IR 05000156/2013201: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (4 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 08/27/2013 | | issue date = 08/27/2013 | ||
| title = IR 05000156-13-201 on August 5-8, 2013 at the University of Wisconsin - NRC Routine Inspection Report | | title = IR 05000156-13-201 on August 5-8, 2013 at the University of Wisconsin - NRC Routine Inspection Report | ||
| author name = Bowman G | | author name = Bowman G | ||
| author affiliation = NRC/NRR/DPR/PRAB | | author affiliation = NRC/NRR/DPR/PRAB | ||
| addressee name = Agasie R | | addressee name = Agasie R | ||
| addressee affiliation = Univ of Wisconsin - Madison | | addressee affiliation = Univ of Wisconsin - Madison | ||
| docket = 05000156 | | docket = 05000156 | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter | {{#Wiki_filter:August 27, 2013 | ||
==SUBJECT:== | |||
UNIVERSITY OF WISCONSIN - NRC ROUTINE INSPECTION REPORT NO. 50-156/2013-201 | |||
SUBJECT: UNIVERSITY OF WISCONSIN - NRC ROUTINE INSPECTION REPORT NO. 50-156/2013-201 | |||
==Dear Mr. Agasie:== | ==Dear Mr. Agasie:== | ||
| Line 29: | Line 27: | ||
completed an inspection at your University of Wisconsin Nuclear Reactor Laboratory. The enclosed report documents the inspection results, which were discussed on August 8, 2013, with you and members of your staff. | completed an inspection at your University of Wisconsin Nuclear Reactor Laboratory. The enclosed report documents the inspection results, which were discussed on August 8, 2013, with you and members of your staff. | ||
This inspection examined activities conducted under your license as they relate to safety and compliance with the | This inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license. | ||
The inspector observed various activities in progress, interviewed personnel, and reviewed selected procedures and representative records. | The inspector observed various activities in progress, interviewed personnel, and reviewed selected procedures and representative records. | ||
| Line 35: | Line 33: | ||
Based on the results of this inspection, the NRC has determined that one Severity Level IV violation of NRC requirements has occurred. This violation is being treated as a Non-Cited Violation (NCV), consistent with Section 2.3.2.b of the Enforcement Policy. The NCV is described in the subject inspection report. If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with copies to the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001. | Based on the results of this inspection, the NRC has determined that one Severity Level IV violation of NRC requirements has occurred. This violation is being treated as a Non-Cited Violation (NCV), consistent with Section 2.3.2.b of the Enforcement Policy. The NCV is described in the subject inspection report. If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with copies to the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001. | ||
In accordance with Title 10 of the Code of Federal Regulations, Section 2.390, | In accordance with Title 10 of the Code of Federal Regulations, Section 2.390, Public inspections, exemptions, and requests for withholding, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (Agencywide Documents Access and Management System (ADAMS)). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
R. Should you have any questions concerning this inspection, please contact Craig Bassett at (301) 466-4495 or by electronic mail at Craig.Bassett@nrc.gov. | R. Should you have any questions concerning this inspection, please contact Craig Bassett at (301) 466-4495 or by electronic mail at Craig.Bassett@nrc.gov. | ||
Sincerely, | Sincerely, | ||
/RA/ (Patrick Isaac Acting for) | /RA/ (Patrick Isaac Acting for) | ||
Gregory T. Bowman, Chief Research and Test Reactors Oversight Branch | |||
Gregory T. Bowman, Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation | |||
Docket No.: 50-156 License No.: R-74 | |||
Enclosure: | Enclosure: | ||
NRC Inspection Report No. 50-156/2013-201 | |||
cc: Please see next page | |||
}} | }} | ||
Latest revision as of 05:58, 11 January 2025
| ML13232A255 | |
| Person / Time | |
|---|---|
| Site: | University of Wisconsin |
| Issue date: | 08/27/2013 |
| From: | Gregory Bowman NRC/NRR/DPR/PRAB |
| To: | Agasie R Univ of Wisconsin - Madison |
| Bassett C | |
| References | |
| IR-13-201 | |
| Download: ML13232A255 (22) | |
Text
August 27, 2013
SUBJECT:
UNIVERSITY OF WISCONSIN - NRC ROUTINE INSPECTION REPORT NO. 50-156/2013-201
Dear Mr. Agasie:
From August 5 - 8, 2013, the U.S. Nuclear Regulatory Commission (NRC, the Commission)
completed an inspection at your University of Wisconsin Nuclear Reactor Laboratory. The enclosed report documents the inspection results, which were discussed on August 8, 2013, with you and members of your staff.
This inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspector observed various activities in progress, interviewed personnel, and reviewed selected procedures and representative records.
Based on the results of this inspection, the NRC has determined that one Severity Level IV violation of NRC requirements has occurred. This violation is being treated as a Non-Cited Violation (NCV), consistent with Section 2.3.2.b of the Enforcement Policy. The NCV is described in the subject inspection report. If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with copies to the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001.
In accordance with Title 10 of the Code of Federal Regulations, Section 2.390, Public inspections, exemptions, and requests for withholding, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (Agencywide Documents Access and Management System (ADAMS)). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
R. Should you have any questions concerning this inspection, please contact Craig Bassett at (301) 466-4495 or by electronic mail at Craig.Bassett@nrc.gov.
Sincerely,
/RA/ (Patrick Isaac Acting for)
Gregory T. Bowman, Chief Research and Test Reactors Oversight Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation
Docket No.: 50-156 License No.: R-74
Enclosure:
NRC Inspection Report No. 50-156/2013-201