IR 05000254/2012010: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 12/21/2012
| issue date = 12/21/2012
| title = IR 05000254-12-010, 05000265-12-010; 10/22/12 - 11/09/12; Quad Cities Nuclear Power Station, Units 1 and 2; Post Approval Site Inspection for License Renewal
| title = IR 05000254-12-010, 05000265-12-010; 10/22/12 - 11/09/12; Quad Cities Nuclear Power Station, Units 1 and 2; Post Approval Site Inspection for License Renewal
| author name = Stone A M
| author name = Stone A
| author affiliation = NRC/RGN-III/DRS/EB2
| author affiliation = NRC/RGN-III/DRS/EB2
| addressee name = Pacilio M J
| addressee name = Pacilio M
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000254, 05000265
| docket = 05000254, 05000265
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532
{{#Wiki_filter:December 21, 2012
-4352 December 21, 2012 Mr. Michael Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville , IL 60555


SUBJECT: QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 NRC POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL REPORT 050002 54/201 2 0 10; 05000265/2012010
==SUBJECT:==
QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 NRC POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL REPORT 05000254/2012010; 05000265/2012010


==Dear Mr. Pacilio:==
==Dear Mr. Pacilio:==
On November 9, 201 2 , the U.S. Nuclear Regulatory Commission (NRC) completed Post-Approval Site Inspection for License Renewal at your Quad Cities Nuclear Power Station, Unit s 1 and 2. The enclosed report documents the results of this inspection, which were discussed on November 9, 201 2 , with Mr. T. Hanley, and other members of your staff.
On November 9, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed Post-Approval Site Inspection for License Renewal at your Quad Cities Nuclear Power Station, Units 1 and 2. The enclosed report documents the results of this inspection, which were discussed on November 9, 2012, with Mr. T. Hanley, and other members of your staff.


The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, and interviewed personnel.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.


Based on the results of this inspection, there were no findings of significance identified
The inspectors reviewed selected procedures and records, and interviewed personnel. Based on the results of this inspection, there were no findings of significance identified.
. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).


Sincerely,/RA/
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS)
Ann Marie Stone, Chie f Engineering Branch 2 Division of Reactor Safety Docket Nos.
component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


50-254; 50-265 License Nos. DPR
Sincerely,
-29; DPR 30
/RA/
 
Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR 30  


===Enclosure:===
===Enclosure:===
Inspection Report 05000 254/2012010; 05000265/201210
Inspection Report 05000254/2012010; 05000265/201210 w/Attachment: Supplemental Information
 
REGION III==
Docket Nos:
50-254; 50-265 License Nos:
DPR-29, DPR-30 Report No:
05000254/2012010; 05000265/2012010 Licensee:
Exelon Generation Company, LLC Facility:
Quad Cities Nuclear Power Station, Units 1 and 2 Location:
Cordova, IL Dates:
October 22, 2012 - November 9, 2012 Inspectors:
B. Jose, Senior Reactor Engineer (Lead)
 
N. Féliz Adorno, Reactor Engineer
 
G. ODwyer, Reactor Engineer
 
J. Bozga, Reactor Engineer
 
E. Sanchez, Reactor Engineer
 
J. Corujo, Reactor Engineer
 
J. Gilliam, Reactor Engineer
 
D. Betancourt, Reactor Engineer Approved by:
A. M. Stone, Chief
 
Engineering Branch 2


===w/Attachment:===
Division of Reactor Safety
Supplemental Information cc w/encl:
Distribution via ListServŽ


Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION III Docket Nos:
Enclosure  
50-254; 50-265 License Nos: DPR-29, DPR-30 Report No:
05000254/20 12010; 05000265/20 12010 Licensee: Exelon Generation Company, LLC Facility: Quad Cities Nuclear Power Station, Units 1 and 2 Location: Cordova, IL Dates: October 22, 201 2 - November 9, 201 2 Inspectors:
B. Jose, Senior Reactor Engineer (Lead)
N. Féliz Adorno
, Reactor Engineer G. O'Dwyer, Reactor Engineer J. Bozga, Reactor Engineer E. Sanchez, Reactor Engineer J. Corujo, Reactor Engineer J. Gilliam, Reactor Engineer D. Betancourt, Reactor Engineer Approved by:
A. M. Stone, Chief Engineering Branch 2 Division of Reactor Safety 1 Enclosure  


=SUMMARY OF FINDINGS=
=SUMMARY OF FINDINGS=
IR 05000254/2012010, 05000265/2012010; 10/22/12  
IR 05000254/2012010, 05000265/2012010; 10/22/12 - 11/09/12; Quad Cities Nuclear Power
 
Station, Units 1 and 2; Post Approval Site Inspection for License Renewal.


- 11/09/12; Quad Cities Nuclear Power Station, Units 1 and 2; Post Approval Site Inspection for License Renewal
The report covers a team inspection conducted by region-based engineering inspectors. The inspectors concluded that items, license conditions, and regulatory requirements associated with the issuance of the renewed operating license were being met. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 4, dated December 2006.
. The report covers a team inspection conducted by region-based engineering inspectors. The inspectors concluded that items, license conditions, and regulatory requirements associated with the issuance of the renewed operating license were being met. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 4, dated December 2006.


A.
A.


===Cornerstone: Initiating Events, Mitigating Systems, Barrier Integrity===
===Cornerstone: Initiating Events, Mitigating Systems, Barrier Integrity===
===NRC-Identified===
and Self-Revealed Findings No findings of significance were identified.


N RC-Identified and Self-Revealed Findings No findings of significance were identified.
B.


B. No violations of significance were identified.
No violations of significance were identified.


===
===Licensee-Identified Violations===
Licensee-Identified Violations===
4.


4. OTHER ACTIVITIES
OTHER ACTIVITIES


=REPORT DETAILS=
=REPORT DETAILS=


{{a|4OA5}}
4OA5
==4OA5 ==
 
===.1 Other Activities===
===.1 Other Activities===
The purpose of this inspection is to verify committed actions and license conditions associated with the renewed license for Units 1 and 2 are implemented in accordance with 10 CFR Part 54.


The purpose of this inspection is to verify committed actions and license conditions associated with the renewed license for Unit s 1 and 2 are implemented in accordance with 10 CFR Part 54.
Post-Approval Site Inspection for License Renewal (Phase II) - IP 71003 a.
: (1) Inspection Scope The inspectors discussed the identification of new SSCs, under the purview of title 10 of the code of federal regulations (CFR) 54.37(b), with the licensees license renewal staff.


Post-Approval Site Inspection for License Renewal (Phase II) - IP 71003  a.
The licensee personnel indicated newly identified components had resulted from a change to the Environmental Qualification (EQ) Program. The components were subsequently added to the site EQ Program, which is also credited as the license renewal (LR) Aging Management Program (AMP) B1.35. The AMP will manage the effects of aging for those newly identified components.
: (1) Inspection Scope The inspectors discussed the identification of new SSCs, under the purview of title 10 of the code of federal regulations (CFR) 54.37(b), with the licensee's license renewal staff.


The licensee personnel indicated newly identified components had resulted from a change to the Environmental Qualification (EQ) Program. The components were subsequently added to the site EQ Program , which is also credited as the license renewal (LR) Aging Management Program (AMP) B1.35. T he AMP will manage the effects of aging for those newly identified components.
Review of Newly Identified SSCs [Systems Structures and Components]
The license renewal Updated Final Safety Analysis Report (UFSAR) Supplement, Appendix A.1.35, Environmental Qualification (EQ) of electrical components, remains an accurate summary of the AMP, and does not require revision as a result of the newly identified components.
: (2) As part of reviewing the Aging Management Programs (AMPs) associated with the Commitment Items, the inspectors reviewed the UFSAR descriptions to confirm the implemented programs were consistent with the UFSAR descriptions.


Review of Newly Identified SSCs
Review of Updated Final Safety Analysis Report and Commitment Item Change Process The inspectors reviewed the licensees procedures to ensure that Commitment Item revisions would follow the guidance in NEI 99-04, Guidelines for Managing NRC Commitment Item Changes, including the elimination of commitment, and would properly evaluate, report, and approve changes to license renewal commitments listed in the UFSAR in accordance with 10 CFR 50.59. The inspectors also reviewed the licensees Commitment Item tracking program to evaluate its effectiveness.
[Systems Structures and Components]
The license renewal Updated Final Safety Analysis Report (UFSAR) Supplement, Appendix A.1.35, "Environmental Qualification (EQ) of electrical components," remains an accurate summary of the AMP, and does not require revision as a result of the newly identified components.
: (2) As part of reviewing the Aging Management Programs (AMPs) associated with the Commitment Items, the inspectors reviewed the UFSAR descriptions to confirm the implemented programs were consistent with the UFSAR descriptions
. Review of Updated Final Safety Analysis Report and Commitment Item Change Process The inspectors reviewed the licensee's procedures to ensure that Commitment Item revisions would follow the guidance in NEI 99
-04, "Guidelines for Managing NRC Commitment Item Changes," including the elimination of commitment, and would properly evaluate, report, and approve changes to license renewal commitments listed in the UFSAR in accordance with 10 CFR 50.59. The inspectors also reviewed the licensee's Commitment Item tracking program to evaluate its effectiveness.


With respect to implementation, the inspectors reviewed changes associated with each commitment. One Unresolved Item (URI) was identified and is documented in Section 4OA5.1.b (1).
With respect to implementation, the inspectors reviewed changes associated with each commitment. One Unresolved Item (URI) was identified and is documented in Section 4OA5.1.b (1).
: (3) The inspectors reviewed supporting documents including completed surveillance records, conducted interviews, performed visual inspection of structures and components to veri fy the licensee completed the necessary actions to comply with the license conditions that are a part of the renewed operating license. The inspectors verified the licensee implemented the Aging Management Programs and time
: (3) The inspectors reviewed supporting documents including completed surveillance records, conducted interviews, performed visual inspection of structures and components to verify the licensee completed the necessary actions to comply with the license conditions that are a part of the renewed operating license. The inspectors verified the licensee implemented the Aging Management Programs and time-limited Review of Commitment Items aging analyses (TLAA) included in NUREG-1796, Safety Evaluation Report (SER)
-limited Review of Commitment Item s
Related to the License Renewal of Dresden Nuclear Power Station Units 2 and 3 and Quad Cities Nuclear Power Station, Units 1 and 2, in accordance with Title 10 of the Code of Federal Regulations (CFR) Part 54, Requirements for the Renewal of Operating Licenses for Nuclear Power Plants. The inspectors verified a selected sample of corrective actions taken to address issues identified during the Dresden Units 2 and 3 license renewal inspections, which was documented in Inspection Reports 05000237/2009007 and 05000249/2010010, and were also applicable to Quad Cities Units 1 and 2.
3 Enclosure aging analyses (TLAA) included in NUREG
 
-1796, "Safety Evaluation Report (SER) Related to the License Renewal of Dresden Nuclear Power Station Units 2 and 3 and Quad Cities Nuclear Power Station, Units 1 and 2 ," in accordance with Title 10 of the Code of Federal Regulations (CFR) Part 54, "Requirements for the Renewal of Operating Licenses for Nuclear Power Plants.The inspectors verified a selected sample of corrective actions taken to address issues identified during the Dresden Unit s 2 and 3 license renewal inspection s , which w as documented in Inspection Report s 05000237/2009007 and 05000249/2010010 , and were also applicable to Quad Cities Units 1 and 2
When changes to these items were identified, the inspectors reviewed the Commitment Item Change Evaluation Form (CCEF) to verify the licensee followed the guidance in NEI 99-04 for the license renewal Commitment Item change process, including the elimination of commitments, and properly evaluated, reported, and approved where necessary, changes to license renewal commitments listed in the UFSAR in accordance with 10 CFR 50.59.
. When changes to these items were identified, the inspectors reviewed the Commitment Item Change Evaluation Form (CCEF) to verify the licensee followed the guidance in NEI 99-04 for the license renewal Commitment Item change process, including the elimination of commitments, and properly evaluated, reported, and approved where necessary, changes to license renewal commitments listed in the UFSAR in accordance with 10 CFR 50.59.


The inspectors reviewed the Commitment Items listed below which are referenced to Appendix A of the SER. Specific documents reviewed are listed in the enclosure.
The inspectors reviewed the Commitment Items listed below which are referenced to Appendix A of the SER. Specific documents reviewed are listed in the enclosure.


1. Commitment Item 1 specified the existing ASME Section XI, Subsections IWB, IWC, and IWD Aging Management Program
===1. Commitment Item 1 specified the existing ASME Section XI, Subsections IWB, IWC,===
, is part of the Inservice Inspection (ISI) Program. It provides identification of signs of degradation, and establishment of corrective actions for condition monitoring of reactor coolant pressure retaining piping and components within the scope of license renewal.
and IWD Aging Management Program, is part of the Inservice Inspection (ISI)
Program. It provides identification of signs of degradation, and establishment of corrective actions for condition monitoring of reactor coolant pressure retaining piping and components within the scope of license renewal. The inspections will be implemented in accordance with 10 CFR 50.55(a). Also Quad Cities implemented Risk Informed Inservice Inspection and the alternative Risk Informed Inservice Inspection programs for Class 1 and 2 piping.
 
Commitment Item 1, ASME [American Society of Mechanical Engineers] Code, Section XI Inservice Inspection, Subsections IWB, IWC, and IWD The inspectors reviewed the licensing basis, program basis documents, implementing procedures, non-destructive examination (NDE) records, and related condition reports; and interviewed the responsible plant personnel regarding these documents. The inspectors verified the licensee incorporated the Risk Informed ISI Program for Class 1 and 2 Systems.
 
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 1.


The inspections will be implemented in accordance with 10 CFR 50.55(a). Also Quad Cities implemented Risk Informed Inservice Inspection and the alternative Risk Informed Inservice Inspection programs for Class 1 and 2 piping.
===2. Commitment Item 2 specified the existing water chemistry program was credited for===
license renewal for both Units 1 and 2 and that the program was enhanced prior to the period of extended operation.


Commitment Item 1, ASME [American Society of Mechanical Engineers] Code, Section XI Inservice Inspection, Subsections IWB, IWC, and IWD The inspectors reviewed the licensing basis, program basis documents, implementing procedures, non
Commitment Item 2, Water Chemistry The inspectors reviewed changes and enhancements to the program and ensured the program remained effective for both units. The inspectors verified procedure CY-QC-110-608, Reactor/Turbine Building Sample Panel Sample Collection, Revision 21 was revised to ensure the integrity of the samples collected.
-destructive examination (NDE) records, and related condition reports; and interviewed the responsible plant personnel regarding these documents. The inspectors verified the licensee incorporated the Risk Informed ISI Program for Class 1 and 2 Systems.


Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 1. 2. Commitment Item 2 specified the existing water chemistry program was credited for license renewal for both Units 1 and 2 and that the program was enhanced prior to the period of extended operation
The inspectors reviewed the licensing basis, program basis documents, planned and completed work orders, Commitment Item changes, Issue Reports, inspection procedures and interviewed the plant personnel responsible for the program.
. Commitment Item 2, Water Chemistry The inspectors reviewed changes and enhancements to the program and ensured the program remained effective for both units
. The inspectors verified procedure CY-QC-110-608, Reactor/Turbine Building Sample Panel Sample Collection, Revision 21 was revised to ensure the integrity of the samples collected.


The inspectors reviewed the licensing basis, program basis document s, planned and completed work orders, Commitment Item changes, Issue Reports, inspection 4 Enclosure procedures and interviewed the plant personnel responsible for the program.
Planned and completed chemistry surveillance tests and related Issue Reports demonstrated the water chemistry program was appropriately applied to Units 1 and 2.


Planned and completed chemistry surveillance tests and related Issue Reports demonstrated the water chemistry program was appropriately applied to Unit s 1 and 2. Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 2 for Units 1 and 2.
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 2 for Units 1 and 2.


3. Commitment Item 3 specified the existing Reactor Head Closure Studs Aging Management Program was credited. The program is implemented through station procedures, ISI program plan for Quad Cities, and corporate procedures for inservice inspection of welds and components. The program implements inspection requirements of ASME Section XI and preventive measures described in Regulatory Guide 1.65, "Materials and Inspection for Reactor Vessel Closure Studs
===3. Commitment Item 3 specified the existing Reactor Head Closure Studs Aging===
." The reactor head studs at Quad Cities are not metal plated and have had manganese phosphate coatings applied.
Management Program was credited. The program is implemented through station procedures, ISI program plan for Quad Cities, and corporate procedures for inservice inspection of welds and components. The program implements inspection requirements of ASME Section XI and preventive measures described in Regulatory Guide 1.65, "Materials and Inspection for Reactor Vessel Closure Studs." The reactor head studs at Quad Cities are not metal plated and have had manganese phosphate coatings applied.


Commitment Item 3, Reactor Head Closure Studs The inspectors interviewed the plant personnel responsible for the program and reviewed the program bas is documents, implementing procedures, work orders, and related IRs to verify the program was being implemented on Unit s 1 and 2. Based on review of the licensee actions, the inspectors determined the licensee met Commitment Item 3. 4. Commitment Item 4 specified the existing BWR Vessel Attachment Welds Aging Management Program activities incorporated the inspection and evaluation recommendations of BWRVIP
Commitment Item 3, Reactor Head Closure Studs The inspectors interviewed the plant personnel responsible for the program and reviewed the program basis documents, implementing procedures, work orders, and related IRs to verify the program was being implemented on Units 1 and 2.
-48, 'Vessel ID Attachment Weld Inspection and Evaluation Guidelines," as well as the water chemistry recommendations of EPRI TR-103515-R2, "BWR Water Chemistry Guidelines."  The program is implemented through station procedures that provide for mitigation of cracking through water chemistry and monitoring for cracking through in vessel examinations.


Commitment Item 4, BWR [Boiling Water Reactor] Vessel ID [Internal Diameter] Attachment Welds The inspectors reviewed the licensing basis, program basis documents, implementing procedures, NDE examination records, and interviewed the plant personnel responsible for the program regarding these documents to verify the program is being implemented on Unit s 1 and 2. Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 4. 5. Commitment Items 5 specified the existing BWR Feedwater Nozzle program was credited for license renewal and would be enhanced prior to the period of extended operation. This program implemented inservice inspection specified in ASME Code, Section XI and enhanced it with recommendations from General Electric NE A71-0594-A, Revision 1 "Alternate BWR Feedwater Nozzle Inspection Requirements
Based on review of the licensee actions, the inspectors determined the licensee met Commitment Item 3.
."  Per their enhancements
, the licensee will perform periodic ultrasonic testing inspection of certain critical regions of the BWR feedwater nozzles. Commitment Item 5, BWR Feedwater Nozzle


5 Enclosure The inspectors reviewed the licensing basis, program basis documents, implementing procedures, NDE examination records, related condition reports, and interviewed the responsible plant personnel. The inspectors verified the licensee implement ed the recommendations of report GE
===4. Commitment Item 4 specified the existing BWR Vessel Attachment Welds Aging===
-NE-523-A71-0594-A, Revision 1, which was approved by the NRC staff.
Management Program activities incorporated the inspection and evaluation recommendations of BWRVIP-48, 'Vessel ID Attachment Weld Inspection and Evaluation Guidelines," as well as the water chemistry recommendations of EPRI TR-103515-R2, "BWR Water Chemistry Guidelines." The program is implemented through station procedures that provide for mitigation of cracking through water chemistry and monitoring for cracking through in vessel examinations.


Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 5. 6. Commitment Item 6 specified the existing BWR Control Rod Drive Return Line Nozzle inspection program was credited for license renewal. This program implemented inservice inspection in accordance with ASME Code Section XI. The licensee cut and capped the CRD return line nozzle. As a result, the augmented inspections described in NUREG
Commitment Item 4, BWR [Boiling Water Reactor] Vessel ID [Internal Diameter]
-0619 "BWR Feedwater Nozzle and Control Rod Drive Return Line Nozzle Cracking" or GE NE A71-0594, "Alternative BWR Feedwater Nozzle Inspection Requirements" are not required.
Welds The inspectors reviewed the licensing basis, program basis documents, implementing procedures, NDE examination records, and interviewed the plant personnel responsible for the program regarding these documents to verify the program is being implemented on Units 1 and 2.
 
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 4.
 
===5. Commitment Items 5 specified the existing BWR Feedwater Nozzle program was===
credited for license renewal and would be enhanced prior to the period of extended operation. This program implemented inservice inspection specified in ASME Code, Section XI and enhanced it with recommendations from General Electric NE-523-A71-0594-A, Revision 1 Alternate BWR Feedwater Nozzle Inspection Requirements. Per their enhancements, the licensee will perform periodic ultrasonic testing inspection of certain critical regions of the BWR feedwater nozzles.
 
Commitment Item 5, BWR Feedwater Nozzle The inspectors reviewed the licensing basis, program basis documents, implementing procedures, NDE examination records, related condition reports, and interviewed the responsible plant personnel. The inspectors verified the licensee implemented the recommendations of report GE-NE-523-A71-0594-A, Revision 1, which was approved by the NRC staff.
 
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 5.
 
===6. Commitment Item 6 specified the existing BWR Control Rod Drive Return Line===
Nozzle inspection program was credited for license renewal. This program implemented inservice inspection in accordance with ASME Code Section XI. The licensee cut and capped the CRD return line nozzle. As a result, the augmented inspections described in NUREG-0619 BWR Feedwater Nozzle and Control Rod Drive Return Line Nozzle Cracking or GE NE-523-A71-0594, Alternative BWR Feedwater Nozzle Inspection Requirements are not required.


Commitment Item 6, Control Rod Drive (CRD) Return Line Nozzle The inspectors reviewed the licensing basis, program basis documents, implementing procedures, NDE examination records, related condition reports, and interviewed the plant personnel regarding these documents.
Commitment Item 6, Control Rod Drive (CRD) Return Line Nozzle The inspectors reviewed the licensing basis, program basis documents, implementing procedures, NDE examination records, related condition reports, and interviewed the plant personnel regarding these documents.


Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 6. 7. Commitment Item 7 specified the existing BWR SCC Program was credited for license renewal. The BWR SCC Program is credited for managing the aging effects of crack initiation and growth, loss of fracture toughness, and loss of material in susceptible components. The program was also enhanced to include an additional ultrasonic examination of the Quad Cities Unit 2 reactor vessel head crack (detected in 1990) to verify the relevant indication has remained essentially unchanged.
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 6.
 
===7. Commitment Item 7 specified the existing BWR SCC Program was credited for===
license renewal. The BWR SCC Program is credited for managing the aging effects of crack initiation and growth, loss of fracture toughness, and loss of material in susceptible components. The program was also enhanced to include an additional ultrasonic examination of the Quad Cities Unit 2 reactor vessel head crack (detected in 1990) to verify the relevant indication has remained essentially unchanged.


Commitment Item 7, BWR Stress Corrosion Cracking (SCC)
Commitment Item 7, BWR Stress Corrosion Cracking (SCC)
The inspectors reviewed the licensing basis, program basis document s , implementing procedures, weld examination records, and related IRs; and interviewed the plant personnel responsible for the program regarding these documents to verify the program is being implemented.
The inspectors reviewed the licensing basis, program basis documents, implementing procedures, weld examination records, and related IRs; and interviewed the plant personnel responsible for the program regarding these documents to verify the program is being implemented.
 
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 7.
 
===8. Commitment Item 8 specified the existing BWR reactor vessel penetration inspection===
program was credited for license renewal. The license renewal program applies only to the Standby Liquid Control/Core Plate DP penetrations and Instrument penetrations N11A/B and N12A/B. This program implemented inspection and flaw evaluation in conformance with BWRVIP-27 and BWRVIP-49.


Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 7. 8. Commitment Item 8 specified the existing BWR reactor vessel penetration inspection program was credited for license renewal. The license renewal program applies only to the Standby Liquid Control/Core Plate DP penetrations and Instrument penetrations N11A/B and N12A/B. This program implemented inspection and flaw evaluation in conformance with BWRVIP
Commitment Item 8, BWR Penetrations The inspectors reviewed the program basis documents, procedures, and NDE examination records to verify the program was adequately implemented.
-27 and BWRVIP
-49. Commitment Item 8, BWR Penetrations The inspectors reviewed the program basis documents, procedures, and NDE examination records to verify the program was adequately implemented.


6 Enclosure Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 8. 9. Commitment Item 9 specified the existing BWR Vessel Internals Program (VIP) would be credited for license renewal and enhanced with inspections consistent with BWRVIP-48. The BWR Vessel internals Aging Management Program mitigates the effect of stress corrosion cracking, intergranular stress corrosion cracking (IGSCC), and irradiation assisted stress corrosion cracking in reactor pressure vessels internals through water chemistry activities that are implemented through station procedures and are consistent with the guidelines of year 2000 revision of EPRI TR-103515-R2, BWR Water Chemistry Guidelines. The program also manages cracking of reactor pressure vessel internals through condition monitoring activities that consist of examinations and the BWRVIP guidelines, as well as the requirements of ASME Section XI.
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 8.
 
===9. Commitment Item 9 specified the existing BWR Vessel Internals Program (VIP)===
would be credited for license renewal and enhanced with inspections consistent with BWRVIP-48. The BWR Vessel internals Aging Management Program mitigates the effect of stress corrosion cracking, intergranular stress corrosion cracking (IGSCC),and irradiation assisted stress corrosion cracking in reactor pressure vessels internals through water chemistry activities that are implemented through station procedures and are consistent with the guidelines of year 2000 revision of EPRI TR-103515-R2, BWR Water Chemistry Guidelines. The program also manages cracking of reactor pressure vessel internals through condition monitoring activities that consist of examinations and the BWRVIP guidelines, as well as the requirements of ASME Section XI.


