{{#Wiki_filter:Engineering Report No. PNPS-CS-12-00001, Rev. | {{#Wiki_filter:Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J78 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YE NEI U-III Seismic Walkdown Checklist (SWC) | ||
Bldg. RB Floor El. 23' Room, Area | SWEL2-014 Equipment ID No. | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on | 19-HO-179 Equip. Class, Other (0) | ||
Additional space is provided at the end of this checklist for documenting other comments. | Equipment Description Spent Fuel Pool and cavity drains Location: Bldg. | ||
RB Floor El. 23' Room, Area Drywell Manufacturer, Model, Etc. (optional but recommended) | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | Anchorage | ||
: 1. Is the anchorage configuration verification required (i.e., is the item | : 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)? | ||
YO | YO NZ | ||
: 3. Is the anchorage free of corrosion that is more than mild | : 2. Is the anchorage free of bent, broken, missing or loose hardware? | ||
: 4. Is the anchorage free of visible cracks in the concrete near | : 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | : 4. Is the anchorage free of visible cracks in the concrete near the anchors? | ||
YEI NDI U-- N/A[(Note: This question only applies if the item is one of the 50% for | YOI NEý UO NIAZ YOl NO] UL N/AZ YOl NE] UOE N/AZ IEnter the equipment class name from Appendix B: Classes of Equipment. | ||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J79 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YE NF--] Ur-- | |||
Seismic Walkdown Checklist (SWC) | |||
SWEL2-014 Equipment ID No. | |||
19-HO-179 Equip. Class2 Other (0) | |||
Equipment Description Spent Fuel Pool and cavity drains | |||
: 5. Is the anchorage configuration consistent with plant documentation? | |||
YEI NDI U-- | |||
N/A[ | |||
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of YE NI-] UD-potentially adverse seismic conditions? | : 6. Based on the above anchorage evaluations, is the anchorage free of YE NI-] UD-potentially adverse seismic conditions? | ||
Interaction | Interaction Effects | ||
Robust manual valve.YrI NEI uiD N/ | : 7. Are soft targets free from impact by nearby equipment or structures? | ||
Robust manual valve. | |||
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment | YrI NEI uiD N/AO | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | : 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | ||
: 11. Have you looked for and found no other seismic conditions that could YZ Nil U[ | : 9. Do attached lines have adequate flexibility to avoid damage? | ||
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | |||
YM ND uD N/AD:] | |||
Y[-] NDI UD-N/A[ | |||
YM Nn UD 2 Enter the equipment class name from Appendix B: Classes of Equipment. | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J80 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YE NF-I U-- | |||
Seismic Walkdown Checklist (SWC) | |||
SWEL2- 014 Equipment ID No. | |||
19-HO-179 Equip. Class3 Other (0) | |||
Equipment Description Spent Fuel Pool and cavity drains Other Adverse Conditions | |||
: 11. Have you looked for and found no other seismic conditions that could YZ Nil U[I adversely affect the safety functions of the equipment? | |||
Comments (Additional pages may be added as necessary) | Comments (Additional pages may be added as necessary) | ||
Area walk-by is AWC- | Area walk-by is AWC-36 Evaluated by: | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | bAV 62 A,1'Y Date: | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | -SEFF r-LB qu":: | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | *':.14?31L 3 Enter the equipment class name from Appendix B: Classes of Equipment. | ||
Bldg. RB Floor El. 117 Room, Area RefuelFloor Manufacturer, Model, Etc. (optional but recommended) | |||
Wide Gate, Dwq MIM1 12- | Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J81 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ N[-- UL-- | ||
Additional space is provided at the end of this checklist for documenting other comments. | Seismic Walkdown Checklist (SWC) | ||
SWEL2-014 Equipment ID No. | |||
19-HO-179 Equip. Class4 Other (0) | |||
Equipment Description Spent Fuel Pool and cavity drains Photographs Note: | |||
Note: | |||
4 Enter the equipment class name from Appendix B: Classes of Equipment. | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J82 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YE Nr-] U-Seismic Walkdown Checklist (SWC) | |||
SWEL2-014 Equipment ID No. | |||
19-HO-179 Equip. Classw Other (0) | |||
Equipment Description Spent Fuel Pool and cavity drains I4 UtLW. | |||
Note: | |||
5 Enter the equipment class name from Appendix B: Classes of Equipment. | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J83 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YO NF-- U-I Seismic Walkdown Checklist (SWC) | |||
SWEL2- 015 Equipment ID No. | |||
pool cavity gates Equip. Class, Other (0) | |||
Equipment Description Spent Fuel Pool and cavity drains Location: Bldg. | |||
RB Floor El. 117 Room, Area RefuelFloor Manufacturer, Model, Etc. (optional but recommended) | |||
Wide Gate, Dwq MIM1 12-2 Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | Anchorage | ||
: 1. Is the anchorage configuration verification required (i.e., is the item | : 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)? | ||
YI- | YI-NN | ||
: 3. Is the anchorage free of corrosion that is more than mild | : 2. Is the anchorage free of bent, broken, missing or loose hardware? | ||
: 4. Is the anchorage free of visible cracks in the concrete near | : 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | : 4. Is the anchorage free of visible cracks in the concrete near the anchors? | ||
YOI NI UFI N/AN(Note: This question only applies if the item is one of the 50% for | Y-I Nil U[-] N/AN YE] N] Ur-] N/A ] | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of YN NO Ur- | Y[-] N[-] UP-] N/AZ I Enter the equipment class name from Appendix B: Classes of Equipment. | ||
Interaction | |||
: 8. Are overhead equipment, distribution | Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J84 of J 134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ NEI UL-1 Seismic Walkdown Checklist (SWC) | ||
SWEL2-015 Equipment ID No. | |||
pool cavity gates Equip. Class2 Other (0) | |||
Equipment Description Spent Fuel Pool and cavity drains | |||
: 5. Is the anchorage configuration consistent with plant documentation? | |||
YOI NI UFI N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of YN NO Ur-1 potentially adverse seismic conditions? | |||
Interaction Effects | |||
: 7. Are soft targets free from impact by nearby equipment or structures? | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | |||
Lamps well supported on rigid conduits. | Lamps well supported on rigid conduits. | ||
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment | : 9. Do attached lines have adequate flexibility to avoid damage? | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | : 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | ||
: 11. Have you looked for and found no other seismic conditions that could YN NEI- | YOI NO U[- | ||
N/A[ | |||
YZ NEI UIU N/A-- | |||
Y-- NEI UD-N/AE Y[ | |||
NEI Ur 2 Enter the equipment class name from Appendix B: Classes of Equipment. | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J85 of J134 ATrACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YN! NFI-UI-- | |||
Seismic Walkdown Checklist (SWC) | |||
SWEL2-015 Equipment ID No. | |||
pool cavity gates Equip. Class3 Other (0) | |||
Equipment Description Spent Fuel Pool and cavity drains Other Adverse Conditions | |||
: 11. Have you looked for and found no other seismic conditions that could YN NEI-UMI adversely affect the safety functions of the equipment? | |||
Comments (Additional pages may be added as necessary) | Comments (Additional pages may be added as necessary) | ||
Gate inspected while removed for refueling. | Gate inspected while removed for refueling. It was hanging on the East wall of the SFP, North of the cattle chute opening. | ||
It was hanging on the East wall of the SFP, North of | Area walk-by is A WC-38 Evaluated by: | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | Date:A(,I J,ý"/ J.'-A I | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | "EPF VA'%~s Date~: | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | _3 I | ||
Bldg. RB Floor El. 117' Room, Area Refuel | 3 Enter the equipment class name from Appendix B: Classes of Equipment. | ||
Narrow Gate, Dwc MIM112- | |||
Additional space is provided at the end of this checklist for documenting other comments. | Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J86 of J 134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ N--] U--i Seismic Walkdown Checklist (SWC) | ||
SWEL2- 015 Equipment ID No. | |||
pool cavity gates Equip. Class4 Other (0) | |||
Equipment Description Spent Fuel Pool and cavity drains Photographs 4 Enter the equipment class name from Appendix B: Classes of Equipment. | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J87 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YE NR UED Seismic Walkdown Checklist (SWC) | |||
SWEL2- 015 Equipment ID No. | |||
pool cavity gates Equip. Class5 Other (0) | |||
Equipment Description Spent Fuel Pool and cavity drains Note: | |||
Note: | |||
5 Enter the equipment class name from Appendix B: Classes of Equipment. | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J88 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YE NLI-- U-- | |||
Seismic Walkdown Checklist (SWC) | |||
SWEL2-016 Equipment ID No. | |||
pool cavity gates Equip. Class, Other (0) | |||
Equipment Description Spent Fuel Pool and cavity drains Location: Bldg. | |||
RB Floor El. 117' Room, Area Refuel Floor Manufacturer, Model, Etc. (optional but recommended) | |||
Narrow Gate, Dwc MIM112-2 Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | Anchorage | ||
: 1. Is the anchorage configuration verification required (i.e., is the item | : 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)? | ||
Y[:I | Y[:I NO | ||
: 3. Is the anchorage free of corrosion that is more than mild | : 2. Is the anchorage free of bent, broken, missing or loose hardware? | ||
: 4. Is the anchorage free of visible cracks in the concrete near | : 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | : 4. Is the anchorage free of visible cracks in the concrete near the anchors? | ||
Y[I NE] UE] N/A[(Note: This question only applies if the item is one of the 50% for | Y[-] NE] U[-J N/AE YE] NEil uiJ N/AE YE-] NE-] uEr] N/AN 1 Enter the equipment class name from Appendix B: Classes of Equipment. | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of YZ NEi UE]potentially adverse seismic conditions? | |||
Interaction | Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J89 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YE NE] UE] | ||
: 8. Are overhead equipment, distribution | Seismic Walkdown Checklist (SWC) | ||
SWEL2-016 Equipment ID No. | |||
Lamps well supported on rigid | gool cavity gates Equip. Class2 Other (0) | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | Equipment Description Spent Fuel Pool and cavity drains | ||
: 11. Have you looked for and found no other seismic conditions that could Y[ NEI UI-adversely affect the safety functions of the equipment? | : 5. Is the anchorage configuration consistent with plant documentation? | ||
Y[I NE] UE] N/A[ | |||
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of YZ NEi UE] | |||
potentially adverse seismic conditions? | |||
Interaction Effects | |||
: 7. Are soft targets free from impact by nearby equipment or structures? | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | |||
Lamps well supported on rigid conduits | |||
: 9. Do attached lines have adequate flexibility to avoid damage? | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | |||
Y[:] NEi UE] N/AM YO NE]I UE N/AE] | |||
YEI NE] UE] N/AE Y[ | |||
NE] UEi 2 Enter the equipment class name from Appendix B: Classes of Equipment. | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J90 of J134 ATRACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ NFI] U-I Seismic Walkdown Checklist (SWC) | |||
SWEL2-016 Equipment ID No. | |||
pool cavity gates Equip. Class3 Other (0) | |||
Equipment Description Spent Fuel Pool and cavity drains Other Adverse Conditions | |||
: 11. Have you looked for and found no other seismic conditions that could Y[ | |||
NEI UI-adversely affect the safety functions of the equipment? | |||
Comments (Additional pages may be added as necessary) | Comments (Additional pages may be added as necessary) | ||
Gate inspected while removed for refueling. | Gate inspected while removed for refueling. It was hanging on the east wall of the SFP on the south side of the cattle chute opening. | ||
It was hanging on the east wall of the SFP on the | Area walk-by is A WC-38. | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | Eva~uated 10it De lSM-1 fV. | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | kAL Date: | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | DAM1 4-/Z~4,1 V | ||
Bldg. RW Floor El. 23 Room, Area MG | 3 Enter the equipment class name from Appendix B: Classes of Equipment. | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on | |||
Additional space is provided at the end of this checklist for documenting other comments. | Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J91 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YO Nni-UI-Seismic Walkdown Checklist (SWC) | ||
SWEL2-016 Equipment ID No. pool cavity -gates Equip. Class4 Other (0) | |||
Equipment Description Spent Fuel Pool and cavity drains Photographs 4 Enter the equipment class name from Appendix B: Classes of Equipment. | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J92 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ Nr--] UI-- | |||
Seismic Walkdown Checklist (SWC) | |||
SWEL2-016 Equipment ID No. | |||
pool cavity gates Equip. Classs Other (0) | |||
Equipment Description Spent Fuel Pool and cavity drains Note: | |||
Note: | |||
5 Enter the equipment class name from Appendix B: Classes of Equipment. | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J93 of J 134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YZ N--I U-I Seismic Walkdown Checklist (SWC) | |||
SWELl-083 Equipment ID No. | |||
X55 Equip. Class, Transformers (04) | |||
Equipment Description Transformer to Y3/Y31 Location: Bldg. RW Floor El. 23 Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended) | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | Anchorage | ||
: 1. Is the anchorage configuration verification required (i.e., is the item | : 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)? | ||
Refer to response to question | Refer to response to question #5. | ||
#5.2. Is the anchorage free of bent, broken, missing or loose hardware? | : 2. Is the anchorage free of bent, broken, missing or loose hardware? | ||
: 3. Is the anchorage free of corrosion that is more than mild | : 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | ||
: 4. Is the anchorage free of visible cracks in the concrete near | : 4. Is the anchorage free of visible cracks in the concrete near the anchors? | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | Y-I NZ Y; Nn U-N/A[D YZ Nn U-- N/AD-Y] Nn UD N/A-I Enter the equipment class name from Appendix B: Classes of Equipment. | ||
Yr] NE-] U-] N/AE(Note: This question only applies if the item is one of the 50% for | |||
Note: The transformer and its anchorage are different from what | Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J94 of J 134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YE NFIl U[] | ||
Interaction | Seismic Walkdown Checklist (SWC) | ||
The Unistrut supporting conduits X1200 and A 3025 above X55 has | SWELl-083 Equipment ID No. | ||
The engagement | X55 Equip. Class Transformers (04) | ||
See attached photo.8. Are overhead equipment, distribution | Equipment Description Transformer to Y3/Y31 | ||
: 5. Is the anchorage configuration consistent with plant documentation? | |||
Masonry wall 194.20 is seismically qualified. | Yr] NE-] U-] N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | ||
See Drawing C-961 SHI,Rev. El.9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment | Note: The transformer and its anchorage are different from what is shown in drawing E15A-8, Rev. EO. This is due to the replacement of the transformer per EC 0000016677, Rev. 0. | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of YE NEl UL-potentially adverse seismic conditions? | |||
Interaction Effects | |||
: 7. Are soft targets free from impact by nearby equipment or structures? | |||
The Unistrut supporting conduits X1200 and A 3025 above X55 has two anchors with nuts that are not fully engaged. The engagement is greater than 75% in both cases, and this is judged to be adequate to develop the full strength of the anchor. Therefore, this is not considered a potential seismic interaction. See attached photo. | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | |||
Masonry wall 194.20 is seismically qualified. See Drawing C-961 SHI, Rev. El. | |||
: 9. Do attached lines have adequate flexibility to avoid damage? | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | |||
YE ND UL-N/AD] | |||
YE NI-- Ur-] N/AD-YE N[:] Uil N/A[-] | |||
YE N[-- Uil | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J95 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YN Nn-U-Seismic Walkdown Checklist (SWC) | |||
SWELl-083 Equipment ID No. X55 Equip. Class Transformers (04) | |||
Equipment Description Transformer to Y3/Y31 Other Adverse Conditions | |||
