| title = U.S. Nuclear Regulatory Commission Monitoring Visit Report 05000201-12-001, on 06/12/12 - 12/04/12, West Valley Demonstration Project, West Valley, New York Dtd 01/03/13 | | title = U.S. Nuclear Regulatory Commission Monitoring Visit Report 05000201-12-001, on 06/12/12 - 12/04/12, West Valley Demonstration Project, West Valley, New York Dtd 01/03/13 | ||
| author name = Ferdas M | | author name = Ferdas M | ||
| author affiliation = NRC/RGN-I/DNMS/DB | | author affiliation = NRC/RGN-I/DNMS/DB | ||
| addressee name = Bower B | | addressee name = Bower B | ||
| addressee affiliation = West Valley Demonstration Project | | addressee affiliation = West Valley Demonstration Project | ||
| docket = 05000201 | | docket = 05000201 | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter | {{#Wiki_filter:January 3, 2013 | ||
==SUBJECT:== | |||
U. S. NUCLEAR REGULATORY COMMISSION MONITORING VISIT REPORT NO. 05000201/2012001, WEST VALLEY DEMONSTRATION PROJECT, WEST VALLEY, NEW YORK | |||
SUBJECT: U. S. NUCLEAR REGULATORY COMMISSION MONITORING VISIT REPORT NO. 05000201/2012001, WEST VALLEY DEMONSTRATION PROJECT, WEST VALLEY, NEW YORK | |||
==Dear Mr. Bower:== | ==Dear Mr. Bower:== | ||
On June 12-13, November 14-15, and December 4, 2012, the NRC conducted a series of monitoring visits at the U.S. Department of | On June 12-13, November 14-15, and December 4, 2012, the NRC conducted a series of monitoring visits at the U.S. Department of Energys West Valley Demonstration Project site to review ongoing decommissioning activities. The monitoring visits consisted of observations by the NRC representative, interviews with personnel, and an examination of representative records. The results of the monitoring visits were discussed with you on December 4, 2012, and are provided in the enclosed report. No public health and safety issues were identified. | ||
No reply to this letter is required. Please contact Mark Roberts at (610) 337-5094 if you have any questions regarding this matter. | No reply to this letter is required. Please contact Mark Roberts at (610) 337-5094 if you have any questions regarding this matter. | ||
Sincerely,/RA/ | Sincerely, | ||
/RA/ | |||
Marc S. Ferdas, Chief Decommissioning Branch Division of Nuclear Materials Safety | Marc S. Ferdas, Chief Decommissioning Branch Division of Nuclear Materials Safety | ||
===Enclosure:=== | ===Enclosure:=== | ||
Report No. 05000201/2012001 | Report No. 05000201/2012001 | ||
REGION I== | |||
2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 | |||
January 3, 2013 | |||
Docket No. | |||
05000201 License No. | |||
LSF-1 | |||
Bryan | |||
=EXECUTIVE SUMMARY= | =EXECUTIVE SUMMARY= | ||
U.S. Department of Energy (DOE) West Valley Demonstration Project (WVDP) NRC Monitoring Visit Report No. 2012001 | U.S. Department of Energy (DOE) | ||
West Valley Demonstration Project (WVDP) | |||
NRC Monitoring Visit Report No. 2012001 | |||
A series of routine, announced monitoring visits were conducted on June 12-13, November 14-15, and December 4, 2012, by NRC staff at the DOE WVDP site in West Valley, New York. The program for conducting NRC monitoring visits at the WVDP is described in Inspection Manual Chapter (IMC) 0111, | A series of routine, announced monitoring visits were conducted on June 12-13, November 14-15, and December 4, 2012, by NRC staff at the DOE WVDP site in West Valley, New York. The program for conducting NRC monitoring visits at the WVDP is described in Inspection Manual Chapter (IMC) 0111, Region I Monitoring Activities for the DOE West Valley Demonstration Project. The monitoring visits included a review of programs and activities associated with the WVDP site decommissioning project. The monitoring visits consisted of interviews with DOE, | ||
DOE contractor, and New York State Energy Research and Development Agency (NYSERDA)personnel; a review of documents; and tours of the facility. The NRC staff also attended the June 13 and November 15, 2012, WVDP Regulatory Roundtable Meeting and the November 14, 2012 DOE Quarterly Public Meeting. Based on the results of these activities, no public health and safety issues were identified. | |||
