ML13120A191: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:OFFICIAL USE ONLY  
{{#Wiki_filter:OFFICIAL USE ONLY - SECURITY RELATED INFORMATION  
- SECURITY RELATED INFORMATION
  UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA  30303-1257
UNITED STATES  
  Enclosure transmitted herewith contains SUNSI.  When separated from enclosure, this  
NUCLEAR REGULATORY COMMISSION  
transmittal document is decontrolled
REGION II  
 
245 PEACHTREE CENTER AVENUE NE, SUITE 1200  
LIMITED INTERNAL
ATLANTA, GEORGIA  30303-1257  
DISTRIBUTION PERMITTED
  OFFICIAL USE ONLY  
Enclosure transmitted herewith contains SUNSI.  When separated from enclosure, this  
- SECURITY-RELATED INFORMATION
transmittal document is decontrolled  
  April 24, 2013  
  Mr. T. A. Lynch  
LIMITED INTERNAL  
DISTRIBUTION PERMITTED  
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION  
April 24, 2013  
   
Mr. T. A. Lynch  
Vice President  
Vice President  
Southern Nuclear Operating Company, Inc.  
Southern Nuclear Operating Company, Inc.  
Joseph M. Farley Nuclear Plant  
Joseph M. Farley Nuclear Plant  
P.O. Drawer 470, BIN B500  
P.O. Drawer 470, BIN B500  
Ashford, AL  36312  
Ashford, AL  36312  
  SUBJECT:  JOSEPH M FARLEY NUCLEAR PLANT - NOTIFICATION OF CYBER SECURITY TI MILESTONES 1-7  INSPECTION AND REQUEST FOR  
   
SUBJECT:   
JOSEPH M FARLEY NUCLEAR PLANT - NOTIFICATION OF CYBER  
SECURITY TI MILESTONES 1-7  INSPECTION AND REQUEST FOR  
INFORMATION (NRC INSPECTION REPORT NO. 05000348/2013404 AND  
INFORMATION (NRC INSPECTION REPORT NO. 05000348/2013404 AND  
05000364/2013404)  
05000364/2013404)  
  Dear Mr. Lynch:  
   
 
Dear Mr. Lynch:  
   
