part 50, The program includes an exception to NUREG 1801 for two-ply design bellows that cannot be tested to satisfy the requirements of Appendix J. Testing is in accordance with NRC approved alternate test until the bellows are replaced.
 
The inspectors reviewed the licensing basis, program basis documents, implementing procedures, and interviewed the responsible plant personnel regarding these documents. The inspectors verified the requirements for testing two-ply bellows have been incorporated into station programs and procedures.
 
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 28.
 
29.
 
Commitment Item 29 specified the existing masonry wall program was credited for license renewal.
 
Commitment Item 29, Masonry Wall Program The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders, related corrective action documents and interviewed personnel responsible for the program regarding these documents. The inspectors performed walkdowns of masonry walls that perform a high energy line break barrier function.
 
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 29.
 
30.
 
Commitment Item 30 specified the existing structures monitoring program was credited for license renewal and would be enhanced prior to the period of extended operation. The structures monitoring program was an existing program that provided for aging management of various structures and external surfaces of mechanical components within the scope of license renewal.
 
Commitment Item 30, Structures Monitoring Program The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders, related corrective action documents and interviewed personnel responsible for the program regarding these documents. The inspectors also walked down several jet impingement shield supports.
 
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 30.
 
31.
 
Commitment Item 31 specified the existing RG 1.127, "Inspection of Water-Control Structures Associated with Nuclear Power Plants," program was credited for license renewal and would be enhanced prior to the period of extended operation. This program was part of the Structures Monitoring Program and consisted of procedures that provided for condition monitoring of structural steel elements, concrete, and earthen structures within the scope of license renewal.
 
Commitment Item 31, Regulatory Guide (RG) 1.127, Inspection of Water-Control Structures Associated with Nuclear Power Plants The inspectors reviewed the licensing basis, program basis documentation, and revised implementing procedures. The inspectors reviewed completed work orders and associated condition reports, and interviewed responsible water control structure program personnel.
 
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 31 with the exception of the URI described in section 4OA5.1.b(2).
 
32.
 
Commitment Item 32 specified enhancements to the Protective Coating Monitoring and Maintenance Program to be implemented prior to the period of extended operation. The Protective Coating Monitoring and Maintenance Program was an existing program that provided for aging management of Service Level I coatings inside primary containment. Service Level I coatings were used in areas where the coating failure could adversely affect the operation of post-accident fluid systems and thereby impair safe shutdown. The program provided for visual inspections to identify any condition that adversely affects the ability of the coating film to function as intended.
 
Commitment Item 32, Protective Coating Monitoring and Maintenance Program The inspectors reviewed the program basis documentation, revised implementing procedures, completed inspections, and interviewed responsible plant personnel regarding these documents.
 
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 32.
 
33.
 
Commitment Item 33 specified licensee would develop a program that was consistent with NUREG-1801 AMP XI.E1 for electrical cables and connections installed in adverse localized environments not subject to 10 CFR 50.49 environmental qualification requirements.
 
Commitment Item 33, Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements The licensee developed a program to visually inspect all accessible electrical cables and connections installed in adverse localized environments for signs of accelerated age-related degradation. Additional inspections, repairs, or replacements are to be initiated as appropriate.
 
The inspectors interviewed the program owner, reviewed licensing basis, the program basis documentation, implementing procedures, work orders and records of walk downs for determining adverse localized environments and visual inspections for cables. The inspectors also reviewed corrective actions, which addressed and identified cable issues and their associated corrective actions. Also, the inspectors reviewed the corrective action taken in reference to the finding from Dresden Inspection Report 05000237/2009007.
 
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 33.
 
34.
 
Commitment Item 34 specified for the Metal Fatigue of Reactor Coolant Pressure Boundary the existing program was credited with enhancements. The licensee will enhance the program by utilizing the EPRI-licensed FatiguePro computer software for counting fatigue stress cycles and track fatigue usage factors for selected components. The enhanced program calculates and tracks cumulative usage factors for bounding locations in the reactor coolant pressure boundary (reactor pressure vessel and Class I piping), containment torus, torus vents, torus attached piping and penetrations.
 
Commitment Item 34, Metal Fatigue of Reactor Coolant Pressure Boundary The inspectors reviewed the licensing basis, Metal Fatigue and Reactor Coolant Pressure Boundary Program basis documentation, FatiguePro implementing procedures, fatigue and transient monitoring program report, related corrective action documents, and interviewed the program owner regarding these documents.
 
The inspectors reviewed changes to the program to ensure the program remained effective for both units.
 
Based on review of the licensees actions, the inspectors determined the licensee met Commitment Item 34.
 
35.
 
Commitment Item 35 specified the licensee was to maintain the existing environmental qualification program of the electrical components for the period of extended operation.
 
Commitment Item 35, Environmental Qualification (EQ) of Electrical Components Program activities establish, demonstrate and document the level of qualification, qualified configuration, maintenance, surveillance and replacement requirements necessary to meet 10 CFR 50.49.
 
The inspectors interviewed the program owner, reviewed the licensing basis, program basis documents, and various existing EQ Binders.
 
Based on the review of the licensees action, the inspectors determined the licensee met Commitment Item 35.
 
36.
 
Commitment Item 36 specified the existing Boraflex monitoring program was credited for license renewal. The Boraflex monitoring program is based on manufacturers recommendations relies on periodic inspection, testing, monitoring and analysis of the criticality design to assure the required 5percent subcriticality margin is maintained.
 
Commitment Item 36, Boraflex Monitoring The inspectors interviewed the program owner, reviewed the licensing basis, program basis documents, implementing procedures, planned and completed work orders and related corrective actions.
 
Based on review of the licensees actions, the inspectors determined the licensee met Commitment Item 36.
 
37.
 
Commitment Item 37 specified the licensee was to develop a program to manage aging of cables in sensitive instrumentation circuits with low level signals in the Nuclear Instrumentation Systems and Radiation Monitoring Systems.
 
Commitment Item 37, Electrical Cables Not Subject to 10 CFR 50.49 Environmental Requirements Used in Instrument Circuits The program is applied to the cables of the Nuclear Instrumentation Systems, which included source range monitors (SRMs), intermediate range monitors (IRMs), local power range monitors, and Radiation Monitoring Systems, which included drywell high range radiation monitors, main steam line radiation monitors, and the steam jet air ejector radiation monitors. The program specified a review of calibration and surveillance results, and cable testing for cable aging degradation before the period of extended operation and every 10 years thereafter.
 
The inspectors interviewed the program owner, reviewed the licensing basis, program basis documents, implementing procedures, work orders and related corrective actions.
 
Based on the review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 37.
 
38.
 
This Commitment Item does not apply to Quad Cities.
 
Commitment Item 38, Inaccessible Medium-Voltage Cables Not Subject to 10 CFR 50.49 Environmental Requirements
 
39.
 
Commitment Item 39 specified the existing corrective action program was credited for license renewal.
 
Commitment Item 39, Corrective Action Program The inspectors interviewed the program owner, reviewed the licensing basis, implementing procedures, corrective action program results, and interviewed the responsible plant personnel regarding this program. The inspectors also reviewed training given to engineers to increase awareness of aging concerns and license renewal. The inspectors verified the licensee was entering issues related to license renewal in the corrective action program.
 
The inspector also reviewed a corrective action, AR 01352551, which is tracking actions to revise various procedures to reflect aging management focus. This AR also tracks actions to establish aging-related degradation Passport coding and determine orientation/training needs.
 
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 39.
 
40.
 
Commitment Item 40 specified the licensee was to develop and implement a program to periodically inspect non-segregated bus ducts that connect the reserve auxiliary transformers (RATs) to 4160 V essential service system (ESS), the non-segregated bus ducts that connect the Emergency Diesel Generators (EDGs) to the ESS buses, and the non-segregated bus ducts that connect ESS buses.
 
Commitment Item 40, Periodic Inspection of Non-EQ, Non-Segregated Electrical Bus Ducts The inspectors interviewed the program owner, reviewed the licensing basis, program basis documents, implementing procedures, planned and completed work orders and related corrective actions.
 
Based on the review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 40.
 
41.
 
Commitment Item 41 specified the existing periodic inspection of ventilation system elastomers was credited for license renewal and that the program would be enhanced prior to the period of extended operation.
 
Commitment Item 41, Periodic Inspection of Ventilation System Elastomers The inspectors reviewed the licensing basis, program basis documentation, implementing procedures, completed work orders, related corrective action documents and interviewed personnel responsible for the program regarding these documents.
 
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 41.
 
42.
 
Commitment Item 42 specified the existing periodic testing of drywell and torus spray nozzles was credited for license renewal.
 
Commitment Item 42, Periodic Testing of Drywell and Torus Spray Nozzles The inspectors reviewed the program basis documentation, Drywell and Torus Spray Nozzle test procedures, completed work orders and condition reports to verify the program has been implemented.
 
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 42.
 
43.
 
Commitment Item 43 specified the existing lubricating oil monitoring program would be enhanced to include components exposed to an environment of lubricating oil in the following systems: reactor core isolation cooling system, main generator hydrogen seal oil system, high pressure coolant injection system, emergency diesel generator and auxiliaries system, station blackout system, and electro-hydraulic control system prior to the period of extended operation.
 
Commitment Item 43, Lubricating Oil Monitoring Activities The inspectors reviewed licensing basis, program basis documents, implementing procedures, scheduled and completed work orders, result trends, completed oil analysis laboratory results, and applicable corrective action program documents.
 
Additionally, the program owner was interviewed regarding these documents. The inspectors verified the licensee has enhanced the program to include the systems and subsystems listed in the Commitment Item in necessary documents to ensure aging is managed through the period of extended operation.
 
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 43.
 
44.
 
Commitment Item 44 specified the licensee would develop and implement an Aging Management Program for heat exchangers in the scope of License Renewal that are not tested or inspected by the open-cycle and closed-cycle cooling water system aging management programs, to be completed prior to the period of extended operation.
 
Commitment Item 44, Heat Exchanger Test and Inspection Activities The inspectors reviewed the licensing basis, program basis documents, commitment changes, planned and completed work orders, Issue Reports, inspection procedures and interviewed the plant personnel responsible for the program to verify the program was being implemented. For example, the inspectors reviewed commitment change 11-02 which was a clarification in response to an NRC observation in Section 4OA5.1.a
: (2) of NRC inspection report 05000265/2012008 and verified the proper implementation of the change. General program requirements for this commitment were inspected and determined to be complete for Quad Cities Units 1 and 2.
 
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 44.
 
45.
 
Commitment Item 45 specified the licensee would use the existing Generator Stator Water Chemistry program to manage aging effects by monitoring and controlling stator water chemistry per established procedures.
 
Commitment Item 45, Generator Stator Water Chemistry Activities The inspectors reviewed Units 1 and 2 chemistry reports to verify parameters were monitored. General program requirements for this commitment were inspected and determined to be complete for Quad Cities Units 1 and 2.
 
Based on the review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 45.
 
46.
 
Commitment Item 46 specified the licensee would develop and implement an Aging Management Program to inspect components in the plant heating system once before the end of the current operating term and periodically at intervals not to exceed once every 5 years during the period of extended operation.
 
Commitment Item 46, Periodic Inspection of Plant Heating System The inspectors reviewed the licensing basis, program basis documents, planned and completed work orders, Issue Reports, inspection procedures and interviewed the plant personnel responsible for the program to verify the program was being implemented on Units 1 and 2.
 
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 46 with the exception of the URI documented in Section 4OA5.1.b(1).
 
47.
 
Commitment Item 47 specified revised Pressure Temperature (P/T) limits will be prepared and submitted to the NRC for approval prior to the period of extended operation using an approved fluence methodology. On October 17, 2005 License Amendment No. 228 and No. 223 approved the revised P/T limits. The amendments revised Technical Specification (TS) Section 3.4.9, Reactor Coolant System Pressure, and Temperature (P/T) Limits, by incorporating revisions to the P/T limit curves for 54 effective full power years (extending to the end of the renewed license). The amendment also resolved a non-conservative condition for TS 2.4.9, Figure 3.4.9-2, Non-Nuclear Heatup/Cooldown Curve. The inspectors verified the program requirements have been incorporated into station programs.
 
Commitment Item 47, Time-limited Aging Analysis (TLAA) - Neutron Embrittlement of the Reactor Vessel and Internals Based on the licensees actions, the inspectors determined the licensee met Commitment Item 47.
 
48.
 
Commitment Item 48 specified commitments of the TLAA related to metal fatigue.
 
Quad Cities is taking credit for an existing program for monitoring the metal fatigue of reactor coolant pressure boundary. As discussed in Commitment Item 34, the licensee enhanced their current AMP with the EPRI-licensed FatiguePro computer software. In addition, prior to the period of extended operation, plant-specific calculations were performed for applicable locations identified in NUREG/CR-6260, Application of NUREG/CR-5999 Interim Fatigue Curves to Selected Nuclear Power Plant Components.
 
Commitment Item 48, TLAA - Metal Fatigue The inspectors reviewed the licensing basis, Fatigue and Transients monitoring program implementing procedures, Commitment Item change documents, calculations that assessed effects of reactor coolant on component fatigue life, related corrective action documents, and interviewed the program owner regarding these documents.
 
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 48.
 
49.
 
Commitment Item 49 specified a reanalysis will be applied to EQ components now qualified for the current operating term of 40 years. The EQ binders for components within the scope of 10 CFR 50.49 will be updated to include environmental conditions associated with Extended Power Uprate implementation together with an extended operating period of 60 years.
 
Commitment Item 49, TLAA -Environmental Qualification of Electrical Equipment The inspectors reviewed several examples of EQ Binders for components within the scope of 10 CFR 50.49. The inspectors verified these EQ Binders were updated to include an extended operating period of 60 years. The inspectors also verified where a qualified life of 60 years could not be achieved; measures were in place to replace components before or at the end of the qualified life.
 
Based on the examples reviewed and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 49.
 
50.
 
Commitment Item 50 specified two specific TLAAs would be updated prior to the period of extended operation.


13 Enclosure Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 27. 28. Commitment Item 28 specified the existing 10 CFR Part 50; Appendix J Aging Management Program was credited for license renewal. The program provides for aging management of pressure boundary degradation due to loss of material in the primary containment and various systems penetrating primary containment. The program also manages changes in material properties of gaskets, "O" rings, and packing materials for the primary containment pressure boundary access points. Commitment Item 28, Appendix J of 10 CFR Part 50, The program includes an exception to NUREG 1801 for two-ply design bellows that cannot be tested to satisfy the requirements of Appendix J. Testing is in accordance with NRC approved alternate test until the bellows are replaced. The inspectors reviewed the licensing basis, program basis documents, implementing procedures, and interviewed the responsible plant personnel regarding these documents. The inspectors verified the requirements for testing two-ply bellows have been incorporated into station programs and procedures. Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 28. 29. Commitment Item 29 specified the existing masonry wall program was credited for license renewal. Commitment Item 29, Masonry Wall Program The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders, related corrective action documents and interviewed personnel responsible for the program regarding these documents. The inspectors performed walkdowns of masonry walls that perform a high energy line break barrier function. Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 29. 30. Commitment Item 30 specified the existing structures monitoring program was credited for license renewal and would be enhanced prior to the period of extended operation. The structures monitoring program was an existing program that provided for aging management of various structures and external surfaces of mechanical components within the scope of license renewal. Commitment Item 30, Structures Monitoring Program The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders, related corrective action documents and interviewed personnel responsible for the program regarding these documents. The inspectors also walked down several jet impingement shield supports. Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 30.
Commitment Item 50, Other Plant-Specific TLAAs The first specified the licensee conduct a UT inspection of the Dresden Unit 3 (the lead unit) drywell steel plate remaining thickness at the sand pocket level and use the results to revise the associated corrosion calculation and validate an acceptable wall thickness will remain to the end of the 60-year licensed operating period for Dresden and Quad Cities Plants.


14 Enclosure 31. Commitment Item 31 specified the existing RG 1.127, "Inspection of Water-Control Structures Associated with Nuclear Power Plants," program was credited for license renewal and would be enhanced prior to the period of extended operation. This program was part of the Structures Monitoring Program and consisted of procedures that provided for condition monitoring of structural steel elements, concrete, and earthen structures within the scope of license renewal.
The second TLAA specified the licensee conduct a UT inspection of the ECCS suction strainer flange remaining thickness and use the results to revise the associated galvanic corrosion calculation and validate an acceptable thickness will remain to the end of the 60-year licensed operating period for Quad Cities Units 1 and 2.


Commitment Item 31, Regulatory Guide (RG) 1.127, Inspection of Water-Control Structures Associated with Nuclear Power Plants The inspectors reviewed the licensing basis, program basis documentation, and revised implementing procedures. The inspectors reviewed completed work orders and associated condition reports, and interviewed responsible water control structure program personnel. Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 31 with the exception of the URI described in section 4OA5.1.b(2). 32. Commitment Item 32 specified enhancements to the Protective Coating Monitoring and Maintenance Program to be implemented prior to the period of extended operation. The Protective Coating Monitoring and Maintenance Program was an existing program that provided for aging management of Service Level I coatings inside primary containment. Service Level I coatings were used in areas where the coating failure could adversely affect the operation of post-accident fluid systems and thereby impair safe shutdown. The program provided for visual inspections to identify any condition that adversely affects the ability of the coating film to function as intended. Commitment Item 32, Protective Coating Monitoring and Maintenance Program The inspectors reviewed the program basis documentation, revised implementing procedures, completed inspections, and interviewed responsible plant personnel regarding these documents.
The inspectors reviewed the licensing basis documents, UT inspection results of the Quad Cities Units 1 and 2 ECCS suction strainer flanges and interviewed the plant personnel responsible for the program.


Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 32. 33. Commitment Item 33 specified licensee would develop a program that was consistent with NUREG-1801 AMP XI.E1 for electrical cables and connections installed in adverse localized environments not subject to 10 CFR 50.49 environmental qualification requirements. Commitment Item 33, Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements The licensee developed a program to visually inspect all accessible electrical cables and connections installed in adverse localized environments for signs of accelerated age-related degradation. Additional inspections, repairs, or replacements are to be initiated as appropriate. The inspectors interviewed the program owner, reviewed licensing basis, the program basis documentation, implementing procedures, work orders and records of walk downs for determining adverse localized environments and visual 15 Enclosure inspections for cables. The inspectors also reviewed corrective actions, which addressed and identified cable issues and their associated corrective actions. Also, the inspectors reviewed the corrective action taken in reference to the finding from Dresden Inspection Report 05000237/2009007. Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 33. 34. Commitment Item 34 specified for the Metal Fatigue of Reactor Coolant Pressure Boundary the existing program was credited with enhancements. The licensee will enhance the program by utilizing the EPRI-licensed FatiguePro computer software for counting fatigue stress cycles and track fatigue usage factors for selected components. The enhanced program calculates and tracks cumulative usage factors for bounding locations in the reactor coolant pressure boundary (reactor pressure vessel and Class I piping), containment torus, torus vents, torus attached piping and penetrations. Commitment Item 34, Metal Fatigue of Reactor Coolant Pressure Boundary The inspectors reviewed the licensing basis, Metal Fatigue and Reactor Coolant Pressure Boundary Program basis documentation, FatiguePro implementing procedures, fatigue and transient monitoring program report, related corrective action documents, and interviewed the program owner regarding these documents. The inspectors reviewed changes to the program to ensure the program remained effective for both units.
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 50.