=REPORT DETAILS= | =REPORT DETAILS= | ||
1.0 | |||
1.0 Introduction | |||
In accordance with the WVDP Act of 1980 and as implemented by a Memorandum of Understanding between the DOE and the NRC, a series of routine, announced monitoring visits were conducted on June 12-13, November 14-15, and December 4, 2012, by NRC staff at the DOE WVDP site in West Valley, New York. The program for conducting NRC monitoring visits at the WVDP is described in IMC 0111, Region I Monitoring Activities for the DOE West Valley Demonstration Project. The monitoring visits included a review of programs and activities associated with the WVDP site decommissioning project. | |||
2.0 High Level Waste Storage | 2.0 High Level Waste Storage | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
The NRC reviewed the storage of vitrified High Level Waste (HLW) at the WVDP site. The monitoring visits consisted of interviews with DOE and DOE contractor personnel; a review of documents; and tours of the facility. | The NRC reviewed the storage of vitrified High Level Waste (HLW) at the WVDP site. | ||
The monitoring visits consisted of interviews with DOE and DOE contractor personnel; a review of documents; and tours of the facility. | |||
====b. Observations and Findings==== | ====b. Observations and Findings==== | ||
| Line 60: | Line 81: | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
The NRC reviewed the performance of the Permeable Treatment Wall (PTW) installed on the WVDP north plateau for mitigation of the strontium-90 (Sr-90) groundwater plume. The monitoring visits consisted of interviews with DOE and DOE contractor personnel; a review of documents; and tours of the facility. | The NRC reviewed the performance of the Permeable Treatment Wall (PTW) installed on the WVDP north plateau for mitigation of the strontium-90 (Sr-90) groundwater plume. The monitoring visits consisted of interviews with DOE and DOE contractor personnel; a review of documents; and tours of the facility. | ||
====b. Observations and Findings==== | ====b. Observations and Findings==== | ||
| Line 67: | Line 86: | ||
====c. Conclusions==== | ====c. Conclusions==== | ||
No public health and safety issues were identified. Review of the initial PTW Annual Monitoring Report indicates the performance of the PTW is meeting the established Remedial Action Objectives and functional requirements. 4.0 Response and Follow-up to a Small Fire in the Vitrification Cell | No public health and safety issues were identified. Review of the initial PTW Annual Monitoring Report indicates the performance of the PTW is meeting the established Remedial Action Objectives and functional requirements. | ||
4.0 Response and Follow-up to a Small Fire in the Vitrification Cell | |||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
| Line 75: | Line 96: | ||
On September 13, 2012, WVDP waste operations staff, in accordance with approved procedures, was using an abrasive saw to remotely cut up contaminated equipment for disposal. After approximately 25 minutes of cutting, a fire watch observed smoke from a small fire coming from the cell floor. Cutting operations were immediately halted and emergency response operations were initiated. Response actions included an emergency announcement, initiation of fire suppression actions, and an on scene response by an Incident Commander. Due to the small size of the fire and its location within a shielded cell, the fire self-extinguished without use of the fire extinguishing agents that were being prepared to be deployed. A post-event fire watch was established and eventually secured. The apparent cause of the small fire was the ignition of wood fines and hydraulic oil in the grooves adjacent to the transfer cart rails within the cell. | On September 13, 2012, WVDP waste operations staff, in accordance with approved procedures, was using an abrasive saw to remotely cut up contaminated equipment for disposal. After approximately 25 minutes of cutting, a fire watch observed smoke from a