| issue date = 02/25/2013
| issue date = 02/25/2013
| title = IR 05000285-13-010, on 04/08/2013, Fort Calhoun Station IMC 0350 Inspection -Request for Information
| title = IR 05000285-13-010, on 04/08/2013, Fort Calhoun Station IMC 0350 Inspection -Request for Information
| author name = Hay M C
| author name = Hay M
| author affiliation = NRC/RGN-IV/DRP
| author affiliation = NRC/RGN-IV/DRP
| addressee name = Cortopassi L P
| addressee name = Cortopassi L
| addressee affiliation = Omaha Public Power District
| addressee affiliation = Omaha Public Power District
| docket = 05000285
| docket = 05000285
Line 14: Line 14:
| page count = 7
| page count = 7
}}
}}
See also: [[followed by::IR 05000285/2013010]]
See also: [[see also::IR 05000285/2013010]]


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:February 25, 2013       
[[Issue date::February 25, 2013]]
Lou Cortopassi, Vice President 
  and Chief Nuclear Officer
Omaha Public Power District
Fort Calhoun Station FC-2-4 
P.O. Box 550
Fort Calhoun, NE  68023-0550
SUBJECT:
FORT CALHOUN STATION - NOTIFICATION OF INSPECTION
(NRC INSPECTION REPORT 05000285/2013010) AND REQUEST FOR
INFORMATION
Dear Mr. Cortopassi:
On April 8, 2013, inspectors from the Nuclear Regulatory Commission (NRC) will perform an
Inspection Manual Chapter (IMC) 0350 Team Inspection at Fort Calhoun Station, using
applicable portions of NRC Inspection Procedures 95003, Supplemental Inspection for
Repetitive Degraded Cornerstone, Multiple Degraded Cornerstones, Multiple Yellow Inputs or
One Red Input, 92702, Followup on Traditional Enforcement Actions Including Violations,
Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute
Resolution Confirmatory Orders, and 93806, Operations Readiness Assessment Team
Inspections.  This inspection supports the assessment and verification of the issues described
in the Restart Checklist enclosed in the Confirmatory Action Letter (CAL) issued to Fort Calhoun
Station on June 11, 2012, and any modifications thereof; and other selected areas to inform the
NRCs assessment of the safety, organizational, and programmatic issues at the station.
This inspection is a part of the IMC 0350 oversight inspection activities.  Experience has shown
that this inspection is a resource intensive inspection both for the NRC inspectors and your staff.
The inspection will include 2-weeks of onsite inspections by the team.  The current inspection
schedule is as follows:
Preparation Week: April 1, 2013 
Onsite weeks: April 8-19, 2013  
In order to minimize the impact to your onsite resources and to ensure a productive inspection,
we have enclosed a request for documents and resources needed for this inspection.  It is
important that all of these documents are up-to-date and complete in order to minimize the
number of additional documents requested during the preparation and/or onsite portions of the
inspection.
UNITED STATES
NUCLEAR REGULATORY COMMISSION
RE G IO N I V
1600 EAST LAMAR BLVD
ARLINGTON, TEXAS 76011-4511


Lou Cortopassi, Vice President and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station FC-2-4 P.O. Box 550 Fort Calhoun, NE 68023-0550
L. Cortopassi  
- 2 -
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Ms. Kelly Root.  If there are any questions
about this inspection or the material requested, please contact the lead inspector, Brian Larson,
at (817) 200-1172 or email: brian.larson@nrc.gov. 
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number 3150-
0018.  The NRC may not conduct or sponsor, and a person is not required to respond to, a
request for information or an information collection requirement unless the requesting document
displays a currently valid Office of Management and Budget control number. 
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document system
(ADAMS).  ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).  
Sincerely,
/RA/
Michael Hay, Chief 
Project Branch F 
Division of Reactor Projects
Docket No.:  50-285
License No.:  DPR-40
Enclosure:
Fort Calhoun Station IMC 0350 Inspection - Request for Information (ORAT)
cc w/enclosure:  Electronic Distribution for Fort Calhoun Station