Based on review of the licensee's actions, the inspectors determined the licensee met Commitment Item 34. 35. Commitment Item 35 specified the licensee was to maintain the existing environmental qualification program of the electrical components for the period of extended operation. Commitment Item 35, Environmental Qualification (EQ) of Electrical Components Program activities establish, demonstrate and document the level of qualification, qualified configuration, maintenance, surveillance and replacement requirements necessary to meet 10 CFR 50.49. The inspectors interviewed the program owner, reviewed the licensing basis, program basis documents, and various existing EQ Binders. Based on the review of the licensee's action, the inspectors determined the licensee met Commitment Item 35. 36. Commitment Item 36 specified the existing Boraflex monitoring program was credited for license renewal. The Boraflex monitoring program is based on manufacturer's recommendations relies on periodic inspection, testing, monitoring and analysis of the criticality design to assure the required 5percent subcriticality margin is maintained.Commitment Item 36, Boraflex Monitoring 16 Enclosure The inspectors interviewed the program owner, reviewed the licensing basis, program basis documents, implementing procedures, planned and completed work orders and related corrective actions. Based on review of the licensee's actions, the inspectors determined the licensee met Commitment Item 36. 37. Commitment Item 37 specified the licensee was to develop a program to manage aging of cables in sensitive instrumentation circuits with low level signals in the Nuclear Instrumentation Systems and Radiation Monitoring Systems. Commitment Item 37, Electrical Cables Not Subject to 10 CFR 50.49 Environmental Requirements Used in Instrument Circuits The program is applied to the cables of the Nuclear Instrumentation Systems, which included source range monitors (SRMs), intermediate range monitors (IRMs), local power range monitors, and Radiation Monitoring Systems, which included drywell high range radiation monitors, main steam line radiation monitors, and the steam jet air ejector radiation monitors. The program specified a review of calibration and surveillance results, and cable testing for cable aging degradation before the period of extended operation and every 10 years thereafter. The inspectors interviewed the program owner, reviewed the licensing basis, program basis documents, implementing procedures, work orders and related corrective actions. Based on the review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 37. 38. This Commitment Item does not apply to Quad Cities. Commitment Item 38, Inaccessible Medium-Voltage Cables Not Subject to 10 CFR 50.49 Environmental Requirements 39. Commitment Item 39 specified the existing corrective action program was credited for license renewal. Commitment Item 39, Corrective Action Program The inspectors interviewed the program owner, reviewed the licensing basis, implementing procedures, corrective action program results, and interviewed the responsible plant personnel regarding this program. The inspectors also reviewed training given to engineers to increase awareness of aging concerns and license renewal. The inspectors verified the licensee was entering issues related to license renewal in the corrective action program. The inspector also reviewed a corrective action, AR 01352551, which is tracking actions to revise various procedures to reflect aging management focus. This AR also tracks actions to establish aging-related degradation Passport coding and determine orientation/training needs. Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 39.
51.


17 Enclosure 40. Commitment Item 40 specified the licensee was to develop and implement a program to periodically inspect non-segregated bus ducts that connect the reserve auxiliary transformers (RATs) to 4160 V essential service system (ESS), the non-segregated bus ducts that connect the Emergency Diesel Generators (EDGs) to the ESS buses, and the non-segregated bus ducts that connect ESS buses. Commitment Item 40, Periodic Inspection of Non-EQ, Non-Segregated Electrical Bus Ducts The inspectors interviewed the program owner, reviewed the licensing basis, program basis documents, implementing procedures, planned and completed work orders and related corrective actions. Based on the review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 40. 41. Commitment Item 41 specified the existing periodic inspection of ventilation system elastomers was credited for license renewal and that the program would be enhanced prior to the period of extended operation. Commitment Item 41, Periodic Inspection of Ventilation System Elastomers The inspectors reviewed the licensing basis, program basis documentation, implementing procedures, completed work orders, related corrective action documents and interviewed personnel responsible for the program regarding these documents.
Commitment Item 51 specified the licensee perform an evaluation of operating experience at EPU levels to ensure operating experience at EPU levels is properly addressed by the Aging Management Programs, and submit this evaluation to the NRC for review prior to entering the period of extended operation.


Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 41. 42. Commitment Item 42 specified the existing periodic testing of drywell and torus spray nozzles was credited for license renewal. Commitment Item 42, Periodic Testing of Drywell and Torus Spray Nozzles The inspectors reviewed the program basis documentation, Drywell and Torus Spray Nozzle test procedures, completed work orders and condition reports to verify the program has been implemented. Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 42. 43. Commitment Item 43 specified the existing lubricating oil monitoring program would be enhanced to include components exposed to an environment of lubricating oil in the following systems: reactor core isolation cooling system, main generator hydrogen seal oil system, high pressure coolant injection system, emergency diesel generator and auxiliaries system, station blackout system, and electro-hydraulic control system prior to the period of extended operation. Commitment Item 43, Lubricating Oil Monitoring Activities The inspectors reviewed licensing basis, program basis documents, implementing procedures, scheduled and completed work orders, result trends, completed oil 18 Enclosure analysis laboratory results, and applicable corrective action program documents. Additionally, the program owner was interviewed regarding these documents. The inspectors verified the licensee has enhanced the program to include the systems and subsystems listed in the Commitment Item in necessary documents to ensure aging is managed through the period of extended operation.
Commitment Item 51, BWR Operating Experience - EPU levels The licensee performed this evaluation and submitted it for NRC review on October 18, 2012 and therefore, met this commitment.


Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 43. 44. Commitment Item 44 specified the licensee would develop and implement an Aging Management Program for heat exchangers in the scope of License Renewal that are not tested or inspected by the open-cycle and closed-cycle cooling water system aging management programs, to be completed prior to the period of extended operation. Commitment Item 44, Heat Exchanger Test and Inspection Activities The inspectors reviewed the licensing basis, program basis documents, commitment changes, planned and completed work orders, Issue Reports, inspection procedures and interviewed the plant personnel responsible for the program to verify the program was being implemented. For example, the inspectors reviewed commitment change 11-02 which was a clarification in response to an NRC observation in Section 4OA5.1.a (2) of NRC inspection report 05000265/2012008 and verified the proper implementation of the change. General program requirements for this commitment were inspected and determined to be complete for Quad Cities Units 1 and 2. Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 44. 45. Commitment Item 45 specified the licensee would use the existing Generator Stator Water Chemistry program to manage aging effects by monitoring and controlling stator water chemistry per established procedures. Commitment Item 45, Generator Stator Water Chemistry Activities The inspectors reviewed Units 1 and 2 chemistry reports to verify parameters were monitored. General program requirements for this commitment were inspected and determined to be complete for Quad Cities Units 1 and 2. Based on the review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 45. 46. Commitment Item 46 specified the licensee would develop and implement an Aging Management Program to inspect components in the plant heating system once before the end of the current operating term and periodically at intervals not to exceed once every 5 years during the period of extended operation. Commitment Item 46, Periodic Inspection of Plant Heating System The inspectors reviewed the licensing basis, program basis documents, planned and completed work orders, Issue Reports, inspection procedures and interviewed 19 Enclosure the plant personnel responsible for the program to verify the program was being implemented on Units 1 and 2. Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 46 with the exception of the URI documented in Section 4OA5.1.b(1). 47. Commitment Item 47 specified revised Pressure Temperature (P/T) limits will be prepared and submitted to the NRC for approval prior to the period of extended operation using an approved fluence methodology. On October 17, 2005 License Amendment No. 228 and No. 223 approved the revised P/T limits. The amendments revised Technical Specification (TS) Section 3.4.9, "Reactor Coolant System Pressure, and Temperature (P/T) Limits," by incorporating revisions to the P/T limit curves for 54 effective full power years (extending to the end of the renewed license). The amendment also resolved a non-conservative condition for TS 2.4.9, Figure 3.4.9-2, "Non-Nuclear Heatup/Cooldown Curve."  The inspectors verified the program requirements have been incorporated into station programs. Commitment Item 47, Time-limited Aging Analysis (TLAA) - Neutron Embrittlement of the Reactor Vessel and Internals Based on the licensee's actions, the inspectors determined the licensee met Commitment Item 47. 48. Commitment Item 48 specified commitments of the TLAA related to metal fatigue. Quad Cities is taking credit for an existing program for monitoring the metal fatigue of reactor coolant pressure boundary. As discussed in Commitment Item 34, the licensee enhanced their current AMP with the EPRI-licensed FatiguePro computer software. In addition, prior to the period of extended operation, plant-specific calculations were performed for applicable locations identified in NUREG/CR-6260, "Application of NUREG/CR-5999 Interim Fatigue Curves to Selected Nuclear Power Plant Components." Commitment Item 48, TLAA - Metal Fatigue The inspectors reviewed the licensing basis, Fatigue and Transients monitoring program implementing procedures, Commitment Item change documents, calculations that assessed effects of reactor coolant on component fatigue life, related corrective action documents, and interviewed the program owner regarding these documents. Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 48. 49. Commitment Item 49 specified a reanalysis will be applied to EQ components now qualified for the current operating term of 40 years. The EQ binders for components within the scope of 10 CFR 50.49 will be updated to include environmental conditions associated with Extended Power Uprate implementation together with an extended operating period of 60 years. Commitment Item 49, TLAA -Environmental Qualification of Electrical Equipment 20 Enclosure The inspectors reviewed several examples of EQ Binders for components within the scope of 10 CFR 50.49. The inspectors verified these EQ Binders were updated to include an extended operating period of 60 years. The inspectors also verified where a qualified life of 60 years could not be achieved; measures were in place to replace components before or at the end of the qualified life. Based on the examples reviewed and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 49. 50. Commitment Item 50 specified two specific TLAAs would be updated prior to the period of extended operation. Commitment Item 50, Other Plant-Specific TLAAs The first specified the licensee conduct a UT inspection of the Dresden Unit 3 (the lead unit) drywell steel plate remaining thickness at the sand pocket level and use the results to revise the associated corrosion calculation and validate an acceptable wall thickness will remain to the end of the 60-year licensed operating period for Dresden and Quad Cities Plants.
52.


The second TLAA specified the licensee conduct a UT inspection of the ECCS suction strainer flange remaining thickness and use the results to revise the associated galvanic corrosion calculation and validate an acceptable thickness will remain to the end of the 60-year licensed operating period for Quad Cities Units 1 and 2. The inspectors reviewed the licensing basis documents, UT inspection results of the Quad Cities Units 1 and 2 ECCS suction strainer flanges and interviewed the plant personnel responsible for the program.
This commitment, discussed in SER Section 3.0.3.18, specified the licensee would manage the aging of components within the scope of the LR program through the performance of periodic UT inspections, visual (VT-3) inspections, and visual inspection of flexible hoses for age related degradation.


Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 50. 51. Commitment Item 51 specified the licensee perform an evaluation of operating experience at EPU levels to ensure operating experience at EPU levels is properly addressed by the Aging Management Programs, and submit this evaluation to the NRC for review prior to entering the period of extended operation. Commitment Item 51, BWR Operating Experience - EPU levels The licensee performed this evaluation and submitted it for NRC review on October 18, 2012 and therefore, met this commitment. 52. This commitment, discussed in SER Section 3.0.3.18, specified the licensee would manage the aging of components within the scope of the LR program through the performance of periodic UT inspections, visual (VT-3) inspections, and visual inspection of flexible hoses for age related degradation.
AMP B.2.9, Periodic Inspection of Components Subject to Moist Air This program is a new program that manages the loss of material aging degradation of stainless steel, carbon steel, cast iron, aluminum, copper, brass, and bronze components. The licensee created this program to ensure aging degradation of components is inspected at a frequency that allows the identification of any degradation that may occur due to the components exposure to a moist air environment. If abnormal conditions are identified as a result of any of the programs UT or visual inspections, the licensee committed to performing engineering evaluations to address the progression of the degradation and identifying appropriate corrective actions in accordance with the site controlled Quality Assurance Program.


AMP B.2.9, Periodic Inspection of Components Subject to Moist Air This program is a new program that manages the loss of material aging degradation of stainless steel, carbon steel, cast iron, aluminum, copper, brass, and bronze 21 Enclosure components. The licensee created this program to ensure aging degradation of components is inspected at a frequency that allows the identification of any degradation that may occur due to the component's exposure to a moist air environment. If abnormal conditions are identified as a result of any of the program's UT or visual inspections, the licensee committed to performing engineering evaluations to address the progression of the degradation and identifying appropriate corrective actions in accordance with the site controlled Quality Assurance Program. The inspectors reviewed the licensing basis, program basis documents, implementing procedures, scheduled, and completed work orders, action requests, engineering changes and evaluations and issue reports. Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 52 with the exception of the URI documented in Section 4OA5.1.b(1). 53. This aging management program commits to the periodic inspection of steam dryers, which are normally exposed to a 288°Celsius high purity water environment and are subject to cracking. This aging management program manages the cracking of the stainless steel plate and weld materials. The periodic inspections will be performed in accordance with NRC staff approved frequency and guidance AMP B.2.10, Periodic Inspection of Steam Dryers The inspectors reviewed the program basis documentation, implementing procedures, completed inspections, related corrective action documents, and interviewed responsible program personnel regarding these documents. Based on the review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met this Commitment Item. b. (1) Findings and Observations Concern with Meeting One Time Visual Inspections IAW ASME Section XI Requirements  
The inspectors reviewed the licensing basis, program basis documents, implementing procedures, scheduled, and completed work orders, action requests, engineering changes and evaluations and issue reports.
 
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 52 with the exception of the URI documented in Section 4OA5.1.b(1).
 
53.
 
This aging management program commits to the periodic inspection of steam dryers, which are normally exposed to a 288°Celsius high purity water environment and are subject to cracking. This aging management program manages the cracking of the stainless steel plate and weld materials. The periodic inspections will be performed in accordance with NRC staff approved frequency and guidance AMP B.2.10, Periodic Inspection of Steam Dryers The inspectors reviewed the program basis documentation, implementing procedures, completed inspections, related corrective action documents, and interviewed responsible program personnel regarding these documents.
 
Based on the review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met this Commitment Item.
 
b.
: (1) Findings and Observations Concern with Meeting One Time Visual Inspections IAW ASME Section XI Requirements  


=====Introduction:=====
=====Introduction:=====
As part of the review of various licensee Commitment Items, the inspectors identified an unresolved item (URI) related to potential non-conformance with the commitments as described in Appendix A of the UFSAR. Specifically, the licensee did not follow the requirements of the ASME Section XI when performing various visual examinations. Description B.1.23 One Time Inspection - Ventilation Systems, Compressed Gas Systems, SBLC Chemistry Program;: During the Phase I inspection of Commitment Items (IR 05000265/2012008; ML12129A226), the inspectors identified the licensee was not performing visual examinations in accordance with the ASME code. The inspectors identified this through direct observation, review of the work orders used to perform these examinations and interviews with the appropriate plant personnel. The commitment to perform visual examinations in accordance with the ASME Section XI code applies to the following programs:
As part of the review of various licensee Commitment Items, the inspectors identified an unresolved item (URI) related to potential non-conformance with the commitments as described in Appendix A of the UFSAR. Specifically, the licensee did not follow the requirements of the ASME Section XI when performing various visual examinations.
B.1.24 Selective Leaching; B.2.8 Periodic Inspection of Plant Heating Steam; and B.2.9 Periodic Inspection of Components Subject to Moist Air Environments. The Commitment Item specifically states, "The inspection will be performed in accordance with ASME Code requirements. Certified NDE examiners will conduct a VT-3 visual inspection (VT-1 for the Selective Leaching program, these inspections will consist of visual inspection consistent with ASME Section XI VT-1 visual inspection requirements.)." For visual examinations performed in accordance with the code, ASME section XI IWA 2210 requires visual examination be performed in accordance with ASME Section V Article 9. This section requires a procedure be used when performing visual examinations that include instructions on how the visual inspection is to be performed as well as illumination and instruments to be used. ASME Section XI has specific requirements associated with the different levels of visual examinations (VT-1 or VT-3) including distance, illumination, and character card resolution requirements. Contrary to this the licensee did not perform the VT-1 or VT-3 examinations in accordance with written procedures which documented the requirements for lighting, distance and other key parameters as well as acceptance criteria. Failure to do so did not ensure an ASME qualified process is used and clear requirements are provided and met. The licensee submitted a Commitment Item change to clarify their position, indicating the intent was to have a qualified person performing the inspection, not to perform the examination in accordance with the requirements of the code. The licensee also indicated ASME requirements were verbally communicated to the examiners during their pre-job brief therefore, ensuring compliance with the code. In a letter dated May 18, 2012 (ML# 12173A423) the licensee requested a Commitment Item change. NRR staff subsequently issued a Request for Additional Information (ML 12291A831) and is awaiting the licensee's response in order to make a decision regarding these Commitment Items.
 
Description
* B.1.23 One Time Inspection - Ventilation Systems, Compressed Gas Systems, SBLC Chemistry Program;
: During the Phase I inspection of Commitment Items (IR 05000265/2012008; ML12129A226), the inspectors identified the licensee was not performing visual examinations in accordance with the ASME code. The inspectors identified this through direct observation, review of the work orders used to perform these examinations and interviews with the appropriate plant personnel. The commitment to perform visual examinations in accordance with the ASME Section XI code applies to the following programs:
* B.1.24 Selective Leaching;
* B.2.8 Periodic Inspection of Plant Heating Steam; and
* B.2.9 Periodic Inspection of Components Subject to Moist Air Environments.
 
The Commitment Item specifically states, The inspection will be performed in accordance with ASME Code requirements. Certified NDE examiners will conduct a VT-3 visual inspection (VT-1 for the Selective Leaching program, these inspections will consist of visual inspection consistent with ASME Section XI VT-1 visual inspection requirements.).
For visual examinations performed in accordance with the code, ASME section XI IWA 2210 requires visual examination be performed in accordance with ASME Section V Article 9. This section requires a procedure be used when performing visual examinations that include instructions on how the visual inspection is to be performed as well as illumination and instruments to be used. ASME Section XI has specific requirements associated with the different levels of visual examinations (VT-1 or VT-3)including distance, illumination, and character card resolution requirements. Contrary to this the licensee did not perform the VT-1 or VT-3 examinations in accordance with written procedures which documented the requirements for lighting, distance and other key parameters as well as acceptance criteria. Failure to do so did not ensure an ASME qualified process is used and clear requirements are provided and met.
 
The licensee submitted a Commitment Item change to clarify their position, indicating the intent was to have a qualified person performing the inspection, not to perform the examination in accordance with the requirements of the code. The licensee also indicated ASME requirements were verbally communicated to the examiners during their pre-job brief therefore, ensuring compliance with the code. In a letter dated May 18, 2012 (ML# 12173A423) the licensee requested a Commitment Item change. NRR staff subsequently issued a Request for Additional Information (ML12291A831) and is awaiting the licensees response in order to make a decision regarding these Commitment Items.
 
Therefore, this issue is considered unresolved pending resolution of the above issue.