small fire coming from the cell floor. Cutting operations were immediately halted and emergency response operations were initiated. Response actions included an emergency announcement, initiation of fire suppression actions, and an on scene response by an Incident Commander. Due to the small size of the fire and its location within a shielded cell, the fire self-extinguished without use of the fire extinguishing agents that were being prepared to be deployed. A post-event fire watch was established and eventually secured. The apparent cause of the small fire was the ignition of wood fines and hydraulic oil in the grooves adjacent to the transfer cart rails within the cell. | ||
The NRC verified that | The NRC verified that DOEs short-term and longer term responses to the event were appropriate. Immediate notifications were provided to the plant staff and follow-up notifications to appropriate regulatory organizations were subsequently made. The follow-up corrective actions included appropriate actions that should prevent recurrence. | ||
====c. Conclusions==== | ====c. Conclusions==== | ||
No public health and safety issues were identified. | No public health and safety issues were identified. DOEs response and corrective actions were appropriate and in accordance with applicable procedures. | ||
5.0 Pre-demolition Preparations for the Open-Air Demolition of the 01-14 Building | |||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
The NRC reviewed | The NRC reviewed DOEs pre-demolition preparations for the open-air demolition of the 01-14 building. The monitoring visits consisted of interviews with DOE and DOE contractor personnel; a review of documents; and tours of the area. | ||
====b. Observations and Findings==== | ====b. Observations and Findings==== | ||
The 01-14 building is a 60-foot tall metal, block, and concrete building that covers an area of approximately 2200 square feet. The building housed support equipment for early WVDP operations and later housed equipment for the HLW vitrification off-gas treatment system. Although a separate building, it is attached to the MPPB and contains piping and electrical systems leading from the MPPB and the HLW vitrification facility. | The 01-14 building is a 60-foot tall metal, block, and concrete building that covers an area of approximately 2200 square feet. The building housed support equipment for early WVDP operations and later housed equipment for the HLW vitrification off-gas treatment system. Although a separate building, it is attached to the MPPB and contains piping and electrical systems leading from the MPPB and the HLW vitrification facility. | ||
DOE has been performing a number of pre-demolition activities intended to physically disconnect the 01-14 building from the remaining facilities. Piping, ventilation, and electrical systems have been isolated and capped. Contaminated piping and vessels remaining in the building have been drained, filled with a grout mixture, and capped. The NRC concluded that these actions should prevent dispersal of contamination during the demolition process. The NRC also noted that the DOE was implementing lessons learned from the Separations Process Research Unit (SPRU) Closure Project accident at another DOE facility in their work plans. | DOE has been performing a number of pre-demolition activities intended to physically disconnect the 01-14 building from the remaining facilities. Piping, ventilation, and electrical systems have been isolated and capped. Contaminated piping and vessels remaining in the building have been drained, filled with a grout mixture, and capped. | ||
The NRC concluded that these actions should prevent dispersal of contamination during the demolition process. The NRC also noted that the DOE was implementing lessons learned from the Separations Process Research Unit (SPRU) Closure Project accident at another DOE facility in their work plans. | |||