SUBJECT: FORT CALHOUN STATION - NOTIFICATION OF INSPECTION (NRC INSPECTION REPORT 05000285/2013010) AND REQUEST FOR INFORMATION
L. Cortopassi
- 3 -
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov) 
Acting Deputy Regional Administrator (Steve.Reynolds@nrc.gov) 
DRP Director (Kriss.Kennedy@nrc.gov) 
Acting DRS Director (Thomas.Blount@nrc.gov) 
Manual Chapter 0350 Panel Chairman (Anton.Vegel@nrc.gov) 
Acting DRP Deputy Director (Michael.Scott@nrc.gov) 
Acting DRS Deputy Director and Manual Chapter 0350 Panel Member (Jeff.Clark@nrc.gov) 
Senior Resident Inspector and Manual Chapter 0350 Panel Member (John.Kirkland@nrc.gov) 
Resident Inspector (Jacob.Wingebach@nrc.gov) 
Branch Chief, DRP/F and Manual Chapter 0350 Panel Member (Michael.Hay@nrc.gov) 
Senior Project Engineer, DRP/F (Rick.Deese@nrc.gov) 
Project Engineer, DRP/F (Chris.Smith@nrc.gov) 
Public Affairs Officer (Victor.Dricks@nrc.gov) 
Public Affairs Officer (Lara.Uselding@nrc.gov) 
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
Project Manager and Manual Chapter 0350 Panel Member (Joseph.Sebroski@nrc.gov) 
Assistant Project Manager and Manual Chapter 0350 Panel Member (Lynnea.Wilkins@nrc.gov) 
RITS Coordinator (Marisa.Herrera@nrc.gov) 
Regional Counsel (Karla.Fuller@nrc.gov) 
Congressional Affairs Officer (Jenny.Weil@nrc.gov) 
Branch Chief, ORA/ACES (Heather.Gepford@nrc.gov) 
Enforcement Specialist, ACES (Christi.Maier@nrc.gov) 
OEMail Resource 
RIV/ETA: OEDO (John.Cassidy@nrc.gov) 
Manual Chapter 0350 Panel Vice-Chairman (Loiuse.Lund@nrc.gov) 
Manual Chapter 0350 Panel Member (Michael.Markley@nrc.gov) 
Manual Chapter 0350 Panel Non-voting Member (Michael.Balazik@nrc.gov) 
F:\\NRC\\FCS 95003\\RFI\\FCS 2013010-ORAT RFI LTR-btl.docx        ML13057A069
ADAMS:    No      Yes
SUNSI Review Complete
Reviewer Initials:
Publicly Available
  Non-Sensitive
  Non-publicly Available
  Sensitive
SOE:DRS/OB
C:DRP/F
BLarson
MHay
/RA via email/
/RA/
2 /22/13
2 /25/ 13
OFFICIAL RECORD COPY  T=Telephone          E=E-mail        F=Fax


==Dear Mr. Cortopassi:==
On April 8, 2013, inspectors from the Nuclear Regulatory Commission (NRC) will perform an Inspection Manual Chapter (IMC) 0350 Team Inspection at Fort Calhoun Station, using applicable portions of NRC Inspection Procedures 95003, "Supplemental Inspection for Repetitive Degraded Cornerstone, Multiple Degraded Cornerstones, Multiple Yellow Inputs or One Red Input," 92702, "Followup on Traditional Enforcement Actions Including Violations, Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute Resolution Confirmatory Orders," and 93806, "Operations Readiness Assessment Team Inspections." This inspection supports the assessment and verification of the issues described in the Restart Checklist enclosed in the Confirmatory Action Letter (CAL) issued to Fort Calhoun Station on June 11, 2012, and any modifications thereof; and other selected areas to inform the NRC's assessment of the safety, organizational, and programmatic issues at the station. This inspection is a part of the IMC 0350 oversight inspection activities. Experience has shown that this inspection is a resource intensive inspection both for the NRC inspectors and your staff. The inspection will include 2-weeks of onsite inspections by the team. The current inspection schedule is as follows: Preparation Week: April 1, 2013 Onsite weeks: April 8-19, 2013 In order to minimize the impact to your onsite resources and to ensure a productive inspection, we have enclosed a request for documents and resources needed for this inspection. It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and/or onsite portions of the inspection. We have discussed the schedule for these inspection activities with your staff and understand that our regulatory contact for this inspection will be Ms. Kelly Root. If there are any questions about this inspection or the material requested, please contact the lead inspector, Brian Larson, at (817) 200-1172 or email: brian.larson@nrc.gov.
- 1 -
Enclosure
FORT CALHOUN STATION IMC 0350 INSPECTION - REQUEST FOR INFORMATION
Operations Readiness Assessment Team (ORAT)
From:
Brian Larson
Senior Operations Engineer, NRC RIV
817-200-1172
brian.larson@nrc.gov
To:  
Kelly Root
Recovery Regulatory Director, Fort Calhoun Station
Subject:
Information Request to Support April 2013 IMC 0350 Team Inspection - ORAT
(IPs 95003, 92702, 93806)
The following information is requested in order to support inspection preparation activities
starting April 8, 2013:
*
Electronically accessible files on Certrec website for: Brian Larson, Clyde Osterholtz,  
Chris Steely, Thomas Farina and Theresa Buchanan
*
Documents to facilitate preparation for the onsite inspection weeks using IP 93806,  
Operations Readiness Assessment Team Inspections.  
Inspectors will review the documents listed below during preparation week and identify
additional documents that will be needed during the onsite inspection weeks. It is  
requested that documents identified during preparation week be made available and
ready for review on the first day of inspection (April 8, 2013).  If you have any questions
regarding this information request, please call the inspection team leader as soon as
possible.  
Generic
*
Documents that relate to establishment of an appropriate safety attitude and  
proper working atmosphere for Operations Department personnel
*
Documents that relate to Operations management oversight, including
expectations, analyses, self-assessments, corrective actions and improvement
plans
*
Documents that relate to implementation of an Operations program to gather and
apply lessons learned from industry experience
*
Documents that relate to Quality Assurance Department involvement in plant
operations
*
Documents that relate to communication of station goals to Operations
Department personnel