Therefore, this issue is considered unresolved pending resolution of the above issue.  (URI 05000254/2012010-01; 05000265/2012010-01: Concern with Meeting One Time Visual Inspections IAW ASME Section XI Requirements) (2) Questions Regarding Aging Management Inspections on the 16 foot diameter Discharge Piping
(URI 05000254/2012010-01; 05000265/2012010-01: Concern with Meeting One Time Visual Inspections IAW ASME Section XI Requirements)
: (2) Questions Regarding Aging Management Inspections on the 16 foot diameter Discharge Piping  


=====Introduction:=====
=====Introduction:=====
As part of the review of licensee Commitment Item 31, the inspectors identified an unresolved item (URI) related to a 16 foot diameter discharge piping. Specifically, the licensee does not physically inspect the piping for aging effects so that the intended functions of this component will be maintained during the period of extended operation.
As part of the review of licensee Commitment Item 31, the inspectors identified an unresolved item (URI) related to a 16 foot diameter discharge piping.
 
Specifically, the licensee does not physically inspect the piping for aging effects so that the intended functions of this component will be maintained during the period of extended operation.


=====Description:=====
=====Description:=====
As part of the review of Commitment Item 31 associated with the Water Control Structures inspection program, the inspectors reviewed the components that are within the scope of this program and how effects of aging are managed. NUREG 1796; "Safety Evaluation Report Related to the License Renewal of the Dresden Nuclear Power Station, Units 2 and 3 and Quad Cities Nuclear Power Station, Units 1 and 2"; dated 2004, Section 3.5.2.3.4 "RG 1.127, Inspection of Water-Control Structures 23 Enclosure Associated with Nuclear Power Plants" described the scope of the program and how the effects of aging are managed. Page 3-426 of NUREG 1796 identified the 16 foot diameter discharge piping as an in-scope component. The 16 foot diameter discharge piping provides an Ultimate Heat Sink (UHS) function in that during a Lock and Dam No. 14 failure the discharge piping provides suction source for portable pumps to provide cooling water flow to the Residual Heat Removal Service Water (RHRSW) pumps and Diesel Generator Cooling Water (DGCW) Pumps. The licensee, however, does not physically inspect the discharge piping. The licensee provided aging management of the discharge piping by crediting the performance of a one-time inspection of a 96 inch diameter ice melt line. The ice melt line prevents freezing of the river water entering the plant intake and also performs a support function for the UHS. During this inspection, the licensee was unable to locate where the Office of Nuclear Reactor Regulation (NRR) had reviewed and approved this method of aging management of the discharge piping. In response to this concern, the licensee initiated Condition Report 01434957, "(LR) Scoping Review Required for UHS Discharge Piping," dated November 2, 2012. Therefore, this issue is considered unresolved pending additional review of the information provided by the licensee and consultation with NRR to determine the appropriate aging management of the 16 foot diameter discharge piping. (URI 05000254/2012010-02; 05000265/2012010-02: Questions Regarding Aging Management Inspections on the 16 foot diameter Discharge Piping). c. The inspectors did not identify any other substantive instances of incomplete license renewal commitments with respect to timeliness or adequacy. The inspectors concluded pending resolution of the above mentioned URIs, commitments, license conditions, and regulatory requirements associated with the issuance of the renewed operating license were being met at the Quad Cities Nuclear Power Plant Units 1 and 2. Overall Conclusions
As part of the review of Commitment Item 31 associated with the Water Control Structures inspection program, the inspectors reviewed the components that are within the scope of this program and how effects of aging are managed. NUREG 1796; Safety Evaluation Report Related to the License Renewal of the Dresden Nuclear Power Station, Units 2 and 3 and Quad Cities Nuclear Power Station, Units 1 and 2; dated 2004, Section 3.5.2.3.4 RG 1.127, Inspection of Water-Control Structures Associated with Nuclear Power Plants described the scope of the program and how the effects of aging are managed. Page 3-426 of NUREG 1796 identified the 16 foot diameter discharge piping as an in-scope component. The 16 foot diameter discharge piping provides an Ultimate Heat Sink (UHS) function in that during a Lock and Dam No.
{{a|4OA6}}
 
==4OA6 ==
14 failure the discharge piping provides suction source for portable pumps to provide cooling water flow to the Residual Heat Removal Service Water (RHRSW) pumps and Diesel Generator Cooling Water (DGCW) Pumps. The licensee, however, does not physically inspect the discharge piping. The licensee provided aging management of the discharge piping by crediting the performance of a one-time inspection of a 96 inch diameter ice melt line. The ice melt line prevents freezing of the river water entering the plant intake and also performs a support function for the UHS. During this inspection, the licensee was unable to locate where the Office of Nuclear Reactor Regulation (NRR)had reviewed and approved this method of aging management of the discharge piping.
===.1 Management Meetings On November 9, 2012, the inspectors presented the inspection results to Mr. T. Hanley, and other members of the licensee staff.===
 
The licensee acknowledged the issues presented. The inspectors confirmed none of the potential report input discussed was considered proprietary. Exit Meeting Summary ATTACHMENT:
In response to this concern, the licensee initiated Condition Report 01434957, (LR)
Scoping Review Required for UHS Discharge Piping, dated November 2, 2012.
 
Therefore, this issue is considered unresolved pending additional review of the information provided by the licensee and consultation with NRR to determine the appropriate aging management of the 16 foot diameter discharge piping. (URI 05000254/2012010-02; 05000265/2012010-02: Questions Regarding Aging Management Inspections on the 16 foot diameter Discharge Piping).
 
c.
 
The inspectors did not identify any other substantive instances of incomplete license renewal commitments with respect to timeliness or adequacy. The inspectors concluded pending resolution of the above mentioned URIs, commitments, license conditions, and regulatory requirements associated with the issuance of the renewed operating license were being met at the Quad Cities Nuclear Power Plant Units 1 and 2.
 
Overall Conclusions 4OA6
 
===.1 Management Meetings===
On November 9, 2012, the inspectors presented the inspection results to Mr. T. Hanley, and other members of the licensee staff. The licensee acknowledged the issues presented. The inspectors confirmed none of the potential report input discussed was considered proprietary.
 
===Exit Meeting Summary===
ATTACHMENT:  


=SUPPLEMENTAL INFORMATION=
=SUPPLEMENTAL INFORMATION=


==KEY POINTS OF CONTACT==
==KEY POINTS OF CONTACT==
: [[contact::T. Hanley]], Site Vice President Licensee  
: [[contact::T. Hanley]], Site Vice President
Licensee  
: [[contact::K. Ohr]], Site Engineering Director  
: [[contact::K. Ohr]], Site Engineering Director  
: [[contact::W. Beck]], Regulatory Assurance Manager  
: [[contact::W. Beck]], Regulatory Assurance Manager  
: [[contact::K. O'Shea]], Operations Director  
: [[contact::K. OShea]], Operations Director  
: [[contact::T. Rushing]], Sr. System Manager/Engineering  
: [[contact::T. Rushing]], Sr. System Manager/Engineering  
: [[contact::P. Yost]], Program Engineering  
: [[contact::P. Yost]], Program Engineering  
Line 134: Line 640:
: [[contact::M. Wagner]], Regulatory Assurance  
: [[contact::M. Wagner]], Regulatory Assurance  
: [[contact::T. Petersen]], Regulatory Assurance  
: [[contact::T. Petersen]], Regulatory Assurance  
==LIST OF ITEMS==
==LIST OF ITEMS==
OPENED, CLOSED AND DISCUSSED  
===OPENED, CLOSED AND DISCUSSED===
: 05000254/2012010-01  
: 05000254/2012010-01  
===Opened===
===Opened===
: 05000265/2012010-01 URI Concerns with Meeting One Time Visual Inspections IAW ASME Section XI Requirements (4OA5.1.b(1))
: 05000265/2012010-01 URI Concerns with Meeting One Time Visual Inspections IAW ASME Section XI Requirements (4OA5.1.b(1))  
: 05000254/2012010-02  
: 05000254/2012010-02  
: 05000265/2012010-02 URI Questions Regarding Aging Management Inspections on the 16' Diameter Discharge Pipes (4OA5.1.b(2)) None Closed and  
: 05000265/2012010-02 URI Questions Regarding Aging Management Inspections on the 16 Diameter Discharge Pipes (4OA5.1.b(2))
None Closed and  
 