Commitment Item 9, BWR Vessel Internals The inspectors reviewed the licensing basis, program basis documents, implementing procedures, NDE examination records; and interviewed the plant personnel responsible for the program regarding these documents to verify the program is being implemented.
Commitment Item 9, BWR Vessel Internals The inspectors reviewed the licensing basis, program basis documents, implementing procedures, NDE examination records; and interviewed the plant personnel responsible for the program regarding these documents to verify the program is being implemented.


Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 9. 10. Commitment Item 10 specified a new Aging Management Program for thermal aging and neutron irradiation embrittlement of CASS reactor internal components within the scope of license renewal, to ensure the integrity of the CASS components exposed to high temperature and neutron fluence present in the reactor environment. This program includes a component specific evaluation of the loss of fracture toughness. For those components
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 9.
, where the loss of fracture toughness may affect function of the component, an enhanced VT
 
-1 inspection will be conducted. These inspections will be in accordance with BWRVIP
10.
-03, and will be performed as part of the ISI program.
 
Commitment Item 10 specified a new Aging Management Program for thermal aging and neutron irradiation embrittlement of CASS reactor internal components within the scope of license renewal, to ensure the integrity of the CASS components exposed to high temperature and neutron fluence present in the reactor environment. This program includes a component specific evaluation of the loss of fracture toughness. For those components, where the loss of fracture toughness may affect function of the component, an enhanced VT-1 inspection will be conducted. These inspections will be in accordance with BWRVIP-03, and will be performed as part of the ISI program.


Commitment Item 10, Thermal Aging and Neutron Irradiation Embrittlement of Cast Austenitic Stainless Steel (CASS)
Commitment Item 10, Thermal Aging and Neutron Irradiation Embrittlement of Cast Austenitic Stainless Steel (CASS)
The inspectors reviewed the licensing basis, program basis documents, implementing procedures, completed inspections and interviewed the plant personnel responsible for the program regarding these documents to verify the program is being implemented.
The inspectors reviewed the licensing basis, program basis documents, implementing procedures, completed inspections and interviewed the plant personnel responsible for the program regarding these documents to verify the program is being implemented.


Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 10. 11. Commitment Item 11 specified the existing FAC Program was credited for license renewal with enhancements to include portions of the main steam and the reactor vessel head vent systems prior to the period of extended operation. The site's FAC program is based on EPRI guidelines found in NSAC
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 10.
-202L-R3, "Recommendations for an Effective Flow Accelerated Corrosion Program."
 
11.


The program is credited for Commitment Item 11, Flow Accelerated Corrosion (FAC)
Commitment Item 11 specified the existing FAC Program was credited for license renewal with enhancements to include portions of the main steam and the reactor vessel head vent systems prior to the period of extended operation. The sites FAC program is based on EPRI guidelines found in NSAC-202L-R3, Recommendations for an Effective Flow Accelerated Corrosion Program. The program is credited for Commitment Item 11, Flow Accelerated Corrosion (FAC)predicting, detecting, and monitoring for loss of material by wall thinning in piping, fittings, and valve bodies due to FAC.


7 Enclosure predicting, detecting, and monitoring for loss of material by wall thinning in piping, fittings, and valve bodies due to FAC.
The inspectors reviewed the licensing basis, program basis documents, implementing procedures, pipe examination records and related IRs and interviewed the responsible plant personnel regarding these documents.


The inspectors reviewed the licensing basis, program basis document s , implementing procedures, pipe examination records and related IRs and interviewed the responsible plant personnel regarding these documents.
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 11.


Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 11. 12. Commitment Item 12 specified the existing bolting integrity program was credited for license renewal and that the program would be enhanced prior to the period of extended operation. The Bolting Integrity Program is an existing program that consist s of the preventive and condition monitoring of pressure retaining bolted joints o f piping and components for age
12.
-related degradation to discover and correct conditions that could lead to a loss of intended function.
 
Commitment Item 12 specified the existing bolting integrity program was credited for license renewal and that the program would be enhanced prior to the period of extended operation. The Bolting Integrity Program is an existing program that consists of the preventive and condition monitoring of pressure retaining bolted joints of piping and components for age-related degradation to discover and correct conditions that could lead to a loss of intended function.


Commitment Item 12, Bolting Integrity The inspectors reviewed the licensing basis, the Bolting Integrity Program basis documentation, implementing procedures, planned and completed work orders, related corrective action documents, and interviewed responsible program personnel regarding these documents.
Commitment Item 12, Bolting Integrity The inspectors reviewed the licensing basis, the Bolting Integrity Program basis documentation, implementing procedures, planned and completed work orders, related corrective action documents, and interviewed responsible program personnel regarding these documents.


Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 12. 13. Commitment Item 13 specified the existing program was credited for license renewal and had been enhanced, prior to the period of extended operation, to include periodic inspections of cooling water pump internal linings, additional heat exchangers and sub
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 12.
-components, external surfaces of various submerged pumps, components in the high humidity/moisture environments of the pump vaults, and piping. Commitment Item 13, Open-Cycle Cooling Water Program The inspectors reviewed changes and enhancements to the program and ensured that the program remained effective for both units
 
. The inspectors reviewed the licensing basis, program basis document s, planned and completed work orders, Commitment Item changes, Issue Reports, inspection procedures and interviewed the plant personnel responsible for the program to verify the program w as being implemented
13.
. General program requirements for this commitment were inspected and determined to be complete for Quad Cities Unit s 1 and 2. Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 13 for Units 1 and 2.
 
Commitment Item 13 specified the existing program was credited for license renewal and had been enhanced, prior to the period of extended operation, to include periodic inspections of cooling water pump internal linings, additional heat exchangers and sub-components, external surfaces of various submerged pumps, components in the high humidity/moisture environments of the pump vaults, and piping.
 
Commitment Item 13, Open-Cycle Cooling Water Program The inspectors reviewed changes and enhancements to the program and ensured that the program remained effective for both units. The inspectors reviewed the licensing basis, program basis documents, planned and completed work orders, Commitment Item changes, Issue Reports, inspection procedures and interviewed the plant personnel responsible for the program to verify the program was being implemented. General program requirements for this commitment were inspected and determined to be complete for Quad Cities Units 1 and 2.
 
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 13 for Units 1 and 2.
 
14.
 
Commitment Item 14 specified the existing closed-cycle cooling water chemistry program was enhanced and credited for license renewal for both Units 1 and 2.
 
Commitment Item 14, Closed-Cycle Cooling Water Chemistry The inspectors reviewed the licensing basis, program basis documents, planned and completed work orders, Issue Reports, inspection procedures and interviewed plant personnel responsible for the program to verify the program was being implemented. General program requirements for this commitment were inspected and determined to be complete for Quad Cities Unit 1 and 2.
 
The licensee changed this commitment Item to use the guidance from the latest Electric Power Research Institute (EPRI) guidance document, EPRI TR 1007820, Closed Cooling Water Chemistry Guideline, Revision 1 instead of a previous EPRI Guidance procedure. The inspectors noted Revision 2 of the GALL endorsed the latest EPRI guidance document, EPRI TR 1007820. The inspectors verified this commitment change was appropriate.
 
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 14.
 
15.
 
Commitment Item 15 specified the existing inspection of overhead heavy load and light load (related to refueling) handling systems program was credited for license renewal and that the program would be enhanced prior to the period of extended operation.
 
Commitment Item 15, Overhead Heavy Load and Light Load (Related to Refueling)
Handling Systems The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders, related corrective action documents and interviewed personnel responsible for the program regarding these documents.
 
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 15.
 
16.
 
Commitment Item 16 specified the existing compressed air monitoring program was credited for license renewal and that the program would be enhanced prior to the period of extended operation.
 
Commitment Item 16, Compressed Air Monitoring The inspectors reviewed the licensing basis, program basis documents, planned and completed work orders, Issue Reports, inspection procedures and interviewed the plant personnel responsible for the program to verify the program was being implemented. General program requirements for this commitment were inspected and determined to be complete for Quad Cities Unit 1 and 2.
 
Based on review of the timeliness and adequacy of the licensees actions the inspectors determined the licensee met Commitment Item 16.
 
17.
 
Commitment Item 17 specified the existing program was credited for license renewal and was consistent with NUREG-1801 Generic Aging Lessons Learned (GALL).
 
Commitment Item 17, BWR Reactor Water Cleanup (RWCU) System The inspectors reviewed the licensing basis, program basis documents, and work orders. The licensee has replaced all in-scope portions of the RWCU system piping with IGSCC resistant piping. The RWCU portions that are inboard of the second isolation valve are being managed by the ISI program. The inspectors reviewed selected samples to confirm the ISI program was being utilized for the sections of the RWCU previously mentioned.
 
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 17.
 
18.
 
Commitment Item 18 specified the licensee would enhance the existing fire protection program as follows:
Commitment Item 18, Fire Protection (non-water)
* Provide specific guidance to check fire doors for wear and holes in skin that could affect intended function during weekly tours as well as check the fire door clearances.
* Inspect external surfaces of the carbon dioxide system.
* Perform a visual inspection (VT-1 or equivalent) on a 10 percent sample population of each type of fire seal on a refueling outage frequency. Expand the sample population by 10 percent if any of the inspected seals are found to have abnormal degradation that could prevent the seal from performing its intended function.
 
The inspectors reviewed the licensing basis, program basis documents, and existing implementing procedures. The inspectors verified the above enhancements were incorporated into the existing program documents and implementing procedures. The inspectors also reviewed the completed inspections and training requirements.
 
Based on the review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 18.
 
19.
 
Commitment Item 19 specified the existing fire water system program was credited for license renewal and that the program would include several enhancements prior to the period of extended operation.
 
Commitment Item 19, Fire Water System The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders and related corrective action documents.
 
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 19.
 
20.
 
Commitment Item 20 specified the existing above-ground carbon steel tanks program was credited for license renewal and that the program would be enhanced prior to the period of extended operation. The enhancements included periodic system engineer walkdowns on the nitrogen storage tanks utilizing a standalone procedure and a one-time UT thickness inspection will be performed on the aluminum condensate storage tank or demineralized water storage tank.
 
Commitment Item 20, Above-ground Carbon Steel Tanks The inspectors reviewed the licensing basis, program basis documents, implementing procedures, scheduled, and completed work orders, related action requests, engineering changes, and evaluations. The inspectors verified the licensee has implemented procedure changes to address the documentation of inspection results by system engineers. In addition, the inspectors verified the licensee has implemented procedures to address internal/external inspections as well as committed UT inspections.
 
During this review, the inspectors identified the B Contaminated Condensate Storage Tank (CCST) inspection performed in 2007 time frame did not include NDE. Specifically, the license renewal commitment specified NDE would be performed once before the period of extended operation (PEO) and every five years thereafter. The inspectors noted this omission in 2007 was a failure to follow the requirements of the commitment. However, since the licensee performed a UT inspection of the B CCST in November 2012 (before the PEO) in accordance with the requirements of the commitment, this commitment was met.
 
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 20.


14. Commitment Item 14 specified the existing closed
21.
-cycle cooling water chemistry program was enhanced and credited for license renewal for both Units 1 and 2.


Commitment Item 14, Closed
Commitment Item 21 specified the existing fuel oil chemistry program was credited for license renewal and that the program would be enhanced prior to the period of extended operation. The program was to be enhanced to include inspection of the fuel oil tank interiors for corrosion during regularly scheduled tank cleanings.
-Cycle Cooling Water Chemistry The inspectors reviewed the licensing basis, program basis document s, planned and completed work orders, Issue Reports, inspection procedures and interviewed 8 Enclosure plant personnel responsible for the program to verify the program w as being implemented
. General program requirements for this commitment were inspected and determined to be complete for Quad Cities Unit 1 and 2.


The licensee changed this commitment Item to use the guidance from the latest Electric Power Research Institute (EPRI) guidance document, EPRI TR 1007820, "Closed Cooling Water Chemistry Guideline," Revision 1 instead of a previous EPRI Guidance procedure. The inspectors noted Revision 2 of the GALL endorsed the latest EPRI guidance document, EPRI TR 1007820. The inspectors verified this commitment change was appropriate.
Commitment Item 21, Fuel Oil Chemistry The inspectors interviewed the program owner, reviewed the licensing basis, program basis documents, scheduled, and completed work orders and implementing procedures. The inspectors verified the licensee has implemented a program that evaluates the material condition and bottom thickness of the fuel oil storage tanks to ensure aging effects are effectively managed.


Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 14. 15. Commitment Item 15 specified the existing inspection of overhead heavy load and light load (related to refueling) handling systems program was credited for license renewal and that the program would be enhanced prior to the period of extended operation.
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 21.


Commitment Item 15, Overhead Heavy Load and Light Load (Related to Refueling) Handling Systems The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders, related corrective action documents and interviewed personnel responsible for the program regarding these documents.
22.


Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 15. 16. Commitment Item 16 specified the existing compressed air monitoring program was credited for license renewal and that the program would be enhanced prior to the period of extended operation
Commitment Item 22 specified the existing reactor vessel surveillance Aging Management Program was credited for license renewal and that the program would be enhanced prior to the period of extended operation. The program is implemented through station procedures that conform to the requirements of 10 CFR Part 50, Appendix H, "Reactor Vessel Material Surveillance Program Requirements." Neutron embrittlement is predicted utilizing chemistry tables and Position 1.3 limitations as described in Regulatory Guide 1.99, Revision 2, "Radiation Embrittlement of Reactor Vessel Materials."
. Commitment Item 16, Compressed Air Monitoring The inspectors reviewed the licensing basis, program basis document s, planned and completed work orders, Issue Reports, inspection procedures and interviewed the plant personnel responsible for the program to verify the program w as being implemented
. General program requirements for this commitment were inspected and determined to be complete for Quad Cities Unit 1 and 2.


Based on review of the timeliness and adequacy of the licensee's actions the inspectors determined the licensee met Commitment Item 16. 17. Commitment Item 17 specifie d the existing program was credited for license renewal and was consistent with NUREG
Commitment Item 22, Reactor Vessel Surveillance The inspectors reviewed the licensing basis, program basis documents, implementing procedures and interviewed the AMP owner regarding these documents. The inspectors verified the licensee incorporated the testing requirements for reactor vessel test capsules have been incorporated into station programs and procedures.
-1801 "Generic Aging Lessons Learned (GALL)." Commitment Item 17, BWR Reactor Water Cleanup (RWCU) System The inspectors reviewed the licensing basis, program basis document s, and work orders. The licensee has replaced all in
-scope portions of the RWCU system piping with IGSCC resistant piping. The RWCU portions that are inboard of the second 9 Enclosure isolation valve are being managed by the ISI program. The inspectors reviewed selected samples to confirm the ISI program was being utilized for the sections of the RWCU previously mentioned
. Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 17. 18. Commitment Item 18 specified the licensee would enhance the existing fire protection program as follows:
Commitment Item 18, Fire Protection (non-water)  Provide specific guidance to check fire doors for wear and holes in skin that could affect intended function during weekly tours as well as check the fire door clearances.


Inspect external surfaces of the carbon dioxide system.
Based on review and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 22.


Perform a visual inspection (VT
23.
-1 or equivalent) on a 10 percent sample population of each type of fire seal on a refueling outage frequency. Expand the sample population by 10 percent if any of the inspected seals are found to have abnormal degradation that could prevent the seal from performing its intended function. The inspectors reviewed the licensing basis, program basis document s, and existing implementing procedures. The inspectors verified the above


enhancements were incorporated into the existing program documents and implementing procedures. The inspectors also reviewed the completed inspections and training requirements.
Commitment Item 23 specified the licensee perform one-time inspections of selected plant equipment to verify current plant Aging Management Programs were effective in managing the effects of aging prior to the period of extended operation.


Based on the review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 18. 19. Commitment Item 19 specified the existing fire water system program was credited for license renewal and that the program would include several enhancements prior to the period of extended operation
Commitment Item 23, One-Time Inspection The licensee had established separate one-time inspection programs covering the specific commitments listed in the SER. The inspectors reviewed the licensing basis, each program basis document, implementing procedures, inspection results and related IRs, and interviewed the responsible plant personnel regarding these documents.
. Commitment Item 19, Fire Water System The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders and related corrective action documents.


Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 19. 20. Commitment Item 20 specified the existing above
The inspectors verified the licensee had documented the results of the one-time inspections, and with one exception, had followed up appropriately when aging effects were identified. For the one exception, a one-time inspection of the clean demineralized water check valve 0-4399-16 was performed and the results showed significant corrosion in the seating surface. In addition, all internal surfaces revealed moderate corrosion with some material wastage. The valve was replaced and the licensee performed an evaluation to determine if any aging management actions were needed. The site performed additional inspections at other valves belonging to the same sample group and those were found in good condition.
-ground carbon steel tanks program was credited for license renewal and that the program would be enhanced prior to the period of extended operation.


The enhancements included periodic system engineer walkdowns on the nitrogen storage tanks utilizing a standalone procedure and a one
Based on those results the licensee determined the valve that had been replaced was an outlier and no aging management was needed. However, the licensee did not address the two additional check valves that shared the same environment as the one affected. During the inspection, the inspectors questioned why these other valves didnt need to be age managed. The licensee was able to provide additional information that showed based on the replacement history of the other two valves and the physical state of the pressure boundary (the license renewal function) there was reasonable assurance that the components could meet the function for another 20 years.
-time UT thickness inspection will be performed o n the aluminum condensate storage tank or demineralized water storage tank
.Commitment Item 20, Above-ground Carbon Steel Tanks


10 Enclosure The inspectors reviewed the licensing basis, program basis document s , implementing procedures, scheduled, and completed work orders, related action requests, engineering changes, and evaluations. The inspectors verified the licensee has implemented procedure changes to address the documentation of inspection results by system engineers. In addition, the inspectors verified the licensee has implemented procedures to address internal/external inspections as well as committed UT inspections.
Also, the inspectors determined in some cases the licensee had performed inspections on only one Unit. For eleven cases, the inspectors could not find a justification for the basis of selecting one Unit as a representative sample of both Units. Specifically, no evaluation was performed to demonstrate the most susceptible environment was selected. During the inspection, the licensee was able to provide additional information to show the environment in both Units is similar enough that sampling one Unit was representative of both.


During this review, the inspectors identified the 'B' Contaminated Condensate Storage Tank (CCST) inspection performed in 2007 time frame did not include NDE. Specifically, the license renewal commitment specified NDE would be performed once before the period of extended operation (PEO) and every five years thereafter. The inspectors noted this omission in 2007 was a failure to follow the requirements of the commitment. However, since th e licensee performed a UT inspection of the 'B' CCST in November 2012 (before the PEO) in accordance with the requirements of the commitment, th is commitment was met. Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 20. 21. Commitment Item 21 specified the existing fuel oil chemistry program was credite d for license renewal and that the program would be enhanced prior to the period of extended operation.
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 23 with the exception of the URI documented in Section 4OA5.1.b(1).


Th e program was to be enhanced to include inspection of the fuel oil tank interiors for corrosion during regularly scheduled tank cleanings.
24.


Commitment Item 21, Fuel Oil Chemistry The inspectors interviewed the program owner, reviewed the licensing basis, program basis document s , scheduled, and completed work orders and implementing procedures. The inspectors verified the licensee has implemented a program that evaluates the material condition and bottom thickness of the fuel oil storage tanks to ensure aging effects are effectively managed.
Commitment Item 24 specified one-time visual inspection of a sample of materials susceptible to selective leaching of materials prior to the period of extended operation.


Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 21. 22. Commitment Item 22 specified the existing reactor vessel surveillance Aging Management Program was credited for license renewal and that the program would be enhanced prior to the period of extended operation. The program i s implemented through station procedures that conform to the requirements of 10 CFR Part 50, Appendix H, "Reactor Vessel Material Surveillance Program Requirements."  Neutron embrittlement is predicted utilizing chemistry tables and Position 1.3 limitations as described in Regulatory Guide 1.99, Revision 2, "Radiation Embrittlement of Reactor Vessel Materials." Commitment Item 22, Reactor Vessel Surveillance The inspectors reviewed the licensing basis, program basis documents, implementing procedures and interviewed the AMP owner regarding these documents. The inspectors verified the licensee incorporated the testing requirements for reactor vessel test capsules have been incorporated into station programs and procedures.
Commitment Item 24, Selective Leaching of Materials The inspectors reviewed the licensing basis, the Selective Leaching of Materials Program basis documentation, completed work orders, and interviewed personnel responsible for the program regarding these documents and verified the program was appropriately applied to both Units 1 and 2.


11 Enclosure Based on review and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 22. 23. Commitment Item 23 specified the licensee perform one
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 24 with the exception of the URI documented in Section 4OA5.1.b(1).
-time inspections of selected plant equipment to verify current plant Aging Management Program s were effective in managing the effects of aging prior to the period of extended operation
. Commitment Item 23, One-Time Inspection The licensee had established separate one
-time inspection programs covering the specific commitments listed in the SER. The inspectors reviewed the licensing basis, each program basis document, implementing procedures, inspection results and related I Rs , and interviewed the responsible plant personnel regarding these documents.


The inspectors verified the licensee had documented the results of the one
25.
-time inspections, and with one exception, had followed up appropriately when aging effects were identified. For the one exception, a one
-time inspection of the clean demineralized water check valve 0
-4399-16 was performed and the results showed significant corrosion in the seating surface.


In addition, all internal surfaces revealed moderate corrosion with some material wastage. The valve was replaced and the licensee performed an evaluation to determine if any aging management actions were needed. The site performed additional inspections at other valves belonging to the same sample group and th ose were found in good condition. Based on those results the licensee determined the valve that had been replaced was an outlier and no aging management was needed. However, the licensee did not address the two additional check valves that share d the same environment as the one affected. During the inspection
Commitment Item 25 specified an enhancement to complete one-time inspections prior to the period of extended operation as well as periodic checks on buried carbon steel fuel oil storage tanks. The Buried Piping and Tanks Inspection Program was an existing program that provided preventive and condition monitoring measures to manage loss of material, due to either corrosion of ferrous piping and tanks or aggressive chemical attack of asbestos concrete piping, from external environments for buried piping and tanks.
, the inspectors questioned why these other valves didn't need to be age manage d. The licensee was able to provide additional information that showed based on the replacement history of the other two valves and the physical state of the pressure boundary (the license renewal function) there was reasonable assurance that the components could meet the function for another 20 years. Also, the inspectors determined in some cases the licensee had performed inspections on only one Unit. For eleven cases
, the inspectors could not find a justification for the basis of selecting one Unit as a representative sample of both Units. Specifically, no evaluation was performed to demonstrate the most susceptible environment was selected. During the inspection
, the licensee was able to provide additional information to show the environment in both Units is similar enough that sampling one Unit was representative of both.


Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 23 with the exception of the URI documented in Section 4OA5.1.b(1)
Commitment Item 25, Buried Piping and Tanks Inspection The inspectors reviewed the licensing basis, the Buried Piping and Tanks Inspection Program basis documentation, implementing procedures, completed work orders, the results of the onetime inspections, related corrective action documents, and interviewed responsible program personnel regarding these documents. The inspectors verified planned and completed work orders and related IRs demonstrated that the program was appropriately applied Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 25.
. 24. Commitment Item 24 specified one
-time visual inspection of a sample of materials susceptible to selective leaching of materials prior to the period of extended operation.Commitment Item 24, Selective Leaching of Materials


12 Enclosure The inspectors reviewed the licensing basis, the Selective Leaching of Materials Program basis documentation, completed work orders, and interviewed personnel responsible for the program regarding these documents and verified the program was appropriately applied to both Units 1 and 2. Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 24 with the exception of the URI documented in Section 4OA5.1.b(1)
26.
. 25. Commitment Item 25 specified an enhancement to complete one
-time inspections prior to the period of extended operation as well as periodic checks on buried carbon steel fuel oil storage tanks. The Buried Piping and Tanks Inspection Program was an existing program that provided preventive and condition monitoring measures to manage loss of material, due to either corrosion of ferrous piping and tanks or aggressive chemical attack of asbestos concrete piping, from external environments for buried piping and tanks.


Commitment Item 25, Buried Piping and Tanks Inspection The inspectors reviewed the licensing basis, the Buried Piping and Tanks Inspection Program basis documentation, implementing procedures, completed work orders, the results of the onetime inspections, related corrective action documents, and interviewed responsible program personnel regarding these documents. The inspectors verified planned and completed work orders and related IRs demonstrated that the program was appropriately applied Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 25. 26. Commitment Item 26 specified the existing ASME Code, Section XI, Subsection IWE program was credited for license renewal and would be enhanced prior to the period of extended operation.
Commitment Item 26 specified the existing ASME Code, Section XI, Subsection IWE program was credited for license renewal and would be enhanced prior to the period of extended operation.


Commitment Item 26, ASME Code, Section XI, Subsection IWE The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders, related corrective action documents and interviewed personnel responsible for the program regarding these documents.
Commitment Item 26, ASME Code, Section XI, Subsection IWE The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders, related corrective action documents and interviewed personnel responsible for the program regarding these documents.


Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 26. 27. Commitment Item 27 ASME Code Section XI, Subsection IWF Component Support Program specified the existing ASME Code Section XI, Subsection IWF Component Support Program was credited for license renewal with enhancement to include inspection of Code Class MC supports.
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 26.
 
27.
 
Commitment Item 27 ASME Code Section XI, Subsection IWF Component Support Program specified the existing ASME Code Section XI, Subsection IWF Component Support Program was credited for license renewal with enhancement to include inspection of Code Class MC supports.


Commitment Item 27, ASME Code, Section XI, Subsection IWF The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders, related corrective action documents, and interviewed personnel responsible for the program regarding these documents.
Commitment Item 27, ASME Code, Section XI, Subsection IWF The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders, related corrective action documents, and interviewed personnel responsible for the program regarding these documents.