This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0018. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
- 2 -
Enclosure
02.02.d
*
Documents that relate to self-assessment capability as it relates to readiness for
operation, including the effectiveness of root cause analysis, corrective actions,
and the trending and generic applicability review of self-identified problems
*
Documents/procedures that describe the deficiency reporting system (corrective
action program), including thresholds and prioritization
*
Documents from any root cause analysis performed for the Operations and  
Training Departments
02.02.e
*
Documents that relate to preparing licensed operators for restart (heatup,
criticality, low power operations, full power operations)
*
Documents that relate to preparing licensed operators to respond to alarms
(ARPs), abnormal and emergency plant conditions (AOPs, EOPs),  
instrumentation and control setpoint and display anomalies, and the potential for  
a high number of challenges to safety systems during startup/testing
02.02.g
*
Technical Specifications (TS), Updated Safety Analysis Report (USAR)
*
Documents that relate to preparing licensed operators to recognize, locate and
comply with TS
*
Operations Department procedures with index of numbers and titles
*
Documents that relate to administrative controls for startup testing activities
under TS constraints
*
List of all licensed operators
02.02.l
*
FCS Organizational Charts 
*
Documents as they relate to Operations shift manning, Emergency Plan
activation and response
*
Documents that relate to Operations augmented shift staffing during plant restart
*
Documents that relate to management oversight and involvement in the  
implementation of Operations evolutions and work controls


Sincerely,/RA/ Michael Hay, Chief Project Branch F Division of Reactor Projects Docket No.: 50-285 License No.: DPR-40
- 3 -
Enclosure
*
Closure Books to facilitate preparation for the onsite inspection weeks using IMC 0350
Restart Checklist.
Inspectors will review the Closure Books listed below during preparation week and
identify additional documents that will be needed during the onsite inspection weeks.  It
is requested that documents identified during preparation week be made available and
ready for review on the first day of inspection (April 8, 2013). If you have any questions
regarding this information request, please call the inspection team leader as soon as
possible.
1. CL 2.b.1 - System Health Reviews
a. 2.b.1.5 - Chemical and Volume Control System
b. 2.b.1.9 - Control Rod Drive System
c. 2.b.1.10 - Reactor Coolant System
d. 2.b.1.15 - Main Feedwater System
e. 2.b.1.17 - Steam Generator System
f.
2.b.1.19 - Instrument Air System
g. 2.b.1.23 - Engineered Safeguards System
2. CL 5.c - Procedure Quality
a. 5.c.1 - Licensee Assessment of the Fundamental Performance Deficiency of
Procedure Quality/Procedure Management
b. 5.c.2 - Adequacy of extent of condition and extent of causes
c. 5.c.3 - Adequacy of corrective actions
d. NCV 2012301-01 - Seven Examples of Inadequate Procedures for the
Mitigating Systems Cornerstone
e. NCV 2012301-04 - Five Examples of Inadequate Procedures for the Initiating
Events Cornerstone
f.
NCV 2012301-06 - Inadequate Procedures with Four Examples for the
Barrier Integrity Cornerstone
g. NCV 2011002-01 - Inadequate Operating Instruction Results in a Loss of  
Auxiliary Feedwater
h. NCV 2010004-10 - Inadequate Maintenance Procedure Results in a Plant
Shutdown
3. CL 5.e - Configuration Control
a. LER 2012-008-0 - Technical Specification Violation for Fuel Movement (VA-
66)
4. CL 5.f - Emergency Response