===Discussed===
===Discussed===
==LIST OF DOCUMENTS REVIEWED==


Attachment
==LIST OF DOCUMENTS REVIEWED==
The following is a partial list of documents reviewed during the inspection.
: Inclusion on this list does not imply that the NRC inspector reviewed the documents in their entirety, but rather that selected sections or portions of the documents were evaluated as part of the overall inspection effort.
: Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the Inspection Report.
: UFSAR-11-R12-026; multiple UFSAR Appendix A AMP changes; October 25, 2005 General
: MOD 50.59 screening
: QC-S-2012-0089 Issued on 10/03/2012 for Multiple Appendix A AMP Changes; Revision 00
: UFSAR-05-R9-012; multiple UFSAR Appendix A AMP EPRI Guidance Changes and Updates; October 28, 2005
: MOD 50.59 Screening
: QC-S-2005-0198 Issued on October 28, 2005, for Multiple Appendix A AMP EPRI Guidance Changes by Updating; Revision 0
: AR 01430273;
: LR-Stator Water Condensation Water Dripping on Floor; October 23, 2012 Corrective Action Program Documents Generated as a Result of the Inspection
: AR 01430839;
: LR-ISI Pressure Test PM Model WOs were not Updated; October 24, 2012
: AR 01430918;
: LR-NRC Identified Visual Inspection was not Documented; October 24, 2012
: AR 01431473;
: LR-NRC Identified Wear on Piping from Diamond Plating; October 25, 2012
: AR 01431795; Quad Cities License Renewal Concern; Checworks Software; October 26, 2012
: AR 01432003; LR- NRC Identified; Clarify Vent. Elastomer Requirements-OPEX; October 26, 2012
: AR 01433189; LR Drawing B-1068 Update Required; October 30, 2012
: AR 01433898; LR Clarify CCST Inspection Question Response; October 31, 2012
: AR 01434957; LR Scoping Review Required for UHS Discharge Piping; November 2, 2012
: AR 01436493; Typo in Quad Cities IVVI Basis Document in Appendix H; November 6, 2012
: AR 01436538;
: LR-UT Report of 1/2 EDG Non-Seg Bus Duct not in
: WO 880854-01; November 6, 2012
: AR 01436872; Clarify Regulatory Commitment Regarding CASS; November 7, 2012
: AR 01437012;
: ER-AB-331 Attachment 1 Needs Enhancements; November 7, 2012
: WO 01143493; EP Reactor Head Flange Leak Detection System
: VT-2 Inspection; March 24, 2010 Commitment Item 1
: WO 00880897; DGCW 2nd Period Pressure Test; April 13, 2009
: WO 01379576; DGCW 3rd Period Pressure Test; March 9, 2012
: WO 00885380-01; RHRSW Suction 1st Period Static VT2 Test; January 27, 2006
: WO 00617085-01; 1B RHRSW 1st Period VT2 Pressure Test; December 2, 2005
: WO 00617087-01; 1A RHRSW 1st Period VT2 Pressure Test; November 15, 2005
: WO 01072305-01; RHRSW Suction 2nd Period Static VT2 Test; February 6, 2009
: WO 00860809-01; ECCS Ring/HPCI Level 1st Period VT2 Pressure Test; January 20, 2006 MOD50.59 Screening
: QC-S-2005-0198 Issued on 10/28/2005 for Multiple Appendix A AMP EPRI Guidance Changes By Updating; Revision 0 Commitment Item 2
: CY-QC-110-608, Reactor/Turbine Building Sample Panel Sample Collection, Revision 21
: CY-AA-160-100 Attach 1; U1 and U2 Torus Chem. Data for 11/18/2010
: CY-AA-160-100 Attach 1; U1 and U2 Rx Water and RWCU Data (Mode 1) for 02/01/2009
: CY-AA-160-100 Attach 1; U1 and U2 Rx Water and RWCU Data (Mode 1) for 02/11/2009
: CY-AA-160-100 Attach 1; U1 and U2 Rx Water and RWCU Data (Mode 1) for 04/16/2011
: CY-AA-160-100 Attach 1; U1 and U2 Rx Water and RWCU Data (Mode 1) for 04/29/2011
: CY-AA-160-100 Attach 1; U1 and U2 Condensate and FW Data (Mode 1) for 02/02/2009
: CY-AA-160-100 Attach 1; U1 and U2 Condensate and FW Data (Mode 1) for 02/04/2009
: Attachment
: CY-AA-160-100 Attach 1; U1 and U2 Condensate and FW Data (Mode 1) for 02/05/2009
: CY-AA-160-100 Attach 1; U1 and U2 Condensate and FW Data (Mode 1) for 02/07/2009
: CY-AA-160-100 Attach 1; U1 and U2 Condensate and FW Data (Mode 1) for 02/11/2009
: CY-AA-160-100 Attach 1; U1 and U2 Condensate and FW Data (Mode 1) for 02/02/2009
: CY-AA-160-100 Attach 1; U1 and U2 CRD Cooling Water Data for 08/04/2009
: CY-AA-160-100 Attach 1; U1 and U2 CRD Cooling Water Data for 08/11/2009
: CY-AA-160-100 Attach 1; U1 and U2 Fuel Pool Data for 01/22/2009
: CY-AA-160-100 Attach 1; U1 and U2 Fuel Pool Data for 01/23/2009
: CY-AA-160-100 Attach 1; U1 and U2 Fuel Pool Data for 01/29/2009
: AR 01228627; Chemistry Action Levels Entered S/U from Q1R21; 06/06/2011
: AR 01229935; Chemistry Action Levels Entered S/U from Q1F63; 6/15/2010
: AR 01047774; Chemistry Action Levels Entered S/U from Q2R20; 3/14/2010
: AR 01074663; Chemistry Action Levels Entered S/U from Q2R20; 4/14/2010
: CY-AB-120-110; Condensate and Feedwater Chemistry; Revision 15
: CY-AB-120-100; Reactor Water Chemistry; Revision 12
: CY-AB-120-320; Control Rod Drive Water Chemistry; Revision 5
: CY-QC-110-608; Reactor/Turbine Bldg Sample Panel Collection; Revision 21 ISI program plan QC station Unit 1 and 2 Third Interval; Revision 6 Commitment Item 3
: GE-VT-101; Procedure for
: VT-1 examination; Version 2
: GE-PDI-UT-5; PDI Generic Procedure for Straight Beam Ultrasonic Examination of Bolts and Studs; Revision 2 Q1R19-07; Examination Summary Ssheet; May 15, 2007
: AR 00339417; PSU Reactor Pressure Stud Threads Damaged; May 29, 2005
: AR 01354038;
: LR-Replaced RPV Head Bolt in 2005 Q1M18; April 15, 2012 B.1.4 BWR Vessel ID Attachment Welds; Revision 4 Commitment Item 4
: ER-AB-331; BWR Internals Program Management; Revision 11 QCTS 0740-04; RPV In-Vessel Examination; Revision 9
: ER-AA-330-002; Inservice Inspection of Section XI Welds and Components; Revision 9 Q1R20
: ISI 90-day Report; August 21, 2009 In Vessel Visual Inspection - IVVI Examination Checklist Quad Cities Unit 2 Spring 2010; March 4, 2010
: ER-AA-330-002; Inservice Inspection of Section XI Welds and Components; Revision 9 Commitment Items 5 and 6
: ER-AA-330-009; ASME Section XI Repair/Replacement Program; Revision 6 Q1R21-091; Examination Summary Sheet; May 19, 2011 Q1R21-090; Examination Summary Sheet; May 21, 2011 Q1R21-121; Examination Summary Sheet; March 17, 2008
: QC-481565-RP03; ISI Program plan 5th interval; Revision 0
: AR 01129456; 2010 ISI FASA DEF No. 2-ISI plan; October 22, 2010
: ER-AA-330-002; Inservice Inspection of section XI Welds and Components; Revision 9
: GE-NE-523-A71-0594-A; Alternate BWR Feedwater Nozzle Inspection Requirements; Revision 1 Q1R19-100; Examination Summary Sheet; May 16, 2007 Q1R19-105; Examination Summary Sheet; May 16, 2007 Q2R17-90; UT Examination Summary Sheet; March 19, 2004 Quad Cities Nuclear Power Station-Unit 1 Post Outage (90 day) Summary Report; May 24, 2009 Commitment Item 7
: ER-AA-330; Conduct of Inservice Inspection Activities; Revision 8
: Attachment
: ER-AA-330-009; ASME Section XI Repair/Replacement Program; Revision 6
: AR 1232114; LR IGSCC Document Needing Revision to Support License Renewal; June 23, 2011 Q2R16-101; UT Examination Summary Sheet; February 26, 2002
: AR 1436872; Clarify Regulatory Commitment Regarding CASS; November 7, 2012
: WC-AA-120; Preventive Maintenance Program Requirements; Revision 0 2QR19-092; UT Examination Summary Sheet; March 17, 2008
: ER-AB-331; BWR Internals Program Management; Revision 11 Commitment Item 8 QCTS 0740-04; RPV In-Vessel Examination; Revision 9 Reactor Internals and In-vessel Visual inspection (IVVI) Basis Document; Quad Cities Nuclear Power Station; Revision 6 IVVI Basis Document Quad Cities Nuclear Power Station; Appendix E Standby Liquid Control/Core Plate DP
: BWRVIP-27-A; Revision 6 IVVI Basis Document Quad Cities Nuclear Power Station; Appendix J Instrument Penetrations
: BWRVIP-49-A; Revision 6 Q1R20-060; UT Examination Data Sheet; May 11, 2009 Q1R20-061; PT Examination Summary Sheet; May 6, 2009 2QR19-127; UT Examination Summary Sheet; March 17, 2008 Relief Request
: CR-01; Inspection of Standby Liquid Control Nozzle Inner Radius; Revision 1
: ER-AB-331; BWR Internals Program Management; Revision 11 Commitment Item 9 QCTS 0740-04; RPV In-Vessel Examination; Revision 9 IVVI Basis Document Quad Cities Nuclear Power Station; Appendix B Core Spray
: BWRVIP-18; Revision 1 IVVI Basis Document Quad Cities Nuclear Power Station; Appendix C Core Plate
: BWRVIP-25; Revision 6 IVVI Basis Document Quad Cities Nuclear Power Station; Appendix F Shroud Support
: BWRVIP-38; Revision 6 IVVI 09-04; IVVI Examination Data Sheet Lower Plenum; May 11, 2009 IVVI 09-08; IVVI Examination Data Sheet Top Guide; May 11, 2009 IVVI Examination Data Sheet Core Spray Piping; March 29, 2010 IVVI Examination Data Sheet Core Spray Sparger; March 29, 2010 IVVI Examination Data Sheet Jet Pump; March 29, 2010 IVVI Examination Data Sheet Top Guide; March 29, 2010
: GEH-RPT-7480-168971-EE2-Shroud UT; Core Shroud Ultrasonic Examination; April 3, 2010
: AR 917088; PSU Auxiliary Wedges Needed on Jet Pump #5; May 7, 2009
: AR 917812; Q1R20 IVVI Core Spray Piping Indications; May 9, 2009
: AR 917813; Q1R20 IVVI Jet Pump 19 Main Wedge; May 8, 2009
: AR 1045378; Q2R20 IVVI Wedge Guide Wear on Jet Pump 5; March 18, 2010
: AR1436493; typo in Quad Cities IVVI Basis Document in Appendix H; November 6, 2012
: AR 1437012;
: ER-AB-331 Attachment 1 Needs Enhancements; November 7, 2012 BWRVIP 2004-426; Consideration of NDE Uncertainty in Flaw Evaluations; May 25, 2004
: GEH-UT-511; Procedure for the Automated Ultrasonic Examination of Core Spray Piping Welds Contained Within the Reactor Pressure Vessel; Revision 16A
: GEH-VT-203; Procedure for In-vessel Visual Inspection (IVVI) of BWR 3 RPV Internals; Revision 20
: EC 375522; Evaluation of Q1R20 IVVI Inspection Findings; Revision 0
: ER-AB-331-101; Evaluation for Thermal Aging/ Neutron Embrittlement of Reactor Internals Components; Revision2Commitment Item 10 
: Attachment Reactor Internals and In-vessel Visual Inspection (IVVI) Basis Document; Appendix T Cast Austenitic Stainless Steel Components
: BWRVIP-234; Revision 6 IVVI Examination Data Sheet
: IVVI-2012-Fuel Support Casting Q2R21; April 1st, 2012 IVVI Examination Data Sheet
: IVVI-2012-CRGT Q2R21; April 1st, 2012 IVVI Examination Data Sheet
: IVVI-2012-Jet Pump; April 1st, 2012
: AR 0113772; License Renewal Commitment Change Required; November 9, 2010
: NSAC-202L-R3; Recommendations for an Effective Flow-Accelerated Corrosion Program; Revision 3 Commitment Item 11
: AR 131914; FAC Examination Found Steam Seal Headers Degraded; November 15, 2002
: AR 317476; PSU Q1R18 FAC; Excessive Wall Thinning Line 1-1SSH8-5; March 26, 2005 Quad Cities Generating Station Unit 1 and Unit 2 Flow Accelerated Corrosion Susceptible Non-Modeled Program; Revision 3
: IT-AA-101-1001-F-01; CHECWORKS DTSQA Classification Checklist; April 25, 2011
: IT-AA-101; Digital Technology Software Quality Assurance Procedure; Revision 7
: UFSAR-07-R10-053; Revision of UFSAR Appendix A, Section A.1.11 to Reflect Current Revision of
: NSAC-202L; July 17, 2009
: ER-AA-430; Conduct of Flow Accelerated Corrosion Activities; Revision 5
: ER-AA-430-1001; Guidelines for Flow Accelerated Corrosion Activities; Revision 6 Q2R20 Refueling Outage FAC Activity Summary Report; April 1, 2010 Q2R21 Refueling Outage FAC Activity Summary Report; June 10, 2011
: AR 01252564; 2011 Flow Accelerated Corrosion FASA Deficiency; August 17, 2011
: AR 01252577; 2011 Flow Accelerated Corrosion FASA Deficiency; August 17, 2011
: ER-AA-2030; Conduct of Plant Engineering Manual; Revision 11 Commitment Item 12
: ER-AA-330-002; Inservice Inspection of Section XI Welds and Components; Revision 9
: MA-MW-736-600; Torquing and Tightening of Bolted Connections; Revision 4 QCMMS 6600-03; Emergency Diesel Generator Periodic Preventive Maintenance Inspection; Revision 27
: WO 880542; HPCI System Walkdown; February 14, 2011
: WO 1165003; Diesel Generator Periodic Inspection; November 18, 2009
: AR1357370; LR Procedure Update Required to Document LR Commitment; April 23, 2012
: AR 625752; 1B RHR Pump Seal Cooler Not Cooling Effectively; 05/05/2007 Commitment Item 13
: WO 01190642;
: MM-U-1A RHR Hx Rm Cooler Air/Water side Inspect/Clean; 11/04/2009 QCMPM 5700-01; Emergency AHU maintenance/inspection completed 11/04/2009 QCTP 0820-10; Hx and Room Cooler Inspection Completed 11/04/2009; Revision 5
: WO 877693; MM (LR) Inspect 2A RHRSW Pump Internals (HP PMP) Degraded Belzona/Cermallo; 06/23/2007 PMRQ 25552-09; RHRSW Pump Internals Predefine; 06/23/2007
: WO 013 07130; MM Clean/Inspect HPCI Room Cooler Air/Water Side; 11/09/2010 QCMPM 5700-01; Emergency AHU Maintenance/Inspection Completed 11/09/2010 QCTP 0820-10; Hx and Room Cooler Inspection Completed 11/09/2010; Revision 5
: WO 01066831; U-1A CS Room Cooler Air/Water Side Inspect/Clean; 07/21/2009 QCMPM 5700-01; Emergency AHU Maintenance/Inspection Completed 07/21/2009 QCTP 0820-10; Hx and Room Cooler Inspection Completed 07/21/2009; Revision 5
: WO 01165003; U-1/2 2 yr EDG Inspection Per QCEPM 0400-14; 01/07/2010
: WO 01072595; 2A RHRSW Pressure Test (ISI); 06/19/2009
: WO 01072594; 2B RHRSW Pressure Test (ISI) with Qtrly Flow Test; 04/02/2009
: CY-QC-110-610; SW Silt Dispersant Operation; Revision 3
: Attachment
: CY-QC-110-612; SW and RHRSW /DG Cooling Water Corrosion Inhibitor Operation; Revision 5
: AR 01266139; Revise QCMMS 6620-06 to Not Allow Skipping Of Cleaning Of Lube Oil Coolers; 09/21/2011
: Commitment Item 14
: AR 01250421; Closed Cycle Cooling Water AMP EPRI Guidance Changed in UFSAR; 8/11/2011
: AR 01250797; Insert Coolant Sampling Steps Into QCOS 6620-01 Like QCOS 6600-41, -42 and -43; 08/12/2011
: WO 01488199; LR- Internal Inspections on U1 SBO DG Radiators and LO Coolers Sat; 03/07/2012
: WO 01488200; LR- internal inspections on U2 SBO DG Radiators and LO Coolers Sat; 03/07/2012
: WO 854342; LR - U- 1/2 EDG engine 12 yr Inspection; 01/22/2008
: WO 820688; LR - U- 1 EDG engine 12 yr Inspection; 05/20/2007
: WO 725725; LR - U- 2 EDG engine 12 yr Inspection; 04/07/2006
: WO 01442537; LR 1/2 DG Monthly Load Test (IST)-QCOS 6600-43; 07/05/2011
: WO 01447614; LR
: U1 DG Monthly Load Test (IST) QCOS 6600-41; 06/20/2011
: WO 01443656; LR U2 DG Monthly Load Test (IST) QCOS 6600-42; 06/28/2011
: WO 01165003; U-1/2 EDG Periodic (2-YR) Inspection QCMMS 6600-03; 01/07/2010
: WO 01121776; U-1 EDG Periodic (2-YR) Inspection QCMMS 6600-03; 09/25/2009
: WO 01133111; U-2 EDG Periodic (2-YR) Inspection QCMMS 6600-03; 10/30/2009
: WO 01175345; MM U-2 EDG Alternate Cycle (4-YR) Inspection QCMMS 6600-03; 10/30/2009
: CY-AA-120-400; Closed Cooling Water Chemistry; Revision 12 QCFHP 0500-22; Annual Inspection of the Refueling Platform; Revision 4
: Commitment Item 15 QCMPM 5800-01; Annual Crane Inspection and Preventative Maintenance Inspection; Revision 11
: QCMPM 5800-02; Periodic Inspection and Preventative Maintenance Program for Overhead Cranes, Jib Cranes and Monorail Systems; Revision 45
: WO 01388990-01; Refuel Platform Inspection; dated December 6, 2011
: WO 01432267-01; Refuel Platform Inspection; dated March 1, 2012
: WO 01448072-01; Realign Unit 1 Refuel Bridge to Rails and Measure Drive Wheels; dated February 25, 2012
: WO 01448073-01; Realign Unit 2 Refuel Bridge to Rails and Measure Drive Wheels; dated December 22, 2011
: WO 01234840-01; U1 Refuel Bridge Trolley Rail Replacement; dated July 5, 2012
: WO 01458962-01; Need WO to Replace the Unit 2 Refuel Bridge Trolley Rail; dated January 4, 2012
: WO 01447356-01; Rx Bldg O/H Crane Insp; dated July 10, 2011
: WO 01231176-01; Structural Steel Visual Inspection of RBOC; dated January 10, 2011
: WO 01365317-01; Refuel Floor Jib Crane Insp; dated August 23, 2011
: WO 01512328-01; Unit 1 Tbn Bldg Overhead Crane Insp; dated March 1, 2012
: WO 01521552-01; Unit 2 Tbn Bldg Overhead Crane Insp; dated March 14, 2012
: WO 01466929-01; (LR) 1/2 EDG Room Monorail Inspection; dated March 12, 2012
: WO 01467603-01; Unit 2 LR Inspection Required for 2D RHRSW Vault Monorail; dated February 28, 2012
: WO 01467599-01; LR U1 MM Inspection Required for 1D RHRSW Vault Monorail; dated February 20, 2012
: WO 01467905-01; (LR) U2 Drywell First Level Monorail
: 2-5823-1DW Inspection; dated March 22, 2012
: WO 01467591-01; (LR) U2 HPCI Monorail Hoist Requires Inspection; dated February 1, 2012
: WO 01467606-01; (LR) U1 HPCI Monorail Hoist Requires Inspection; dated February 15, 2012
: AR 01229907; Unit 1 Refuel Bridge and Rail Alignment Check Survey Results; dated June 17, 2011 
: Attachment
: AR 01229910; Unit 2 Refuel Bridge and Rail Alignment Check Survey Results; dated June 17, 2011
: AR 01250648; Refuel Bridge Inspection PMs Not Tied to License Renewal: dated August 12, 2011
: AR 01245155; Need WO to Replace the Unit 2 Refuel Bridge Trolley Rail; dated July 28, 2011 QCTS 4700-02; License Renewal Compressed Air Monitoring Program Walkdowns; Revision 0 Commitment Item 16
: AR 00101562-24-05; PMID
: 169156-01 U2 IA System Walkdown Inspections Outside MSIV Room; 1/31/2005
: WO 01418544; (LR) U1 Instrument Air System (Outside MSIV Room) Walkdown; 6/21/2011
: AR 00101562-24-04; PMID
: 169155-01 U1 IA System Walkdown Inspections Outside MSIV Room; 1/31/2005
: WO 01418543; (LR) U2 Instrument Air System (Outside MSIV Room) Walkdown; 6/24/2011
: AR 00101562-24-06; PMID
: 169157-01 and PMID
: 169159-01 U1 IA System Walkdown Inspections Inside MSIV Room; 1/31/2005
: WO 01255793; (LR) U1 Instrument Air System (Inside MSIV Room) Walkdown; 5/10/2011
: WO 00836443; (LR) U1 Instrument Air System (Inside MSIV Room) Walkdown; 5/07/2007
: EC 21454; U2- Install new RWCU Piping, Valves, Instrumentation / Regn HX - M04-2-91-027B; January 6, 2008 Commitment Item 17
: EC 21224; U1- Install new RWCU Piping, Valves, Instrumentation / Regn HX - M04-2-91-027B; May 9, 1996 Examination Summary Sheet; Component 12S-S9R; March 20, 2010 QCMMS 4100-22; Sprinkler/Water Spray Header and Nozzle and Cardox System Inspection; Revision 18 Commitment Item 18 QCMMS 4100-32; 1/2-4101A Diesel Driven Fire Pump Annual Capacity Test; Revision 26 QCMMS 4100-61; Fire Door Inspection; Revision 17 QCMMS 4100-75; Bi-Annual Penetration Fire Barrier (Seal) Inspection; Revision 2 QCEMS 0850-01; Bi-Annual Penetration Fire Barrier (Seal) Inspection; Revision 5 QCMMS 4100-73; Surveillance of Structural Steel Fire Coating; Revision 0 QCMMS 4100-74; Fire Damper Visual Inspection Surveillance; Revision 3 QCEMS 0850-02; Visual Inspection of Fire Wraps and Interior Conduit Seals; Revision 2
: OP-AA-201-001; Fire Marshal Tours; Revision 5
: WO 880953; Inspect Cardox System; February 24, 2009
: WO 1283994; Fire Door Inspection 18 Month; March 2, 2011
: WO 876695; Penetration Fire Stop Inspection; March 1, 2007
: WO 1091498; Structural Steel Fire Coating Inspection; April 16, 2009 QCAP 1500-01; Administrative Requirements for Fire Protection; Revision 32 Commitment Item 19
: CC-AA-211; Fire Protection Program; Revision 4
: WO 01174715-01; Group A Fire Hose Inspection; dated September 28, 2009
: WO 01348205-01; Ext Hose Cab Flush/Vlv Test; dated November 30, 2010
: WO 01210098-01; Deluge Sys Func Test A Diesel Fire Pump; dated February 28, 2010
: WO 01080140-01; Deluge Sys Func Test Bus Duct Penet; dated May 4, 2009
: WO 01164519-01; Pre-Action System Func Test EHC Units; dated July 20, 2009
: WO 01252891-01; Unit 1 Pre-Action Sprinkler Sys Func Test Unit Track way; dated July 14 2010
: WO 00837233-01; Unit 1 Refuel Air Flow Test Duct Penetration; dated May 17, 2007
: WO 01215007-01; (LR) Fire System Flow Test; dated March 22, 2011
: WO 01143952-01; Unit 2 (LR) Deluge Sys Func Test Aux Trans 21; dated April 12, 2010
: Attachment
: WO 01256532-01; Unit 1 (LR) Deluge Sys Func Test Main Xfmr; dated June 4, 2011
: WO 01256533-01; Unit 1 (LR) Deluge Sys Func Test Aux Trans 12; dated May 15, 2011
: WO 01189093-01; Unit 2 (LR) Deluge Sys Func Test Main Xfmr; dated April 12, 2010
: WO 01144443-01; Unit 2 (LR) Deluge Sys Func Test Aux Trans 22; dated March 21, 2010
: AR 01247654; (LR) QCAP 1500-01 Does Not State Sprinkler Test Requirement; dated August 4, 2011
: AR 01082022; Sprinkler Replacement-License Renewal Commitment; dated June 18, 2010
: AR 01359490; LR QCMPM 4400-12 Deficiencies Found During Binder Review; dated April 27, 2012
: WO 00880530-01; A CCST External Inspection; August 18, 2010 Commitment Item 20
: WO 01070836-04; Inspect Pipe Located Outside Power Block; December 21, 2007
: WO 01076215-04; Inspect Pipe Located Outside Power Block; February 22, 2008
: AR 01102022; Discovered Small Evulsions on the South Point of 'A' CCST; August 16, 2010
: AR 01102065; Discovered a Small Gouge on the SE Point of 'A' CCST; August 16, 2010
: AR 01102071; Discovered a Small Gouge on the SW Point of 'A' CCST; August 16, 2010
: AR 00714795; Corrosion/CRUD Spots Found During a CCST Internal Inspection; December 20, 2007 QCTS 8700-01; Outdoor Nitrogen System and Storage Tank Inspection; Revision 0
: ER-AA-2030; Conduct of Plant Engineering Manual; Revision 12
: EC 368147; CCST Bottom UT Inspection - Contingency Evaluation; December 26, 2007
: C-8051; Contaminated Condensate Storage Tank; May 6, 1960
: EC 381655; CCST Tank Wall Thickness; Revision 0
: AR 01274649; Revise QCMPM 6600-03 Based on LR Review of FO Chemistry; October 10, 2011 Commitment Item 21
: WO 01441038; Diesel Generator Fuel Oil Particulate Sample; June 20, 2011
: WO 01439049; SBO Diesel Generator Fuel Oil Particulate Sample; June 14, 2011
: WO 013995557; Sample 1/2A Fire Pump Diesel Fuel Day Tank; March 29, 2011
: WO 00715907; (LR) SBO Fuel Storage Tank Clean/ Inspect; September 13, 2011
: LS-AA-107-1001; UFSAR Appendix A 50.59 Screening (UFSAR-11-R12-026); Revision 3 Commitment Item 22
: ER-AA-370; Reactor Coolant Pressure Boundary (RCPB) Integrity; Revision 8
: AR 01150317; LR UFSAR Change Needed for RPV Surveillance; December 9, 2010
: WO 744465; One-Time Inspection of 1B Electromatic RV Discharge Vacuum Breaker; December 6, 2006 Commitment Item 23
: WO 576900; EHC B Pump Replacement; August 19, 2005
: WO 588917; One Time Inspection U1 H2 Seal Oil Drain Valve; September 7, 2004
: WO 588916; Inspect H2 Recirc Pump Casing; September 13, 2004
: WO 592851; Inspect 2B MG Set Drain Valve; October 21, 2005
: AR 725422; 1B EHC Pump - Suction Strainer Inspection; January 22, 2008
: AR 1163884; Corrosion on
: 2-3905A Valve 2A and 2B ASD TCV; January 18, 2011
: WO753340; One Time Inspect 1/2 CLN DM Water Pump CH Valve; December 28, 2010
: ER-AA-335-017;
: VT-3 Visual Examination of Pump and Valve Internals; Revision 8
: ER-AA-335-016;
: VT-3 Visual Examination of Component Supports, Attachments, and Interiors of Reactor Vessels; Revision 6
: WO 00588912-01; One-Time Inspect Torus Lubrite Base Plates; May 11, 2011
: WO 00744465-01; One-Time Inspection of 1B Electromatic RV DSCH Vacuum BRKR; May 14, 2007
: Attachment
: WO 00744458-01; One-Time Inspection of 2E Electromatic RV DSCH Vacuum BRKR; April 5, 2006
: WO 00587714-01; One-Time Inspect MCR Vent Air Intake Duct; May 11, 2010
: WO 00744592-01; Perform a One-Time Inspection on the Internals of
: 2-1999-101; July 8, 2008
: WO 00759335-01; SBLC PP Overhaul; September 18, 2007
: WO 00576900-01; EHC B Pump Replacement; January 25, 2008
: WO 00591342-01; One-Time Inspect MG Set FLTR PI Damper; October 25, 2004
: WO 00588917-01; One-Time Inspect U1 H2 Seal Oil DRN VLV; March 29, 2005
: WO 00592919-01; One-Time Inspect U1 EDG Day Tank UT; September 22, 2009
: WO 00744563-01; Perform a One-Time Inspection of the
: 1-1499-11A Drain Valve; July 21, 2009
: WO 00744573-01; Inspect
: 1-3999-272A; October 20, 2008
: AR 01249018; 0-4399-16 Clean Demin Valve Rusted Internally; August 8, 2011
: AR 01299894; LR - One-Time Inspection of 0-4399-16 Check Valve; December 8, 2011
: AR 00725422; 1B EHC Pump - Suction Strainer Inspection; January 22, 2008
: WO 0592895; One-Time inspection of U1 Train A DG Cooling Water Pump Cooler Inlet Valve for Selective Leaching; September 20, 2011 Commitment Item 24
: IR 01265610; Appearance of Selective Leaching on Valve 3999-201; September 20, 2011
: WO 0588922; One-Time Inspection of Stator Water Cooling Heat Exchanger Service Water Drain Valve
: 1-3999-718 for Selective Leaching; February 28, 2006
