IR 05000263/2013503: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (10 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 08/28/2013 | | issue date = 08/28/2013 | ||
| title = IR 05000263-13-503; on 07/22/2013 - 07/26/2013; Monticello Nuclear Generating Plant; Baseline Emergency Preparedness Biennial Exercise Inspection | | title = IR 05000263-13-503; on 07/22/2013 - 07/26/2013; Monticello Nuclear Generating Plant; Baseline Emergency Preparedness Biennial Exercise Inspection | ||
| author name = Skokowski R | | author name = Skokowski R | ||
| author affiliation = NRC/RGN-III/DRS/PSB | | author affiliation = NRC/RGN-III/DRS/PSB | ||
| addressee name = Fili K | | addressee name = Fili K | ||
| addressee affiliation = Northern States Power Co | | addressee affiliation = Northern States Power Co | ||
| docket = 05000263 | | docket = 05000263 | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter | {{#Wiki_filter:August 28, 2013 | ||
==SUBJECT:== | |||
MONTICELLO NUCLEAR GENERATING PLANT BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000263/2013503 | |||
==Dear Ms. Fili:== | |||
On July 26, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Monticello Nuclear Generating Plant. The enclosed report documents the results of this inspection, which were discussed on July 26, 2013, with Mr. K. Jepson and other members of your staff. | |||
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license. | |||
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. No findings were identified during this inspection. | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its Enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) | |||
component of NRC's Agencywide Documents Access and Management System (ADAMS), | |||
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | |||
Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-263 License No. DPR-22 | |||
===Enclosure:=== | ===Enclosure:=== | ||
Inspection Report 05000263/2013503; | Inspection Report 05000263/2013503; w/Attachment: Supplemental Information | ||
REGION III== | |||
Docket No: | |||
50-263 License No: | |||
DPR-22 Report No: | |||
0500263/2013503 Licensee: | |||
Northern States Power Company, Minnesota Facility: | |||
Monticello Nuclear Generating Plant Location: | |||
Monticello, MN Dates: | |||
July 22 through 26, 2013 Inspectors: | |||
R. Jickling, Senior Emergency Preparedness Inspector | |||
J. Beavers, Emergency Preparedness Inspector | |||
P. Voss, Resident Inspector Approved by: | |||
R. Skokowski, Chief Plant Support Branch Division of Reactor Safety | |||
Enclosure | |||
=SUMMARY OF FINDINGS= | =SUMMARY OF FINDINGS= | ||
IR 05000263/2013503; 07/22/2013 - 07/26/2013; Monticello Nuclear Generating Plant; Baseline Emergency Preparedness Biennial Exercise Inspection. | IR 05000263/2013503; 07/22/2013 - 07/26/2013; Monticello Nuclear Generating Plant; | ||
Baseline Emergency Preparedness Biennial Exercise Inspection. | |||
NUREG-1649, | This report covers a one-week period of announced baseline inspection by two regional inspectors and one resident inspector. The significance of most findings is indicated by their color (Green, White, Yellow, Red) using Inspection Manual Chapter 0609, Significance Determination Process (SDP). Findings for which the SDP does not apply may be Green or be assigned a severity level after NRC management review. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 4, dated December 2006. | ||
=== | ===NRC-Identified=== | ||
and Self-Revealed Findings | and Self-Revealed Findings | ||
===Cornerstone: Emergency Preparedness No findings were identified. | ===Cornerstone: Emergency Preparedness=== | ||
No findings were identified. | |||
=== | ===Licensee-Identified Violations=== | ||
No violations were identified. | No violations were identified. | ||
| Line 52: | Line 79: | ||
==REACTOR SAFETY== | ==REACTOR SAFETY== | ||
===Cornerstone: Emergency Preparedness=== | |||
{{a|1EP1}} | |||
==1EP1 Exercise Evaluation== | ==1EP1 Exercise Evaluation== | ||
{{IP sample|IP=IP 71114.01}} | {{IP sample|IP=IP 71114.01}} | ||
===.1 Exercise Evaluation=== | ===.1 Exercise Evaluation=== | ||
====a. Inspection Scope==== | |||
The inspectors reviewed the July 23, 2013, Biennial Emergency Preparedness Exercise objectives and scenario to ensure the exercise would acceptably test major elements of the licensees emergency plan and to verify that the exercises simulated problems provided an acceptable framework to support demonstration of the licensees capability to implement its plan. The inspectors also reviewed records of other drills and exercises conducted in 2011, 2012, and 2013, to verify that those drills scenarios were sufficiently different from the scenario used in the July 23, 2013, exercise. | |||