: 11. Have you looked for and found no other seismic conditions that could YM NEI UI-adversely affect the safety functions of the equipment? | : 11. Have you looked for and found no other seismic conditions that could YM NEI UI-adversely affect the safety functions of the equipment? | ||
Comments | Comments.(Additional pages may be added as necessary) | ||
.(Additional pages may be added as necessary) | SWEL 1-083 is on A WC-0 17. | ||
SWEL 1-083 is on A WC-0 17.Follow up internal inspection performed on 4-29-13. | Follow up internal inspection performed on 4-29-13. All internal fasteners in place and appear tight. | ||
All internal fasteners in place and appear tight.No loose or missing items observed. | No loose or missing items observed. No adverse seismic interactions observed. | ||
No adverse seismic interactions observed. | Evaluaed by-.: | ||
Evaluaed by-.: W wj D",40) | W wj D",40) 6 t, ivW. s' Jeff Kalb | ||
Pages 9 and H8.Mr. Grimes' current Entergy qualification as Seismic Walkdown Engineer was also verified | &a | ||
EN-DC-168 REV 0 Engineering Report No. PNPS-CS-12-00001, Rev. | ( | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | Date: | ||
Bldg. RW Floor El. 23 Room, Area | 3 bqmJi V II P | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on | Note: This follow-up internal inspection was performed during PNPS Refueling Outage 19. An Entergy shared resource, David Grimes from Vermont Yankee, performed duties of one SWE team member. Mr. Grimes SWE credentials were verified by review of Vermont Yankee's Phase 1 submittal report VY-RPT-12-00019 Rev.0 (Asset Suite EC40647) Pages 9 and H8. | ||
Mr. Grimes' current Entergy qualification as Seismic Walkdown Engineer was also verified via the Entergy Plateau qualification system as part of the pre-job brief for this walkdown. | |||
EN-DC-168 REV 0 | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J96 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ NF-] Ur Seismic Walkdown Checklist (SWC) | |||
SWELl-083 Equipment ID No. | |||
X55 Equip. Class Transformers (04) | |||
Equipment Description Transformer to Y3/Y31 Photographs Note: Equipment tag VAULW. | |||
t-JVCPICIII VICPVV U1 MJUIIJ111VIII | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J97 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NEI UD-- | |||
Seismic Walkdown Checklist (SWC) | |||
SWELl-083 Equipment ID No. | |||
X55 Equip. Class Transformers (04) | |||
Equipment Description Transformer to Y3/Y31 Note: Nut on Unistrut that is not fully engaged. | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J98 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 6 Status: YE N-i Ur-- | |||
Seismic Walkdown Checklist (SWC) | |||
SWELl- 084 Equipment ID No. | |||
X56 Equip. Class' Transformers (04) | |||
Equipment Description Transformer to Y4/Y41 Location: Bldg. RW Floor El. 23 Room, Area CSR Manufacturer, Model, Etc. (optional but recommended) | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings, Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | Anchorage | ||
: 1. Is the anchorage configuration verification required (i.e., is the item | : 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)? | ||
YZ | YZ NO | ||
: 3. Is the anchorage free of corrosion that is more than mild | : 2. Is the anchorage free of bent, broken, missing or loose hardware? | ||
: 4. Is the anchorage free of visible cracks in the concrete near | : 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | : 4. Is the anchorage free of visible cracks in the concrete near the anchors? | ||
YZ NEI UE] N/AE7(Note: This question only applies if the item is one of the 50% for | YZ NI U[-I N/AR YZ N[D] U-l N/AD Y] Nil U[-] N/A-- | ||
The anchor configuration matches drawings E15A3 E2, E15A-8 EO,E15A-7 and the SEWs package, detail 3/3. Two additional bolts | IEnter the equipment class name from Appendix B: Classes of Equipment. | ||
The design | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI UE]potentially adverse seismic conditions? | Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J99 of J 134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 6 Status: YZ NE] UE-Seismic Walkdown Checklist (SWC) | ||
Interaction | SWELl-084 Equipment ID No. | ||
Unistrut supporting conduit was noted to be within an inch of the top | X56 Equip. Class Transformers (04) | ||
This is acceptable based on minimal vertical displacement of the cabinet during a seismic event. Panel is also touching | Equipment Description Transformer to Y4/Y41 | ||
: 5. Is the anchorage configuration consistent with plant documentation? | |||
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment | YZ NEI UE] N/AE7 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | The anchor configuration matches drawings E15A3 E2, E15A-8 EO, E15A-7 and the SEWs package, detail 3/3. Two additional bolts were noted for the connection of the panel to the channel. The design in calculation C15.0.3059 specifies 3/16" fillet welds, which also exists at the connection, therefore, the bolts are extra and the configuration is acceptable. | ||
: 11. Have you looked for and found no other seismic conditions that could YE NI-] Ur- | : 6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI UE] | ||
potentially adverse seismic conditions? | |||
Interaction Effects | |||
: 7. Are soft targets free from impact by nearby equipment or structures? | |||
Unistrut supporting conduit was noted to be within an inch of the top of the cabinet. This is acceptable based on minimal vertical displacement of the cabinet during a seismic event. Panel is also touching the column! wall on the right side. This is acceptable, as the cabinet does not contain essential relays and is therefore not prone to chatter. | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage? | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | |||
YN NE]I UM N/AE] | |||
YE NE] U[-E N/AE-- | |||
YN NEI UE-N/AE] | |||
YM NEI UE] | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J100 of J134 ATrACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 6 Status: YE Nnl UrI Seismic Walkdown Checklist (SWC) | |||
SWELl-084 Equipment ID No. | |||
X56 Equip. Class Transformers (04) | |||
Equipment Description Transformer to Y4/Y41 Other Adverse Conditions | |||
: 11. Have you looked for and found no other seismic conditions that could YE NI-] Ur-I adversely affect the safety functions of the equipment? | |||
Comments (Additional pages may be added as necessary) | Comments (Additional pages may be added as necessary) | ||
Area walk-by is AWC-018.Follow-up internal visual inspection performed on 4/18/13. | Area walk-by is AWC-018. | ||
Maintenance of the transformer was | Follow-up internal visual inspection performed on 4/18/13. Maintenance of the transformer was in progress at the time of inspection (W0296640). Four cables were intentionally de-terminated at this time, refer to photo below. | ||
Four cables were intentionally de-terminated | All fasteners were in place with no signs of any being loose. | ||
No loose or missing items were identified. | |||
No potentially adverse seismic interactions were identified. | No potentially adverse seismic interactions were identified. | ||
Q~ | Q~ 1191 Evaluatedi by: QSWUaILw Date: i J | ||
Bldg. RW Floor El. 23 Room, Area MG | 3. | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on | JeW Kalb | ||
Additional space is provided at the end of this checklist for documenting other comments. | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J101 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 6 Status: YE NIIJ U[I Seismic Walkdown Checklist (SWC) | |||
SWELl-084 Equipment ID No. | |||
X56 Equip. Class Transformers (04) | |||
Equipment Description Transformer to Y4/Y41 Photographs | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J102 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 6 Status: YM NFI-U[-] | |||
Seismic Walkdown Checklist (SWC) | |||
SWELl-084 Equipment ID No. | |||
X56 Equip. Class Transformers (04) | |||
Equipment Description Transformer to Y4/Y41 Note: Cabinet anchorage | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J103 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 6 of 6 Status: YZ Nr--] Ur-Seismic Walkdown Checklist (SWC) | |||
SWELl-084 Equipment ID No. | |||
X56 Equip. Class Transformers (04) | |||
Equipment Description Transformer to Y4/Y41 | |||
*or | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J104 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YN ND-UD-1 Seismic Walkdown Checklist (SWC) | |||
SWELl-095 Equipment ID No. | |||
EPA1 Equip. Class, Instrumentation and Control Panels (20) | |||
Equipment Description RPS Elec Protection Assembly Location: Bldg. RW Floor El. 23 Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended) | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | Anchorage | ||
: 1. Is the anchorage configuration verification required (i.e., is the item | : 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)? | ||
YM Ni- | YM Ni-I | ||
: 3. Is the anchorage free of corrosion that is more than mild | : 2. Is the anchorage free of bent, broken, missing or loose hardware? | ||
: 4. Is the anchorage free of visible cracks in the concrete near | : 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | : 4. Is the anchorage free of visible cracks in the concrete near the anchors? | ||
YZ ND] ULi N/ADl(Note: This question only applies if the item is one of the 50% for | YE ND-U[-1 N/AD-1 Y] N[D U[-I N/AD-YE Nn Ur N/AEDI I Enter the equipment class name from Appendix B: Classes of Equipment. | ||
See SEWS package for EPA 1-6, dated 8/4/94.6. Based on the above anchorage evaluations, is the anchorage free of Y[ ND-- UD-potentially adverse seismic conditions? | |||
Interaction | Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J105 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ N-- UI-Seismic Walkdown Checklist (SWC) | ||
Panel D-7 is mounted above EPA I with its cover latch facing the floor,and was examined for an interaction involving the cover | SWELl-095 Equipment ID No. | ||
EPA I Equip. Class Instrumentation and Control Panels (20) | |||
See attached photo.8. Are overhead equipment, distribution | Equipment Description RPS Elec Protection Assembly | ||
: 5. Is the anchorage configuration consistent with plant documentation? | |||
Masonry wall 194.20 is seismically qualified. | YZ ND] ULi N/ADl (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | ||
See Drawing C-961 SHI,Rev. El.9. Do attached lines have adequate flexibility to avoid damage?There is a short, rigid conduit running between EPA 1 and EPA2, | See SEWS package for EPA 1-6, dated 8/4/94. | ||
: 10. Based on the above seismic interaction evaluations, is equipment | : 6. Based on the above anchorage evaluations, is the anchorage free of Y[ | ||
: 11. Have you looked for and found no other seismic conditions that could Y[ NEI- UI-adversely affect the safety functions of the equipment? | ND-- UD-potentially adverse seismic conditions? | ||
Interaction Effects | |||
: 7. Are soft targets free from impact by nearby equipment or structures? | |||
Panel D-7 is mounted above EPA I with its cover latch facing the floor, and was examined for an interaction involving the cover coming unlatched over EPA 1 during a seismic event. The cover appears to be adequately latched and the panel securely anchored, and does not present a seismic interaction concern. See attached photo. | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | |||
Masonry wall 194.20 is seismically qualified. See Drawing C-961 SHI, Rev. El. | |||
: 9. Do attached lines have adequate flexibility to avoid damage? | |||
There is a short, rigid conduit running between EPA 1 and EPA2, as well as a conduit running from EPA I that is in close proximity to EPA2. | |||
Both panels and the conduit are all anchored to the same wall, so this is not judged to be a seismic interaction hazard. See SEWS package for EPA 1-6, dated 8/4/94, for further confirmation. | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | |||
Y[ | |||
ND: | |||
UD-] N/AD-- | |||
YE ND-uD-N/AD-YE ND-- uD-N/AD-YE Nr-- Ur- | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J106 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YE Nil U-] | |||
Seismic Walkdown Checklist (SWC) | |||
SWELl-095 Equipment ID No. | |||
EPA 1 Equip. Class Instrumentation and Control Panels (20) | |||
Equipment Description RPS Elec Protection Assembly Other Adverse Conditions | |||
: 11. Have you looked for and found no other seismic conditions that could Y[ | |||
NEI-UI-adversely affect the safety functions of the equipment? | |||
Comments (Additional pages may be added as necessary) | Comments (Additional pages may be added as necessary) | ||
SWELl-095 is on AWC-017.Follow-up internal visual inspection of panel performed on 12/12/12: | SWELl-095 is on AWC-017. | ||
-All internal fasteners in place and appear tight-No adverse conditions | Follow-up internal visual inspection of panel performed on 12/12/12: | ||
~.il ~ | -All internal fasteners in place and appear tight | ||
Bldg. RW Floor El. 23 Room, Area MG | -No adverse conditions observed A loose label for 194.502A-005-10 was found on top of EPA 1. This was reported to Operations and an ESOMS request was initiated. | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on | ~.il ~ru Evaluated bv Date: | ||
Additional space is provided at the end of this checklist for documenting other comments. | i=/=/, | ||
*o-kLL jV r | |||
I j | |||
I t 02 | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J107 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YN NE-I UII-Seismic Walkdown Checklist (SWC) | |||
SWELl-095 Equipment ID No. | |||
EPA I Equip. Class Instrumentation and Control Panels (20) | |||
Equipment Description RPS Elec Protection Assembly Photographs Note: Equipment tag Note: Overall view of panel | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J108 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NF-M Ur--] | |||
Seismic Walkdown Checklist (SWC) | |||
SWELl-095 Equipment ID No. | |||
EPA1 Equip. Class Instrumentation and Control Panels (20) | |||
Equipment Description RPS Elec Protection Assembly Note: Cabinet internals | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J109 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YZ ND-- | |||
UD Seismic Walkdown Checklist (SWC) | |||
SWELl-096 Equipment ID No. | |||
EPA2 Equip. Class, Instrumentation and Control Panels (20) | |||
Equipment Description RPS Elec Protection Assembly Location: Bldg. RW Floor El. 23 Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended) | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | Anchorage | ||
: 1. Is the anchorage configuration verification required (i.e., is the item | : 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)? | ||
YZ N[ | YZ N[D | ||
: 3. Is the anchorage free of corrosion that is more than mild | : 2. Is the anchorage free of bent, broken, missing or loose hardware? | ||
: 4. Is the anchorage free of visible cracks in the concrete near | : 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | : 4. Is the anchorage free of visible cracks in the concrete near the anchors? | ||
YO ND] U[i N/AD-I(Note: This question only applies if the item is one of the 50% for | YN ND U[i] N/Al] | ||
See SEWS package for EPA 1-6, dated 8/4/94.6. Based on the above anchorage evaluations, is the anchorage free of Y[ ND-] UD-potentially adverse seismic conditions? | Y; ND Ur-N/AD-- | ||
Interaction | YM ND UD N/AD-1 | ||
: 8. Are overhead equipment, distribution | ' Enter the equipment class name from Appendix B: Classes of Equipment. | ||
Masonry wall 194.20 is seismically qualified. | Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J 110 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ ND1 UD-] | ||
See Drawing C-961 SHI,Rev. El.9. Do attached lines have adequate flexibility to avoid damage?There is a short, rigid conduit running between EPA 1 and EPA2, | Seismic Walkdown Checklist (SWC) | ||
: 10. Based on the above seismic interaction evaluations, is equipment | SWELl-096 Equipment ID No. | ||
: 11. Have you looked for and found no other seismic conditions that could YE N[:] | EPA2 Equip. Class Instrumentation and Control Panels (20) | ||
Comments | Equipment Description RPS Elec Protection Assembly | ||
.(Additional pages may be added as necessary) | : 5. Is the anchorage configuration consistent with plant documentation? | ||
SWEL 1-096 is on A WC-017.Follow-up internal inspection of panel performed on 12/12/12: | YO ND] U[i N/AD-I (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | ||
-All internal fasteners appear to be in place and tight.-Small debris found in bottom comer of cabinet and removed by electrician | See SEWS package for EPA 1-6, dated 8/4/94. | ||
((1) screw, (2) nuts | : 6. Based on the above anchorage evaluations, is the anchorage free of Y[ | ||
-No adverse conditions | ND-] UD-potentially adverse seismic conditions? | ||
Bldg. RW Floor El. 23 Room, Area MG | Interaction Effects | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on | : 7. Are soft targets free from impact by nearby equipment or structures? | ||
Additional space is provided at the end of this checklist for documenting other comments. | : 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | ||
Masonry wall 194.20 is seismically qualified. See Drawing C-961 SHI, Rev. El. | |||
: 9. Do attached lines have adequate flexibility to avoid damage? | |||
There is a short, rigid conduit running between EPA 1 and EPA2, as well as a conduit running from EPA 1 that is in close proximity to EPA2. | |||
Conduit B081 is also in close proximity to EPA2, approx. 1.5" away. | |||
The panels and the conduits are all anchored to the same wall, so this is not judged to be a seismic interaction hazard. See SEWS package for EPA 1-6, dated 8/4/94, for further confirmation. | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | |||