13 Enclosure Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 27. 28. Commitment Item 28 specifie d the existing 10 CFR Part 50; Appendix J Aging Management Program was credited for license renewal. The program provides for aging management of pressure boundary degradation due to loss of material in the primary containment and various systems penetrating primary containment. The program also manages changes in material properties of gaskets, "O" rings, and packing materials for the primary containment pressure boundary access points.
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 27.
 
28.
 
Commitment Item 28 specified the existing 10 CFR Part 50; Appendix J Aging Management Program was credited for license renewal. The program provides for aging management of pressure boundary degradation due to loss of material in the primary containment and various systems penetrating primary containment. The program also manages changes in material properties of gaskets, O rings, and packing materials for the primary containment pressure boundary access points.


Commitment Item 28, Appendix J of 10 CFR Part 50, The program includes an exception to NUREG 1801 for two
Commitment Item 28, Appendix J of 10 CFR Part 50, The program includes an exception to NUREG 1801 for two-ply design bellows that cannot be tested to satisfy the requirements of Appendix J. Testing is in accordance with NRC approved alternate test until the bellows are replaced.
-ply design bellows that cannot be tested to satisfy the requirements of Appendix J. Testing is in accordance with NRC approved alternate test until the bellows are replaced.


The inspectors reviewed the licensing basis, program basis documents, implementing procedures, and interviewed the responsible plant personnel regarding these documents. The inspectors verified the requirements for testing two-ply bellows have been incorporated into station programs and procedures.
The inspectors reviewed the licensing basis, program basis documents, implementing procedures, and interviewed the responsible plant personnel regarding these documents. The inspectors verified the requirements for testing two-ply bellows have been incorporated into station programs and procedures.


Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 28. 29. Commitment Item 29 specified the existing masonry wall program was credited for license renewal.
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 28.
 
29.
 
Commitment Item 29 specified the existing masonry wall program was credited for license renewal.
 
Commitment Item 29, Masonry Wall Program The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders, related corrective action documents and interviewed personnel responsible for the program regarding these documents. The inspectors performed walkdowns of masonry walls that perform a high energy line break barrier function.
 
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 29.
 
30.
 
Commitment Item 30 specified the existing structures monitoring program was credited for license renewal and would be enhanced prior to the period of extended operation. The structures monitoring program was an existing program that provided for aging management of various structures and external surfaces of mechanical components within the scope of license renewal.
 
Commitment Item 30, Structures Monitoring Program The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders, related corrective action documents and interviewed personnel responsible for the program regarding these documents. The inspectors also walked down several jet impingement shield supports.
 
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 30.


Commitment Item 29, Masonry Wall Program The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders, related corrective action documents and interviewed personnel responsible for the program regarding these documen ts. The inspectors performed walkdowns of masonry walls that perform a high energy line break barrier function.
31.


Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 29. 30. Commitment Item 30 specified the existing structures monitoring program was credited for license renewal and would be enhanced prior to the period of extended operation.
Commitment Item 31 specified the existing RG 1.127, "Inspection of Water-Control Structures Associated with Nuclear Power Plants," program was credited for license renewal and would be enhanced prior to the period of extended operation. This program was part of the Structures Monitoring Program and consisted of procedures that provided for condition monitoring of structural steel elements, concrete, and earthen structures within the scope of license renewal.


The structures monitoring program was an existing program that provided for aging management of various structures and external surfaces of mechanical components within the scope of license renewal
Commitment Item 31, Regulatory Guide (RG) 1.127, Inspection of Water-Control Structures Associated with Nuclear Power Plants The inspectors reviewed the licensing basis, program basis documentation, and revised implementing procedures. The inspectors reviewed completed work orders and associated condition reports, and interviewed responsible water control structure program personnel.
. Commitment Item 30, Structures Monitoring Program The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders, related corrective action documents and interviewed personnel responsible for the program regarding these documents. The inspectors also walked down several jet impingement shield supports. Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 30.


14 Enclosure 31. Commitment Item 31 specified the existing RG 1.127, "Inspection of Water
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 31 with the exception of the URI described in section 4OA5.1.b(2).
-Control Structures Associated with Nuclear Power Plants," program was credited for license renewal and would be enhanced prior to the period of extended operation. This program was part of the Structures Monitoring Program and consisted of procedures that provided for condition monitoring of structural steel elements, concrete, and earthen structures within the scope of license renewal.


Commitment Item 31, Regulatory Guide (RG) 1.127, Inspection of Water
32.
-Control Structures Associated with Nuclear Power Plants The inspectors reviewed the licensing basis, program basis documentation, and revised implementing procedures. The inspectors reviewed completed work orders and associated condition reports
, and interviewed responsible water control structure program personnel.


Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 31 with the exception of the URI described in section 4OA5.1.b(2). 32. Commitment Item 32 specified enhancements to the Protective Coating Monitoring and Maintenance Program to be implemented prior to the period of extended operation. The Protective Coating Monitoring and Maintenance Program was an existing program that provided for aging management of Service Level I coatings inside primary containment. Service Level I coatings were used in areas where the coating failure could adversely affect the operation of post
Commitment Item 32 specified enhancements to the Protective Coating Monitoring and Maintenance Program to be implemented prior to the period of extended operation. The Protective Coating Monitoring and Maintenance Program was an existing program that provided for aging management of Service Level I coatings inside primary containment. Service Level I coatings were used in areas where the coating failure could adversely affect the operation of post-accident fluid systems and thereby impair safe shutdown. The program provided for visual inspections to identify any condition that adversely affects the ability of the coating film to function as intended.
-accident fluid systems and thereby impair safe shutdown. The program provided for visual inspections to identify any condition that adversely affects the ability of the coating film to function as intended.


Commitment Item 32, Protective Coating Monitoring and Maintenance Program The inspectors reviewed the program basis documentation, revised implementing procedures, completed inspections, and interviewed responsible plant personnel regarding these documents.
Commitment Item 32, Protective Coating Monitoring and Maintenance Program The inspectors reviewed the program basis documentation, revised implementing procedures, completed inspections, and interviewed responsible plant personnel regarding these documents.


Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 32. 33. Commitment Item 33 specified licensee would develop a program that wa s consistent with NUREG
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 32.
-1801 AMP XI.E1 for electrical cables and connections installed in adverse localized environments not subject to 10 CFR 50.49 environmental qualification requirements.
 
33.
 
Commitment Item 33 specified licensee would develop a program that was consistent with NUREG-1801 AMP XI.E1 for electrical cables and connections installed in adverse localized environments not subject to 10 CFR 50.49 environmental qualification requirements.


Commitment Item 33, Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements The licensee developed a program to visually inspect all accessible electrical cables and connections installed in adverse localized environments for signs of accelerated age-related degradation. Additional inspections, repairs, or replacements are to be initiated as appropriate.
Commitment Item 33, Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements The licensee developed a program to visually inspect all accessible electrical cables and connections installed in adverse localized environments for signs of accelerated age-related degradation. Additional inspections, repairs, or replacements are to be initiated as appropriate.


The inspectors interviewed the program owner, reviewed licensing basis, the  
The inspectors interviewed the program owner, reviewed licensing basis, the program basis documentation, implementing procedures, work orders and records of walk downs for determining adverse localized environments and visual inspections for cables. The inspectors also reviewed corrective actions, which addressed and identified cable issues and their associated corrective actions. Also, the inspectors reviewed the corrective action taken in reference to the finding from Dresden Inspection Report 05000237/2009007.


program basis documentation, implementing procedures, work orders and records of walk downs for determining adverse localized environments and visual 15 Enclosure inspections for cables. The inspectors also reviewed corrective actions, which addressed and identified cable issues and their associated corrective actions.
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 33.


Also , the inspectors reviewed the corrective action taken in reference to the finding from Dresden Inspection Report 05000237/2009007.
34.


Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 33. 34. Commitment Item 34 specified for the Metal Fatigue of Reactor Coolant Pressure Boundary the existing program was credited with enhancements. The licensee will enhance the program by utilizing the EPRI
Commitment Item 34 specified for the Metal Fatigue of Reactor Coolant Pressure Boundary the existing program was credited with enhancements. The licensee will enhance the program by utilizing the EPRI-licensed FatiguePro computer software for counting fatigue stress cycles and track fatigue usage factors for selected components. The enhanced program calculates and tracks cumulative usage factors for bounding locations in the reactor coolant pressure boundary (reactor pressure vessel and Class I piping), containment torus, torus vents, torus attached piping and penetrations.
-licensed FatiguePro computer software for counting fatigue stress cycles and track fatigue usage factors for selected components. The enhanced program calculates and tracks cumulative usage factors for bounding locations in the reactor coolant pressure boundary (reactor pressure vessel and Class I piping), containment torus, torus vents, torus attached piping and penetrations.


Commitment Item 34, Metal Fatigue of Reactor Coolant Pressure Boundary The inspectors reviewed the licensing basis, Metal Fatigue and Reactor Coolant Pressure Boundary Program basis documentation, FatiguePro implementing procedures, fatigue and transient monitoring program report, related corrective action documents, and interviewed the program owner regarding these documents. The inspectors reviewed changes to the program to ensure the program remained effective for both units.
Commitment Item 34, Metal Fatigue of Reactor Coolant Pressure Boundary The inspectors reviewed the licensing basis, Metal Fatigue and Reactor Coolant Pressure Boundary Program basis documentation, FatiguePro implementing procedures, fatigue and transient monitoring program report, related corrective action documents, and interviewed the program owner regarding these documents.


Based on review of the licensee's actions, the inspectors determined the licensee met Commitment Item 34. 35. Commitment Item 35 specified the licensee was to maintain the existing environmental qualification program of the electrical components for the period of extended operation
The inspectors reviewed changes to the program to ensure the program remained effective for both units.
. Commitment Item 35, Environmental Qualification (EQ) of Electrical Components Program activities establish, demonstrate and document the level of qualification, qualified configuration, maintenance, surveillance and replacement requirements necessary to meet 10 CFR 50.49.


The inspectors interviewed the program owner, reviewed the licensing basis, program basis document s, and various existing EQ Binders
Based on review of the licensees actions, the inspectors determined the licensee met Commitment Item 34.
. Based on the review of the licensee's action, the inspectors determined the licensee met Commitment Item 35. 36. Commitment Item 3 6 specified the existing Boraflex monitoring program was credited for license renewal.


The Boraflex monitoring program is based on manufacturer's recommendations relies on periodic inspection, testing, monitoring and analysis of the criticality design to assure the required 5percent subcriticality margin is maintained.Commitment Item 36, Boraflex Monitoring
35.


16 Enclosure The inspectors interviewed the program owner, reviewed the licensing basis, program basis documents, implementing procedures, planned and completed work orders and related corrective actions.
Commitment Item 35 specified the licensee was to maintain the existing environmental qualification program of the electrical components for the period of extended operation.


Based on review of the licensee's actions, the inspectors determined the licensee met Commitment Item 3 6. 37. Commitment Item 37 specified the licensee was to develop a program to manage aging of cables in sensitive instrumentation circuits with low level signals in the Nuclear Instrumentation Systems and Radiation Monitoring Systems
Commitment Item 35, Environmental Qualification (EQ) of Electrical Components Program activities establish, demonstrate and document the level of qualification, qualified configuration, maintenance, surveillance and replacement requirements necessary to meet 10 CFR 50.49.
. Commitment Item 37, Electrical Cables Not Subject to 10 CFR 50.49 Environmental Requirements Used in Instrument Circuits The program is applied to the cables of the Nuclear Instrumentation Systems
, which included source range monitors (SRMs), intermediate range monitors (IRMs), local power range monitors, and Radiation Monitoring Systems, which included drywell high range radiation monitors, main steam line radiation monitors, and the steam jet air ejector radiation monitors. The program specified a review of calibration and surveillance results, and cable testing for cable aging degradation before the period of extended operation and every 10 years thereafter
. The inspectors interviewed the program owner, reviewed the licensing basis, program basis document s, implementing procedures, work orders and related corrective actions.


Based on the review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 37. 38. This Commitment Item does not apply to Quad Cities.
The inspectors interviewed the program owner, reviewed the licensing basis, program basis documents, and various existing EQ Binders.


Commitment Item 38, Inaccessible Medium
Based on the review of the licensees action, the inspectors determined the licensee met Commitment Item 35.
-Voltage Cables Not Subject to 10 CFR 50.49 Environmental Requirements 39. Commitment Item 39 specified the existing corrective action program was credited for license renewal.
 
36.
 
Commitment Item 36 specified the existing Boraflex monitoring program was credited for license renewal. The Boraflex monitoring program is based on manufacturers recommendations relies on periodic inspection, testing, monitoring and analysis of the criticality design to assure the required 5percent subcriticality margin is maintained.
 
Commitment Item 36, Boraflex Monitoring The inspectors interviewed the program owner, reviewed the licensing basis, program basis documents, implementing procedures, planned and completed work orders and related corrective actions.
 
Based on review of the licensees actions, the inspectors determined the licensee met Commitment Item 36.
 
37.
 
Commitment Item 37 specified the licensee was to develop a program to manage aging of cables in sensitive instrumentation circuits with low level signals in the Nuclear Instrumentation Systems and Radiation Monitoring Systems.
 
Commitment Item 37, Electrical Cables Not Subject to 10 CFR 50.49 Environmental Requirements Used in Instrument Circuits The program is applied to the cables of the Nuclear Instrumentation Systems, which included source range monitors (SRMs), intermediate range monitors (IRMs), local power range monitors, and Radiation Monitoring Systems, which included drywell high range radiation monitors, main steam line radiation monitors, and the steam jet air ejector radiation monitors. The program specified a review of calibration and surveillance results, and cable testing for cable aging degradation before the period of extended operation and every 10 years thereafter.
 
The inspectors interviewed the program owner, reviewed the licensing basis, program basis documents, implementing procedures, work orders and related corrective actions.
 
Based on the review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 37.
 
38.
 
This Commitment Item does not apply to Quad Cities.
 
Commitment Item 38, Inaccessible Medium-Voltage Cables Not Subject to 10 CFR 50.49 Environmental Requirements  
 
39.
 
Commitment Item 39 specified the existing corrective action program was credited for license renewal.


Commitment Item 39, Corrective Action Program The inspectors interviewed the program owner, reviewed the licensing basis, implementing procedures, corrective action program results, and interviewed the responsible plant personnel regarding this program. The inspectors also reviewed training given to engineers to increase awareness of aging concerns and license renewal. The inspectors verified the licensee was entering issues related to license renewal in the corrective action program.
Commitment Item 39, Corrective Action Program The inspectors interviewed the program owner, reviewed the licensing basis, implementing procedures, corrective action program results, and interviewed the responsible plant personnel regarding this program. The inspectors also reviewed training given to engineers to increase awareness of aging concerns and license renewal. The inspectors verified the licensee was entering issues related to license renewal in the corrective action program.


The inspector also reviewed a corrective action, AR 01352551, which is tracking actions to revise various procedures to reflect aging management focus. This AR also track s actions to establish aging
The inspector also reviewed a corrective action, AR 01352551, which is tracking actions to revise various procedures to reflect aging management focus. This AR also tracks actions to establish aging-related degradation Passport coding and determine orientation/training needs.
-related degradation Passport coding and determine orientation/training needs.


Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 39.
Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 39.


17 Enclosure 40. Commitment Item 40 specified the licensee was to develop and implement a program to periodically inspect non
40.
-segregated bus ducts that connect the reserve auxiliary transformers (RATs) to 4160 V essential service system (ESS)
, the non-segregated bus ducts that connect the Emergency Diesel Generators (EDGs) to the ESS buses, and the non
-segregated bus ducts that connect ESS buses.


Commitment Item 40, Periodic Inspection of Non
Commitment Item 40 specified the licensee was to develop and implement a program to periodically inspect non-segregated bus ducts that connect the reserve auxiliary transformers (RATs) to 4160 V essential service system (ESS), the non-segregated bus ducts that connect the Emergency Diesel Generators (EDGs) to the ESS buses, and the non-segregated bus ducts that connect ESS buses.
-EQ, Non-Segregated Electrical Bus Ducts The inspectors interviewed the program owner, reviewed the licensing basis, program basis document s, implementing procedures, planned and completed work orders and related corrective actions.


Based on the review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 40. 41. Commitment Item 41 specified the existing periodic inspection of ventilation system elastomers was credited for license renewal and that the program would be enhanced prior to the period of extended operation.
Commitment Item 40, Periodic Inspection of Non-EQ, Non-Segregated Electrical Bus Ducts The inspectors interviewed the program owner, reviewed the licensing basis, program basis documents, implementing procedures, planned and completed work orders and related corrective actions.
 
Based on the review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 40.
 
41.
 
Commitment Item 41 specified the existing periodic inspection of ventilation system elastomers was credited for license renewal and that the program would be enhanced prior to the period of extended operation.


Commitment Item 41, Periodic Inspection of Ventilation System Elastomers The inspectors reviewed the licensing basis, program basis documentation, implementing procedures, completed work orders, related corrective action documents and interviewed personnel responsible for the program regarding these documents.
Commitment Item 41, Periodic Inspection of Ventilation System Elastomers The inspectors reviewed the licensing basis, program basis documentation, implementing procedures, completed work orders, related corrective action documents and interviewed personnel responsible for the program regarding these documents.


Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 41. 42. Commitment Item 42 specified the existing periodic testing of drywell and torus spray nozzles was credited for license renewal.
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 41.
 
42.
 
Commitment Item 42 specified the existing periodic testing of drywell and torus spray nozzles was credited for license renewal.
 
Commitment Item 42, Periodic Testing of Drywell and Torus Spray Nozzles The inspectors reviewed the program basis documentation, Drywell and Torus Spray Nozzle test procedures, completed work orders and condition reports to verify the program has been implemented.
 
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 42.
 
43.
 
Commitment Item 43 specified the existing lubricating oil monitoring program would be enhanced to include components exposed to an environment of lubricating oil in the following systems: reactor core isolation cooling system, main generator hydrogen seal oil system, high pressure coolant injection system, emergency diesel generator and auxiliaries system, station blackout system, and electro-hydraulic control system prior to the period of extended operation.


Commitment Item 42, Periodic Testing of Drywell and Torus Spray Nozzles The inspectors reviewed the program basis documentation, Drywell and Torus Spray Nozzle test procedures, completed work orders and condition reports to verify the program has been implemented
Commitment Item 43, Lubricating Oil Monitoring Activities The inspectors reviewed licensing basis, program basis documents, implementing procedures, scheduled and completed work orders, result trends, completed oil analysis laboratory results, and applicable corrective action program documents.
. Based on review of the timeliness and adequacy of the licensee
's actions, the inspectors determined the licensee met Commitment Item 42. 43. Commitment Item 43 specified the existing lubricating oil monitoring program would be enhanced to include components exposed to an environment of lubricating oil in the following systems: reactor core isolation cooling system, main generator hydrogen seal oil system, high pressure coolant injection system, emergency diesel generator and auxiliaries system, station blackout system, and electro
-hydraulic control system prior to the period of extended operation.


Commitment Item 43, Lubricating Oil Monitoring Activities The inspectors reviewed licensing basis, program basis document s, implementing procedures, scheduled and completed work orders, result trends, completed oil 18 Enclosure analysis laboratory results, and applicable corrective action program documents. Additionally, the program owner was interviewed regarding these documents. The inspectors verified the licensee has enhanced the program to include the systems and subsystems listed in the Commitment Item in necessary documents to ensure aging is managed through the period of extended operation.
Additionally, the program owner was interviewed regarding these documents. The inspectors verified the licensee has enhanced the program to include the systems and subsystems listed in the Commitment Item in necessary documents to ensure aging is managed through the period of extended operation.


Based on review of the timeliness and adequacy of the licensee
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 43.
's actions, the inspectors determined the licensee met Commitment Item 43. 44. Commitment Item 44 specified the licensee would develop and implement an Aging Management Program for heat exchangers in the scope of License Renewal that are not tested or inspected by the open
-cycle and closed
-cycle cooling water system aging management programs, to be completed prior to the period of extended operation
. Commitment Item 44, Heat Exchanger Test and Inspection Activities The inspectors reviewed the licensing basis, program basis document s , commitment changes, planned and completed work orders, Issue Reports, inspection procedures and interviewed the plant personnel responsible for the program to verify the program w as being implemented
. For example, the inspectors reviewed commitment change 11-02 which was a clarification in response to an NRC observation in Section 4OA5.1.a
: (2) of NRC inspection report 05000265/2012008 and verified the proper implementation of the change.


General program requirements for this commitme nt were inspected and determined to be complete for Quad Cities Units 1 and 2.
44.


Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 44. 45. Commitment Item 45 specified the licensee would use the existing Generator Stator Water Chemistry program to manage aging effects by monitoring and controlling stator water chemistry per established procedures.
Commitment Item 44 specified the licensee would develop and implement an Aging Management Program for heat exchangers in the scope of License Renewal that are not tested or inspected by the open-cycle and closed-cycle cooling water system aging management programs, to be completed prior to the period of extended operation.
 
Commitment Item 44, Heat Exchanger Test and Inspection Activities The inspectors reviewed the licensing basis, program basis documents, commitment changes, planned and completed work orders, Issue Reports, inspection procedures and interviewed the plant personnel responsible for the program to verify the program was being implemented. For example, the inspectors reviewed commitment change 11-02 which was a clarification in response to an NRC observation in Section 4OA5.1.a
: (2) of NRC inspection report 05000265/2012008 and verified the proper implementation of the change. General program requirements for this commitment were inspected and determined to be complete for Quad Cities Units 1 and 2.
 
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 44.
 
45.
 
Commitment Item 45 specified the licensee would use the existing Generator Stator Water Chemistry program to manage aging effects by monitoring and controlling stator water chemistry per established procedures.


Commitment Item 45, Generator Stator Water Chemistry Activities The inspectors reviewed Units 1 and 2 chemistry reports to verify parameters were monitored. General program requirements for this commitment were inspected and determined to be complete for Quad Cities Units 1 and 2.
Commitment Item 45, Generator Stator Water Chemistry Activities The inspectors reviewed Units 1 and 2 chemistry reports to verify parameters were monitored. General program requirements for this commitment were inspected and determined to be complete for Quad Cities Units 1 and 2.


Based on the review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 45. 46. Commitment Item 46 specified the licensee would develop and implement an Aging Management Program to inspect components in the plant heating system once before the end of the current operating term and periodically at intervals not to exceed once every 5 years during the period of extended operation.
Based on the review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 45.
 
46.
 
Commitment Item 46 specified the licensee would develop and implement an Aging Management Program to inspect components in the plant heating system once before the end of the current operating term and periodically at intervals not to exceed once every 5 years during the period of extended operation.
 
Commitment Item 46, Periodic Inspection of Plant Heating System The inspectors reviewed the licensing basis, program basis documents, planned and completed work orders, Issue Reports, inspection procedures and interviewed the plant personnel responsible for the program to verify the program was being implemented on Units 1 and 2.
 
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 46 with the exception of the URI documented in Section 4OA5.1.b(1).
 
47.
 
Commitment Item 47 specified revised Pressure Temperature (P/T) limits will be prepared and submitted to the NRC for approval prior to the period of extended operation using an approved fluence methodology. On October 17, 2005 License Amendment No. 228 and No. 223 approved the revised P/T limits. The amendments revised Technical Specification (TS) Section 3.4.9, Reactor Coolant System Pressure, and Temperature (P/T) Limits, by incorporating revisions to the P/T limit curves for 54 effective full power years (extending to the end of the renewed license). The amendment also resolved a non-conservative condition for TS 2.4.9, Figure 3.4.9-2, Non-Nuclear Heatup/Cooldown Curve. The inspectors verified the program requirements have been incorporated into station programs.


Commitment Item 46, Periodic Inspection of Plant Heating System The inspectors reviewed the licensing basis, program basis document s, planned and completed work orders, Issue Reports, inspection procedures and interviewed 19 Enclosure the plant personnel responsible for the program to verify the program was being implemented on Units 1 and 2. Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 46 with the exception of the URI documented in Section 4OA5.1.b(1)
Commitment Item 47, Time-limited Aging Analysis (TLAA) - Neutron Embrittlement of the Reactor Vessel and Internals Based on the licensees actions, the inspectors determined the licensee met Commitment Item 47.
. 47. Commitment Item 47 specified revised Pressure Temperature (P/T) limits will be prepared and submitted to the NRC for approval prior to the period of extended operation using an approved fluence methodology. On October 17, 2005 License Amendment No. 228 and No. 223 approved the revised P/T limits. The amendments revise d Technical Specification (TS) Section 3.4.9, "Reactor Coolant System Pressure, and Temperature (P/T) Limits," by incorporating revisions to the P/T limit curves for 54 effective full power years (extending to the end of the renewed license). The amendment also resolved a non
-conservative condition for TS 2.4.9, Figure 3.4.9
-2, "Non-Nuclear Heatup/Cooldown Curve."


The inspectors verified the program requirements have been incorporated into station programs.
48.


Commitment Item 47, Time-limited Aging Analysis (TLAA)
Commitment Item 48 specified commitments of the TLAA related to metal fatigue.
- Neutron Embrittlement of the Reactor Vessel and Internals Based on the licensee
's actions, the inspectors determined the licensee met Commitment Item 47. 48. Commitment Item 48 specified commitments of the TLAA related to metal fatigue.


