IR 05000341/2012001: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (4 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 03/04/2013 | | issue date = 03/04/2013 | ||
| title = Annual Assessment Letter for Fermi Power Plant, Unit 2 (Report 05000341/2012001) | | title = Annual Assessment Letter for Fermi Power Plant, Unit 2 (Report 05000341/2012001) | ||
| author name = Shear G | | author name = Shear G | ||
| author affiliation = NRC/RGN-III/DRP | | author affiliation = NRC/RGN-III/DRP | ||
| addressee name = Plona J | | addressee name = Plona J | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:March 4, 2013 | ||
SUBJECT: ANNUAL ASSESSMENT LETTER FOR FERMI POWER PLANT, UNIT 2 (REPORT 05000341/2012001) | ==SUBJECT:== | ||
ANNUAL ASSESSMENT LETTER FOR FERMI POWER PLANT, UNIT 2 (REPORT 05000341/2012001) | |||
==Dear Mr. Plona:== | ==Dear Mr. Plona:== | ||
On February | On February 13, 2013, the NRC completed its end-of-cycle performance review of the Fermi Power Plant, Unit 2. The NRC reviewed the most recent quarterly performance indicators (PIs) | ||
, 2012. This letter informs you of the | in addition to inspection results and enforcement actions from January 1, 2012, through December 31, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. | ||
The NRC determined the performance at Fermi Power Plant, Unit 2, during the most recent quarter was within the Regulatory Response Column of the | The NRC determined the performance at Fermi Power Plant, Unit 2, during the most recent quarter was within the Regulatory Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because the NRC identified that the Unplanned Scrams per 7000 Critical Hours performance indicator (PI) has crossed the Green-to-White threshold. The change was due to the reactor scram that occurred in the 4th quarter of 2012 and two previous scrams. | ||
-to-White threshold. The change was due to the reactor scram that occurred in the 4th quarter of 2012 and two previous | |||
Fermi Power Plant, Unit 2, transitioned to the Licensee Response Column on August 24, 2012, with the | Previously the NRC determined the performance at Fermi Power Plant, Unit 2, during the first three quarters of 2012 was within the Regulatory Response Column of the NRCs ROP Action Matrix because of one or more greater-than-green Security Cornerstone inputs as described in Report 05000341/2010201 sent on January 6, 2011. Fermi Power Plant, Unit 2, transitioned to the Licensee Response Column on August 24, 2012, with the NRCs closure of the one or more greater-than-green Security Cornerstone inputs that were being held open pending the completion of a supplemental inspection and effective corrective actions by the licensee. The NRC documented the results of that supplemental inspection in NRC Inspection Report 05000341/2012406 sent on October 4, 2012. | ||
-than-green Security Cornerstone inputs that were being held open pending the completion of a supplemental inspection and effective corrective actions by the licensee. The NRC documented the results of that supplemental inspection in NRC Inspection Report 05000341/2012406 sent on October 4, 2012. | |||
In addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, | In addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area, to review your actions to address the White performance indicator. Your staff has not yet notified the NRC of your readiness for it to conduct a supplemental inspection to review the actions taken to address the performance issues. The enclosed inspection plan lists the inspections scheduled through December 31, 2014. | ||
, | |||
Routine inspections performed by resident inspectors are not included in the inspection plan. | |||
The inspections listed during the last 12 months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. | The inspections listed during the last 12 months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. The inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. The NRC also plans on performing special and infrequently performed inspections including: Inspection Procedure (IP) 71111.21, Component Design Basis Inspection, IP 71111.07T, Heat Sink Performance, IP 71111.11B, Licensed Operator Requalification Program, and Temporary Instruction (TI) 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping. | ||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Please contact Mr. Jamnes Cameron, Chief, Division of Reactor Projects, Branch 6, at 630-829-9833 with any questions you may have regarding this letter or the inspection plan. | |||
Sincerely, | |||
/RA/ | |||
Gary L. Shear, Acting Director Division of Reactor Projects | |||
Docket No. 50-341; 072-071 License No. NPF-43 | |||
Enclosure: | |||
Fermi 2 Inspection/Activity Plan | |||
cc w/encl: | |||
Distribution via ListServ | Distribution via ListServ | ||
}} | }} | ||
Latest revision as of 10:43, 11 January 2025
| ML13063A131 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 03/04/2013 |
| From: | Shear G Division Reactor Projects III |
| To: | Plona J Detroit Edison, Co |
| References | |
| IR-12-001 | |
| Download: ML13063A131 (6) | |
Text
March 4, 2013
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR FERMI POWER PLANT, UNIT 2 (REPORT 05000341/2012001)
Dear Mr. Plona:
On February 13, 2013, the NRC completed its end-of-cycle performance review of the Fermi Power Plant, Unit 2. The NRC reviewed the most recent quarterly performance indicators (PIs)
in addition to inspection results and enforcement actions from January 1, 2012, through December 31, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined the performance at Fermi Power Plant, Unit 2, during the most recent quarter was within the Regulatory Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because the NRC identified that the Unplanned Scrams per 7000 Critical Hours performance indicator (PI) has crossed the Green-to-White threshold. The change was due to the reactor scram that occurred in the 4th quarter of 2012 and two previous scrams.
Previously the NRC determined the performance at Fermi Power Plant, Unit 2, during the first three quarters of 2012 was within the Regulatory Response Column of the NRCs ROP Action Matrix because of one or more greater-than-green Security Cornerstone inputs as described in Report 05000341/2010201 sent on January 6, 2011. Fermi Power Plant, Unit 2, transitioned to the Licensee Response Column on August 24, 2012, with the NRCs closure of the one or more greater-than-green Security Cornerstone inputs that were being held open pending the completion of a supplemental inspection and effective corrective actions by the licensee. The NRC documented the results of that supplemental inspection in NRC Inspection Report 05000341/2012406 sent on October 4, 2012.
In addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area, to review your actions to address the White performance indicator. Your staff has not yet notified the NRC of your readiness for it to conduct a supplemental inspection to review the actions taken to address the performance issues. The enclosed inspection plan lists the inspections scheduled through December 31, 2014.
Routine inspections performed by resident inspectors are not included in the inspection plan.
The inspections listed during the last 12 months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. The inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence. The NRC also plans on performing special and infrequently performed inspections including: Inspection Procedure (IP) 71111.21, Component Design Basis Inspection, IP 71111.07T, Heat Sink Performance, IP 71111.11B, Licensed Operator Requalification Program, and Temporary Instruction (TI) 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact Mr. Jamnes Cameron, Chief, Division of Reactor Projects, Branch 6, at 630-829-9833 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Gary L. Shear, Acting Director Division of Reactor Projects
Docket No. 50-341; 072-071 License No. NPF-43
Enclosure:
Fermi 2 Inspection/Activity Plan
cc w/encl:
Distribution via ListServ