YE NDI UD-N/AD-- | |||
Y[ | |||
NDI UD-N/AD-Y[ | |||
ND UD-- N/AD-YE ND UD | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J 11 of J1 34 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YE NEI ULI Seismic Walkdown Checklist (SWC) | |||
SWELl-096 Equipment ID No. | |||
EPA2 Equip. Class Instrumentation and Control Panels (20) | |||
Equipment Description RPS Elec Protection Assembly Other Adverse Conditions | |||
: 11. Have you looked for and found no other seismic conditions that could YE N[:] ULI adversely affect the safety functions of the equipment? | |||
Comments.(Additional pages may be added as necessary) | |||
SWEL 1-096 is on A WC-017. | |||
Follow-up internal inspection of panel performed on 12/12/12: | |||
-All internal fasteners appear to be in place and tight. | |||
-Small debris found in bottom comer of cabinet and removed by electrician ((1) screw, (2) nuts and metal shavings) | |||
-No adverse conditions observed Evaluated by: | |||
2311 ~LJ/ | |||
Date: | |||
t | |||
,, 4_ | |||
I2j1z1J? | |||
I | |||
" j | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J112 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YE NFIl ULI Seismic Walkdown Checklist (SWC) | |||
SWELl-096 Equipment ID No. | |||
EPA2 Equip. Class Instrumentation and Control Panels (20) | |||
Equipment Description RPS Elec Protection Assembly Photographs Note: Equipment tag Note: Overall view of equipment | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J113 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NEI U[-] | |||
Seismic Walkdown Checklist (SWC) | |||
SWELl-096 Equipment ID No. | |||
EPA2 Equip. Class Instrumentation and Control Panels (20) | |||
Equipment Description RPS Elec Protection Assembly Photographs Note: Cabinet internals Note: Cabinet internals on door | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J114 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 6 Status: YZ Nr-] UL-] | |||
Seismic Walkdown Checklist (SWC) | |||
SWELl-097 Equipment ID No. | |||
EPA3 Equip. Class, Instrumentation and Control Panels (20) | |||
Equipment Description RPS Elec Protection Assembly Location: Bldg. RW Floor El. 23 Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended) | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | Anchorage | ||
: 1. Is the anchorage configuration verification required (i.e., is the item | : 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)? | ||
Y[ Nr-2. Is the anchorage free of bent, broken, missing or loose hardware? | Y[ | ||
: 3. Is the anchorage free of corrosion that is more than mild | Nr- | ||
: 4. Is the anchorage free of visible cracks in the concrete near | : 2. Is the anchorage free of bent, broken, missing or loose hardware? | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | : 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | ||
YZ N[-] Ur-- N/Ar-D(Note: This question only applies if the item is one of the 50% for | : 4. Is the anchorage free of visible cracks in the concrete near the anchors? | ||
See SEWS package for EPA 1-6, dated 8/4/94.6. Based on the above anchorage evaluations, is the anchorage free of YE N[-] UD-potentially adverse seismic conditions? | YZ NE] U[-] N/AF-YO NE] U[-- N/A YZ NEi Ui N/AD-- | ||
A small fraction of the lower washers and anchor bolts come | I Enter the equipment class name from Appendix B: Classes of Equipment. | ||
See attached photo.Interaction | |||
: 8. Are overhead equipment, distribution | Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J115 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 6 Status: YE ND-U[- | ||
Seismic Walkdown Checklist (SWC) | |||
Masonry wall 194.20 is seismically qualified. | SWELl-097 Equipment ID No. | ||
See Drawing C-961 SH 1,Rev. El.9. Do attached lines have adequate flexibility to avoid damage?There is a short, rigid conduit running between EPA3 and EPA4, | EPA3 Equip. Class Instrumentation and Control Panels (20) | ||
: 10. Based on the above seismic interaction evaluations, is equipment | Equipment Description RPS Elec Protection Assembly | ||
: 11. Have you looked for and found no other seismic conditions that could YE N[-I U--adversely affect the safety functions of the equipment? | : 5. Is the anchorage configuration consistent with plant documentation? | ||
YZ N[-] Ur-- N/Ar-D (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
See SEWS package for EPA 1-6, dated 8/4/94. | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of YE N[-] UD-potentially adverse seismic conditions? | |||
A small fraction of the lower washers and anchor bolts come below the tab. The amount is insignificant, and the bolts are judged to securely anchor the panel to the wall, so this is not considered an adverse condition. See attached photo. | |||
Interaction Effects | |||
: 7. Are soft targets free from impact by nearby equipment or structures? | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | |||
Masonry wall 194.20 is seismically qualified. See Drawing C-961 SH 1, Rev. El. | |||
: 9. Do attached lines have adequate flexibility to avoid damage? | |||
There is a short, rigid conduit running between EPA3 and EPA4, as well as a conduit running from EPA3 that is in close proximity to EPA4. | |||
Both panels and the conduit are all anchored to the same wall, so this is not judged to be a seismic interaction hazard. See SEWS package for EPA 1-6, dated 8/4/94, for further confirmation. | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | |||
YN ND U[D-N/AD:] | |||
YE ND-] uD-I N/AD-YZ NDI UD-1 N/AD-- | |||
Y] NDI UDl | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J116 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 6 Status: YE NFIl UFI-Seismic Walkdown Checklist (SWC) | |||
SWELl-097 Equipment ID No. | |||
EPA3 Equip. Class Instrumentation and-Control Panels (20) | |||
Equipment Description RPS Elec Protection Assembly Other Adverse Conditions | |||
: 11. Have you looked for and found no other seismic conditions that could YE N[-I U-- | |||
adversely affect the safety functions of the equipment? | |||
Comments (Additional pages may be added as necessary) | Comments (Additional pages may be added as necessary) | ||
SWELI-097 is on AWC-017.Follow-up internal inspection of panel performed on 1/9/13:-No loose or missing fasteners observed-No other adverse conditions | SWELI-097 is on AWC-017. | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | Follow-up internal inspection of panel performed on 1/9/13: | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | -No loose or missing fasteners observed | ||
Bldg. RW Floor El. 23 Room, Area MG | -No other adverse conditions observed Evaluated by: | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on | Ž),X4j | ||
Additional space is provided at the end of this checklist for documenting other comments. | .I I | ||
Date: | |||
bNTv.1 /)0)13 T-C-Ff- ý,ýLB SU k& | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J117 of J134 A'TACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 6 Status: YE N I Ur-L Seismic Walkdown Checklist (SWC) | |||
SWELl- 097 Equipment ID No. | |||
EPA3 Equip. Class Instrumentation and Control Panels (20) | |||
Equipment Description RPS Elec Protection Assembly Photographs Note: Equipment tag Note: Overall view of panel | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J118 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 6 Status: YN ND UFIu Seismic Walkdown Checklist (SWC) | |||
SWELl-097 Equipment ID No. | |||
EPA3 Equip. Class Instrumentation and Control Panels (20) | |||
Equipment Description RPS Elec Protection Assembly Note: Typical anchor bolt on bottom of panel. | |||
num. lyplucll allullut UUil U11 1UP Ui Pallut. | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J119 of J134 ATrACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 6 of 6 Status: YE ND-- Ur-] | |||
Seismic Walkdown Checklist (SWC) | |||
SWELl-097 Equipment ID No. | |||
EPA3 Equip. Class Instrumentation and Control Panels (20) | |||
Equipment Description RPS Elec Protection Assembly Note: Cabinet intemals Note: Cabinet intemals | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J120 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YE NF UD Seismic Walkdown Checklist (SWC) | |||
SWELl-098 Equipment ID No. | |||
EPA4 Equip. Class, Instrumentation and Control Panels (20) | |||
Equipment Description RPS Elec Protection Assembly Location: Bldg. RW Floor El. 23 Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended) | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | Anchorage | ||
: 1. Is the anchorage configuration verification required (i.e., is the item | : 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)? | ||
Y[ NrI-2. Is the anchorage free of bent, broken, missing or loose hardware? | Y[ | ||
: 3. Is the anchorage free of corrosion that is more than mild | NrI- | ||
: 4. Is the anchorage free of visible cracks in the concrete near | : 2. Is the anchorage free of bent, broken, missing or loose hardware? | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | : 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | ||
YO NiD UrI N/AFD(Note: This question only applies if the item is one of the 50% for | : 4. Is the anchorage free of visible cracks in the concrete near the anchors? | ||
See SEWS package for EPA 1-6, dated 8/4/94.6. Based on the above anchorage evaluations, is the anchorage free of YE NEI UI--potentially adverse seismic conditions? | YZ NEI | ||
A small fraction of the lower washers and anchor bolts come | [--] N/AE] | ||
See attached photo.Interaction | Y[ | ||
: 8. Are overhead equipment, distribution | NR UDl N/AD-YZ N-- UI-N/AD I Enter the equipment class name from Appendix B: Classes of Equipment. | ||
Masonry wall 194.20 is seismically qualified. | Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J121 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YE Nn U-Seismic Walkdown Checklist (SWC) | ||
See Drawing C-961 SHI,Rev. El.9. Do attached lines have adequate flexibility to avoid damage?There is a short, rigid conduit running between EPA3 and EPA4, | SWELl-098 Equipment ID No. | ||
: 10. Based on the above seismic interaction evaluations, is equipment | EPA4 Equip. Class Instrumentation and Control Panels (20) | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | Equipment Description RPS Elec Protection Assembly | ||
: 11. Have you looked for and found no other seismic conditions that could Y] NEIl | : 5. Is the anchorage configuration consistent with plant documentation? | ||
YO NiD UrI N/AFD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
See SEWS package for EPA 1-6, dated 8/4/94. | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of YE NEI UI-- | |||
potentially adverse seismic conditions? | |||
A small fraction of the lower washers and anchor bolts come below the tab. The amount is insignificant, and the bolts are judged to securely anchor the panel to the wall, so this is not considered an adverse condition. See attached photo. | |||
Interaction Effects | |||
: 7. Are soft targets free from impact by nearby equipment or structures? | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | |||
Masonry wall 194.20 is seismically qualified. See Drawing C-961 SHI, Rev. El. | |||
: 9. Do attached lines have adequate flexibility to avoid damage? | |||
There is a short, rigid conduit running between EPA3 and EPA4, as well as a conduit running from EPA3 that is in close proximity to EPA4. | |||
Both panels and the conduit are all anchored to the same wall, so this is not judged to be a seismic interaction hazard. See SEWS package for EPA 1-6, dated 8/4/94, for further confirmation. | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | |||
Y[ | |||
ND-- U[I N/AD-YE NEI U-- N/Ai-Y[ | |||
ND-] UD-N/AD Y[ | |||
NDI U[-- | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J122 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ NFIl UI--] | |||
Seismic Walkdown Checklist (SWC) | |||
SWELl-098 Equipment ID No. | |||
EPA4 Equip. Class Instrumentation and Control Panels (20) | |||
Equipment Description RPS Elec Protection Assembly Other Adverse Conditions | |||
: 11. Have you looked for and found no other seismic conditions that could Y] NEIl UF adversely affect the safety functions of the equipment? | |||
Comments (Additional pages may be added as necessary) | Comments (Additional pages may be added as necessary) | ||
SWELI-098 is on AWC-017.Follow-up internal inspection performed on 1/9/13:-Observed one missing screw on upper left comer of circuit board at back of panel. Circuit board | SWELI-098 is on AWC-017. | ||
Evaluated by: | Follow-up internal inspection performed on 1/9/13: | ||
Bldg. RW Floor El. 23 Room, Area MG | -Observed one missing screw on upper left comer of circuit board at back of panel. Circuit board has very low weight/mass and was adequately supported by the remaining 5 screws. Not a seismic interaction hazard. Screw was replaced by ELAB mechanic that provided access to the panel. | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on | -No other loose or missing fasteners or adverse conditions observed. | ||
Additional space is provided at the end of this checklist for documenting other comments. | Evaluated by: Dayj 0,) )-rI Date: | ||
Sf r-r- kIii LK ia LIA-t>W | |||
~AF k!*Lr~ | |||
Ar~ | |||
1/10/13 | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J123 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ NFI-UFi Seismic Walkdown Checklist (SWC) | |||
SWELl-098 Equipment ID No. | |||
EPA4 Equip. Class Instrumentation and Control Panels (20) | |||
Equipment Description RPS Elec Protection Assembly Photographs Note: Equipment tag Note: Overall view of panel showing anchorage | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J124 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YE ND-- UF] | |||
Seismic Walkdown Checklist (SWC) | |||
SWELl-098 Equipment ID No. | |||
EPA4 Equip. Class Instrumentation and Control Panels (20) | |||
Eauibment Description RPS Elec Protection Assembil Note: Typical anchor bolt on bottom of panel. | |||
Note: Cabinet internals | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J125 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YN ND-- UI-- | |||
Seismic Walkdown Checklist (SWC) | |||
SWELl-099 Equipment ID No. | |||
EPA5 Equip. Class, Instrumentation and Control Panels (20) | |||
Equipment Description RPS Elec Protection Assembly Location: Bldg. RW Floor El. 23 Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended) | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | Anchorage | ||
: 1. Is the anchorage configuration verification required (i.e., is the item | : 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)? | ||
Due to location on the wall, only two of four anchors are visible,therefore, this component was not chosen for 50% anchorage verification. | Due to location on the wall, only two of four anchors are visible, therefore, this component was not chosen for 50% anchorage verification. | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | : 2. Is the anchorage free of bent, broken, missing or loose hardware? | ||
Two of four anchors are visible.3. Is the anchorage free of corrosion that is more than mild | Two of four anchors are visible. | ||
Two of four anchors are visible.4. Is the anchorage free of visible cracks in the concrete near | : 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | Two of four anchors are visible. | ||
Yrll N[-] UrI N/AN(Note: This question only applies if the item is one of the 50% for | : 4. Is the anchorage free of visible cracks in the concrete near the anchors? | ||
Refer to response to question | Two of four anchors are visible. | ||
# 1.6. Based on the above anchorage evaluations, is the anchorage free of YM NEI | Y[-] NE YE ND-UD-1 N/AD-YE N[D] U[] N/ADý YE N[l lD-- N/AD-1 Enter the equipment class name from Appendix B: Classes of Equipment. | ||
Interaction | |||
: 8. Are overhead equipment, distribution | Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J126 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: Y[ | ||
NEI UF-- | |||
Masonry wall 194.20 is seismically qualified. | Seismic Walkdown Checklist (SWC) | ||
See Drawing C-961 SHI,Rev. El.9. Do attached lines have adequate flexibility to avoid damage?There is a short, rigid conduit running between EPA5 and EPA6. | SWELl- 099 Equipment ID No. | ||
: 10. Based on the above seismic interaction evaluations, is equipment | EPA5 Equip. Class Instrumentation and Control Panels (20) | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | Equipment Description RPS Elec Protection Assembly | ||
: 11. Have you looked for and found no other seismic conditions that could Y NEil | : 5. Is the anchorage configuration consistent with plant documentation? | ||
Comments | Yrll N[-] UrI N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | ||
.(Additional pages may be added as necessary) | Refer to response to question # 1. | ||
SWELl-099 is on AWC-017.Follow-up internal inspection performed on 4/2/13:-All fasteners in place and appear tight-No loose items observed in panel-No debris in bottom of | : 6. Based on the above anchorage evaluations, is the anchorage free of YM NEI UI potentially adverse seismic conditions? | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | Interaction Effects | ||
Bldg. RW Floor El. 23 Room, Area MG | : 7. Are soft targets free from impact by nearby equipment or structures? | ||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on | : 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | ||
Additional space is provided at the end of this checklist for documenting other comments. | Masonry wall 194.20 is seismically qualified. See Drawing C-961 SHI, Rev. El. | ||
: 9. Do attached lines have adequate flexibility to avoid damage? | |||