: WO 0588925, Inspect ECCS Room Cooler Inlet Header Drain Valve for Selective Leaching; April 2, 2010
: WO 0692748; Inspect Demin. Pump 1 / 2- 4303A for Selective Leaching; August 10, 2011
: WO 0880546; Clean and Inspect U2 HPCI Lube Oil Cooler for Selective Leaching; March 17, 2008 QCMPM 6600-03; Diesel Fuel Oil Storage Tank Cleaning; Revision 3 Commitment Item 25
: ER-AA-450; Structures Monitoring; Revision 1
: WO 880906; EDG Fuel Oil Storage Tank Cleaning and Inspection; August 18, 2010
: WO 592920; One -Time Inspection U2 EDG Fuel Oil Storage Tank; September 9, 2010
: WO1396215; License Renewal Inspection Underground FP Piping; May 21, 2011
: WO 1377212; EDG Fuel Oil Storage Tank Leak Check; August 22, 2011
: ER-AA-335-004; Ultrasonic (UT) Measurement of Material Thickness and Interfereing Conditions; Revision 6
: ER-AA-330; Conduct of Inservice Inspection Activities; Revision 8 Commitment Item 26
: ER-AA-330-007; Visual Examination of Section XI Class MC Surfaces and Class CC Liners; Revision 7 QCTS 0820-11; Surveillance of Dryer-Separator Pit, Spent Fuel Pool, and Drywell Liner Area Drains; Revision 4
: WO 01076914-01; Unit 1 Perform IWE Pre-outage/Outage Examinations (ISI); dated June 18, 2009
: WO 01144147-01; Unit 2 Perform IWE Pre-outage/Outage Examinations (ISI); dated April 20, 2010
: WO 01077068-01; Unit 1 Dryer Separator Pool, Spent Fuel Pool, Drywell Liner Drain; dated May 2, 2009
: WO 01143942-01; Unit 2 Dryer Separator Pool, Spent Fuel Pool, Drywell Liner Drain; dated March 18, 2010
: WO 01256579-01; Unit 1 Dryer Separator Pool, Spent Fuel Pool, Drywell Liner Drain; dated May 9, 2011
: Attachment
: WO 01333337-01; Unit 2 Dryer Separator Pool, Spent Fuel Pool, Drywell Liner Drain; dated March 21, 2012
: WO 01192383-01; D3 RFL Com UT Inspection of Drywell Liner; dated November 5, 2010
: WO 00712865-01; D3 3RFL UT Insp of the Cylindrical and Upper Spherical Areas O; dated November 8, 2008
: WO 01523240-01; LR Review of Sand Pocket Drain Inspection; dated March 21, 2012
: AR 00940064; Bellows Testing as Being Performed Will Not Meet LR Commitment; dated July 9, 2009
: AR 01184660; LR Bellows Testing Clarifications in License Renewal; dated March 8, 2011
: AR 00912776; PSU- Missing Nut for ASME Exam; dated April 28, 2009
: AR 00914413; PSU Q1R20 CISI Indication on X-01 Moisture Barrier; dated May 1, 2009
: AR 01044236; Q2R20 PSU - Damaged X-200A Hatch Stud Requires Replacement; dated March 18, 2010 QCS01.G03; Quad Cities Nuclear Power Station Units 1 and 2, ISI Program Plan Fourth Ten Year Inspection Interval; dated December 3, 2010 Commitment Item 27 QCS01.G04; Quad Cities Nuclear Power Station Units 1 and 2, ISI Classification Basis Document Fourth Ten-Year Inspection Interval; dated December 3, 2010 QCS01.G05; Quad Cities Nuclear Power Station Units 1 and 2, ISI Selection Document Fourth Ten-Year Inspection Interval; dated December 3, 2010
: ER-AA-330; Conduct of Inservice Inspection Activities; Revision 8
: ER-AA-330-003; Inservice Inspection of Section XI Component Supports; Revision 7 Exelon Letter to Nuclear Regulatory Commission,
: SVP-09-045; Quad Cities Unit 1 Post Outage Inservice Inspection Summary Report; dated August 21, 2009 Exelon Letter to Nuclear Regulatory Commission,
: SVP-10-044; Quad Cities Unit 2 Post Outage Inservice Inspection Summary Report; dated June 18, 2010
: AR 00916378; Plant Configuration Does Not Match CB and I Drawing for Torus; dated May 6, 2009
: AR 00846680; D3R20 LLRT ON 3-1201-1 and 1201-1A Exceeded Admin Alarm Limit; November 18, 2008 Commitment Item 28 Document ID No. 2008-63; Integrated Leakage Rate Test Final Report; December 1, 2008
: WO 99027210; D3 15y TS Primary Containment (ILRT) Leak Rate Test; November 14, 2008
: ER-AA-450; Structures Monitoring; Revision 1
: Commitment Item 29
: ER-QC-450-1001; Quad Cities Structures Monitoring Instructions; Revision 0
: Structures Monitoring Form for Turbine Building Unit 1 and Unit 2 Masonry Wall Inspection Elevation 595'-0"; dated July 20, 2012
: AR 00130841; Mortar Found Missing Partially on Wall Joint at 2 Locations; dated November 8, 2002
: AR 00132264; Crack in Concrete Block Wall Joint; dated November 18, 2002
: AR 00993130; Cement Block at U-2 TB Floor Frisking Station Loose on Wall; dated November 13, 2009
: AR 01065498; Service Building Outside Wall Deteriorating; dated May 4, 2010 QCTP 1301-11; Internal Flood Protection Program; Revision 5 Commitment Item 30
: ER-AA-450; Structures Monitoring; Revision 1
: ER-QC-450-1001; Quad Cities Structures Monitoring Instructions; Revision 0 
: Attachment Structures Monitoring Form for Turbine Building Unit 1 and Unit 2 Masonry Wall Inspection Elevation 595'-0"; dated July 20, 2012
: Structures Monitoring Form for Turbine Building Unit 1 Elevation 547'-0"; dated July 20, 2012
: Structures Monitoring Form for Turbine Building Unit 1 Elevation 572'-6"; dated July 20, 2012
: Structures Monitoring Form for Turbine Building Unit 2 Elevation 547'-0"; dated July 20, 2012
: Structures Monitoring Form for Turbine Building Unit 2 Elevation 572'-6"; dated March 31, 2012
: Structures Monitoring Form for Reactor Building Drywell Unit 1 (Basement) Elevation 579'-10"; dated June 3, 2011
: Structures Monitoring Form for Reactor Building Unit 1 Elevation 647'-0"; dated June 3, 2011 Structures Monitoring Form for Turbine Building Unit 1 and Unit 2 HPCI rooms EL. 554'-0"; dated April 16, 2010 QCMPM 4400-11; RHR Service Water Intake Bay Inspection; Revision 9
: Commitment Item 31 QCMPM 4400-12; Circulating Water Intake Bay Inspection; Revision 15
: WO 01359218-01; RHR Service Wtr Bay Inspection - Both Screens; January 11, 2011
: WO 01298081-01; (LR) 1A Circ Water Intake Bay Insp; dated January 11, 2011
: WO 01298081-02; (LR) 1B Circ Water Intake Bay Insp; dated December 29, 2010
: WO 01298081-03; (LR) 1C Circ Water Intake Bay Insp; dated October 21, 2010
: WO 01304080-01; (LR) 2A Circ Water Intake Bay Insp; dated January 20, 2011
: WO 01304080-02; (LR) 2B Circ Water Intake Bay Insp; dated January 20, 2011
: WO 01304080-03; (LR) 2C Circ Water Intake Bay Insp; dated January 20, 2011
: WO 01364381-01; Discharge Flume Weir Inspection; dated January 13, 2011
: WO 01332195-01; (LR) Intake Canal Sounding Readings; dated December 10, 2010
: WO 01484249-01; (LR) Intake Canal Sounding Readings; dated May 10, 2012
: WO 01484249-02; (LR) Intake Canal Sounding Readings; dated May 15, 2012
: WO 00576538-01; One-Time Inspect Intake Ice Melt Line (License Renewal); dated May 4, 2009
: AR 01355486; LR - B1.31 Additional Scope Required in Structure Monitoring; dated April 18, 2012
: AR 01361129; NOS ID: LR AMP B.1.31 Structures Monitoring Signatures N/A; dated May 1, 2012
: ER-AA-330-008; Exelon Service Level I, and Safety-Related (Service Level III) Protective Coatings; Revision 7 Commitment Item 32
: ER-QC-330-1000; Primary Containment and Coating Inspections; Revision 4
: WO 699205; Unit 1 Torus Coating Inspection - Underwater Areas; April 13, 2011
: WO 699207; Unit 1 Coating Inspection - Vapor Phase; April 13, 2011
: WO 1079750; Torus Coating Inspection - Underwater Phase; April 17, 2009
: WO 1079742; Coating Inspection - Vapor Phase; May 3, 2009 Quad Cities Maintenance Inspection of Safety Related Coating Systems; April 27, 2009
: WO 1241027; Q2R20 Prep and Recoat Drywell Level 1, Azimuth 120; March 17, 2010
: AR 1343538; Q2R21 LL LR Coating Inspections Lessons Learned; March 21, 2012 Unit 1 Torus Q1R20 Outage Inspection Plan; De-Sludging, Inspection and Coating Repair; April 29, 2009 Calc 64.305.2029; Torus Pitting Corrosion Acceptance Criteria for Quad Cities Nuclear Power Station Units 1 and 2
: AR 01151699; License Renewal A.1.33 Actions not Scheduled; December 13, 2010 Commitment Item 33
: AR 00747735; Various Cables in Trays 847T, 848B, and 848T are Degraded; March 10, 2008
: AR 01217239;
: 1-0203-2D- Junction Box 2D MSIV; May 17, 2011
: MA-AA-723-500; Inspection of Non EQ Cables and Connections for Managing Adverse Localized Environments; Revision 34a Attachment
: ER-AA-470; Fatigue and transient monitoring program; Revision 5 Commitment Item 34 09-02; Change evaluation form for commitment 101562-48-01; September 9, 2012
: AR 00960410; Commitment Update; October 13, 2009
: AR 00665518; Fatigue monitoring vents within 80 percent of allowable limits; August 28, 2007
: AR 00905509; Potential issue with FatiguePro monitoring of FW nozzle; April 9, 2009
: CC-AA-203; Environmental Qualification Program; Revision 8 Commitment Item 35 EQ Binder
: EQ-GEN036; NAMCO EC210 series Receptacle and Connector/ Cable Assembly; Revision 07 EQ Binder
: EQ-GEN017; EGS (Patel) Quick Disconnect Electrical Connectors (QDC); Revision 10 EQ Binder
: EQ-90Q; Reactor Water Clean-up (RWCU) Auto-Isolation Panel and Lambda power supplies; Revision 01
: NF-AA-610; On-Site Wet Storage of Spent Nuclear Fuel; Revision 11 Commitment Item 36
: NF-AA-610-1000; Creation of Racklife Input Files and Statepoints; Revision 3
: CY-AB-120-300; Spent Fuel Pool Chemistry Control; Revision 11
: SEP-300020-01; Procedure for Measuring the Boron-10 Areal Density in the Boraflex Spent Nuclear Fuel Storage Racks; Revision 0 QCTS 0941-04; Inservice Surveillance Evaluation of Boraflex Neutron Absorbing Material Coupon; Revision 3
: WO 01425456; Periodic Update of Spent Fuel Rack Computer Model Racklife; March 14, 2012
: WO 01471725; Perform 2011 Badger Testing in Spent Fuel Pools; November 30, 2011
: AR 00181471; Procedure
: CY-AB-120-300 and
: NF-AA-610 Inadequate Reviews; October 17, 2003
: AR 00641606; Elevated Fuel Pool Temperature Concern-Boraflex Degradation; June 18, 2007
: AR 00867354; Degraded Boraflex Criticality Analysis Extent of Condition; July 16, 2010
: WO 01580603; Review LPRM, IRM, SRM Calibration Results; October 9, 2012 Commitment Item 37
: WO 01414438; Full Core LPRM Calibration; April 20, 2011
: WO 01070356; DIV. II, Drywell Radiation Monitor CAL/ FUNC Test; March 31, 2009 N/A for Quad Cities Commitment Item 38
: AR 01372208; Light Corrosion on Area Heater
: 1-5755-F Piping; May 30, 2012 Commitment Item 39
: AR 01372218; Light Corrosion on Area Heater
: 2-5753-E Piping; May 30, 2012
: AR 01352551;
: LR-ISG-2011-05 Ongoing Review of OPEX; April 11, 2012 N-QCESPCT; Engineering Continuing Training, License Renewal (Commitments and Requirements); Revision 3
: AR 01314803; Document Corrosion of the
: 1-9400-100 Y Strainer; January 18, 2012
: AR 01346776; NRC License Renewal U-2 Inspection Insights; March 28, 2012
: AR 1220714; LR- Corrosion on U1/2 EDG Non-Seg Bus Duct at Location Y4-Z4; May 25, 2011 Commitment Item 40
: AR 1215114; LR- U1 EDG Bus Duct Insulating Boots Missing Hardware; May 12, 2011
: WO 00880854-01; EM U1/2 DG Bus Duct Internal Inspection; May 27, 2011
: WO 00880852-01; EM Inspect U-2 EDG Bus Duct Internals; March 23, 2010 QCEPM 0400-09; Electrical Inspection of Isolated Phase Buses and Non-Segregated Buses; Revision 16
: Attachment QCEPM 0400-18; Emergency Diesel Generator Non- Segregated Bus Duct Preventive Maintenance Inspection; Revision 3 QCMPM 7500-01; Standby Gas Treatment System Removal of Charcoal Adsorber Test Canister; Revision 4
: Commitment Item 41 QCIS 7500-01; Standby Gas Treatment
: DOP-Freon Test; Revision 2
: QCMPM 9400-01; Crevs Air Filtration Unit Charcoal Test Canister Removal; Revision 2
: QCIS 5700-04; Main Control Room Air Filter Unit Dop-Freon Test; Revision 1
: QCTS 0440-05; Control Room Hvac Component Inspection; Revision 11
: Work Order
: 01218756-01; SBGT Removal of Charcoal Adsorber Test Canister; dated December 3, 2010
: Work Order
: 01218757-01; SGTS In Place Charcoal Adsorber Freon Leak Test - Train A; dated December 3, 2010
: Work Order
: 01099940-01; SBGT Removal of Charcoal Adsorber Test Canister; dated July 13, 2009
: Work Order
: 01099941-01; SGTS In Place Charcoal Adsorber Freon Leak Test - Train B; dated July 14, 2009
: Work Order
: 01333732-01; CR Emer Filtration Sys Removal/Charc Adsorber Test Canister; dated January 20, 2012
: Work Order
: 01130534-01; Control Rm HVAC Air Filtr Unit In Place DOP Lk Test of; dated October 22, 2009
: Work Order
: 01130976-01; (LR) Control Room Hvac Component Inspection; October 21, 2009
: Work Order
: 01232158-01; Control Room Hvac Component Inspection; dated April 20, 2011
: Work Order
: 00880916-01; (LR) Unit 1 SBO Building Day Tank Room Vent Sys Seal/Gasket Insp; dated November 11, 2010
: Work Order
: 00880918-01; (LR) Unit 2 SBO Building Day Tank Room Vent Sys Seal/Gasket Insp; dated September 8, 2010
: Work Order
: 00880549-01; Unit 1 (LR) EDG Room Vent Sys Seal/Gasket Insp; dated September 22, 2009
: Work Order
: 00880554-01; Unit 2 (LR) EDG Room Vent Sys Seal/Gasket Insp; dated October 24, 2011
: Work Order
: 01245101-01; Unit 1 Rubber Seat Inspection of Rx Bldg Vent Isol Dampers; dated March 9, 2011
: Work Order
: 01245045-01; Unit 2 Rubber Seat Inspection of Rx Bldg Vent Isol Dampers; dated December 16, 2010
: AR 012511591; LR EDG Vent Elastomer Inspect Note Degradation - No IR; dated August 15, 2011
: AR 01290296; LR - Procedure Require Additional LR Flags; dated November 14, 2011 QCTS 0320-02; Suppression Chamber Spray Header and Nozzle Water Spray Test; Revision 7 Commitment Item 42 QCTS 0320-03; Drywell Spray Header and Nozzle Air Test; Revision 10
: WO 1087169; U2 SES Air Test of Drywell Spray Header and Nozzles per QCTS 0320-03; March 22, 2008
: WO 1096469; U1 SES Air Test of Drywell Spray Header and Nozzle per QCTS 0320-03; May 13, 2009
: WO 1096468; U1 SES Torus Water Test per QCTS 0320-02; May 17, 2009
: WO 1147401; U2 SES Water Test of Torus Spray Header and Nozzles; March 16, 2010
: AR 01359100; LR discrepancy noted in results binder during final review; April 26, 2012 Commitment Item 43 QCMPM 1300-01;RCIC pump and turbine preventive maintenance; Revision 23
: Attachment QCMPM 5100-01; Hydrogen seal oil vacuum pump PM; Revision 28 QCMPM 2300-01; HPCI refuel preventive maintenance; Revision 11 QCMPM 0400-17; Station lubrication program; Revision 34
: MA-AA-716-230; Predictive maintenance program; Revision 8
: MA-AA-716-230-1001; Oil analysis interpretation guideline; Revision 13
: WO 01075092-01; MM U-1 RCIC pump and turbine preventive maintenance insp; July 7, 2008
: WO 01167297-01; Sample and Change oil for RCIC PMP outboard bearing; October 18, 2009
: AR 01137133; LR commitment enhancements found during check-in; November8, 2010
: AR 01137140; Revise QCMP 1300-01 to incorporate (LR) reference; November 8, 2010
: AR 00800972; U2 hydrogen seal oil vacuum pump gearbox oil analysis result; July 28, 2008
: AR 00608179; U-2 EHC Fluid analysis results; March 23, 2007 Evaluation Form for Commitment Change Tracking No. 11-02; 12/08/2011
: Commitment Item 44 Quad Cities to NRC Docketed Letter
: SVP-12-056 dated 06/13/2012 on Commitment Change 11-02
: AR 01233683; change QCOS 2300-05 to Record Inlet And Outlet Temperatures On The Lube Oil Coolers And Gland Seal Condensers; June 28, 2011 QCOS 2300-05; Quarterly HPCI Pump Operability Test; Revision 68 QCOS 2300-05; Quarterly HPCI Pump Operability Test; Revision 69
: AR 01233959; QCTP 0820-10 Needs Clarification of Commitment Statement; 06/28/2011 QCTP 0820-10; U1 or U2 Hx and Room Cooler Inspection; Revision 6
: AR 01346172; Hx Eddy Current Test Commitment 44 change 11-02; 3/27/2012
: AR 01253778; LR Hx test and Inspection Activities
: AR 01297210; Update RCMT for Hx Eddy Current Test commitment 44 change 11-02; 12/02/2011
: WO 01130976; LR Common CR HVAC Inspection Completed; 10/21/2009 QCTS 0440-05; CR HVAC Component Inspection; Revision 9
: WO 01395196; U1 LR SBO Battery Room AHU Maintenance; 03/11/2011 Tab 4C:
: WO 01413564; (LR) U2 SBO Batt Rm AHU Maint; 05/04/2011 PMID/169774-01; (LR) U2 SBO Batt Rm AHU Maint; 05/04/2011 QCMMPM 5700-24; U1 and U2 SBO Bldg Battery Room AHU and ACUs; Revision 2 B.2.7; Generator Stator Water Chemistry Activities; Revision 1 Commitment Item 45
: CY-AA-120-440; Stator Cooling Water Chemistry; Revision 8
: CY-AA-160-100 attach 1; U2 Stator Demin Chem. data for 04/16/2010
: CY-AA-160-100 attach 1; U1 and U2 Stator Demin Chem. data for 04/22/2010
: CY-AA-160-100 attach 1; U1 and U2 Stator Demin Chem. data for 04/29/2010
: CY-AA-160-100 attach 1; U1 and U2 Stator Demin Chem. data for 05/28/2010
: CY-AA-160-100 attach 1; U1 and U2 Stator Demin Chem. Data for 05/08/2010
: CY-AA-160-100 Attach 1; U1 and U2 Stator Demin Chem. Data for 05/20/2010
: CY-AA-160-100 Attach 1; U1 and U2 Stator Demin Chem. Data for 05/28/2010
: CY-AA-160-100 Attach 1; U1 and U2 Stator Demin Chem. Data for 05/05/2011
: CY-AA-160-100 Attach 1; U1 and U2 Stator Demin Chem. data for 05/11/2011
: AR 00696882; U1 Stator Water Demin Outlet Conductivity Increase; 11/09/2007
: AR 00288647; U2 Stator Demin Inlet Dissolved Oxygen Low; 01/06/2005
: AR 00297413; U1 SWC Conductivity Corr. Check failed A.C.; 02/03/2005
: WO 880860; Disassemble and inspect Valve 0-5799-131; September 23, 2011 Commitment Item 46
: WO 880859; Disassemble and Inspect Valve
: 1-5799-770; July 19, 2012
: WO 880858; Disassemble and Inspect Valve 0-5799-92; July 22, 2011
: WO 880857; Disassemble and Inspect Manual Valve
: 2-5799-833; July 20, 2012
: Attachment
: WO 880856; Disassemble and Inspect Manual Valve
: 2-5799-295; July 15, 2011
: WO 1533256; Disassemble and Inspect Steam Heater Trap
: 2-5751-K-T; July 25, 2012 Letter from the NRC:
: Dresden Nuclear Power Station, Units 2 and 3, and Quad Cities Nuclear Power Station, Units 1 an 2 - Issuance of Amendments Regarding Pressure and Temperature Limits; Date October 17, 2012 Commitment Item 47
: IT-AA-101-1001-F-01; DTSQA Classification Checklist for FatiguePro (EX0007237); Revision 0 Commitment Item 48
: IT-AA-101-1001; DTSQA Level Classifications; Revision 6 09-02; Commitment Change Evaluation Form for 101562-48-01; September 1, 2009
: ER-AA-470; Fatigue and Transient Monitoring Program; Revision 5 PMID
: 00173219; Fatigue and Transient Monitoring Program Report 1/1/12 thru 6/30/12; September 4, 2012 0800676.302; Quad Cities Revised Analysis for FatiguePro Locations; April 4, 2012 0800676.303; Quad Cities Revised Analysis for FatiguePro Locations; December 12, 2010
: AR 00665518; Fatigue Monitoring Events Within 80 Percent of Allowable Limits; August 28, 2007
: AR 00905509; Potential Issue with Fatiguepro Monitoring of FW Nozzle; April, 9, 2009
: CC-AA-203; Environmental Qualification Program; Revision 8 Commitment Item 49 EQ Binder
: EQ-GEN036; NAMCO EC210 Series Receptacle and Connector/Cable Assembly; Revision 07
: EQ Binder
: EQ-GEN017; EGS (Patel) Quick Disconnect Electrical Connectors (QDC); Revision 10 EQ Binder
: EQ-90Q; Reactor Water Clean-up (RWCU) Auto-Isolation Panel and Lambda Power Supplies; Revision 01
: WO 757589; UT inspect U1 ECCS Suction Strainer Flange; March 12, 2008 Commitment Item 50
: WO 757588; UT inspect U2 ECCS Suction Strainer Flange; April 4, 2006 Exelon Letter to Nuclear Regulatory Commission,
: SVP-12-094; License Renewal Commitment for Evaluation of Operating Experience at Extended Power Uprate Levels Prior to Period of Extended Operation; dated October 18, 2012 Commitment Item 51
: AR 00985077; U-2 EDG - Interior Surfaces Corrosion on Starting Air Piping AMP B.2.9
: WO 00880899-01; MM U-1 RCIC Trip and Throttle Valve Disassembly/Inspection; May 17, 2011
: WO 00592905 01; MM one-time inspect UT U1 EDG ST Air RCVR (LR); July 30, 2009
: WO 00836175-01; NDE (LR) UT Walkdown OD ADS Discharge Piping; May11, 2007
: WO 00880861-01; MM Prep piping inboard U2 X-19 for UT (LR); February 28, 2008
: AR 01176082; (LR)-Missed
: VT-3 Inspection During RCIC
: PM 20686-01; February 16, 2011
: WO 880808-01; Inspection of EDG starting air flex hoses; October 27, 2009
: WO 00880898-01; MM RCIC turbine disassembly/inspection; February 21, 2007
: AR 01176013; Maintenance Planning to Review All Open LR WO for Correct Instructions to Ensure LR Commitments Met; May 6, 2011
: ER-AB-331; BWR Internals Program Management; Revision 11 AMP B.2.10 QCTS 0740-04; RPV In-Vessel Examination; Revision 9 IVVI Basis Document Quad Cities Nuclear Power Station; Appendix M Steam Dryer
: BWRVIP-139-A; Revision 6
: Attachment
: IVVI-09-07; IVVI Examination Data Sheet Steam Dryer ID and OD; May 11, 2009 IVVI Examination Data Sheet Steam Dryer; March 29, 2010 Examination Data Sheet
: IVVI-2011-Steam Dryer OD; May 24, 2011
: AR 747071; Q2R19 IVVI Steam Dryer Indications on Internal Weld; March 9, 2008
: AR 1045557; Q2R20
: IVVI-Previous Dryer Indications Reinspection Results; March 21, 2010
: Attachment
==LIST OF ACRONYMS==
: [[USED]] [[]]
: [[ADAMS]] [[Agencywide Document Access Management System]]
: [[AMP]] [[Aging Management Program]]
: [[AR]] [[Action Request]]
: [[ASME]] [[American Society of Mechanical Engineers]]
: [[BWR]] [[Boiling Water Reactor]]
: [[CASS]] [[Cast Austenitic Stainless Steel]]
: [[CCEF]] [[Item Change Evaluation Form]]
: [[CCST]] [[Contaminated Condensate Storage Tank]]
: [[CFR]] [[Code of Federal Regulations]]
: [[DGCW]] [[Diesel Generator Circulating Water]]
: [[EDG]] [[Emergency Diesel Generator]]
: [[EPRI]] [[Electric Power Research Institute]]
: [[EQ]] [[Environmental Qualifications]]
: [[ESS]] [[Essential Service]]
: [[FAC]] [[Flow Accelerated Corrosion]]
: [[GALL]] [[]]
: [[NUREG]] [[-1801 "Generic Aging Lessons Learned"]]
: [[IGSCC]] [[Intergranual Stress Corrosion Cracking]]
: [[IMC]] [[Inspection Manual Chapter]]
: [[ID]] [[Internal Diameter]]
: [[IP]] [[Inspection Procedure]]
: [[IR]] [[Inspection Report]]
: [[IR]] [[Issue Report]]
: [[IRM]] [[Intermediate Range Monitor]]
: [[ISI]] [[Inservice Inspection]]
: [[MC]] [[Metal Containment]]
: [[NDE]] [[Non Destructive Examination]]
: [[NEI]] [[Nuclear Energy Institute]]
: [[NRC]] [[]]
: [[U.S.]] [[Nuclear Regulatory Commission]]
: [[NRR]] [[Division of Nuclear Reactor Regulation]]
: [[NUREG]] [[Nuclear Regulation]]
: [[PARS]] [[Publicly Available Records]]
: [[PEO]] [[Period of Extended Operation P/T Pressure Temperature]]
: [[RAI]] [[Request for Additional Information]]
: [[RAT]] [[Reserve Auxiliary Transformer]]
: [[RG]] [[Regulatory Guide]]
: [[RHRSW]] [[Residual Heat Removal Service Water]]
: [[RWCU]] [[Reactor Water Cleanup]]
: [[SBLC]] [[Standby Liquid Control]]
: [[SCC]] [[Stress Corrosion Cracking]]
: [[SER]] [[Safety Evaluation Report]]
: [[SRM]] [[Source Range Monitor]]
: [[SSC]] [[Systems Structures and Components]]
: [[TLAA]] [[Time Limited Aging Analysis]]
: [[TR]] [[Technical Report]]
: [[TS]] [[Technical Specifications]]
: [[UFSAR]] [[Updated Final Safety Analysis Report]]
: [[UHS]] [[Ultimate Heat Sink]]
: [[URI]] [[Unresolved Item]]
: [[UT]] [[Ultrasonic Test VIP Vessel Internals Program]]
: [[M.]] [[Pacilio    -2- In accordance with 10]]
: [[CFR]] [[2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the]]
: [[NRC]] [[Public Document Room or from the Publicly Available Records System (]]
: [[PARS]] [[) component of NRC's document system (ADAMS).]]
: [[ADAMS]] [[is accessible from the]]
: [[NRC]] [[Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely,    Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 Enclosure: Inspection Report 05000254/2012010; 05000265/2012010  w/Attachment:  Supplemental Information cc w/encl: Distribution via ListServŽ DISTRIBUTIONCayetano Santos  : RidsNrrDorlLpl3-2 Resource  RidsNrrPMQuadCities Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker Christine Lipa Carole Ariano Linda Linn]]
: [[DRPIII]] [[]]
DRSIII Tammy Tomczak ROPreports.Resource@nrc.gov
: [[DOCUME]] [[NT NAME:  G:\DRSIII\DRS\Work in Progress\QUAD 2012]]
: [[010 IR]] [[71003]]
: [[BJ.]] [[docx  Publicly Available  Non-Publicly Available  Sensitive  Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy]]
: [[OFFICE]] [[]]
: [[RIII]] [[]]
: [[RIII]] [[]]
: [[RIII]] [[]]
: [[RIII]] [[]]
: [[NAME]] [[BJose A AMStone]]
: [[DATE]] [[12/19/12  12/21/12]]
: [[OFFICI]] [[AL]]
: [[RECORD]] [[]]
: [[COPY]] [[]]
}}
}}