Quad Cities is taking credit for an existing program for monitoring the metal fatigue of reactor coolant pressure boundary. As discussed in Commitment Item 34 , the licensee enhanced their current AMP with the EPRI
Quad Cities is taking credit for an existing program for monitoring the metal fatigue of reactor coolant pressure boundary. As discussed in Commitment Item 34, the licensee enhanced their current AMP with the EPRI-licensed FatiguePro computer software. In addition, prior to the period of extended operation, plant-specific calculations were performed for applicable locations identified in NUREG/CR-6260, Application of NUREG/CR-5999 Interim Fatigue Curves to Selected Nuclear Power Plant Components.
-licensed FatiguePro computer software. In addition, prior to the period of extended operation, plant
-specific calculations were performed for applicable locations identified in NUREG/CR
-6260, "Application of NUREG/CR
-5999 Interim Fatigue Curves to Selected Nuclear Power Plant Components
." Commitment Item 48, TLAA - Metal Fatigue The inspectors reviewed the licensing basis, Fatigue and Transients monitoring program implementing procedures, Commitment Item change documents, calculations that assessed effects of reactor coolant on component fatigue life, related corrective action documents, and interviewed the program owner regarding these documents.


Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 48. 49. Commitment Item 49 specified a reanalysis will be applied to EQ components now qualified for the current operating term of 40 years. The EQ binders for components within the scope of 10 CFR 50.49 will be updated to include environmental conditions associated with Extended Power Uprate implementation together with an extended operating period of 60 years. Commitment Item 49, TLAA -Environmental Qualification of Electrical Equipment
Commitment Item 48, TLAA - Metal Fatigue The inspectors reviewed the licensing basis, Fatigue and Transients monitoring program implementing procedures, Commitment Item change documents, calculations that assessed effects of reactor coolant on component fatigue life, related corrective action documents, and interviewed the program owner regarding these documents.


20 Enclosure The inspectors reviewed several examples of EQ Binders for components within the scope of 10 CFR 50.49. The inspectors verified these EQ Binders were updated to include an extended operating period of 60 years. The inspectors also verified where a qualified life of 60 years could not be achieved; measures were in place to replace components before or at the end of the qualified life.
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 48.


Based on the examples reviewed and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 49. 50. Commitment Item 50 specified two specific TLAAs would be updated prior to the period of extended operation.
49.


Commitment Item 50, Other Plant-Specific TLAAs The first specified the licensee conduct a UT inspection of the Dresden Unit 3 (the lead unit) drywell steel plate remaining thickness at the sand pocket level and use the results to revise the associated corrosion calculation and validate an acceptable wall thickness will remain to the end of the 60
Commitment Item 49 specified a reanalysis will be applied to EQ components now qualified for the current operating term of 40 years. The EQ binders for components within the scope of 10 CFR 50.49 will be updated to include environmental conditions associated with Extended Power Uprate implementation together with an extended operating period of 60 years.
-year licensed operating period for Dresden and Quad Cities Plants
.


The second TLAA specified the licensee conduct a UT inspection of the ECCS suction strainer flange remaining thickness and use the results to revise the associated galvanic corrosion calculation and validate an acceptable thickness will remain to the end of the 60
Commitment Item 49, TLAA -Environmental Qualification of Electrical Equipment The inspectors reviewed several examples of EQ Binders for components within the scope of 10 CFR 50.49. The inspectors verified these EQ Binders were updated to include an extended operating period of 60 years. The inspectors also verified where a qualified life of 60 years could not be achieved; measures were in place to replace components before or at the end of the qualified life.
-year licensed operating period for Quad Cities Units 1 and 2. The inspectors reviewed the licensing basis documents , UT inspection results of the Quad Cities Units 1 and 2 ECCS suction strainer flanges and interviewed the plant personnel responsible for the program
.


Based on review of the timeliness and adequacy of the licensee
Based on the examples reviewed and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 49.
's actions, the inspectors determined the licensee met Commitment Item 50. 51. Commitment Item 51 specified the licensee perform an evaluation of operating experience at EPU levels to ensure operating experience at EPU levels is properly addressed by the Aging Management Programs, and submit this evaluation to the NRC for review prior to entering the period of extended operation.


Commitment Item 51, BWR Operating Experience
50.
- EPU levels The licensee performed this evaluation and submitted it for NRC review on October 18, 2012 and therefore, met this commitment.


52. This commitment, discussed in SER Section 3.0.3.18, specified the licensee would manage the aging of components within the scope of the LR program through the performance of periodic UT inspections, visual (VT
Commitment Item 50 specified two specific TLAAs would be updated prior to the period of extended operation.
-3) inspections, and visual inspection of flexible hoses for age related degradation.


AMP B.2.9, Periodic Inspection of Components Subject to Moist Air This program is a new program that manages the loss of material aging degradation of stainless steel, carbon steel, cast iron, aluminum, copper, brass, and bronze 2 1 Enclosure components. The licensee created this program to ensure aging degradation of components is inspected at a frequency that allows the identification of any degradation that may occur due to the component
Commitment Item 50, Other Plant-Specific TLAAs The first specified the licensee conduct a UT inspection of the Dresden Unit 3 (the lead unit) drywell steel plate remaining thickness at the sand pocket level and use the results to revise the associated corrosion calculation and validate an acceptable wall thickness will remain to the end of the 60-year licensed operating period for Dresden and Quad Cities Plants.
's exposure to a moist air environment. If abnormal conditions are identified as a result of any of the program's UT or visual inspections, the licensee committed to performing engineering evaluations to address the progression of the degradation and identifying appropriate corrective actions in accordance with the site controlled Quality Assurance Program.


The inspectors reviewed the licensing basis, program basis document s , implementing procedures, scheduled, and completed work orders, action requests, engineering changes and evaluations and issue reports.
The second TLAA specified the licensee conduct a UT inspection of the ECCS suction strainer flange remaining thickness and use the results to revise the associated galvanic corrosion calculation and validate an acceptable thickness will remain to the end of the 60-year licensed operating period for Quad Cities Units 1 and 2.


Based on review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met Commitment Item 52 with the exception of the URI documented in Section 4OA5.1.b(1)
The inspectors reviewed the licensing basis documents, UT inspection results of the Quad Cities Units 1 and 2 ECCS suction strainer flanges and interviewed the plant personnel responsible for the program.
. 53. This aging management program commits to the periodic inspection of steam dryers, which are normally exposed to a 288
°Celsius high purity water environment and are subject to cracking. This aging management program manages the cracking of the stainless steel plate and weld materials.


The periodic inspections will be performed in accordance with NRC staff approved frequency and guidance AMP B.2.10, Periodic Inspection of Steam Dryers The inspectors reviewed the program basis documentation, implementing procedures, completed inspections, related corrective action documents, and interviewed responsible program personnel regarding these documents.
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 50.


Based on the review of the timeliness and adequacy of the licensee's actions, the inspectors determined the licensee met this Commitment Item
51.
. b.
: (1) Findings and Observations Concern with Meeting One Time Visual Inspections IAW ASME Section XI Requirements Introduction
:  As part of the review of various licensee Commitment Items, the inspectors identified an unresolved item (URI) related to potential non-conformance with the commitments as described in Appendix A of the UFSAR.


Specifically, the licensee did not follow the requirements of the ASME Section XI when performing various visual examinations.
Commitment Item 51 specified the licensee perform an evaluation of operating experience at EPU levels to ensure operating experience at EPU levels is properly addressed by the Aging Management Programs, and submit this evaluation to the NRC for review prior to entering the period of extended operation.


Description B.1.23 One Time Inspection
Commitment Item 51, BWR Operating Experience - EPU levels The licensee performed this evaluation and submitted it for NRC review on October 18, 2012 and therefore, met this commitment.
- Ventilation Systems, Compressed Gas Systems, SBLC Chemistry Program
;:  During the Phase I inspection of Commitment Item s (IR 05000265/2012008; ML12129A226), the inspectors identified the licensee was not performing visual examinations in accordance with the ASME code.


The inspectors identified this through direct observation, review of the work orders used to perform these examinations and interviews with the appropriate plant personnel.
52.


The commitment to perform visual examinations in accordance with the ASME Section XI code applies to the following programs:
This commitment, discussed in SER Section 3.0.3.18, specified the licensee would manage the aging of components within the scope of the LR program through the performance of periodic UT inspections, visual (VT-3) inspections, and visual inspection of flexible hoses for age related degradation.
B.1.24 Selective Leaching
;  B.2.8 Periodic Inspection of Plant Heating Steam; and  B.2.9 Periodic Inspection of Components Subject to Moist Air Environments
. The Commitment Item specifically states, "The inspection will be performed in accordance with ASME Code requirements.


Certified NDE examiners will conduct a VT-3 visual inspection (VT-1 for the Selective Leaching program , these inspections will consist of visual inspection consistent with ASME Section XI VT
AMP B.2.9, Periodic Inspection of Components Subject to Moist Air This program is a new program that manages the loss of material aging degradation of stainless steel, carbon steel, cast iron, aluminum, copper, brass, and bronze components. The licensee created this program to ensure aging degradation of components is inspected at a frequency that allows the identification of any degradation that may occur due to the components exposure to a moist air environment. If abnormal conditions are identified as a result of any of the programs UT or visual inspections, the licensee committed to performing engineering evaluations to address the progression of the degradation and identifying appropriate corrective actions in accordance with the site controlled Quality Assurance Program.
-1 visual inspection requirements.


)." For visual examinations performed in accordance with the code
The inspectors reviewed the licensing basis, program basis documents, implementing procedures, scheduled, and completed work orders, action requests, engineering changes and evaluations and issue reports.
, ASME section XI IWA 2210 requires visual examination be performed in accordance with ASME Section V Article 9.


This section requires a procedure be used when performing visual examinations that include instructions on how the visual inspection is to be performed as well as illumination and instruments to be used.
Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 52 with the exception of the URI documented in Section 4OA5.1.b(1).


ASME Section XI has specific requirements associated with the different levels of visual examinations (VT
53.
-1 or VT-3) including distance, illumination, and character card resolution requirements.


Contrary to this the licensee did not perform the VT
This aging management program commits to the periodic inspection of steam dryers, which are normally exposed to a 288°Celsius high purity water environment and are subject to cracking. This aging management program manages the cracking of the stainless steel plate and weld materials. The periodic inspections will be performed in accordance with NRC staff approved frequency and guidance AMP B.2.10, Periodic Inspection of Steam Dryers The inspectors reviewed the program basis documentation, implementing procedures, completed inspections, related corrective action documents, and interviewed responsible program personnel regarding these documents.
-1 or VT-3 examinations in accordance with written procedures which document ed the requirements for lighting, distance and other key parameters as well as acceptance criteria. Failure to do so did not ensure an ASME qualified process is used and clear requirements are provided and met.


The licensee submitted a Commitment Item change to clarify their position, indicating the intent was to have a qualified person performing the inspection, not to perform the examination in accordance with the requirements of the code. The licensee also indicated ASME requirements were verbally communicated to the examiners during their pre-job brief therefore, ensuring compliance with the code. In a letter dated May 18, 2012 (ML# 12173A423) the licensee request ed a Commitment Item change. NR R staff subsequently issued a Request for Additional Information (ML 12291A831
Based on the review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met this Commitment Item.
) and is awaiting the licensee
's response in order to make a decision regarding these Commitment Item s.


Therefore, this issue is considered unresolved pending resolution of the above issue. (URI 05000254/2012010
b.
-0 1; 05000265/2012010
: (1) Findings and Observations Concern with Meeting One Time Visual Inspections IAW ASME Section XI Requirements  
-0 1:  Concern with Meeting One Time Visual Inspections IAW ASME Section XI Requirements
)
: (2) Questions Regarding Aging Management Inspections on the 16 foot diameter Discharge Piping


=====Introduction:=====
=====Introduction:=====
As part of the review of licensee Commitment Item 31, the inspectors identified an unresolved item (URI) related to a 16 foot diameter discharge piping. Specifically, the licensee does not physically inspect the piping for aging effects so that the intended functions of this component will be maintained during the period of extended operation.
As part of the review of various licensee Commitment Items, the inspectors identified an unresolved item (URI) related to potential non-conformance with the commitments as described in Appendix A of the UFSAR. Specifically, the licensee did not follow the requirements of the ASME Section XI when performing various visual examinations.
 
Description
* B.1.23 One Time Inspection - Ventilation Systems, Compressed Gas Systems, SBLC Chemistry Program;
: During the Phase I inspection of Commitment Items (IR 05000265/2012008; ML12129A226), the inspectors identified the licensee was not performing visual examinations in accordance with the ASME code. The inspectors identified this through direct observation, review of the work orders used to perform these examinations and interviews with the appropriate plant personnel. The commitment to perform visual examinations in accordance with the ASME Section XI code applies to the following programs:
* B.1.24 Selective Leaching;
* B.2.8 Periodic Inspection of Plant Heating Steam; and
* B.2.9 Periodic Inspection of Components Subject to Moist Air Environments.
 
The Commitment Item specifically states, The inspection will be performed in accordance with ASME Code requirements. Certified NDE examiners will conduct a VT-3 visual inspection (VT-1 for the Selective Leaching program, these inspections will consist of visual inspection consistent with ASME Section XI VT-1 visual inspection requirements.).
For visual examinations performed in accordance with the code, ASME section XI IWA 2210 requires visual examination be performed in accordance with ASME Section V Article 9. This section requires a procedure be used when performing visual examinations that include instructions on how the visual inspection is to be performed as well as illumination and instruments to be used. ASME Section XI has specific requirements associated with the different levels of visual examinations (VT-1 or VT-3)including distance, illumination, and character card resolution requirements. Contrary to this the licensee did not perform the VT-1 or VT-3 examinations in accordance with written procedures which documented the requirements for lighting, distance and other key parameters as well as acceptance criteria. Failure to do so did not ensure an ASME qualified process is used and clear requirements are provided and met.
 
The licensee submitted a Commitment Item change to clarify their position, indicating the intent was to have a qualified person performing the inspection, not to perform the examination in accordance with the requirements of the code. The licensee also indicated ASME requirements were verbally communicated to the examiners during their pre-job brief therefore, ensuring compliance with the code. In a letter dated May 18, 2012 (ML# 12173A423) the licensee requested a Commitment Item change. NRR staff subsequently issued a Request for Additional Information (ML12291A831) and is awaiting the licensees response in order to make a decision regarding these Commitment Items.
 
Therefore, this issue is considered unresolved pending resolution of the above issue.
 
(URI 05000254/2012010-01; 05000265/2012010-01: Concern with Meeting One Time Visual Inspections IAW ASME Section XI Requirements)
: (2) Questions Regarding Aging Management Inspections on the 16 foot diameter Discharge Piping
 
=====Introduction:=====
As part of the review of licensee Commitment Item 31, the inspectors identified an unresolved item (URI) related to a 16 foot diameter discharge piping.
 
Specifically, the licensee does not physically inspect the piping for aging effects so that the intended functions of this component will be maintained during the period of extended operation.


=====Description:=====
=====Description:=====
As part of the review of Commitment Item 31 associated with the Water Control Structures inspection program, the inspectors reviewed the components that are within the scope of this program and how effects of aging are managed. NUREG 1796; "Safety Evaluation Report Related to the License Renewal of the Dresden Nuclear Power Station, Units 2 and 3 and Quad Cities Nuclear Power Station, Units 1 and 2
As part of the review of Commitment Item 31 associated with the Water Control Structures inspection program, the inspectors reviewed the components that are within the scope of this program and how effects of aging are managed. NUREG 1796; Safety Evaluation Report Related to the License Renewal of the Dresden Nuclear Power Station, Units 2 and 3 and Quad Cities Nuclear Power Station, Units 1 and 2; dated 2004, Section 3.5.2.3.4 RG 1.127, Inspection of Water-Control Structures Associated with Nuclear Power Plants described the scope of the program and how the effects of aging are managed. Page 3-426 of NUREG 1796 identified the 16 foot diameter discharge piping as an in-scope component. The 16 foot diameter discharge piping provides an Ultimate Heat Sink (UHS) function in that during a Lock and Dam No.
"; dated 2004
 
, Section 3.5.2.3.4 "RG 1.127, Inspection of Water
14 failure the discharge piping provides suction source for portable pumps to provide cooling water flow to the Residual Heat Removal Service Water (RHRSW) pumps and Diesel Generator Cooling Water (DGCW) Pumps. The licensee, however, does not physically inspect the discharge piping. The licensee provided aging management of the discharge piping by crediting the performance of a one-time inspection of a 96 inch diameter ice melt line. The ice melt line prevents freezing of the river water entering the plant intake and also performs a support function for the UHS. During this inspection, the licensee was unable to locate where the Office of Nuclear Reactor Regulation (NRR)had reviewed and approved this method of aging management of the discharge piping.
-Control Structures 23 Enclosure Associated with Nuclear Power Plants
" described the scope of the program and how the effects of aging are managed. Page 3
-426 of NUREG 1796 identified the 16 foot diameter discharge piping as an in
-scope component. The 16 foot diameter discharge piping provides an Ultimate Heat Sink (UHS) function in that during a Lock and Dam No. 14 failure the discharge piping provides suction source for portable pumps to provide cooling water flow to the Residual Heat Removal Service Water (RHRSW) pumps and Diesel Generator Cooling Water (DGCW) Pumps. The licensee
, however , does not physically inspect the discharge piping. The licensee provided aging management of the discharge piping by crediting the performance of a one-time inspection of a 96 inch diameter ice melt line. The ice melt line prevents freezing of the river water entering the plant intake and also performs a support function for the UHS. During this inspection, the licensee was unable to locate where the Office of Nuclear Reactor Regulation (NRR) had reviewed and approved this method of aging management of the discharge piping.


In response to this concern, the licensee initiated Condition Report 01434957 , "(LR) Scoping Review Required for UHS Discharge Piping
In response to this concern, the licensee initiated Condition Report 01434957, (LR)
," dated November 2, 2012.
Scoping Review Required for UHS Discharge Piping, dated November 2, 2012.


Therefore, this issue is considered unresolved pending additional review of the information provided by the licensee and consultation with NRR to determine the appropriate aging management of the 16 foot diameter discharge piping.
Therefore, this issue is considered unresolved pending additional review of the information provided by the licensee and consultation with NRR to determine the appropriate aging management of the 16 foot diameter discharge piping. (URI 05000254/2012010-02; 05000265/2012010-02: Questions Regarding Aging Management Inspections on the 16 foot diameter Discharge Piping).


  (URI 05000254/2012010
c.
-02; 05000265/2012010
-02:  Questions Regarding Aging Management Inspections on the 16 foot diameter Discharge Piping
). c. The inspectors did not identify any other substantive instances of incomplete license renewal commitment s with respect to timeliness or adequacy.


The inspectors concluded pending resolution of the above mentioned URIs, commitment s, license conditions, and regulatory requirements associated with the issuance of the renewed operating license were being met at the Quad Cities Nuclear Power Plant Unit s 1 and 2. Overall Conclusions
The inspectors did not identify any other substantive instances of incomplete license renewal commitments with respect to timeliness or adequacy. The inspectors concluded pending resolution of the above mentioned URIs, commitments, license conditions, and regulatory requirements associated with the issuance of the renewed operating license were being met at the Quad Cities Nuclear Power Plant Units 1 and 2.
 
Overall Conclusions 4OA6


{{a|4OA6}}
==4OA6 ==
===.1 Management Meetings===
===.1 Management Meetings===
 
On November 9, 2012, the inspectors presented the inspection results to Mr. T. Hanley, and other members of the licensee staff. The licensee acknowledged the issues presented. The inspectors confirmed none of the potential report input discussed was considered proprietary.
O n November 9, 201 2 , the inspector s presented the inspection results to Mr. T. Hanley , and other members of the licensee staff. The licensee acknowledged the issues presented. The inspectors confirmed none of the potential report input discussed was considered proprietary.


===Exit Meeting Summary===
===Exit Meeting Summary===
 
ATTACHMENT:  
ATTACHMENT:


=SUPPLEMENTAL INFORMATION=
=SUPPLEMENTAL INFORMATION=


Attachment
==KEY POINTS OF CONTACT==
SUPPLEMENTAL INFORMATION KEY POINTS OF CONTAC
T
: [[contact::T. Hanley]], Site Vice President
: [[contact::T. Hanley]], Site Vice President
Licensee  
Licensee  
: [[contact::K. Ohr]], Site Engineering Director
: [[contact::K. Ohr]], Site Engineering Director  
: [[contact::W. Beck]], Regulatory Assurance Manager
: [[contact::W. Beck]], Regulatory Assurance Manager  
: [[contact::K. O'Shea ]], Operations Director
: [[contact::K. OShea]], Operations Director  
: [[contact::T. Rushing]], Sr. System Manager/Engineering
: [[contact::T. Rushing]], Sr. System Manager/Engineering  
: [[contact::P. Yost]], Program Engineering
: [[contact::P. Yost]], Program Engineering  
: [[contact::M. Rice]], Program Engineering
: [[contact::M. Rice]], Program Engineering  
: [[contact::M. Dunlay]], Design Engineering
: [[contact::M. Dunlay]], Design Engineering  
: [[contact::B. Stedman]], Design Engineering
: [[contact::B. Stedman]], Design Engineering  
: [[contact::N. Howard]], System Engineering
: [[contact::N. Howard]], System Engineering  
: [[contact::A. Burress]], System Engineering
: [[contact::A. Burress]], System Engineering  
: [[contact::D. Luebbe]], System Engineering
: [[contact::D. Luebbe]], System Engineering  
: [[contact::M. Wagner]], Regulatory Assurance
: [[contact::M. Wagner]], Regulatory Assurance  
: [[contact::T. Petersen]], Regulatory Assurance
: [[contact::T. Petersen]], Regulatory Assurance  
LIST OF ITEMS OPENED, CLOSED AND DISCUSS
 