There is a short, rigid conduit running between EPA5 and EPA6. Both panels are anchored to the same wall, so this is not judged to be a seismic interaction hazard. See SEWS package for EPA 1-6, dated 8/4/94, for further confirmation. | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | |||
YE* Nil ur-] N/A[-I YE ND urEI N/AD YE NEI Ur1 N/A[- | |||
YE NDI U[I N/ | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J127 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YE NF] U-Seismic Walkdown Checklist (SWC) | |||
SWELl-099 Equipment ID No. | |||
EPA5 Equip. Class Instrumentation and Control Panels (20) | |||
Equipment Description RPS Elec Protection Assembly Other Adverse Conditions | |||
: 11. Have you looked for and found no other seismic conditions that could Y | |||
NEil UiF adversely affect the safety functions of the equipment? | |||
Comments.(Additional pages may be added as necessary) | |||
SWELl-099 is on AWC-017. | |||
Follow-up internal inspection performed on 4/2/13: | |||
-All fasteners in place and appear tight | |||
-No loose items observed in panel | |||
-No debris in bottom of panel Evaluated by: | |||
JA JJ Date: | |||
t | |||
/ | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J128 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YE Nr-] UL-Seismic Walkdown Checklist (SWC) | |||
SWELl-099 Equipment ID No. | |||
EPA5 Equip. Class Instrumentation and Control Panels (20) | |||
Equipment Description RPS Elec Protection Assembly Photographs Note: Equipment tag Note: EPA5 is on the right | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J129 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YM NF] U-I Seismic Walkdown Checklist (SWC) | |||
SWELl-099 Equipment ID No. | |||
EPA5 Equip. Class Instrumentation and Control Panels (20) | |||
Equipment Description RPS Elec Protection Assembly Photographs Note: Cabinet internals Note: Cabinet intemals on door | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J130 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YZ ND I U-- | |||
Seismic Walkdown Checklist (SWC) | |||
SWELl-100 Equipment ID No. | |||
EPA6 Equip. Class, Instrumentation and Control Panels (20) | |||
Equipment Description RPS Elec Protection Assembly Location: Bldg. RW Floor El. 23 Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended) | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments. | |||
Anchorage | Anchorage | ||
: 1. Is the anchorage configuration verification required (i.e., is the item | : 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)? | ||
Due to location on the wall, only two of four anchors are visible,therefore, this component was not chosen for 50% anchorage verification. | Due to location on the wall, only two of four anchors are visible, therefore, this component was not chosen for 50% anchorage verification. | ||
: 2. Is the anchorage free of bent, broken, missing or loose hardware? | : 2. Is the anchorage free of bent, broken, missing or loose hardware? | ||
Two of four anchors are visible.3. Is the anchorage free of corrosion that is more than mild | Two of four anchors are visible. | ||
Two of four anchors are visible.4. Is the anchorage free of visible cracks in the concrete near | : 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | ||
near the bottom left anchor that | Two of four anchors are visible. | ||
Y- | : 4. Is the anchorage free of visible cracks in the concrete near the anchors? | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | There is a surface crack (<1/16') near the bottom left anchor that is judged to be insignificant. | ||
YE] NEI Ui- N/AZ(Note: This question only applies if the item is one of the 50% for | Y-NE YO NEI] UI'- | ||
Refer to response to question | N/AD-YE NDI ULI N/AD YN ND-- U-- N/AD-- | ||
#1.6. Based on the above anchorage evaluations, is the anchorage free of Y[ NE] UE]potentially adverse seismic conditions? | ' Enter the equipment class name from Appendix B: Classes of Equipment. | ||
Interaction | |||
: 8. Are overhead equipment, distribution | Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J131 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ NF-U-Seismic Walkdown Checklist (SWC) | ||
SWELl-100 Equipment ID No. | |||
Masonry wall 194.20 is seismically qualified. | EPA6 Equip. Class Instrumentation and Control Panels (20) | ||
See Drawing C-961 SHI,Rev. El.9. Do attached lines have adequate flexibility to avoid damage?There is a short, rigid conduit running between EPA5 and EPA6. | Equipment Description RPS Elec Protection Assembly | ||
: 10. Based on the above seismic interaction evaluations, is equipment | : 5. Is the anchorage configuration consistent with plant documentation? | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | YE] NEI Ui-N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | ||
: 11. Have you looked for and found no other seismic conditions that could YN N[] U- | Refer to response to question #1. | ||
: 6. Based on the above anchorage evaluations, is the anchorage free of Y[ | |||
NE] UE] | |||
potentially adverse seismic conditions? | |||
Interaction Effects | |||
: 7. Are soft targets free from impact by nearby equipment or structures? | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | |||
Masonry wall 194.20 is seismically qualified. See Drawing C-961 SHI, Rev. El. | |||
: 9. Do attached lines have adequate flexibility to avoid damage? | |||
There is a short, rigid conduit running between EPA5 and EPA6. Both panels are anchored to the same wall, so this is not judged to be a seismic interaction hazard. See SEWS package for EPA 1-6, dated 8/4/94, for further confirmation. | |||
: 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects? | |||
YM NE] UE] N/AD-YE NEI UE] N/AE] | |||
YN NEI U[] N/A[-] | |||
Y[ | |||
NEI UF-- | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J132 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ N[R UR] | |||
Seismic Walkdown Checklist (SWC) | |||
SWELl-100 Equipment ID No. | |||
EPA6 Equip. Class Instrumentation and Control Panels (20) | |||
Equipment Description RPS Elec Protection Assembly Other Adverse Conditions | |||
: 11. Have you looked for and found no other seismic conditions that could YN N[] U-I adversely affect the safety functions of the equipment? | |||
Comments (Additional pages may be added as necessary) | Comments (Additional pages may be added as necessary) | ||
SWELl-100 is on AWC-017.Follow up internal inspection performed on 4/2/13:-All fasteners in place and appear tight-No potential adverse seismic interactions observed-One small screw and two small washers found in the bottom of the panel. They did not appear | SWELl-100 is on AWC-017. | ||
These items were removed | Follow up internal inspection performed on 4/2/13: | ||
,,L) | -All fasteners in place and appear tight | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | -No potential adverse seismic interactions observed | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | -One small screw and two small washers found in the bottom of the panel. They did not appear to have fallen off, most likely left over from previous maintenance. These items were removed by electrical maintenance escort. | ||
~ | Evaluated by: D6aVu)',n | ||
Bldg. RB Floor El. 74' Room, Area, General Area | ,,L) L Date: | ||
SWEL2-11, SWEL2- | L -j- -13 | ||
-aF VLRQk&t | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J133 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ NEil Ui-- | |||
Seismic Walkdown Checklist (SWC) | |||
SWELl-100 Equipment ID No. | |||
EPA6 Equip. Class Instrumentation and Control Panels (20) | |||
Equipment Description RPS Elec Protection Assembly Photographs Note: Equipment tag Note: EPA6 is on the /eft. | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J134 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YE NF U[- | |||
Seismic Walkdown Checklist (SWC) | |||
SWELl-100 Equipment ID No. | |||
EPA6 Equip. Class Instrumentation and Control Panels (20) | |||
Equipment Description RPS Elec Protection Assembly Photographs Note: Cabinet internals Note: | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K1 of K27 Attachment K Form 9.7: Deferred Area Walk-By Checklists (AWCs) | |||
~1 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K2 of K27 ATrACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet I of 5 Status: YZ NI Ui-] | |||
Area Walk-By Checklist (AWC) | |||
AWC- 033 Location: Bldg. RB Floor El. 74' Room, Area, General Area North SWEL Components: SWEL2-11, SWEL2-12 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. | |||
Additional space is provided at the end of this checklist for documenting other comments. | Additional space is provided at the end of this checklist for documenting other comments. | ||
: 1. Does anchorage of equipment in the area appear to be free | : 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)? | ||
: 2. Does anchorage of equipment in the area appear to be free | : 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions? | ||
: 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially | : 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)? | ||
Y[ | |||
Engineering Report No. PNPS-CS-12-00001, Rev. | NDI Ur-] N/AD1 YO NEI U[:] N/AD-Y[ | ||
Bldg. RB Floor El. 74' Room, Area General Area | N[-] UD1 N/AD-- | ||
Fluorescent light fixture overhead east of HO-1 72 and 173 | I If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item. | ||
Conduit is well supported between the | |||
Conduit R931 to 19-FS-4806 (FS is non-safety related per Q-list and Asset Suite) fuel | Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K3 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 5 Status: YO NR-UL-Area Walk-By Checklist (AWC) | ||
: 5. Does it appear that the area is free of potentially adverse | AWC- 033 Location: Bldg. RB Floor El. 74' Room, Area General Area North | ||
Numerous items located east of hoistway but all have wheels locked/chocked or adequate standoff distance from equipment YE NF- U-I N/ | : 4. Does it appear that the area is free of potentially adverse seismic YE Ni[] U-- N/A-- | ||
Bldg. RB Floor El. 74 Room, Area General Area | spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)? | ||
Fluorescent light fixture overhead east of HO-1 72 and 173 support chains offset by conduit. Conduit is well supported between the two chains. Load to conduit is small and acceptable. Conduit R931 to 19-FS-4806 (FS is non-safety related per Q-list and Asset Suite) fuel pool gate leak detector. | |||
: 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area? | |||
: 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area? | |||
: 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)? | |||
Numerous items located east of hoistway but all have wheels locked/ | |||
chocked or adequate standoff distance from equipment YE NF-U-I N/AD YE ND] Ur-N/AFD YE NFI Ur-N/AD- | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K4 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 5 Status: YE NF] uF] | |||
Area Walk-By Checklist (AWC) | |||
AWC- 033 Location: Bldg. RB Floor El. 74 Room, Area General Area North | |||
: 8. Have you looked for and found no other seismic conditions that could YE NE] U-- | |||
adversely affect the safety functions of the equipment in the area? | |||
Radiation shielding above and west of HO-173 appears well attached and well labeled, acceptable. | |||
Comments (Additional pages may be added as necessary) | Comments (Additional pages may be added as necessary) | ||
Some minor cracking observed in joints of masonry wall at southwest comer of | Some minor cracking observed in joints of masonry wall at southwest comer of hoistway approximately 12'-14' up, on the east face of the wall. CR-PNP-2013-1204 initiated, but this was determined by the SWE team to not represent an adverse seismic condition based on the location and limited extent of cracking. | ||
**Note that this area is bounded by the Snubber Cage on the west side-did not do walk-by of | **Note that this area is bounded by the Snubber Cage on the west side-did not do walk-by of snubber shop area because it is separated from the General Area by robust chain link cage. (see photo below) | ||
Bldg. RB Floor El. 74 Room, Area General Area | Evaluated by: | ||
SWEL2-11, SWEL2- | Date: 2/27/12 ter e | ||
Bldg. RB Floor El. 74 Room, Area General Area | _2_z_7/_1 | ||
SWEL2-11. | |||
SWEL2- | Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K5 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 4 of 5 Status: Y9 NF Ur-Area Walk-By Checklist (AWC) | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | AWC- 033 Location: Bldg. RB Floor El. 74 Room, Area General Area North SWEL Components: SWEL2-11, SWEL2-12 Photographs Note: Cracking, CR initiated, refer to comments above Note: Overall view of area | ||
Bldg. RB Floor El. 74' Room, Areal | |||
SWEL2-03. | Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K6 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 5 of 5 Status: YE N-- Ui-Area Walk-By Checklist (AWC) | ||
AWC- 033 Location: Bldg. RB Floor El. 74 Room, Area General Area North SWEL Components: SWEL2-11. SWEL2-12 Note: | |||
Note: Fluorescent light chain offset by conduit, acceptable, see #4 above. | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K7 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet I of 5 Status: YZ NR U-Area Walk-By Checklist (AWC) | |||
AWC- 034 Location: Bldg. RB Floor El. 74' Room, Areal SFPHx SWEL Components: SWEL2-03. 04. 05. 06. 07. 08. 13 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. | |||
Additional space is provided at the end of this checklist for documenting other comments. | Additional space is provided at the end of this checklist for documenting other comments. | ||
: 1. Does anchorage of equipment in the area appear to be free | : 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)? | ||
: 2. Does anchorage of equipment in the area appear to be free | : 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions? | ||
: 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially | : 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)? | ||
Y[ | |||
Engineering Report No. PNPS-CS-12-00001, Rev. | N[l UEiD N/AD-- | ||
Bldg. RB Floor El. 74' Room, Area | Y[ | ||
: 5. Does it appear that the area is free of potentially adverse | NDl U[-I N/A[:] | ||
YE NDI u[-] N/AD-- | |||
' If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item. | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K8 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 5 Status: Y[* ND-UD-Area Walk-By Checklist (AWC) | |||
AWC- 034 Location: Bldg. RB Floor El. 74' Room, Area SFPHx | |||
: 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)? | |||
: 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area? | |||
Fire protection line all socket welded and well supported. | |||
1" copper drain water line on south wall well supported. | 1" copper drain water line on south wall well supported. | ||
YE ND-] Ur-- N/A[-YZ NEI UD- N/AD-6. Does it appear that the area is free of potentially adverse | YE ND-] Ur-- N/A[- | ||
YN NDI UD1 N/AD-Y[ NDJ UD N/ADl Engineering Report No. PNPS-CS-12-00001, Rev. | YZ NEI UD-N/AD- | ||
Bldg. RB Floor El. 74 Room, Area | : 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area? | ||
-CR-PNP-2013-1195 initiated for loose nut on hanger P210A discharge. | : 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)? | ||
Bolt is in place, nut is 75%engaged. | YN NDI UD1 N/AD-Y[ | ||
This condition was determined by SWE team to not represent an adverse | NDJ UD N/ADl | ||
-Jam nut on a pipe clamp below 19-HO-186 is approximately 50% engagement but tight, the clamp | |||
-Conduit R1072 pull fitting cover only one bolt hanging open. There are no wires in the conduit,therefore conduit is secure and acceptable with one bolt.-Panel A-10 has only one screw holding the cover on, but is acceptable (see photo below)-CR-PNP-2013-1201 initiated for rod hanger for 1" copper demin. line detached at clamp at top of rod,above! north of 19-HO- 166. The next support is approximately 3' downstream, 7' upstream. | Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K9 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 5 Status: YZ NiL ULI-- | ||
Area Walk-By Checklist (AWC) | |||
-CR-PNP-2013-1205 initiated for 1" copper instrument air line sagging approximately 6" near valve 31-HO-255 in overhead above mesh entry door to room. This condition was determined by SWE team | AWC- 034 Location: Bldg. RB Floor El. 74 Room, Area SFPHx | ||
(see photos below)Evaluated by: __ | : 8. Have you looked for and found no other seismic conditions that could YZ NEI Ur-adversely affect the safety functions of the equipment in the area? | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | Comments (Additional pages may be added as necessary) | ||
Bldg. RB Floor El. 74 Room, Area | -CR-PNP-2013-1195 initiated for loose nut on hanger P210A discharge. Bolt is in place, nut is 75% | ||
SWEL2-03. | engaged. This condition was determined by SWE team to not represent an adverse seismic interaction/concern. | ||
-Jam nut on a pipe clamp below 19-HO-186 is approximately 50% engagement but tight, the clamp is not connected to anything (see photo below) | |||
Bldg. RB Floor El. 74 Room, Area | -Rolling portable stair near 19-HO-165 is free to roll but not near safety related equipment and has a relatively low weight!mass, therefore acceptable. | ||
SWEL2-03, 04, 05, 06, 07, 08, | -Conduit R1072 pull fitting cover only one bolt hanging open. There are no wires in the conduit, therefore conduit is secure and acceptable with one bolt. | ||
Bldg. RB Floor El. 23' Room, Area, Main Steam | -Panel A-10 has only one screw holding the cover on, but is acceptable (see photo below) | ||