Latest revision as of 19:36, 11 January 2025

IR 05000254-12-010, 05000265-12-010; 10/22/12 - 11/09/12; Quad Cities Nuclear Power Station, Units 1 and 2; Post Approval Site Inspection for License Renewal
ML12356A431
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 12/21/2012
From: Ann Marie Stone
NRC/RGN-III/DRS/EB2
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
Benny Jose
References
IR-12-010
Download: ML12356A431 (43)


Text

December 21, 2012

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 NRC POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL REPORT 05000254/2012010; 05000265/2012010

Dear Mr. Pacilio:

On November 9, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed Post-Approval Site Inspection for License Renewal at your Quad Cities Nuclear Power Station, Units 1 and 2. The enclosed report documents the results of this inspection, which were discussed on November 9, 2012, with Mr. T. Hanley, and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, and interviewed personnel. Based on the results of this inspection, there were no findings of significance identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS)

component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR 30

Enclosure:

Inspection Report 05000254/2012010; 05000265/201210 w/Attachment: Supplemental Information

REGION III==

Docket Nos:

50-254; 50-265 License Nos:

DPR-29, DPR-30 Report No:

05000254/2012010; 05000265/2012010 Licensee:

Exelon Generation Company, LLC Facility:

Quad Cities Nuclear Power Station, Units 1 and 2 Location:

Cordova, IL Dates:

October 22, 2012 - November 9, 2012 Inspectors:

B. Jose, Senior Reactor Engineer (Lead)

N. Féliz Adorno, Reactor Engineer

G. ODwyer, Reactor Engineer

J. Bozga, Reactor Engineer

E. Sanchez, Reactor Engineer

J. Corujo, Reactor Engineer

J. Gilliam, Reactor Engineer

D. Betancourt, Reactor Engineer Approved by:

A. M. Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Enclosure

SUMMARY OF FINDINGS

IR 05000254/2012010, 05000265/2012010; 10/22/12 - 11/09/12; Quad Cities Nuclear Power

Station, Units 1 and 2; Post Approval Site Inspection for License Renewal.

The report covers a team inspection conducted by region-based engineering inspectors. The inspectors concluded that items, license conditions, and regulatory requirements associated with the issuance of the renewed operating license were being met. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 4, dated December 2006.

A.

Cornerstone: Initiating Events, Mitigating Systems, Barrier Integrity

NRC-Identified

and Self-Revealed Findings No findings of significance were identified.

B.

No violations of significance were identified.

Licensee-Identified Violations

4.

OTHER ACTIVITIES

REPORT DETAILS

4OA5

.1 Other Activities

The purpose of this inspection is to verify committed actions and license conditions associated with the renewed license for Units 1 and 2 are implemented in accordance with 10 CFR Part 54.

Post-Approval Site Inspection for License Renewal (Phase II) - IP 71003 a.

(1) Inspection Scope The inspectors discussed the identification of new SSCs, under the purview of title 10 of the code of federal regulations (CFR) 54.37(b), with the licensees license renewal staff.

The licensee personnel indicated newly identified components had resulted from a change to the Environmental Qualification (EQ) Program. The components were subsequently added to the site EQ Program, which is also credited as the license renewal (LR) Aging Management Program (AMP) B1.35. The AMP will manage the effects of aging for those newly identified components.

Review of Newly Identified SSCs [Systems Structures and Components]

The license renewal Updated Final Safety Analysis Report (UFSAR) Supplement, Appendix A.1.35, Environmental Qualification (EQ) of electrical components, remains an accurate summary of the AMP, and does not require revision as a result of the newly identified components.

(2) As part of reviewing the Aging Management Programs (AMPs) associated with the Commitment Items, the inspectors reviewed the UFSAR descriptions to confirm the implemented programs were consistent with the UFSAR descriptions.

Review of Updated Final Safety Analysis Report and Commitment Item Change Process The inspectors reviewed the licensees procedures to ensure that Commitment Item revisions would follow the guidance in NEI 99-04, Guidelines for Managing NRC Commitment Item Changes, including the elimination of commitment, and would properly evaluate, report, and approve changes to license renewal commitments listed in the UFSAR in accordance with 10 CFR 50.59. The inspectors also reviewed the licensees Commitment Item tracking program to evaluate its effectiveness.

With respect to implementation, the inspectors reviewed changes associated with each commitment. One Unresolved Item (URI) was identified and is documented in Section 4OA5.1.b (1).

(3) The inspectors reviewed supporting documents including completed surveillance records, conducted interviews, performed visual inspection of structures and components to verify the licensee completed the necessary actions to comply with the license conditions that are a part of the renewed operating license. The inspectors verified the licensee implemented the Aging Management Programs and time-limited Review of Commitment Items aging analyses (TLAA) included in NUREG-1796, Safety Evaluation Report (SER)

Related to the License Renewal of Dresden Nuclear Power Station Units 2 and 3 and Quad Cities Nuclear Power Station, Units 1 and 2, in accordance with Title 10 of the Code of Federal Regulations (CFR) Part 54, Requirements for the Renewal of Operating Licenses for Nuclear Power Plants. The inspectors verified a selected sample of corrective actions taken to address issues identified during the Dresden Units 2 and 3 license renewal inspections, which was documented in Inspection Reports 05000237/2009007 and 05000249/2010010, and were also applicable to Quad Cities Units 1 and 2.

When changes to these items were identified, the inspectors reviewed the Commitment Item Change Evaluation Form (CCEF) to verify the licensee followed the guidance in NEI 99-04 for the license renewal Commitment Item change process, including the elimination of commitments, and properly evaluated, reported, and approved where necessary, changes to license renewal commitments listed in the UFSAR in accordance with 10 CFR 50.59.

The inspectors reviewed the Commitment Items listed below which are referenced to Appendix A of the SER. Specific documents reviewed are listed in the enclosure.

1. Commitment Item 1 specified the existing ASME Section XI, Subsections IWB, IWC,

and IWD Aging Management Program, is part of the Inservice Inspection (ISI)

Program. It provides identification of signs of degradation, and establishment of corrective actions for condition monitoring of reactor coolant pressure retaining piping and components within the scope of license renewal. The inspections will be implemented in accordance with 10 CFR 50.55(a). Also Quad Cities implemented Risk Informed Inservice Inspection and the alternative Risk Informed Inservice Inspection programs for Class 1 and 2 piping.

Commitment Item 1, ASME [American Society of Mechanical Engineers] Code,Section XI Inservice Inspection, Subsections IWB, IWC, and IWD The inspectors reviewed the licensing basis, program basis documents, implementing procedures, non-destructive examination (NDE) records, and related condition reports; and interviewed the responsible plant personnel regarding these documents. The inspectors verified the licensee incorporated the Risk Informed ISI Program for Class 1 and 2 Systems.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 1.

2. Commitment Item 2 specified the existing water chemistry program was credited for

license renewal for both Units 1 and 2 and that the program was enhanced prior to the period of extended operation.

Commitment Item 2, Water Chemistry The inspectors reviewed changes and enhancements to the program and ensured the program remained effective for both units. The inspectors verified procedure CY-QC-110-608, Reactor/Turbine Building Sample Panel Sample Collection, Revision 21 was revised to ensure the integrity of the samples collected.

The inspectors reviewed the licensing basis, program basis documents, planned and completed work orders, Commitment Item changes, Issue Reports, inspection procedures and interviewed the plant personnel responsible for the program.

Planned and completed chemistry surveillance tests and related Issue Reports demonstrated the water chemistry program was appropriately applied to Units 1 and 2.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 2 for Units 1 and 2.

3. Commitment Item 3 specified the existing Reactor Head Closure Studs Aging

Management Program was credited. The program is implemented through station procedures, ISI program plan for Quad Cities, and corporate procedures for inservice inspection of welds and components. The program implements inspection requirements of ASME Section XI and preventive measures described in Regulatory Guide 1.65, "Materials and Inspection for Reactor Vessel Closure Studs." The reactor head studs at Quad Cities are not metal plated and have had manganese phosphate coatings applied.

Commitment Item 3, Reactor Head Closure Studs The inspectors interviewed the plant personnel responsible for the program and reviewed the program basis documents, implementing procedures, work orders, and related IRs to verify the program was being implemented on Units 1 and 2.

Based on review of the licensee actions, the inspectors determined the licensee met Commitment Item 3.

4. Commitment Item 4 specified the existing BWR Vessel Attachment Welds Aging

Management Program activities incorporated the inspection and evaluation recommendations of BWRVIP-48, 'Vessel ID Attachment Weld Inspection and Evaluation Guidelines," as well as the water chemistry recommendations of EPRI TR-103515-R2, "BWR Water Chemistry Guidelines." The program is implemented through station procedures that provide for mitigation of cracking through water chemistry and monitoring for cracking through in vessel examinations.

Commitment Item 4, BWR [Boiling Water Reactor] Vessel ID [Internal Diameter]

Welds The inspectors reviewed the licensing basis, program basis documents, implementing procedures, NDE examination records, and interviewed the plant personnel responsible for the program regarding these documents to verify the program is being implemented on Units 1 and 2.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 4.

5. Commitment Items 5 specified the existing BWR Feedwater Nozzle program was

credited for license renewal and would be enhanced prior to the period of extended operation. This program implemented inservice inspection specified in ASME Code,Section XI and enhanced it with recommendations from General Electric NE-523-A71-0594-A, Revision 1 Alternate BWR Feedwater Nozzle Inspection Requirements. Per their enhancements, the licensee will perform periodic ultrasonic testing inspection of certain critical regions of the BWR feedwater nozzles.