The inspectors evaluated the licensees exercise performance, focusing on the risk-significant activities of emergency classification, notification, and protective action decision making, implementation of accident mitigation strategies, and correction of past exercise weaknesses in the following emergency response facilities: | |||
The inspectors | * Control Room Simulator (CRS); | ||
* Technical Support Center (TSC); and | |||
* Emergency Operations Facility (EOF) | |||
The inspectors also assessed the licensees recognition of abnormal plant conditions, transfer of responsibilities between facilities, internal communications, interfaces with offsite officials, readiness of emergency facilities and related equipment, and overall implementation of the licensees emergency plan. | |||
The inspectors | The inspectors attended post-exercise critiques in the CRS, TSC, and EOF to evaluate the licensees initial self-assessment of its exercise performance. The inspectors later met with the licensees lead exercise evaluators and managers to obtain the licensees findings and assessments of its exercise participants performances. | ||
These self-assessments were then compared with the inspectors independent observations and assessments to assess the licensees ability to adequately critique its exercise performance. Documents reviewed are listed in the Attachment to this report. | |||
This exercise evaluation inspection constituted one sample as defined in Inspection Procedure (IP) 71114.01-06. | This exercise evaluation inspection constituted one sample as defined in Inspection Procedure (IP) 71114.01-06. | ||
====b. Findings==== | ====b. Findings==== | ||
No findings were identified. | No findings were identified. {{a|1EP8}} | ||
==1EP8 Exercise Evaluation - Scenario Review== | ==1EP8 Exercise Evaluation - Scenario Review== | ||
{{IP sample|IP=IP 71114.08}} | {{IP sample|IP=IP 71114.08}} | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
Prior to the inspection activity, the inspectors conducted an in-office review of the exercise objectives and scenario submitted to the NRC using IP 71114.08, | Prior to the inspection activity, the inspectors conducted an in-office review of the exercise objectives and scenario submitted to the NRC using IP 71114.08, Exercise Evaluation - Scenario Review, to determine if the exercise would test major elements of the Emergency Plan, as required by 10 CFR 50.47(b)(14). This inspection activity represents one sample on a biennial cycle. | ||
The inspectors reviewed various documents, which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis. | |||
This review of the exercise objectives and scenario constituted one sample as defined in IP 71114.08-06. | |||
====b. Findings==== | ====b. Findings==== | ||
| Line 84: | Line 118: | ||
==OTHER ACTIVITIES== | ==OTHER ACTIVITIES== | ||
===Cornerstone: Emergency Preparedness=== | |||
{{a|4OA1}} | |||
==4OA1 Performance Indicator Verification== | ==4OA1 Performance Indicator Verification== | ||
{{IP sample|IP=IP 71151}} | {{IP sample|IP=IP 71151}} | ||
===.1 Drill/Exercise Performance=== | ===.1 Drill/Exercise Performance=== | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
The inspectors sampled licensee submittals for the Drill/Exercise Performance Indicator (PI) for the period from the second quarter 2012 through the first quarter 2013. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the Nuclear Energy Institute (NEI) Document 99-02, | The inspectors sampled licensee submittals for the Drill/Exercise Performance Indicator (PI) for the period from the second quarter 2012 through the first quarter 2013. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the Nuclear Energy Institute (NEI) Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, was used. The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI, assessments of PI opportunities during pre-designated control room simulator training sessions, and performance during other drills. Documents reviewed are listed in the Attachment to this report. | ||
This inspection constituted one Drill/Exercise Performance (DEP) sample as defined in IP 71151-05. | This inspection constituted one Drill/Exercise Performance (DEP) sample as defined in IP 71151-05. | ||