ED 050002 54/201 2 010-01 Opened  05000265/2012010
==LIST OF ITEMS==
-01 URI Concerns with Meeting
===OPENED, CLOSED AND DISCUSSED===
One Time Visual Inspections IAW ASME Section XI Requirements  (4OA5.1.b(1))  05000254/2012010
: 05000254/2012010-01  
-02 05000265/2012010
-02 URI Questions Regarding
Aging Management Inspections on the 16' Diameter Discharge Pipes (4OA5.1.b(2))  None Closed and
Discussed
Attachment
LIST OF DOCUMENTS REVIEWED The following is a partial list of documents reviewed during the inspection. Inclusion on this list does not imply that the NRC inspector reviewed the documents
in their entirety, but rather that selected sections or portions of the documents were evaluated as part of the overall inspection
effort. Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the Inspection Report
. UFSAR-11-R12-026; multiple UFSAR Appendix A AMP changes; October 25, 2005
General MOD 50.59 screening QC
-S-2012-0089 Issued on 10/03/2012 for
Multiple Appendix A AMP
Changes; Revision 00
UFSAR-05-R9-012; multiple UFSAR Appendix A AMP EPRI Guidance Changes and Updates; October 28, 2005 MOD 50.59 Screening QC
-S-2005-0198 Issued on October 28, 2005
, for Multiple Appendix A AMP EPRI Guidance Changes by
Updating; Revision 0
AR 01430273; LR
-Stator Water Condensation Water Dripping on Floor; October 23, 2012
Corrective Action Program Documents Generated as a Result of the Inspection
AR 01430839; LR
-ISI Pressure Test PM Model WOs were not Updated; October 24, 2012
AR 01430918; LR
-NRC Identified Visual Inspection was not Documented; October 24, 2012
AR 01431473; LR
-NRC Identified Wear on Piping from Diamond Plating; October 25, 2012
AR 01431795; Quad Cities License Renewal Concern; Checworks Software; October 26, 2012
AR 01432003; LR
- NRC Identified; Clarify Vent. Elastomer Requirements
-OPEX; October 26, 2012
AR 01433189; LR Drawing B
-1068 Update Required; October 30, 2012
AR 01433898; LR Clarify CCST Inspection Question Response; October 31, 2012
AR 01434957; LR Scoping Review Required for UHS Discharge Piping; November 2, 2012
AR 01436493; Typo in Quad Cities IVVI Basis Document in Appendix H; November 6, 2012
AR 01436538; LR
-UT Report of 1/2 EDG Non
-Seg Bus Duct not in WO 880854
-01; November 6, 2012 AR 01436872; Clarify Regulatory Commitment Regarding CASS; November 7, 2012
AR 01437012; ER
-AB-331 Attachment 1 Needs Enhancements; November 7, 2012
WO 01143493; EP Reactor Head Flange Leak Detection System VT
-2 Inspection
; March 24, 2010
Commitment Item 1
WO 00880897; DGCW 2
nd Period Pressure Test; April
13, 2009 WO 01379576; DGCW 3
rd Period Pressure Test; March 9, 2012
WO 00885380
-01; RHRSW Suction 1
st Period Static VT2 Test; January 27, 2006
WO 00617085
-01; 1B RHRSW 1
st Period VT2 Pressure Test; December 2, 2005
WO 00617087
-01; 1A RHRSW 1
st Period VT2 Pressure Test; November 15, 2005
WO 01072305
-01; RHRSW Suction 2
nd Period Static VT2 Test; February 6, 2009
WO 00860809
-01; ECCS Ring/HPCI Level 1
st Period VT2 Pressure Test; January 20, 2006
MOD50.59 Screening QC
-S-2005-0198 Issued on 10/28/2005 for
Multiple Appendix A AMP EPRI Guidance Changes By Updating; Revision 0
Commitment Item 2
CY-QC-110-608, Reactor/Turbine Building Sample Panel Sample Collection, Revision 21
CY-AA-160-100 Attach 1; U1 and U2 Torus
Chem. Data for 11/18/2010
CY-AA-160-10 0 Attach 1; U1 and U2 Rx Water and RWCU
Data (Mode 1) for 02/01/2009
CY-AA-160-100 Attach 1; U1 and U2 Rx Water and RWCU
Data (Mode 1) for 02/11/2009
CY-AA-160-100 Attach 1; U1 and U2 Rx Water and RWCU
Data (Mode 1) for 04/16/2011
CY-AA-160-100 Attach 1; U1 and U2 Rx Water and RWCU
Data (Mode 1) for 04/29/2011
CY-AA-160-100 Attach 1; U1 and U2 Condensate
and FW Data (Mode 1) for 02/02/2009
CY-AA-160-100 Attach 1; U1 and U2 Condensate
and FW Data (Mode 1) for 02/04/2009
Attachment
CY-AA-160-100 Attach 1; U1 and U2 Condensate
and FW Data (Mode 1) for 02/05/2009
CY-AA-160-100 Attach 1; U1 and U2 Condensate
and FW Data (Mode 1) for 02/07/2009
CY-AA-160-100 Attach 1; U1 and U2 Condensate
and FW Data (Mode 1) for 02/11/2009
CY-AA-160-100 Attach 1; U1 and U2 Condensate
and FW Data (Mode 1) for 02/02/2009
CY-AA-160-100 Attach 1; U1 and U2 CRD Cooling Water Data for 08/04/2009
CY-AA-160-100 Attach 1; U1 and U2 CRD Cooling Water Data for 08/11/2009
CY-AA-160-100 Attach 1; U1 and U2 Fuel Pool Data for 01/22/2009
CY-AA-160-100 Attach 1; U1 and U2 Fuel Pool Data for 01/23/2009
CY-AA-160-100 Attach 1; U1 and U2 Fuel Pool Data for 01/29/2009
AR 01228627; Chemistry Action Levels Entered
S/U from Q1R21; 06/06/2011
AR 01229935; Chemistry Action Levels Entered S/U from Q1F63; 6/15/2010
AR 01047774; Chemistry Action Levels Entered
S/U from Q2R20; 3/14/2010
AR 01074663; Chemistry Action Levels Entered
S/U from Q2R20; 4/14/2010
CY-AB-120-110; Condensate
and Feedwater Chemistry; Revision 15
CY-AB-120-100; Reactor Water Chemistry; Revision 12
CY-AB-120-320; Control Rod Drive Water Chemistry; Revision 5
CY-QC-110-608; Reactor/Turbine Bldg Sample Panel
Collection; Revision 21
ISI program plan QC station Unit 1
and 2 Third Interval; Revision 6
Commitment Item 3
GE-VT-101; Procedure for VT
-1 examination; Version 2
GE-PDI-UT-5; PDI Generic Procedure
for Straight Beam Ultrasonic Examination
of Bolts a nd Studs; Revision 2
Q1R19-07; Examination
Summary Ssheet; May 15, 2007
AR 00339417; PSU Reactor Pressure Stud Threads Damaged; May 29, 2005
AR 01354038; LR
-Replaced RPV Head Bolt in 2005 Q1M18; April 15, 2012
B.1.4 BWR Vessel ID Attachment Welds; Revision 4
Commitment Item 4
ER-AB-331; BWR Internals Program Management; Revision 11
QCTS 0740-04; RPV In
-Vessel Examination; Revision 9
ER-AA-330-002; Inservice Inspection of Section XI Welds and Components; Revision 9
Q1R20 ISI 90
-day Report; August 21, 2009
In Vessel Visual Inspection
- IVVI Examination Checklist Quad Cities Unit 2 Spring 2010; March 4, 2010 ER-AA-330-002; Inservice Inspection
of Section XI Welds and Components; Revision 9
Commitment Items 5 and 6 ER-AA-330-009; ASME Section XI Repair/Replacement
Program; Revision 6
Q1R21-091; Examination Summary Sheet; May 19, 2011
Q1R21-090; Examination Summary Sheet; May 21, 2011 Q1R21-121; Examination Summary Sheet; March 17, 2008
QC-481565-RP03; ISI Program plan 5
th interval; Revision 0
AR 01129456; 2010 ISI FASA DEF No. 2-ISI plan; October 22, 2010
ER-AA-330-002; Inservice
Inspection of section XI
Welds and Components; Revision 9 GE-NE-523-A71-0594-A; Alternate BWR Feedwater Nozzle Inspection Requirements; Revision 1
Q1R19-100; Examination Summary Sheet; May 16, 2007
Q1R19-105; Examination Summary Sheet; May 16, 2007
Q2R17-90; UT Examination Summary Sheet; March 19, 2004
Quad Cities Nuclear Power Station
-Unit 1 Post Outage (90 day) Summary Report; May 24, 2009
Commitment Item 7
ER-AA-330; Conduct of Inservice Inspection Activities; Revision 8
Attachment
ER-AA-330-009; ASME Section XI Repair/Replacement Program; Revisi
on 6 AR 1232114; LR IGSCC Document Needing Revision to Support License Renewal; June 23, 2011
Q2R16-101; UT Examination Summary Sheet; February 26, 2002
AR 1436872; Clarify Regulatory Commitment Regarding CASS; November 7, 2012
WC-AA-120; Preventive Maintenance Program Requirements; Revision 0
2QR19-092; UT Examination Summary Sheet; March 17, 2008
ER-AB-331; BWR Internals Program Management; Revision 11
Commitment Item 8
QCTS 0740-04; RPV In
-Vessel Examination; Revision 9
Reactor Internals and In
-vessel Visual inspection (IVVI) Basis Document; Quad Cities Nuclear Power Station; Revision 6
IVVI Basis Document Quad Cities Nuclear Power Station; Appendix E Standby Liquid Control/Core Plate DP BWRVIP
-27-A; Revision 6
IVVI Basis Document Quad Cities Nuclear Power Station; Appendix J Instrument Penetrations BWRVIP-49-A; Revision 6
Q1R20-060; UT Examination Data Sheet; May 11, 2009
Q1R20-061; PT Examination Summary Sheet; May 6, 2009
2QR19-127; UT Examination Summary Sheet; March 17, 2008
Relief Request CR
-01; Inspection of Standby Liquid Control Nozzle Inner Radius; Revision
ER-AB-331; BWR Internals Program Management; Revision 11
Commitment Item 9
QCTS 0740-04; RPV In
-Vessel Examination; Revision 9
IVVI Basis Document Quad Cities Nuclear Power Station; Appendix B Core Spray BWRVIP
-18; Revision 1
IVVI Basis Document Quad Cities Nuclear Power Station; Appendix C Core Plate BWRVIP
-25; Revision 6
IVVI Basis Document Quad Cities Nuclear Power Station; Appendix F Shroud Support BWRVIP
-38; Revision 6
IVVI 09-04; IVVI Examination Data Sheet Lower Plenum; May 11, 2009
IVVI 09-08; IVVI Examination Data Sheet Top Guide; May 11, 2009
IVVI Examination Data Sheet Core Spray Piping; March 29, 2010
IVVI Examination Data Sheet Core Spray Sparger; March 29, 2010
IVVI Examination Data Sheet Jet Pump; March 29, 2010
IVVI Examination Data Sheet Top Guide; March 29, 2010
GEH-RPT-7480-168971-EE2-Shroud UT; Core Shroud Ultrasonic Examination; April 3, 2010
AR 917088; PSU Auxiliary Wedges Needed on Jet Pump #5; May 7, 2009
AR 917812; Q1R20 IVVI Core Spray Piping Indications; May 9, 2009
AR 917813; Q1R20 IVVI Jet Pump 19 Main Wedge; May 8, 2009
AR 1045378; Q2R20 IVVI Wedge Guide Wear on Jet Pump 5; March 18, 2010
AR1436493; typo in Quad Cities IVVI Basis Document in Appendix H;
November 6, 2012
AR 1437012; ER
-AB-331 Attachment 1 Needs Enhancements; November 7, 2012
BWRVIP 2004
-426; Consideration of NDE Uncertainty in Flaw Evaluations; May 25, 2004
GEH-UT-511; Procedure for the Automated Ultrasonic Examination of Core Spray Piping Welds Contained Within the Reactor Pressure Vessel; Revision 16A
GEH-VT-203; Procedure for In
-vessel Visual Inspection (IVVI) of BWR 3 RPV Internals; Revision 20 EC 375522; Evaluation of Q1R20 IVVI Inspection Findings; Revision 0
ER-AB-331-101; Evaluation for Thermal Aging/ Neutron Embrittlement of Reactor Internals Components; Revision2Commitment Item 10