The NRC reviewed the proposed radiological controls, local air sampling, and radiological surveys to be employed during project operations. In addition to the local air sampling, the inspector noted that a network of offsite environmental air samplers surrounding the site will be in place to monitor potential ground level airborne releases. | The NRC reviewed the proposed radiological controls, local air sampling, and radiological surveys to be employed during project operations. In addition to the local air sampling, the inspector noted that a network of offsite environmental air samplers surrounding the site will be in place to monitor potential ground level airborne releases. | ||
| Line 93: | Line 118: | ||
No public health and safety issues were identified. DOE was actively incorporating lessons learned from a similar DOE demolition project into the 01-14 building demolition project to prevent similar occurrences. | No public health and safety issues were identified. DOE was actively incorporating lessons learned from a similar DOE demolition project into the 01-14 building demolition project to prevent similar occurrences. | ||
6.0 Meetings | |||
June 13 and November 15, 2012, WVDP Regulatory Roundtable Meetings | |||
NRC Region I representatives attended all-day meetings of the WVDP Regulatory Roundtable on June 13 and November 15, 2012. The WVDP Regulatory Roundtable Meetings also included representatives from the NRCs Office of Federal and State Materials and Environmental Management Programs, the Environmental Protection Agency (Region II), NYSERDA, the New York State Department of Environmental Conservation, DOE, and the DOE WVDP contractor. The purpose of the meetings was to gain an understanding of future work activities and to foster dialogue among the participants regarding the regulatory requirements of the project. Items discussed during these meetings included the HLW canister relocation project, demolition activities, waste operations, PTW performance, an update on erosion studies, and waste tank 8D-4 characterization sampling. The June 13, 2012, meeting included a tour of an offsite environmental air sampling system that is representative of the network of samplers that were scheduled to be in place to monitor potential ground level airborne releases during demolition activities. | |||
November 14, 2012, DOE Quarterly Public Meeting | |||
NRC Region I representatives attended the DOE quarterly meeting held on the evening of November 14, 2012. Representatives from DOE provided updates to members of the public on the project and on the Phase I decommissioning studies that are to be undertaken for the next phase of the decommissioning project. Approximately twenty-five people were in attendance. | |||
===Exit Meeting Summary=== | ===Exit Meeting Summary=== | ||
| Line 101: | Line 134: | ||
=SUPPLEMENTAL INFORMATION= | =SUPPLEMENTAL INFORMATION= | ||
PARTIAL LIST OF PERSONS CONTACTED | |||
PARTIAL LIST OF PERSONS CONTACTED | |||
Department of Energy | |||
: [[contact::M. Bellis]], Operations Activity Manager | : [[contact::M. Bellis]], Operations Activity Manager | ||
: [[contact::K. Bohan]], Federal Project Director | : [[contact::K. Bohan]], Federal Project Director | ||
| Line 107: | Line 142: | ||
: [[contact::C. Eckert]], Safety and Site Programs Team Leader | : [[contact::C. Eckert]], Safety and Site Programs Team Leader | ||
: [[contact::G. Gorsuch]], Industrial Hygienist | : [[contact::G. Gorsuch]], Industrial Hygienist | ||
: [[contact::J. Prowst]], DOE Health Physics Support Contractor | : [[contact::J. Prowst]], DOE Health Physics Support Contractor | ||
NYSERDA | |||
: [[contact::P. Bembia]], Program Director | : [[contact::P. Bembia]], Program Director | ||
: [[contact::A. Mellon]], Project Manager | : [[contact::A. Mellon]], Project Manager | ||
: [[contact::E. Traverso]], Radiation Safety Officer | : [[contact::E. Traverso]], Radiation Safety Officer | ||
CH2MHILL-B&W West Valley, LLC | CH2MHILL-B&W West Valley, LLC | ||
: [[contact::C. Biedermann]], Senior Consulting Engineer | : [[contact::C. Biedermann]], Senior Consulting Engineer | ||
: [[contact::N. Bridges]], Radiation Protection Supervisor | : [[contact::N. Bridges]], Radiation Protection Supervisor | ||