Commitment Item 5, BWR Feedwater Nozzle The inspectors reviewed the licensing basis, program basis documents, implementing procedures, NDE examination records, related condition reports, and interviewed the responsible plant personnel. The inspectors verified the licensee implemented the recommendations of report GE-NE-523-A71-0594-A, Revision 1, which was approved by the NRC staff.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 5.

6. Commitment Item 6 specified the existing BWR Control Rod Drive Return Line

Nozzle inspection program was credited for license renewal. This program implemented inservice inspection in accordance with ASME Code Section XI. The licensee cut and capped the CRD return line nozzle. As a result, the augmented inspections described in NUREG-0619 BWR Feedwater Nozzle and Control Rod Drive Return Line Nozzle Cracking or GE NE-523-A71-0594, Alternative BWR Feedwater Nozzle Inspection Requirements are not required.

Commitment Item 6, Control Rod Drive (CRD) Return Line Nozzle The inspectors reviewed the licensing basis, program basis documents, implementing procedures, NDE examination records, related condition reports, and interviewed the plant personnel regarding these documents.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 6.

7. Commitment Item 7 specified the existing BWR SCC Program was credited for

license renewal. The BWR SCC Program is credited for managing the aging effects of crack initiation and growth, loss of fracture toughness, and loss of material in susceptible components. The program was also enhanced to include an additional ultrasonic examination of the Quad Cities Unit 2 reactor vessel head crack (detected in 1990) to verify the relevant indication has remained essentially unchanged.

Commitment Item 7, BWR Stress Corrosion Cracking (SCC)

The inspectors reviewed the licensing basis, program basis documents, implementing procedures, weld examination records, and related IRs; and interviewed the plant personnel responsible for the program regarding these documents to verify the program is being implemented.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 7.

8. Commitment Item 8 specified the existing BWR reactor vessel penetration inspection

program was credited for license renewal. The license renewal program applies only to the Standby Liquid Control/Core Plate DP penetrations and Instrument penetrations N11A/B and N12A/B. This program implemented inspection and flaw evaluation in conformance with BWRVIP-27 and BWRVIP-49.

Commitment Item 8, BWR Penetrations The inspectors reviewed the program basis documents, procedures, and NDE examination records to verify the program was adequately implemented.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 8.

9. Commitment Item 9 specified the existing BWR Vessel Internals Program (VIP)

would be credited for license renewal and enhanced with inspections consistent with BWRVIP-48. The BWR Vessel internals Aging Management Program mitigates the effect of stress corrosion cracking, intergranular stress corrosion cracking (IGSCC),and irradiation assisted stress corrosion cracking in reactor pressure vessels internals through water chemistry activities that are implemented through station procedures and are consistent with the guidelines of year 2000 revision of EPRI TR-103515-R2, BWR Water Chemistry Guidelines. The program also manages cracking of reactor pressure vessel internals through condition monitoring activities that consist of examinations and the BWRVIP guidelines, as well as the requirements of ASME Section XI.

Commitment Item 9, BWR Vessel Internals The inspectors reviewed the licensing basis, program basis documents, implementing procedures, NDE examination records; and interviewed the plant personnel responsible for the program regarding these documents to verify the program is being implemented.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 9.

10.

Commitment Item 10 specified a new Aging Management Program for thermal aging and neutron irradiation embrittlement of CASS reactor internal components within the scope of license renewal, to ensure the integrity of the CASS components exposed to high temperature and neutron fluence present in the reactor environment. This program includes a component specific evaluation of the loss of fracture toughness. For those components, where the loss of fracture toughness may affect function of the component, an enhanced VT-1 inspection will be conducted. These inspections will be in accordance with BWRVIP-03, and will be performed as part of the ISI program.

Commitment Item 10, Thermal Aging and Neutron Irradiation Embrittlement of Cast Austenitic Stainless Steel (CASS)

The inspectors reviewed the licensing basis, program basis documents, implementing procedures, completed inspections and interviewed the plant personnel responsible for the program regarding these documents to verify the program is being implemented.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 10.

11.

Commitment Item 11 specified the existing FAC Program was credited for license renewal with enhancements to include portions of the main steam and the reactor vessel head vent systems prior to the period of extended operation. The sites FAC program is based on EPRI guidelines found in NSAC-202L-R3, Recommendations for an Effective Flow Accelerated Corrosion Program. The program is credited for Commitment Item 11, Flow Accelerated Corrosion (FAC)predicting, detecting, and monitoring for loss of material by wall thinning in piping, fittings, and valve bodies due to FAC.

The inspectors reviewed the licensing basis, program basis documents, implementing procedures, pipe examination records and related IRs and interviewed the responsible plant personnel regarding these documents.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 11.

12.

Commitment Item 12 specified the existing bolting integrity program was credited for license renewal and that the program would be enhanced prior to the period of extended operation. The Bolting Integrity Program is an existing program that consists of the preventive and condition monitoring of pressure retaining bolted joints of piping and components for age-related degradation to discover and correct conditions that could lead to a loss of intended function.

Commitment Item 12, Bolting Integrity The inspectors reviewed the licensing basis, the Bolting Integrity Program basis documentation, implementing procedures, planned and completed work orders, related corrective action documents, and interviewed responsible program personnel regarding these documents.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 12.

13.

Commitment Item 13 specified the existing program was credited for license renewal and had been enhanced, prior to the period of extended operation, to include periodic inspections of cooling water pump internal linings, additional heat exchangers and sub-components, external surfaces of various submerged pumps, components in the high humidity/moisture environments of the pump vaults, and piping.

Commitment Item 13, Open-Cycle Cooling Water Program The inspectors reviewed changes and enhancements to the program and ensured that the program remained effective for both units. The inspectors reviewed the licensing basis, program basis documents, planned and completed work orders, Commitment Item changes, Issue Reports, inspection procedures and interviewed the plant personnel responsible for the program to verify the program was being implemented. General program requirements for this commitment were inspected and determined to be complete for Quad Cities Units 1 and 2.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 13 for Units 1 and 2.

14.

Commitment Item 14 specified the existing closed-cycle cooling water chemistry program was enhanced and credited for license renewal for both Units 1 and 2.

Commitment Item 14, Closed-Cycle Cooling Water Chemistry The inspectors reviewed the licensing basis, program basis documents, planned and completed work orders, Issue Reports, inspection procedures and interviewed plant personnel responsible for the program to verify the program was being implemented. General program requirements for this commitment were inspected and determined to be complete for Quad Cities Unit 1 and 2.

The licensee changed this commitment Item to use the guidance from the latest Electric Power Research Institute (EPRI) guidance document, EPRI TR 1007820, Closed Cooling Water Chemistry Guideline, Revision 1 instead of a previous EPRI Guidance procedure. The inspectors noted Revision 2 of the GALL endorsed the latest EPRI guidance document, EPRI TR 1007820. The inspectors verified this commitment change was appropriate.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 14.

15.

Commitment Item 15 specified the existing inspection of overhead heavy load and light load (related to refueling) handling systems program was credited for license renewal and that the program would be enhanced prior to the period of extended operation.

Commitment Item 15, Overhead Heavy Load and Light Load (Related to Refueling)

Handling Systems The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders, related corrective action documents and interviewed personnel responsible for the program regarding these documents.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 15.

16.

Commitment Item 16 specified the existing compressed air monitoring program was credited for license renewal and that the program would be enhanced prior to the period of extended operation.

Commitment Item 16, Compressed Air Monitoring The inspectors reviewed the licensing basis, program basis documents, planned and completed work orders, Issue Reports, inspection procedures and interviewed the plant personnel responsible for the program to verify the program was being implemented. General program requirements for this commitment were inspected and determined to be complete for Quad Cities Unit 1 and 2.

Based on review of the timeliness and adequacy of the licensees actions the inspectors determined the licensee met Commitment Item 16.

17.

Commitment Item 17 specified the existing program was credited for license renewal and was consistent with NUREG-1801 Generic Aging Lessons Learned (GALL).

Commitment Item 17, BWR Reactor Water Cleanup (RWCU) System The inspectors reviewed the licensing basis, program basis documents, and work orders. The licensee has replaced all in-scope portions of the RWCU system piping with IGSCC resistant piping. The RWCU portions that are inboard of the second isolation valve are being managed by the ISI program. The inspectors reviewed selected samples to confirm the ISI program was being utilized for the sections of the RWCU previously mentioned.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 17.

18.

Commitment Item 18 specified the licensee would enhance the existing fire protection program as follows:

Commitment Item 18, Fire Protection (non-water)

  • Provide specific guidance to check fire doors for wear and holes in skin that could affect intended function during weekly tours as well as check the fire door clearances.
  • Inspect external surfaces of the carbon dioxide system.
  • Perform a visual inspection (VT-1 or equivalent) on a 10 percent sample population of each type of fire seal on a refueling outage frequency. Expand the sample population by 10 percent if any of the inspected seals are found to have abnormal degradation that could prevent the seal from performing its intended function.

The inspectors reviewed the licensing basis, program basis documents, and existing implementing procedures. The inspectors verified the above enhancements were incorporated into the existing program documents and implementing procedures. The inspectors also reviewed the completed inspections and training requirements.

Based on the review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 18.

19.

Commitment Item 19 specified the existing fire water system program was credited for license renewal and that the program would include several enhancements prior to the period of extended operation.

Commitment Item 19, Fire Water System The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders and related corrective action documents.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 19.

20.

Commitment Item 20 specified the existing above-ground carbon steel tanks program was credited for license renewal and that the program would be enhanced prior to the period of extended operation. The enhancements included periodic system engineer walkdowns on the nitrogen storage tanks utilizing a standalone procedure and a one-time UT thickness inspection will be performed on the aluminum condensate storage tank or demineralized water storage tank.

Commitment Item 20, Above-ground Carbon Steel Tanks The inspectors reviewed the licensing basis, program basis documents, implementing procedures, scheduled, and completed work orders, related action requests, engineering changes, and evaluations. The inspectors verified the licensee has implemented procedure changes to address the documentation of inspection results by system engineers. In addition, the inspectors verified the licensee has implemented procedures to address internal/external inspections as well as committed UT inspections.

During this review, the inspectors identified the B Contaminated Condensate Storage Tank (CCST) inspection performed in 2007 time frame did not include NDE. Specifically, the license renewal commitment specified NDE would be performed once before the period of extended operation (PEO) and every five years thereafter. The inspectors noted this omission in 2007 was a failure to follow the requirements of the commitment. However, since the licensee performed a UT inspection of the B CCST in November 2012 (before the PEO) in accordance with the requirements of the commitment, this commitment was met.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 20.

21.

Commitment Item 21 specified the existing fuel oil chemistry program was credited for license renewal and that the program would be enhanced prior to the period of extended operation. The program was to be enhanced to include inspection of the fuel oil tank interiors for corrosion during regularly scheduled tank cleanings.

Commitment Item 21, Fuel Oil Chemistry The inspectors interviewed the program owner, reviewed the licensing basis, program basis documents, scheduled, and completed work orders and implementing procedures. The inspectors verified the licensee has implemented a program that evaluates the material condition and bottom thickness of the fuel oil storage tanks to ensure aging effects are effectively managed.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 21.

22.

Commitment Item 22 specified the existing reactor vessel surveillance Aging Management Program was credited for license renewal and that the program would be enhanced prior to the period of extended operation. The program is implemented through station procedures that conform to the requirements of 10 CFR Part 50, Appendix H, "Reactor Vessel Material Surveillance Program Requirements." Neutron embrittlement is predicted utilizing chemistry tables and Position 1.3 limitations as described in Regulatory Guide 1.99, Revision 2, "Radiation Embrittlement of Reactor Vessel Materials."

Commitment Item 22, Reactor Vessel Surveillance The inspectors reviewed the licensing basis, program basis documents, implementing procedures and interviewed the AMP owner regarding these documents. The inspectors verified the licensee incorporated the testing requirements for reactor vessel test capsules have been incorporated into station programs and procedures.

Based on review and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 22.

23.

Commitment Item 23 specified the licensee perform one-time inspections of selected plant equipment to verify current plant Aging Management Programs were effective in managing the effects of aging prior to the period of extended operation.

Commitment Item 23, One-Time Inspection The licensee had established separate one-time inspection programs covering the specific commitments listed in the SER. The inspectors reviewed the licensing basis, each program basis document, implementing procedures, inspection results and related IRs, and interviewed the responsible plant personnel regarding these documents.

The inspectors verified the licensee had documented the results of the one-time inspections, and with one exception, had followed up appropriately when aging effects were identified. For the one exception, a one-time inspection of the clean demineralized water check valve 0-4399-16 was performed and the results showed significant corrosion in the seating surface. In addition, all internal surfaces revealed moderate corrosion with some material wastage. The valve was replaced and the licensee performed an evaluation to determine if any aging management actions were needed. The site performed additional inspections at other valves belonging to the same sample group and those were found in good condition.

Based on those results the licensee determined the valve that had been replaced was an outlier and no aging management was needed. However, the licensee did not address the two additional check valves that shared the same environment as the one affected. During the inspection, the inspectors questioned why these other valves didnt need to be age managed. The licensee was able to provide additional information that showed based on the replacement history of the other two valves and the physical state of the pressure boundary (the license renewal function) there was reasonable assurance that the components could meet the function for another 20 years.

Also, the inspectors determined in some cases the licensee had performed inspections on only one Unit. For eleven cases, the inspectors could not find a justification for the basis of selecting one Unit as a representative sample of both Units. Specifically, no evaluation was performed to demonstrate the most susceptible environment was selected. During the inspection, the licensee was able to provide additional information to show the environment in both Units is similar enough that sampling one Unit was representative of both.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 23 with the exception of the URI documented in Section 4OA5.1.b(1).

24.

Commitment Item 24 specified one-time visual inspection of a sample of materials susceptible to selective leaching of materials prior to the period of extended operation.

Commitment Item 24, Selective Leaching of Materials The inspectors reviewed the licensing basis, the Selective Leaching of Materials Program basis documentation, completed work orders, and interviewed personnel responsible for the program regarding these documents and verified the program was appropriately applied to both Units 1 and 2.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 24 with the exception of the URI documented in Section 4OA5.1.b(1).

25.

Commitment Item 25 specified an enhancement to complete one-time inspections prior to the period of extended operation as well as periodic checks on buried carbon steel fuel oil storage tanks. The Buried Piping and Tanks Inspection Program was an existing program that provided preventive and condition monitoring measures to manage loss of material, due to either corrosion of ferrous piping and tanks or aggressive chemical attack of asbestos concrete piping, from external environments for buried piping and tanks.

Commitment Item 25, Buried Piping and Tanks Inspection The inspectors reviewed the licensing basis, the Buried Piping and Tanks Inspection Program basis documentation, implementing procedures, completed work orders, the results of the onetime inspections, related corrective action documents, and interviewed responsible program personnel regarding these documents. The inspectors verified planned and completed work orders and related IRs demonstrated that the program was appropriately applied Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 25.

26.

Commitment Item 26 specified the existing ASME Code,Section XI, Subsection IWE program was credited for license renewal and would be enhanced prior to the period of extended operation.

Commitment Item 26, ASME Code,Section XI, Subsection IWE The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders, related corrective action documents and interviewed personnel responsible for the program regarding these documents.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 26.

27.

Commitment Item 27 ASME Code Section XI, Subsection IWF Component Support Program specified the existing ASME Code Section XI, Subsection IWF Component Support Program was credited for license renewal with enhancement to include inspection of Code Class MC supports.

Commitment Item 27, ASME Code,Section XI, Subsection IWF The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders, related corrective action documents, and interviewed personnel responsible for the program regarding these documents.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 27.

28.

Commitment Item 28 specified the existing 10 CFR Part 50; Appendix J Aging Management Program was credited for license renewal. The program provides for aging management of pressure boundary degradation due to loss of material in the primary containment and various systems penetrating primary containment. The program also manages changes in material properties of gaskets, O rings, and packing materials for the primary containment pressure boundary access points.

Commitment Item 28, Appendix J of 10 CFR Part 50, The program includes an exception to NUREG 1801 for two-ply design bellows that cannot be tested to satisfy the requirements of Appendix J. Testing is in accordance with NRC approved alternate test until the bellows are replaced.

The inspectors reviewed the licensing basis, program basis documents, implementing procedures, and interviewed the responsible plant personnel regarding these documents. The inspectors verified the requirements for testing two-ply bellows have been incorporated into station programs and procedures.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 28.

29.

Commitment Item 29 specified the existing masonry wall program was credited for license renewal.

Commitment Item 29, Masonry Wall Program The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders, related corrective action documents and interviewed personnel responsible for the program regarding these documents. The inspectors performed walkdowns of masonry walls that perform a high energy line break barrier function.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 29.

30.

Commitment Item 30 specified the existing structures monitoring program was credited for license renewal and would be enhanced prior to the period of extended operation. The structures monitoring program was an existing program that provided for aging management of various structures and external surfaces of mechanical components within the scope of license renewal.

Commitment Item 30, Structures Monitoring Program The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders, related corrective action documents and interviewed personnel responsible for the program regarding these documents. The inspectors also walked down several jet impingement shield supports.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 30.

31.

Commitment Item 31 specified the existing RG 1.127, "Inspection of Water-Control Structures Associated with Nuclear Power Plants," program was credited for license renewal and would be enhanced prior to the period of extended operation. This program was part of the Structures Monitoring Program and consisted of procedures that provided for condition monitoring of structural steel elements, concrete, and earthen structures within the scope of license renewal.

Commitment Item 31, Regulatory Guide (RG) 1.127, Inspection of Water-Control Structures Associated with Nuclear Power Plants The inspectors reviewed the licensing basis, program basis documentation, and revised implementing procedures. The inspectors reviewed completed work orders and associated condition reports, and interviewed responsible water control structure program personnel.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 31 with the exception of the URI described in section 4OA5.1.b(2).

32.

Commitment Item 32 specified enhancements to the Protective Coating Monitoring and Maintenance Program to be implemented prior to the period of extended operation. The Protective Coating Monitoring and Maintenance Program was an existing program that provided for aging management of Service Level I coatings inside primary containment. Service Level I coatings were used in areas where the coating failure could adversely affect the operation of post-accident fluid systems and thereby impair safe shutdown. The program provided for visual inspections to identify any condition that adversely affects the ability of the coating film to function as intended.

Commitment Item 32, Protective Coating Monitoring and Maintenance Program The inspectors reviewed the program basis documentation, revised implementing procedures, completed inspections, and interviewed responsible plant personnel regarding these documents.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 32.

33.

Commitment Item 33 specified licensee would develop a program that was consistent with NUREG-1801 AMP XI.E1 for electrical cables and connections installed in adverse localized environments not subject to 10 CFR 50.49 environmental qualification requirements.

Commitment Item 33, Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements The licensee developed a program to visually inspect all accessible electrical cables and connections installed in adverse localized environments for signs of accelerated age-related degradation. Additional inspections, repairs, or replacements are to be initiated as appropriate.

The inspectors interviewed the program owner, reviewed licensing basis, the program basis documentation, implementing procedures, work orders and records of walk downs for determining adverse localized environments and visual inspections for cables. The inspectors also reviewed corrective actions, which addressed and identified cable issues and their associated corrective actions. Also, the inspectors reviewed the corrective action taken in reference to the finding from Dresden Inspection Report 05000237/2009007.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 33.