Attachment
===Opened===
Reactor Internals and In
: 05000265/2012010-01 URI Concerns with Meeting One Time Visual Inspections IAW ASME Section XI Requirements (4OA5.1.b(1))  
-vessel Visual Inspection (IVVI) Basis Document; Appendix T Cast Austenitic Stainless Steel Components BWRVIP-234; Revision 6
: 05000254/2012010-02  
IVVI Examination Data Sheet IVVI
: 05000265/2012010-02 URI Questions Regarding Aging Management Inspections on the 16 Diameter Discharge Pipes (4OA5.1.b(2))
-2012-Fuel Support Casting Q2R21; April 1
None Closed and  
st, 2012 IVVI Examination Data Sheet IVVI
-2012-CRGT Q2R21; April 1
st, 2012 IVVI Examination Data Sheet IVVI
-2012-Jet Pump; April 1
st, 2012 AR 0113772; License Renewal Commitment Change Required; November 9, 2010
NSAC-202L-R3; Recommendations for an Effective Flow
-Accelerated Corrosion Program; Revision 3
Commitment Item 11
AR 131914; FAC Examination Found Steam Seal Headers Degraded; November 15, 2002
AR 317476; PSU Q1R18 FAC; Excessive Wall
Thinning Line 1-1SSH8-5; March 26, 2005
Quad Cities Generating Station Unit 1 and Unit 2 Flow Accelerated Corrosion Susceptible Non
-Modeled Program; Revision 3
IT-AA-101-1001-F-01; CHECWORKS DTSQA Classification Checklist; April 25, 2011
IT-AA-101; Digital Technology Software Quality Assurance Procedure; Revision 7
UFSAR-07-R10-053; Revision of UFSAR Appendix A, Section A.1.11 to Reflect Current Revision of NSAC-202L; July 17, 2009
ER-AA-430; Conduct of Flow Accelerated Corrosion Activities; Revision 5
ER-AA-430-1001; Guidelines for Flow Accelerated Corrosion Activities; Revision 6
Q2R20 Refueling Outage FAC Activity Summary Report; April 1, 2010
Q2R21 Refueling Outage FAC Activity Summary Report; June 10, 2011
AR 01252564; 2011 Flow Accelerated Corrosion FASA Deficiency; August 17, 2011
AR 01252577; 2011 Flow Accelerated Corrosion FASA Deficiency; August 17, 2011
ER-AA-2030; Conduct of Plant Engineering Manual; Revision 11
Commitment Item
ER-AA-330-002; Inservice Inspection of Section XI Welds and Components; Revision 9
MA-MW-736-600; Torquing and Tightening of Bolted Connections; Revision 4
QCMMS 6600
-03; Emergency Diesel Generator Periodic Preventive Maintenance Inspection; Revision 27
WO 880542; HPCI System Walkdown; February 14, 2011
WO 1165003; Diesel Generator Periodic Inspection; November 18, 2009
AR1357370; LR Procedure Update Required to Document LR Commitment; April 23, 2012
AR 625752; 1B RHR Pump Seal Cooler Not Cooling Effectively; 05/05/2007
Commitment Item 13
WO 01190642; MM
-U-1A RHR Hx Rm Cooler Air/Water side Inspect/Clean; 11/04/2009
QCMPM 5700
-01; Emergency AHU maintenance/inspection completed 11/04/2009
QCTP 0820-10; Hx and Room Cooler Inspection
Completed 11/04/2009; Revision 5
WO 877693; MM (LR) Inspect 2A RHRSW Pump Internals (HP PMP) Degraded Belzona/Cermallo; 06/23/2007
PMRQ 25552
-09; RHRSW Pump Internals Predefine; 06/23/2007
WO 013 07130; MM Clean/Inspect HPCI Room Cooler Air/Water Side; 11/09/2010
QCMPM 5700
-01; Emergency AHU Maintenance/Inspection Completed 11/09/2010
QCTP 0820-10; Hx and Room Cooler Inspection Completed 11/09/2010; Revision 5
WO 01066831; U
-1A CS Room Cooler Air/Water
Side Inspect/Clean; 07/21/2009
QCMPM 5700
-01; Emergency AHU Maintenance/Inspection Completed
07/21/2009
QCTP 0820-10; Hx and Room Cooler Inspection
Completed 07/21/2009; Revision 5
WO 01165003; U
-1/2 2 yr EDG Inspection Per QCEPM 0400
-14; 01/07/2010
WO 01072595; 2A RHRSW Pressure Test (ISI); 06/19/2009
WO 01072594; 2B RHRSW Pressure Test (ISI) with Qtrly Flow
Test; 04/02/2009
CY-QC-110-610; SW Silt Dispersant Operation; Revision 3
Attachment
CY-QC-110-612; SW and RHRSW /DG Cooling Water Corrosion Inhibitor Operation; Revision 5
AR 01266139; Revise QCMMS 6620
-06 to Not Allow Skipping Of Cleaning Of Lube Oil Coolers
; 09/21/2011
Commitment Item 14
AR 01250421; Closed Cycle Cooling Water AMP EPRI Guidance Changed in UFSAR; 8/11/2011
AR 01250797; Insert Coolant Sampling Steps Into QCOS 6620-01 Like QCOS 6600-41, -42 and -43; 08/12/2011
WO 01488199; LR
- Internal Inspections on U1 SBO DG Radiators
and LO Coolers Sat
; 03/07/2012
WO 01488200; LR
- internal inspections on U2 SBO DG Radiators
and LO Coolers Sat; 03/07/2012
WO 854342; LR
- U- 1/2 EDG engine 12 yr Inspection; 01/22/2008
WO 820688; LR
- U- 1 EDG engine 12 yr Inspection;
05/20/2007
WO 725725; LR
- U- 2 EDG engine 12 yr Inspection;
04/07/2006
WO 01442537; LR 1/2 DG Monthly Load Test (IST)
-QCOS 6600-43; 07/05/2011
WO 01447614; LR  U1 DG Monthly Load Test (IST) QCOS 6600
-41; 06/20/2011
WO 01443656; LR U2 DG Monthly Load Test (IST) QCOS 6600
-42; 06/28/2011
WO 01165003; U
-1/2 EDG Periodic (2
-YR) Inspection QCMMS 6600
-03; 01/07/2010
WO 01121776; U
-1 EDG Periodic (2
-YR) Inspection QCMMS 6600
-03; 09/25/2009
WO 01133111; U
-2 EDG Periodic (2
-YR) Inspection QCMMS 6600
-03; 10/30/2009
WO 01175345; MM U
-2 EDG Alternate Cycle (4
-YR) Inspection QCMMS 6600
-03; 10/30/2009
CY-AA-120-400; Closed Cooling Water Chemistry; Revision 12
QCFHP 0500
-22; Annual Inspection of the Refueling Platform;
Revision 4
Commitment Item
QCMPM 5800
-01; Annual Crane Inspection and Preventative Maintenance Inspection; Revision 11
QCMPM 5800
-02; Periodic Inspection and Preventative Maintenance Program for Overhead Cranes, Jib Cranes and Monorail Systems; Revision 45
WO 01388990
-01; Refuel Platform Inspection; dated December 6, 2011
WO 01432267
-01; Refuel Platform Inspection; dated March 1, 2012
WO 01448072
-01; Realign Unit 1 Refuel Bridge to Rails
and Measure Drive Wheels; dated February 25, 2012
WO 01448073
-01; Realign Unit 2 Refuel Bridge to Rails
and Measure Drive Wheels; dated December 22, 2011
WO 01234840
-01; U1 Refuel Bridge Trolley Rail Replacement; dated July 5, 2012
WO 01458962
-01; Need WO to Replace the Unit 2 Refuel Bridge Trolley Rail; dated January 4, 2012  WO 01447356
-01; Rx Bldg O/H Crane Insp; dated July 10, 2011
WO 01231176
-01; Structural Steel Visual Inspection of RBOC; dated January 10, 2011
WO 01365317
-01; Refuel Floor Jib Crane Insp; dated August 23, 2011
WO 01512328
-01; Unit 1 Tbn Bldg Overhead Crane Insp; dated March 1, 2012
WO 01521552
-01; Unit 2 Tbn Bldg Overhead Crane Insp; dated March 14, 2012
WO 01466929
-01; (LR) 1/2 EDG Room Monorail Inspection; dated March 12, 2012
WO 01467603
-01; Unit 2 LR Inspection Required for 2D RHRSW Vault Monorail; dated February 28, 2012  WO 01467599
-01; LR U1 MM Inspection Required for 1D RHRSW Vault Monorail; dated February 20, 2012  WO 01467905
-01; (LR) U2 Drywell First Level Monorail 2
-5823-1DW Inspection; dated March 22, 2012  WO 01467591
-01; (LR) U2 HPCI Monorail Hoist Requires Inspection; dated February 1, 2012
WO 01467606
-01; (LR) U1 HPCI Monorail Hoist Requires Inspection; dated February 15, 2012
AR 01229907; Unit 1 Refuel Bridge and Rail Alignment Check Survey Results; dated June 17 , 2011
Attachment
AR 01229910; Unit 2 Refuel Bridge and Rail Alignment Check Survey Results; dated June 17, 2011  AR 01250648; Refuel Bridge Inspection PMs Not Tied to License Renewal: dated August 12, 2011
AR 01245155; Need WO to Replace the Unit 2 Refuel Bridge Trolley Rail; dated July 28, 2011
QCTS 4700-02; License Renewal Compressed Air Monitoring Program Walkdowns; Revision 0
Commitment Item 16
AR 00101562
-24-05; PMID 169156
-01 U2 IA System Walkdown Inspections Outside MSIV Room; 1/31/2005 WO 01418544; (LR) U1 Instrument Air System (Outside
MSIV Room) Walkdown; 6/21/2011
AR 00101562
-24-04; PMID 169155
-01 U1 IA System Walkdown Inspections Outside MSIV Room; 1/31/2005 WO 01418543; (LR) U2 Instrument Air System (Outside MSIV Room) Walkdown; 6/24/2011 AR 00101562
-24-06; PMID 169157
-01 and PMID 169159
-01 U1 IA System Walkdown Inspections Inside MSIV Room; 1/31/2005
WO 01255793; (LR) U1 Instrument Air System (Inside MSIV Room) Walkdown; 5/10/2011
WO 00836443; (LR) U1 Instrument Air System (Inside MSIV Room) Walkdown; 5/07/2007
EC 21454; U2
- Install new RWCU Piping, Valves, Instrumentation / Regn HX
- M04-2-91-027B; January 6, 2008
Commitment Item 17
EC 21224; U1
- Install new RWCU Piping, Valves, Instrumentation / Regn HX
- M04-2-91-027B; May 9, 199
Examination Summary Sheet; Component 12S
-S9R; March 20, 2010
QCMMS 4100
-22; Sprinkler/Water Spray Header and Nozzle and Cardox System Inspection;
Revision 18
Commitment Item 18
QCMMS 4100
-32; 1/2-4101A Diesel Driven Fire Pump
Annual Capacity Test; Revisi
on 26 QCMMS 4100
-61; Fire Door Inspection; Revision 17
QCMMS 4100
-75; Bi-Annual Penetration Fire Barrier (Seal) Inspection; Revision 2
QCEMS 0850
-01; Bi-Annual Penetration Fire Barrier (Seal) Inspection; Revision 5
QCMMS 4100
-73; Surveillance of Structural
Steel Fire Coating; Revision 0
QCMMS 4100
-74; Fire Damper Visual Inspection Surveillance; Revision 3
QCEMS 0850
-02; Visual Inspection of Fire Wraps and Interior Conduit Seals; Revision 2
OP-AA-201-001; Fire Marshal Tours; Revision 5
WO 880953; Inspect Cardox System; February 24, 2009
WO 1283994; Fire Door Inspection 18 Month; March 2, 2011
WO 876695; Penetration Fire Stop Inspection; March 1, 2007
WO 1091498; Structural Steel Fire Coating Inspection; April 16, 2009
QCAP 1500-01; Administrative Requirements for Fire Protection; Revision 32
Commitment Item 19
CC-AA-211; Fire Protection Program; Revision 4
WO 01174715
-01; Group A Fire Hose Inspection; dated September 28, 2009
WO 01348205
-01; Ext Hose Cab Flush/Vlv Test; dated November 30, 2010
WO 01210098
-01; Deluge Sys Func Test A Diesel Fire Pump; dated February 28, 2010
WO 01080140
-01; Deluge Sys Func Test Bus Duct Penet; dated May 4, 2009
WO 01164519
-01; Pre-Action System Func Test EHC Units; dated July 20, 2009
WO 01252891
-01; Unit 1 Pre
-Action Sprinkler Sys Func Test Unit Track way; dated July 14 2010
WO 00837233
-01; Unit 1 Refuel Air Flow Test Duct Penetration; dated May 17, 2007
WO 01215007
-01; (LR) Fire System Flow Test; dated March 22, 2011
WO 01143952
-01; Unit 2 (LR) Deluge Sys Func Test Aux Trans 21; dated April 12, 2010
Attachment
WO 01256532
-01; Unit 1 (LR) Deluge Sys Func Test Main Xfmr; dated June 4, 2011
WO 01256533
-01; Unit 1 (LR) Deluge Sys Func Test Aux Trans 12; dated May 15, 2011
WO 01189093
-01; Unit 2 (LR) Deluge Sys Func Test Main Xfmr; dated April 12, 2010
WO 01144443
-01; Unit 2 (LR) Deluge Sys Func Test Aux Trans 22; dated March 21, 2010
AR 01247654; (LR) QCAP 1500
-01 Does Not State Sprinkler Test Requirement; dated August 4, 2011 AR 01082022; Sprinkler Replacement
-License Renewal Commitment; dated June 18, 2010
AR 01359490; LR QCMPM 4400
-12 Deficiencies Found During Binder Review; dated April 27, 2012 WO 00880530
-01; A CCST External Inspection; August 18, 2010
Commitment Item 20
WO 01070836
-04; Inspect Pipe Located Outside Power Block; December 21, 2007
WO 01076215
-04; Inspect Pipe Located Outside Power Block; February 22, 2008
AR 01102022; Discovered Small Evulsions on the South Point of 'A' CCST; August 16, 2010
AR 01102065; Discovered a Small Gouge on the SE Point of 'A' CCST; August 16, 2010
AR 01102071; Discovered a Small Gouge on the SW Point of 'A' CCST; August 16, 2010
AR 00714795; Corrosion/CRUD Spots Found During a CCST Internal Inspection; December 20, 2007 QCTS 8700-01; Outdoor Nitrogen System and Storage Tank Inspection; Revision 0
ER-AA-2030; Conduct of Plant Engineering Manual; Revision 12
EC 368147; CCST Bottom UT Inspection
- Contingency Evaluation; December 26, 2007
C-8051; Contaminated Condensate Storage Tank; May 6, 1960
EC 381655; CCST Tank Wall Thickness; Revision
AR 01274649; Revise QCMPM 6600
-03 Based on LR Review of FO Chemistry; October 10, 2011
Commitment Item 21
WO 01441038; Diesel Generator Fuel Oil Particulate Sample; June 20, 2011
WO 01439049; SBO Diesel Generator Fuel Oil Particulate Sample; June 14, 20
WO 013995557; Sample 1/2A Fire Pump Diesel Fuel Day Tank; March 29, 2011
WO 00715907; (LR) SBO Fuel Storage Tank Clean/ Inspect; September 13, 2011
LS-AA-107-1001; UFSAR Appendix A 50.59 Screening (UFSAR
-11-R12-026); Revision
Commitment Item 22
ER-AA-370; Reactor Coolan t Pressure Boundary (RCPB) Integrity; Revision 8
AR 01150317; LR UFSAR Change Needed for RPV Surveillance; December 9, 2010
WO 744465; One
-Time Inspection
of 1B Electromatic RV Discharge Vacuum Breaker; December 6, 2006 Commitment Item 23
WO 576900; EHC B Pump Replacement; August 19, 2005
WO 588917; One
Time Inspection U1 H2 Seal Oil Drain
Valve; September 7, 2004
WO 588916; Inspect H2 Recirc Pump Casing; September 13, 2004
WO 592851; Inspect 2B MG Set Drain Valve; October 21, 2005
AR 725422; 1B EHC Pump
- Suction Strainer Inspection; January 22, 2008
AR 1163884; Corrosion on 2
-3905A Valve 2A and 2B ASD TCV; January 18, 2011
WO753340; One Time Inspect 1/2 CLN DM Water Pump CH Valve; December 28, 2010
ER-AA-335-017; VT-3 Visual Examination of Pump and Valve Internals; Revision 8
ER-AA-335-016; VT-3 Visual Examination of Component Supports, Attachments, and Interiors of Reactor Vessels; Revision 6
WO 00 588912-01; One-Time Inspect Torus Lubrite Base
Plates; May 11, 2011
WO 00744465
-01; One-Time Inspection of 1B Electromatic RV DSCH Vacuum BRKR; May 14, 2007
Attachment
WO 00744458
-01; One-Time Inspection of 2E Electromatic RV DSCH Vacuum BRKR; April 5, 2006 WO 00587714
-01; One-Time Inspect MCR Vent Air Intake Duct; May 11, 2010
WO 007 44592-01; Perform a One
-Time Inspection on the Internals of 2
-1999-101; July 8, 2008 WO 00759335
-01; SBLC PP Overhaul; September 18, 2007
WO 00576900
-01; EHC B Pump Replacement; January 25, 2008
WO 00591342
-01; One-Time Inspect MG Set FLTR PI Damper; October 25, 2004
WO 00588917
-01; One-Time Inspect U1 H2 Seal Oil DRN VLV; March 29, 2005
WO 00592919
-01; One-Time Inspect U1 EDG Day Tank UT; September 22, 2009
WO 00744563
-01; Perform a One
-Time Inspection of the 1
-1499-11A Drain Valve; July 21, 2009
WO 00744573-01; Inspect 1
-3999-272A; October 20, 2008
AR 01249018; 0
-4399-16 Clean Demin Valve Rusted Internally; August 8, 2011
AR 01299894; LR
- One-Time Inspection of 0
-4399-16 Check Valve; December 8, 2011
AR 00725422; 1B EHC Pump
- Suction Strainer Inspection; January 22, 2008
WO 0592895; One
-Time inspection of U1 Train A DG Cooling Water Pump Cooler Inlet Valve for Selective Leaching; September 20, 2011
Commitment Item
IR 01265610; Appearance of Selective Leaching on Valve 3999
-201; September 20, 2011
WO 0588922; One
-Time Inspection of Stator Water Cooling Heat Exchanger Service Water Drain Valve 1-3999-718 for Selective Leaching; February 28, 2006
WO 0588925, Inspect ECCS Room Cooler Inlet Header Drain Valve for Selective Leaching; April 2, 2010 WO 0692748; Inspect Demin. Pump 1 / 2
- 4303A for Selective Leaching; August 10, 2011
WO 0880546; Clean and Inspect U2 HPCI Lube Oil Cooler for Selective Leaching; March 17, 2008
QCMPM 6600
-03; Diesel Fuel Oil Storage Tank Cleaning; Revision 3
Commitment Item
ER-AA-450; Structures Monitoring; Revision 1
WO 880906; EDG Fuel Oil Storage Tank Cleaning and Inspection; August 18, 2010
WO 592920; One
-Time Inspection U2 EDG Fuel Oil Storage Tank; September 9, 2010
WO1396215; License Renewal Inspection Underground FP
Piping; May 21, 2011
WO 1377212; EDG Fuel Oil Storage Tank Leak Check; August 22, 2011
ER-AA-335-004; Ultrasonic (UT) Measurement of Material Thickness and Interfereing Conditions; Revision 6
ER-AA-330; Conduct of Inservice Inspection Activities; Revision 8
Commitment Item 26
ER-AA-330-007; Visual Examination of Section XI Class MC Surfaces and Class CC Liners; Revision 7
QCTS 0820-11; Surveillance of Dryer
-Separator Pit, Spent Fuel Pool, and Drywell Liner Area Drains; Revision 4
WO 01076914
-01; Unit 1 Perform IWE Pre
-outage/Outage Examinations (ISI); dated June 18, 2009 WO 01144147
-01; Unit 2 Perform IWE Pre
-outage/Outage Examinations (ISI); dated April 20, 2010
WO 01077068
-01; Unit 1 Dryer Separator Pool, Spent Fuel Pool, Drywell Liner Drain; dated May 2, 2009 WO 01143942
-01; Unit 2 Dryer Separator Pool, Spent Fuel Pool, Drywell Liner Drain; dated March 18, 2010 WO 01256579
-01; Unit 1 Dryer Separator Pool, Spent Fuel Pool, Drywell Liner Drain; dated May 9, 2011
Attachment
WO 01333337
-01; Unit 2 Dryer Separator Pool, Spent Fuel Pool, Drywell Liner Drain; dated March 21, 2012 WO 01192383
-01; D3 RFL Com UT Inspection of Drywell Liner; dated November 5, 2010
WO 00712865
-01; D3 3RFL UT Insp of the Cylindrical
and Upper Spherical Areas O; dated November 8, 2
008 WO 01523240
-01; LR Review of Sand Pocket Drain Inspection; dated March 21, 2012
AR 00940064; Bellows Testing as Being Performed Will Not Meet LR Commitment; dated July 9, 2009 AR 01184660; LR Bellows Testing Clarifications in License Renewal; dated March 8, 2011
AR 00912776; PSU
- Missing Nut for ASME Exam; dated April 28, 2009
AR 00914413; PSU Q1R20 CISI Indication on X
-01 Moisture Barrier; dated May 1, 2009
AR 01044236; Q2R20 PSU
- Damaged X-200A Hatch Stud Requires Replacement; dated March 18, 2010 QCS01.G03; Quad Cities Nuclear Power Station Units 1 and 2, ISI Program Plan Fourth Ten Year Inspection Interval; dated December 3, 2010
Commitment Item
QCS01.G04; Quad Cities Nuclear Power Station Units 1 and 2, ISI Classification Basis Document Fourth T en-Year Inspection Interval; dated December 3, 2010
QCS01.G05; Quad Cities Nuclear Power Station Units 1 and 2, ISI Selection Document Fourth Ten-Year Inspection Interval; dated December 3, 2010
ER-AA-330; Conduct of Inservice Inspection Activities; Revisi
on 8 ER-AA-330-003; Inservice Inspection of Section XI Component Supports; Revision 7
Exelon Letter to Nuclear Regulatory Commission, SVP
-09-045; Quad Cities Unit 1 Post Outage Inservice Inspection Summary Report; dated August 21, 2009
Exelon Letter to Nuclear Regulatory Commission, SVP
-10-044; Quad Cities Unit 2 Post Outage Inservice Inspection Summary Report; dated June 18, 2010
AR 00916378; Plant Configuration Does Not Match CB
and I Drawing for Torus; dated May 6, 2009 AR 00846680; D3R20 LLRT ON 3
-1201-1 and 1201
-1A Exceeded Admin Alarm Limit; November 18, 2008 Commitment Item 28
Document ID No. 2008-63; Integrated Leakage Rate Test Final Report; December 1, 2008
WO 99027210; D3 15y TS Primary Containment (ILRT) Leak Rate Test; November 14, 2008
ER-AA-450; Structures Monitoring; Revision 1
Commitment Item 29
ER-QC-450-1001; Quad Cities Structures Monitoring Instructions; Revision 0
Structures Monitoring Form for Turbine Building Unit 1 and Unit 2 Masonry Wall Inspection Elevation 595'
-0"; dated July 20, 2012
AR 00130841; Mortar Found Missing Partially on Wall Joint at 2 Locations; dated November 8, 2002  AR 00132264; Crack in Concrete Block Wall Joint; dated November 18, 2002
AR 00993130; Cement Block at U
-2 TB Floor Frisking Station Loose on Wall; dated November 13, 2009  AR 01065498; Service Building Outside Wall Deteriorating; dated May 4, 2010
QCTP 1301-11; Internal Flood Protection Program; Revision 5
Commitment Item
ER-AA-450; Structures Monitoring; Revision 1
ER-QC-450-1001; Quad Cities Structures Monitoring Instructions; Revision 0
Attachment
Structures Monitoring Form for Turbine Building Unit 1 and Unit 2 Masonry Wall Inspection Elevation 595'
-0"; dated July 20, 2012
Structures Monitoring Form for Turbine Building Unit 1 Elevation 547'
-0"; dated July 20, 2012
Structures Monitoring Form for Turbine Building Unit 1 Elevation 572'
-6"; dated July 20, 2012
Structures
Monitoring Form for Turbine Building Unit 2 Elevation 547'
-0"; dated July 20, 2012
Structures Monitoring Form for Turbine Building Unit 2 Elevation 572'
-6"; dated March 31, 2012
Structures Monitoring Form for Reactor Building Drywell Unit 1 (Basement) Elevation 579'
-10"; dated June 3, 2011
Structures Monitoring Form for Reactor Building Unit 1 Elevation 647'
-0"; dated June 3, 2011
Structures Monitoring Form for Turbine Building Unit 1 and Unit 2 HPCI rooms EL. 554'
-0"; dated April 16, 2010
QCMPM 4400
-11; RHR Service Water Intake Bay Inspection; Revision 9
Commitment Item 31 QCMPM 4400
-12; Circulating Water Intake Bay Inspection; Revision 15
WO 01359218
-01; RHR Service Wtr Bay Inspection
- Both Screens; January 11, 2011
WO 01298081
-01; (LR) 1A Circ Water Intake Bay Insp; dated January 11, 2011
WO 01298081
-02; (LR) 1B Circ Water Intake Bay Insp; dated December 29, 2010
WO 01298081
-03; (LR) 1C Circ Water Intake Bay Insp; dated October 21, 2010
WO 01304080
-01; (LR) 2A Circ Water Intake Bay Insp; dated January 20, 2011
WO 01304080
-02; (LR) 2B Circ Water Intake Bay Insp; dated January 20, 2011
WO 01304080
-03; (LR) 2C Circ Water Intake Bay Insp; dated January 20, 2011
WO 01364381
-01; Discharge Flume Weir Inspection; dated January 13, 2011
WO 01332195
-01; (LR) Intake Canal Sounding Readings; dated December 10, 2010
WO 01484249
-01; (LR) Intake Canal Sounding Readings; dated May 10, 2012
WO 01484249
-02; (LR) Intake Canal Sounding Readings; dated May 15, 2012
WO 00576538
-01; One-Time Inspect Intake Ice Melt Line (License Renewal); dated May 4, 2009
AR 01355486; LR
- B1.31 Additional Scope Required in Structure Monitoring; dated April 18, 2012
AR 01361129; NOS ID: LR AMP B.1.31 Structures Monitoring Signatures N/A; dated May 1, 2012
ER-AA-330-008; Exelon Service Level I, and Safety
-Related (Service Level III) Protective Coatings; Revision 7
Commitment Item 32 ER-QC-330-1000; Primary Containment and Coating Inspections; Revision 4
WO 699205; Unit 1 Torus Coating Inspection
- Underwater Areas; April 13, 2011
WO 699207; Unit 1 Coating Inspection
- Vapor Phase; April 13, 2011
WO 1079750; Torus Coating Inspection
- Underwater Phase; April 17, 2009
WO 1079742; Coating Inspection
- Vapor Phase; May 3, 2009
Quad Cities Maintenance Inspection of Safety Related Coating Systems; April 27, 2009
WO 1241027; Q2R20 Prep and Recoat Drywell Level 1, Azimuth 120; March 17, 2010
AR 1343538; Q2R21 LL LR Coating Inspections Lessons Learned; March 21, 2012
Unit 1 T orus Q1R20 Outage Inspection Plan; De
-Sludging, Inspection and Coating Repair; April 29, 2009 Calc 64.305.2029; Torus Pitting Corrosion Acceptance Criteria for Quad Cities Nuclear Power Station Units 1 and 2
AR 01151699; License Renewal A.1.33 Actions not Scheduled; December 13, 2010
Commitment Item 33
AR 00747735; Various Cables in Trays 847T, 848B, and 848T are Degraded; March 10, 2008
AR 01217239; 1
-0203-2D- Junction Box 2D MSIV; May 17, 2011
MA-AA-723-500; Inspection of Non EQ Cables and Connections for Managing Adverse Localized Environments; Revision 34
a
Attachment
ER-AA-470; Fatigue and transient monitoring program; Revision 5
Commitment Item
09-02; Change evaluation form for commitment 101562
-48-01; September 9, 2012
AR 00960410; Commitment Update; October 13, 2009
AR 00665518; Fatigue monitoring vents within 80
percent of allowable limits; August 28, 2007
AR 00905509; Potential issue with
Fatigue Pro monitoring of FW nozzle; April 9, 2009
CC-AA-203; Environmental Qualification Program; Revision 8
Commitment Item 35
EQ Binder EQ
-GEN036; NAMCO EC210 series Receptacle and Connector/ Cable Assembly; Revision 07
EQ Binder EQ
-GEN017; EGS (Patel) Quick Disconnect Electrical Connectors (QDC); Revision 10
EQ Binder EQ
-90Q; Reactor Water Clean
-up (RWCU) Auto
-Isolation Panel and Lambda power supplies; Revision
NF-AA-610; On-Site Wet Storage of Spent Nuclear Fuel; Revision 11
Commitment Item 36
NF-AA-610-1000; Creation of Racklife Input Files and Statepoints; Revision 3
CY-AB-120-300; Spent Fuel Pool Chemistry Control; Revision 11
SEP-300020-01; Procedure for
Measuring the Boron
-10 Areal Density in the Boraflex Spent Nuclear Fuel Storage Racks; Revision 0
QCTS 0941-04; Inservice Surveillance Evaluation of Boraflex Neutron Absorbing Material Coupon; Revision 3
WO 01425456; Periodic Update of Spent Fuel Rack Computer Model Racklife; March 14, 2012
WO 01471725; Perform 2011 Badger Testing in Spent Fuel Pools; November 30, 2011
AR 00181471; Procedure CY
-AB-120-300 and NF-AA-610 Inadequate Reviews; October 17, 2003
AR 00641606; Elevated Fuel Pool Temperature Concern-Boraflex Degradation; June 18, 2007
AR 00867354; Degraded Boraflex Criticality Analysis Extent of Condition; July 16, 2010
WO 01580603; Review LPRM, IRM, SRM Calibration Results; October 9, 2012
Commitment Item 37
WO 01414438; Full Core LPRM Calibration; April 20, 2011
WO 01070356; DI
: [[contact::V. II]], Drywell Radiation Monitor CAL/ FUNC Test; March 31, 2009
N/A for Quad Cities
Commitment Item 38
AR 01372208; Light Corrosion on Area Heater 1
-5755-F Piping; May 30, 2012
Commitment Item 39
AR 01372218; Light Corrosion on Area Heater 2
-5753-E Piping; May 30, 2012
AR 01352551; LR
-ISG-2011-05 Ongoing Review of OPEX; April 11, 2012
N-QCESPCT; Engineering Continuing Training, License Renewal (Commitments and Requirements); Revision 3
AR 01314803; Document Corrosion of the 1-9400-100 Y Strainer; January 18, 2012
AR 01346776; NRC License Renewal U
-2 Inspection Insights; March 28, 2012
AR 1220714; LR
- Corrosion on U1/2 EDG Non
-Seg Bus Duct at Location Y4
-Z4; May 25, 2011
Commitment Item 40
AR 1215114; LR
- U1 EDG Bus Duct Insulating Boots Missing Hardware; May 12, 2011
WO 00880854
-01; EM U1/2 DG Bus Duct Internal Inspection; May 27, 2011
WO 00880852
-01; EM Inspect U
-2 EDG Bus Duct Internals; March 23, 2010
QCEPM 0400
-09; Electrical Inspection of Isolated Phase Buses and Non
-Segregated Buses; Revision 16
Attachment
QCEPM 0400
-18; Emergency Diesel Generator Non
- Segregated Bus Duct Preventive Maintenance Inspection; Revision 3
QCMPM 7500
-01; Standby Gas Treatment System Removal of Charcoal Adsorber Test Canister; Revision 4
Commitment Item 41
QCIS 7500-01; Standby Gas Treatment DOP
-Freon Test; Revision 2
QCMPM 9400
-01; Crevs Air Filtration Unit Charcoal Test Canister Removal; Revision 2
QCIS 5700-04; Main Control Room Air Filter Unit Dop
-Freon Test; Revision 1
QCTS 0440-05; Control Room Hvac Component Inspection; Revision 11
Work Order 01218756
-01; SBGT Removal of Charcoal Adsorber Test Canister; dated December 3, 2010  Work Order 01218757
-01; SGTS In Place Charcoal Adsorber Freon Leak Test
- Train A; dated December 3, 2010  Work Order 01099940
-01; SBGT Removal of Charcoal Adsorber Test Canister; dated July 13, 2009  Work Order 01099941
-01; SGTS In Place Charcoal Adsorber Freon Leak Test
- Train B; dated July 14, 2009
Work Order 01333732
-01; CR Emer Filtration Sys Removal/Charc Adsorber Test Canister; dated January 20, 2012
Work Order 01130534
-01; Control Rm HVAC Air Filtr Unit In Place DOP Lk Test of; dated October 22, 2009  Work Order 01130976
-01; (LR) Control Room Hvac Component Inspection; October 21, 2009
Work Order 01232158
-01; Control Room Hvac Component Inspection; dated April 20, 2011
Work Order 00880916
-01; (LR) Unit 1 SBO Building Day Tank Room Vent Sys Seal/Gasket Insp; dated November 11, 2010
Work Order 00880918
-01; (LR) Unit 2 SBO Building Day Tank Room Vent Sys Seal/Gasket Insp; dated September 8, 2010
Work Order 00880549
-01; Unit 1 (LR) EDG Room Vent Sys Seal/Gasket Insp; dated September 22, 2009  Work Order 00880554
-01; Unit 2 (LR) EDG Room Vent Sys Seal/Gasket Insp; dated October 24, 2011  Work Order
245101-01; Unit 1 Rubber Seat Inspection of Rx Bldg Vent Isol Dampers; dated March 9, 2011
Work Order 01245045
-01; Unit 2 Rubber Seat Inspection of Rx Bldg Vent Isol Dampers; dated December 16, 2010
AR 012511591; LR EDG Vent Elastomer Inspect Note Degradation
- No IR; dated August 15, 2011 AR 01290296; LR
- Procedure Require Additional LR Flags; dated November 14, 2011
QCTS 0320-02; Suppression Chamber Spray Header and Nozzle Water Spray Test; Revision 7
Commitment Item 42
QCTS 0320-03; Drywell Spray Header and Nozzle Air Test; Revision 10
WO 1087169; U2 SES Air Test of Drywell Spray Header and Nozzles per QCTS 0320
-03; March 22, 2008 WO 1096469; U1 SES Air Test of Drywell Spray Header and Nozzle per QCTS 0320
-03; May 13, 2009 WO 1096468; U1 SES Torus Water Test per QCTS 0320
-02; May 17, 2009
WO 1147401; U2 SES Water Test of Torus Spray Header and Nozzles; March 16, 2010
AR 01359100; LR discrepancy noted in results binder during final review; April 26, 2012
Commitment Item 43
QCMPM 130 0-01;RCIC pump and turbine preventive maintenance; Revision 23
Attachment
QCMPM 5100
-01; Hydrogen seal oil vacuum pump PM; Revision 28
QCMPM 2300
-01; HPCI refuel preventive maintenance; Revision 11
QCMPM 0400
-17; Station lubrication program; Revision 34
MA-AA-716-230; Predictive maintenance program; Revision 8
MA-AA-716-230-1001; Oil analysis interpretation guideline; Revision 13
WO 01075092
-01; MM U-1 RCIC pump and turbine preventive maintenance insp; July 7, 2008
WO 01167297
-01; Sample and Change oil for RCIC PMP outboard bearing; October 18, 2009
AR 01137133; LR commitment enhancements found during check
-in; November8, 2010
AR 01137140; Revise QCMP 1300
-01 to incorporate (LR) reference; November 8, 2010
AR 00800972; U2 hydrogen seal oil vacuum pump gearbox oil analysis result; July 28, 2008
AR 00608179; U
-2 EHC Fluid analysis results; March 23, 2007
Evaluation Form for Commitment Change Tracking No. 11-02; 12/08/2011
Commitment Item 44
Quad Cities to NRC Docketed Letter
SVP-12-056 dated 06/13/2012 on Commitment Change
11-02 AR 01233683; change QCOS 2300
-05 to Record Inlet And Outlet Temperatures On The Lube Oil Coolers And Gland Seal Condensers; June 28, 2011
QCOS 2300-05; Quarterly HPCI Pump Operability Test; Revision 68
QCOS 2300-05; Quarterly HPCI Pump Operability Test; Revision 69
AR 01233959; QCTP 0820
-10 Needs Clarification
of Commitment Statement; 06/28/2011
QCTP 0820-10; U1 or U2 Hx and Room Cooler Inspection; Revision 6
AR 01346172; Hx Eddy Current Test
Commitment 44 change 11
-02; 3/27/2012
AR 01253778; LR Hx test and Inspection Activities
AR 01297210; Update RCMT for Hx Eddy Current Test commitment 44 change 11
-02; 12/02/2011
WO 01130976; LR Common CR HVAC Inspection Completed; 10/21/2009
QCTS 0440-05; CR HVAC Component Inspection; Revision 9
WO 01395196; U1 LR SBO Battery Room AHU Maintenance; 03/11/2011
Tab 4C: WO 01413564; (LR) U2 SBO Batt Rm AHU Maint; 05/04/2011
PMID/169774
-01; (LR) U2 SBO Batt Rm AHU Maint; 05/04/2011
QCMMPM 5700
-24; U1 and U2 SBO Bldg Battery Room AHU and ACUs; Revision
B.2.7; Generator Stator Water Chemistry Activities; Revision 1
Commitment Item 45
CY-AA-120-440; Stator Cooling Water Chemistry; Revision 8
CY-AA-160-100 attach 1; U2 Stator Demin Chem. data for 04/16/2010
CY-AA-160-100 attach 1; U1
and U2 Stator Demin Chem. data for 04/22/2010
CY-AA-160-100 attach 1; U1
and U2 Stator Demin Chem. data for 04/29/2010
CY-AA-160-100 attach 1; U1
and U2 Stator Demin Chem. data for 05/28/2010
CY-AA-160-100 attach 1; U1
and U2 Stator Demin Chem. Data
for 05/08/2010
CY-AA-160-100 Attach 1; U1 and U2 Stator Demin Chem. Data
for 05/20/2010
CY-AA-160-100 Attach 1; U1 and U2 Stator Demin Chem. Data
for 05/28/2010
CY-AA-160-100 Attach 1; U1 and U2 Stator Demin Chem. Data
for 05/05/2011
CY-AA-160-100 Attach 1; U1 and U2 Stator Demin Chem. data for 05/11/2011
AR 00696882; U1 Stator Water Demin Outlet Conductivity Increase; 11/09/2007
AR 00288647; U2 Stator Demin Inlet Dissolved Oxygen Low; 01/06/2005
AR 00297413; U1 SWC Conductivity Corr. Check failed A.C.; 02/03/2005
WO 880860; Disassemble and inspect Valve 0
-5799-131; September 23, 2011
Commitment Item 46 WO 880859; Disassemble and Inspect Valve 1-5799-770; July 19, 2012 WO 880858; Disassemble and Inspect Valve 0-5799-92; July 22, 2011 WO 880857; Disassemble
and Inspect Manual Valve
2-5799-833; July 20, 2012
Attachment
WO 880856; Disassemble and Inspect
Manual Valve
2-5799-295; July 15, 2011 WO 1533256; Disassemble and Inspect Steam Heater Trap 2
-5751-K-T; July 25, 2012
Letter from the NRC:  Dresden Nuclear Power Station, Units 2 and 3, and Quad Cities Nuclear Power Station, Units 1 an 2
- Issuance of Amendments Regarding Pressure and Temperature Limits; Date October 17, 2012
Commitment Item 47
IT-AA-101-1001-F-01; DTSQA Classification Checklist for FatiguePro (EX0007237); Revision 0
Commitment Item 48
IT-AA-101-1001; DTSQA Level Classifications; Revision 6
09-02; Commitment Change Evaluation Form for 101562
-48-01; September 1, 2009
ER-AA-470; Fatigue and Transient Monitoring Program; Revision 5
PMID 00173219; Fatigue an
d Transient Monitoring Program Report 1/1/12 thru 6/30/12; September 4, 2012
0800676.302; Quad Cities Revised Analysis for FatiguePro
Locations; April 4, 2012
0800676.303; Quad Cities Revised Analysis for FatiguePro
Locations; December 12, 2010
AR 00665518; Fatigue Monitoring Events Within 80
Percent of Allowable Limits; August 28, 2007
AR 00905509; Potential Issue with Fatigue
pro Monitoring of FW Nozzle; April, 9, 2009
CC-AA-203; Environmental Qualification Program; Revision 8
Commitment Item 49
EQ Binder EQ
-GEN036; NAMCO EC210 Series Receptacle and Connector/Cable Assembly; Revision 07
EQ Binder EQ
-GEN017; EGS (Patel) Quick Disconnect Electrical Connectors (QDC); Revision 10
EQ Binder EQ
-90Q; Reactor Water Clean
-up (RWCU) Auto
-Isolation Panel and
Lambda Power Supplies; Revision 01
WO 757589; UT inspect U1 ECCS Suction Strainer Flange; March 12, 2008
Commitment Item 50
WO 757588; UT inspect U2 ECCS Suction Strainer Flange; April 4, 2006
Exelon Letter to Nuclear Regulatory Commission, SVP-12-094; License Renewal Commitment for Evaluation of Operating Experience at Extended Power Uprate Levels Prior to Period of Extended Operation; dated October 18, 2012
Commitment Item 51
AR 00985077; U
-2 EDG - Interior Surfaces Corrosion
on Starting Air Piping AMP B.2.9 WO 00880899
-01; MM U-1 RCIC Trip and Throttle Valve Disassembly/Inspection; May 17, 2011
WO 00592905 01; MM one
-time inspect UT U1 EDG ST
Air RCVR (LR); July 30, 2009
WO 00836175
-01; NDE (LR) UT Walkdown OD ADS Discharge Piping; May11, 2007
WO 0088086
1-01; MM Prep piping inboard U2 X
-19 for UT (LR); February 28, 2008
AR 01176082; (LR)
-Missed VT-3 Inspection During RCIC PM 20686
-01; February 16, 2011
WO 880808-01; Inspection of EDG starting air flex hoses; October 27, 2009
WO 00880898
-01; MM RCIC turbine disassembly/inspection; February 21, 2007
AR 01176013; Maintenance Planning to Review All Open LR WO for Correct Instructions
t o Ensure LR Commitments Met; May 6, 2011 ER-AB-331; BWR Internals Program Management; Revision 11
AMP B.2.10
QCTS 0740-04; RPV In-Vessel Examination; Revision 9
IVVI Basis Document Quad Cities Nuclear Power Station; Appendix M Steam Dryer BWRVIP
-139-A; Revision 6
Attachment
IVVI-09-07; IVVI Examination Data Sheet Steam Dryer ID and OD; May 11, 2009
IVVI Examination Data Sheet
Steam Dryer; March 29, 2010
Examination Data Sheet IVVI
-2011-Steam Dryer OD; May 24, 2011
AR 747071; Q2R19 IVVI Steam Dryer Indications on Internal Weld; March 9, 2008
AR 1045557; Q2R20 IVVI
-Previous Dryer Indications Reinspection Results;
March 21, 2010
Attachment
LIST OF ACRONYMS USE
D  ADAMS Agencywide Document Access Management System
AMP Aging Management Program
AR Action Request
ASME American Society of Mechanical Engineers
BWR Boiling Water Reactor
CASS Cast Austenitic Stainless Steel
CCEF Item Change Evaluation Form
CCST Contaminated Condensate Storage Tank
CFR Code of Federal Regulations
DGCW Diesel Generator Circulating Water
EDG Emergency Diesel Generator
EPRI Electric Power Research Institute
EQ Environmental Qualifications
ESS Essential Service  FAC Flow Accelerated Corrosion
GALL  NUREG-1801 "Generic Aging Lessons Learned"
IGSCC Intergranual Stress Corrosion Cracking
IMC Inspection Manual Chapter
ID Internal Diameter
IP Inspection Procedure
IR Inspection Report
IR Issue Report
IRM Intermediate Range Monitor
ISI Inservice Inspection
MC Metal Containment
NDE Non Destructive Examination
NEI Nuclear Energy Institute
NRC U.S. Nuclear Regulatory Commission
NRR Division of Nuclear Reactor Regulation
NUREG Nuclear Regulation
PARS Publicly Available Records
PEO Period of Extended Operation
P/T Pressure Temperature
RAI Request for Additional Information
RAT Reserve Auxiliary Transformer
RG Regulatory Guide
RHRSW Residual Heat Removal Service Water
RWCU Reactor Water Cleanup
SBLC Standby Liquid
Control SCC Stress Corrosion Cracking
SER Safety Evaluation Report
SRM Source Range Monitor
SSC Systems Structures and Components
TLAA Time Limited Aging Analysis
TR Technical Report TS Technical Specifications
UFSAR Updated Final Safety Analysis Report
UHS Ultimate Heat Sink
URI Unresolved Item
UT Ultrasonic Test
VIP Vessel Internals Program