   
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)  
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)  
Region II (RII) staff will conduct an inspection of the Cyber Security Milestones 1-7 requirements specified by the conditions of your operating license at the Farley Nuclear Plant on July 22 - 26, 2013.  The inspection team will be led by Mr. Jigar Patel, Reactor Inspector, of the NRC RII  
Region II (RII) staff will conduct an inspection of the Cyber Security Milestones 1-7 requirements  
specified by the conditions of your operating license at the Farley Nuclear Plant on July 22 - 26,  
2013.  The inspection team will be led by Mr. Jigar Patel, Reactor Inspector, of the NRC RII  
office.  The team will be composed of personnel from the NRC RII office and personnel from the  
office.  The team will be composed of personnel from the NRC RII office and personnel from the  
NRC office of Nuclear Security and Incident Response (NSIR).  The inspection will be  
NRC office of Nuclear Security and Incident Response (NSIR).  The inspection will be  
conducted in accordance with Temporary Instruction (TI) 2201/004, "Inspection of  
conducted in accordance with Temporary Instruction (TI) 2201/004, Inspection of  
Implementation of Interim Cyber Security Milestones 1-7." The TI inspection will be performed  
Implementation of Interim Cyber Security Milestones 1-7.  The TI inspection will be performed  
to evaluate and verify your ability to meet the interim milestone requirements of the NRC's Cyber Security Rule, Title 10, Code of Federal Regulations (CFR), Part 73, Section 54, "Protection of Digital Computer and Communication Systems and Networks." In accordance with 10 CFR 73.54, each nuclear power plant licensee was required to submit a proposed cyber security plan (CSP) and implementation schedule for NRC review and approval.  On December 14, 2009, by letter (ML093080517) to the Nuclear Energy Institute  
to evaluate and verify your ability to meet the interim milestone requirements of the NRCs
Cyber Security Rule, Title 10, Code of Federal Regulations (CFR), Part 73, Section 54,  
Protection of Digital Computer and Communication Systems and Networks.  
In accordance with 10 CFR 73.54, each nuclear power plant licensee was required to submit  
a proposed cyber security plan (CSP) and implementation schedule for NRC review and  
approval.  On December 14, 2009, by letter (ML093080517) to the Nuclear Energy Institute  
(NEI), the NRC provided their expectations for the proposed implementation schedule.  On  
(NEI), the NRC provided their expectations for the proposed implementation schedule.  On  
January 5, 2011, by letter (ML110060093) to the NRC, NEI issued an initial "Template for the  
January 5, 2011, by letter (ML110060093) to the NRC, NEI issued an initial Template for the  
Cyber Security Plan Implementation Schedule" (ML110060097).  On February 28, 2011, by  
Cyber Security Plan Implementation Schedule (ML110060097).  On February 28, 2011, by  
letter (ML110600206) to the NRC, NEI provided a revised, "Template for the Cyber Security Plan Implementation Schedule." The purpose of the letter's attachment was to provide the  
letter (ML110600206) to the NRC, NEI provided a revised, Template for the Cyber Security  
licensee with a generically written templat
Plan Implementation Schedule.  The purpose of the letters attachment was to provide the  
e to develop their proposed CSP implementation schedule.  Utilization of the generic template required the licensee to make conforming changes to ensure the submitted schedule accurately accounted for site-specific activities.  The CSP,  
licensee with a generically written template to develop their proposed CSP implementation  
implementation schedule, and other applicable information for your facility provided the
schedule.  Utilization of the generic template required the licensee to make conforming changes  
OFFICIAL USE ONLY
to ensure the submitted schedule accurately accounted for site-specific activities.  The CSP,  
- SECURITY RELATED INFORMATION
implementation schedule, and other applicable information for your facility provided the  
T. Lynch 2
OFFICIAL USE ONLY
- SECURITY RELATED INFORMATION
implementation aspects, including the key intermediate milestone attributes and dates as well as the full implementation dates.  The implementation aspects were described based in part on


OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
T. Lynch
2
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
implementation aspects, including the key intermediate milestone attributes and dates as well
as the full implementation dates.  The implementation aspects were described based in part on
letters to NRC dated July 16, 2010 (ML110880218) and supplemented by letters dated March  
letters to NRC dated July 16, 2010 (ML110880218) and supplemented by letters dated March  
28, 2011 (ML11088021) and April 21, 2011 (ML111020258).  By reference to NRC safety  
28, 2011 (ML11088021) and April 21, 2011 (ML111020258).  By reference to NRC safety  
evaluation report dated July 28, 2011 (ML11178A018) license condition 2.D was modified for facility operating licenses NFP-2 and NPF-8 for Farley Units 1 and 2 to ensure that the CSP would be implemented and maintained consistent with NRC requirements.  
evaluation report dated July 28, 2011 (ML11178A018) license condition 2.D was modified for  
 
facility operating licenses NFP-2 and NPF-8 for Farley Units 1 and 2 to ensure that the CSP  
would be implemented and maintained consistent with NRC requirements.  
On April 23, 2013, during a conversation between Mr. B. Arens of your staff, and Mr. J. Patel,  
On April 23, 2013, during a conversation between Mr. B. Arens of your staff, and Mr. J. Patel,  
NRC RII, our respective staffs confirmed arrangements for a three day information gathering  
NRC RII, our respective staffs confirmed arrangements for a three day information gathering  
onsite visit and a one-week onsite inspection.  The subject TI inspection provides a  
onsite visit and a one-week onsite inspection.  The subject TI inspection provides a  
programmatic level review and verification of the licensee's site-specific implementation of Interim Milestones 1 through 7.  The schedule for the onsite TI Inspection for the Interim  
programmatic level review and verification of the licensees site-specific implementation of  
Interim Milestones 1 through 7.  The schedule for the onsite TI Inspection for the Interim  
Milestones 1 through 7 is as follows:   
Milestones 1 through 7 is as follows:   
 