===Enclosure:===
Fort Calhoun Station IMC 0350 Inspection - Request for Information (ORAT) cc w/enclosure: Electronic Distribution for Fort Calhoun Station
- 4 -
Enclosure  
a. 5.f.7 - Licensee Assessment of the Fundamental Performance Deficiency of
Emergency Response Organization
b. 5.f.8 - Adequacy of extent of condition and extent of causes
c. 5.f.9 - Adequacy of corrective actions
5. CL 7.a - Operations Organization Ready for Restart
a. 7.a.1 - Perform Operational Readiness Assessment Team inspection
b. 7.a.2 - Licensee Assessment of the Fundamental Performance Deficiency
associated with Site Operational Focus
c. 7.a.3 - Adequacy of extent of condition and extent of causes
d. 7.a.4 - Adequacy of corrective actions
6. CL 7.b - Systems Ready for Restart and Mode Restraints Properly Addressed
a. 7.b.1 - Final system readiness and mode restraint review
7. CL 7.c - Final Review of Corrective Action Program for Restart Items (Ops Only)  
a. 7.c.1 - Final corrective action program review for restart items prior to restart
*
Generic documents to facilitate preparation for the onsite inspection weeks.  Inspectors
will review the documents listed below during preparation week and identify additional
documents that will be needed during the onsite inspection weeks.  It is requested that
documents identified during preparation week be made available and ready for review
on the first day of inspection (April 8, 2013). If you have any questions regarding this
information request, please call the inspection team leader as soon as possible.
1. Documents related to 95003 Recovery Project
2. Documents related to 95003 Collective Evaluation
3. Documents related to Fundamental Performance Deficiencies
4. Common Factors Analysis Report
}}
}}

Latest revision as of 10:54, 11 January 2025

IR 05000285-13-010, on 04/08/2013, Fort Calhoun Station IMC 0350 Inspection -Request for Information
ML13057A069
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 02/25/2013
From: Hay M
NRC/RGN-IV/DRP
To: Cortopassi L
Omaha Public Power District
References
IR-13-010
Download: ML13057A069 (7)


See also: IR 05000285/2013010

Text

February 25, 2013

Lou Cortopassi, Vice President

and Chief Nuclear Officer

Omaha Public Power District

Fort Calhoun Station FC-2-4

P.O. Box 550

Fort Calhoun, NE 68023-0550

SUBJECT:

FORT CALHOUN STATION - NOTIFICATION OF INSPECTION

(NRC INSPECTION REPORT 05000285/2013010) AND REQUEST FOR

INFORMATION

Dear Mr. Cortopassi:

On April 8, 2013, inspectors from the Nuclear Regulatory Commission (NRC) will perform an

Inspection Manual Chapter (IMC) 0350 Team Inspection at Fort Calhoun Station, using

applicable portions of NRC Inspection Procedures 95003, Supplemental Inspection for

Repetitive Degraded Cornerstone, Multiple Degraded Cornerstones, Multiple Yellow Inputs or

One Red Input, 92702, Followup on Traditional Enforcement Actions Including Violations,

Deviations, Confirmatory Action Letters, Confirmatory Orders, and Alternative Dispute

Resolution Confirmatory Orders, and 93806, Operations Readiness Assessment Team

Inspections. This inspection supports the assessment and verification of the issues described

in the Restart Checklist enclosed in the Confirmatory Action Letter (CAL) issued to Fort Calhoun

Station on June 11, 2012, and any modifications thereof; and other selected areas to inform the

NRCs assessment of the safety, organizational, and programmatic issues at the station.

This inspection is a part of the IMC 0350 oversight inspection activities. Experience has shown

that this inspection is a resource intensive inspection both for the NRC inspectors and your staff.

The inspection will include 2-weeks of onsite inspections by the team. The current inspection

schedule is as follows:

Preparation Week: April 1, 2013

Onsite weeks: April 8-19, 2013

In order to minimize the impact to your onsite resources and to ensure a productive inspection,

we have enclosed a request for documents and resources needed for this inspection. It is

important that all of these documents are up-to-date and complete in order to minimize the

number of additional documents requested during the preparation and/or onsite portions of the

inspection.