: [[contact::T. Dogal]], Manager, Facilities Disposition | : [[contact::T. Dogal]], Manager, Facilities Disposition | ||
: [[contact::H. Dukes]], Nuclear Operations Manager | : [[contact::H. Dukes]], Nuclear Operations Manager | ||
: [[contact::J. Rendall]], Vice President, Regulatory Affairs | : [[contact::J. Rendall]], Vice President, Regulatory Affairs | ||
PARTIAL LIST OF DOCUMENTS REVIEWED | |||
Permeable Treatment Wall Performance Annual Monitoring Report - 2012, Rev. 1, July 2012. Weapons Complex Monitor, Volume 23, No. 36, August 3, 2012. | PARTIAL LIST OF DOCUMENTS REVIEWED | ||
Monthly WVDP Project Performance Reports (various). | |||
Permeable Treatment Wall Performance Annual Monitoring Report - 2012, Rev. 1, July 2012. | |||
Weapons Complex Monitor, Volume 23, No. 36, August 3, 2012. | |||
Presentations from the June 13 and November 15, 2012, Regulatory Roundtable Meetings, | Presentations from the June 13 and November 15, 2012, Regulatory Roundtable Meetings, | ||
Ashford, New York. | Ashford, New York. | ||
Presentations from the November 14, 2012, DOE Quarterly Public Information Meeting, Ashford, New York. | Presentations from the November 14, 2012, DOE Quarterly Public Information Meeting, | ||
Ashford, New York. | |||
Letter dated September 27, 2012 to New York State Department of Environmental Conservation | Letter dated September 27, 2012 to New York State Department of Environmental Conservation | ||
from DOE WVDP - Hazardous Waste Contingency Plan Activation. | from DOE WVDP - Hazardous Waste Contingency Plan Activation. | ||
CH2MHILL B&W West Valley, LLC - Fact Finding Meeting Minutes, Meeting No. FF2012-021, Small Fire in Vit cell During Abrasive Cutting, September 19, 2012. | CH2MHILL B&W West Valley, LLC - Fact Finding Meeting Minutes, Meeting No. FF2012-021, | ||
Small Fire in Vit cell During Abrasive Cutting, September 19, 2012. | |||
DOE-WVDP Oversight Assessment S12-054E, Fire in Hot Cell Corrective Actions, October 29, | |||
Management Self-Assessment Final Report, Assessment No. NBG-MASS-0038, Building 01/14 Demolition, 12-3-2012. | 2012. | ||
Verification of Readiness to Start Up or Restart Nuclear Facilities, Order - DOE O 425.1D, | Management Self-Assessment Final Report, Assessment No. NBG-MASS-0038, Building 01/14 | ||
HLW | Demolition, 12-3-2012. | ||
MPPB | Verification of Readiness to Start Up or Restart Nuclear Facilities, Order - DOE O 425.1D, | ||
NRC | 4-16-2010. | ||
NYSERDA New York State Energy Research and Development Agency PTW | LIST OF ACRONYMS USED | ||
Sr-90 | DOE | ||
WVDP | Department of Energy | ||
HLW | |||
High Level Waste | |||
IMC | |||
Inspection Manual Chapter | |||
MPPB | |||
Main Plant Processing Building | |||
NRC | |||
Nuclear Regulatory Commission | |||
NYSERDA | |||
New York State Energy Research and Development Agency | |||
PTW | |||
Permeable Treatment Wall | |||
SPRU | |||
Separations Process Research Unit | |||
Sr-90 | |||
Strontium-90 | |||
WVDP | |||
West Valley Demonstration Project | |||
}} | }} | ||
Latest revision as of 19:23, 11 January 2025
| ML13004A238 | |
| Person / Time | |
|---|---|
| Site: | West Valley Demonstration Project |
| Issue date: | 01/03/2013 |
| From: | Marc Ferdas Decommissioning Branch I |
| To: | Bower B West Valley Demonstration Project |
| References | |
| IR-12-001 | |
| Download: ML13004A238 (10) | |
Text
January 3, 2013
SUBJECT:
U. S. NUCLEAR REGULATORY COMMISSION MONITORING VISIT REPORT NO. 05000201/2012001, WEST VALLEY DEMONSTRATION PROJECT, WEST VALLEY, NEW YORK
Dear Mr. Bower:
On June 12-13, November 14-15, and December 4, 2012, the NRC conducted a series of monitoring visits at the U.S. Department of Energys West Valley Demonstration Project site to review ongoing decommissioning activities. The monitoring visits consisted of observations by the NRC representative, interviews with personnel, and an examination of representative records. The results of the monitoring visits were discussed with you on December 4, 2012, and are provided in the enclosed report. No public health and safety issues were identified.