* Information gathering visit:  July 9 - 11, 2013   
*  
* Onsite inspection:  July 22 - 26, 2013  
Information gathering visit:  July 9 - 11, 2013   
  The purpose of the information gathering visit is to: (1) obtain information and documentation  
*  
needed to support the TI inspection; (2) become fa
Onsite inspection:  July 22 - 26, 2013  
miliar with the Farley Nuclear Plant Cyber  
   
Security Program and plant layout; and (3) arrange administrative details, such as office space, availability of knowledgeable office personnel and to ensure unescorted site access privileges.  
The purpose of the information gathering visit is to: (1) obtain information and documentation  
 
needed to support the TI inspection; (2) become familiar with the Farley Nuclear Plant Cyber  
Security Program and plant layout; and (3) arrange administrative details, such as office space,  
availability of knowledgeable office personnel and to ensure unescorted site access privileges.  
   
   
In order to assure a productive TI inspection, we have enclosed a request for documents  
In order to assure a productive TI inspection, we have enclosed a request for documents  
needed to ensure the inspectors are adequately prepared.  These documents have been  
needed to ensure the inspectors are adequately prepared.  These documents have been  
divided into three groups (I, II, & III).  Group I lists information necessary to aid the inspectors in planning for the TI inspection prior to the information gathering visit.  It is requested that this information be provided to the lead inspector via mail no later than June 12, 2013.  Group II lists  
divided into three groups (I, II, & III).  Group I lists information necessary to aid the inspectors in  
planning for the TI inspection prior to the information gathering visit.  It is requested that this  
information be provided to the lead inspector via mail no later than June 12, 2013.  Group II lists  
information and possible areas for discussion necessary to assist the inspectors during the  
information and possible areas for discussion necessary to assist the inspectors during the  
TI inspection.  It is requested this information be available during the information gathering visit  
TI inspection.  It is requested this information be available during the information gathering visit  
(July 9, 2013).  Group III consists of those items that the inspectors will review, or need access to, during the TI inspection.  Group III also lists the information necessary to aid the inspectors in tracking questions and answers identified as a result of the TI inspection.  It is requested that  
(July 9, 2013).  Group III consists of those items that the inspectors will review, or need access  
to, during the TI inspection.  Group III also lists the information necessary to aid the inspectors  
in tracking questions and answers identified as a result of the TI inspection.  It is requested that  
this information be provided to the lead inspector as the information is generated during the  
this information be provided to the lead inspector as the information is generated during the  
TI inspection.  It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the TI inspection.  
TI inspection.  It is important that all of these documents are up to date and complete in order to  
  This letter does not contain new or amended information collection requirements subject to the  
minimize the number of additional documents requested during the preparation and/or the  
onsite portions of the TI inspection.  
   
This letter does not contain new or amended information collection requirements subject to the  
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection  
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection  
requirements were approved by the Office  
requirements were approved by the Office of Management and Budget, control number 3150-
of Management and Budget, control number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.   
0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a  
request for information or an information collection requirement unless the requesting document  
displays a currently valid Office of Management and Budget control number.   
   
   
Your cooperation and support during this inspection will be appreciated.  If you have questions concerning this inspection, or the inspection team's information or logistical needs, please  
Your cooperation and support during this inspection will be appreciated.  If you have questions  
contact Mr. Patel at (404) 997-4577, or me at (404) 997-4511.  
concerning this inspection, or the inspection team's information or logistical needs, please  
OFFICIAL USE ONLY  
contact Mr. Patel at (404) 997-4577, or me at (404) 997-4511.
- SECURITY RELATED INFORMATION
 
T. Lynch 3  
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION  
OFFICIAL USE ONLY
T. Lynch  
- SECURITY RELATED INFORMATION
3  
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component
of NRC's document system, ADAMS.
   
   
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
(the Public Electronic Reading Room).  However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.   
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
  Sincerely,   
available electronically for public inspection in the NRC Public Document Room or from the
      /RA/   Michael F. King, Chief  
Publicly Available Records (PARS) component of NRC's document system, ADAMS.
ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the  
Public Electronic Reading Room).  However, because of the security-related concerns  
contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters  
enclosure will not be available for public inspection.   
   
Sincerely,  
   
/RA/  
Michael F. King, Chief  
Engineering Branch 2  
Engineering Branch 2  
Division of Reactor Safety   
Division of Reactor Safety   
  Docket No.:  50-348, 50-364 License No.:  NPF-2, NPF-8  
   
  Enclosure: Document Request For Cyber Security Temporary Instruction
Docket No.:  50-348, 50-364  
(TI) 2201/004 Interim Milestones 1-7  
License No.:  NPF-2, NPF-8  
Inspection
   
  (OFFICIAL USE ONLY)  
Enclosure:  
  cc:  (See page 4)
Document Request For Cyber Security Temporary Instruction (TI) 2201/004 Interim Milestones 1-7  
Inspection
(OFFICIAL USE ONLY)  
cc:  (See page 4)  


_________________________ 
G SUNSI REVIEW COMPLETE
G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS      SIGNATURE RA RA      NAME PATEL KING      DATE 4/24/2013 4/ 24/2013 4/    /2013 4/    /2013 4/    /2013 4/    /2013 4/    /2013 E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO     
OFFICIAL USE ONLY
- SECURITY RELATED INFORMATION
T. Lynch 4
OFFICIAL USE ONLY
- SECURITY RELATED INFORMATION
cc: Keith Wooten


_________________________
G SUNSI REVIEW COMPLETE G FORM 665 ATTACHED
OFFICE
RII:DRS
RII:DRS
SIGNATURE
RA
RA
NAME
PATEL
KING
DATE
4/24/2013
4/ 24/2013
4/    /2013
4/    /2013
4/    /2013
4/    /2013
4/    /2013
E-MAIL COPY?
    YES
NO   
  YES
NO      YES
NO   
  YES
NO   
  YES
NO      YES
NO   
  YES
NO   
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
T. Lynch
4
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION
cc:
Keith Wooten
Project Manager  
Project Manager  
Nuclear Fleet Security  
Nuclear Fleet Security  
Southern Nuclear Operating Company, Inc.  
Southern Nuclear Operating Company, Inc.  
40 Iverness Center Parkway  
40 Iverness Center Parkway  
Birmingham, AL  35242  
Birmingham, AL  35242  
   
   
David Burford  
David Burford  
Manager  
Manager  
Nuclear Fleet Security  
Nuclear Fleet Security  
Southern Nuclear Operating Company, Inc.  
Southern Nuclear Operating Company, Inc.  
40 Iverness Center Parkway  
40 Iverness Center Parkway  
Birmingham, AL  35242  
Birmingham, AL  35242  
   
   
L. B. Hogg Nuclear Licensing  
L. B. Hogg  
Nuclear Licensing  
Southern Nuclear Operating Company, Inc.  
Southern Nuclear Operating Company, Inc.  
40 Inverness Center Parkway  
40 Inverness Center Parkway  
Birmingham, AL  35242  
Birmingham, AL  35242  
   
   
S. P. McGavin Security Manager  
S. P. McGavin  
Security Manager  
Joseph M. Farley Nuclear Plant  
Joseph M. Farley Nuclear Plant  
7388 North State Highway 95  
7388 North State Highway 95  
Columbia, AL  36319  
Columbia, AL  36319  


 
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION  
OFFICIAL USE ONLY  
- SECURITY RELATED INFORMATION
5  
  5  OFFICIAL USE ONLY  
   
- SECURITY RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION  
Letter to T. A. Lynch from Michael F. King dated April 24, 2013  
Letter to T. A. Lynch from Michael F. King dated April 24, 2013  
   
   
SUBJECT:  JOSEPH M FARLEY NUCLEAR PLANT - NOTIFICATION OF CYBER SECURITY TI MILESTONES 1-7  INSPECTION AND REQUEST FOR  
SUBJECT:   
JOSEPH M FARLEY NUCLEAR PLANT - NOTIFICATION OF CYBER  
SECURITY TI MILESTONES 1-7  INSPECTION AND REQUEST FOR  
INFORMATION (NRC INSPECTION REPORT NO. 05000348/2013404 AND  
INFORMATION (NRC INSPECTION REPORT NO. 05000348/2013404 AND  
05000364/2013404)  
05000364/2013404)  
   