SWEL1-001. | -CR-PNP-2013-1201 initiated for rod hanger for 1" copper demin. line detached at clamp at top of rod, above! north of 19-HO-166. The next support is approximately 3' downstream, 7' upstream. This condition was determined by SWE team to not represent an adverse seismic interaction/concern. | ||
002, 003, | -CR-PNP-2013-1205 initiated for 1" copper instrument air line sagging approximately 6" near valve 31-HO-255 in overhead above mesh entry door to room. This condition was determined by SWE team to not represent an adverse seismic interaction/concern. (see photos below) | ||
Evaluated by: __ | |||
_Date: | |||
,Zj-. | |||
DAIL, " | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K10 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 4 of 5 Status: YE NLi-- | |||
ULI--- | |||
Area Walk-By Checklist (AWC) | |||
AWC- 034 Location: Bldg. RB Floor El. 74 Room, Area SFPHx SWEL Components: SWEL2-03. 04. 05. 06. 07. 08. 13 Photographs Note: uverall area Note: CR initiated for clamp | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page Kll of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 5 of 5 Status: YE NRI-UD-7 Area Walk-By Checklist (AWC) | |||
AWC- 034 Location: Bldg. RB Floor El. 74 Room, Area SFPHx SWEL Components: SWEL2-03, 04, 05, 06, 07, 08, 13 Note: A-IC panel with one bolt holding cover Note: Airline sagging | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K12 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet I of 3 Status: YZ NF U[-I Area Walk-By Checklist (AWC) | |||
AWC- 035 Location: Bldg. RB Floor El. 23' Room, Area, Main Steam Tunnel SWEL Components: SWEL1-001. 002, 003, 004 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. | |||
Additional space is provided at the end of this checklist for documenting other comments. | Additional space is provided at the end of this checklist for documenting other comments. | ||
: 1. Does anchorage of equipment in the area appear to be free | : 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)? | ||
: 2. Does anchorage of equipment in the area appear to be free | : 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions? | ||
: 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially | : 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)? | ||
YZ ND U-N/AD Y[ | |||
Engineering Report No. PNPS-CS-12-00001, Rev. | ND U[ | ||
Bldg. RB Floor El. 23 Room, Area Main Steam | N/A[D] | ||
: 5. Does it appear that the area is free of potentially adverse | YZ ND ulI N/AD I If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item. | ||
1" | |||
: 6. Does it appear that the area is free of potentially adverse | Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K13 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 3 Status: YZ NF ULII Area Walk-By Checklist (AWC) | ||
YN N[I UE] N/AE]YN NEI Ur- N/AD-YZ NDI U-- N/AD-YN NED U[-I N/AD-Engineering Report No. PNPS-CS-12-00001, Rev. | AWC- 035 Location: Bldg. RB Floor El. 23 Room, Area Main Steam Tunnel | ||
Bldg. RB Floor El. 23 Room, Area Main Steam | : 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)? | ||
-Multiple scaffolds in place for RF019 work: 13-117, 13-121, 13-129, 13-137, 13-156, all appropriately labeled and green tagged.-Insulation intentionally removed for FW check valve work- laid down on scaffold and on floor. It | : 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area? | ||
-No adverse conditions were found during the area walk-by, therefore no pictures are attached to | Fire protection line all socket welded and well supported. 1" copper drain water line on south wall well supported. | ||
Bldg. RB Floor El. 23' Room, Area, | : 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area? | ||
SWEL2-009, 010, | : 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)? | ||
YN N[I UE] N/AE] | |||
YN NEI Ur-N/AD-YZ NDI U-- N/AD-YN NED U[-I N/AD- | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K14 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 3 Status: YE N[-] URII Area Walk-By Checklist (AWC) | |||
AWC- 035 Location: Bldg. RB Floor El. 23 Room, Area Main Steam Tunnel | |||
: 8. Have you looked for and found no other seismic conditions that could Y[ | |||
NEI U[-] | |||
adversely affect the safety functions of the equipment in the area? | |||
Comments (Additional pages may be added as necessary) | |||
-Multiple scaffolds in place for RF019 work: 13-117, 13-121, 13-129, 13-137, 13-156, all appropriately labeled and green tagged. | |||
-Insulation intentionally removed for FW check valve work-laid down on scaffold and on floor. It will be reinstalled during RFO, therefore acceptable. | |||
-No adverse conditions were found during the area walk-by, therefore no pictures are attached to this form. Refer to SWEL 1-001, -002, -003, -004 for pictures of SWEL items, if needed. | |||
Evaluated by: NI | |||
& ) | |||
) | |||
xL..4 Date: | |||
f 9 S)(F V | |||
4L L | |||
bwyU -lq | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K15 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet I of 5 Status: YZ NF Ur-I Area Walk-By Checklist (AWC) | |||
AWC- 036 Location: Bldg. RB Floor El. 23' Room, Area, Drywell SWEL Components: SWEL2-009, 010, 014 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. | |||
Additional space is provided at the end of this checklist for documenting other comments. | Additional space is provided at the end of this checklist for documenting other comments. | ||
: 1. Does anchorage of equipment in the area appear to be free | : 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)? | ||
Refer to comments on sheet | Refer to comments on sheet 3 | ||
: 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially | : 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions? | ||
: 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)? | |||
Engineering Report No. PNPS-CS-12-00001, Rev. | YE NE-] Ul-- | ||
Bldg. RB Floor El. 23 Room, Area | N/AL] | ||
YE NE-] uE] N/Ar-YE NE] ur] N/AF-I If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item. | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K16 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 5 Status: YE N[j-Ur Area Walk-By Checklist (AWC) | |||
AWC- 036 Location: Bldg. RB Floor El. 23 Room, Area Drywell | |||
: 4. Does it aooear that the area is free of notentiallv adverse seismic YrI NFl urF-N/AFl spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)? | |||
No ceiling in this area. Lights are well supported by rigid conduits. | No ceiling in this area. Lights are well supported by rigid conduits. | ||
: 5. Does it appear that the area is free of potentially adverse | : 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area? | ||
: 7. Does it appear that the area is free of potentially adverse | In general, all equipment in Drywell is qualified for seismic loading. | ||
: 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area? | |||
Note that Drywell is inert during power operations. | |||
: 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)? | |||
Significant maintenance activities in progress at time of walkdown. | Significant maintenance activities in progress at time of walkdown. | ||
Drywell closeout procedure walkdown will ensure that all items | Drywell closeout procedure walkdown will ensure that all items are removed or secured prior to start up. | ||
Bldg. RB Floor El. 23 Room, Area | Y[ | ||
Time spent performing walk-by of south side of Drywell 23' was minimized due to very high dose | N-- U-- N/AD-YZ NDI ulD N/AD-Y[ | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | NDI UDl N/AD- | ||
Bldg. RB Floor El. 23 Room, Area | |||
SWEL2-009, 010, | Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K17 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 5 Status: YE NEI-UF-] | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | Area Walk-By Checklist (AWC) | ||
Bldg. RB Floor El. 23 Room, Area | AWC- 036 Location: Bldg. RB Floor El. 23 Room, Area Drywell | ||
SWEL2-009, 010, | : 8. Have you looked for and found no other seismic conditions that could Y[ | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | NEi U-- | ||
Bldg. RB Floor El. 41 Room, Area, | adversely affect the safety functions of the equipment in the area? | ||
SWELl -023, | Comments (Additional pages may be added as necessary) | ||
Time spent performing walk-by of south side of Drywell 23' was minimized due to very high dose rates at the time. | |||
Evaluated by: Daytj S | |||
I | |||
(§3,9 LII Date: | |||
I'2!3-h 3 7t --V a a L14-71 Im.. | |||
'3113 V___t ___ - | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K18 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 4 of 5 Status: YE NI-Ur-- | |||
Area Walk-By Checklist (AWC) | |||
AWC- 036 Location: Bldg. RB Floor El. 23 Room, Area Drywell SWEL Components: SWEL2-009, 010, 014 Photographs Note: Scao Note: | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K19 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 5 of 5 Status: Y[E NEI ULI Area Walk-By Checklist (AWC) | |||
AWC- 036 Location: Bldg. RB Floor El. 23 Room, Area Drywell SWEL Components: SWEL2-009, 010, 014 Note: | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K20 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 1 of 4 Status: YE NnI U[- | |||
Area Walk-By Checklist (AWC) | |||
AWC- 037 Location: Bldg. RB Floor El. 41 Room, Area, Drywell SWEL Components: SWELl -023, 034 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. | |||
Additional space is provided at the end of this checklist for documenting other comments. | Additional space is provided at the end of this checklist for documenting other comments. | ||
: 1. Does anchorage of equipment in the area appear to be free | : 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)? | ||
All equipment in this area is anchored to the structure by welds | All equipment in this area is anchored to the structure by welds to Drywell liner plate or Bioshield wall plate. | ||
: 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially | : 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions? | ||
: 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)? | |||
Engineering Report No. PNPS-CS-12-00001, Rev. | YZ N[-] ul-N/A[-- | ||
Bldg. RB Floor El. 41 Room, Area | YZ NEI UEI N/A[-- | ||
Y[ | |||
NEI ui-- | |||
N/A[-I | |||
' If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item. | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K21 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 4 Status: YZ NI-- UI-Area Walk-By Checklist (AWC) | |||
AWC- 037 Location: Bldg. RB Floor El. 41 Room, Area Drywell | |||
: 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)? | |||
No ceiling in this area. Lights are well supported by rigid conduits. | No ceiling in this area. Lights are well supported by rigid conduits. | ||
: 5. Does it appear that the area is free of potentially adverse | : 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area? | ||
: 7. Does it appear that the area is free of potentially adverse | In general, all equipment in Drywell is qualified for seismic loading. | ||
: 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area? | |||
Note that Drywell is inert during power operations. | |||
: 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)? | |||
Significant maintenance activities in progress at time of walkdown. | Significant maintenance activities in progress at time of walkdown. | ||
Drywell closeout inspection will ensure that all items are removed | Drywell closeout inspection will ensure that all items are removed or secured prior to start up. | ||
Bldg. RB Floor El. 41 Room, Area | YN NEI U[:] N/AEZ YN NEI UEZ N/AD-- | ||
It was determined that these blocks should have been removed per plant design | YE NDI U[- | ||
As of May | N/AD-YN NDI Ur-N/AD-I | ||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K22 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 4 Status: YE! N-- | |||
U-] | |||
Area Walk-By Checklist (AWC) | |||
AWC- 037 Location: Bldg. RB Floor El. 41 Room, Area Drywell | |||
: 8. Have you looked for and found no other seismic conditions that could YE Nni Ur-] | |||
adversely affect the safety functions of the equipment in the area? | |||
Concrete shielding blocks were identified in the NIB Nozzle penetration of the Bioshield wall with no restraint steel in place. | |||
CR-PNP-2013-3008 was initiated for this condition. It was determined that these blocks should have been removed per plant design change in previous outage. WO 349326 to remove blocks scheduled for 516/13 prior to restart. As of May 2 8th, this activity has been completed as confirmed by site personnel. | |||
Comments (Additional pages may be added as necessary) | Comments (Additional pages may be added as necessary) | ||
Evaluated by: )L vý& / ) h Date: | Evaluated by: | ||
Bldg. RB Floor El. 41 Room, Area | )L vý& | ||
SWELl -023, | / | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | ) | ||
Bldg. RB Floor El. 117 Room, Areal Refuel | h Date: | ||
SWEL2-015. | I3tr-F-6VA ký bMi 4V. Ji | ||
I Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K23 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 4 of 4 Status: YE NI1 U-- | |||
Area Walk-By Checklist (AWC) | |||
AWC- 037 Location: Bldg. RB Floor El. 41 Room, Area Drywell SWEL Components: SWELl -023, 034 Photouraohs Note: Concrete shielding blocks Note: | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K24 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet I of 4 Status: YZ NEI U[- | |||
Area Walk-By Checklist (AWC) | |||
AWC- 038 Location: Bldg. RB Floor El. 117 Room, Areal Refuel Floor SWEL Components: SWEL2-015. 016 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings. | |||
Additional space is provided at the end of this checklist for documenting other comments. | Additional space is provided at the end of this checklist for documenting other comments. | ||
: 1. Does anchorage of equipment in the area appear to be free | : 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)? | ||
: 2. Does anchorage of equipment in the area appear to be free | : 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions? | ||
: 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially | : 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)? | ||
Y[J NDI U-- | |||
Engineering Report No. PNPS-CS-12-00001, Rev. | N/AD-YE NDI UE N/AD YO NDI u[-] N/AD- | ||
Bldg. RB Floor El. 117 Room, Area Refuel | ' If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item. | ||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K25 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 4 Status: YE NI I U-- | |||
Area Walk-By Checklist (AWC) | |||
AWC- 038 Location: Bldg. RB Floor El. 117 Room, Area Refuel Floor | |||
: 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)? | |||
No ceiling in this area. Lights are well supported by rigid conduits. | No ceiling in this area. Lights are well supported by rigid conduits. | ||
: 5. Does it appear that the area is free of potentially adverse | : 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area? | ||
Note that gates are underwater during | Fire Protection piping well supported and socket welded joints. | ||
: 7. Does it appear that the area is free of potentially adverse | : 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area? | ||
Much equipment and material staged in the area due to | None observed. Note that gates are underwater during plant operations and refueling. | ||
The general area surrounding the SFP is classified as a 'safe location' per PNPS Seismic Interaction Hazard Procedure 1.17. 1.YE NEI U[-] N/ | : 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)? | ||
Bldg. RB Floor El. 117 Room, Area Refuel | Much equipment and material staged in the area due to ongoing refueling activities. | ||
They were found to be in | The general area surrounding the SFP is classified as a 'safe location' per PNPS Seismic Interaction Hazard Procedure 1.17. 1. | ||
Comments | YE NEI U[-] N/AD YZ NDI U[-- | ||
.(Additional pages may be added as necessary) | N/AD YZ NDl U-- N/AD-- | ||
Area included in this walkby was South, West and North sides of spent fuel pool (West of Rx Cavity).Evaluaed bY -oJ Date;,-S~f¶ Pf-~. | YO ND U[ | ||
Engineering Report No. PNPS-CS-12-00001, Rev. | N/AD | ||
Bldg. RB Floor El. 117 Room, Area Refuel | |||
SWEL2-015. | Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K26 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 4 Status: YZ NiF U-II Area Walk-By Checklist (AWC) | ||
AWC- 038 Location: Bldg. RB Floor El. 117 Room, Area Refuel Floor | |||
: 8. Have you looked for and found no other seismic conditions that could YZ NEI] U] | |||
adversely affect the safety functions of the equipment in the area? | |||
The SFP inlet line siphon breakers were specifically viewed and photographed as part of this walk-by. They were found to be in place with no obvious seismic interaction concerns. | |||
Comments.(Additional pages may be added as necessary) | |||
Area included in this walkby was South, West and North sides of spent fuel pool (West of Rx Cavity). | |||
Evaluaed bY - | |||
oJ Date; | |||
,-S~f¶ Pf-~. | |||
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K27 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 4 of 4 Status: YE NI] U-] | |||
Area Walk-By Checklist (AWC) | |||
AWC- 038 Location: Bldg. RB Floor El. 117 Room, Area Refuel Floor SWEL Components: SWEL2-015. 016 PhotoaraDhs I | |||
Note: | |||
Note: NE Siphon Break A}} | |||
Latest revision as of 05:58, 11 January 2025
| ML13232A129 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 06/17/2013 |
| From: | Maclay L Entergy Nuclear Operations |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| 2.13.056 PNPS-CS-12-00001, Rev 1 | |
| Download: ML13232A129 (84) | |
Text
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J78 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YE NEI U-III Seismic Walkdown Checklist (SWC)
SWEL2-014 Equipment ID No.
