IR 05000298/2013406: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (3 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 09/03/2013 | | issue date = 09/03/2013 | ||
| title = IR 05000298-13-406, on 08/08/2013, Cooper Nuclear Station - NRC Material Control and Accounting Program Inspection Report | | title = IR 05000298-13-406, on 08/08/2013, Cooper Nuclear Station - NRC Material Control and Accounting Program Inspection Report | ||
| author name = Drake J | | author name = Drake J | ||
| author affiliation = NRC/RGN-IV/DRS | | author affiliation = NRC/RGN-IV/DRS | ||
| addressee name = Limpias O | | addressee name = Limpias O | ||
| addressee affiliation = Nebraska Public Power District (NPPD) | | addressee affiliation = Nebraska Public Power District (NPPD) | ||
| docket = 05000298 | | docket = 05000298 | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:September 3, 2013 | ||
==SUBJECT:== | |||
COOPER NUCLEAR STATION - NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000298/2013406 | |||
SUBJECT: COOPER NUCLEAR STATION - NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000298/2013406 | |||
==Dear Mr. Limpias:== | ==Dear Mr. Limpias:== | ||
On August 8, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at Cooper Nuclear Station. The inspection covered a key attribute of the Security Cornerstone of the | On August 8, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at Cooper Nuclear Station. The inspection covered a key attribute of the Security Cornerstone of the NRCs Reactor Oversight Process, Material Control and Accounting of Special Nuclear Material. The enclosed inspection report documents the inspection results, which were discussed on August 8, 2013, with Mr. D. Buman, Director, Engineering, and other members of your staff. | ||
The inspection examined activities conducted under your license as they relate to security and compliance with the | The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license. | ||
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | ||
| Line 37: | Line 32: | ||
Based on the results of this inspection, no findings were identified. | Based on the results of this inspection, no findings were identified. | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRCs document system, (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. | ||
UNITED STATES NUCLEAR REGULATORY COMMISSION RE G IO N I V 1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011-4511 In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1). | |||
Sincerely, | Sincerely, | ||
/RA/ James F. Drake, Chief Plant Support Branch 2 Division of Reactor Safety | /RA/ | ||
James F. Drake, Chief | |||
Plant Support Branch 2 | |||
Division of Reactor Safety | |||
Docket Nos: 50-298 License Nos: DPR-46 | Docket Nos: 50-298 License Nos: DPR-46 | ||
| Line 51: | Line 52: | ||
cc w/o enclosure: Electronic Distribution for Cooper Nuclear Station | cc w/o enclosure: Electronic Distribution for Cooper Nuclear Station | ||
ML13249A564 Letter with Enclosure ADAMS No Yes SUNSI Review Complete Reviewer Initials: JFD Category A.3 Non-publicly Available Sensitive KEYWORD: MD3.4 Sensitive - Security-Related - Periodic Review Required Letter Only ADAMS No Yes SUNSI Review Complete Reviewer Initials: JFD Publicly Available Non-sensitive KEYWORD: SUNSI Review Complete PSB2 PSB2 C:PSB2 C:DRP/C C:PSB2 JODonnell LRicketson JDrake J Quichocho JDrake /RA/ /RA/ /RA/ /RA/ /RA/ 8/14/13 8/14/13 8/15/13 8/21/13 9/3/13 | ML13249A564 Letter with Enclosure ADAMS No Yes SUNSI Review Complete Reviewer Initials: JFD Category A.3 Non-publicly Available Sensitive KEYWORD: MD3.4 Sensitive - Security-Related - Periodic Review Required Letter Only ADAMS No Yes SUNSI Review Complete Reviewer Initials: JFD | ||
Publicly Available Non-sensitive KEYWORD: SUNSI Review Complete | |||
PSB2 PSB2 C:PSB2 C:DRP/C C:PSB2 JODonnell LRicketson JDrake J Quichocho JDrake | |||
/RA/ | |||
/RA/ | |||
/RA/ | |||
/RA/ | |||
/RA/ | |||
8/14/13 8/14/13 8/15/13 8/21/13 9/3/13 | |||
}} | }} | ||
Latest revision as of 05:44, 11 January 2025
| ML13249A587 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 09/03/2013 |
| From: | James Drake Division of Reactor Safety IV |
| To: | Limpias O Nebraska Public Power District (NPPD) |
| References | |
| IR-13-406 | |
| Download: ML13249A587 (3) | |
Text
September 3, 2013
SUBJECT:
COOPER NUCLEAR STATION - NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000298/2013406
Dear Mr. Limpias:
On August 8, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at Cooper Nuclear Station. The inspection covered a key attribute of the Security Cornerstone of the NRCs Reactor Oversight Process, Material Control and Accounting of Special Nuclear Material. The enclosed inspection report documents the inspection results, which were discussed on August 8, 2013, with Mr. D. Buman, Director, Engineering, and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, no findings were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of the NRCs document system, (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
UNITED STATES NUCLEAR REGULATORY COMMISSION RE G IO N I V 1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011-4511 In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
/RA/
James F. Drake, Chief
Plant Support Branch 2
Division of Reactor Safety
Docket Nos: 50-298 License Nos: DPR-46
Nonpublic Enclosure:
NRC Inspection Report 05000298/2013406 w/Attachment: Supplemental Information
cc w/o enclosure: Electronic Distribution for Cooper Nuclear Station
ML13249A564 Letter with Enclosure ADAMS No Yes SUNSI Review Complete Reviewer Initials: JFD Category A.3 Non-publicly Available Sensitive KEYWORD: MD3.4 Sensitive - Security-Related - Periodic Review Required Letter Only ADAMS No Yes SUNSI Review Complete Reviewer Initials: JFD
Publicly Available Non-sensitive KEYWORD: SUNSI Review Complete
PSB2 PSB2 C:PSB2 C:DRP/C C:PSB2 JODonnell LRicketson JDrake J Quichocho JDrake
/RA/
/RA/
/RA/
/RA/
/RA/
8/14/13 8/14/13 8/15/13 8/21/13 9/3/13