M. Pacilio
===Discussed===
    -2- In accordance with
==LIST OF DOCUMENTS REVIEWED==
CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component o
f NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
Sincerely,    Ann Marie Stone, Chief
Engineering Branch 2
Division of Reactor Safety
Docket Nos. 50
-254; 50-265 License Nos. DPR
-29; DPR-30 Enclosure:
Inspection Report
050002 54/201 2 010; 05000265/2012010
w/Attachment:  Supplemental Information
cc w/encl:
Distribution via ListServ
Ž DISTRIBUTI
ONCayetano Santos
: RidsNrrDorlLpl3
-2 Resource
RidsNrrPMQuadCities Resource
RidsNrrDirsIrib Resource
Chuck Casto
Cynthia Pederson
Steven Orth
Jared Heck
Allan Barker
Christine Lipa
Carole Ariano
Linda Linn
DRPIII DRSIII Tammy Tomczak
ROPreports.Resource@nrc.gov


DOCUMENT NAME:
G:\DRSIII\DRS\Work in Progress
\QUAD 2012 010 IR 71003 BJ.docx
Publicly Available
Non-Publicly Available
Sensitive  Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE  RIII    RIII    RIII    RIII    NAME  BJose A AMStone      DATE  12/19/1 2  12/21/1 2    OFFICIAL RECORD COPY
}}
}}

Latest revision as of 19:36, 11 January 2025

IR 05000254-12-010, 05000265-12-010; 10/22/12 - 11/09/12; Quad Cities Nuclear Power Station, Units 1 and 2; Post Approval Site Inspection for License Renewal
ML12356A431
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 12/21/2012
From: Ann Marie Stone
NRC/RGN-III/DRS/EB2
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
Benny Jose
References
IR-12-010
Download: ML12356A431 (43)


Text

December 21, 2012

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2 NRC POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL REPORT 05000254/2012010; 05000265/2012010

Dear Mr. Pacilio:

On November 9, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed Post-Approval Site Inspection for License Renewal at your Quad Cities Nuclear Power Station, Units 1 and 2. The enclosed report documents the results of this inspection, which were discussed on November 9, 2012, with Mr. T. Hanley, and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, and interviewed personnel. Based on the results of this inspection, there were no findings of significance identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS)

component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Ann Marie Stone, Chief Engineering Branch 2 Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR 30

Enclosure:

Inspection Report 05000254/2012010; 05000265/201210 w/Attachment: Supplemental Information

REGION III==

Docket Nos:

50-254; 50-265 License Nos:

DPR-29, DPR-30 Report No:

05000254/2012010; 05000265/2012010 Licensee:

Exelon Generation Company, LLC Facility:

Quad Cities Nuclear Power Station, Units 1 and 2 Location:

Cordova, IL Dates:

October 22, 2012 - November 9, 2012 Inspectors:

B. Jose, Senior Reactor Engineer (Lead)

N. Féliz Adorno, Reactor Engineer

G. ODwyer, Reactor Engineer

J. Bozga, Reactor Engineer

E. Sanchez, Reactor Engineer

J. Corujo, Reactor Engineer

J. Gilliam, Reactor Engineer

D. Betancourt, Reactor Engineer Approved by:

A. M. Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Enclosure

SUMMARY OF FINDINGS

IR 05000254/2012010, 05000265/2012010; 10/22/12 - 11/09/12; Quad Cities Nuclear Power

Station, Units 1 and 2; Post Approval Site Inspection for License Renewal.

The report covers a team inspection conducted by region-based engineering inspectors. The inspectors concluded that items, license conditions, and regulatory requirements associated with the issuance of the renewed operating license were being met. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 4, dated December 2006.

A.

Cornerstone: Initiating Events, Mitigating Systems, Barrier Integrity

NRC-Identified

and Self-Revealed Findings No findings of significance were identified.

B.

No violations of significance were identified.

Licensee-Identified Violations

4.

OTHER ACTIVITIES

REPORT DETAILS

4OA5

.1 Other Activities

The purpose of this inspection is to verify committed actions and license conditions associated with the renewed license for Units 1 and 2 are implemented in accordance with 10 CFR Part 54.

Post-Approval Site Inspection for License Renewal (Phase II) - IP 71003 a.

(1) Inspection Scope The inspectors discussed the identification of new SSCs, under the purview of title 10 of the code of federal regulations (CFR) 54.37(b), with the licensees license renewal staff.

The licensee personnel indicated newly identified components had resulted from a change to the Environmental Qualification (EQ) Program. The components were subsequently added to the site EQ Program, which is also credited as the license renewal (LR) Aging Management Program (AMP) B1.35. The AMP will manage the effects of aging for those newly identified components.

Review of Newly Identified SSCs [Systems Structures and Components]

The license renewal Updated Final Safety Analysis Report (UFSAR) Supplement, Appendix A.1.35, Environmental Qualification (EQ) of electrical components, remains an accurate summary of the AMP, and does not require revision as a result of the newly identified components.

(2) As part of reviewing the Aging Management Programs (AMPs) associated with the Commitment Items, the inspectors reviewed the UFSAR descriptions to confirm the implemented programs were consistent with the UFSAR descriptions.

Review of Updated Final Safety Analysis Report and Commitment Item Change Process The inspectors reviewed the licensees procedures to ensure that Commitment Item revisions would follow the guidance in NEI 99-04, Guidelines for Managing NRC Commitment Item Changes, including the elimination of commitment, and would properly evaluate, report, and approve changes to license renewal commitments listed in the UFSAR in accordance with 10 CFR 50.59. The inspectors also reviewed the licensees Commitment Item tracking program to evaluate its effectiveness.

With respect to implementation, the inspectors reviewed changes associated with each commitment. One Unresolved Item (URI) was identified and is documented in Section 4OA5.1.b (1).

(3) The inspectors reviewed supporting documents including completed surveillance records, conducted interviews, performed visual inspection of structures and components to verify the licensee completed the necessary actions to comply with the license conditions that are a part of the renewed operating license. The inspectors verified the licensee implemented the Aging Management Programs and time-limited Review of Commitment Items aging analyses (TLAA) included in NUREG-1796, Safety Evaluation Report (SER)

Related to the License Renewal of Dresden Nuclear Power Station Units 2 and 3 and Quad Cities Nuclear Power Station, Units 1 and 2, in accordance with Title 10 of the Code of Federal Regulations (CFR) Part 54, Requirements for the Renewal of Operating Licenses for Nuclear Power Plants. The inspectors verified a selected sample of corrective actions taken to address issues identified during the Dresden Units 2 and 3 license renewal inspections, which was documented in Inspection Reports 05000237/2009007 and 05000249/2010010, and were also applicable to Quad Cities Units 1 and 2.

When changes to these items were identified, the inspectors reviewed the Commitment Item Change Evaluation Form (CCEF) to verify the licensee followed the guidance in NEI 99-04 for the license renewal Commitment Item change process, including the elimination of commitments, and properly evaluated, reported, and approved where necessary, changes to license renewal commitments listed in the UFSAR in accordance with 10 CFR 50.59.

The inspectors reviewed the Commitment Items listed below which are referenced to Appendix A of the SER. Specific documents reviewed are listed in the enclosure.

1. Commitment Item 1 specified the existing ASME Section XI, Subsections IWB, IWC,

and IWD Aging Management Program, is part of the Inservice Inspection (ISI)

Program. It provides identification of signs of degradation, and establishment of corrective actions for condition monitoring of reactor coolant pressure retaining piping and components within the scope of license renewal. The inspections will be implemented in accordance with 10 CFR 50.55(a). Also Quad Cities implemented Risk Informed Inservice Inspection and the alternative Risk Informed Inservice Inspection programs for Class 1 and 2 piping.

Commitment Item 1, ASME [American Society of Mechanical Engineers] Code,Section XI Inservice Inspection, Subsections IWB, IWC, and IWD The inspectors reviewed the licensing basis, program basis documents, implementing procedures, non-destructive examination (NDE) records, and related condition reports; and interviewed the responsible plant personnel regarding these documents. The inspectors verified the licensee incorporated the Risk Informed ISI Program for Class 1 and 2 Systems.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 1.

2. Commitment Item 2 specified the existing water chemistry program was credited for

license renewal for both Units 1 and 2 and that the program was enhanced prior to the period of extended operation.

Commitment Item 2, Water Chemistry The inspectors reviewed changes and enhancements to the program and ensured the program remained effective for both units. The inspectors verified procedure CY-QC-110-608, Reactor/Turbine Building Sample Panel Sample Collection, Revision 21 was revised to ensure the integrity of the samples collected.

The inspectors reviewed the licensing basis, program basis documents, planned and completed work orders, Commitment Item changes, Issue Reports, inspection procedures and interviewed the plant personnel responsible for the program.

Planned and completed chemistry surveillance tests and related Issue Reports demonstrated the water chemistry program was appropriately applied to Units 1 and 2.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 2 for Units 1 and 2.

3. Commitment Item 3 specified the existing Reactor Head Closure Studs Aging

Management Program was credited. The program is implemented through station procedures, ISI program plan for Quad Cities, and corporate procedures for inservice inspection of welds and components. The program implements inspection requirements of ASME Section XI and preventive measures described in Regulatory Guide 1.65, "Materials and Inspection for Reactor Vessel Closure Studs." The reactor head studs at Quad Cities are not metal plated and have had manganese phosphate coatings applied.

Commitment Item 3, Reactor Head Closure Studs The inspectors interviewed the plant personnel responsible for the program and reviewed the program basis documents, implementing procedures, work orders, and related IRs to verify the program was being implemented on Units 1 and 2.

Based on review of the licensee actions, the inspectors determined the licensee met Commitment Item 3.

4. Commitment Item 4 specified the existing BWR Vessel Attachment Welds Aging

Management Program activities incorporated the inspection and evaluation recommendations of BWRVIP-48, 'Vessel ID Attachment Weld Inspection and Evaluation Guidelines," as well as the water chemistry recommendations of EPRI TR-103515-R2, "BWR Water Chemistry Guidelines." The program is implemented through station procedures that provide for mitigation of cracking through water chemistry and monitoring for cracking through in vessel examinations.

Commitment Item 4, BWR [Boiling Water Reactor] Vessel ID [Internal Diameter]

Welds The inspectors reviewed the licensing basis, program basis documents, implementing procedures, NDE examination records, and interviewed the plant personnel responsible for the program regarding these documents to verify the program is being implemented on Units 1 and 2.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 4.

5. Commitment Items 5 specified the existing BWR Feedwater Nozzle program was

credited for license renewal and would be enhanced prior to the period of extended operation. This program implemented inservice inspection specified in ASME Code,Section XI and enhanced it with recommendations from General Electric NE-523-A71-0594-A, Revision 1 Alternate BWR Feedwater Nozzle Inspection Requirements. Per their enhancements, the licensee will perform periodic ultrasonic testing inspection of certain critical regions of the BWR feedwater nozzles.

Commitment Item 5, BWR Feedwater Nozzle The inspectors reviewed the licensing basis, program basis documents, implementing procedures, NDE examination records, related condition reports, and interviewed the responsible plant personnel. The inspectors verified the licensee implemented the recommendations of report GE-NE-523-A71-0594-A, Revision 1, which was approved by the NRC staff.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 5.

6. Commitment Item 6 specified the existing BWR Control Rod Drive Return Line

Nozzle inspection program was credited for license renewal. This program implemented inservice inspection in accordance with ASME Code Section XI. The licensee cut and capped the CRD return line nozzle. As a result, the augmented inspections described in NUREG-0619 BWR Feedwater Nozzle and Control Rod Drive Return Line Nozzle Cracking or GE NE-523-A71-0594, Alternative BWR Feedwater Nozzle Inspection Requirements are not required.

Commitment Item 6, Control Rod Drive (CRD) Return Line Nozzle The inspectors reviewed the licensing basis, program basis documents, implementing procedures, NDE examination records, related condition reports, and interviewed the plant personnel regarding these documents.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 6.

7. Commitment Item 7 specified the existing BWR SCC Program was credited for

license renewal. The BWR SCC Program is credited for managing the aging effects of crack initiation and growth, loss of fracture toughness, and loss of material in susceptible components. The program was also enhanced to include an additional ultrasonic examination of the Quad Cities Unit 2 reactor vessel head crack (detected in 1990) to verify the relevant indication has remained essentially unchanged.

Commitment Item 7, BWR Stress Corrosion Cracking (SCC)

The inspectors reviewed the licensing basis, program basis documents, implementing procedures, weld examination records, and related IRs; and interviewed the plant personnel responsible for the program regarding these documents to verify the program is being implemented.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 7.

8. Commitment Item 8 specified the existing BWR reactor vessel penetration inspection

program was credited for license renewal. The license renewal program applies only to the Standby Liquid Control/Core Plate DP penetrations and Instrument penetrations N11A/B and N12A/B. This program implemented inspection and flaw evaluation in conformance with BWRVIP-27 and BWRVIP-49.

Commitment Item 8, BWR Penetrations The inspectors reviewed the program basis documents, procedures, and NDE examination records to verify the program was adequately implemented.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 8.

9. Commitment Item 9 specified the existing BWR Vessel Internals Program (VIP)

would be credited for license renewal and enhanced with inspections consistent with BWRVIP-48. The BWR Vessel internals Aging Management Program mitigates the effect of stress corrosion cracking, intergranular stress corrosion cracking (IGSCC),and irradiation assisted stress corrosion cracking in reactor pressure vessels internals through water chemistry activities that are implemented through station procedures and are consistent with the guidelines of year 2000 revision of EPRI TR-103515-R2, BWR Water Chemistry Guidelines. The program also manages cracking of reactor pressure vessel internals through condition monitoring activities that consist of examinations and the BWRVIP guidelines, as well as the requirements of ASME Section XI.

Commitment Item 9, BWR Vessel Internals The inspectors reviewed the licensing basis, program basis documents, implementing procedures, NDE examination records; and interviewed the plant personnel responsible for the program regarding these documents to verify the program is being implemented.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 9.

10.

Commitment Item 10 specified a new Aging Management Program for thermal aging and neutron irradiation embrittlement of CASS reactor internal components within the scope of license renewal, to ensure the integrity of the CASS components exposed to high temperature and neutron fluence present in the reactor environment. This program includes a component specific evaluation of the loss of fracture toughness. For those components, where the loss of fracture toughness may affect function of the component, an enhanced VT-1 inspection will be conducted. These inspections will be in accordance with BWRVIP-03, and will be performed as part of the ISI program.

Commitment Item 10, Thermal Aging and Neutron Irradiation Embrittlement of Cast Austenitic Stainless Steel (CASS)

The inspectors reviewed the licensing basis, program basis documents, implementing procedures, completed inspections and interviewed the plant personnel responsible for the program regarding these documents to verify the program is being implemented.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 10.

11.

Commitment Item 11 specified the existing FAC Program was credited for license renewal with enhancements to include portions of the main steam and the reactor vessel head vent systems prior to the period of extended operation. The sites FAC program is based on EPRI guidelines found in NSAC-202L-R3, Recommendations for an Effective Flow Accelerated Corrosion Program. The program is credited for Commitment Item 11, Flow Accelerated Corrosion (FAC)predicting, detecting, and monitoring for loss of material by wall thinning in piping, fittings, and valve bodies due to FAC.

The inspectors reviewed the licensing basis, program basis documents, implementing procedures, pipe examination records and related IRs and interviewed the responsible plant personnel regarding these documents.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 11.

12.

Commitment Item 12 specified the existing bolting integrity program was credited for license renewal and that the program would be enhanced prior to the period of extended operation. The Bolting Integrity Program is an existing program that consists of the preventive and condition monitoring of pressure retaining bolted joints of piping and components for age-related degradation to discover and correct conditions that could lead to a loss of intended function.

Commitment Item 12, Bolting Integrity The inspectors reviewed the licensing basis, the Bolting Integrity Program basis documentation, implementing procedures, planned and completed work orders, related corrective action documents, and interviewed responsible program personnel regarding these documents.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 12.

13.

Commitment Item 13 specified the existing program was credited for license renewal and had been enhanced, prior to the period of extended operation, to include periodic inspections of cooling water pump internal linings, additional heat exchangers and sub-components, external surfaces of various submerged pumps, components in the high humidity/moisture environments of the pump vaults, and piping.

Commitment Item 13, Open-Cycle Cooling Water Program The inspectors reviewed changes and enhancements to the program and ensured that the program remained effective for both units. The inspectors reviewed the licensing basis, program basis documents, planned and completed work orders, Commitment Item changes, Issue Reports, inspection procedures and interviewed the plant personnel responsible for the program to verify the program was being implemented. General program requirements for this commitment were inspected and determined to be complete for Quad Cities Units 1 and 2.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 13 for Units 1 and 2.

14.

Commitment Item 14 specified the existing closed-cycle cooling water chemistry program was enhanced and credited for license renewal for both Units 1 and 2.

Commitment Item 14, Closed-Cycle Cooling Water Chemistry The inspectors reviewed the licensing basis, program basis documents, planned and completed work orders, Issue Reports, inspection procedures and interviewed plant personnel responsible for the program to verify the program was being implemented. General program requirements for this commitment were inspected and determined to be complete for Quad Cities Unit 1 and 2.

The licensee changed this commitment Item to use the guidance from the latest Electric Power Research Institute (EPRI) guidance document, EPRI TR 1007820, Closed Cooling Water Chemistry Guideline, Revision 1 instead of a previous EPRI Guidance procedure. The inspectors noted Revision 2 of the GALL endorsed the latest EPRI guidance document, EPRI TR 1007820. The inspectors verified this commitment change was appropriate.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 14.

15.

Commitment Item 15 specified the existing inspection of overhead heavy load and light load (related to refueling) handling systems program was credited for license renewal and that the program would be enhanced prior to the period of extended operation.

Commitment Item 15, Overhead Heavy Load and Light Load (Related to Refueling)

Handling Systems The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders, related corrective action documents and interviewed personnel responsible for the program regarding these documents.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 15.

16.

Commitment Item 16 specified the existing compressed air monitoring program was credited for license renewal and that the program would be enhanced prior to the period of extended operation.

Commitment Item 16, Compressed Air Monitoring The inspectors reviewed the licensing basis, program basis documents, planned and completed work orders, Issue Reports, inspection procedures and interviewed the plant personnel responsible for the program to verify the program was being implemented. General program requirements for this commitment were inspected and determined to be complete for Quad Cities Unit 1 and 2.

Based on review of the timeliness and adequacy of the licensees actions the inspectors determined the licensee met Commitment Item 16.

17.

Commitment Item 17 specified the existing program was credited for license renewal and was consistent with NUREG-1801 Generic Aging Lessons Learned (GALL).

Commitment Item 17, BWR Reactor Water Cleanup (RWCU) System The inspectors reviewed the licensing basis, program basis documents, and work orders. The licensee has replaced all in-scope portions of the RWCU system piping with IGSCC resistant piping. The RWCU portions that are inboard of the second isolation valve are being managed by the ISI program. The inspectors reviewed selected samples to confirm the ISI program was being utilized for the sections of the RWCU previously mentioned.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 17.

18.

Commitment Item 18 specified the licensee would enhance the existing fire protection program as follows:

Commitment Item 18, Fire Protection (non-water)

  • Provide specific guidance to check fire doors for wear and holes in skin that could affect intended function during weekly tours as well as check the fire door clearances.
  • Inspect external surfaces of the carbon dioxide system.
  • Perform a visual inspection (VT-1 or equivalent) on a 10 percent sample population of each type of fire seal on a refueling outage frequency. Expand the sample population by 10 percent if any of the inspected seals are found to have abnormal degradation that could prevent the seal from performing its intended function.

The inspectors reviewed the licensing basis, program basis documents, and existing implementing procedures. The inspectors verified the above enhancements were incorporated into the existing program documents and implementing procedures. The inspectors also reviewed the completed inspections and training requirements.

Based on the review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 18.

19.

Commitment Item 19 specified the existing fire water system program was credited for license renewal and that the program would include several enhancements prior to the period of extended operation.

Commitment Item 19, Fire Water System The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders and related corrective action documents.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 19.

20.

Commitment Item 20 specified the existing above-ground carbon steel tanks program was credited for license renewal and that the program would be enhanced prior to the period of extended operation. The enhancements included periodic system engineer walkdowns on the nitrogen storage tanks utilizing a standalone procedure and a one-time UT thickness inspection will be performed on the aluminum condensate storage tank or demineralized water storage tank.

Commitment Item 20, Above-ground Carbon Steel Tanks The inspectors reviewed the licensing basis, program basis documents, implementing procedures, scheduled, and completed work orders, related action requests, engineering changes, and evaluations. The inspectors verified the licensee has implemented procedure changes to address the documentation of inspection results by system engineers. In addition, the inspectors verified the licensee has implemented procedures to address internal/external inspections as well as committed UT inspections.

During this review, the inspectors identified the B Contaminated Condensate Storage Tank (CCST) inspection performed in 2007 time frame did not include NDE. Specifically, the license renewal commitment specified NDE would be performed once before the period of extended operation (PEO) and every five years thereafter. The inspectors noted this omission in 2007 was a failure to follow the requirements of the commitment. However, since the licensee performed a UT inspection of the B CCST in November 2012 (before the PEO) in accordance with the requirements of the commitment, this commitment was met.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 20.

21.

Commitment Item 21 specified the existing fuel oil chemistry program was credited for license renewal and that the program would be enhanced prior to the period of extended operation. The program was to be enhanced to include inspection of the fuel oil tank interiors for corrosion during regularly scheduled tank cleanings.

Commitment Item 21, Fuel Oil Chemistry The inspectors interviewed the program owner, reviewed the licensing basis, program basis documents, scheduled, and completed work orders and implementing procedures. The inspectors verified the licensee has implemented a program that evaluates the material condition and bottom thickness of the fuel oil storage tanks to ensure aging effects are effectively managed.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 21.

22.

Commitment Item 22 specified the existing reactor vessel surveillance Aging Management Program was credited for license renewal and that the program would be enhanced prior to the period of extended operation. The program is implemented through station procedures that conform to the requirements of 10 CFR Part 50, Appendix H, "Reactor Vessel Material Surveillance Program Requirements." Neutron embrittlement is predicted utilizing chemistry tables and Position 1.3 limitations as described in Regulatory Guide 1.99, Revision 2, "Radiation Embrittlement of Reactor Vessel Materials."

Commitment Item 22, Reactor Vessel Surveillance The inspectors reviewed the licensing basis, program basis documents, implementing procedures and interviewed the AMP owner regarding these documents. The inspectors verified the licensee incorporated the testing requirements for reactor vessel test capsules have been incorporated into station programs and procedures.

Based on review and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 22.

23.

Commitment Item 23 specified the licensee perform one-time inspections of selected plant equipment to verify current plant Aging Management Programs were effective in managing the effects of aging prior to the period of extended operation.

Commitment Item 23, One-Time Inspection The licensee had established separate one-time inspection programs covering the specific commitments listed in the SER. The inspectors reviewed the licensing basis, each program basis document, implementing procedures, inspection results and related IRs, and interviewed the responsible plant personnel regarding these documents.

The inspectors verified the licensee had documented the results of the one-time inspections, and with one exception, had followed up appropriately when aging effects were identified. For the one exception, a one-time inspection of the clean demineralized water check valve 0-4399-16 was performed and the results showed significant corrosion in the seating surface. In addition, all internal surfaces revealed moderate corrosion with some material wastage. The valve was replaced and the licensee performed an evaluation to determine if any aging management actions were needed. The site performed additional inspections at other valves belonging to the same sample group and those were found in good condition.

Based on those results the licensee determined the valve that had been replaced was an outlier and no aging management was needed. However, the licensee did not address the two additional check valves that shared the same environment as the one affected. During the inspection, the inspectors questioned why these other valves didnt need to be age managed. The licensee was able to provide additional information that showed based on the replacement history of the other two valves and the physical state of the pressure boundary (the license renewal function) there was reasonable assurance that the components could meet the function for another 20 years.