   
Distribution:
Distribution:  
RidsNrrPMFarley Resource  
RidsNrrPMFarley Resource  
B. Westreich, NSIR (hard copy w/ encl) RIDSNRRDIRS  
B. Westreich, NSIR (hard copy w/ encl)  
RIDSNRRDIRS  
   
   
Distribution W/O OUO:
Distribution W/O OUO:  
PUBLIC
PUBLIC
}}
}}

Latest revision as of 09:12, 11 January 2025

Notification of Cyber Security Ti Milestones 1-7 Inspection and Request for Information (NRC Inspection Report No. 05000348/2013404 and 05000364/2013404) (OUO Removed)
ML13120A191
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/24/2013
From: Mark King
NRC/RGN-II/DRS/EB2
To: Lynch T
Southern Nuclear Operating Co
References
IR-13-404
Download: ML13120A191 (6)


See also: IR 05000348/2013404

Text

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this

transmittal document is decontrolled

LIMITED INTERNAL

DISTRIBUTION PERMITTED

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION

April 24, 2013

Mr. T. A. Lynch

Vice President

Southern Nuclear Operating Company, Inc.

Joseph M. Farley Nuclear Plant

P.O. Drawer 470, BIN B500

Ashford, AL 36312

SUBJECT:

JOSEPH M FARLEY NUCLEAR PLANT - NOTIFICATION OF CYBER

SECURITY TI MILESTONES 1-7 INSPECTION AND REQUEST FOR

INFORMATION (NRC INSPECTION REPORT NO. 05000348/2013404 AND

05000364/2013404)

Dear Mr. Lynch:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II (RII) staff will conduct an inspection of the Cyber Security Milestones 1-7 requirements

specified by the conditions of your operating license at the Farley Nuclear Plant on July 22 - 26,

2013. The inspection team will be led by Mr. Jigar Patel, Reactor Inspector, of the NRC RII

office. The team will be composed of personnel from the NRC RII office and personnel from the

NRC office of Nuclear Security and Incident Response (NSIR). The inspection will be

conducted in accordance with Temporary Instruction (TI) 2201/004, Inspection of

Implementation of Interim Cyber Security Milestones 1-7. The TI inspection will be performed

to evaluate and verify your ability to meet the interim milestone requirements of the NRCs

Cyber Security Rule, Title 10, Code of Federal Regulations (CFR), Part 73, Section 54,

Protection of Digital Computer and Communication Systems and Networks.

In accordance with 10 CFR 73.54, each nuclear power plant licensee was required to submit

a proposed cyber security plan (CSP) and implementation schedule for NRC review and

approval. On December 14, 2009, by letter (ML093080517) to the Nuclear Energy Institute

(NEI), the NRC provided their expectations for the proposed implementation schedule. On

January 5, 2011, by letter (ML110060093) to the NRC, NEI issued an initial Template for the

Cyber Security Plan Implementation Schedule (ML110060097). On February 28, 2011, by

letter (ML110600206) to the NRC, NEI provided a revised, Template for the Cyber Security

Plan Implementation Schedule. The purpose of the letters attachment was to provide the

licensee with a generically written template to develop their proposed CSP implementation

schedule. Utilization of the generic template required the licensee to make conforming changes

to ensure the submitted schedule accurately accounted for site-specific activities. The CSP,

implementation schedule, and other applicable information for your facility provided the

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

T. Lynch

2

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

implementation aspects, including the key intermediate milestone attributes and dates as well

as the full implementation dates. The implementation aspects were described based in part on

letters to NRC dated July 16, 2010 (ML110880218) and supplemented by letters dated March

28, 2011 (ML11088021) and April 21, 2011 (ML111020258). By reference to NRC safety

evaluation report dated July 28, 2011 (ML11178A018) license condition 2.D was modified for

facility operating licenses NFP-2 and NPF-8 for Farley Units 1 and 2 to ensure that the CSP

would be implemented and maintained consistent with NRC requirements.

On April 23, 2013, during a conversation between Mr. B. Arens of your staff, and Mr. J. Patel,

NRC RII, our respective staffs confirmed arrangements for a three day information gathering

onsite visit and a one-week onsite inspection. The subject TI inspection provides a

programmatic level review and verification of the licensees site-specific implementation of

Interim Milestones 1 through 7. The schedule for the onsite TI Inspection for the Interim

Milestones 1 through 7 is as follows:

Information gathering visit: July 9 - 11, 2013

Onsite inspection: July 22 - 26, 2013

The purpose of the information gathering visit is to: (1) obtain information and documentation

needed to support the TI inspection; (2) become familiar with the Farley Nuclear Plant Cyber

Security Program and plant layout; and (3) arrange administrative details, such as office space,

availability of knowledgeable office personnel and to ensure unescorted site access privileges.

In order to assure a productive TI inspection, we have enclosed a request for documents

needed to ensure the inspectors are adequately prepared. These documents have been

divided into three groups (I, II, & III). Group I lists information necessary to aid the inspectors in

planning for the TI inspection prior to the information gathering visit. It is requested that this

information be provided to the lead inspector via mail no later than June 12, 2013. Group II lists

information and possible areas for discussion necessary to assist the inspectors during the

TI inspection. It is requested this information be available during the information gathering visit

(July 9, 2013). Group III consists of those items that the inspectors will review, or need access

to, during the TI inspection. Group III also lists the information necessary to aid the inspectors

in tracking questions and answers identified as a result of the TI inspection. It is requested that

this information be provided to the lead inspector as the information is generated during the

TI inspection. It is important that all of these documents are up to date and complete in order to

minimize the number of additional documents requested during the preparation and/or the

onsite portions of the TI inspection.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget control number.

Your cooperation and support during this inspection will be appreciated. If you have questions

concerning this inspection, or the inspection team's information or logistical needs, please

contact Mr. Patel at (404) 997-4577, or me at (404) 997-4511.

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

T. Lynch

3

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRC's document system, ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room). However, because of the security-related concerns

contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters

enclosure will not be available for public inspection.

Sincerely,

/RA/

Michael F. King, Chief

Engineering Branch 2

Division of Reactor Safety

Docket No.: 50-348, 50-364

License No.: NPF-2, NPF-8

Enclosure:

Document Request For Cyber Security Temporary Instruction (TI) 2201/004 Interim Milestones 1-7

Inspection

(OFFICIAL USE ONLY)

cc: (See page 4)

_________________________

G SUNSI REVIEW COMPLETE G FORM 665 ATTACHED

OFFICE

RII:DRS

RII:DRS

SIGNATURE

RA

RA

NAME

PATEL

KING

DATE

4/24/2013

4/ 24/2013

4/ /2013

4/ /2013

4/ /2013

4/ /2013

4/ /2013

E-MAIL COPY?

YES

NO

YES

NO YES

NO

YES

NO

YES

NO YES

NO

YES

NO

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

T. Lynch

4

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

cc:

Keith Wooten

Project Manager

Nuclear Fleet Security

Southern Nuclear Operating Company, Inc.

40 Iverness Center Parkway

Birmingham, AL 35242

David Burford

Manager

Nuclear Fleet Security

Southern Nuclear Operating Company, Inc.

40 Iverness Center Parkway

Birmingham, AL 35242

L. B. Hogg

Nuclear Licensing

Southern Nuclear Operating Company, Inc.

40 Inverness Center Parkway

Birmingham, AL 35242

S. P. McGavin

Security Manager

Joseph M. Farley Nuclear Plant

7388 North State Highway 95

Columbia, AL 36319

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

5

OFFICIAL USE ONLY - SECURITY RELATED INFORMATION

Letter to T. A. Lynch from Michael F. King dated April 24, 2013

SUBJECT:

JOSEPH M FARLEY NUCLEAR PLANT - NOTIFICATION OF CYBER

SECURITY TI MILESTONES 1-7 INSPECTION AND REQUEST FOR

INFORMATION (NRC INSPECTION REPORT NO. 05000348/2013404 AND

05000364/2013404)

Distribution:

RidsNrrPMFarley Resource

B. Westreich, NSIR (hard copy w/ encl)

RIDSNRRDIRS

Distribution W/O OUO:

PUBLIC