34.

Commitment Item 34 specified for the Metal Fatigue of Reactor Coolant Pressure Boundary the existing program was credited with enhancements. The licensee will enhance the program by utilizing the EPRI-licensed FatiguePro computer software for counting fatigue stress cycles and track fatigue usage factors for selected components. The enhanced program calculates and tracks cumulative usage factors for bounding locations in the reactor coolant pressure boundary (reactor pressure vessel and Class I piping), containment torus, torus vents, torus attached piping and penetrations.

Commitment Item 34, Metal Fatigue of Reactor Coolant Pressure Boundary The inspectors reviewed the licensing basis, Metal Fatigue and Reactor Coolant Pressure Boundary Program basis documentation, FatiguePro implementing procedures, fatigue and transient monitoring program report, related corrective action documents, and interviewed the program owner regarding these documents.

The inspectors reviewed changes to the program to ensure the program remained effective for both units.

Based on review of the licensees actions, the inspectors determined the licensee met Commitment Item 34.

35.

Commitment Item 35 specified the licensee was to maintain the existing environmental qualification program of the electrical components for the period of extended operation.

Commitment Item 35, Environmental Qualification (EQ) of Electrical Components Program activities establish, demonstrate and document the level of qualification, qualified configuration, maintenance, surveillance and replacement requirements necessary to meet 10 CFR 50.49.

The inspectors interviewed the program owner, reviewed the licensing basis, program basis documents, and various existing EQ Binders.

Based on the review of the licensees action, the inspectors determined the licensee met Commitment Item 35.

36.

Commitment Item 36 specified the existing Boraflex monitoring program was credited for license renewal. The Boraflex monitoring program is based on manufacturers recommendations relies on periodic inspection, testing, monitoring and analysis of the criticality design to assure the required 5percent subcriticality margin is maintained.

Commitment Item 36, Boraflex Monitoring The inspectors interviewed the program owner, reviewed the licensing basis, program basis documents, implementing procedures, planned and completed work orders and related corrective actions.

Based on review of the licensees actions, the inspectors determined the licensee met Commitment Item 36.

37.

Commitment Item 37 specified the licensee was to develop a program to manage aging of cables in sensitive instrumentation circuits with low level signals in the Nuclear Instrumentation Systems and Radiation Monitoring Systems.

Commitment Item 37, Electrical Cables Not Subject to 10 CFR 50.49 Environmental Requirements Used in Instrument Circuits The program is applied to the cables of the Nuclear Instrumentation Systems, which included source range monitors (SRMs), intermediate range monitors (IRMs), local power range monitors, and Radiation Monitoring Systems, which included drywell high range radiation monitors, main steam line radiation monitors, and the steam jet air ejector radiation monitors. The program specified a review of calibration and surveillance results, and cable testing for cable aging degradation before the period of extended operation and every 10 years thereafter.

The inspectors interviewed the program owner, reviewed the licensing basis, program basis documents, implementing procedures, work orders and related corrective actions.

Based on the review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 37.

38.

This Commitment Item does not apply to Quad Cities.

Commitment Item 38, Inaccessible Medium-Voltage Cables Not Subject to 10 CFR 50.49 Environmental Requirements

39.

Commitment Item 39 specified the existing corrective action program was credited for license renewal.

Commitment Item 39, Corrective Action Program The inspectors interviewed the program owner, reviewed the licensing basis, implementing procedures, corrective action program results, and interviewed the responsible plant personnel regarding this program. The inspectors also reviewed training given to engineers to increase awareness of aging concerns and license renewal. The inspectors verified the licensee was entering issues related to license renewal in the corrective action program.

The inspector also reviewed a corrective action, AR 01352551, which is tracking actions to revise various procedures to reflect aging management focus. This AR also tracks actions to establish aging-related degradation Passport coding and determine orientation/training needs.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 39.

40.

Commitment Item 40 specified the licensee was to develop and implement a program to periodically inspect non-segregated bus ducts that connect the reserve auxiliary transformers (RATs) to 4160 V essential service system (ESS), the non-segregated bus ducts that connect the Emergency Diesel Generators (EDGs) to the ESS buses, and the non-segregated bus ducts that connect ESS buses.

Commitment Item 40, Periodic Inspection of Non-EQ, Non-Segregated Electrical Bus Ducts The inspectors interviewed the program owner, reviewed the licensing basis, program basis documents, implementing procedures, planned and completed work orders and related corrective actions.

Based on the review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 40.

41.

Commitment Item 41 specified the existing periodic inspection of ventilation system elastomers was credited for license renewal and that the program would be enhanced prior to the period of extended operation.

Commitment Item 41, Periodic Inspection of Ventilation System Elastomers The inspectors reviewed the licensing basis, program basis documentation, implementing procedures, completed work orders, related corrective action documents and interviewed personnel responsible for the program regarding these documents.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 41.

42.

Commitment Item 42 specified the existing periodic testing of drywell and torus spray nozzles was credited for license renewal.

Commitment Item 42, Periodic Testing of Drywell and Torus Spray Nozzles The inspectors reviewed the program basis documentation, Drywell and Torus Spray Nozzle test procedures, completed work orders and condition reports to verify the program has been implemented.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 42.

43.

Commitment Item 43 specified the existing lubricating oil monitoring program would be enhanced to include components exposed to an environment of lubricating oil in the following systems: reactor core isolation cooling system, main generator hydrogen seal oil system, high pressure coolant injection system, emergency diesel generator and auxiliaries system, station blackout system, and electro-hydraulic control system prior to the period of extended operation.

Commitment Item 43, Lubricating Oil Monitoring Activities The inspectors reviewed licensing basis, program basis documents, implementing procedures, scheduled and completed work orders, result trends, completed oil analysis laboratory results, and applicable corrective action program documents.

Additionally, the program owner was interviewed regarding these documents. The inspectors verified the licensee has enhanced the program to include the systems and subsystems listed in the Commitment Item in necessary documents to ensure aging is managed through the period of extended operation.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 43.

44.

Commitment Item 44 specified the licensee would develop and implement an Aging Management Program for heat exchangers in the scope of License Renewal that are not tested or inspected by the open-cycle and closed-cycle cooling water system aging management programs, to be completed prior to the period of extended operation.

Commitment Item 44, Heat Exchanger Test and Inspection Activities The inspectors reviewed the licensing basis, program basis documents, commitment changes, planned and completed work orders, Issue Reports, inspection procedures and interviewed the plant personnel responsible for the program to verify the program was being implemented. For example, the inspectors reviewed commitment change 11-02 which was a clarification in response to an NRC observation in Section 4OA5.1.a

(2) of NRC inspection report 05000265/2012008 and verified the proper implementation of the change. General program requirements for this commitment were inspected and determined to be complete for Quad Cities Units 1 and 2.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 44.

45.

Commitment Item 45 specified the licensee would use the existing Generator Stator Water Chemistry program to manage aging effects by monitoring and controlling stator water chemistry per established procedures.

Commitment Item 45, Generator Stator Water Chemistry Activities The inspectors reviewed Units 1 and 2 chemistry reports to verify parameters were monitored. General program requirements for this commitment were inspected and determined to be complete for Quad Cities Units 1 and 2.

Based on the review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 45.

46.

Commitment Item 46 specified the licensee would develop and implement an Aging Management Program to inspect components in the plant heating system once before the end of the current operating term and periodically at intervals not to exceed once every 5 years during the period of extended operation.

Commitment Item 46, Periodic Inspection of Plant Heating System The inspectors reviewed the licensing basis, program basis documents, planned and completed work orders, Issue Reports, inspection procedures and interviewed the plant personnel responsible for the program to verify the program was being implemented on Units 1 and 2.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 46 with the exception of the URI documented in Section 4OA5.1.b(1).

47.

Commitment Item 47 specified revised Pressure Temperature (P/T) limits will be prepared and submitted to the NRC for approval prior to the period of extended operation using an approved fluence methodology. On October 17, 2005 License Amendment No. 228 and No. 223 approved the revised P/T limits. The amendments revised Technical Specification (TS) Section 3.4.9, Reactor Coolant System Pressure, and Temperature (P/T) Limits, by incorporating revisions to the P/T limit curves for 54 effective full power years (extending to the end of the renewed license). The amendment also resolved a non-conservative condition for TS 2.4.9, Figure 3.4.9-2, Non-Nuclear Heatup/Cooldown Curve. The inspectors verified the program requirements have been incorporated into station programs.

Commitment Item 47, Time-limited Aging Analysis (TLAA) - Neutron Embrittlement of the Reactor Vessel and Internals Based on the licensees actions, the inspectors determined the licensee met Commitment Item 47.

48.

Commitment Item 48 specified commitments of the TLAA related to metal fatigue.

Quad Cities is taking credit for an existing program for monitoring the metal fatigue of reactor coolant pressure boundary. As discussed in Commitment Item 34, the licensee enhanced their current AMP with the EPRI-licensed FatiguePro computer software. In addition, prior to the period of extended operation, plant-specific calculations were performed for applicable locations identified in NUREG/CR-6260, Application of NUREG/CR-5999 Interim Fatigue Curves to Selected Nuclear Power Plant Components.

Commitment Item 48, TLAA - Metal Fatigue The inspectors reviewed the licensing basis, Fatigue and Transients monitoring program implementing procedures, Commitment Item change documents, calculations that assessed effects of reactor coolant on component fatigue life, related corrective action documents, and interviewed the program owner regarding these documents.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 48.

49.

Commitment Item 49 specified a reanalysis will be applied to EQ components now qualified for the current operating term of 40 years. The EQ binders for components within the scope of 10 CFR 50.49 will be updated to include environmental conditions associated with Extended Power Uprate implementation together with an extended operating period of 60 years.

Commitment Item 49, TLAA -Environmental Qualification of Electrical Equipment The inspectors reviewed several examples of EQ Binders for components within the scope of 10 CFR 50.49. The inspectors verified these EQ Binders were updated to include an extended operating period of 60 years. The inspectors also verified where a qualified life of 60 years could not be achieved; measures were in place to replace components before or at the end of the qualified life.

Based on the examples reviewed and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 49.

50.

Commitment Item 50 specified two specific TLAAs would be updated prior to the period of extended operation.

Commitment Item 50, Other Plant-Specific TLAAs The first specified the licensee conduct a UT inspection of the Dresden Unit 3 (the lead unit) drywell steel plate remaining thickness at the sand pocket level and use the results to revise the associated corrosion calculation and validate an acceptable wall thickness will remain to the end of the 60-year licensed operating period for Dresden and Quad Cities Plants.

The second TLAA specified the licensee conduct a UT inspection of the ECCS suction strainer flange remaining thickness and use the results to revise the associated galvanic corrosion calculation and validate an acceptable thickness will remain to the end of the 60-year licensed operating period for Quad Cities Units 1 and 2.

The inspectors reviewed the licensing basis documents, UT inspection results of the Quad Cities Units 1 and 2 ECCS suction strainer flanges and interviewed the plant personnel responsible for the program.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 50.

51.

Commitment Item 51 specified the licensee perform an evaluation of operating experience at EPU levels to ensure operating experience at EPU levels is properly addressed by the Aging Management Programs, and submit this evaluation to the NRC for review prior to entering the period of extended operation.

Commitment Item 51, BWR Operating Experience - EPU levels The licensee performed this evaluation and submitted it for NRC review on October 18, 2012 and therefore, met this commitment.

52.

This commitment, discussed in SER Section 3.0.3.18, specified the licensee would manage the aging of components within the scope of the LR program through the performance of periodic UT inspections, visual (VT-3) inspections, and visual inspection of flexible hoses for age related degradation.

AMP B.2.9, Periodic Inspection of Components Subject to Moist Air This program is a new program that manages the loss of material aging degradation of stainless steel, carbon steel, cast iron, aluminum, copper, brass, and bronze components. The licensee created this program to ensure aging degradation of components is inspected at a frequency that allows the identification of any degradation that may occur due to the components exposure to a moist air environment. If abnormal conditions are identified as a result of any of the programs UT or visual inspections, the licensee committed to performing engineering evaluations to address the progression of the degradation and identifying appropriate corrective actions in accordance with the site controlled Quality Assurance Program.

The inspectors reviewed the licensing basis, program basis documents, implementing procedures, scheduled, and completed work orders, action requests, engineering changes and evaluations and issue reports.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 52 with the exception of the URI documented in Section 4OA5.1.b(1).

53.

This aging management program commits to the periodic inspection of steam dryers, which are normally exposed to a 288°Celsius high purity water environment and are subject to cracking. This aging management program manages the cracking of the stainless steel plate and weld materials. The periodic inspections will be performed in accordance with NRC staff approved frequency and guidance AMP B.2.10, Periodic Inspection of Steam Dryers The inspectors reviewed the program basis documentation, implementing procedures, completed inspections, related corrective action documents, and interviewed responsible program personnel regarding these documents.

Based on the review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met this Commitment Item.

b.

(1) Findings and Observations Concern with Meeting One Time Visual Inspections IAW ASME Section XI Requirements
Introduction:

As part of the review of various licensee Commitment Items, the inspectors identified an unresolved item (URI) related to potential non-conformance with the commitments as described in Appendix A of the UFSAR. Specifically, the licensee did not follow the requirements of the ASME Section XI when performing various visual examinations.

Description

  • B.1.23 One Time Inspection - Ventilation Systems, Compressed Gas Systems, SBLC Chemistry Program;
During the Phase I inspection of Commitment Items (IR 05000265/2012008; ML12129A226), the inspectors identified the licensee was not performing visual examinations in accordance with the ASME code. The inspectors identified this through direct observation, review of the work orders used to perform these examinations and interviews with the appropriate plant personnel. The commitment to perform visual examinations in accordance with the ASME Section XI code applies to the following programs:
  • B.1.24 Selective Leaching;
  • B.2.8 Periodic Inspection of Plant Heating Steam; and
  • B.2.9 Periodic Inspection of Components Subject to Moist Air Environments.

The Commitment Item specifically states, The inspection will be performed in accordance with ASME Code requirements. Certified NDE examiners will conduct a VT-3 visual inspection (VT-1 for the Selective Leaching program, these inspections will consist of visual inspection consistent with ASME Section XI VT-1 visual inspection requirements.).

For visual examinations performed in accordance with the code, ASME section XI IWA 2210 requires visual examination be performed in accordance with ASME Section V Article 9. This section requires a procedure be used when performing visual examinations that include instructions on how the visual inspection is to be performed as well as illumination and instruments to be used. ASME Section XI has specific requirements associated with the different levels of visual examinations (VT-1 or VT-3)including distance, illumination, and character card resolution requirements. Contrary to this the licensee did not perform the VT-1 or VT-3 examinations in accordance with written procedures which documented the requirements for lighting, distance and other key parameters as well as acceptance criteria. Failure to do so did not ensure an ASME qualified process is used and clear requirements are provided and met.

The licensee submitted a Commitment Item change to clarify their position, indicating the intent was to have a qualified person performing the inspection, not to perform the examination in accordance with the requirements of the code. The licensee also indicated ASME requirements were verbally communicated to the examiners during their pre-job brief therefore, ensuring compliance with the code. In a letter dated May 18, 2012 (ML# 12173A423) the licensee requested a Commitment Item change. NRR staff subsequently issued a Request for Additional Information (ML12291A831) and is awaiting the licensees response in order to make a decision regarding these Commitment Items.

Therefore, this issue is considered unresolved pending resolution of the above issue.

(URI 05000254/2012010-01; 05000265/2012010-01: Concern with Meeting One Time Visual Inspections IAW ASME Section XI Requirements)

(2) Questions Regarding Aging Management Inspections on the 16 foot diameter Discharge Piping
Introduction:

As part of the review of licensee Commitment Item 31, the inspectors identified an unresolved item (URI) related to a 16 foot diameter discharge piping.

Specifically, the licensee does not physically inspect the piping for aging effects so that the intended functions of this component will be maintained during the period of extended operation.

Description:

As part of the review of Commitment Item 31 associated with the Water Control Structures inspection program, the inspectors reviewed the components that are within the scope of this program and how effects of aging are managed. NUREG 1796; Safety Evaluation Report Related to the License Renewal of the Dresden Nuclear Power Station, Units 2 and 3 and Quad Cities Nuclear Power Station, Units 1 and 2; dated 2004, Section 3.5.2.3.4 RG 1.127, Inspection of Water-Control Structures Associated with Nuclear Power Plants described the scope of the program and how the effects of aging are managed. Page 3-426 of NUREG 1796 identified the 16 foot diameter discharge piping as an in-scope component. The 16 foot diameter discharge piping provides an Ultimate Heat Sink (UHS) function in that during a Lock and Dam No.

14 failure the discharge piping provides suction source for portable pumps to provide cooling water flow to the Residual Heat Removal Service Water (RHRSW) pumps and Diesel Generator Cooling Water (DGCW) Pumps. The licensee, however, does not physically inspect the discharge piping. The licensee provided aging management of the discharge piping by crediting the performance of a one-time inspection of a 96 inch diameter ice melt line. The ice melt line prevents freezing of the river water entering the plant intake and also performs a support function for the UHS. During this inspection, the licensee was unable to locate where the Office of Nuclear Reactor Regulation (NRR)had reviewed and approved this method of aging management of the discharge piping.

In response to this concern, the licensee initiated Condition Report 01434957, (LR)

Scoping Review Required for UHS Discharge Piping, dated November 2, 2012.

Therefore, this issue is considered unresolved pending additional review of the information provided by the licensee and consultation with NRR to determine the appropriate aging management of the 16 foot diameter discharge piping. (URI 05000254/2012010-02; 05000265/2012010-02: Questions Regarding Aging Management Inspections on the 16 foot diameter Discharge Piping).

c.

The inspectors did not identify any other substantive instances of incomplete license renewal commitments with respect to timeliness or adequacy. The inspectors concluded pending resolution of the above mentioned URIs, commitments, license conditions, and regulatory requirements associated with the issuance of the renewed operating license were being met at the Quad Cities Nuclear Power Plant Units 1 and 2.

Overall Conclusions 4OA6

.1 Management Meetings

On November 9, 2012, the inspectors presented the inspection results to Mr. T. Hanley, and other members of the licensee staff. The licensee acknowledged the issues presented. The inspectors confirmed none of the potential report input discussed was considered proprietary.

Exit Meeting Summary

ATTACHMENT:

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

T. Hanley, Site Vice President

Licensee

K. Ohr, Site Engineering Director
W. Beck, Regulatory Assurance Manager
K. OShea, Operations Director
T. Rushing, Sr. System Manager/Engineering
P. Yost, Program Engineering
M. Rice, Program Engineering
M. Dunlay, Design Engineering
B. Stedman, Design Engineering
N. Howard, System Engineering
A. Burress, System Engineering
D. Luebbe, System Engineering
M. Wagner, Regulatory Assurance
T. Petersen, Regulatory Assurance

LIST OF ITEMS

OPENED, CLOSED AND DISCUSSED

05000254/2012010-01

Opened

05000265/2012010-01 URI Concerns with Meeting One Time Visual Inspections IAW ASME Section XI Requirements (4OA5.1.b(1))
05000254/2012010-02
05000265/2012010-02 URI Questions Regarding Aging Management Inspections on the 16 Diameter Discharge Pipes (4OA5.1.b(2))

None Closed and

Discussed