Also, the inspectors determined in some cases the licensee had performed inspections on only one Unit. For eleven cases, the inspectors could not find a justification for the basis of selecting one Unit as a representative sample of both Units. Specifically, no evaluation was performed to demonstrate the most susceptible environment was selected. During the inspection, the licensee was able to provide additional information to show the environment in both Units is similar enough that sampling one Unit was representative of both.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 23 with the exception of the URI documented in Section 4OA5.1.b(1).

24.

Commitment Item 24 specified one-time visual inspection of a sample of materials susceptible to selective leaching of materials prior to the period of extended operation.

Commitment Item 24, Selective Leaching of Materials The inspectors reviewed the licensing basis, the Selective Leaching of Materials Program basis documentation, completed work orders, and interviewed personnel responsible for the program regarding these documents and verified the program was appropriately applied to both Units 1 and 2.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 24 with the exception of the URI documented in Section 4OA5.1.b(1).

25.

Commitment Item 25 specified an enhancement to complete one-time inspections prior to the period of extended operation as well as periodic checks on buried carbon steel fuel oil storage tanks. The Buried Piping and Tanks Inspection Program was an existing program that provided preventive and condition monitoring measures to manage loss of material, due to either corrosion of ferrous piping and tanks or aggressive chemical attack of asbestos concrete piping, from external environments for buried piping and tanks.

Commitment Item 25, Buried Piping and Tanks Inspection The inspectors reviewed the licensing basis, the Buried Piping and Tanks Inspection Program basis documentation, implementing procedures, completed work orders, the results of the onetime inspections, related corrective action documents, and interviewed responsible program personnel regarding these documents. The inspectors verified planned and completed work orders and related IRs demonstrated that the program was appropriately applied Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 25.

26.

Commitment Item 26 specified the existing ASME Code,Section XI, Subsection IWE program was credited for license renewal and would be enhanced prior to the period of extended operation.

Commitment Item 26, ASME Code,Section XI, Subsection IWE The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders, related corrective action documents and interviewed personnel responsible for the program regarding these documents.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 26.

27.

Commitment Item 27 ASME Code Section XI, Subsection IWF Component Support Program specified the existing ASME Code Section XI, Subsection IWF Component Support Program was credited for license renewal with enhancement to include inspection of Code Class MC supports.

Commitment Item 27, ASME Code,Section XI, Subsection IWF The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders, related corrective action documents, and interviewed personnel responsible for the program regarding these documents.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 27.

28.

Commitment Item 28 specified the existing 10 CFR Part 50; Appendix J Aging Management Program was credited for license renewal. The program provides for aging management of pressure boundary degradation due to loss of material in the primary containment and various systems penetrating primary containment. The program also manages changes in material properties of gaskets, O rings, and packing materials for the primary containment pressure boundary access points.

Commitment Item 28, Appendix J of 10 CFR Part 50, The program includes an exception to NUREG 1801 for two-ply design bellows that cannot be tested to satisfy the requirements of Appendix J. Testing is in accordance with NRC approved alternate test until the bellows are replaced.

The inspectors reviewed the licensing basis, program basis documents, implementing procedures, and interviewed the responsible plant personnel regarding these documents. The inspectors verified the requirements for testing two-ply bellows have been incorporated into station programs and procedures.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 28.

29.

Commitment Item 29 specified the existing masonry wall program was credited for license renewal.

Commitment Item 29, Masonry Wall Program The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders, related corrective action documents and interviewed personnel responsible for the program regarding these documents. The inspectors performed walkdowns of masonry walls that perform a high energy line break barrier function.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 29.

30.

Commitment Item 30 specified the existing structures monitoring program was credited for license renewal and would be enhanced prior to the period of extended operation. The structures monitoring program was an existing program that provided for aging management of various structures and external surfaces of mechanical components within the scope of license renewal.

Commitment Item 30, Structures Monitoring Program The inspectors reviewed the licensing basis, the program basis documentation, implementing procedures, completed work orders, related corrective action documents and interviewed personnel responsible for the program regarding these documents. The inspectors also walked down several jet impingement shield supports.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 30.

31.

Commitment Item 31 specified the existing RG 1.127, "Inspection of Water-Control Structures Associated with Nuclear Power Plants," program was credited for license renewal and would be enhanced prior to the period of extended operation. This program was part of the Structures Monitoring Program and consisted of procedures that provided for condition monitoring of structural steel elements, concrete, and earthen structures within the scope of license renewal.

Commitment Item 31, Regulatory Guide (RG) 1.127, Inspection of Water-Control Structures Associated with Nuclear Power Plants The inspectors reviewed the licensing basis, program basis documentation, and revised implementing procedures. The inspectors reviewed completed work orders and associated condition reports, and interviewed responsible water control structure program personnel.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 31 with the exception of the URI described in section 4OA5.1.b(2).

32.

Commitment Item 32 specified enhancements to the Protective Coating Monitoring and Maintenance Program to be implemented prior to the period of extended operation. The Protective Coating Monitoring and Maintenance Program was an existing program that provided for aging management of Service Level I coatings inside primary containment. Service Level I coatings were used in areas where the coating failure could adversely affect the operation of post-accident fluid systems and thereby impair safe shutdown. The program provided for visual inspections to identify any condition that adversely affects the ability of the coating film to function as intended.

Commitment Item 32, Protective Coating Monitoring and Maintenance Program The inspectors reviewed the program basis documentation, revised implementing procedures, completed inspections, and interviewed responsible plant personnel regarding these documents.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 32.

33.

Commitment Item 33 specified licensee would develop a program that was consistent with NUREG-1801 AMP XI.E1 for electrical cables and connections installed in adverse localized environments not subject to 10 CFR 50.49 environmental qualification requirements.

Commitment Item 33, Electrical Cables and Connections Not Subject to 10 CFR 50.49 Environmental Qualification Requirements The licensee developed a program to visually inspect all accessible electrical cables and connections installed in adverse localized environments for signs of accelerated age-related degradation. Additional inspections, repairs, or replacements are to be initiated as appropriate.

The inspectors interviewed the program owner, reviewed licensing basis, the program basis documentation, implementing procedures, work orders and records of walk downs for determining adverse localized environments and visual inspections for cables. The inspectors also reviewed corrective actions, which addressed and identified cable issues and their associated corrective actions. Also, the inspectors reviewed the corrective action taken in reference to the finding from Dresden Inspection Report 05000237/2009007.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 33.

34.

Commitment Item 34 specified for the Metal Fatigue of Reactor Coolant Pressure Boundary the existing program was credited with enhancements. The licensee will enhance the program by utilizing the EPRI-licensed FatiguePro computer software for counting fatigue stress cycles and track fatigue usage factors for selected components. The enhanced program calculates and tracks cumulative usage factors for bounding locations in the reactor coolant pressure boundary (reactor pressure vessel and Class I piping), containment torus, torus vents, torus attached piping and penetrations.

Commitment Item 34, Metal Fatigue of Reactor Coolant Pressure Boundary The inspectors reviewed the licensing basis, Metal Fatigue and Reactor Coolant Pressure Boundary Program basis documentation, FatiguePro implementing procedures, fatigue and transient monitoring program report, related corrective action documents, and interviewed the program owner regarding these documents.

The inspectors reviewed changes to the program to ensure the program remained effective for both units.

Based on review of the licensees actions, the inspectors determined the licensee met Commitment Item 34.

35.

Commitment Item 35 specified the licensee was to maintain the existing environmental qualification program of the electrical components for the period of extended operation.

Commitment Item 35, Environmental Qualification (EQ) of Electrical Components Program activities establish, demonstrate and document the level of qualification, qualified configuration, maintenance, surveillance and replacement requirements necessary to meet 10 CFR 50.49.

The inspectors interviewed the program owner, reviewed the licensing basis, program basis documents, and various existing EQ Binders.

Based on the review of the licensees action, the inspectors determined the licensee met Commitment Item 35.

36.

Commitment Item 36 specified the existing Boraflex monitoring program was credited for license renewal. The Boraflex monitoring program is based on manufacturers recommendations relies on periodic inspection, testing, monitoring and analysis of the criticality design to assure the required 5percent subcriticality margin is maintained.

Commitment Item 36, Boraflex Monitoring The inspectors interviewed the program owner, reviewed the licensing basis, program basis documents, implementing procedures, planned and completed work orders and related corrective actions.

Based on review of the licensees actions, the inspectors determined the licensee met Commitment Item 36.

37.

Commitment Item 37 specified the licensee was to develop a program to manage aging of cables in sensitive instrumentation circuits with low level signals in the Nuclear Instrumentation Systems and Radiation Monitoring Systems.

Commitment Item 37, Electrical Cables Not Subject to 10 CFR 50.49 Environmental Requirements Used in Instrument Circuits The program is applied to the cables of the Nuclear Instrumentation Systems, which included source range monitors (SRMs), intermediate range monitors (IRMs), local power range monitors, and Radiation Monitoring Systems, which included drywell high range radiation monitors, main steam line radiation monitors, and the steam jet air ejector radiation monitors. The program specified a review of calibration and surveillance results, and cable testing for cable aging degradation before the period of extended operation and every 10 years thereafter.

The inspectors interviewed the program owner, reviewed the licensing basis, program basis documents, implementing procedures, work orders and related corrective actions.

Based on the review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 37.

38.

This Commitment Item does not apply to Quad Cities.

Commitment Item 38, Inaccessible Medium-Voltage Cables Not Subject to 10 CFR 50.49 Environmental Requirements

39.

Commitment Item 39 specified the existing corrective action program was credited for license renewal.

Commitment Item 39, Corrective Action Program The inspectors interviewed the program owner, reviewed the licensing basis, implementing procedures, corrective action program results, and interviewed the responsible plant personnel regarding this program. The inspectors also reviewed training given to engineers to increase awareness of aging concerns and license renewal. The inspectors verified the licensee was entering issues related to license renewal in the corrective action program.

The inspector also reviewed a corrective action, AR 01352551, which is tracking actions to revise various procedures to reflect aging management focus. This AR also tracks actions to establish aging-related degradation Passport coding and determine orientation/training needs.

Based on review of the timeliness and adequacy of the licensee actions, the inspectors determined the licensee met Commitment Item 39.

40.

Commitment Item 40 specified the licensee was to develop and implement a program to periodically inspect non-segregated bus ducts that connect the reserve auxiliary transformers (RATs) to 4160 V essential service system (ESS), the non-segregated bus ducts that connect the Emergency Diesel Generators (EDGs) to the ESS buses, and the non-segregated bus ducts that connect ESS buses.

Commitment Item 40, Periodic Inspection of Non-EQ, Non-Segregated Electrical Bus Ducts The inspectors interviewed the program owner, reviewed the licensing basis, program basis documents, implementing procedures, planned and completed work orders and related corrective actions.

Based on the review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 40.

41.

Commitment Item 41 specified the existing periodic inspection of ventilation system elastomers was credited for license renewal and that the program would be enhanced prior to the period of extended operation.

Commitment Item 41, Periodic Inspection of Ventilation System Elastomers The inspectors reviewed the licensing basis, program basis documentation, implementing procedures, completed work orders, related corrective action documents and interviewed personnel responsible for the program regarding these documents.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 41.

42.

Commitment Item 42 specified the existing periodic testing of drywell and torus spray nozzles was credited for license renewal.

Commitment Item 42, Periodic Testing of Drywell and Torus Spray Nozzles The inspectors reviewed the program basis documentation, Drywell and Torus Spray Nozzle test procedures, completed work orders and condition reports to verify the program has been implemented.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 42.

43.

Commitment Item 43 specified the existing lubricating oil monitoring program would be enhanced to include components exposed to an environment of lubricating oil in the following systems: reactor core isolation cooling system, main generator hydrogen seal oil system, high pressure coolant injection system, emergency diesel generator and auxiliaries system, station blackout system, and electro-hydraulic control system prior to the period of extended operation.

Commitment Item 43, Lubricating Oil Monitoring Activities The inspectors reviewed licensing basis, program basis documents, implementing procedures, scheduled and completed work orders, result trends, completed oil analysis laboratory results, and applicable corrective action program documents.

Additionally, the program owner was interviewed regarding these documents. The inspectors verified the licensee has enhanced the program to include the systems and subsystems listed in the Commitment Item in necessary documents to ensure aging is managed through the period of extended operation.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 43.

44.

Commitment Item 44 specified the licensee would develop and implement an Aging Management Program for heat exchangers in the scope of License Renewal that are not tested or inspected by the open-cycle and closed-cycle cooling water system aging management programs, to be completed prior to the period of extended operation.

Commitment Item 44, Heat Exchanger Test and Inspection Activities The inspectors reviewed the licensing basis, program basis documents, commitment changes, planned and completed work orders, Issue Reports, inspection procedures and interviewed the plant personnel responsible for the program to verify the program was being implemented. For example, the inspectors reviewed commitment change 11-02 which was a clarification in response to an NRC observation in Section 4OA5.1.a

(2) of NRC inspection report 05000265/2012008 and verified the proper implementation of the change. General program requirements for this commitment were inspected and determined to be complete for Quad Cities Units 1 and 2.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 44.

45.

Commitment Item 45 specified the licensee would use the existing Generator Stator Water Chemistry program to manage aging effects by monitoring and controlling stator water chemistry per established procedures.

Commitment Item 45, Generator Stator Water Chemistry Activities The inspectors reviewed Units 1 and 2 chemistry reports to verify parameters were monitored. General program requirements for this commitment were inspected and determined to be complete for Quad Cities Units 1 and 2.

Based on the review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 45.

46.

Commitment Item 46 specified the licensee would develop and implement an Aging Management Program to inspect components in the plant heating system once before the end of the current operating term and periodically at intervals not to exceed once every 5 years during the period of extended operation.

Commitment Item 46, Periodic Inspection of Plant Heating System The inspectors reviewed the licensing basis, program basis documents, planned and completed work orders, Issue Reports, inspection procedures and interviewed the plant personnel responsible for the program to verify the program was being implemented on Units 1 and 2.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 46 with the exception of the URI documented in Section 4OA5.1.b(1).

47.

Commitment Item 47 specified revised Pressure Temperature (P/T) limits will be prepared and submitted to the NRC for approval prior to the period of extended operation using an approved fluence methodology. On October 17, 2005 License Amendment No. 228 and No. 223 approved the revised P/T limits. The amendments revised Technical Specification (TS) Section 3.4.9, Reactor Coolant System Pressure, and Temperature (P/T) Limits, by incorporating revisions to the P/T limit curves for 54 effective full power years (extending to the end of the renewed license). The amendment also resolved a non-conservative condition for TS 2.4.9, Figure 3.4.9-2, Non-Nuclear Heatup/Cooldown Curve. The inspectors verified the program requirements have been incorporated into station programs.

Commitment Item 47, Time-limited Aging Analysis (TLAA) - Neutron Embrittlement of the Reactor Vessel and Internals Based on the licensees actions, the inspectors determined the licensee met Commitment Item 47.

48.

Commitment Item 48 specified commitments of the TLAA related to metal fatigue.

Quad Cities is taking credit for an existing program for monitoring the metal fatigue of reactor coolant pressure boundary. As discussed in Commitment Item 34, the licensee enhanced their current AMP with the EPRI-licensed FatiguePro computer software. In addition, prior to the period of extended operation, plant-specific calculations were performed for applicable locations identified in NUREG/CR-6260, Application of NUREG/CR-5999 Interim Fatigue Curves to Selected Nuclear Power Plant Components.

Commitment Item 48, TLAA - Metal Fatigue The inspectors reviewed the licensing basis, Fatigue and Transients monitoring program implementing procedures, Commitment Item change documents, calculations that assessed effects of reactor coolant on component fatigue life, related corrective action documents, and interviewed the program owner regarding these documents.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 48.

49.

Commitment Item 49 specified a reanalysis will be applied to EQ components now qualified for the current operating term of 40 years. The EQ binders for components within the scope of 10 CFR 50.49 will be updated to include environmental conditions associated with Extended Power Uprate implementation together with an extended operating period of 60 years.

Commitment Item 49, TLAA -Environmental Qualification of Electrical Equipment The inspectors reviewed several examples of EQ Binders for components within the scope of 10 CFR 50.49. The inspectors verified these EQ Binders were updated to include an extended operating period of 60 years. The inspectors also verified where a qualified life of 60 years could not be achieved; measures were in place to replace components before or at the end of the qualified life.

Based on the examples reviewed and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 49.

50.

Commitment Item 50 specified two specific TLAAs would be updated prior to the period of extended operation.

Commitment Item 50, Other Plant-Specific TLAAs The first specified the licensee conduct a UT inspection of the Dresden Unit 3 (the lead unit) drywell steel plate remaining thickness at the sand pocket level and use the results to revise the associated corrosion calculation and validate an acceptable wall thickness will remain to the end of the 60-year licensed operating period for Dresden and Quad Cities Plants.

The second TLAA specified the licensee conduct a UT inspection of the ECCS suction strainer flange remaining thickness and use the results to revise the associated galvanic corrosion calculation and validate an acceptable thickness will remain to the end of the 60-year licensed operating period for Quad Cities Units 1 and 2.

The inspectors reviewed the licensing basis documents, UT inspection results of the Quad Cities Units 1 and 2 ECCS suction strainer flanges and interviewed the plant personnel responsible for the program.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 50.

51.

Commitment Item 51 specified the licensee perform an evaluation of operating experience at EPU levels to ensure operating experience at EPU levels is properly addressed by the Aging Management Programs, and submit this evaluation to the NRC for review prior to entering the period of extended operation.

Commitment Item 51, BWR Operating Experience - EPU levels The licensee performed this evaluation and submitted it for NRC review on October 18, 2012 and therefore, met this commitment.

52.

This commitment, discussed in SER Section 3.0.3.18, specified the licensee would manage the aging of components within the scope of the LR program through the performance of periodic UT inspections, visual (VT-3) inspections, and visual inspection of flexible hoses for age related degradation.

AMP B.2.9, Periodic Inspection of Components Subject to Moist Air This program is a new program that manages the loss of material aging degradation of stainless steel, carbon steel, cast iron, aluminum, copper, brass, and bronze components. The licensee created this program to ensure aging degradation of components is inspected at a frequency that allows the identification of any degradation that may occur due to the components exposure to a moist air environment. If abnormal conditions are identified as a result of any of the programs UT or visual inspections, the licensee committed to performing engineering evaluations to address the progression of the degradation and identifying appropriate corrective actions in accordance with the site controlled Quality Assurance Program.

The inspectors reviewed the licensing basis, program basis documents, implementing procedures, scheduled, and completed work orders, action requests, engineering changes and evaluations and issue reports.

Based on review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met Commitment Item 52 with the exception of the URI documented in Section 4OA5.1.b(1).

53.

This aging management program commits to the periodic inspection of steam dryers, which are normally exposed to a 288°Celsius high purity water environment and are subject to cracking. This aging management program manages the cracking of the stainless steel plate and weld materials. The periodic inspections will be performed in accordance with NRC staff approved frequency and guidance AMP B.2.10, Periodic Inspection of Steam Dryers The inspectors reviewed the program basis documentation, implementing procedures, completed inspections, related corrective action documents, and interviewed responsible program personnel regarding these documents.

Based on the review of the timeliness and adequacy of the licensees actions, the inspectors determined the licensee met this Commitment Item.

b.

(1) Findings and Observations Concern with Meeting One Time Visual Inspections IAW ASME Section XI Requirements
Introduction:

As part of the review of various licensee Commitment Items, the inspectors identified an unresolved item (URI) related to potential non-conformance with the commitments as described in Appendix A of the UFSAR. Specifically, the licensee did not follow the requirements of the ASME Section XI when performing various visual examinations.

Description

  • B.1.23 One Time Inspection - Ventilation Systems, Compressed Gas Systems, SBLC Chemistry Program;
During the Phase I inspection of Commitment Items (IR 05000265/2012008; ML12129A226), the inspectors identified the licensee was not performing visual examinations in accordance with the ASME code. The inspectors identified this through direct observation, review of the work orders used to perform these examinations and interviews with the appropriate plant personnel. The commitment to perform visual examinations in accordance with the ASME Section XI code applies to the following programs:
  • B.1.24 Selective Leaching;
  • B.2.8 Periodic Inspection of Plant Heating Steam; and
  • B.2.9 Periodic Inspection of Components Subject to Moist Air Environments.

The Commitment Item specifically states, The inspection will be performed in accordance with ASME Code requirements. Certified NDE examiners will conduct a VT-3 visual inspection (VT-1 for the Selective Leaching program, these inspections will consist of visual inspection consistent with ASME Section XI VT-1 visual inspection requirements.).

For visual examinations performed in accordance with the code, ASME section XI IWA 2210 requires visual examination be performed in accordance with ASME Section V Article 9. This section requires a procedure be used when performing visual examinations that include instructions on how the visual inspection is to be performed as well as illumination and instruments to be used. ASME Section XI has specific requirements associated with the different levels of visual examinations (VT-1 or VT-3)including distance, illumination, and character card resolution requirements. Contrary to this the licensee did not perform the VT-1 or VT-3 examinations in accordance with written procedures which documented the requirements for lighting, distance and other key parameters as well as acceptance criteria. Failure to do so did not ensure an ASME qualified process is used and clear requirements are provided and met.

The licensee submitted a Commitment Item change to clarify their position, indicating the intent was to have a qualified person performing the inspection, not to perform the examination in accordance with the requirements of the code. The licensee also indicated ASME requirements were verbally communicated to the examiners during their pre-job brief therefore, ensuring compliance with the code. In a letter dated May 18, 2012 (ML# 12173A423) the licensee requested a Commitment Item change. NRR staff subsequently issued a Request for Additional Information (ML12291A831) and is awaiting the licensees response in order to make a decision regarding these Commitment Items.

Therefore, this issue is considered unresolved pending resolution of the above issue.

(URI 05000254/2012010-01; 05000265/2012010-01: Concern with Meeting One Time Visual Inspections IAW ASME Section XI Requirements)

(2) Questions Regarding Aging Management Inspections on the 16 foot diameter Discharge Piping
Introduction:

As part of the review of licensee Commitment Item 31, the inspectors identified an unresolved item (URI) related to a 16 foot diameter discharge piping.

Specifically, the licensee does not physically inspect the piping for aging effects so that the intended functions of this component will be maintained during the period of extended operation.

Description:

As part of the review of Commitment Item 31 associated with the Water Control Structures inspection program, the inspectors reviewed the components that are within the scope of this program and how effects of aging are managed. NUREG 1796; Safety Evaluation Report Related to the License Renewal of the Dresden Nuclear Power Station, Units 2 and 3 and Quad Cities Nuclear Power Station, Units 1 and 2; dated 2004, Section 3.5.2.3.4 RG 1.127, Inspection of Water-Control Structures Associated with Nuclear Power Plants described the scope of the program and how the effects of aging are managed. Page 3-426 of NUREG 1796 identified the 16 foot diameter discharge piping as an in-scope component. The 16 foot diameter discharge piping provides an Ultimate Heat Sink (UHS) function in that during a Lock and Dam No.

14 failure the discharge piping provides suction source for portable pumps to provide cooling water flow to the Residual Heat Removal Service Water (RHRSW) pumps and Diesel Generator Cooling Water (DGCW) Pumps. The licensee, however, does not physically inspect the discharge piping. The licensee provided aging management of the discharge piping by crediting the performance of a one-time inspection of a 96 inch diameter ice melt line. The ice melt line prevents freezing of the river water entering the plant intake and also performs a support function for the UHS. During this inspection, the licensee was unable to locate where the Office of Nuclear Reactor Regulation (NRR)had reviewed and approved this method of aging management of the discharge piping.

In response to this concern, the licensee initiated Condition Report 01434957, (LR)

Scoping Review Required for UHS Discharge Piping, dated November 2, 2012.

Therefore, this issue is considered unresolved pending additional review of the information provided by the licensee and consultation with NRR to determine the appropriate aging management of the 16 foot diameter discharge piping. (URI 05000254/2012010-02; 05000265/2012010-02: Questions Regarding Aging Management Inspections on the 16 foot diameter Discharge Piping).

c.

The inspectors did not identify any other substantive instances of incomplete license renewal commitments with respect to timeliness or adequacy. The inspectors concluded pending resolution of the above mentioned URIs, commitments, license conditions, and regulatory requirements associated with the issuance of the renewed operating license were being met at the Quad Cities Nuclear Power Plant Units 1 and 2.

Overall Conclusions 4OA6

.1 Management Meetings

On November 9, 2012, the inspectors presented the inspection results to Mr. T. Hanley, and other members of the licensee staff. The licensee acknowledged the issues presented. The inspectors confirmed none of the potential report input discussed was considered proprietary.

Exit Meeting Summary

ATTACHMENT:

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

T. Hanley, Site Vice President

Licensee

K. Ohr, Site Engineering Director
W. Beck, Regulatory Assurance Manager
K. OShea, Operations Director
T. Rushing, Sr. System Manager/Engineering
P. Yost, Program Engineering
M. Rice, Program Engineering
M. Dunlay, Design Engineering
B. Stedman, Design Engineering
N. Howard, System Engineering
A. Burress, System Engineering
D. Luebbe, System Engineering
M. Wagner, Regulatory Assurance
T. Petersen, Regulatory Assurance

LIST OF ITEMS

OPENED, CLOSED AND DISCUSSED

05000254/2012010-01

Opened

05000265/2012010-01 URI Concerns with Meeting One Time Visual Inspections IAW ASME Section XI Requirements (4OA5.1.b(1))
05000254/2012010-02
05000265/2012010-02 URI Questions Regarding Aging Management Inspections on the 16 Diameter Discharge Pipes (4OA5.1.b(2))

None Closed and

Discussed

LIST OF DOCUMENTS REVIEWED