UNITED STATES

NUCLEAR REGULATORY COMMISSION

RE G IO N I V

1600 EAST LAMAR BLVD

ARLINGTON, TEXAS 76011-4511

L. Cortopassi

- 2 -

We have discussed the schedule for these inspection activities with your staff and understand

that our regulatory contact for this inspection will be Ms. Kelly Root. If there are any questions

about this inspection or the material requested, please contact the lead inspector, Brian Larson,

at (817) 200-1172 or email: brian.larson@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0018. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRCs document system

(ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Michael Hay, Chief

Project Branch F

Division of Reactor Projects

Docket No.: 50-285

License No.: DPR-40

Enclosure:

Fort Calhoun Station IMC 0350 Inspection - Request for Information (ORAT)

cc w/enclosure: Electronic Distribution for Fort Calhoun Station

L. Cortopassi

- 3 -

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Acting Deputy Regional Administrator (Steve.Reynolds@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

Acting DRS Director (Thomas.Blount@nrc.gov)

Manual Chapter 0350 Panel Chairman (Anton.Vegel@nrc.gov)

Acting DRP Deputy Director (Michael.Scott@nrc.gov)

Acting DRS Deputy Director and Manual Chapter 0350 Panel Member (Jeff.Clark@nrc.gov)

Senior Resident Inspector and Manual Chapter 0350 Panel Member (John.Kirkland@nrc.gov)

Resident Inspector (Jacob.Wingebach@nrc.gov)

Branch Chief, DRP/F and Manual Chapter 0350 Panel Member (Michael.Hay@nrc.gov)

Senior Project Engineer, DRP/F (Rick.Deese@nrc.gov)

Project Engineer, DRP/F (Chris.Smith@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)

Project Manager and Manual Chapter 0350 Panel Member (Joseph.Sebroski@nrc.gov)

Assistant Project Manager and Manual Chapter 0350 Panel Member (Lynnea.Wilkins@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

Branch Chief, ORA/ACES (Heather.Gepford@nrc.gov)

Enforcement Specialist, ACES (Christi.Maier@nrc.gov)

OEMail Resource

RIV/ETA: OEDO (John.Cassidy@nrc.gov)

Manual Chapter 0350 Panel Vice-Chairman (Loiuse.Lund@nrc.gov)

Manual Chapter 0350 Panel Member (Michael.Markley@nrc.gov)

Manual Chapter 0350 Panel Non-voting Member (Michael.Balazik@nrc.gov)

F:\\NRC\\FCS 95003\\RFI\\FCS 2013010-ORAT RFI LTR-btl.docx ML13057A069

ADAMS: No Yes

SUNSI Review Complete

Reviewer Initials:

Publicly Available

Non-Sensitive

Non-publicly Available

Sensitive

SOE:DRS/OB

C:DRP/F

BLarson

MHay

/RA via email/

/RA/

2 /22/13

2 /25/ 13

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

- 1 -

Enclosure

FORT CALHOUN STATION IMC 0350 INSPECTION - REQUEST FOR INFORMATION

Operations Readiness Assessment Team (ORAT)

From:

Brian Larson

Senior Operations Engineer, NRC RIV

817-200-1172

brian.larson@nrc.gov

To:

Kelly Root

Recovery Regulatory Director, Fort Calhoun Station

Subject:

Information Request to Support April 2013 IMC 0350 Team Inspection - ORAT

(IPs 95003, 92702, 93806)

The following information is requested in order to support inspection preparation activities

starting April 8, 2013:

Electronically accessible files on Certrec website for: Brian Larson, Clyde Osterholtz,

Chris Steely, Thomas Farina and Theresa Buchanan

Documents to facilitate preparation for the onsite inspection weeks using IP 93806,

Operations Readiness Assessment Team Inspections.

Inspectors will review the documents listed below during preparation week and identify

additional documents that will be needed during the onsite inspection weeks. It is

requested that documents identified during preparation week be made available and

ready for review on the first day of inspection (April 8, 2013). If you have any questions

regarding this information request, please call the inspection team leader as soon as

possible.