19-HO-179 Equip. Class, Other (0)
Equipment Description Spent Fuel Pool and cavity drains Location: Bldg.
RB Floor El. 23' Room, Area Drywell Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
YO NZ
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
YOI NEý UO NIAZ YOl NO] UL N/AZ YOl NE] UOE N/AZ IEnter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J79 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YE NF--] Ur--
Seismic Walkdown Checklist (SWC)
SWEL2-014 Equipment ID No.
19-HO-179 Equip. Class2 Other (0)
Equipment Description Spent Fuel Pool and cavity drains
- 5. Is the anchorage configuration consistent with plant documentation?
YEI NDI U--
N/A[
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of YE NI-] UD-potentially adverse seismic conditions?
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
Robust manual valve.
YrI NEI uiD N/AO
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YM ND uD N/AD:]
Y[-] NDI UD-N/A[
YM Nn UD 2 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J80 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YE NF-I U--
Seismic Walkdown Checklist (SWC)
SWEL2- 014 Equipment ID No.
19-HO-179 Equip. Class3 Other (0)
Equipment Description Spent Fuel Pool and cavity drains Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YZ Nil U[I adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Area walk-by is AWC-36 Evaluated by:
bAV 62 A,1'Y Date:
-SEFF r-LB qu"::
- ':.14?31L 3 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J81 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ N[-- UL--
Seismic Walkdown Checklist (SWC)
SWEL2-014 Equipment ID No.
19-HO-179 Equip. Class4 Other (0)
Equipment Description Spent Fuel Pool and cavity drains Photographs Note:
Note:
4 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J82 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YE Nr-] U-Seismic Walkdown Checklist (SWC)
SWEL2-014 Equipment ID No.
19-HO-179 Equip. Classw Other (0)
Equipment Description Spent Fuel Pool and cavity drains I4 UtLW.
Note:
5 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J83 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YO NF-- U-I Seismic Walkdown Checklist (SWC)
SWEL2- 015 Equipment ID No.
pool cavity gates Equip. Class, Other (0)
Equipment Description Spent Fuel Pool and cavity drains Location: Bldg.
RB Floor El. 117 Room, Area RefuelFloor Manufacturer, Model, Etc. (optional but recommended)
Wide Gate, Dwq MIM1 12-2 Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
YI-NN
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
Y-I Nil U[-] N/AN YE] N] Ur-] N/A ]
Y[-] N[-] UP-] N/AZ I Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J84 of J 134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ NEI UL-1 Seismic Walkdown Checklist (SWC)
SWEL2-015 Equipment ID No.
pool cavity gates Equip. Class2 Other (0)
Equipment Description Spent Fuel Pool and cavity drains
- 5. Is the anchorage configuration consistent with plant documentation?
YOI NI UFI N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of YN NO Ur-1 potentially adverse seismic conditions?
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Lamps well supported on rigid conduits.
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YOI NO U[-
N/A[
YZ NEI UIU N/A--
Y-- NEI UD-N/AE Y[
NEI Ur 2 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J85 of J134 ATrACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YN! NFI-UI--
Seismic Walkdown Checklist (SWC)
SWEL2-015 Equipment ID No.
pool cavity gates Equip. Class3 Other (0)
Equipment Description Spent Fuel Pool and cavity drains Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YN NEI-UMI adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Gate inspected while removed for refueling. It was hanging on the East wall of the SFP, North of the cattle chute opening.
Area walk-by is A WC-38 Evaluated by:
Date:A(,I J,ý"/ J.'-A I
"EPF VA'%~s Date~:
_3 I
3 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J86 of J 134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ N--] U--i Seismic Walkdown Checklist (SWC)
SWEL2- 015 Equipment ID No.
pool cavity gates Equip. Class4 Other (0)
Equipment Description Spent Fuel Pool and cavity drains Photographs 4 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J87 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YE NR UED Seismic Walkdown Checklist (SWC)
SWEL2- 015 Equipment ID No.
pool cavity gates Equip. Class5 Other (0)
Equipment Description Spent Fuel Pool and cavity drains Note:
Note:
5 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J88 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YE NLI-- U--
Seismic Walkdown Checklist (SWC)
SWEL2-016 Equipment ID No.
pool cavity gates Equip. Class, Other (0)
Equipment Description Spent Fuel Pool and cavity drains Location: Bldg.
RB Floor El. 117' Room, Area Refuel Floor Manufacturer, Model, Etc. (optional but recommended)
Narrow Gate, Dwc MIM112-2 Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Y[:I NO
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
Y[-] NE] U[-J N/AE YE] NEil uiJ N/AE YE-] NE-] uEr] N/AN 1 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J89 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YE NE] UE]
Seismic Walkdown Checklist (SWC)
SWEL2-016 Equipment ID No.
gool cavity gates Equip. Class2 Other (0)
Equipment Description Spent Fuel Pool and cavity drains
- 5. Is the anchorage configuration consistent with plant documentation?
Y[I NE] UE] N/A[
(Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of YZ NEi UE]
potentially adverse seismic conditions?
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Lamps well supported on rigid conduits
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Y[:] NEi UE] N/AM YO NE]I UE N/AE]
YEI NE] UE] N/AE Y[
NE] UEi 2 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J90 of J134 ATRACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ NFI] U-I Seismic Walkdown Checklist (SWC)
SWEL2-016 Equipment ID No.
pool cavity gates Equip. Class3 Other (0)
Equipment Description Spent Fuel Pool and cavity drains Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could Y[
NEI UI-adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Gate inspected while removed for refueling. It was hanging on the east wall of the SFP on the south side of the cattle chute opening.
Area walk-by is A WC-38.
Eva~uated 10it De lSM-1 fV.
kAL Date:
DAM1 4-/Z~4,1 V
3 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J91 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YO Nni-UI-Seismic Walkdown Checklist (SWC)
SWEL2-016 Equipment ID No. pool cavity -gates Equip. Class4 Other (0)
Equipment Description Spent Fuel Pool and cavity drains Photographs 4 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J92 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ Nr--] UI--
Seismic Walkdown Checklist (SWC)
SWEL2-016 Equipment ID No.
pool cavity gates Equip. Classs Other (0)
Equipment Description Spent Fuel Pool and cavity drains Note:
Note:
5 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J93 of J 134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YZ N--I U-I Seismic Walkdown Checklist (SWC)
SWELl-083 Equipment ID No.
X55 Equip. Class, Transformers (04)
Equipment Description Transformer to Y3/Y31 Location: Bldg. RW Floor El. 23 Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Refer to response to question #5.
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
Y-I NZ Y; Nn U-N/A[D YZ Nn U-- N/AD-Y] Nn UD N/A-I Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J94 of J 134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YE NFIl U[]
Seismic Walkdown Checklist (SWC)
SWELl-083 Equipment ID No.
X55 Equip. Class Transformers (04)
Equipment Description Transformer to Y3/Y31
- 5. Is the anchorage configuration consistent with plant documentation?
Yr] NE-] U-] N/AE (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Note: The transformer and its anchorage are different from what is shown in drawing E15A-8, Rev. EO. This is due to the replacement of the transformer per EC 0000016677, Rev. 0.
- 6. Based on the above anchorage evaluations, is the anchorage free of YE NEl UL-potentially adverse seismic conditions?
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
The Unistrut supporting conduits X1200 and A 3025 above X55 has two anchors with nuts that are not fully engaged. The engagement is greater than 75% in both cases, and this is judged to be adequate to develop the full strength of the anchor. Therefore, this is not considered a potential seismic interaction. See attached photo.
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Masonry wall 194.20 is seismically qualified. See Drawing C-961 SHI, Rev. El.
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YE ND UL-N/AD]
YE NI-- Ur-] N/AD-YE N[:] Uil N/A[-]
YE N[-- Uil
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J95 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YN Nn-U-Seismic Walkdown Checklist (SWC)
SWELl-083 Equipment ID No. X55 Equip. Class Transformers (04)
Equipment Description Transformer to Y3/Y31 Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YM NEI UI-adversely affect the safety functions of the equipment?
Comments.(Additional pages may be added as necessary)
SWEL 1-083 is on A WC-0 17.
Follow up internal inspection performed on 4-29-13. All internal fasteners in place and appear tight.
No loose or missing items observed. No adverse seismic interactions observed.
Evaluaed by-.:
W wj D",40) 6 t, ivW. s' Jeff Kalb
&a
(
Date:
3 bqmJi V II P
Note: This follow-up internal inspection was performed during PNPS Refueling Outage 19. An Entergy shared resource, David Grimes from Vermont Yankee, performed duties of one SWE team member. Mr. Grimes SWE credentials were verified by review of Vermont Yankee's Phase 1 submittal report VY-RPT-12-00019 Rev.0 (Asset Suite EC40647) Pages 9 and H8.
Mr. Grimes' current Entergy qualification as Seismic Walkdown Engineer was also verified via the Entergy Plateau qualification system as part of the pre-job brief for this walkdown.
EN-DC-168 REV 0
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J96 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ NF-] Ur Seismic Walkdown Checklist (SWC)
SWELl-083 Equipment ID No.
X55 Equip. Class Transformers (04)
Equipment Description Transformer to Y3/Y31 Photographs Note: Equipment tag VAULW.
t-JVCPICIII VICPVV U1 MJUIIJ111VIII
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J97 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NEI UD--
Seismic Walkdown Checklist (SWC)
SWELl-083 Equipment ID No.
X55 Equip. Class Transformers (04)
Equipment Description Transformer to Y3/Y31 Note: Nut on Unistrut that is not fully engaged.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J98 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 6 Status: YE N-i Ur--
Seismic Walkdown Checklist (SWC)
SWELl- 084 Equipment ID No.
X56 Equip. Class' Transformers (04)
Equipment Description Transformer to Y4/Y41 Location: Bldg. RW Floor El. 23 Room, Area CSR Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings, Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
YZ NO
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
YZ NI U[-I N/AR YZ N[D] U-l N/AD Y] Nil U[-] N/A--
IEnter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J99 of J 134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 6 Status: YZ NE] UE-Seismic Walkdown Checklist (SWC)
SWELl-084 Equipment ID No.
X56 Equip. Class Transformers (04)
Equipment Description Transformer to Y4/Y41
- 5. Is the anchorage configuration consistent with plant documentation?
YZ NEI UE] N/AE7 (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
The anchor configuration matches drawings E15A3 E2, E15A-8 EO, E15A-7 and the SEWs package, detail 3/3. Two additional bolts were noted for the connection of the panel to the channel. The design in calculation C15.0.3059 specifies 3/16" fillet welds, which also exists at the connection, therefore, the bolts are extra and the configuration is acceptable.
- 6. Based on the above anchorage evaluations, is the anchorage free of YZ NEI UE]
potentially adverse seismic conditions?
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
Unistrut supporting conduit was noted to be within an inch of the top of the cabinet. This is acceptable based on minimal vertical displacement of the cabinet during a seismic event. Panel is also touching the column! wall on the right side. This is acceptable, as the cabinet does not contain essential relays and is therefore not prone to chatter.
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YN NE]I UM N/AE]
YE NE] U[-E N/AE--
YN NEI UE-N/AE]
YM NEI UE]
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J100 of J134 ATrACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 6 Status: YE Nnl UrI Seismic Walkdown Checklist (SWC)
SWELl-084 Equipment ID No.
X56 Equip. Class Transformers (04)
Equipment Description Transformer to Y4/Y41 Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YE NI-] Ur-I adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
Area walk-by is AWC-018.
Follow-up internal visual inspection performed on 4/18/13. Maintenance of the transformer was in progress at the time of inspection (W0296640). Four cables were intentionally de-terminated at this time, refer to photo below.
All fasteners were in place with no signs of any being loose.
No loose or missing items were identified.
No potentially adverse seismic interactions were identified.
Q~ 1191 Evaluatedi by: QSWUaILw Date: i J
3.
JeW Kalb
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J101 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 6 Status: YE NIIJ U[I Seismic Walkdown Checklist (SWC)
SWELl-084 Equipment ID No.
X56 Equip. Class Transformers (04)
Equipment Description Transformer to Y4/Y41 Photographs
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J102 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 6 Status: YM NFI-U[-]
Seismic Walkdown Checklist (SWC)
SWELl-084 Equipment ID No.
X56 Equip. Class Transformers (04)
Equipment Description Transformer to Y4/Y41 Note: Cabinet anchorage
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J103 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 6 of 6 Status: YZ Nr--] Ur-Seismic Walkdown Checklist (SWC)
SWELl-084 Equipment ID No.
X56 Equip. Class Transformers (04)
Equipment Description Transformer to Y4/Y41
- or
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J104 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YN ND-UD-1 Seismic Walkdown Checklist (SWC)
SWELl-095 Equipment ID No.
EPA1 Equip. Class, Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Location: Bldg. RW Floor El. 23 Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
YM Ni-I
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
YE ND-U[-1 N/AD-1 Y] N[D U[-I N/AD-YE Nn Ur N/AEDI I Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J105 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ N-- UI-Seismic Walkdown Checklist (SWC)
SWELl-095 Equipment ID No.
EPA I Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly
- 5. Is the anchorage configuration consistent with plant documentation?
YZ ND] ULi N/ADl (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See SEWS package for EPA 1-6, dated 8/4/94.
- 6. Based on the above anchorage evaluations, is the anchorage free of Y[
ND-- UD-potentially adverse seismic conditions?
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
Panel D-7 is mounted above EPA I with its cover latch facing the floor, and was examined for an interaction involving the cover coming unlatched over EPA 1 during a seismic event. The cover appears to be adequately latched and the panel securely anchored, and does not present a seismic interaction concern. See attached photo.
