ML13015A095: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:SAFEGUARDS INFORMATION | {{#Wiki_filter:SAFEGUARDS INFORMATION | ||
SAFEGUARDS INFORMATION | |||
January 18, 2013 | |||
| Line 28: | Line 33: | ||
PE-30 | PE-30 | ||
North Power Plant Loop | North Power Plant Loop | ||
Richland, WA 99352 | Richland, WA 99352 | ||
SUBJECT: ERRATA FOR COLUMBIA GENERATING STATION - NRC SECURITY INSPECTION REPORT 05000397/2012201 | |||
SUBJECT: | |||
ERRATA FOR COLUMBIA GENERATING STATION - NRC SECURITY | |||
INSPECTION REPORT 05000397/2012201 | |||
Dear Mr. Black: | Dear Mr. Black: | ||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the | This errata corrects the cover letter (page 1) and the enclosure (page 11) in the paragraph | ||
NRC Public Document Room or from the Publicly Available Records System (PARS) component of the | under the section, Exit Meeting Summary, dated January 7, 2013, to include the date of the | ||
telephonic re-exit meeting which occurred on December 20, 2012, with you and other members | |||
of your staff. Please replace the 1st page of the cover letter and the 11th page of the enclosure | |||
with the enclosed revised pages. | |||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs | |||
Rules of Practice, a copy of this letter will be available electronically for public inspection in the | |||
NRC Public Document Room or from the Publicly Available Records System (PARS) | |||
component of the NRCs Agencywide Documents Access and Management System (ADAMS). | |||
ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the | |||
Public Electronic Reading Room). | |||
However, the material enclosed herewith contains Safeguards Information as defined by | However, the material enclosed herewith contains Safeguards Information as defined by | ||
10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not | 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the | ||
Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be | |||
made available electronically for public inspection in the NRC Public Document Room or from | |||
the PARS component of ADAMS. If you choose to provide a response and Safeguards | |||
Information is necessary to provide an acceptable response, please provide the level of | |||
protection described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary | |||
to provide an acceptable response, please mark your entire response Security-Related | |||
Information - Withhold from public disclosure under 10 CFR 2.390, in accordance with | |||
The enclosure transmitted herewith contains Safeguards Information. When separated from | |||
the enclosure, this transmittal document is decontrolled. | |||
SAFEGUARDS INFORMATION | |||
A. Black | |||
SAFEGUARDS INFORMATION | -2- | ||
SAFEGUARDS INFORMATION 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is | SAFEGUARDS INFORMATION | ||
10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In | |||
accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your | |||
response. | |||
Sincerely, | |||
/RA/ | |||
Michael J. Buckley, Acting Chief | Michael J. Buckley, Acting Chief | ||
Security Performance Evaluation Branch | Security Performance Evaluation Branch | ||
Division of Security Operations Office of Nuclear Security and Incident Response | Division of Security Operations | ||
Office of Nuclear Security and Incident Response | |||
Docket No. 50-397 | Docket No. 50-397 | ||
License No. NPF-21 | |||
License No. NPF-21 Public Enclosure: Errata page for Cover Letter for Inspection Report 05000397/2012201 | |||
Public Enclosure: Errata page for Cover Letter for Inspection Report 05000397/2012201 | |||
Nonpublic Enclosure: Errata page for Inspection Report 05000397/2012201 | Nonpublic Enclosure: Errata page for Inspection Report 05000397/2012201 | ||
cc w/enclosure: C. Workman, Columbia Generating Station | cc w/enclosure: C. Workman, Columbia Generating Station | ||
cc w/o enclosure: M. Reddemann, Columbia Generating Station | |||
cc w/o enclosure: M. Reddemann, Columbia Generating Station | |||
ML13015A166 OFFICE NSIR/DSO NSIR/DSO/ | ML13015A166 | ||
OFFICE | |||
NSIR/DSO NSIR/DSO/SPEB | |||
RIV | |||
NSIR/DSO/SPEB | |||
NAME | |||
J. Curry | |||
D. Willis | |||
M. Haire | |||
M. Buckley | |||
DATE | |||
1/15/13 | |||
1/18/13 | |||
1/18/13 | |||
1/18/13 | |||
}} | }} | ||
Latest revision as of 19:15, 11 January 2025
| ML13015A095 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 01/18/2013 |
| From: | Buckley M NRC/NSIR/DSO/DDSO/SPEB |
| To: | Black A Energy Northwest |
| References | |
| IR 2012201 | |
| Download: ML13015A095 (2) | |
See also: IR 05000397/2012201
Text
SAFEGUARDS INFORMATION
SAFEGUARDS INFORMATION
January 18, 2013
Mr. Andy Black
Operations Support General Manager
Energy Northwest
Columbia Generating Station
PE-30
North Power Plant Loop
Richland, WA 99352
SUBJECT:
ERRATA FOR COLUMBIA GENERATING STATION - NRC SECURITY
INSPECTION REPORT 05000397/2012201
Dear Mr. Black:
This errata corrects the cover letter (page 1) and the enclosure (page 11) in the paragraph
under the section, Exit Meeting Summary, dated January 7, 2013, to include the date of the
telephonic re-exit meeting which occurred on December 20, 2012, with you and other members
of your staff. Please replace the 1st page of the cover letter and the 11th page of the enclosure
with the enclosed revised pages.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs
Rules of Practice, a copy of this letter will be available electronically for public inspection in the
NRC Public Document Room or from the Publicly Available Records System (PARS)
component of the NRCs Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the
Public Electronic Reading Room).
However, the material enclosed herewith contains Safeguards Information as defined by
10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the
Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be
made available electronically for public inspection in the NRC Public Document Room or from
the PARS component of ADAMS. If you choose to provide a response and Safeguards
Information is necessary to provide an acceptable response, please provide the level of
protection described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary
to provide an acceptable response, please mark your entire response Security-Related
Information - Withhold from public disclosure under 10 CFR 2.390, in accordance with
The enclosure transmitted herewith contains Safeguards Information. When separated from
the enclosure, this transmittal document is decontrolled.
SAFEGUARDS INFORMATION
A. Black
-2-
SAFEGUARDS INFORMATION
10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In
accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your
response.
Sincerely,
/RA/
Michael J. Buckley, Acting Chief
Security Performance Evaluation Branch
Division of Security Operations
Office of Nuclear Security and Incident Response
Docket No. 50-397
License No. NPF-21
Public Enclosure: Errata page for Cover Letter for Inspection Report 05000397/2012201
Nonpublic Enclosure: Errata page for Inspection Report 05000397/2012201
cc w/enclosure: C. Workman, Columbia Generating Station
cc w/o enclosure: M. Reddemann, Columbia Generating Station
OFFICE
NSIR/DSO NSIR/DSO/SPEB
RIV
NSIR/DSO/SPEB
NAME
J. Curry
D. Willis
M. Haire
M. Buckley
DATE
1/15/13
1/18/13
1/18/13
1/18/13