No reply to this letter is required. Please contact Mark Roberts at (610) 337-5094 if you have any questions regarding this matter.
Sincerely,
/RA/
Marc S. Ferdas, Chief Decommissioning Branch Division of Nuclear Materials Safety
Enclosure:
Report No. 05000201/2012001
REGION I==
2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713
January 3, 2013
Docket No.
05000201 License No.
LSF-1
Bryan
EXECUTIVE SUMMARY
U.S. Department of Energy (DOE)
West Valley Demonstration Project (WVDP)
NRC Monitoring Visit Report No. 2012001
A series of routine, announced monitoring visits were conducted on June 12-13, November 14-15, and December 4, 2012, by NRC staff at the DOE WVDP site in West Valley, New York. The program for conducting NRC monitoring visits at the WVDP is described in Inspection Manual Chapter (IMC) 0111, Region I Monitoring Activities for the DOE West Valley Demonstration Project. The monitoring visits included a review of programs and activities associated with the WVDP site decommissioning project. The monitoring visits consisted of interviews with DOE,
DOE contractor, and New York State Energy Research and Development Agency (NYSERDA)personnel; a review of documents; and tours of the facility. The NRC staff also attended the June 13 and November 15, 2012, WVDP Regulatory Roundtable Meeting and the November 14, 2012 DOE Quarterly Public Meeting. Based on the results of these activities, no public health and safety issues were identified.
REPORT DETAILS
1.0 Introduction
In accordance with the WVDP Act of 1980 and as implemented by a Memorandum of Understanding between the DOE and the NRC, a series of routine, announced monitoring visits were conducted on June 12-13, November 14-15, and December 4, 2012, by NRC staff at the DOE WVDP site in West Valley, New York. The program for conducting NRC monitoring visits at the WVDP is described in IMC 0111, Region I Monitoring Activities for the DOE West Valley Demonstration Project. The monitoring visits included a review of programs and activities associated with the WVDP site decommissioning project.
2.0 High Level Waste Storage
a. Inspection Scope
The NRC reviewed the storage of vitrified High Level Waste (HLW) at the WVDP site.
The monitoring visits consisted of interviews with DOE and DOE contractor personnel; a review of documents; and tours of the facility.
b. Observations and Findings
The NRC verified that the 275 stainless steel canisters of vitrified HLW were being adequately controlled in the mechanical process cell in the Main Plant Processing Building (MPPB). Relocation of the canisters is necessary in order to proceed with demolition preparations for the MPPB. The HLW canisters are to be relocated to a concrete pad to be constructed at the south end of the site. The HLW canisters are to be placed in specially designed and fabricated multi-purpose storage and transportation canisters and stored in shielded casks on a concrete pad (interim storage facility). NAC International has been selected as the sub-contractor for this project. Design and construction work is currently scheduled for completion in 2014 and the canister relocation completed as early as 2015.
c. Conclusions
No public health and safety issues were identified. The HLW canisters are appropriately being controlled. DOE is developing plans for the relocation of the canisters to an onsite interim storage facility.
3.0 North Plateau Permeable Treatment Wall
a. Inspection Scope
The NRC reviewed the performance of the Permeable Treatment Wall (PTW) installed on the WVDP north plateau for mitigation of the strontium-90 (Sr-90) groundwater plume. The monitoring visits consisted of interviews with DOE and DOE contractor personnel; a review of documents; and tours of the facility.