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Masonry wall 194.20 is seismically qualified. See Drawing C-961 SHI, Rev. El.
- 9. Do attached lines have adequate flexibility to avoid damage?
There is a short, rigid conduit running between EPA 1 and EPA2, as well as a conduit running from EPA I that is in close proximity to EPA2.
Both panels and the conduit are all anchored to the same wall, so this is not judged to be a seismic interaction hazard. See SEWS package for EPA 1-6, dated 8/4/94, for further confirmation.
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Y[
ND:
UD-] N/AD--
YE ND-uD-N/AD-YE ND-- uD-N/AD-YE Nr-- Ur-
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J106 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YE Nil U-]
Seismic Walkdown Checklist (SWC)
SWELl-095 Equipment ID No.
EPA 1 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could Y[
NEI-UI-adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
SWELl-095 is on AWC-017.
Follow-up internal visual inspection of panel performed on 12/12/12:
-All internal fasteners in place and appear tight
-No adverse conditions observed A loose label for 194.502A-005-10 was found on top of EPA 1. This was reported to Operations and an ESOMS request was initiated.
~.il ~ru Evaluated bv Date:
i=/=/,
- o-kLL jV r
I j
I t 02
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J107 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YN NE-I UII-Seismic Walkdown Checklist (SWC)
SWELl-095 Equipment ID No.
EPA I Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Photographs Note: Equipment tag Note: Overall view of panel
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J108 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NF-M Ur--]
Seismic Walkdown Checklist (SWC)
SWELl-095 Equipment ID No.
EPA1 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Note: Cabinet internals
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J109 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YZ ND--
UD Seismic Walkdown Checklist (SWC)
SWELl-096 Equipment ID No.
EPA2 Equip. Class, Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Location: Bldg. RW Floor El. 23 Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
YZ N[D
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
YN ND U[i] N/Al]
Y; ND Ur-N/AD--
YM ND UD N/AD-1
' Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J 110 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ ND1 UD-]
Seismic Walkdown Checklist (SWC)
SWELl-096 Equipment ID No.
EPA2 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly
- 5. Is the anchorage configuration consistent with plant documentation?
YO ND] U[i N/AD-I (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See SEWS package for EPA 1-6, dated 8/4/94.
- 6. Based on the above anchorage evaluations, is the anchorage free of Y[
ND-] UD-potentially adverse seismic conditions?
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Masonry wall 194.20 is seismically qualified. See Drawing C-961 SHI, Rev. El.
- 9. Do attached lines have adequate flexibility to avoid damage?
There is a short, rigid conduit running between EPA 1 and EPA2, as well as a conduit running from EPA 1 that is in close proximity to EPA2.
Conduit B081 is also in close proximity to EPA2, approx. 1.5" away.
The panels and the conduits are all anchored to the same wall, so this is not judged to be a seismic interaction hazard. See SEWS package for EPA 1-6, dated 8/4/94, for further confirmation.
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YE NDI UD-N/AD--
Y[
NDI UD-N/AD-Y[
ND UD-- N/AD-YE ND UD
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J 11 of J1 34 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YE NEI ULI Seismic Walkdown Checklist (SWC)
SWELl-096 Equipment ID No.
EPA2 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YE N[:] ULI adversely affect the safety functions of the equipment?
Comments.(Additional pages may be added as necessary)
SWEL 1-096 is on A WC-017.
Follow-up internal inspection of panel performed on 12/12/12:
-All internal fasteners appear to be in place and tight.
-Small debris found in bottom comer of cabinet and removed by electrician ((1) screw, (2) nuts and metal shavings)
-No adverse conditions observed Evaluated by:
2311 ~LJ/
Date:
t
,, 4_
I2j1z1J?
I
" j
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J112 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YE NFIl ULI Seismic Walkdown Checklist (SWC)
SWELl-096 Equipment ID No.
EPA2 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Photographs Note: Equipment tag Note: Overall view of equipment
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J113 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YZ NEI U[-]
Seismic Walkdown Checklist (SWC)
SWELl-096 Equipment ID No.
EPA2 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Photographs Note: Cabinet internals Note: Cabinet internals on door
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J114 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 6 Status: YZ Nr-] UL-]
Seismic Walkdown Checklist (SWC)
SWELl-097 Equipment ID No.
EPA3 Equip. Class, Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Location: Bldg. RW Floor El. 23 Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Y[
Nr-
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
YZ NE] U[-] N/AF-YO NE] U[-- N/A YZ NEi Ui N/AD--
I Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J115 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 6 Status: YE ND-U[-
Seismic Walkdown Checklist (SWC)
SWELl-097 Equipment ID No.
EPA3 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly
- 5. Is the anchorage configuration consistent with plant documentation?
YZ N[-] Ur-- N/Ar-D (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See SEWS package for EPA 1-6, dated 8/4/94.
- 6. Based on the above anchorage evaluations, is the anchorage free of YE N[-] UD-potentially adverse seismic conditions?
A small fraction of the lower washers and anchor bolts come below the tab. The amount is insignificant, and the bolts are judged to securely anchor the panel to the wall, so this is not considered an adverse condition. See attached photo.
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Masonry wall 194.20 is seismically qualified. See Drawing C-961 SH 1, Rev. El.
- 9. Do attached lines have adequate flexibility to avoid damage?
There is a short, rigid conduit running between EPA3 and EPA4, as well as a conduit running from EPA3 that is in close proximity to EPA4.
Both panels and the conduit are all anchored to the same wall, so this is not judged to be a seismic interaction hazard. See SEWS package for EPA 1-6, dated 8/4/94, for further confirmation.
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YN ND U[D-N/AD:]
YE ND-] uD-I N/AD-YZ NDI UD-1 N/AD--
Y] NDI UDl
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J116 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 6 Status: YE NFIl UFI-Seismic Walkdown Checklist (SWC)
SWELl-097 Equipment ID No.
EPA3 Equip. Class Instrumentation and-Control Panels (20)
Equipment Description RPS Elec Protection Assembly Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YE N[-I U--
adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
SWELI-097 is on AWC-017.
Follow-up internal inspection of panel performed on 1/9/13:
-No loose or missing fasteners observed
-No other adverse conditions observed Evaluated by:
Ž),X4j
.I I
Date:
bNTv.1 /)0)13 T-C-Ff- ý,ýLB SU k&
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J117 of J134 A'TACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 6 Status: YE N I Ur-L Seismic Walkdown Checklist (SWC)
SWELl- 097 Equipment ID No.
EPA3 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Photographs Note: Equipment tag Note: Overall view of panel
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J118 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 6 Status: YN ND UFIu Seismic Walkdown Checklist (SWC)
SWELl-097 Equipment ID No.
EPA3 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Note: Typical anchor bolt on bottom of panel.
num. lyplucll allullut UUil U11 1UP Ui Pallut.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J119 of J134 ATrACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 6 of 6 Status: YE ND-- Ur-]
Seismic Walkdown Checklist (SWC)
SWELl-097 Equipment ID No.
EPA3 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Note: Cabinet intemals Note: Cabinet intemals
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J120 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet I of 5 Status: YE NF UD Seismic Walkdown Checklist (SWC)
SWELl-098 Equipment ID No.
EPA4 Equip. Class, Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Location: Bldg. RW Floor El. 23 Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Y[
NrI-
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
YZ NEI
[--] N/AE]
Y[
NR UDl N/AD-YZ N-- UI-N/AD I Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J121 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YE Nn U-Seismic Walkdown Checklist (SWC)
SWELl-098 Equipment ID No.
EPA4 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly
- 5. Is the anchorage configuration consistent with plant documentation?
YO NiD UrI N/AFD (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
See SEWS package for EPA 1-6, dated 8/4/94.
- 6. Based on the above anchorage evaluations, is the anchorage free of YE NEI UI--
potentially adverse seismic conditions?
A small fraction of the lower washers and anchor bolts come below the tab. The amount is insignificant, and the bolts are judged to securely anchor the panel to the wall, so this is not considered an adverse condition. See attached photo.
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Masonry wall 194.20 is seismically qualified. See Drawing C-961 SHI, Rev. El.
- 9. Do attached lines have adequate flexibility to avoid damage?
There is a short, rigid conduit running between EPA3 and EPA4, as well as a conduit running from EPA3 that is in close proximity to EPA4.
Both panels and the conduit are all anchored to the same wall, so this is not judged to be a seismic interaction hazard. See SEWS package for EPA 1-6, dated 8/4/94, for further confirmation.
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Y[
ND-- U[I N/AD-YE NEI U-- N/Ai-Y[
ND-] UD-N/AD Y[
NDI U[--
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J122 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ NFIl UI--]
Seismic Walkdown Checklist (SWC)
SWELl-098 Equipment ID No.
EPA4 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could Y] NEIl UF adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
SWELI-098 is on AWC-017.
Follow-up internal inspection performed on 1/9/13:
-Observed one missing screw on upper left comer of circuit board at back of panel. Circuit board has very low weight/mass and was adequately supported by the remaining 5 screws. Not a seismic interaction hazard. Screw was replaced by ELAB mechanic that provided access to the panel.
-No other loose or missing fasteners or adverse conditions observed.
Evaluated by: Dayj 0,) )-rI Date:
Sf r-r- kIii LK ia LIA-t>W
~AF k!*Lr~
Ar~
1/10/13
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J123 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ NFI-UFi Seismic Walkdown Checklist (SWC)
SWELl-098 Equipment ID No.
EPA4 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Photographs Note: Equipment tag Note: Overall view of panel showing anchorage
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J124 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YE ND-- UF]
Seismic Walkdown Checklist (SWC)
SWELl-098 Equipment ID No.
EPA4 Equip. Class Instrumentation and Control Panels (20)
Eauibment Description RPS Elec Protection Assembil Note: Typical anchor bolt on bottom of panel.
Note: Cabinet internals
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J125 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YN ND-- UI--
Seismic Walkdown Checklist (SWC)
SWELl-099 Equipment ID No.
EPA5 Equip. Class, Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Location: Bldg. RW Floor El. 23 Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Due to location on the wall, only two of four anchors are visible, therefore, this component was not chosen for 50% anchorage verification.
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
Two of four anchors are visible.
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Two of four anchors are visible.
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
Two of four anchors are visible.
Y[-] NE YE ND-UD-1 N/AD-YE N[D] U[] N/ADý YE N[l lD-- N/AD-1 Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J126 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: Y[
NEI UF--
Seismic Walkdown Checklist (SWC)
SWELl- 099 Equipment ID No.
EPA5 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly
- 5. Is the anchorage configuration consistent with plant documentation?
Yrll N[-] UrI N/AN (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Refer to response to question # 1.
- 6. Based on the above anchorage evaluations, is the anchorage free of YM NEI UI potentially adverse seismic conditions?
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Masonry wall 194.20 is seismically qualified. See Drawing C-961 SHI, Rev. El.
- 9. Do attached lines have adequate flexibility to avoid damage?
There is a short, rigid conduit running between EPA5 and EPA6. Both panels are anchored to the same wall, so this is not judged to be a seismic interaction hazard. See SEWS package for EPA 1-6, dated 8/4/94, for further confirmation.
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YE* Nil ur-] N/A[-I YE ND urEI N/AD YE NEI Ur1 N/A[-
YE NDI U[I N/
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J127 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YE NF] U-Seismic Walkdown Checklist (SWC)
SWELl-099 Equipment ID No.
EPA5 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could Y
NEil UiF adversely affect the safety functions of the equipment?
Comments.(Additional pages may be added as necessary)
SWELl-099 is on AWC-017.
Follow-up internal inspection performed on 4/2/13:
-All fasteners in place and appear tight
-No loose items observed in panel
-No debris in bottom of panel Evaluated by:
JA JJ Date:
t
/
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J128 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YE Nr-] UL-Seismic Walkdown Checklist (SWC)
SWELl-099 Equipment ID No.
EPA5 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Photographs Note: Equipment tag Note: EPA5 is on the right
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J129 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YM NF] U-I Seismic Walkdown Checklist (SWC)
SWELl-099 Equipment ID No.
EPA5 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Photographs Note: Cabinet internals Note: Cabinet intemals on door
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J130 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 1 of 5 Status: YZ ND I U--
Seismic Walkdown Checklist (SWC)
SWELl-100 Equipment ID No.
EPA6 Equip. Class, Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Location: Bldg. RW Floor El. 23 Room, Area MG SET Manufacturer, Model, Etc. (optional but recommended)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
- 1. Is the anchorage configuration verification required (i.e., is the item one of the 50% of SWEL items requiring such verification)?
Due to location on the wall, only two of four anchors are visible, therefore, this component was not chosen for 50% anchorage verification.
- 2. Is the anchorage free of bent, broken, missing or loose hardware?
Two of four anchors are visible.
- 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Two of four anchors are visible.
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?
There is a surface crack (<1/16') near the bottom left anchor that is judged to be insignificant.
Y-NE YO NEI] UI'-
N/AD-YE NDI ULI N/AD YN ND-- U-- N/AD--
' Enter the equipment class name from Appendix B: Classes of Equipment.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J131 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 2 of 5 Status: YZ NF-U-Seismic Walkdown Checklist (SWC)
SWELl-100 Equipment ID No.
EPA6 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly
- 5. Is the anchorage configuration consistent with plant documentation?
YE] NEI Ui-N/AZ (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Refer to response to question #1.
- 6. Based on the above anchorage evaluations, is the anchorage free of Y[
NE] UE]
potentially adverse seismic conditions?
Interaction Effects
- 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Masonry wall 194.20 is seismically qualified. See Drawing C-961 SHI, Rev. El.
- 9. Do attached lines have adequate flexibility to avoid damage?
There is a short, rigid conduit running between EPA5 and EPA6. Both panels are anchored to the same wall, so this is not judged to be a seismic interaction hazard. See SEWS package for EPA 1-6, dated 8/4/94, for further confirmation.
- 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
YM NE] UE] N/AD-YE NEI UE] N/AE]
YN NEI U[] N/A[-]
Y[
NEI UF--
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J132 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 3 of 5 Status: YZ N[R UR]
Seismic Walkdown Checklist (SWC)
SWELl-100 Equipment ID No.
EPA6 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Other Adverse Conditions
- 11. Have you looked for and found no other seismic conditions that could YN N[] U-I adversely affect the safety functions of the equipment?
Comments (Additional pages may be added as necessary)
SWELl-100 is on AWC-017.
Follow up internal inspection performed on 4/2/13:
-All fasteners in place and appear tight
-No potential adverse seismic interactions observed
-One small screw and two small washers found in the bottom of the panel. They did not appear to have fallen off, most likely left over from previous maintenance. These items were removed by electrical maintenance escort.
Evaluated by: D6aVu)',n
,,L) L Date:
L -j- -13
-aF VLRQk&t
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J133 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 4 of 5 Status: YZ NEil Ui--
Seismic Walkdown Checklist (SWC)
SWELl-100 Equipment ID No.
EPA6 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Photographs Note: Equipment tag Note: EPA6 is on the /eft.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment J Page J134 of J134 ATTACHMENT 9.6 SEISMIC WALKDOWN CHECKLIST FORM Sheet 5 of 5 Status: YE NF U[-
Seismic Walkdown Checklist (SWC)
SWELl-100 Equipment ID No.