Generic

Documents that relate to establishment of an appropriate safety attitude and

proper working atmosphere for Operations Department personnel

Documents that relate to Operations management oversight, including

expectations, analyses, self-assessments, corrective actions and improvement

plans

Documents that relate to implementation of an Operations program to gather and

apply lessons learned from industry experience

Documents that relate to Quality Assurance Department involvement in plant

operations

Documents that relate to communication of station goals to Operations

Department personnel

- 2 -

Enclosure

02.02.d

Documents that relate to self-assessment capability as it relates to readiness for

operation, including the effectiveness of root cause analysis, corrective actions,

and the trending and generic applicability review of self-identified problems

Documents/procedures that describe the deficiency reporting system (corrective

action program), including thresholds and prioritization

Documents from any root cause analysis performed for the Operations and

Training Departments

02.02.e

Documents that relate to preparing licensed operators for restart (heatup,

criticality, low power operations, full power operations)

Documents that relate to preparing licensed operators to respond to alarms

(ARPs), abnormal and emergency plant conditions (AOPs, EOPs),

instrumentation and control setpoint and display anomalies, and the potential for

a high number of challenges to safety systems during startup/testing

02.02.g

Technical Specifications (TS), Updated Safety Analysis Report (USAR)

Documents that relate to preparing licensed operators to recognize, locate and

comply with TS

Operations Department procedures with index of numbers and titles

Documents that relate to administrative controls for startup testing activities

under TS constraints

List of all licensed operators

02.02.l

FCS Organizational Charts

Documents as they relate to Operations shift manning, Emergency Plan

activation and response

Documents that relate to Operations augmented shift staffing during plant restart

Documents that relate to management oversight and involvement in the

implementation of Operations evolutions and work controls

- 3 -

Enclosure

Closure Books to facilitate preparation for the onsite inspection weeks using IMC 0350

Restart Checklist.

Inspectors will review the Closure Books listed below during preparation week and

identify additional documents that will be needed during the onsite inspection weeks. It

is requested that documents identified during preparation week be made available and

ready for review on the first day of inspection (April 8, 2013). If you have any questions

regarding this information request, please call the inspection team leader as soon as

possible.

1. CL 2.b.1 - System Health Reviews

a. 2.b.1.5 - Chemical and Volume Control System

b. 2.b.1.9 - Control Rod Drive System

c. 2.b.1.10 - Reactor Coolant System

d. 2.b.1.15 - Main Feedwater System

e. 2.b.1.17 - Steam Generator System

f.

2.b.1.19 - Instrument Air System

g. 2.b.1.23 - Engineered Safeguards System

2. CL 5.c - Procedure Quality

a. 5.c.1 - Licensee Assessment of the Fundamental Performance Deficiency of

Procedure Quality/Procedure Management

b. 5.c.2 - Adequacy of extent of condition and extent of causes

c. 5.c.3 - Adequacy of corrective actions

d. NCV 2012301-01 - Seven Examples of Inadequate Procedures for the

Mitigating Systems Cornerstone

e. NCV 2012301-04 - Five Examples of Inadequate Procedures for the Initiating

Events Cornerstone

f.

NCV 2012301-06 - Inadequate Procedures with Four Examples for the

Barrier Integrity Cornerstone

g. NCV 2011002-01 - Inadequate Operating Instruction Results in a Loss of

Auxiliary Feedwater

h. NCV 2010004-10 - Inadequate Maintenance Procedure Results in a Plant

Shutdown

3. CL 5.e - Configuration Control

a. LER 2012-008-0 - Technical Specification Violation for Fuel Movement (VA-

66)

4. CL 5.f - Emergency Response

- 4 -

Enclosure

a. 5.f.7 - Licensee Assessment of the Fundamental Performance Deficiency of

Emergency Response Organization

b. 5.f.8 - Adequacy of extent of condition and extent of causes

c. 5.f.9 - Adequacy of corrective actions

5. CL 7.a - Operations Organization Ready for Restart

a. 7.a.1 - Perform Operational Readiness Assessment Team inspection

b. 7.a.2 - Licensee Assessment of the Fundamental Performance Deficiency

associated with Site Operational Focus

c. 7.a.3 - Adequacy of extent of condition and extent of causes

d. 7.a.4 - Adequacy of corrective actions

6. CL 7.b - Systems Ready for Restart and Mode Restraints Properly Addressed

a. 7.b.1 - Final system readiness and mode restraint review

7. CL 7.c - Final Review of Corrective Action Program for Restart Items (Ops Only)

a. 7.c.1 - Final corrective action program review for restart items prior to restart

Generic documents to facilitate preparation for the onsite inspection weeks. Inspectors

will review the documents listed below during preparation week and identify additional

documents that will be needed during the onsite inspection weeks. It is requested that

documents identified during preparation week be made available and ready for review

on the first day of inspection (April 8, 2013). If you have any questions regarding this

information request, please call the inspection team leader as soon as possible.

1. Documents related to 95003 Recovery Project

2. Documents related to 95003 Collective Evaluation

3. Documents related to Fundamental Performance Deficiencies

4. Common Factors Analysis Report