| Line 99: | Line 132: | ||
====b. Findings==== | ====b. Findings==== | ||
No findings were identified. | No findings were identified. | ||
===.2 Emergency Response Organization Drill Participation=== | ===.2 Emergency Response Organization Drill Participation=== | ||
====a. Inspection Scope==== | |||
The inspectors sampled licensee submittals for the Emergency Response Organization (ERO) Drill Participation PI for the period from the second quarter 2012 through the first quarter 2013. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, was used. | |||
The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI, performance during the 2012 and 2013 drills, and revisions of the roster of personnel assigned to key ERO positions. Documents reviewed are listed in the Attachment to this report. | |||
This inspection constituted one ERO Drill Participation sample as defined in IP 71151-05. | This inspection constituted one ERO Drill Participation sample as defined in IP 71151-05. | ||
| Line 113: | Line 145: | ||
===.3 Alert and Notification System=== | ===.3 Alert and Notification System=== | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
The inspectors sampled licensee submittals for the Alert and Notification System (ANS) PI for the period from the second quarter 2012 through the first quarter 2013. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, | The inspectors sampled licensee submittals for the Alert and Notification System (ANS) | ||
PI for the period from the second quarter 2012 through the first quarter 2013. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, was used. The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI Guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI and results of periodic scheduled ANS operability tests. Documents reviewed are listed in the Attachment to this report. | |||
This inspection constituted one ANS sample as defined in IP 71151-05. | This inspection constituted one ANS sample as defined in IP 71151-05. | ||
| Line 121: | Line 153: | ||
====b. Findings==== | ====b. Findings==== | ||
No findings were identified. | No findings were identified. | ||
{{a|4OA6}} | {{a|4OA6}} | ||
==4OA6 Management Meetings== | ==4OA6 Management Meetings== | ||
===.1=== | |||
===Exit Meeting Summary=== | |||
On July 26, 2013, the inspectors presented the biennial exercise inspection results to Mr. K. Jepson and other members of the licensee staff. The licensee acknowledged the issues presented. | |||
The inspectors confirmed that none of the potential report input discussed was considered proprietary. | |||
===.2 Public and Media Briefing=== | |||
On July 26, 2013, the inspector summarized the NRC's preliminary exercise inspection conclusions at a public and media briefing hosted by the Department of Homeland Security and the Federal Emergency Management Agency Region V Field Office staff at the Wright County Government Center in Buffalo, Minnesota. | |||
ATTACHMENT: | |||
=SUPPLEMENTAL INFORMATION= | =SUPPLEMENTAL INFORMATION= | ||
| Line 145: | Line 181: | ||
: [[contact::N. Knapp]], Emergency Preparedness Coordinator | : [[contact::N. Knapp]], Emergency Preparedness Coordinator | ||
: [[contact::L. Narikawa]], Emergency Preparedness Coordinator | : [[contact::L. Narikawa]], Emergency Preparedness Coordinator | ||
: [[contact::S. | : [[contact::S. OConnor]], Regulatory Affairs Analyst | ||
: [[contact::K. Petersen]], Chemistry Manager | : [[contact::K. Petersen]], Chemistry Manager | ||
: [[contact::T. Shortell]], Training Manager | : [[contact::T. Shortell]], Training Manager | ||
| Line 151: | Line 187: | ||
: [[contact::K. Thomas]], Emergency Preparedness Coordinator | : [[contact::K. Thomas]], Emergency Preparedness Coordinator | ||
: [[contact::K. VanGrinsven]], Emergency Preparedness Coordinator | : [[contact::K. VanGrinsven]], Emergency Preparedness Coordinator | ||
: [[contact::E. Weinkam]], Nuclear Emergency Preparedness Director Nuclear Regulatory Commission | : [[contact::E. Weinkam]], Nuclear Emergency Preparedness Director | ||
Nuclear Regulatory Commission | |||
: [[contact::P. Voss]], Resident Inspector | : [[contact::P. Voss]], Resident Inspector | ||
: [[contact::M. Ziolkowski]], Reactor Engineer | : [[contact::M. Ziolkowski]], Reactor Engineer | ||
==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED== | ==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED== | ||
===Opened, Closed, and Discussed=== | ===Opened, Closed, and Discussed=== | ||
None | None | ||
==LIST OF DOCUMENTS REVIEWED== | ==LIST OF DOCUMENTS REVIEWED== | ||
}} | }} | ||
Latest revision as of 05:51, 11 January 2025
| ML13240A353 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 08/28/2013 |
| From: | Richard Skokowski Plant Support Branch II |
| To: | Fili K Northern States Power Co |
| Rick Skokowski | |
| References | |
| IR-13-503 | |
| Download: ML13240A353 (13) | |
Text
August 28, 2013
SUBJECT:
MONTICELLO NUCLEAR GENERATING PLANT BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000263/2013503
Dear Ms. Fili:
On July 26, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Monticello Nuclear Generating Plant. The enclosed report documents the results of this inspection, which were discussed on July 26, 2013, with Mr. K. Jepson and other members of your staff.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. No findings were identified during this inspection.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its Enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS)
component of NRC's Agencywide Documents Access and Management System (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-263 License No. DPR-22
Enclosure:
Inspection Report 05000263/2013503; w/Attachment: Supplemental Information
REGION III==
Docket No:
50-263 License No:
DPR-22 Report No:
0500263/2013503 Licensee:
Northern States Power Company, Minnesota Facility:
Monticello Nuclear Generating Plant Location:
Monticello, MN Dates:
July 22 through 26, 2013 Inspectors:
R. Jickling, Senior Emergency Preparedness Inspector
J. Beavers, Emergency Preparedness Inspector
P. Voss, Resident Inspector Approved by:
R. Skokowski, Chief Plant Support Branch Division of Reactor Safety
Enclosure
SUMMARY OF FINDINGS
IR 05000263/2013503; 07/22/2013 - 07/26/2013; Monticello Nuclear Generating Plant;
Baseline Emergency Preparedness Biennial Exercise Inspection.
This report covers a one-week period of announced baseline inspection by two regional inspectors and one resident inspector. The significance of most findings is indicated by their color (Green, White, Yellow, Red) using Inspection Manual Chapter 0609, Significance Determination Process (SDP). Findings for which the SDP does not apply may be Green or be assigned a severity level after NRC management review. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 4, dated December 2006.
NRC-Identified
and Self-Revealed Findings
Cornerstone: Emergency Preparedness
No findings were identified.
Licensee-Identified Violations
No violations were identified.
REPORT DETAILS
REACTOR SAFETY
Cornerstone: Emergency Preparedness
1EP1 Exercise Evaluation
.1 Exercise Evaluation
a. Inspection Scope
The inspectors reviewed the July 23, 2013, Biennial Emergency Preparedness Exercise objectives and scenario to ensure the exercise would acceptably test major elements of the licensees emergency plan and to verify that the exercises simulated problems provided an acceptable framework to support demonstration of the licensees capability to implement its plan. The inspectors also reviewed records of other drills and exercises conducted in 2011, 2012, and 2013, to verify that those drills scenarios were sufficiently different from the scenario used in the July 23, 2013, exercise.
The inspectors evaluated the licensees exercise performance, focusing on the risk-significant activities of emergency classification, notification, and protective action decision making, implementation of accident mitigation strategies, and correction of past exercise weaknesses in the following emergency response facilities:
- Control Room Simulator (CRS);
- Technical Support Center (TSC); and
The inspectors also assessed the licensees recognition of abnormal plant conditions, transfer of responsibilities between facilities, internal communications, interfaces with offsite officials, readiness of emergency facilities and related equipment, and overall implementation of the licensees emergency plan.
The inspectors attended post-exercise critiques in the CRS, TSC, and EOF to evaluate the licensees initial self-assessment of its exercise performance. The inspectors later met with the licensees lead exercise evaluators and managers to obtain the licensees findings and assessments of its exercise participants performances.
These self-assessments were then compared with the inspectors independent observations and assessments to assess the licensees ability to adequately critique its exercise performance. Documents reviewed are listed in the Attachment to this report.
This exercise evaluation inspection constituted one sample as defined in Inspection Procedure (IP) 71114.01-06.
b. Findings
No findings were identified.
1EP8 Exercise Evaluation - Scenario Review
a. Inspection Scope
Prior to the inspection activity, the inspectors conducted an in-office review of the exercise objectives and scenario submitted to the NRC using IP 71114.08, Exercise Evaluation - Scenario Review, to determine if the exercise would test major elements of the Emergency Plan, as required by 10 CFR 50.47(b)(14). This inspection activity represents one sample on a biennial cycle.
The inspectors reviewed various documents, which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis.
This review of the exercise objectives and scenario constituted one sample as defined in IP 71114.08-06.
b. Findings
No findings were identified.
OTHER ACTIVITIES
Cornerstone: Emergency Preparedness
4OA1 Performance Indicator Verification
.1 Drill/Exercise Performance
a. Inspection Scope
The inspectors sampled licensee submittals for the Drill/Exercise Performance Indicator (PI) for the period from the second quarter 2012 through the first quarter 2013. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the Nuclear Energy Institute (NEI) Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, was used. The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI, assessments of PI opportunities during pre-designated control room simulator training sessions, and performance during other drills. Documents reviewed are listed in the Attachment to this report.
This inspection constituted one Drill/Exercise Performance (DEP) sample as defined in IP 71151-05.
b. Findings
No findings were identified.
.2 Emergency Response Organization Drill Participation
a. Inspection Scope
The inspectors sampled licensee submittals for the Emergency Response Organization (ERO) Drill Participation PI for the period from the second quarter 2012 through the first quarter 2013. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, was used.
The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI, performance during the 2012 and 2013 drills, and revisions of the roster of personnel assigned to key ERO positions. Documents reviewed are listed in the Attachment to this report.
This inspection constituted one ERO Drill Participation sample as defined in IP 71151-05.
b. Findings
No findings were identified.
.3 Alert and Notification System
a. Inspection Scope
The inspectors sampled licensee submittals for the Alert and Notification System (ANS)
PI for the period from the second quarter 2012 through the first quarter 2013. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, was used. The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI Guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI and results of periodic scheduled ANS operability tests. Documents reviewed are listed in the Attachment to this report.
This inspection constituted one ANS sample as defined in IP 71151-05.
b. Findings
No findings were identified.
4OA6 Management Meetings
.1
Exit Meeting Summary
On July 26, 2013, the inspectors presented the biennial exercise inspection results to Mr. K. Jepson and other members of the licensee staff. The licensee acknowledged the issues presented.
The inspectors confirmed that none of the potential report input discussed was considered proprietary.
.2 Public and Media Briefing
On July 26, 2013, the inspector summarized the NRC's preliminary exercise inspection conclusions at a public and media briefing hosted by the Department of Homeland Security and the Federal Emergency Management Agency Region V Field Office staff at the Wright County Government Center in Buffalo, Minnesota.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- K. Jepson, Acting Site Vice President
- L. Anderson, Emergency Preparedness Manager
- D. Bosnic, Production Manger
- J. Callahan, Corporate Emergency Preparedness Manager
- D. Crofoot, Nuclear Oversight Supervisor
- K. Hougen, Emergency Preparedness Coordinator
- M. Kelly, Performance Assessment Manager
- P. Kissinger, Regulatory Affairs Manager
- N. Knapp, Emergency Preparedness Coordinator
- L. Narikawa, Emergency Preparedness Coordinator
- S. OConnor, Regulatory Affairs Analyst
- K. Petersen, Chemistry Manager
- T. Shortell, Training Manager
- J. Sternisha, Fleet General Manager
- K. Thomas, Emergency Preparedness Coordinator
- K. VanGrinsven, Emergency Preparedness Coordinator
- E. Weinkam, Nuclear Emergency Preparedness Director
Nuclear Regulatory Commission
- P. Voss, Resident Inspector
- M. Ziolkowski, Reactor Engineer
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Opened, Closed, and Discussed
None