b. Observations and Findings
The NRC reviewed information in the 2012 PTW Annual Monitoring Report, which summarizes the performance and condition of the PTW through the first year following installation. The report indicates that the performance of the PTW is meeting the established Remedial Action Objectives and functional requirements. Key objectives and requirements include a reduction in the down gradient Sr-90 concentrations (compared to up gradient concentrations) from the PTW, minimizing expansion of the contaminated groundwater plume, and no substantial diversion or alteration in groundwater flow. The NRC determined that the PTW appears to be removing Sr-90 from the plume as evidenced by the very low or non-detectable concentrations of Sr-90 in monitoring well samples within the wall. Concentrations of Sr-90 in monitoring well samples immediately down gradient of the PTW were generally lower than the corresponding up gradient wells. This reduction is also evident in wells within approximately 100 feet of the down gradient side of the PTW. The groundwater flow patterns have remained consistent with conditions prior to PTW installation and there does not appear to be any expansion of the plume except for areas that were already on the down gradient side of the PTW. Monthly visual inspections of the PTW have not identified any substantial changes to the PTW system.
c. Conclusions
No public health and safety issues were identified. Review of the initial PTW Annual Monitoring Report indicates the performance of the PTW is meeting the established Remedial Action Objectives and functional requirements.
4.0 Response and Follow-up to a Small Fire in the Vitrification Cell
a. Inspection Scope
The NRC reviewed the response and follow-up to a small fire in the vitrification cell on September 13, 2012. The monitoring visits consisted of interviews with DOE and DOE contractor personnel; a review of documents; and tours of the facility.
b. Observations and Findings
On September 13, 2012, WVDP waste operations staff, in accordance with approved procedures, was using an abrasive saw to remotely cut up contaminated equipment for disposal. After approximately 25 minutes of cutting, a fire watch observed smoke from a small fire coming from the cell floor. Cutting operations were immediately halted and emergency response operations were initiated. Response actions included an emergency announcement, initiation of fire suppression actions, and an on scene response by an Incident Commander. Due to the small size of the fire and its location within a shielded cell, the fire self-extinguished without use of the fire extinguishing agents that were being prepared to be deployed. A post-event fire watch was established and eventually secured. The apparent cause of the small fire was the ignition of wood fines and hydraulic oil in the grooves adjacent to the transfer cart rails within the cell.
The NRC verified that DOEs short-term and longer term responses to the event were appropriate. Immediate notifications were provided to the plant staff and follow-up notifications to appropriate regulatory organizations were subsequently made. The follow-up corrective actions included appropriate actions that should prevent recurrence.
c. Conclusions
No public health and safety issues were identified. DOEs response and corrective actions were appropriate and in accordance with applicable procedures.
5.0 Pre-demolition Preparations for the Open-Air Demolition of the 01-14 Building
a. Inspection Scope
The NRC reviewed DOEs pre-demolition preparations for the open-air demolition of the 01-14 building. The monitoring visits consisted of interviews with DOE and DOE contractor personnel; a review of documents; and tours of the area.
b. Observations and Findings
The 01-14 building is a 60-foot tall metal, block, and concrete building that covers an area of approximately 2200 square feet. The building housed support equipment for early WVDP operations and later housed equipment for the HLW vitrification off-gas treatment system. Although a separate building, it is attached to the MPPB and contains piping and electrical systems leading from the MPPB and the HLW vitrification facility.
DOE has been performing a number of pre-demolition activities intended to physically disconnect the 01-14 building from the remaining facilities. Piping, ventilation, and electrical systems have been isolated and capped. Contaminated piping and vessels remaining in the building have been drained, filled with a grout mixture, and capped.
The NRC concluded that these actions should prevent dispersal of contamination during the demolition process. The NRC also noted that the DOE was implementing lessons learned from the Separations Process Research Unit (SPRU) Closure Project accident at another DOE facility in their work plans.
The NRC reviewed the proposed radiological controls, local air sampling, and radiological surveys to be employed during project operations. In addition to the local air sampling, the inspector noted that a network of offsite environmental air samplers surrounding the site will be in place to monitor potential ground level airborne releases.
c. Conclusions
No public health and safety issues were identified. DOE was actively incorporating lessons learned from a similar DOE demolition project into the 01-14 building demolition project to prevent similar occurrences.
6.0 Meetings
June 13 and November 15, 2012, WVDP Regulatory Roundtable Meetings
NRC Region I representatives attended all-day meetings of the WVDP Regulatory Roundtable on June 13 and November 15, 2012. The WVDP Regulatory Roundtable Meetings also included representatives from the NRCs Office of Federal and State Materials and Environmental Management Programs, the Environmental Protection Agency (Region II), NYSERDA, the New York State Department of Environmental Conservation, DOE, and the DOE WVDP contractor. The purpose of the meetings was to gain an understanding of future work activities and to foster dialogue among the participants regarding the regulatory requirements of the project. Items discussed during these meetings included the HLW canister relocation project, demolition activities, waste operations, PTW performance, an update on erosion studies, and waste tank 8D-4 characterization sampling. The June 13, 2012, meeting included a tour of an offsite environmental air sampling system that is representative of the network of samplers that were scheduled to be in place to monitor potential ground level airborne releases during demolition activities.
November 14, 2012, DOE Quarterly Public Meeting
NRC Region I representatives attended the DOE quarterly meeting held on the evening of November 14, 2012. Representatives from DOE provided updates to members of the public on the project and on the Phase I decommissioning studies that are to be undertaken for the next phase of the decommissioning project. Approximately twenty-five people were in attendance.
Exit Meeting Summary
On June 13, November 15, and December 4, 2012, the NRC representative discussed the monitoring visit results with Bryan Bower and other members of the DOE staff.
Mr. Bower acknowledged the monitoring visit results. The NRC representative confirmed that proprietary information was not provided or examined during the monitoring visits.
SUPPLEMENTAL INFORMATION
PARTIAL LIST OF PERSONS CONTACTED
Department of Energy
- M. Bellis, Operations Activity Manager
- K. Bohan, Federal Project Director
- B. Bower, Project Director
- C. Eckert, Safety and Site Programs Team Leader
- G. Gorsuch, Industrial Hygienist
- P. Bembia, Program Director
- A. Mellon, Project Manager
- E. Traverso, Radiation Safety Officer
CH2MHILL-B&W West Valley, LLC
- C. Biedermann, Senior Consulting Engineer
- N. Bridges, Radiation Protection Supervisor
- T. Dogal, Manager, Facilities Disposition
- H. Dukes, Nuclear Operations Manager
- J. Rendall, Vice President, Regulatory Affairs
PARTIAL LIST OF DOCUMENTS REVIEWED
Monthly WVDP Project Performance Reports (various).
Permeable Treatment Wall Performance Annual Monitoring Report - 2012, Rev. 1, July 2012.
Weapons Complex Monitor, Volume 23, No. 36, August 3, 2012.
Presentations from the June 13 and November 15, 2012, Regulatory Roundtable Meetings,
Ashford, New York.
Presentations from the November 14, 2012, DOE Quarterly Public Information Meeting,
Ashford, New York.
Letter dated September 27, 2012 to New York State Department of Environmental Conservation
from DOE WVDP - Hazardous Waste Contingency Plan Activation.
CH2MHILL B&W West Valley, LLC - Fact Finding Meeting Minutes, Meeting No. FF2012-021,
Small Fire in Vit cell During Abrasive Cutting, September 19, 2012.
DOE-WVDP Oversight Assessment S12-054E, Fire in Hot Cell Corrective Actions, October 29,
2012.
Management Self-Assessment Final Report, Assessment No. NBG-MASS-0038, Building 01/14
Demolition, 12-3-2012.
Verification of Readiness to Start Up or Restart Nuclear Facilities, Order - DOE O 425.1D,
4-16-2010.
LIST OF ACRONYMS USED
Department of Energy
High Level Waste
IMC
Inspection Manual Chapter
Main Plant Processing Building
NRC
Nuclear Regulatory Commission
New York State Energy Research and Development Agency
PTW
Permeable Treatment Wall
SPRU
Separations Process Research Unit