EPA6 Equip. Class Instrumentation and Control Panels (20)
Equipment Description RPS Elec Protection Assembly Photographs Note: Cabinet internals Note:
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K1 of K27 Attachment K Form 9.7: Deferred Area Walk-By Checklists (AWCs)
~1 Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K2 of K27 ATrACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet I of 5 Status: YZ NI Ui-]
Area Walk-By Checklist (AWC)
AWC- 033 Location: Bldg. RB Floor El. 74' Room, Area, General Area North SWEL Components: SWEL2-11, SWEL2-12 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
- 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
Y[
NDI Ur-] N/AD1 YO NEI U[:] N/AD-Y[
N[-] UD1 N/AD--
I If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K3 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 5 Status: YO NR-UL-Area Walk-By Checklist (AWC)
AWC- 033 Location: Bldg. RB Floor El. 74' Room, Area General Area North
- 4. Does it appear that the area is free of potentially adverse seismic YE Ni[] U-- N/A--
spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
Fluorescent light fixture overhead east of HO-1 72 and 173 support chains offset by conduit. Conduit is well supported between the two chains. Load to conduit is small and acceptable. Conduit R931 to 19-FS-4806 (FS is non-safety related per Q-list and Asset Suite) fuel pool gate leak detector.
- 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Numerous items located east of hoistway but all have wheels locked/
chocked or adequate standoff distance from equipment YE NF-U-I N/AD YE ND] Ur-N/AFD YE NFI Ur-N/AD-
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K4 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 5 Status: YE NF] uF]
Area Walk-By Checklist (AWC)
AWC- 033 Location: Bldg. RB Floor El. 74 Room, Area General Area North
- 8. Have you looked for and found no other seismic conditions that could YE NE] U--
adversely affect the safety functions of the equipment in the area?
Radiation shielding above and west of HO-173 appears well attached and well labeled, acceptable.
Comments (Additional pages may be added as necessary)
Some minor cracking observed in joints of masonry wall at southwest comer of hoistway approximately 12'-14' up, on the east face of the wall. CR-PNP-2013-1204 initiated, but this was determined by the SWE team to not represent an adverse seismic condition based on the location and limited extent of cracking.
Evaluated by:
Date: 2/27/12 ter e
_2_z_7/_1
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K5 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 4 of 5 Status: Y9 NF Ur-Area Walk-By Checklist (AWC)
AWC- 033 Location: Bldg. RB Floor El. 74 Room, Area General Area North SWEL Components: SWEL2-11, SWEL2-12 Photographs Note: Cracking, CR initiated, refer to comments above Note: Overall view of area
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K6 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 5 of 5 Status: YE N-- Ui-Area Walk-By Checklist (AWC)
AWC- 033 Location: Bldg. RB Floor El. 74 Room, Area General Area North SWEL Components: SWEL2-11. SWEL2-12 Note:
Note: Fluorescent light chain offset by conduit, acceptable, see #4 above.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K7 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet I of 5 Status: YZ NR U-Area Walk-By Checklist (AWC)
AWC- 034 Location: Bldg. RB Floor El. 74' Room, Areal SFPHx SWEL Components: SWEL2-03. 04. 05. 06. 07. 08. 13 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
- 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
Y[
N[l UEiD N/AD--
Y[
NDl U[-I N/A[:]
YE NDI u[-] N/AD--
' If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K8 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 5 Status: Y[* ND-UD-Area Walk-By Checklist (AWC)
AWC- 034 Location: Bldg. RB Floor El. 74' Room, Area SFPHx
- 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
- 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
Fire protection line all socket welded and well supported.
1" copper drain water line on south wall well supported.
YE ND-] Ur-- N/A[-
YZ NEI UD-N/AD-
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
YN NDI UD1 N/AD-Y[
NDJ UD N/ADl
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K9 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 5 Status: YZ NiL ULI--
Area Walk-By Checklist (AWC)
AWC- 034 Location: Bldg. RB Floor El. 74 Room, Area SFPHx
- 8. Have you looked for and found no other seismic conditions that could YZ NEI Ur-adversely affect the safety functions of the equipment in the area?
Comments (Additional pages may be added as necessary)
-CR-PNP-2013-1195 initiated for loose nut on hanger P210A discharge. Bolt is in place, nut is 75%
engaged. This condition was determined by SWE team to not represent an adverse seismic interaction/concern.
-Jam nut on a pipe clamp below 19-HO-186 is approximately 50% engagement but tight, the clamp is not connected to anything (see photo below)
-Rolling portable stair near 19-HO-165 is free to roll but not near safety related equipment and has a relatively low weight!mass, therefore acceptable.
-Conduit R1072 pull fitting cover only one bolt hanging open. There are no wires in the conduit, therefore conduit is secure and acceptable with one bolt.
-Panel A-10 has only one screw holding the cover on, but is acceptable (see photo below)
-CR-PNP-2013-1201 initiated for rod hanger for 1" copper demin. line detached at clamp at top of rod, above! north of 19-HO-166. The next support is approximately 3' downstream, 7' upstream. This condition was determined by SWE team to not represent an adverse seismic interaction/concern.
-CR-PNP-2013-1205 initiated for 1" copper instrument air line sagging approximately 6" near valve 31-HO-255 in overhead above mesh entry door to room. This condition was determined by SWE team to not represent an adverse seismic interaction/concern. (see photos below)
Evaluated by: __
_Date:
,Zj-.
DAIL, "
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K10 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 4 of 5 Status: YE NLi--
ULI---
Area Walk-By Checklist (AWC)
AWC- 034 Location: Bldg. RB Floor El. 74 Room, Area SFPHx SWEL Components: SWEL2-03. 04. 05. 06. 07. 08. 13 Photographs Note: uverall area Note: CR initiated for clamp
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page Kll of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 5 of 5 Status: YE NRI-UD-7 Area Walk-By Checklist (AWC)
AWC- 034 Location: Bldg. RB Floor El. 74 Room, Area SFPHx SWEL Components: SWEL2-03, 04, 05, 06, 07, 08, 13 Note: A-IC panel with one bolt holding cover Note: Airline sagging
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K12 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet I of 3 Status: YZ NF U[-I Area Walk-By Checklist (AWC)
AWC- 035 Location: Bldg. RB Floor El. 23' Room, Area, Main Steam Tunnel SWEL Components: SWEL1-001. 002, 003, 004 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
- 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
YZ ND U-N/AD Y[
ND U[
N/A[D]
YZ ND ulI N/AD I If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K13 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 3 Status: YZ NF ULII Area Walk-By Checklist (AWC)
AWC- 035 Location: Bldg. RB Floor El. 23 Room, Area Main Steam Tunnel
- 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
- 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
Fire protection line all socket welded and well supported. 1" copper drain water line on south wall well supported.
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
- 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
YN N[I UE] N/AE]
YN NEI Ur-N/AD-YZ NDI U-- N/AD-YN NED U[-I N/AD-
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K14 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 3 Status: YE N[-] URII Area Walk-By Checklist (AWC)
AWC- 035 Location: Bldg. RB Floor El. 23 Room, Area Main Steam Tunnel
- 8. Have you looked for and found no other seismic conditions that could Y[
NEI U[-]
adversely affect the safety functions of the equipment in the area?
Comments (Additional pages may be added as necessary)
-Multiple scaffolds in place for RF019 work: 13-117,13-121, 13-129,13-137, 13-156, all appropriately labeled and green tagged.
-Insulation intentionally removed for FW check valve work-laid down on scaffold and on floor. It will be reinstalled during RFO, therefore acceptable.
-No adverse conditions were found during the area walk-by, therefore no pictures are attached to this form. Refer to SWEL 1-001, -002, -003, -004 for pictures of SWEL items, if needed.
Evaluated by: NI
& )
)
xL..4 Date:
f 9 S)(F V
4L L
bwyU -lq
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K15 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet I of 5 Status: YZ NF Ur-I Area Walk-By Checklist (AWC)
AWC- 036 Location: Bldg. RB Floor El. 23' Room, Area, Drywell SWEL Components: SWEL2-009, 010, 014 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
Refer to comments on sheet 3
- 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
YE NE-] Ul--
N/AL]
YE NE-] uE] N/Ar-YE NE] ur] N/AF-I If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K16 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 5 Status: YE N[j-Ur Area Walk-By Checklist (AWC)
AWC- 036 Location: Bldg. RB Floor El. 23 Room, Area Drywell
- 4. Does it aooear that the area is free of notentiallv adverse seismic YrI NFl urF-N/AFl spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
No ceiling in this area. Lights are well supported by rigid conduits.
- 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
In general, all equipment in Drywell is qualified for seismic loading.
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
Note that Drywell is inert during power operations.
- 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Significant maintenance activities in progress at time of walkdown.
Drywell closeout procedure walkdown will ensure that all items are removed or secured prior to start up.
Y[
N-- U-- N/AD-YZ NDI ulD N/AD-Y[
NDI UDl N/AD-
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K17 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 5 Status: YE NEI-UF-]
Area Walk-By Checklist (AWC)
AWC- 036 Location: Bldg. RB Floor El. 23 Room, Area Drywell
- 8. Have you looked for and found no other seismic conditions that could Y[
NEi U--
adversely affect the safety functions of the equipment in the area?
Comments (Additional pages may be added as necessary)
Time spent performing walk-by of south side of Drywell 23' was minimized due to very high dose rates at the time.
Evaluated by: Daytj S
I
(§3,9 LII Date:
I'2!3-h 3 7t --V a a L14-71 Im..
'3113 V___t ___ -
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K18 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 4 of 5 Status: YE NI-Ur--
Area Walk-By Checklist (AWC)
AWC- 036 Location: Bldg. RB Floor El. 23 Room, Area Drywell SWEL Components: SWEL2-009, 010, 014 Photographs Note: Scao Note:
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K19 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 5 of 5 Status: Y[E NEI ULI Area Walk-By Checklist (AWC)
AWC- 036 Location: Bldg. RB Floor El. 23 Room, Area Drywell SWEL Components: SWEL2-009, 010, 014 Note:
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K20 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 1 of 4 Status: YE NnI U[-
Area Walk-By Checklist (AWC)
AWC- 037 Location: Bldg. RB Floor El. 41 Room, Area, Drywell SWEL Components: SWELl -023, 034 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
All equipment in this area is anchored to the structure by welds to Drywell liner plate or Bioshield wall plate.
- 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
YZ N[-] ul-N/A[--
YZ NEI UEI N/A[--
Y[
NEI ui--
N/A[-I
' If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K21 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 4 Status: YZ NI-- UI-Area Walk-By Checklist (AWC)
AWC- 037 Location: Bldg. RB Floor El. 41 Room, Area Drywell
- 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
No ceiling in this area. Lights are well supported by rigid conduits.
- 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
In general, all equipment in Drywell is qualified for seismic loading.
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
Note that Drywell is inert during power operations.
- 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Significant maintenance activities in progress at time of walkdown.
Drywell closeout inspection will ensure that all items are removed or secured prior to start up.
YN NEI U[:] N/AEZ YN NEI UEZ N/AD--
YE NDI U[-
N/AD-YN NDI Ur-N/AD-I
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K22 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 4 Status: YE! N--
U-]
Area Walk-By Checklist (AWC)
AWC- 037 Location: Bldg. RB Floor El. 41 Room, Area Drywell
- 8. Have you looked for and found no other seismic conditions that could YE Nni Ur-]
adversely affect the safety functions of the equipment in the area?
Concrete shielding blocks were identified in the NIB Nozzle penetration of the Bioshield wall with no restraint steel in place.
CR-PNP-2013-3008 was initiated for this condition. It was determined that these blocks should have been removed per plant design change in previous outage. WO 349326 to remove blocks scheduled for 516/13 prior to restart. As of May 2 8th, this activity has been completed as confirmed by site personnel.
Comments (Additional pages may be added as necessary)
Evaluated by:
)L vý&
/
)
h Date:
I Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K23 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 4 of 4 Status: YE NI1 U--
Area Walk-By Checklist (AWC)
AWC- 037 Location: Bldg. RB Floor El. 41 Room, Area Drywell SWEL Components: SWELl -023, 034 Photouraohs Note: Concrete shielding blocks Note:
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K24 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet I of 4 Status: YZ NEI U[-
Area Walk-By Checklist (AWC)
AWC- 038 Location: Bldg. RB Floor El. 117 Room, Areal Refuel Floor SWEL Components: SWEL2-015. 016 Instructions for Completing Checklist This checklist may be used to document the results of the Area Walk-By near one or more SWEL items. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.
- 1. Does anchorage of equipment in the area appear to be free of potentially adverse seismic conditions (if visible without necessarily opening cabinets)?
- 2. Does anchorage of equipment in the area appear to be free of significant degraded conditions?
- 3. Based on a visual inspection from the floor, do the cable/conduit raceways and HVAC ducting appear to be free of potentially adverse seismic conditions (e.g., condition of supports is adequate and fill conditions of cable trays appear to be inside acceptable limits)?
Y[J NDI U--
N/AD-YE NDI UE N/AD YO NDI u[-] N/AD-
' If the room in which the SWEL item is located is very large (e.g., Turbine Hall), the area selected should be described. This selected area should be based on judgment, e.g., on the order of about 35 feet from the SWEL item.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K25 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 2 of 4 Status: YE NI I U--
Area Walk-By Checklist (AWC)
AWC- 038 Location: Bldg. RB Floor El. 117 Room, Area Refuel Floor
- 4. Does it appear that the area is free of potentially adverse seismic spatial interactions with other equipment in the area (e.g., ceiling tiles and lighting)?
No ceiling in this area. Lights are well supported by rigid conduits.
- 5. Does it appear that the area is free of potentially adverse seismic interactions that could cause flooding or spray in the area?
Fire Protection piping well supported and socket welded joints.
- 6. Does it appear that the area is free of potentially adverse seismic interactions that could cause a fire in the area?
None observed. Note that gates are underwater during plant operations and refueling.
- 7. Does it appear that the area is free of potentially adverse seismic interactions associated with housekeeping practices, storage of portable equipment, and temporary installations (e.g., scaffolding, lead shielding)?
Much equipment and material staged in the area due to ongoing refueling activities.
The general area surrounding the SFP is classified as a 'safe location' per PNPS Seismic Interaction Hazard Procedure 1.17. 1.
YE NEI U[-] N/AD YZ NDI U[--
N/AD YZ NDl U-- N/AD--
YO ND U[
N/AD
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K26 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 3 of 4 Status: YZ NiF U-II Area Walk-By Checklist (AWC)
AWC- 038 Location: Bldg. RB Floor El. 117 Room, Area Refuel Floor
- 8. Have you looked for and found no other seismic conditions that could YZ NEI] U]
adversely affect the safety functions of the equipment in the area?
The SFP inlet line siphon breakers were specifically viewed and photographed as part of this walk-by. They were found to be in place with no obvious seismic interaction concerns.
Comments.(Additional pages may be added as necessary)
Area included in this walkby was South, West and North sides of spent fuel pool (West of Rx Cavity).
Evaluaed bY -
oJ Date;
,-S~f¶ Pf-~.
Engineering Report No. PNPS-CS-12-00001, Rev. 1 Attachment K Page K27 of K27 ATTACHMENT 9.7 AREA WALK-BY CHECKLIST Sheet 4 of 4 Status: YE NI] U-]
Area Walk-By Checklist (AWC)
AWC- 038 Location: Bldg. RB Floor El. 117 Room, Area Refuel Floor SWEL Components: SWEL2-015. 016 PhotoaraDhs I
Note: